A non-bonded prestressed anti-seepage anchor cable
By using bondless steel strands and water-stop bearing components in anti-floating anchors, combined with sealing and anti-corrosion measures, the problem of rust by the anti-floating anchor steel is solved, the pull resistance and durability are improved, and the use is extended. life.
Patent Information
- Application Number
- CN202011341472.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-08-19
- Filing Date
- 2020-11-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-11-25
AI Technical Summary
The existing steels with floating anchors are prone to rust and have poor durability when used.
Adopt unbonded steel stranded wire, and water stop bearing components are set along its length, including water stop plates, support frames, sealed pressure pipes and other structures. Combined with sealing gaskets and anti-corrosion fillers, a multi-stage anchor bearing carrier is formed to enhance the resistance to pulling force. and waterproof performance.
It effectively prevents groundwater from infiltration, prevents steel corrosion, improves the durability and pull resistance of floating anchors, solves the cracking phenomenon of base plates and column beams, and extends the service life of anchor cables.
Smart Images

Figure CN112281930B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a non-bonded prestressed anti-seepage anchor cable. Background Art
[0002] With the rapid development of economy, the acceleration of urban construction, and the increasing shortage of urban land, the development and utilization of basements have been paid attention by developers, and the utilization requirements of basement space have gradually increased. The basement area is getting larger and deeper, so the buoyancy of the basement structure is getting bigger and bigger. How to solve the anti-floating problem of the basement has become a common problem, which has attracted widespread attention of engineers. In recent years, more basements have used anchor rods as the basis for structural anti-floating calculation.
[0003] That is, drilling through the soft rock layer, anchoring one end in the hard rock layer, and then tensioning the other free end and anchoring it on the building structure floor, thereby applying pressure to the structural floor, anchoring the concrete floor, and making the concrete floor anti-floating, which is the prestressing of the anti-floating anchor rod. Anti-floating anchor rods are widely used at home and abroad, and their application fields involve water conservancy and hydropower, industrial and civil building environmental management, military engineering, etc. However, the existing anti-floating anchor rods generally have the problem of easy rust of steel and poor durability. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] The purpose of the present invention is to provide a non-bonded prestressed anti-seepage anchor cable, which is used to solve or partially solve the common problems of existing anti-floating anchor rods, that is, the steel material is easy to rust and the durability is poor.
[0006] (II) Technical solution
[0007] In order to solve the above technical problems, the present invention provides an unbonded prestressed anti-seepage anchor cable, comprising a plurality of unbonded steel strands, between the two ends of the plurality of unbonded steel strands, at least one water-stop bearing component is provided along the length direction of the unbonded steel strands, the water-stop bearing component comprises a water-stop plate and a support frame, the water-stop plate is used to pass through the unbonded steel strands and seal with the unbonded steel strands, the support frame is connected to the side of the water-stop plate facing the front end of the unbonded steel strands.
[0008] Based on the above scheme, the water-stop bearing assembly also includes a sealing pressure tube connected one-to-one with a plurality of the unbonded steel strands, one end of the sealing pressure tube passes through the water-stop plate from the side where the water-stop plate is connected to the support frame and is fastened to the water-stop plate, and the sealing pressure tube is used for allowing the unbonded steel strands to pass through.
[0009] On the basis of the above scheme, a step surface is provided on the outer wall of the sealing pressure tube, the step surface abuts against the side surface of the water stop plate connecting support frame, and a sealing gasket is provided between the step surface and the water stop plate.
[0010] On the basis of the above solution, the sealing pressure pipe is fastened by a nut on the side of the water stop plate away from the support frame.
[0011] Based on the above solution, one end of the support frame away from the water stop plate has an inward bending portion.
[0012] On the basis of the above scheme, the ends of a plurality of the unbonded steel strands pass through the concrete bottom plate from the inner side of the concrete bottom plate and are anchored and connected to the outer surface of the concrete bottom plate.
[0013] Based on the above scheme, the unbonded steel strand passes through an anchor plate set on the outer surface of the concrete base plate and is anchored by an anchor; the anchor plate is connected to the side facing the concrete base plate with embedded steel bars, and the embedded steel bars are located inside the concrete base plate.
[0014] Based on the above scheme, the anchor plate is sealed with a sealing cover on the side away from the concrete base plate, and the sealing cover is located outside the anchor and the unbonded steel strand; the interior of the sealing cover is filled with anti-corrosion filler.
