A device and method for transporting and installing vertical strips of building infill walls
By designing an automated strip transportation, clamping and lifting rotary system, combined with the bonding and slurry system, the labor intensity, high cost and safety hazards of manual handling and installation are solved, and efficient and safe strip installation is achieved.
Patent Information
- Application Number
- CN202110114634.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-01-28
AI Technical Summary
In the prior art, the strips that fill the wall require manual handling and installation, which are labor-intensive, cost-effective, and have safety hazards and low efficiency.
A device including a strip transport system, a clamping system and a lifting rotary system was designed to realize the automatic handling, lifting and flipping of strips using mechanical jaws and wire ropes. Combined with a rotating bracket and an adhesive slurry system, the strips were realized. mechanized installation.
It realizes automatic handling and installation of strips, reduces labor intensity and cost, improves installation efficiency, and ensures safety. It only requires one person to operate it, and is suitable for various types of strips.
Smart Images

Figure CN112850539B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a device and a method for transporting and installing vertical strips of building filling walls. Background Art
[0002] With the continuous promotion of prefabricated buildings, the use of large strip wall panels in infill walls has become more and more widespread. However, at present, various strip wall materials are mostly transported, positioned and installed manually, which is costly and inefficient. Each strip weighs more than 200 kilograms and requires more than 3 people. Manual transport, positioning and installation are labor-intensive, costly and time-consuming. There are potential safety hazards in transportation, positioning and installation. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a device and method for transporting and installing vertical slats of building filling walls, which solves the problem that the slats in the prior art need to be transported manually, the installation is labor-intensive, costly, inefficient and has potential safety hazards.
[0004] In order to solve the above technical problems, the technical solution of the present invention is: a device for transporting and installing vertical slats of building infill walls, comprising a slat transport system, a slat clamping system and a slat lifting and rotating system;
[0005] The strip transport system comprises a moving frame and a lifting bracket; one end of the moving frame is open, and its horizontal cross section is U-shaped; the lifting bracket is installed on the moving frame and can be lifted and lowered relative to the moving frame;
[0006] The strip board clamping system includes two sets of mechanical clamps, which are respectively located at the open end and the closed end of the mobile frame;
[0007] The slat lifting and rotating system comprises a first pulley, a second pulley, a third pulley, a steel wire rope, a steel wire rope winding device and a steel wire rope locking device;
[0008] The first pulley is rotatably mounted on the lifting bracket and is disposed close to the opening end of the moving frame;
[0009] The second pulley is rotatably mounted on the lifting bracket and is disposed close to the closed end of the moving frame;
[0010] The third pulley is fixed to the mechanical clamp adjacent to the closed end of the moving frame;
[0011] The wire rope winding device is fixedly installed on the lifting bracket;
[0012] One end of the steel wire rope is fixed to the mechanical clamp located at the open end of the moving frame, and the other end is wound around the first pulley, the second pulley and the third pulley and then wound around the steel wire rope winding device;
[0013] The wire rope locking device at least comprises a first wire rope check switch device fixed to the lifting bracket, which is used to lock or release one end of the wire rope fixedly connected to the mechanical clamp;
[0014] When the slat is lifted, the first wire rope check switch device releases the wire rope, and the two mechanical clamps rise and fall synchronously; when the slat is flipped, the first wire rope check switch device locks the wire rope, the wire rope winding device releases the wire rope, and the end of the slat near the closed end of the moving frame slowly descends until the flipping of the slat is completed.
[0015] As a preferred technical solution, the slat lifting and rotating system also includes a flip shaft, which is rotatably mounted on the lifting bracket; the first pulley is rotatably mounted on the flip shaft; a front mounting seat is fixedly mounted on the flip shaft, and a rear mounting seat is fixedly mounted on the lifting bracket near the second pulley; limiting holes are provided on the front mounting seat and the rear mounting seat, and an anti-sway positioning pin is provided on the mechanical clamp; when the mechanical clamp is lifted into place, the anti-sway positioning pin is inserted into the limiting hole.
[0016] As a preferred technical solution, the front mounting seat is also provided with a positioning pin locking structure, the positioning pin locking structure includes a jack pin, a locking hole is provided on the front mounting seat, and the jack pin is located in the locking hole; the anti-sway positioning pin is provided with a through hole for the jack pin to pass through.
[0017] As a preferred technical solution, the wire rope locking device also includes a second wire rope check switch device and a third wire rope check switch device; the second wire rope check switch device is used to lock or release the wire rope located between the third pulley and the second pulley; the third wire rope check switch device is used to lock or release the wire rope adjacent to the wire rope winding device.
[0018] As a preferred technical solution, it also includes a strip board installation system, which includes a rotating bracket and two strip board pushers;
[0019] One side of the rotating bracket is hinged to the moving frame, and a support leg that can be extended and retracted relative to the rotating bracket is provided at the lower end of the rotating bracket;
[0020] The two strip pushers are fixed on one side where the rotating bracket is hinged with the moving frame, and are respectively located at the lower end and the upper end of the rotating bracket.
