Underground continuous wall structure with high vertical bearing capacity and construction method thereof
By setting up grouting anchors and steel pipe piles in the underground continuous wall structure, the compressive and pull-up bearing capacity are improved, and the problems of complex pile foundation construction and poor waterproofing effect in deep foundation pit construction are solved, and the construction period and Reduced cost and enhanced shear resistance.
Patent Information
- Application Number
- CN202010199507.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-20
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-03-20
AI Technical Summary
In the construction of foundation pits over 10m deep, the underground continuous wall needs to bear the pressure of the structure's self-weight, soil covering and groundwater. The existing technology resists vertical pressure and water buoyancy by setting up engineering piles, but the construction is complex, the construction period is long, the cost is high and the waterproof effect is waterproof. Poor, and in the 'two walls in one' design, shear reinforcement needs to be installed to bear shear force.
Adopt an underground continuous wall structure with high vertical bearing capacity, including a continuous wall main body, a lining wall and a bottom plate. By setting a rectangular array of grouting anchors outside the continuous wall main body, grouting steel pipe piles are used to fix it with the continuous wall main body. Connect and install foam extruded plates in the steel cage to form grouting anchors and steel pipe piles to improve compression and pull-up bearing capacity and avoid installation of engineering piles.
The compressive and pull-up bearing capacity of the underground continuous wall is improved, the construction period and cost are reduced, and the shear resistance is enhanced in the "two walls in one" design, avoiding the need to set up engineering piles below the structural base plate.
Smart Images

Figure CN111270682B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit enclosure and underground structure construction, and in particular to an underground continuous wall structure with high vertical bearing capacity and a construction method thereof. Background Art
[0002] When constructing a deep foundation pit exceeding 10m, an underground continuous wall is generally used as the foundation pit retaining structure. When the underground continuous wall also serves as the outer wall of the main structure, during the use phase, the underground continuous wall needs to bear the downward pressure of the main structure, such as the self-weight of the structure, the covering soil, and the traffic, and the upward buoyancy of the groundwater.
[0003] Generally, in similar situations, the main treatment method is to set engineering piles below the structural raft foundation to resist vertical pressure and water buoyancy through the side friction and end resistance of the pile foundation.
[0004] However, the pile heads need to extend into the structural base plate, and the related waterproof structure is very complicated, the construction is difficult, the construction period is long, the cost is high, and the waterproof and anti-seepage effects are poor.
[0005] In addition, when the underground structure adopts a design method that combines an underground continuous wall and an inner lining wall, that is, a "two walls in one" composite wall structure, shear reinforcement is required between the inner lining wall and the underground continuous wall to bear the shear force between the inner lining wall and the underground continuous wall.
[0006] Therefore, how to improve the compressive and tensile bearing capacity of the underground continuous wall to avoid setting engineering piles below the structural bottom plate has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0007] In view of the above-mentioned defects of the prior art, the present invention provides an underground continuous wall structure with high vertical bearing capacity and a construction method thereof, the purpose of which is to improve the compressive and tensile bearing capacity of the underground continuous wall to avoid setting engineering piles below the structural bottom plate, shorten the construction period and reduce the construction cost.
[0008] To achieve the above-mentioned purpose, the present invention discloses an underground continuous wall structure with high vertical bearing capacity, comprising a continuous wall body, an inner lining wall and a bottom plate.
[0009] Wherein, a plurality of grouting anchor bodies are arranged in the soil outside the main body of the continuous wall;
[0010] A plurality of the grouting anchor bodies are arranged in a rectangular array along the horizontal and vertical directions on the outer side of the continuous wall body;
[0011] Each of the grouting anchor bodies is fixedly connected to the continuous wall body through at least two grouting steel pipe piles;
[0012] Each of the grouting steel pipe piles comprises a steel grouting pipe and slurry filled in the steel grouting pipe;
[0013] The two or more grouting steel pipe piles corresponding to each grouting anchor body are arranged crosswise with each other, and each intersection point of the cross arrangement is located inside the corresponding grouting anchor body.
[0014] Preferably, one end of each of the steel grouting pipes is located inside the continuous wall body, and the middle portion and the other end are located outside the continuous wall body, in the corresponding grouting anchor body;
[0015] Each of the steel grouting pipes is provided with a plurality of grouting holes in the portion located in the corresponding grouting anchor body.
[0016] Preferably, each of the steel grouting pipes is fixedly connected to the steel cage of the continuous wall body.
[0017] More preferably, each of the steel grouting pipes is fixed to the steel cage of the continuous wall body by riveting, bolting or welding.