[0015] On the basis of the above scheme, the front ends of several of the unbonded steel strands are connected to a front end load-bearing assembly, and the front end load-bearing assembly includes a load-bearing plate and a guide bracket assembly. The front ends of several of the unbonded steel strands are respectively fixedly connected to the load-bearing plate, and the guide bracket assembly is fixedly connected to the load-bearing plate on the side of the load-bearing plate away from the unbonded steel strands.
[0016] Based on the above solution, the guide bracket assembly includes a plurality of guide frames, which are evenly connected to the bearing plate along the circumference of the bearing plate, and a plurality of guide frames are connected to a fixing sleeve at one end away from the bearing plate.
[0017] (III) Beneficial effects
[0018] The present invention provides an unbonded prestressed anti-seepage anchor cable, in which a water-stop bearing component is arranged along the length direction of the unbonded steel strand. Specifically, a water-stop plate and a support frame are arranged to form a pressure-type anti-floating anchor rod. By adopting an unbonded steel strand and a multi-section anchoring bearing structure, the pull-out resistance can be increased and the anchoring effect can be improved, which is beneficial to solving the problem of cracking of the bottom plate and columns and beams caused by the shear force formed by the buoyancy of groundwater and the gravity of the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1The overall schematic diagram of the non-bonded prestressed anti-seepage anchor cable provided by the present invention;
[0020] Figure 2 It is a schematic diagram of the water stop bearing assembly of the present invention;
[0021] Figure 3 It is a schematic diagram of a sealing gasket in a water-stop bearing assembly of the present invention;
[0022] Figure 4 It is a schematic diagram of anchoring the end of the unbonded steel strand in the present invention;
[0023] Figure 5 It is a structural schematic diagram of the front-end bearing assembly in the present invention;
[0024] Figure 6 is a schematic diagram of a guide bracket assembly in the present invention;
[0025] Figure 7 is a schematic diagram of a fastening tube in the present invention;
[0026] Figure 8 It is a schematic diagram of the sealed pressure tube in the present invention.
[0027] Description of reference numerals:
[0028] Among them, 1. Unbonded steel strand; 2. Load-bearing plate; 3. Guide frame; 4. Fixing sleeve; 5. Fastener; 6. Sealing cover; 7. Fastening tube; 71. Boss; 8. Nut; 9. Sealing gasket; 10. Anticorrosive medium; 11. Extrusion; 12. Sealing pressure tube; 121. Step surface; 13. Spiral rib; 14. Constraint ring; 15. Isolation bracket; 16. Water stop plate; 17. Support frame; 18. Sealing pressure tube; 19. Sealing gasket; 20. Nut; 21. Anchor plate; 22. Anchor; 23. Sealing cover; 24. Anticorrosive filler; 25. Nut; 26. Fixing plate; 27. Working clip; 28. Sealing gasket. DETAILED DESCRIPTION
[0029] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0031] refer to Figure 1 An embodiment of the present invention provides an unbonded prestressed anti-seepage anchor cable, which includes a plurality of unbonded steel strands 1, between the two ends of the plurality of unbonded steel strands 1, at least one water-stop bearing component is provided along the length direction of the unbonded steel strands 1, the water-stop bearing component includes a water-stop plate 16 and a support frame 17, the water-stop plate 16 is used to pass through the unbonded steel strands 1 and seal with the unbonded steel strands 1, the support frame 17 is connected to the side of the water-stop plate 16 facing the front end of the unbonded steel strand 1.
[0032] The unbonded steel strand 1 is the main component of the anchor cable. The front end of the anchor cable extends into the borehole and reaches the bottom of the borehole, and the end of the anchor cable is connected to the concrete bottom plate layer of the building, thereby fixing the building in the geological layer such as the rock layer, applying a pulling force to the building, and improving the anti-floating performance of the building. A water-stop bearing component can be set along the length direction of the unbonded steel strand 1. The support frame 17 is connected to the front side of the water stop plate 16, and is used to play a certain guiding role and anchoring role at the position where the water-stop bearing component is set on the anchor cable, thereby increasing the pull-out resistance.