[0021] As a preferred technical solution, it also includes a slat positioning system, which includes a lower push rod and an upper push rod, both of which are controllable telescopic rods; a fixed sleeve of the upper push rod is fixed to the end surface of the lifting bracket at one end adjacent to the first pulley; one end of the fixed sleeve of the lower push rod is hinged to the moving frame, and the fixed sleeve of the lower push rod is also hinged with a driving rod for driving it to rotate relative to the moving frame.
[0022] As a preferred technical solution, it also includes a strip board scraping and bonding adhesive system, the strip board scraping and bonding adhesive system includes two template units, the template unit includes a limit template and a magnetic bottom template, one end of the magnetic bottom template is fixedly connected to the middle of the limit template;
[0023] When applying glue to the connection surface of the strips, the two template units are detachably connected through a quick-install connection structure; the magnetic bottom mold extends into the plate gap formed by the two strips, and the limiting template is located outside the plate gap and closely attached to the outer sides of the two strips; the magnetic bottom mold faces the side of the strip and forms a glue channel together with the limiting template and the strip;
[0024] It also includes a driving device for driving the template unit to move along the plate seam.
[0025] As a preferred technical solution, the side of the magnetic bottom mold facing the strip is a molding surface, and a plurality of thickness limiting support feet are arranged on the molding surface. The thickness limiting support feet are distributed in a point shape or a strip shape; the side of the thickness limiting support feet that is tightly attached to the strip is a spherical surface or an arc surface.
[0026] As a preferred technical solution, the quick-release connection mechanism includes a magnetic component, and the magnetic component is fixed on the magnetic bottom mold; the two magnetic components located on the two magnetic bottom molds are attracted to each other.
[0027] A method for transporting and installing vertical strips of building infill walls, including:
[0028] 1) Control the lifting bracket to rise so that the mechanical gripper is higher than the height of the strip stack;
[0029] 2) Adjust the open end of the mobile frame so that it is in the length direction of the stacked slats, and push the mobile frame until the mechanical gripper is located above the stacked slats;
[0030] 3) The first wire rope check switch device is in the open state, the wire rope winding device is operated to release the wire rope, and the two mechanical grippers fall down and clamp the strip;
[0031] 4) Control the wire rope winding device to drive the two mechanical grippers to rise synchronously and lift the slats to the required height;
[0032] The first wire rope check switch device locks the wire rope;
[0033] 5) After operating the mobile frame to leave the slat stack, control the lifting bracket to descend to a suitable height;
[0034] 6) After the slats are transported to the installation location, the lifting bracket is controlled to rise to the height required for the slats to flip;
[0035] 7) Maintain the first wire rope check switch device to lock the wire rope, control the wire rope winding device to release the wire rope, and the end of the slat close to the second pulley completes the fall under the action of its own gravity;
[0036] 8) After the gravity flipping of the strip is completed, a straightening force is applied to the strip so that the upper and lower ends of the strip are respectively close to the angle steels pre-fixed on the wall or floor for controlling the axis position;
[0037] 9) Apply adhesive paste to the gap between the two boards;
[0038] 10) After applying the glue, push the strips together to connect the two strips.
[0039] Compared with the existing strip board construction technology, the advantages of the present invention are:
[0040] 1. The equipment of the present invention is simple to manufacture, easy to use, and can be disassembled for turnover. Mechanized operation and control are realized during use, which changes the traditional method of requiring multiple people to carry and install, reduces labor intensity, shortens installation time, and requires only one person to operate, greatly reducing the cost of manual handling and installation.
[0041] 2. Grabbing the slats, lifting the slats, transporting the slats, flipping the slats by gravity, positioning the slats and installing the slats are all mechanized, with comprehensive functions and high efficiency. No manpower is required, but the operations are carried out by winches, the weight of the slats, jack-assisted devices, etc.
[0042] 3. The present invention has a reasonable structure. The two ends of the slat are lifted at the same time by means of a steel wire rope and a pulley. After being lifted into place, the mechanical clamp is positioned to prevent the slat from shaking back and forth and left and right during transportation. By clamping the slat at two different positions, when the winch slowly relaxes the steel wire rope, one end of the slat slowly falls down, and the other end rotates with the rotating shaft, thereby realizing the flipping of the slat from horizontal to vertical under the action of its own gravity.
[0043] 4. The mobile frame is U-shaped, with one end open so that the mobile frame can be put outside the stacked slats to facilitate grabbing and lifting. The open end of the mobile frame adopts a movable openable connecting door body, which can improve the connection strength of the mobile frame to ensure the overall stability during transportation and prevent the frame from being damaged.
[0044] 5. The lifting bracket is installed on the mobile frame in an adjustable manner so as to lower the center of gravity during transportation to ensure the stability of the transportation system. At the same time, it also allows for sufficient space at the lower end of the slats when they are grabbed, lifted and turned over by gravity.
[0045] 6. The horizontal support rod of the mobile frame adopts a retractable rod, which can be adjusted according to the length and width of the slats and the space of the room in place to adapt to various types of slats.
[0046] 7. A stripboard installation system is provided on one side of the mobile frame so that the stripboard can be close to and squeezed against the column, the wall end or the installed stripboard.
[0047] 8. The slat positioning system can be used to push the slats into position when the slats cannot reach a vertical state after being flipped.
