A new type of super-long truss tower crane attachment device

By designing a new type of ultra-long truss tower crane attachment device, using symmetrical attachment rods and articulated hole structures, the problems of excessive attachment distance and insufficient building load-bearing capacity in high-rise buildings are solved, and higher stability and strength are achieved. Thin walled building environment.

CN112520602BActive Publication Date: 2024-11-05ZHANGJIAGANG TIANYUN BUILDING MACHINERY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202011499150.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-18
Publication Date
2024-11-05
Estimated Expiration
2040-12-18

AI Technical Summary

Technical Problem

In high-rise buildings, existing tower crane attachment devices are difficult to meet the demand for stable connection due to the long attachment distance and insufficient load-bearing capacity of the building structure, especially when the wall thickness of the building is thin.

Method used

A new type of ultra-long truss tower machine attachment device is designed, adopting a left-right symmetrical attachment rod structure, including front truss, middle truss and rear truss. The rear truss is composed of inner adjustment sheet, outer adjustment sheet and diagonal adjustment sheet. It is constructed and optimized for the installation of the attachment support through hinged holes and reinforcement plates to improve structural stability and strength.

Benefits of technology

By simplifying the structure and optimizing the design, the device improves the stability and strength of the attachment device, and can effectively carry a large self-weight. It is suitable for long-distance and low load-bearing building environments, reducing costs and reducing the self-weight of the attachment rod. influence of bending moment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112520602B_ABST
    Figure CN112520602B_ABST
Patent Text Reader

Abstract

The invention discloses a novel super-long truss tower crane attachment device, comprising an attachment frame and a truss-type attachment rod, wherein the attachment frame is installed on a standard section of the tower crane, one end of the attachment rod is connected to the attachment frame, and the other end is connected to a building wall, and the attachment rod comprises a front truss, a middle truss and a rear truss connected in sequence, the front truss is close to the building wall, the middle truss is a square cross-section truss, and the rear truss is composed of an inner adjustment piece, an outer adjustment piece and a diagonal adjustment piece, the rear end of the inner adjustment piece and the rear end of the outer adjustment piece are respectively connected to two corners of the attachment frame, and the two corners are located on the same side of the attachment frame; the front end of the inner adjustment piece and the front end of the outer adjustment piece are respectively connected to two corners of the rear end of the middle truss; and the diagonal adjustment piece is connected between the inner adjustment piece and the outer adjustment piece along a diagonal direction. The attachment device has a simple structure, high stability, saves materials and costs, and is safe to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a novel super-long truss type tower crane attachment device. Background Art

[0002] Tower cranes, as a special type of engineering lifting machinery, are widely used in the construction industry. With the rapid development of high-rise buildings, tower cranes need to be raised as the height of the building increases during use. When the height exceeds the independent height of the tower crane, the tower crane must be connected to the building's load-bearing structure through an attachment device in order to meet the safety requirements.

[0003] For the installation of tower crane attachment frame, the attachment distance is the length from the center of the tower crane standard section to the attachment point, which is basically based on the standard accessories of the manufacturer and is adjusted within the range of 4 meters to 4.5 meters. In recent years, with the changes in the design of public and civil buildings and the improvement of the design of industrial building functions, tower cranes need to consider not only the above content when using and installing them, but also the collision between the installation position and the structure, whether the lifting weight of the tower crane tip in the factory meets the equipment deadweight requirements, etc. This results in many tower crane positions being arranged, and the distance from the center point of the tower crane standard section to the building attachment point is far greater than the limit of 4.5 meters, and some attachment lengths exceed 20 meters. In order to improve the stability of the attachment frame, a three-pole or four-pole design is usually adopted, and some buildings have thinner wall designs, such as cooling towers, whose architectural design wall thickness is sometimes only 12cm, and the load-bearing capacity is not high, and it cannot bear the existing attachment devices. How to solve the above technical problems is what technicians in this field are committed to solving. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a novel super-long truss tower crane attachment device with high structural strength and strong stability.