[0033] The present embodiment provides a non-bonded prestressed anti-seepage anchor cable, in which a water-stop bearing assembly is arranged along the length direction of the non-bonded steel strand 1. Specifically, a water-stop plate 16 and a support frame 17 are arranged to form a pressure-type anti-floating anchor rod. By adopting the non-bonded steel strand 1 and a multi-section anchor bearing structure, the pull-out resistance can be increased, the anchoring effect can be improved, and it is helpful to solve the problem of cracking of the bottom plate and column beams caused by the shear force formed by the floating of groundwater and the gravity of the building. The water-stop plate 16 is sealed with the non-bonded steel strand, which can block and prevent the foundation water, i.e., groundwater, from infiltrating through the gaps in the outer wall of the non-bonded steel strand and the internal gaps of the strand wire diameters; it can effectively prevent groundwater from infiltrating the water-stop bearing assembly, thereby effectively preventing steel from rusting and ensuring the durability of the anti-floating anchor rod.
[0034] Furthermore, the support frame 17 includes a plurality of independent guide frames, and the plurality of guide frames are evenly connected to the water stop plate 16 along the circumference of the water stop plate 16. The front ends of the plurality of guide frames of the support frame 17 may be independent of each other, or may be collectively connected to a fixed sleeve. The specific number and specific location of the water stop bearing assembly may be set according to different underlying soil structures to improve the pull-out resistance. That is, a water stop bearing assembly may be added to a location that needs to be reinforced to increase the pull-out resistance. The support frame 17 may be fixed to the water stop plate 16 by threads and nuts.
[0035] On the basis of the above embodiments, further, referring to Figure 2The water-stop bearing assembly also includes a sealing pressure tube 18 connected to a plurality of the unbonded steel strands 1 in a one-to-one correspondence, and one end of the sealing pressure tube 18 passes through the water-stop plate 16 from the side where the water-stop plate 16 is connected to the support frame 17 and is fastened to the water-stop plate 16. The sealing pressure tube 18 can be fastened to the side of the water-stop plate 16 away from the support frame 17 by a nut 20. A sealing gasket can be provided between the nut 20 and the water-stop plate 16. The sealing pressure tube 18 is used for the unbonded steel strands 1 to pass through. The sealing pressure tube 18 is in sealing cooperation with the unbonded steel strands 1.
[0036] On the basis of the above embodiments, further, referring to Figure 8 The outer wall of the sealing pressure tube 18 is provided with a step surface, and the step surface abuts against the side surface of the water stop plate 16 connected to the support frame 17. Figure 2 , and a sealing gasket 19 is provided between the step surface and the water stop plate 16.
[0037] Specifically, refer to Figure 3 The sealing gasket 19 is L-shaped. The horizontal side of the sealing gasket 19 is inserted into the opening corresponding to the sealing pressure tube 18 on the water stop plate 16, and the vertical side of the sealing gasket 19 is sandwiched between the step surface of the sealing pressure tube 18 and the water stop plate 16, which is conducive to better sealing. The water stop bearing assembly has a good anti-seepage effect.
[0038] On the basis of the above embodiments, further, referring to Figure 2 The sealing pressure pipe 18 is fastened by a nut 20 on the side of the water stop plate 16 away from the support frame 17.
[0039] On the basis of the above embodiment, further, the end of the support frame 17 away from the water stop plate 16 has an inward bending portion, that is, the support frame 17 is L-shaped as a whole, which is conducive to a better anchoring effect.
[0040] On the basis of the above embodiment, further, the ends of a plurality of the unbonded steel strands 1 pass through the concrete bottom plate from the inner side of the concrete bottom plate and are anchored and connected to the outer surface of the concrete bottom plate.
[0041] On the basis of the above embodiments, further, referring to Figure 4 The unbonded steel strand 1 passes through an anchor plate 21 arranged on the outer surface of the concrete bottom plate and is anchored by an anchor 22; the anchor plate 21 is connected to a side facing the concrete bottom plate with embedded steel bars, and the embedded steel bars are located inside the concrete bottom plate.
[0042] The ends of several unbonded steel strands 1 pass through the concrete base plate; the ends of several unbonded steel strands 1 pass through the outer surface of the concrete base plate, pass through the anchor plate 21 and are anchored to the outer surface of the concrete base plate through the anchor 22. The anchor plate 21 is connected to the side facing the concrete base plate with embedded steel bars, and the embedded steel bars are located inside the concrete base plate. Furthermore, on the inner side of the outer surface of the concrete base plate, the outer periphery of several unbonded steel strands 1 can also be provided with spiral bars. The spiral bars can be connected to the anchor plate 21, such as Figure 1 shown.