[0048] 9. The strip board scraping adhesive mortar system forms an adhesive mortar with stable and consistent thickness on the joint surface of the strip boards, which can not only ensure the bonding thickness, but also ensure that there is no leakage of mortar to meet the bonding requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0050] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;
[0051] Figure 2 It is a structural schematic diagram of a slat clamping system and a slat lifting and rotating system in an embodiment of the present invention;
[0052] Figure 3 This is a schematic diagram of the state of clamping a strip board according to an embodiment of the present invention;
[0053] Figure 4 for Figure 3 A top view of
[0054] Figure 5 It is a structural schematic diagram of the strip clamping system clamping the strip;
[0055] Figure 6It is a structural schematic diagram of a wire rope locking device;
[0056] Figure 7 is a schematic diagram of the structure of the front seat plate;
[0057] Figure 8 This is a structural schematic diagram of the connecting door body in an open state in an embodiment of the present invention;
[0058] Fig. 9 It is a structural schematic diagram of the strip board scraping adhesive mortar system;
[0059] Fig.10 Schematic diagram of the state of the slats being straightened.
[0060] In the figure:
[0061] 1-slat transport system; 11-universal wheel; 12-connecting door body; 13-vertical support rod; 14-lifting bracket; 15-horizontal support rod; 16-handle;
[0062] 2-slat mounting system; 21-rotating bracket; 22-supporting leg; 23-slat pusher;
[0063] 3-slat clamping system; 31-mechanical clamping claw; 311-connecting rod; 312-telescopic driving member; 313-gripper; 32-anti-sway positioning pin;
[0064] 4-slat lifting rotation system; 41-first pulley; 42-turning shaft; 43-front mounting seat; 431-locking hole; 432-limiting hole; 433-jack pin; 434-lifting limit sensor; 44-wire rope; 45-first wire rope check switch device; 451-check switch connecting bracket; 452-sleeve; 453-control rod; 454-rope hole; 46-wire rope winding device; 47-second pulley; 48-third pulley; 49-rear mounting seat; 410-second wire rope check switch device; 411-third wire rope check switch device;
[0065] 5-slats;
[0066] 6-slat positioning system; 61-lower push rod; 62-upper push rod;
[0067] 7-strip board scraping and bonding adhesive system; 71-limiting template; 72-high-strength magnet; 73-magnetic bottom mold; 74-thickness limiting support foot; 75-wire connection seat. DETAILED DESCRIPTION
[0068] like Figure 1-10As shown, a device for transporting, positioning and installing vertical slats for building filling walls realizes the three functions of transporting, positioning and installing slats 5; it includes a slat transport system 1, a slat clamping system 3, a slat lifting and rotating system 4, a slat positioning system 6, a slat installation system 2 and a slat scraping and bonding adhesive mortar system 7.
[0069] like Figure 1 , Figure 3 , Figure 4 and Figure 6 As shown, the plank transport system 1 comprises a moving frame and a lifting bracket 14 arranged on the moving frame.
[0070] The mobile frame is assembled by a plurality of horizontal support rods 15, a plurality of vertical support rods 13 and a connecting door body 12; specifically, as Figure 1 and Figure 3 As shown, the cross section of the mobile frame after the vertical support rod 13 and the horizontal support rod 15 are connected is U-shaped, that is, one of the vertical surfaces is not closed and is in an open state. This end is the open end of the mobile frame, and the end opposite to the open end is the closed end; the connecting door body 12 is used to close the open end. Specifically, hinges and buckles are respectively provided on the two vertical support rods 12 corresponding to the opening. The hinges are used to connect the connecting door body 12 with the vertical support rod 13, and the buckles are used to plug the connecting door body 12 and the vertical support rod 13. When it is necessary to clamp the strip 5, the connecting door body 12 is opened to provide a channel for the strip 5 to enter the mobile frame; when the strip 5 is transported, the connecting door body 12 closes the open end of the mobile frame to improve the stability of the mobile frame.
[0071] A handle 16 is provided at one end of the moving frame away from the door body 12 , and the height and spacing of the two handles 16 are reasonable to meet the needs of operators.
[0072] A universal wheel 11 is arranged at the bottom of the mobile frame, and the universal wheel 11 has a braking function, and plays a role of rolling transportation during the handling process. The mobile frame can be transported by manual pushing or mechanical pushing device; the brake is applied when the slats are lifted, turned over and put into place to prevent the mobile frame from moving when the slats are lifted, turned over and put into place.
[0073] The lifting bracket 14 can be lifted relative to the mobile frame. Specifically, the lifting bracket 14 is connected to the mobile frame by a vertically arranged controllable telescopic rod, and the controllable telescopic rod can be a hydraulic or pneumatic jack, or an electric telescopic rod.
[0074] Preferably, the length of the mobile frame and the lifting bracket 14 is adjustable. Specifically, the horizontal support rods 15 parallel to each other in length direction on the lifting bracket 14 and the mobile frame are telescopically adjustable, for example, using hydraulic or pneumatic jacks, etc., to be suitable for carrying strips 5 of different lengths.
[0075] The slat transport system 1 is suitable for the lifting, transport, positioning and installation process of the slats 5, and its rigidity, stability and the required telescopic, lifting, length and height meet the functional requirements.
