A special geological pile foundation construction equipment and construction method

The problem of traditional low construction efficiency is solved by hammering drilling rigs and homemade drills in the whole rock backfill geology and the use of prefabricated piles, achieving efficient and stable pile foundation construction, simplifying the process flow and reducing construction costs.

CN111764388BActive Publication Date: 2024-11-15CHINA THIRD METALLURGICAL GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010698877.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-20
Publication Date
2024-11-15
Estimated Expiration
2040-07-20

AI Technical Summary

Technical Problem

Traditional whole rock backfill geological pile foundation construction has problems such as low pore formation efficiency, long construction time and extended construction period, especially in rock backfill geological environments with large structural strength, high density and low porosity.

Method used

The hammer drilling rig is used to match homemade drill bits and prefabricated piles. The rock is broken by hammering the drill bit and the drilling is protected by using a casing to quickly complete the pile hole construction and hammer the prefabricated piles into the drilling hole, simplifying the on-site filling steps.

Benefits of technology

It improves construction efficiency, shortens construction time, ensures stability of hole wall forming, reduces on-site construction time and costs, and meets the construction period needs of special geological pile foundations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111764388B_ABST
    Figure CN111764388B_ABST
Patent Text Reader

Abstract

A special geological pile foundation construction equipment and construction method, including a homemade drill bit, a hammer head, a hammer bracket, and an operating platform, characterized in that the homemade drill bit and the hammer head are connected together through interference fit between the homemade drill bit's connecting ring plate, the connecting clamp plate and the hammer connecting head of the hammer head; the hammer head and the homemade drill bit are lifted up by tightening the pull rope on the balance rod, and guided by the slide groove on the hammer head and the slideway of the hammer bracket; the other section of the pull rope is connected to the operating panel on the operating platform, and the operating panel controls the operating instructions of tightening, lifting, and releasing the wire. The beneficial effects of the present invention: successfully overcome the unfavorable construction characteristics of the all-rock backfill geological structure with high strength, high density, low porosity, and high compaction coefficient, the hole-making effect is good, a large amount of on-site construction time is saved, construction costs are reduced, and the needs of the construction period can be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of piling and pouring, and in particular to special geological pile foundation construction equipment and a construction method. Background Art

[0002] Drilling pile holes are widely used in my country in high-rise buildings, subway stations, urban overpasses, bridge and dam foundations, and their hole-making technology and equipment are constantly developing and improving. However, the construction technology of pile holes in certain special geological conditions still has certain difficulties. Among them, the construction of all-rock backfill geological pile foundations is a difficult issue in pile hole construction.

[0003] Full rock backfill refers to the use of large rocks to fill the foundation of landslides and reclamation in a certain area. The filling materials are as follows: the first layer is backfilled with large rocks, with particle sizes ranging from 200mm to 1000mm, and some even larger stones. The backfill thickness is 5m to 10m; the second layer is the original clay layer, the thickness is not penetrated. This kind of geology has high structural strength, high density, low porosity, and high compaction coefficient, which poses a huge challenge to pile hole construction.

[0004] Traditional full rock backfill geological pile foundation construction mostly uses impact drills to drill holes, and then uses clay or other special materials to trim the drilled holes. After trimming, the holes are cast into pile holes. This production and construction method has average effects and a slow construction speed. Each pile requires more than 12 hours of construction time just for the backfill rock layer. The hole-making efficiency is low, and on-site pouring and curing are required, which prolongs the construction period and seriously affects the construction progress of the project. Summary of the invention