[0043] On the basis of the above embodiment, further, a plurality of unbonded steel strands 1 are arranged in the grouting hole, and a water stop is provided between the grouting hole and the inner surface of the concrete base plate. The grouting hole is a drilled hole, which is used for placing the anchor cable and then grouting. The provision of a water stop can improve the waterproof performance. The water stop can be pre-buried inside the concrete base plate and extend to the grouting hole. The water stop plate 16 can be connected to the concrete base plate by pre-buried steel bar anchoring. A central grouting pipe can be provided, and after the anchor cable is inserted into the grouting hole, grouting can be performed into the drilled hole through the central grouting pipe.
[0044] On the basis of the above embodiments, further, referring to Figure 4 The anchor pad 21 is sealed with a sealing cover 23 on the side away from the concrete bottom plate, and the sealing cover 23 is located outside the anchor 22 and the unbonded steel strand 1; the interior of the sealing cover 23 is filled with an anti-corrosion filler 24. Furthermore, the ends of several unbonded steel strands 1 pass through the anchor 22 and then pass through the fixing plate 26 in turn, and then are fastened to the fixing plate 26 by the nut 25. A working clip 27 is provided between the fixing plate 26 and the anchor 22. The anchor 22, the fixing plate 26, the working clip 27 and the nut 25 are all located inside the sealing cover 23, and have good waterproof sealing performance. And by filling the anti-corrosion filler 24 inside the sealing cover 23, the end of the unbonded steel strand 1 can be firmly fixed.
[0045] On the basis of the above embodiment, further, the front ends of several of the unbonded steel strands are connected to a front end bearing assembly, the front end bearing assembly includes a bearing plate and a guide bracket assembly, the front ends of several of the unbonded steel strands are respectively fixedly connected to the bearing plate, and the guide bracket assembly is fixedly connected to the bearing plate on the side of the bearing plate away from the unbonded steel strands. The front ends of several unbonded steel strands 1 are respectively connected to the bearing plate 2, and the guide bracket assembly is connected to the front side of the bearing plate 2. That is, the unbonded steel strands 1 and the guide bracket assembly are located on both sides of the bearing plate 2.
[0046] The present embodiment provides a non-bonded prestressed anti-seepage anchor rod bearing body, in which a bearing plate 2 and a guide bracket assembly are connected to the front end of the non-bonded steel strand 1. Firstly, it can play a guiding role when the non-bonded steel strand 1 is inserted into the borehole, so that the anchor cable can be smoothly inserted into the borehole; secondly, when the bottom of the borehole is not thoroughly cleaned, because the guide bracket assembly is located at the front end of the anchor cable, after the anchor cable penetrates the bottom, it can ensure that the bearing plate 2 is at a certain distance from the geological layer at the bottom of the borehole such as silt, thereby ensuring the effectiveness of the subsequent grouting and improving the pull-out resistance and anchoring effect; in addition, the guide bracket assembly can also play a certain anchoring effect, which can increase the pull-out friction resistance of the anchor cable, and further improve the overall pull-out resistance and anchoring effect of the anchor cable.
[0047] On the basis of the above embodiment, further, the guide bracket assembly includes a plurality of guide frames, the plurality of guide frames are evenly connected to the bearing plate along the circumference of the bearing plate, and the ends of the plurality of guide frames away from the bearing plate are collectively connected to the fixing sleeve.
[0048] Specifically, refer to Figure 5 and Figure 6 The guide bracket assembly in the front-end bearing assembly provided in this embodiment is formed by pressing three round steel bars, the front end is equally divided and welded according to the angle, and then inserted into the fixing sleeve 4 and welded. The rear end is made into a threaded end, and after penetrating the bearing plate 2, it can be fastened with the fastening nut 8 using the fastener 5. The connection setting structure of the guide bracket assembly can play a good guiding role when penetrating the drill hole, and the relative space formed between the bearing plate 2 and the bottom of the drill hole ensures the effectiveness of the later grouting, and can increase the anti-pullout friction resistance.
[0049] Furthermore, the guide frame 3 of the guide bracket assembly can also be other shapes such as square steel, and the guide frame 3 and the bearing plate 2 can also be connected by welding or the like. The specific number of guide frames 3 can also be other. The shape, quantity and connection method of the guide frame 3 can be flexibly set according to actual needs, and there is no specific limitation.
[0050] On the basis of the above embodiments, further, referring to Figure 5 The bearing plate 2 is sealed with a sealing cover 6 on one side connected to the guide bracket assembly, and the sealing cover 6 is located outside the plurality of unbonded steel strands 1. The unbonded steel strands 1 inside the sealing cover 6 are placed in a closed space, which can block and prevent the foundation water, i.e., groundwater, from seeping through the gaps in the outer wall of the unbonded steel strands 1 and the gaps inside the twisted steel strands.