[0076] The strip board clamping system 3 includes two sets of mechanical grippers 31, which are respectively located at the open end and the closed end of the lifting bracket 14 close to the moving frame; wherein, the end of the moving frame connected to the door body 12 is set as the open end, and the end opposite to the open end is set as the closed end. The mechanical grippers 31 close to the open end of the moving frame play the role of grabbing, lifting and flipping; the mechanical grippers 31 away from the end connected to the door body 12 play the role of grabbing, lifting and rewinding.
[0077] An anti-shake positioning pin 32 is provided on the mechanical clamp 31. Figure 5 As shown, the mechanical gripper 31 includes a connecting rod 311, and an anti-sway positioning pin 32 is fixed on the connecting rod 311; both ends of the connecting rod 311 are fixedly connected to a gripper 313 through a telescopic driving member 312, and the telescopic driving member 312 can be an electric telescopic rod, a hydraulic or cylinder jack, etc. The telescopic driving member 312 drives the gripper 313 to move, thereby completing the grasping or releasing of the strip 5. The working surface of the gripper 313 is adapted to the surface to be grasped of the strip 5, and an external boss or an internal groove can be provided.
[0078] The slat lifting and rotating system 4 comprises a turning shaft 42, a steel wire rope 44, a first pulley 41, a second pulley 47, a third pulley 48, a steel wire rope winding device 46 and a steel wire rope locking device.
[0079] like Figure 2 , Figure 3 and Figure 4 As shown, the flip shaft 42 is rotatably mounted on the lifting bracket 14, and the first pulley 41 is rotatably mounted on the flip shaft 42; the third pulley 48 is fixed on the mechanical clamp 31 near the closed end of the moving frame, and the second pulley 47 is rotatably mounted on the lifting bracket 14 and is arranged near the third pulley 48. One end of the wire rope 44 is fixed on the mechanical clamp 31 near the open end of the moving frame, and the other end is fixed on the wire rope winding device 46 after passing through the first pulley 41, the second pulley 47 and the third pulley 48. The wire rope is pulled by the wire rope winding device 46, thereby driving the two mechanical clamps 31 to rise synchronously. The wire rope winding device 46 is preferably a winch, and the winch is used to tighten and loosen the wire rope 44, lift the strip 5 when tightening, and flip the strip 5 when loosening.
[0080] The wire rope locking device includes a first wire rope check switch device 45 , a second wire rope check switch device 410 and a third wire rope check switch device 411 .
[0081] like Figure 6As shown, the first steel wire rope check switch device 45, the second steel wire rope check switch device 410 and the third steel wire rope check switch device 411 all include a check switch connecting bracket 451, a sleeve 452 is fixed on the check switch connecting bracket 451, a rope hole 454 is provided in the sleeve 452 for the steel wire rope 44 to pass through, a switch hole is provided on the side wall of the rope hole 454, and a control rod 453 extends into the rope hole 454 through the switch hole. The control rod 453 can be a pneumatic rod or a hydraulic rod, which can lock or release the steel wire rope 44.
[0082] The first wire rope check switch device 45 is arranged near the first pulley 41, and is used to lock or release the wire rope 44 at the fixed connection end with the mechanical clamp; the second wire rope check switch device 410 is located between the third pulley 48 and the second pulley 47, and is used to lock or release the wire rope 44 at that location; the third wire rope check switch device 411 is arranged near the wire rope winding device 46, and is used to lock or release the wire rope 44 close to the wire rope winding device 46.
[0083] When the slat 5 is lifted into place, the first wire rope check switch device 45, the second wire rope check switch device 410 and the third wire rope check switch device 411 all lock and jam the wire rope 44; when the slat 5 needs to be flipped, the third wire rope check switch device 411 releases the lock on the wire rope 44, at least the first wire rope check switch device 45 maintains the locked state of the wire rope 44, and the wire rope winding device 46 releases the wire rope 44, then the third pulley 48 and the mechanical clamp 31 fixedly connected thereto descend at the same time, while the mechanical clamp 31 adjacent to the first pulley 41 rotates around the flip axis 42 relative to the lifting bracket 14, and does not rise or fall; in this way, the slat is transformed from the horizontal to the vertical state. Optimally, when the slat 5 needs to be flipped, the second wire rope check switch device 410 also maintains the locked state of the wire rope 44, thereby improving the stability of the system.
[0084] In order to improve the stability of the strip transport and flipping process, the lifting bracket 14 is fixedly mounted with a rear mounting seat 49, and the flip shaft 42 is fixedly mounted with a front mounting seat 43. Figure 7 As shown, the front mounting seat 43 and the rear mounting seat 49 are both provided with limit holes 432 for cooperating with the anti-sway positioning pin 32 on the mechanical clamp 31. When the wire rope 44 is lifted into place, the anti-sway positioning pin 32 is inserted into the limit hole 432, and the mechanical clamp 31 cannot shake significantly.
[0085] Furthermore, the front mounting seat 43 is also provided with a positioning pin locking structure. Figure 7As shown, the positioning pin locking structure includes a jack pin 433, and a through hole for the jack pin 433 to pass through is provided on the anti-sway positioning pin 32. A locking hole 431 is provided on the front mounting seat 43, and the jack pin 433 is located in the locking hole 431. The jack pin 433 can be extended and retracted relative to the locking hole 431 under hydraulic pressure or gas pressure; when the strip 5 is turned over, the jack pin 433 extends into the through hole of the anti-sway positioning pin 32 to prevent the anti-sway positioning pin 32 from falling out, and also prevents the first wire rope non-return switch device 45 from failing to play a safety role.