[0005] The present invention provides a special geological pile foundation construction equipment and construction method, in order to solve the technical problems that cannot be solved by the traditional all-rock backfilling ground special geological pile foundation construction. The present invention uses a hammer drill with a homemade drill bit to break the large rocks on the rock backfilling ground, and uses the hammer force of the hammer drill to press the drill bit into the ground, and a casing is provided underneath to protect the stability of the borehole wall. After the drilling rig is completed, the hammer drill is used to construct the prefabricated pile into a pile and put it into the borehole. The present invention has high construction efficiency, short construction time, stable hole wall forming, and the prefabricated pile is a finished product, which saves the time required for on-site pouring and curing, shortens the construction progress, and ensures the construction period of the special geological pile foundation.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A special geological pile foundation construction equipment, including a homemade drill bit, a hammer head, a hammer bracket, and an operating platform, characterized in that the homemade drill bit includes a bullet head drill bit, a gravel guide groove, a casing, a protective plate, a guide rod, a lower support plate, a connecting ring plate, and a connecting card plate. The bullet head drill bit, the gravel guide groove, the casing and the guide rod are welded in sequence, the protective plates are evenly distributed on the upper part of the straight tube and welded firmly, the connecting ring plate is welded on the guide rod, and the lower support plate and the connecting card plate are evenly welded on the upper and lower sides of the connecting ring plate; the hammer head includes a hammer connector, an energy transfer rod, a hammer power head, a connecting rod and a slide groove, the hammer connector, the energy transfer rod and the hammer power head are welded in sequence, and the connecting rod is welded between the slide groove and the hammer power head; the hammer bracket includes a bracket base, a bracket frame, a balance rod, a slideway, a pull rope, a main support Rod, auxiliary support rod, matching support rod, the bracket base and the bracket frame are firmly welded, the balance rod is welded to the top of the bracket frame, there is a pull rope on the balance rod, one end of the pull rope is connected to the operating panel of the operating platform, and the other end is connected to the hammer power head. The bracket frame supports the hammer bracket upright above the ground through the main support rod, auxiliary support rod and matching support rod; the operating platform includes an operating panel, an operating table and legs, and the homemade drill bit and the hammer head are connected together through the interference fit of the connecting ring plate of the homemade drill bit, the connecting card plate and the hammer connecting head of the hammer head; the hammer head and the homemade drill bit are tightened and lifted by the pull rope on the balance rod, and are guided by the slide groove on the hammer head and the slideway of the hammer bracket; the other end of the pull rope is connected to the operating panel on the operating platform, and the operating panel controls the operating instructions of tightening, lifting and releasing.

[0008] The construction method of a special geological pile foundation construction method of the present invention is as follows:

[0009] The first step is to map the entire rock backfill ground according to the civil engineering design requirements and mark the locations where pile drilling is required. After the mapping is completed, the hammer drill is brought in and placed at the locations where pile drilling is required. The operating platform, hammer bracket, hammer head and self-made drill bit are installed at the locations where hammer drilling is required. A steel casing is placed outside the self-made drill bit and on top of the casing.

[0010] In the second step, the hammer power head provides a downward hammering force, which is transmitted to the bullet-shaped drill bit on the top of the homemade drill bit through the energy transfer rod and the hammer connector. The bullet-shaped drill bit is shaped like a sharpened bullet, and its tip is pressed against the rock surface of the rock backfill soil. After receiving the downward hammering force, the pressure of its tip is huge enough to crush the rock and drill out the pile hole. The crushed rock is directed out of the pile hole through the crushed stone diversion groove, and then the casing of the crushed stone diversion groove expands the pile hole into a cylindrical hole, and squeezes the rock wall into a vertical cylindrical downward compact stone wall to avoid quality problems such as hole collapse and hole blockage.

[0011] The third step is that as the hammer power head continuously provides downward hammering force, the self-made drill bit gradually moves downward, and the steel casing is hammered into the pile hole together with the self-made drill bit. The pull rope on the hammer power head is released through the operating panel, and the chute and the slideway cooperate to move the hammer head downward. There are vertical downward positioning holes on the slideway, and the hammer power head organizes the height of each downward stroke according to the slideway positioning holes.

[0012] The fourth step is to drill to the designed depth, pull the rope to command, lift the hammer head, and pull the homemade drill bit out of the hollow steel casing. The steel casing remains in the pile hole, remove the homemade drill bit, install the precast pile, and hammer the precast pile into the pile hole.

[0013] The slideway has vertically arranged positioning holes, which are vertically arranged in the entire downward travel of the hammer head.

[0014] The connecting ring plate is welded at a position 450 mm downward from the tail of the guide rod.

[0015] The overall length of the homemade drill bit is 12m-18m.