[0051] On the basis of the above embodiments, further, referring to Figure 5The side of the bearing plate 2 connected to the guide bracket assembly is structured with a protruding side wall surface, the sealing cover 6 is connected to the side wall surface, and a sealing gasket 9 is provided between the sealing cover 6 and the bearing plate 2. The sealing gasket 9 is used to achieve a sealed connection between the sealing cover 6 and the bearing plate 2. Specifically, the sealing cover 6 can be a cylindrical structure with one end open, and a boss is provided on the side of the bearing plate 2 connected to the guide bracket assembly, and the side of the boss forms a side wall surface that cooperates with the sealing cover 6. The open end of the sealing cover 6 can be threaded or welded to the side wall surface of the boss. Furthermore, a connecting groove can also be provided on the side of the bearing plate 2, and the open end of the sealing groove can be inserted into the connecting groove for connection.
[0052] On the basis of the above embodiment, the front end bearing assembly further includes a fastening tube 7 that passes through the sealing cover 6 and the bearing plate 2 in sequence. The fastening tube 7 is located at the end of the bearing plate 2 away from the guide bracket assembly and is used for sealing connection with the central grouting pipe. Figure 7 , a boss 71 may be provided on the outer wall of the fastening tube 7, and the boss 71 abuts against the side of the bearing plate 2 away from the guide bracket assembly. The central grouting pipe may be connected to the fastening tube 7 by threading or welding. A sealing gasket 9 may be provided at the connection between the central grouting pipe and the fastening tube 7. A sealing gasket 9 may also be provided between the boss 71 and the side of the bearing plate 2 to achieve a sealed connection.
[0053] The end of the fastening tube 7 located outside the sealing cover 6 is sealed and fastened to the sealing cover 6. The end can be connected to a nut 8 and fastened to the outer surface of the sealing cover 6 through the nut 8. A sealing gasket 9 can be provided between the nut 8 and the sealing cover 6 for sealing.
[0054] On the basis of the above embodiment, further, the front ends of a plurality of the unbonded steel strands 1 pass through the bearing plate 2 and are extruded and installed on the bearing plate 2 on the side of the bearing plate 2 away from the unbonded steel strands 1 .
[0055] On the basis of the above embodiments, further, referring to Figure 5 The front ends of the plurality of unbonded steel strands 1 are connected to sealed pressure tubes 12 one by one, and one end of the sealed pressure tube 12 passes through the bearing plate 2 from the side of the bearing plate 2 away from the guide bracket assembly and is fastened to the bearing plate 2. The sealing pressure tube 12 can be fastened to the side of the bearing plate 2 connected to the guide bracket assembly by a nut 8. A sealing gasket 9 can be arranged between the nut 8 and the bearing plate 2. The sealed pressure tube 12 is used for the unbonded steel strands 1 to pass through. Reference Figure 8 A step surface 121 may be provided on the outer wall of the sealing pressure tube 12 , and the step surface 121 abuts against the side of the bearing plate 2 away from the guide bracket assembly.
[0056] On the basis of the above embodiment, further, a sealing gasket 9 is provided between the sealing pressure tube 12 and the side of the carrying plate 2 facing away from the guide bracket assembly.
[0057] On the basis of the above embodiments, further, referring to Figure 5 The front-end bearing assembly further includes an extrusion piece 11 corresponding to the unbonded steel strand 1, and the extrusion piece 11 is used to be sleeved on the outside of the unbonded steel strand 1 on the side where the bearing plate 2 is connected to the guide bracket assembly. The unbonded steel strand 1 passes through the sealing pressure tube 12 and is sleeved on the outside of the part on the side where the bearing plate 2 is connected to the guide bracket assembly. The extrusion piece 11 can be an extrusion sleeve or an extrusion spring.
[0058] Furthermore, the side of the bearing plate 2 facing away from the guide bracket assembly is connected with a spiral rib 13 arranged on the periphery of the plurality of unbonded steel strands 1. Figure 1 In this embodiment, a spiral rib 13 is connected to the rear side of the bearing plate 2 of the bearing body, and the spiral rib 13 is located at the periphery of the unbonded steel strand 1 connected to the bearing plate 2.