[0086] Furthermore, a lifting limit sensor 434 is provided on the front mounting seat 43 and the rear mounting seat 49. The lifting limit sensor 434 is located on the side of the front mounting seat 43 and the rear mounting seat 49 facing the mechanical clamp 31, and is used to detect whether the mechanical clamp 31 reaches the lifting height.
[0087] The second wire rope check switch device 410 is fixed on the rear mounting seat 49 or the lifting bracket 14; the first wire rope check switch device 45 is fixed on the front mounting seat 43. The two lifting limit sensors 434 respectively link the first wire rope check switch device 45 and the second wire rope check switch device 410 to operate.
[0088] When the slat 5 is transported to its place, the first wire rope check switch device 45 and the second wire rope check switch device 410 maintain the lock on the wire rope 44, the third wire rope check switch device 411 releases the lock on the wire rope 44, the winch releases the wire rope 44, and the end of the slat 5 near the closed end of the moving frame falls under the action of its own weight, while the end of the slat 5 near the open end of the moving frame cannot descend because the wire rope 44 is locked, but rotates relative to the lifting bracket 14 through the flip shaft 42.
[0089] When the slat 5 is in a nearly vertical state, the position of the lower end of the slat 5 is pushed and adjusted by the slat positioning system 6. The slat positioning system 6 includes a lower push rod 61 and an upper push rod 62. The lower push rod 61 is installed on the mobile frame, and the upper push rod 62 is fixed on the lifting bracket 14. The lower push rod 61 and the upper push rod 62 are both controllable telescopic rods, such as hydraulic rods or pneumatic rods. The lower push rod 61 can be retracted or unfolded relative to the mobile frame. Specifically, the fixed sleeve end of the lower push rod 61 is hinged to the mobile frame. The retraction or unfolding of the lower push rod 61 depends on the driving rod. One end of the driving rod is rotatably installed on the mobile frame, and the other end is hinged to the fixed sleeve of the lower push rod 61. When it is necessary to grab and clamp the stacked slats 5, the driving rod is retracted, the push rod 61 is attached to the side of the moving frame, and the upper push rod 62 is also in a retracted state; when it is necessary to straighten the nearly vertical slats 5, the driving rod is first extended to expand the lower push rod 61, and then the lower push rod 61 and the upper push rod 62 simultaneously push the slats 5 to straighten. Fig.10As shown, the upper and lower ends of the strip plate 5 are both close to the angle steel 8 pre-fixed on the floor or the top plate.
[0090] When the strips 5 need to be installed and docked, the strip installation system 2 and the strip scraping adhesive mortar system 7 assist in the installation and docking. Angle steel 8 is set in advance at the outer position of the bottom and top (outer relative to the installation operation position) according to the installation position of the strips 5, as an axis control device in place, and is set along the filling wall according to the position of each strip 5 to ensure the axis position of the strip 5 and the overall flatness of the wall. When the strips 5 are straightened, the strip installation system 2 is used to push the strips 5 to the appropriate position, and the lower push rod 61 and the upper push rod 62 simultaneously push the strips 5 to straighten, and respectively press against the upper and lower parts of the strips 5, and then the mechanical clamp 31 is released to withdraw the clamping of the strips 5, making room for the strips 5 to be coated with adhesive mortar and lateral close contact, and the strip scraping adhesive mortar system 7 is used to apply glue.
[0091] like Figure 1 and Figure 4 As shown, the strip installation system 2 includes a rotating bracket 21 and two strip pushers 23. The rotating bracket 21 is a triangular diagonal bracing structure. The rotating bracket 21 is hinged with the mobile frame and can rotate relative to the mobile frame. The lower end of the rotating bracket 21 is provided with a support leg 22 that can be telescopic relative to the rotating bracket 21. When in use, the rotating bracket 21 is opened, and the support leg 22 is supported on the ground. At this time, the rotating bracket 21 is on the pushing surface of the strip 5. The two strip pushers 23 are respectively located at the lower end and the upper end of the rotating bracket 21. The strip pushers 23 can use hydraulic or pneumatic jacks; the strip 5 is pushed by the strip pushers 23 to push the strip 5 into place. The strip installation system 2 supplements the stability, rigidity and load of the mobile frame to ensure its overall stability during the flipping, positioning and installation process, prevent lateral overturning, and prevent frame damage. Transportation, active load, and end load of the strip 5 during the flipping process and positioning process. When the slat 5 is lifted and transported, the rotating bracket 21 is attached to the outer side of the moving frame, which does not take up space and is convenient for transfer.
[0092] like Figure 7 As shown, the strip board scraping adhesive system 7 is used to apply adhesive to two strip boards 5 to be connected, forming adhesive with uniform thickness on the connection surface of the strip boards 5; it includes two template units, and the two template units are detachably connected through a quick-install connection structure. Each template unit includes a magnetic bottom mold 73 and a limit template 71.
[0093] The side of the limiting template 71 used for docking with another limiting template 71 is set as the docking surface, and the side used for connecting with the magnetic bottom mold 73 is set as the connecting surface; when in use, the two sides of the limiting template 71 facing the two strips 5 are the forming surfaces. The connecting surface of the limiting template 71 is connected to the middle of the magnetic bottom mold 73.