[0018] The present invention also provides a construction method of an underground continuous wall structure with high vertical bearing capacity, the steps of which are as follows:
[0019] Step 1: measurement and setting out, guide wall production, trench excavation;
[0020] Step 2, making the steel cage of the continuous wall body, and tying and setting the foam extruded board in the steel cage at the position corresponding to each grouting steel pipe pile according to the design;
[0021] Step 3, hanging the steel cage and pouring concrete to form the continuous wall body;
[0022] Step 4: after the main body of the continuous wall reaches the strength requirement, excavate the foundation pit to the height corresponding to the foam extruded board closest to the ground;
[0023] Step 5, chiseling away all the foam extruded boards at the current height of the foundation pit, and then inserting the steel grouting pipes one by one according to the designed angles, and grouting to form the corresponding grouting anchor bodies and the corresponding grouting steel pipe piles;
[0024] Step 6: After the grouting anchor bodies and the corresponding grouting steel pipe piles have reached the strength requirements, repeat steps 4 to 5 until all the grouting anchor bodies and the grouting steel pipe piles are completed; excavate the foundation pit to the bottom of the pit;
[0025] Step 7: construct the lining wall and the base plate.
[0026] Beneficial effects of the present invention:
[0027] The application of the present invention improves the compressive and tensile bearing capacity of the underground continuous wall, so as to avoid setting engineering piles below the structural bottom plate, shorten the construction period and reduce the construction cost; in the "two walls in one" composite wall design scheme, the grouting conduit can also serve as shear reinforcement to increase the shear resistance of the lining wall and the ground-connected wall.
[0028] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 A schematic structural diagram of an embodiment of the present invention is shown.
[0030] Figure 2 A schematic structural diagram of a continuous wall body in an embodiment of the present invention is shown.
[0031] Figure 3 A schematic structural diagram of a steel cage in one embodiment of the present invention is shown.
[0032] Figure 4 A schematic structural diagram of a steel grouting pipe in one embodiment of the present invention is shown.
[0033] Figure 5 A schematic diagram showing the construction status when the foundation pit is excavated to the highest foam extruded board in one embodiment of the present invention.
[0034] Figure 6 A schematic diagram showing the construction status when the grouting anchor bodies and grouting steel pipe piles at the highest point of the foundation pit are completed in one embodiment of the present invention.
[0035] Figure 7 A schematic diagram showing the construction status when the grouting anchor bodies and grouting steel pipe piles at the bottom of the foundation pit are completed in one embodiment of the present invention. DETAILED DESCRIPTION
[0036] Example
[0037] like Figures 1 to 3 As shown, the underground continuous wall structure with high vertical bearing capacity includes a continuous wall body 1, an inner lining wall 8 and a bottom plate 9.
[0038] Among them, a number of grouting anchor bodies 2 are arranged in the soil outside the continuous wall body 1;
[0039] A plurality of grouting anchor bodies 2 are arranged in a rectangular array along the horizontal and vertical directions on the outer side of the continuous wall body 1;
[0040] Each grouting anchor body 2 is fixedly connected to the continuous wall body 1 through at least two grouting steel pipe piles 3;
[0041] Each grouting steel pipe pile 3 includes a steel grouting pipe 4 and slurry filled in the steel grouting pipe 4;
[0042] The two or more grouting steel pipe piles 3 corresponding to each grouting anchor body 2 are arranged crosswise with each other, and each intersection point of the cross arrangement is located inside the corresponding grouting anchor body 2 .
[0043] The principle of the present invention is that a foam extruded board 7 is arranged in the steel cage 6 of the continuous wall body 1. After the concrete pouring of the continuous wall body 1 is completed, when the foundation pit is excavated, the foam extruded board 7 is chiseled out and a steel grouting pipe 4 is inserted, and cement slurry, cement mortar or other cementitious materials are injected into the steel grouting pipe 4 to form a solid grouting anchor body 2 and a grouting steel pipe pile 3 in the surrounding area of the steel grouting pipe 4, thereby improving the bearing capacity and filling the gap between the steel grouting pipe 4 and the continuous wall body 1 to achieve a water-stopping effect.
[0044] The two or more grouting steel pipe piles 3 corresponding to each grouting anchor body 2 are cross-arranged to form a structure similar to "tree roots" for the continuous wall body 1, which can further enhance the vertical bearing capacity of the continuous wall body 1.
[0045] In certain embodiments, such as Figure 1 and Figure 4 As shown, one end of each steel grouting pipe 4 is located inside the continuous wall body 1, and the middle part and the other end are located outside the continuous wall body 1, inside the corresponding grouting anchor body 2;
[0046] Each steel grouting pipe 4 is provided with a plurality of grouting holes 5 in the portion located in the corresponding grouting anchor body 2.
[0047] In some embodiments, each steel grouting pipe 4 is fixedly connected to the steel cage 6 of the continuous wall body 1 .