[0016] The power source of the hammer power head is diesel power.

[0017] The prefabricated piles are high-strength concrete prestressed pipe piles.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] 1) The special geological pile foundation construction method has a small bullet drill bit, a small contact area, a large hammer head hammer force, and a large pressure applied to the rock backfill ground, which well overcomes the unfavorable construction characteristics of the full rock backfill geological structure such as high strength, high density, low porosity, and high compaction coefficient, is convenient for construction, and has a good hole-forming effect.

[0020] 2) In the special geological pile foundation construction method, the design of the gravel diversion trough allows the crushed stones to be discharged along the gravel diversion trough, which is easy to guide and not easy to splash around. The production safety is strong, ensuring the life safety of operators on the construction site.

[0021] 3) The special geological pile foundation construction method and casing design expand the conical hole hammered out into a cylindrical hole to meet the precast pile hole requirements, and press the rocks around the hole wall tightly against the hole wall, thereby ensuring the quality of the hole wall and avoiding drilling problems such as hole collapse, hole accumulation and hole blockage.

[0022] 4) The special geological pile foundation construction method, prefabricated pile construction, reduces the pile hole production steps such as reinforcement binding, pouring, and curing. At the same time, the prefabricated pile production quality is good and the production efficiency is high, which saves a lot of on-site construction time and reduces construction costs.

[0023] 5) A special geological pile foundation construction method is described. While the bullet head breaks the ground, a steel casing is wrapped around the bullet head. The bullet head is followed to the ground below. After the construction reaches the designated position, the bullet head is pulled out of the steel casing, and the steel casing is left at the pile hole position. After the pile construction is completed (at this time, pile hole construction or prefabricated pile construction can be carried out according to the geological conditions), the steel casing is pulled out from below the ground. The construction is simple, the construction yield is high, the construction hole efficiency is fast, the construction time is short, and the construction cost is low, which can meet the needs of the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the arrangement of the drilling structure of a special geological pile foundation construction method of the present invention.

[0025] Figure 2 This is a schematic diagram of the piling structure layout of a special geological pile foundation construction method of the present invention.

[0026] Figure 3 It is an axonometric view of the arrangement of a special geological pile foundation construction method of the present invention.

[0027] Figure 4 It is a schematic diagram of a homemade drill bit for a special geological pile foundation construction method of the present invention.

[0028] In the picture: 1. Homemade drill bit 2. Hammer head 3. Hammer bracket 4. Operating platform 5. Bullet drill bit

[0029] 6. Gravel diversion groove 7. Casing 8. Additional guard plate 9. Guide rod 10. Lower support plate 11. Connecting ring plate 12. Connecting card plate

[0030] 13. Steel casing 14. Hammer connector 15. Energy transfer rod 16. Hammer power head 17. Connecting rod 18. Slide

[0031] 19. Bracket base 20. Bracket frame 21. Balance bar 22. Slide 23. Pull rope 24. Main support rod

[0032] 25. Auxiliary support rod 26. Matching support rod 27. Operation panel 28. Operation table 29. Support leg DETAILED DESCRIPTION

[0033] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:

[0034] like Figure 1 , 2As shown, a special geological pile foundation construction equipment includes a homemade drill bit 1, a hammer head 2, a hammer bracket 3, and an operating platform 4. The homemade drill bit 1 includes a bullet drill bit 5, a gravel guide groove 6, a casing 7, a protective plate 8, a guide rod 9, a lower support plate 10, a connecting ring plate 11, and a connecting card plate 12. The bullet drill bit 5, the gravel guide groove 6, the casing 7 and the guide rod 9 are welded in sequence, the protective plate 8 is evenly distributed on the upper part of the casing 7 and is firmly welded, the connecting ring plate 11 is connected to the guide rod 9, and the upper and lower surfaces of the connecting ring plate 11 are respectively connected to the lower support plate 10 and the connecting card plate 12. The homemade drill bit 1 can well respond to the construction difficulties of rock backfill geology. The pointed design can be well used in the pile hole construction of rock backfill geological structure. The bullet drill bit 5 can easily break the rock backfill ground with small pores and high compaction degree. The broken gravel will not scatter in the air due to the gravel diversion groove 6, which can well avoid construction safety accidents and at the same time the drill hole is well protected; the hammer head 2 includes a hammer connector 14, an energy transfer rod 15, a hammer power head 16, a connecting rod 17 and a slide 18. The hammer connector 14, the energy transfer rod 15 and the hammer power head 16 are welded in sequence, and the connecting rod 17 is welded between the slide 18 and the hammer power head 16. The diesel engine in the hammer power head 16 The power source does not require external power access, the overall structure is compact, and the guide design of the slide 18 makes the entire hammer head stroke fixed, ensuring the smooth progress of the pile hole construction; the hammer bracket 3 includes a bracket base 19, a bracket frame 20, a balance bar 21, a slide 22, a pull rope 23, a main support rod 24, a secondary support rod 25, and a matching support rod 26. The bracket base 19 is firmly welded to the bracket frame 20, and the balance bar 21 is welded to the top of the bracket frame 20. There is a pull rope 23 on the balance bar 21. One end of the pull rope 23 is connected to the operating panel 27 of the operating platform 4, and the other end is connected to the hammer power head 16. The bracket frame 20 is connected to the main support rod 24, the secondary support rod 25 and the matching support rod 26 work together to support the hammer bracket 3 to stand upright on the ground; the operating platform 4 includes an operating panel 27, an operating table 28 and a leg 29, and the homemade drill bit 1 and the hammer head 2 are connected together by interference fit through the connecting ring plate 11 of the homemade drill bit 1, the connecting clamping plate 12 and the hammer connecting head 14 of the hammer head 2; the hammer head 2 and the homemade drill bit 1 are tightened and lifted by the pull rope 23 on the balance rod 21, and are guided by the slide groove 18 on the hammer head 2 and the slideway 22 of the hammer bracket 3; the other end of the pull rope 23 is connected to the operating panel 27 on the operating platform 4, and the operating panel 27 controls the operating instructions of tightening, lifting and releasing the line.

[0035] The construction method of a special geological pile foundation construction method of the present invention is as follows:

[0036] The first step is to map the entire rock backfill ground according to the civil engineering design requirements and mark the locations where pile drilling is required. After the mapping is completed, the hammer drill is brought in and placed at the locations where pile drilling is required. The operating platform 4, hammer bracket 3, hammer head 2 and self-made drill bit 1 are installed at the drilling locations where hammering is required. A steel casing 13 is set on the outside of the self-made drill bit 1 and on the top of the casing 7;

[0037] In the second step, the hammer power head 16 provides a downward hammering force, and transmits the hammering force to the bullet-shaped drill bit 5 on the top of the homemade drill bit 1 through the energy transmission rod 15 and the hammer connector 14. The bullet-shaped drill bit 5 is shaped like a sharpened bullet, and its tip is pressed against the rock surface of the rock backfill soil. After receiving the downward hammering force, the pressure of its tip is huge enough to crush the rock and drill out the pile hole. The crushed rock is directed out of the pile hole through the crushed stone guide groove 6, and then the casing 7 of the crushed stone guide groove 6 expands the pile hole into a cylindrical hole, and squeezes the rock wall into a vertical cylindrical downward compact stone wall to avoid quality problems such as hole collapse and hole blockage;

[0038] The third step is that as the hammer power head 16 continuously provides downward hammering force, the self-made drill bit 1 gradually moves downward, and the steel casing 13 is hammered into the pile hole together with the self-made drill bit 1. The pull rope 23 on the hammer power head 16 is released through the operating panel 27. The chute 18 cooperates with the slideway 22, and the hammer head 2 cooperates to move downward. There is a vertical downward positioning hole on the slideway 22. The hammer power head 16 organizes the height of each downward stroke according to the positioning hole of the slideway 22;

[0039] The fourth step is to drill to the designed depth, the pull rope 23 executes the pulling command, the hammer head 2 is lifted, the homemade drill bit 1 is pulled out from the hollow steel casing 13, the steel casing 13 remains in the pile hole, the homemade drill bit 1 is removed, the prefabricated pile is installed, and the prefabricated pile is hammered into the pile hole. This driving method can save a lot of operating pressure, improve the pile driving efficiency, and save construction time.