[0094] When applying glue to the connecting surface of the strips 5, the magnetic bottom mold 73 extends into the plate seam formed by the two strips 5, and the limiting template 71 is located outside the plate seam formed between the two strips 5 and is closely attached to the outer surface of the strips 5; the limiting template 71 faces the side of the strips 5 and forms a glue channel together with the magnetic bottom mold 73 and the strips 5, and each strip 5 has a corresponding glue channel. After the two template units 5 are docked, the docking surfaces of the two limiting templates 71 are docked with each other and sealed; after the two limiting templates 71 are docked, they adapt to the structure of the plate seam.
[0095] A plurality of thickness limiting support feet 74 are arranged on the molding surface of the position limiting template 71, and the thickness limiting support feet 74 are distributed in a dotted shape or in a strip shape. Due to the arrangement of the thickness limiting support feet 74, a glue passage with a stable width is formed between the position limiting template 71 and the strip 5. The side of the thickness limiting support feet 74 that is in close contact with the strip 5 is a spherical surface or an arc surface, which can reduce the contact area between the thickness limiting support feet 74 and the strip 5 on the one hand, thereby ensuring the application effect of the glue; on the other hand, it can reduce the installation, sliding or disassembly resistance of the template unit 5.
[0096] When the butt joint surface of the strip 5 is a plane, the thickness limiting support foot 74 can be set at any position on the forming surface of the limiting template 71; when the butt joint surface of the strip 5 is concave and convex, the thickness limiting support foot 74 is set to correspond to the convex position of the strip 5.
[0097] The quick-install connection structure can be a combination of bolts and nuts; other forms of connection structures that are convenient for assembly and disassembly can also be used. Preferably, the quick-install connection structure includes a magnetic member 72, which is fixed on a magnetic bottom mold 73. When the strip 5 is glued, the two magnetic members 72 located on the two template units 5 are attracted to each other, so that the two limit templates 71 can be firmly and effectively connected; when the glue application is completed, the two magnetic members 72 can be separated by external force, so that the limit template 71 can be removed from the strip 5.
[0098] Furthermore, the magnetic member 72 is a high-strength magnet or an electromagnet; preferably, the quick-release connection mechanism includes two high-strength magnets, which are respectively located on the upper end surface and the lower end surface of the limiting template 71.
[0099] It also includes a driving device for driving the template unit 5 to move along the plate seam, the driving device includes a pull wire and a pulling device; one end of the pull wire is fixedly connected to the template unit, and the other end is connected to the pulling device, and the lifting device drives the limit template 71 to rise. The pulling device 4 is preferably a winch, which is not shown in the figure.
[0100] The magnetic bottom mold 73 is provided with a wire connection seat 75, the wire is fixed on the wire connection seat 75, and the pulling device 4 is fixed on the crossbeam located on the upper side of the strip 5; the pulling device operates to pull the template unit from the lower end to the top end. During the upward pulling process, the adhesive slurry delivery pipe continuously and uniformly pours adhesive slurry into the template unit. During the upward movement of the limiting template 71, an adhesive slurry with a stable and consistent thickness is formed on the docking surface of the strip 5. The shape of the scraped adhesive slurry is adapted to the shape of the docking surface of the strip 5, and it is scraped from top to bottom and quickly, which can ensure the thickness of the bonding and prevent leakage, so as to ensure the bonding requirements. After the adhesive slurry is scraped, an external force is applied to the magnetic bottom mold 73 to separate the two template units, and the template unit is split from the strip 5 to complete the gluing of the strip 5.
[0101] After the adhesive paste is applied, the strip pusher 23 pushes the strip 5 to move toward the installation side to squeeze the paste and completely put it in place laterally; the rotating bracket 21 provides a lateral support reaction force when the strip pusher 23 applies lateral pressure to the strip 5 to ensure that it pushes the strip 5 into place.
[0102] The present invention clamps the slats 5 through the slat clamping system 3, transports them to the installation site through the slat transportation system 1, lifts and rotates the slats 5 through the slat lifting and rotating system 4, adjusts the slats 5 from horizontal to vertical, puts the slats 5 in place through the slat positioning system 6, applies adhesive mortar to the gap between the two boards 5 through the slat scraping adhesive mortar system 7, and presses the slats 5 to be installed against the installed slats 5 through the slat installation system 2 and squeezes the adhesive mortar, so that the adhesive mortar between the two boards is dense.
[0103] The invention is simple to manufacture, easy to use, and can be disassembled and used in a cyclic manner. Mechanized control is realized during use, which changes the traditional method of multi-person handling and installation. It is safe and efficient, reduces labor intensity, shortens installation time, and only requires one person to operate, greatly reducing the cost of manual handling and installation.