[0059] On the basis of the above embodiment, further, from the front end to the end of the unbonded steel strand 1, a plurality of the unbonded steel strands 1 are staggered with restraint rings 14 and isolation brackets 15. That is, starting from the front end of the unbonded steel strand 1, a restraint ring 14 is first set, and then an isolation bracket 15 is set, and they are staggered in sequence. This makes the distribution of the unbonded steel strand 9 more orderly, which is conducive to better distribution of the unbonded steel strand 1 in the drill hole, thereby improving the pull-out resistance.
[0060] Furthermore, an isolation bracket 15 is arranged adjacent to the front side of the water stop plate, which can facilitate the connection between the unbonded steel strand 1 and the water stop plate.
[0061] On the basis of the above-mentioned embodiments, further, this embodiment relates to the field of underground construction engineering, and discloses a non-bonded prestressed anti-seepage anchor cable; including non-bonded steel strand 1, front-end bearing assembly, water-stop bearing assembly and terminal anchor assembly. The front-end bearing assembly includes a guide bracket welded with three equal parts of round steel at one end, a bearing plate 2, an extrusion sleeve, a fastening tube 7, a sealing pressure tube 12, a sealing cover 6 and other accessories fixed to the structural member; the front anchor end, i.e., the front end, is connected by the bearing plate 2 and the guide bracket, i.e., the bearing body to form a relative space, and the non-bonded steel strand 1 is passed through the bearing plate 2 after extrusion, and the non-bonded steel strand 1 at the extruded end is axially fixed by the sealing pressure tube 12, the extrusion sleeve and the bolts to prevent the non-bonded steel strand 1 from passing through, and a spiral rib 13 is placed behind the bearing plate 2. Subsequently, the non-bonded steel strand 1 is installed with a restraining ring 14 and an isolation bracket 15 at a relative distance.
[0062] The middle anchoring end is also connected by a waterstop plate and a support frame, i.e., a waterstop bearing assembly, to form a relative space. After extrusion, the unbonded steel strand 1 passes through the waterstop plate, and the unbonded steel strand 1 at the extruded end is axially fixed by a sealing pressure tube 18 to prevent the unbonded steel strand 1 from passing through. Similarly, a restraining ring 14 and an isolation bracket 15 are installed at a relative distance on the subsequent unbonded steel strand 1. A waterstop is placed in front of the tail end, and the tail tensioning end is composed of a spiral rib 13, an anchor pad 21, an anchor 22, and a clip. This embodiment provides an anti-floating anchor cable for underground construction projects. Through pre-placement and staged multi-end load-bearing anchoring, a strong anchoring pull-out resistance of the working cable is achieved after tensioning, thereby solving the problem of low pull-out resistance of ordinary anti-floating anchor rods.
[0063] The fixing sleeve 4 is used to fix the guide bracket and increase the guiding property. The guide frame 3 plays the role of guiding and centering, increasing the pull-out resistance, and avoiding the insufficient strength of the concrete at the bearing end caused by the sediment in the bottom hole. The central grouting pipe is used for high-pressure grouting. The sealing cover 6 is used for sealing and protecting the anchoring structure including the built-in fixed end anchor, the steel strand / compression sleeve, and the bearing body. The sealing cover 6 is filled with a protective medium 10. The protective medium 10 protects the built-in anchor structure assembly from rust and leakage. The bite connection between the steel strand and the anchor (extrusion sleeve / spring) meets the requirements of GB / T14370-2015. The bearing plate 2 is the anchor under the relative force of the steel strand, and the bearing plate 2 meets the pressure bearing and anti-interference capabilities under the concrete support. The sealing pressure pipe 12 is ensured by extruding and bonding the steel strand jacket and sealing when connected to the bearing plate 2 to ensure the sealing of the interface between the steel strand and the anchor end. The spiral reinforcement 13 is used to enhance the concrete strength at the lower end of the anchor. The unbonded steel strand 1 is a carrier for connecting the fixed end under the anchor and the structural end above the anchor, and is also a carrier for bidirectional forces.