[0040] like Figure 1 , 2 As shown, the slideway 22 has vertically arranged positioning holes, which are vertically arranged throughout the entire downward travel of the hammer head 2. The positioning holes can well control the descending height of the hammer head 2, which is beneficial to controlling the continuous and effective output of the hammer force.

[0041] like Figure 4 As shown, the connecting ring plate 11 is welded at a position 450 mm downward from the tail of the guide rod.

[0042] like Figure 4 As shown, the overall length of the self-made drill bit 1 is 12m-18m, and the height of the self-made drill bit 1 is consistent with the designed burial depth of the foundation and is greater than the length of the precast pile.

[0043] like Figure 1 , 2 As shown, the hammer power head 16 is powered by diesel.

[0044] like Figure 2 As shown, the prefabricated piles are high-strength concrete prestressed pipe piles.

[0045] The working principle of a special geological pile foundation construction method of the present invention is: the hammer power head 16 outputs a downward hammering force, the tip of the bullet drill bit 5 is pressed downward by force, the rock backfill ground is crushed, and the crushed gravel is discharged from the gravel guide groove 6. As the hammer power head 16 continuously outputs a downward hammering force, the homemade drill bit 1 is hammered into the rock backfill ground. After the hammering reaches the designed depth, the operating panel 27 on the operating platform 4 issues an instruction, the homemade drill bit 1 is pulled out by the pull rope 23, the homemade drill bit 1 is removed and replaced with a prefabricated pile, and the prefabricated pile is hammered into the pile hole just drilled by the hammering force of the hammer power head 16 to complete the construction of the pile foundation.

[0046] The following examples are implemented on the premise of the technical solution of the present invention, and provide detailed implementation methods and specific operation processes, but the protection scope of the present invention is not limited to the following examples. The methods used in the following examples are conventional methods unless otherwise specified.

[0047] [Example]

[0048] According to the design requirements, surveying personnel entered the factory to conduct surveying, fixed the positions of the pile holes at the designed positions, and marked the positions of the pile holes.

[0049] like Figure 3 , 4 As shown, according to the design requirements, the homemade drill bit 1 and the prefabricated piles are processed at the processing base, the hammer drilling rig is brought into the factory, the operating platform 4 and the hammer bracket 3 are set up at the position where the pile hole is marked, the steel casing 13 wrapped outside the homemade drill bit 1 is installed on the hammer connector 14 of the hammer head 2, and the bullet drill bit 5 is against the marked point on the rock backfill ground.

[0050] like Figure 1 , 2 As shown, the hammer power head 16 on the hammer head 2 generates a hammering force, and the homemade drill bit 1 together with the steel casing 13 is hammered into the rock backfill geology to complete the drilling of the pile hole.

[0051] like Figure 1 , 4 As shown, the homemade drill bit 1 drills a hole to the designed depth, and the homemade drill bit 1 is pulled out of the steel casing 13 by using the pull rope 23, the homemade drill bit 1 is removed, the precast pile is installed on the hammer head 2, and the hammer force is used again to hammer the precast pile into the pile hole that has just been constructed.

[0052] Through construction comparison, the method of the present invention is used to construct pile holes in rock backfill geology, and its construction efficiency is higher than other drilling methods. The construction time is saved by 70% compared with other drilling time, and the construction cost is reduced by 50%, which saves a lot of construction time for engineering construction.

[0053] The present invention has a simple structure and is easy to operate during use. It successfully overcomes the unfavorable characteristics of the full rock backfill geological structure, such as high strength, high density, low porosity, and high compaction coefficient. It has a good hole-making effect, saves a lot of on-site construction time, reduces construction costs, and can meet the needs of the construction period.