[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:

[0006] A novel attachment device for an extra-long truss-type tower crane comprises an attachment frame and a truss-type attachment rod, wherein the attachment frame is installed on a standard section of the tower crane, one end of the attachment rod is connected to the attachment frame, and the other end is connected to a building wall, the attachment rod comprises a front truss, a middle truss and a rear truss connected in sequence, the front truss is close to the building wall, the middle truss is a square cross-section truss, the rear truss is composed of an inner adjustment plate, an outer adjustment plate and a diagonal adjustment plate, the rear end of the inner adjustment plate and the rear end of the outer adjustment plate are respectively connected to two corners of the attachment frame, and the two corners are located on the same side of the attachment frame; the front end of the inner adjustment plate and the front end of the outer adjustment plate are respectively connected to the two corners of the rear end of the middle truss; the diagonal adjustment plate is connected between the inner adjustment plate and the outer adjustment plate along the diagonal direction.

[0007] As a specific embodiment, the rear end of the diagonal adjustment piece is connected to the attachment frame at the same corner as the rear end of the inner adjustment piece, and the front end of the diagonal adjustment piece is connected to the middle truss at the same corner as the front end of the outer adjustment piece.

[0008] Preferably, there are two groups of attachment rods, which are symmetrically arranged on the left and right sides of the attachment frame.

[0009] As a specific embodiment, an attachment support for connecting to a building wall is installed on the front end portion of the front truss, and hinge holes are provided on the upper and lower side surfaces of the front end portion of the front truss. The two hinge holes are arranged coaxially, and the attachment support is hingedly installed on the front truss after a hinge shaft passes through two concentric hinge holes.

[0010] As a specific implementation, the front truss includes two symmetrical vertical frames and a connecting frame connected between the two vertical frames. The front ends of the two vertical frames are connected together, and the rear ends are respectively connected to the two corners of the front end of the middle truss. The connecting frame is installed on one side close to the middle truss, and an isosceles triangle is formed between the connecting frame and the two vertical frames.

[0011] As a specific implementation, the front truss further includes a pair of mounting plates with hinge holes, and the mounting plates are welded to the upper and lower side surfaces of the front ends of the two vertical frames for mounting the attachment support.

[0012] As a specific implementation, the attachment frame is a square frame.

[0013] As a specific implementation, the outer adjustment plate, the inner adjustment plate and the diagonal adjustment plate all include an adjustment screw module and a support rod assembly connected in series.

[0014] As a specific embodiment, the attachment device also includes a reinforcing plate, and there are multiple reinforcing plates, at least including those arranged on the upper and lower surfaces of the connection between the front truss and the middle truss and the upper and lower surfaces of the connection between the middle truss and the rear truss.

[0015] As a specific implementation, the middle truss includes a support frame welded from main chords and a plurality of diagonal webs supported between two adjacent main chords, the main chords are made of square channel steel, and the diagonal webs are made of round channel steel.

[0016] Compared with the prior art, the advantages of the present invention are as follows: the new type of super-long truss tower crane attachment device of the present invention adopts two groups of left-right symmetrical attachment rods, and its rear truss adopts a three-piece truss structure of inner adjustment plates, outer adjustment plates and diagonal adjustment plates. The structure formed by the attachment frame and the tower body is stable. The two groups of attachment rods simplify the structure of the attachment device and save costs. At the same time, the front end of the front truss adopts concentric hinge holes to install the attachment support, which can well optimize the influence of the bending moment caused by the deadweight of the attachment rod on the attachment support. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required to be used in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 It is a structural schematic diagram of the novel super-long truss tower crane attachment device of the present invention;

[0019] Figure 2 It is a structural schematic diagram of the front truss in the present invention;

[0020] Figure 3 This is the elevation view of the single-piece frame in the front truss;

[0021] Figure 4 This is the elevation view of the inner adjustment piece;

[0022] Figure 5 This is the elevation view of the outer adjustment piece;

[0023] Figure 6 Elevation drawing of the diagonal adjustment piece;