[0104] The method for using the above-mentioned equipment for transporting and installing vertical strips of building infill walls comprises:
[0105] 1) Adjust the lifting bracket 14 to lift the mechanical gripper 31 to a desired height, which is higher than the height of the stack of strips;
[0106] 2) The open end of the moving frame faces the stacked strips 5, and the moving frame is pushed until the mechanical gripper 31 is located above the stacked strips 5;
[0107] 3) The jack 312 of the mechanical gripper 31 is extended and in an open state to ensure that the distance between the two grippers 313 is greater than the width of the strip 5;
[0108] The first steel wire rope check switch device 45, the second steel wire rope check switch device 410 and the third steel wire rope check switch device 411 are all in a released state;
[0109] The wire rope winding device 46 is operated to release the wire rope 44, so that the two mechanical grippers 31 fall to a suitable height, and then the mechanical grippers 31 grip the strip 5;
[0110] 4) Maintaining the first steel wire rope check switch device 45, the second steel wire rope check switch device 410 and the third steel wire rope check switch device 411 in a released state;
[0111] Control the wire rope winding device 46 to drive the two mechanical grippers 31 to rise synchronously to lift the slat 5;
[0112] When the slat 5 is lifted to the required height, the lifting limit sensor 434 detects that the mechanical clamp 31 is in place, and controls the wire rope winding device 46 to stop running;
[0113] The first wire rope check switch device 45, the second wire rope check switch device 410 and the third wire rope check switch device 411 lock the wire rope 44;
[0114] 5) Move the frame away from the stack of slats, close the connecting door 12, and then adjust the height of the lifting bracket 14 to facilitate stable and safe transportation; optimally, when the slats 5 are at the upper side of the connecting door 12, the overall center of gravity is low and the stability is good;
[0115] 6) After the slat 5 is transported to the installation location, the height of the lifting bracket 14 is adjusted to meet the height required for the flipping of the slat 5, so as to facilitate the flipping of the slat 5; then the connecting door body 12 is opened and pushed to the outside of the mobile frame;
[0116] 7) Maintain the first wire rope check switch device 45 and the second wire rope check switch device 410 to lock the wire rope 44, the third wire rope check switch device 411 releases the lock on the wire rope 44, and controls the wire rope winding device 46 to release the wire rope 44, so that the end of the slat 5 away from the door body 12 falls due to its own gravity, and the other end of the slat 5 rotates around the flip shaft 42;
[0117] 8) After the gravity flipping of the slat 5 is completed, the slat 5 is pushed to the vertical position through the slat positioning system 6, and then the position of the moving frame is finely adjusted so that the upper and lower ends of the slat 5 are respectively close to the angle steel 8 pre-fixed on the wall or floor for controlling the axis position;
[0118] 9) Use the strip board scraping adhesive mortar system 7 to apply adhesive mortar to the gap between the two boards;
[0119] 10) After the application of the adhesive, the strip board 5 is pushed by the strip board installation system 2 to achieve the connection between the two strip boards 5 .
[0120] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A device for transporting and installing vertical strips of building infill walls. Features: It comprises a strip transport system (1), a strip clamping system (3) and a strip lifting and rotating system (4); The strip transport system (1) comprises a moving frame and a lifting bracket (14); one end of the moving frame is open and its horizontal cross section is U-shaped; the lifting bracket (14) is mounted on the moving frame and can be lifted or lowered relative to the moving frame; The strip board clamping system (3) comprises two sets of mechanical clamping claws (31), and the two sets of mechanical clamping claws (31) are respectively located at the open end and the closed end of the movable frame; The slat lifting and rotating system (4) comprises a first pulley (41), a second pulley (47), a third pulley (48), a steel wire rope (44), a steel wire rope winding device (46) and a steel wire rope locking device; The first pulley (41) is rotatably mounted on the lifting bracket (14) and is disposed close to the open end of the movable frame; The second pulley (47) is rotatably mounted on the lifting bracket (14) and is disposed close to the closed end of the movable frame; The third pulley (48) is fixed to the mechanical clamp (31) adjacent to the closed end of the moving frame; The wire rope winding device (46) is fixedly mounted on the lifting bracket (14); One end of the steel wire rope (44) is fixed to the mechanical clamp (31) located at the open end of the moving frame, and the other end is wound around the first pulley (41), the second pulley (47) and the third pulley (48) and then wound around the steel wire rope winding device (46); The wire rope locking device comprises at least a first wire rope non-return switch device (45) fixed to the lifting bracket (14), which is used to lock or release one end of the wire rope (44) fixedly connected to the mechanical clamp (31); When the slat (5) is lifted, the first steel wire rope check switch device (45) releases the steel wire rope (44), and the two mechanical clamps (31) are raised and lowered synchronously; when the slat (5) is flipped, the first steel wire rope check switch device (45) locks the steel wire rope (44), the steel wire rope winding device (46) releases the steel wire rope (44), and the end of the slat (5) adjacent to the closed end of the moving frame slowly descends until the flipping of the slat (5) is completed; The slat lifting and rotating system (4) further comprises a tilting shaft (42), wherein the tilting shaft (42) is rotatably mounted on the lifting bracket (14); the first pulley (41) is rotatably mounted on the tilting shaft (42); a front mounting seat (43) is fixedly mounted on the tilting shaft (42), and a rear mounting seat (49) is fixedly mounted on the lifting bracket (14) adjacent to the second pulley (47); both the front mounting seat (43) and the rear mounting seat (49) are provided with a limiting hole (432), and the mechanical clamp (31) is provided with an anti-sway positioning pin (32); when the mechanical clamp (31) is lifted into place, the anti-sway positioning pin (32) is inserted into the limiting hole (432); The wire rope locking device further comprises a second wire rope check switch device (410) and a third wire rope check switch device (411); the second wire rope check switch device (410) is used to lock or release the wire rope (44) located between the third pulley (48) and the second pulley (47); the third wire rope check switch device (411) is used to lock or release the wire rope (44) adjacent to the wire rope winding device (46).