Claims

1. A construction method for a special geological pile foundation, the method using special geological pile foundation construction equipment, the special geological pile foundation construction equipment comprising a self-made drill bit, a hammer head, a hammer bracket, and an operating platform, characterized in that: The homemade drill bit includes a bullet head drill bit, a gravel guide groove, a casing, a protective plate, a guide rod, a lower support plate, a connecting ring plate, and a connecting card plate. The bullet head drill bit, the gravel guide groove, the casing and the guide rod are welded in sequence, the protective plates are evenly distributed on the upper part of the straight tube and are firmly welded, the connecting ring plate is welded on the guide rod, and the lower support plate and the connecting card plate are evenly welded on the upper and lower sides of the connecting ring plate; the hammer head includes a hammer connector, an energy transfer rod, a hammer power head, a connecting rod and a slide groove, the hammer connector, the energy transfer rod and the hammer power head are welded in sequence, and the connecting rod is welded between the slide groove and the hammer power head; the hammer bracket includes a bracket base, a bracket frame, a balance rod, a slideway, a pull rope, a main support rod, a secondary support rod, and a matching support rod. The bracket base is firmly welded to the bracket frame, and the balance rod is welded to the bracket frame At the top of the balance bar, there is a pull rope, one end of the pull rope is connected to the operating panel of the operating platform, and the other end is connected to the hammer power head. The bracket frame supports the hammer bracket to stand on the ground through the main support rod, the auxiliary support rod and the matching support rod; the operating platform includes an operating panel, an operating table and legs, and the homemade drill bit and the hammer head are connected together through the interference fit of the connecting ring plate of the homemade drill bit, the connecting clamp plate and the hammer connecting head of the hammer head; the hammer head and the homemade drill bit are tightened and lifted by the pull rope on the balance bar, and guided by the slide groove on the hammer head and the slideway of the hammer bracket; the other end of the pull rope is connected to the operating panel on the operating platform, and the operating panel controls the operating instructions of tightening, lifting and releasing the line; the slideway has vertically arranged positioning holes, which are vertically arranged in the entire downward stroke of the hammer head; The construction method includes the following contents: The first step is to map the entire rock backfill ground according to the civil engineering design requirements and mark the locations where pile drilling is required. After the mapping is completed, the hammer drill is brought in and placed at the locations where pile drilling is required. The operating platform, hammer bracket, hammer head and self-made drill bit are installed at the locations where hammer drilling is required. A steel casing is placed outside the self-made drill bit and on top of the casing. In the second step, the hammer power head provides a downward hammering force, which is transmitted to the bullet-shaped drill bit on the top of the homemade drill bit through the energy transfer rod and the hammer connector. The bullet-shaped drill bit is shaped like a sharpened bullet, and its tip is pressed against the rock surface of the rock backfill soil. After receiving the downward hammering force, the pressure of its tip is huge enough to crush the rock and drill out the pile hole. The crushed rock is directed out of the pile hole through the crushed stone diversion groove, and then the casing of the crushed stone diversion groove expands the pile hole into a cylindrical hole, and squeezes the rock wall into a vertical cylindrical downward compact stone wall to avoid hole collapse and hole plugging quality problems; The third step is that as the hammer power head continuously provides downward hammering force, the self-made drill bit gradually moves downward, and the steel casing is hammered into the pile hole together with the self-made drill bit. The pull rope on the hammer power head is released through the operating panel, and the chute and the slideway cooperate to move the hammer head downward. There are vertical downward positioning holes on the slideway, and the hammer power head organizes the height of each downward stroke according to the slideway positioning holes. The fourth step is to drill to the designed depth, pull the rope to command, lift the hammer head, and pull the homemade drill bit out of the hollow steel casing. The steel casing remains in the pile hole, remove the homemade drill bit, install the precast pile, and hammer the precast pile into the pile hole.

2. The construction method of a special geological pile foundation according to claim 1, characterized in that: The connecting ring plate is welded at a position 450 mm downward from the tail of the guide rod.

3. The construction method of a special geological pile foundation according to claim 1, characterized in that: The overall length of the homemade drill bit is 12m-18m.

4. The construction method of a special geological pile foundation according to claim 1 is characterized in that The power source of the hammer power head is diesel power.

5. The construction method of a special geological pile foundation according to claim 1 is characterized in that ,The precast piles are high-strength concrete prestressed pipe piles.