[0048] In some embodiments, each steel grouting pipe 4 is fixed to the steel cage 6 of the continuous wall body 1 by riveting, bolting or welding.
[0049] like Figure 1 and Figures 5 to 7 As shown, the present invention also provides a construction method for an underground continuous wall structure with high vertical bearing capacity, the steps are as follows:
[0050] Step 1: measurement and setting out, guide wall production, trench excavation;
[0051] This step is a traditional step in underground continuous wall construction, and those skilled in the art can understand the relevant meaning. You can refer to "Underground Engineering Construction Technology" edited by Ren Jianxi, published by Northwestern Polytechnical University Press and other related textbooks.
[0052] Step 2, making a steel cage 6 of the continuous wall body 1, and tying and setting a foam extruded board 7 at the position corresponding to each grouting steel pipe pile 3 in the steel cage 6 according to the design;
[0053] Step 3: Hang the steel cage 6 and pour concrete to form the continuous wall body 1;
[0054] Step 4: After the continuous wall body 1 reaches the strength requirement, excavate the foundation pit to the height corresponding to the foam extruded board 7 closest to the ground;
[0055] Step 5, chiseling away all the foam extruded boards 7 at the current height of the foundation pit, and then inserting the steel grouting pipes 4 one by one according to the designed angle, and grouting to form the corresponding grouting anchor bodies 2 and the corresponding grouting steel pipe piles 3;
[0056] Step 6: After the grouting anchor bodies 2 and the corresponding grouting steel pipe piles 3 have reached the strength requirements, repeat steps 4 to 5 until all the grouting anchor bodies 2 and grouting steel pipe piles 3 are completed; excavate the foundation pit to the bottom of the pit;
[0057] Step 7: construct the lining wall 8 and the base plate 9.
[0058] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. An underground continuous wall structure with high vertical bearing capacity, comprising a continuous wall body (1), an inner lining wall (8) and a bottom plate (9); characterized in that: A plurality of grouting anchor bodies (2) are provided in the soil outside the continuous wall body (1); A plurality of the grouting anchor bodies (2) are arranged in a rectangular array along the horizontal and vertical directions on the outer side of the continuous wall body (1); Each of the grouting anchor bodies (2) is fixedly connected to the continuous wall body (1) via at least two grouting steel pipe piles (3); Each of the grouting steel pipe piles (3) comprises a steel grouting pipe (4) and slurry filled in the steel grouting pipe (4); The two or more grouting steel pipe piles (3) corresponding to each grouting anchor body (2) are arranged crosswise with each other, and each intersection point of the cross arrangement is located inside the corresponding grouting anchor body (2).
2. The underground continuous wall structure with high vertical bearing capacity according to claim 1 is characterized in that: One end of each of the steel grouting pipes (4) is located on the inner side of the continuous wall body (1), and the middle part and the other end are located on the outer side of the continuous wall body (1), and inside the corresponding grouting anchor body (2); The portion of each steel grouting pipe (4) located inside the corresponding grouting anchor body (2) is provided with a plurality of grouting holes (5).
3. The underground continuous wall structure with high vertical bearing capacity according to claim 1 is characterized in that: Each of the steel grouting pipes (4) is fixedly connected to the steel cage (6) of the continuous wall body (1).
4. The underground continuous wall structure with high vertical bearing capacity according to claim 3 is characterized in that: Each of the steel grouting pipes (4) is fixed to the steel cage (6) of the continuous wall body (1) by riveting, bolting or welding.
5. The construction method of the underground continuous wall structure with high vertical bearing capacity according to claim 1, comprising the following steps: Step 1: measurement and setting out, guide wall production, trench excavation; Step 2, manufacturing a steel cage (6) of the continuous wall body (1), and tying and arranging a foam extruded board (7) at a position corresponding to each of the grouting steel pipe piles (3) in the steel cage (6) according to the design; Step 3, hanging the steel cage (6) and pouring concrete to form the continuous wall body (1); Step 4: after the continuous wall body (1) reaches the strength requirement, excavate the foundation pit to the height corresponding to the foam extruded board (7) closest to the ground; Step 5, chiseling away all the foam extruded boards (7) at the current height of the foundation pit, then inserting the steel grouting pipes (4) one by one according to the designed angle, and grouting to form the corresponding grouting anchor bodies (2) and the corresponding grouting steel pipe piles (3); Step 6: After the grouting anchor bodies (2) and the corresponding grouting steel pipe piles (3) have reached the strength requirements, repeat steps 4 to 5 until all the grouting anchor bodies (2) and the grouting steel pipe piles (3) are completed; excavate the foundation pit to the bottom of the pit; Step 7: construct the inner lining wall (8) and the base plate (9).