A desulfurization wastewater zero discharge system and method
By adopting seed crystal technology in the desulfurization wastewater treatment of thermal power plants, the problem of easy scale in wastewater is solved, the evaporator scale is delayed, energy consumption and operating costs are reduced, and efficient zero-emission treatment is achieved.
Patent Information
- Application Number
- CN202110318161.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-03-25
AI Technical Summary
The high content of suspended substances in the desulfurization wastewater of thermal power plants is high, the high salt content is strong, the corrosiveness and the water quality fluctuates greatly, resulting in high energy consumption of treatment and high maintenance costs, making it difficult to achieve zero emissions.
The seed crystal technology is used to precipitate calcium sulfate and other substances during solution concentration to reduce the chance of these scaling substances attached to the wall of the heat exchange tube, prevent scaling of the heat exchange tube, and reduce the overall size by recycling calcium sulfate seed crystals. cost.
It effectively delays the scaling on the surface of the evaporator heat exchange tube, reduces the cleaning frequency, saves chemical consumption, reduces energy consumption, and improves the operating efficiency and cost advantages of the system.
Smart Images

Figure CN112875968B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a desulfurization wastewater zero-discharge system and a method thereof, belonging to the technical field of wastewater treatment. Background Art
[0002] With the gradual improvement of environmental protection standards, zero discharge of desulfurization wastewater is the general trend. However, the desulfurization wastewater of thermal power plants has high suspended solids content, high salt content, strong corrosiveness and large water quality fluctuations. When treating it, it consumes a lot of energy, is easy to scale during the evaporation process, and has high maintenance costs. Therefore, reducing the zero discharge cost of desulfurization wastewater has become an urgent problem to be solved in this industry. Summary of the invention
[0003] The purpose of the present invention is to provide a desulfurization wastewater zero discharge system and a desulfurization wastewater zero discharge method. The present invention adopts the seed crystal method technology to make calcium sulfate and other substances precipitated in the solution concentration process grow preferentially on the surface of calcium sulfate seed crystals, thereby reducing the probability of these scaling substances adhering to the wall of the heat exchange tube, effectively preventing the scaling of the heat exchange tube, and the calcium sulfate seed crystals can be recycled to reduce the overall cost.
[0004] In order to solve the above technical problems, the present invention adopts the following technical scheme: a desulfurization wastewater zero emission system, including a pretreatment system, an evaporation reduction system and a high-temperature bypass flue drying system, the pretreatment system includes a wastewater regulating tank, a reactor, a high-efficiency clarifier and a clear water tank connected in sequence through pipelines, the evaporation reduction system includes a heat exchanger, a degassing tower, a falling film evaporator and a concentrate tank connected in sequence through pipelines, the high-temperature bypass flue drying system includes an SCR reactor, a spray drying tower and a concentrate tank connected in sequence through pipelines, the clear water tank is connected to the heat exchanger pipeline, a concentration system delivery pump is arranged on the pipe section between the clear water tank and the heat exchanger, the concentrate tank is connected to the concentrate tank pipeline, and a concentrate pump is arranged on the pipe section between the concentrate tank and the concentrate tank.
[0005] The aforementioned zero-discharge system for desulfurization wastewater, the pretreatment system also includes an A pipeline, a B pipeline, a process water system and a sludge dewatering machine, an A valve and a B valve are arranged on the A pipeline, the reactor is connected to the clean water tank through the A pipeline, a wastewater delivery pump is arranged on the pipe section between the wastewater regulating tank and the reactor, a wastewater lifting pump is arranged on the pipe section between the reactor and the high-efficiency clarifier, a high-efficiency clarifier outlet pipe is arranged on the high-efficiency clarifier, the high-efficiency clarifier outlet pipe is connected to the pipe section between the A valve and the B valve, a sludge discharge pipe is arranged at the bottom of the high-efficiency clarifier, one end of the sludge discharge pipe is connected to the bottom outlet of the high-efficiency clarifier, and the sludge discharge pipe is connected to the bottom outlet of the high-efficiency clarifier. A sludge pool is set at the other end of the pipeline, the process water system is connected to the reactor pipeline, the sludge dewatering machine is connected to the sludge pool pipeline, a sludge delivery pump is set on the pipe section between the sludge dewatering machine and the sludge pool, one end of the B pipe is connected to the pipe section between the process water system and the reactor, the other end of the B pipe is connected to the sludge discharge pipe, and an electric mud bucket is set at the bottom of the sludge dewatering machine; if the effluent of the high-efficiency clarifier is qualified, open the B valve, the effluent enters the A pipe through the high-efficiency clarifier outlet pipe and is transported to the clear water pool; if the effluent of the high-efficiency clarifier is unqualified, open the A valve and close the B valve to make the effluent flow back to the reactor through the A pipe for secondary reaction.