[0064] The restraining ring 14 is used in combination with the isolation bracket 14 to increase the friction resistance of the steel strand and improve the mechanical properties of the concrete structure. The isolation bracket 15 ensures the uniform distribution of the steel strand installation and the uniform force on the load-bearing body, and at the same time forms friction resistance and mechanical properties in combination with the central restraining ring of the steel strand. The locking nuts 25, 20 and 8 are used to tighten and seal the connectors. The anchor, the bite connection between the steel strand and the anchor, and its bite pull-out resistance meets the requirements of GB / T14370-2015. The sealing pressure pipes 12 and 18 are sealed by extruding, bonding and sealing the steel strand jacket, and the sealing gasket and nut are used to tighten to ensure the sealing of the interface between the steel strand and the water stop plate end, thereby blocking the infiltration of groundwater. The water stop plate blocks and prevents the infiltration of foundation water, and is matched with the component compression sleeve, sealing gasket and locking nut. The support frame guides and reinforces the water stop plate to strengthen the concrete strength of the bearing body. The spiral reinforcement enhances the concrete strength at the lower end of the anchor. The anchor pad is the bearing plate under the relative force of the steel strands, and the bearing plate under the concrete support meets the requirements of pressure bearing and anti-interference ability. The working clip is used to lock the anchor after tensioning. The sealing cover 6 and 23 protects the built-in: anchor locking of the tensioning end anchor, the sealing protection between the loose structure, the unbonded steel strands, and the bearing body. The anti-corrosion filler, such as cement mortar, fills the gap between the tensioning end anchors in the anchor sealing cover to prevent leakage.
[0065] The steel strand center restraint ring 14 is used in combination with the isolation bracket to increase the friction resistance of the steel strand and improve the mechanical properties of the concrete structure. The steel strand isolation bracket ensures the uniform distribution of the steel strand installation and the uniform force on the load-bearing body. At the same time, it is combined with the steel strand center restraint ring 14 to form friction resistance and mechanical properties. The locking nut 8 is used to tighten and seal the connector. The sealing gasket 9 is arranged in the anchor structure of the fixed end anchor: between the steel strand and the pressure pipe and the bearing body; the sealing protection of the central grouting pipe and the protective cover.
[0066] The present embodiment provides a non-bonded prestressed anti-seepage anchor cable, which achieves strong anchoring pull-out resistance of the working cable after tensioning through pre-loaded anchoring, thereby solving the problem of low pull-out resistance of ordinary anti-floating anchor rods.
[0067] The guide frame 3 of the carrier and the bearing plate 2 are connected by nuts 8 for easy assembly and installation; the main functions of the guide frame 3 are: to guide the anchor cable when it passes through the drill hole; when the bottom of the drill hole is not thoroughly cleaned, the anchor cable passes through the bottom to ensure that there is a certain distance between the bearing plate 2 and the silt, to ensure the effectiveness of the subsequent grouting; to increase the pull-out resistance. The guide bracket of the rear anchor end is also pressed and formed by three round steels, which are inserted into the bearing plate 2 at equal angles and then fastened or welded with nuts 8. The rear anchor end is added and changed according to the different underlying soil structures to improve the pull-out resistance. The positioning pressure plate is to fix the extruded unbonded steel strand 1 on the bearing plate 2. Prevent the bearing plate 2 and the unbonded steel strand 1 from moving.
[0068] The overall installation steps of the anchor cable are as follows: take the length and quantity of the unbonded steel strand 1 required for the front anchor end and the rear anchor end according to the requirements of the drawings, and peel off the 100mm long PE sheath at the same end of the unbonded steel strand 1; insert the bearing plate 2, spiral reinforcement 13, restraint ring 14, isolation frame and other corresponding components in sequence at relative positions; use an extruder to extrude and install the sheath stripped end of the unbonded steel strand 1; and fix and install each component at a relative position.
[0069] The guide frame 3 is connected to the pressure-bearing steel plate, i.e., the bearing plate 2, by bolts, which can better avoid end sediment and improve pull-out resistance. The anti-floating anchor cable for construction provided in this embodiment can be used for different numbers and specifications of unbonded steel strands 1 (for example, φ12.7, φ15.2, φ17.8, φ21.6, φ21.8, etc.) and realize split-end load bearing. The anti-floating anchor cable needs to be fixed with the bearing plate 2 during construction. The anchor rod, the bearing plate 2, and the guide bracket can enhance the bearing capacity of the anchor rod, which can effectively improve the construction quality and progress.
[0070] A multi-section bearing plate and a guide bracket are connected to the front end of the unbonded steel strand to form a pressure-type anti-floating anchor rod, which can ensure that the concrete at the tensile edge of the component does not produce tensile stress. The guide bracket solves the problem of unclean sediment handling during drilling. The unbonded steel strand and the multi-section anchor bearing structure solve the problem of cracking of the bottom plate and columns and beams caused by the shear force formed by the floating of groundwater and the gravity of the building. The use of unbonded steel strand can greatly improve the corrosion resistance of the steel strand, which is beneficial to increase the service life of the anchor cable and solve the problem that the metal surface of the anti-floating anchor rod has been rusted in the underground environment for many years, resulting in the failure of the anchor pull-out force and the inability to meet the design service life of the building.