[0024] Among them: 100, attachment frame; 200, attachment rod; 300, building wall; 1, front truss; 11, vertical frame; 12, connecting frame; 13, mounting plate; 131, hinge hole; 2, middle truss; 21, main chord; 22, diagonal web; 3, rear truss; 31, inner adjustment plate; 32, outer adjustment plate; 33, diagonal adjustment plate; 4, attachment support; 5, reinforcement plate; 6, adjustment screw module; 7, support rod assembly. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention:

[0026] A new type of super-long truss tower crane attachment device, see Figure 1 As shown, it includes an attachment frame 100 and a truss-type attachment rod 200. The attachment frame 100 is installed on the standard section of the tower crane. One end of the attachment rod 200 is connected to the attachment frame 100, and the other end is connected to the building wall 300. The attachment rod 200 includes a front truss 1, a middle truss 2 and a rear truss 3 connected in sequence. The front truss 1 is close to the building wall 300. The middle truss 2 is a square cross-section truss. The rear truss 3 is composed of an inner adjustment piece 31, an outer adjustment piece 32 and a diagonal adjustment piece 33. The rear end of the inner adjustment piece 31 and the rear end of the outer adjustment piece 32 are respectively connected to the two corners of the attachment frame 100, and the two corners are located on the same side of the attachment frame 100; the front end of the inner adjustment piece 31 and the front end of the outer adjustment piece 32 are respectively connected to the two corners of the rear end of the middle truss 2; and the diagonal adjustment piece 33 is connected between the inner adjustment piece 31 and the outer adjustment piece 32 along the diagonal direction.

[0027] Specifically, the rear end of the diagonal adjustment piece 33 and the rear end of the inner adjustment piece 31 are connected to the same corner of the attachment frame 100, and the front end of the diagonal adjustment piece 33 is connected to the middle truss 2 at the same corner as the front end of the outer adjustment piece 32. Through this arrangement, the structure formed by the attachment rod 200, the attachment frame 100 and the building wall 300 is stable and reliable.

[0028] In this example, there are two groups of attachment rods 200, which are symmetrically arranged on the left and right sides of the attachment frame 100. The attachment frame 100 is a square frame. Figure 4 , 5, 6, the outer adjustment piece 32, the inner adjustment piece 31 and the diagonal adjustment piece 33 all include an adjustment screw module 6 and a support rod assembly 7 connected in series. Specifically, the adjustment screw module 6 on the outer adjustment piece 32 and the inner adjustment piece 31 is arranged on the side close to the middle truss 2, and the support rod assembly 7 is arranged on the side close to the attachment frame 100; while the adjustment screw module 6 on the diagonal adjustment piece 33 is arranged on the side close to the attachment frame 100, and the support rod assembly 7 is arranged on the side close to the middle truss 2. Through this arrangement, the connection between the outer adjustment piece 32, the inner adjustment piece 31 and the diagonal adjustment piece 33 can be stable and reliable.

[0029] In this example, an attachment support 4 for connecting to a building wall 300 is installed on the front end of the front truss 1. Figure 2 As shown, both the upper and lower side surfaces of the front end of the front truss 1 are provided with hinge holes 131, and the two hinge holes 131 are arranged coaxially, and the attachment support 4 is hingedly installed on the front truss 1 after the hinge axis passes through the two concentric hinge holes 131. The front truss 1 includes two symmetrical vertical frames 11 and a connecting frame 12 connected between the two vertical frames 11. The front ends of the two vertical frames 11 are connected together, and the rear ends are respectively connected to the two corners of the front end of the middle truss 2. The connecting frame 12 is installed on the side close to the middle truss 2, and an isosceles triangle is formed between the connecting frame 12 and the two vertical frames 11. The isosceles triangle arrangement can make the front truss 1 stable and will not shake. The attachment support 4 is installed through the two hinge holes 131 on the upper and lower surfaces, which can well optimize the influence of the bending moment caused by the deadweight of the attachment rod 200 on the attachment support 4. Specifically, the front truss 1 here also includes a pair of mounting plates 13 with hinge holes 131. The mounting plates 13 are welded to the upper and lower side surfaces of the front ends of the two vertical frames 11 for mounting the attachment support 4.