[0006] The aforementioned zero-discharge system for desulfurization wastewater comprises: a wastewater regulating tank mixer is provided in the wastewater regulating tank, a reactor mixer is provided in the reactor, a dosing machine is provided on the top of the reactor, an aeration device A is provided in the clear water tank, an aeration device B is provided in the sludge tank, an aeration device A is provided on the aeration device A, one end of the aeration pipe A is connected to the aeration device A, and a Roots blower is provided on the other end of the aeration pipe A, and an aeration pipe B is provided on the aeration device B, one end of the aeration pipe B is connected to the aeration device B, and the other end of the aeration pipe B is connected to the Roots blower.
[0007] The aforementioned zero-discharge system for desulfurization wastewater, the heat exchanger is provided with a cold water inlet pipe, a cold water outlet pipe, a hot water inlet pipe and a hot water outlet pipe, the cold water inlet pipe is connected to the side wall of the clear water tank, the cold water outlet pipe is connected to the top inlet of the degassing tower, one end of the hot water outlet pipe is connected to the heat exchanger, the other end of the hot water outlet pipe is provided with a circulating water make-up water system, and the cold water inlet pipe is provided with an acid dosing device and a scale inhibitor dosing device.
[0008] The aforementioned desulfurization wastewater zero emission system, the evaporation reduction system also includes a distilled water tank, the bottom outlet of the distilled water tank is connected to the hot water inlet pipe, a distilled water pump is arranged on the pipe section between the bottom outlet of the distilled water tank and the hot water inlet pipe, and a C pipe and a D pipe are arranged on the top of the distilled water tank.
[0009] The aforementioned zero-emission system for desulfurization wastewater comprises an E pipe and an F pipe arranged between the degassing tower and the falling film evaporator, one end of the C pipe is connected to the top of the distilled water tank, the other end of the C pipe is connected to the E pipe, one end of the D pipe is connected to the top of the distilled water tank, and the other end of the D pipe is connected to the falling film evaporator.
[0010] The aforementioned zero-discharge system for desulfurization wastewater, wherein a seed dosing device is provided on the falling film evaporator, a pipe on one side of the falling film evaporator is connected to a demister and a steam compressor, the demister is connected to the steam compressor pipe, the outlet of the steam compressor is connected to the side wall pipe of the falling film evaporator, an evaporator circulation pipe is provided on the falling film evaporator, one end of the evaporator circulation pipe is connected to the top of the falling film evaporator, the other end of the evaporator circulation pipe is connected to the bottom of the falling film evaporator, a circulation pump is provided on the evaporator circulation pipe, and an alkali dosing device and a defoaming agent dosing device are provided on the pipe section between the circulation pump and the bottom of the falling film evaporator.
[0011] The aforementioned zero-discharge system for desulfurization wastewater, the evaporation reduction system also includes a seed circulation pipe and a plant steam system, the outlet of the seed circulation pipe is connected to the pipe section between the defoamer dosing device and the circulation pump, the inlet of the seed circulation pipe is connected to the inlet pipe of the circulation pump, a cyclone separator is arranged on the seed circulation pipe, the cyclone separator is provided with a G pipe, an H pipe and an I pipe, the bottom of the cyclone separator is connected to the seed circulation pipe through the G pipe, the top of the cyclone separator is connected to the top of the concentrated liquid tank through the H pipe, one end of the I pipe is connected to the pipe section between the outlet of the seed circulation pipe and the circulation pump, the other end of the I pipe is connected to the inlet of the cyclone separator, the I pipe is provided with a cyclone separator pump, and the plant steam system pipeline is connected to the pipe section between the top of the steam compressor and the side wall of the falling film evaporator.