[0071] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A non-bonded prestressed anti-seepage anchor cable, It is characterized in that It comprises a plurality of unbonded steel strands, between the two ends of the plurality of unbonded steel strands, at least one water-stop bearing assembly is provided along the length direction of the unbonded steel strands, the water-stop bearing assembly comprises a water-stop plate and a support frame, the water-stop plate is used to pass through the unbonded steel strands and seal with the unbonded steel strands, and the support frame is connected to the side of the water-stop plate facing the front end of the unbonded steel strands; The front ends of the plurality of unbonded steel strands are connected to a front end bearing assembly, the front end bearing assembly comprises a bearing plate, the front ends of the plurality of unbonded steel strands are respectively fixedly connected to the bearing plate, the bearing plate is sealed with a sealing cover on a side away from the unbonded steel strands, the sealing cover is located at the periphery of the plurality of unbonded steel strands, and the front ends of the plurality of unbonded steel strands are sealed in the sealing cover; The front-end bearing assembly further comprises a guide bracket assembly, and the guide bracket assembly is fixedly connected to the bearing plate at a side of the bearing plate away from the unbonded steel strand; The side surface of the bearing plate connected to the guide bracket assembly is configured with a protruding side wall surface, and the sealing cover is connected to the side wall surface; The front end bearing assembly further comprises a fastening tube which passes through the sealing cover and the bearing plate in sequence, and the end of the fastening tube which is located on the side of the bearing plate away from the guide bracket assembly is used for sealing connection with the central grouting pipe; The end of the fastening tube located outside the sealing cover is sealed and fastened to the sealing cover; The front ends of several of the unbonded steel strands pass through the bearing plate and are extruded and installed on the bearing plate at a side of the bearing plate away from the unbonded steel strands.
2. The unbonded prestressed anti-seepage anchor cable according to claim 1, It is characterized in that The water-stop bearing assembly also includes a sealing pressure tube connected to a plurality of the unbonded steel strands in a one-to-one correspondence. One end of the sealing pressure tube passes through the water-stop plate from a side where the water-stop plate is connected to the support frame and is fastened to the water-stop plate. The sealing pressure tube is used for the unbonded steel strands to pass through.
3. The unbonded prestressed anti-seepage anchor cable according to claim 2, It is characterized in that A step surface is provided on the outer wall of the sealing pressure tube, the step surface abuts against the side surface of the water stop plate connecting support frame, and a sealing gasket is provided between the step surface and the water stop plate.
4. The unbonded prestressed anti-seepage anchor cable according to claim 2, It is characterized in that The sealing pressure pipe is fastened by a nut on the side of the water stop plate away from the support frame.
5. The unbonded prestressed anti-seepage anchor cable according to any one of claims 1 to 4, It is characterized in that One end of the support frame away from the water stop plate has an inward bending portion.
6. The unbonded prestressed anti-seepage anchor cable according to any one of claims 1 to 4, It is characterized in that The ends of a plurality of the unbonded steel strands pass through the concrete bottom plate from the inner side of the concrete bottom plate and are anchored and connected to the outer surface of the concrete bottom plate.
7. The unbonded prestressed anti-seepage anchor cable according to claim 6, It is characterized in that The unbonded steel strand passes through an anchor plate arranged on the outer surface of the concrete bottom plate and is anchored by an anchor; the anchor plate is connected to a side facing the concrete bottom plate with embedded steel bars, and the embedded steel bars are located inside the concrete bottom plate.
8. The unbonded prestressed anti-seepage anchor cable according to claim 7, It is characterized in that The anchor pad is sealed with a sealing cover on the side away from the concrete bottom plate, and the sealing cover is located at the periphery of the anchor and the unbonded steel strand; the interior of the sealing cover is filled with anti-corrosion filling material.
9. The unbonded prestressed anti-seepage anchor cable according to claim 1, It is characterized in that The guide bracket assembly includes a plurality of guide frames, which are evenly connected to the bearing plate along the circumference of the bearing plate, and a plurality of guide frames are connected to a fixing sleeve at one end away from the bearing plate.