2. A device for transporting and installing vertical strips of building infill walls as claimed in claim 1, Features: The front mounting seat (43) is also provided with a positioning pin locking structure, the positioning pin locking structure comprising a jack pin (433), a locking hole (431) is provided on the front mounting seat (43), and the jack pin (433) is located in the locking hole (431); and the anti-sway positioning pin (32) is provided with a through hole for the jack pin (433) to pass through.
3. A device for transporting and installing vertical strips of building infill walls as claimed in claim 1, Features: Also included is a strip board installation system (2), wherein the strip board installation system (2) comprises a rotating bracket (21) and two strip board pushers (23); One side of the rotating bracket (21) is hinged to the movable frame, and a support leg (22) is provided at the lower end of the rotating bracket (21) and is retractable relative to the rotating bracket (21); The two strip pushers (23) are fixed to one side of the hinged connection between the rotating bracket (21) and the moving frame, and are respectively located at the lower end and the upper end of the rotating bracket (21).
4. A device for transporting and installing vertical strips of building infill walls as claimed in claim 1, Features: It also includes a slat positioning system (6), the slat positioning system (6) including a lower push rod (61) and an upper push rod (62), the lower push rod (61) and the upper push rod (62) are both controllable telescopic rods; a fixing sleeve of the upper push rod (62) is fixed to an end surface of one end of the lifting bracket (14) adjacent to the first pulley (41); one end of the fixing sleeve of the lower push rod (61) is hinged to the moving frame, and the fixing sleeve of the lower push rod (61) is also hinged to a driving rod for driving it to rotate relative to the moving frame.
5. A device for transporting and installing vertical strips of building infill walls as claimed in claim 1, Features: It also comprises a strip board scraping adhesive mortar system (7), the strip board scraping adhesive mortar system (7) comprising two template units, the template unit comprising a limit template (71) and a magnetic bottom template (73), one end of the magnetic bottom template (73) being fixedly connected to the middle of the limit template (71); When applying glue to the connection surface of the strips (5), the two template units are detachably connected via a quick-install connection structure; the magnetic bottom mold (73) extends into the plate gap formed by the two strips (5), and the limiting template (71) is located outside the plate gap and closely attached to the outer surfaces of the two strips (5); the magnetic bottom mold (73) faces the side of the strip (5) and together with the limiting template (71) and the strip (5) forms a glue channel; It also includes a driving device for driving the template unit (5) to move along the plate seam.
6. A device for transporting and installing vertical strips of building infill walls as claimed in claim 5, Features: The side surface of the magnetic bottom mold (73) facing the strip board (5) is a molding surface, and a plurality of thickness limiting support feet (74) are arranged on the molding surface. The thickness limiting support feet (74) are distributed in a point shape or a strip shape; and the side surface of the thickness limiting support feet (74) in close contact with the strip board (5) is a spherical surface or an arc surface.
7. A device for transporting and installing vertical strips of building infill walls as claimed in claim 5, Features: The quick-install connection mechanism comprises a magnetic component (72), wherein the magnetic component (72) is fixed on the magnetic bottom mold (73); the two magnetic components (72) located on the two magnetic bottom molds (73) are attracted to each other.
8. A method for transporting and installing vertical slats for building infill walls using the device for transporting and installing vertical slats for building infill walls as claimed in claim 1, Features: include 1) controlling the lifting bracket (14) to rise so that the mechanical gripper (31) is higher than the height of the stack of strips; 2) adjusting the open end of the movable frame so that it is located in the length direction of the stacked strips (5), and pushing the movable frame until the mechanical gripper (31) is located above the stacked strips (5); 3) The first wire rope check switch device (45) is in the open state, the wire rope winding device (46) is operated to release the wire rope (44), and the two mechanical clamps (31) fall down and clamp the strip (5); 4) controlling the wire rope winding device (46) to drive the two mechanical grippers (31) to rise synchronously, thereby lifting the slat (5) to a desired height; The first steel wire rope non-return switch device (45) locks the steel wire rope (44); 5) After the mobile frame is operated to leave the slat stack, the lifting bracket (14) is controlled to descend to a suitable height; 6) After the slats (5) are transported to the installation location, the lifting bracket (14) is controlled to rise to a height required for the slats (5) to flip over; 7) maintaining the first wire rope check switch device (45) to lock the wire rope (44), controlling the wire rope winding device (46) to release the wire rope (44), and allowing the end of the slat (5) close to the second pulley (47) to fall down under the action of its own gravity; 8) After the slat (5) has been turned over by gravity, a straightening force is applied to the slat (5) so that the upper and lower ends of the slat (5) are respectively pressed against angle steels (8) that are pre-fixed on the wall or floor and are used to control the position of the axis; 9) Apply adhesive paste to the gap between the two plates (5); 10) After the application of the adhesive mortar, push the strips (5) to achieve the connection of the two strips (5).