[0030] In this example, the attachment device also includes a reinforcing plate 5, see Figure 1 , 2 As shown, there are multiple reinforcing plates 5, including at least the upper and lower surfaces of the connection between the front truss 1 and the middle truss 2 and the upper and lower surfaces of the connection between the middle truss 2 and the rear truss 3. The reinforcing plates 5 are provided to improve the rigidity and strength of the attachment rod 200.

[0031] In this example, the middle truss 2 includes a support frame welded by main chords 21 and a plurality of diagonal webs 22 supported between two adjacent main chords 21. The main chords 21 are made of square channel steel, and the diagonal webs 22 are made of round channel steel. The use of a truss with a square cross section as the middle truss 2 facilitates production and manufacturing. The use of the main chords 21 and the diagonal webs 22 to construct the middle truss 2 greatly improves the strength and stability of the entire attachment rod 200.

[0032] It should be emphasized that the above are only preferred embodiments of the present invention and do not limit the present invention in any form. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A novel super-long truss tower crane attachment device, comprising an attachment frame and a truss attachment rod, wherein the attachment frame is installed on a standard section of the tower crane, one end of the attachment rod is connected to the attachment frame, and the other end is connected to a building wall, characterized in that: The attachment rod comprises a front truss, a middle truss and a rear truss connected in sequence, the front truss is close to the building wall side, the middle truss is a square cross-section truss, and the rear truss is composed of an inner adjustment piece, an outer adjustment piece and a diagonal adjustment piece, the rear end of the inner adjustment piece and the rear end of the outer adjustment piece are respectively connected to the two corners of the attachment frame, and the two corners are located on the same side of the attachment frame; the front end of the inner adjustment piece and the front end of the outer adjustment piece are respectively connected to the two corners of the rear end of the middle truss; The diagonal adjustment piece is connected between the inner adjustment piece and the outer adjustment piece in a diagonal direction; the rear end of the diagonal adjustment piece is connected to the attachment frame at the same corner as the rear end of the inner adjustment piece, and the front end of the diagonal adjustment piece is connected to the middle truss at the same corner as the front end of the outer adjustment piece; An attachment support for connecting to a building wall is installed on the front end of the front truss, and hinge holes are opened on both the upper and lower sides of the front end of the front truss, and the two hinge holes are arranged coaxially, and the attachment support is hingedly installed on the front truss after the hinge shaft passes through two concentric hinge holes; The front truss includes two symmetrical vertical frames and a connecting frame connected between the two vertical frames. The front ends of the two vertical frames are connected together, and the rear ends are respectively connected to the two corners of the front end of the middle truss. The connecting frame is installed on the side close to the middle truss, and an isosceles triangle is formed between the connecting frame and the two vertical frames; the front truss also includes a pair of mounting plates with hinge holes, and the mounting plates are welded to the upper and lower side surfaces of the front ends of the two vertical frames for installing the attachment support; the outer adjustment plate, the inner adjustment plate and the diagonal adjustment plate all include a series-connected adjustment screw module and a strut assembly.

2. The novel super-long truss tower crane attachment device according to claim 1 is characterized in that: The attachment rods are provided in two groups, which are symmetrically arranged on the left and right sides of the attachment frame.

3. The novel super-long truss tower crane attachment device according to claim 1 is characterized in that: The attachment frame is a square frame.

4. The novel super-long truss tower crane attachment device according to claim 1 is characterized in that: The attachment device also includes a plurality of reinforcing plates, at least including those arranged on the upper and lower surfaces of the connection between the front truss and the middle truss and the upper and lower surfaces of the connection between the middle truss and the rear truss.

5. The novel super-long truss tower crane attachment device according to claim 1 is characterized in that: The middle truss includes a supporting frame welded from main chords and a plurality of diagonal web members supported between two adjacent main chords. The main chords are made of square channel steels, and the diagonal web members are made of round channel steels.

Citation Information

Cited By

  • Super-long attachment for tower crane in house building project

    CN223823247U