[0012] The above-mentioned zero-emission system for desulfurization wastewater, the high-temperature bypass flue drying system also includes a dust collector, an air preheater and a boiler connected in sequence, the dust collector is connected to the flue of the air preheater, a buffer box is provided on the pipe section between the spray drying tower and the concentrate tank, a concentrate lifting pump is provided on the pipe section between the buffer box and the concentrate tank, the bottom outlet pipe of the spray drying tower is connected to the slag bin system of the power plant, an ash conveying device is provided on the pipe section between the bottom outlet of the spray drying tower and the slag bin system of the power plant, a flue gas pipeline A is provided on the top of the spray drying tower, and a rotary atomizer is provided in the spray drying tower, An inlet electric gate and an inlet electric regulating door are provided on the A flue gas duct. The inlet electric regulating door is arranged at one end close to the spray drying tower. The outlet of the A flue gas duct is connected to the inlet of the rotary atomizer. The inlet end of the A flue gas duct is connected to the pipe section between the outlet of the air preheater and the outlet of the SCR reactor. A B flue gas duct is provided at the bottom flue gas outlet of the spray drying tower. The B flue gas duct is provided with an outlet electric baffle door. One end of the B flue gas duct is connected to the bottom flue gas outlet of the spray drying tower, and the other end of the B flue gas duct is connected to the flue between the dust collector and the air preheater.
[0013] A method for zero discharge of desulfurization wastewater, comprising the following steps:
[0014] S1, turn on the wastewater regulating tank mixer and the wastewater delivery pump, and deliver the desulfurized wastewater to the reactor via a pipeline. At the same time, turn on the reactor mixer, add the integrated adsorption flocculant into the dosing machine, and the reactor mixer stirs the mixed liquid of the integrated adsorption flocculant and the desulfurized wastewater in the reactor. Turn on the wastewater lifting pump, and deliver the mixed liquid of the integrated adsorption flocculant and the desulfurized wastewater to the high-efficiency clarifier via a pipeline to remove suspended matter in the desulfurized wastewater, so that the suspended matter is ≤70mg / L, and obtain A effluent and sludge;
[0015] S2, open valve B, the A outlet water enters pipe A through the outlet pipe of the high-efficiency clarifier and is transported to the clean water tank, the sludge is transported to the sludge tank through the sludge discharge pipe, the A aeration device, the B aeration device and the Roots blower are turned on in sequence, the A aeration device aerates the A outlet water in the clean water tank, the B aeration device aerates the sludge in the sludge tank, the sludge delivery pump is turned on, the sludge is transported to the sludge dewatering machine through the pipeline for dehydration, and the dehydrated sludge enters the electric mud hopper;
[0016] S3, if the suspended solids are greater than 70 mg / L, open valve A and close valve B, so that the effluent A flows back to the reactor through pipe A for secondary reaction, so that the suspended solids in the mixed solution of the integrated adsorption flocculant and wastewater are less than or equal to 70 mg / L, then close valve A and open valve B, so that the effluent A of the secondary reaction is transported to the clean water tank through pipe A, and repeat step S2;
[0017] S4, turn on the delivery pump of the concentration system, deliver the pretreated A outlet water to the cold water inlet pipe, the acid dosing device adds acid into the cold water inlet pipe, the scale inhibitor dosing device adds scale inhibitor into the cold water inlet pipe, the pretreated A outlet water is mixed with the acid and the scale inhibitor to obtain A mixed liquid, the A mixed liquid enters the heat exchanger through the cold water inlet pipe, after heat exchange treatment, the A mixed liquid enters the degassing tower through the cold water outlet pipe, degassing treatment is carried out to remove oxygen and dissolved carbon dioxide and other gases in the wastewater to obtain B outlet water, the B outlet water enters the falling film evaporator through the F pipeline, the seed dosing device adds seeds into the falling film evaporator, and the alkali dosing device adds alkali into the circulation pipe of the evaporator , the defoamer dosing device adds defoamer into the evaporator circulation pipe, the crystal seeds in the crystal seed circulation pipe also enter the evaporator circulation pipe, the circulation pump is turned on, the alkali, defoamer and crystal seeds enter the falling film evaporator to react with the B outlet water, and the evaporation concentration treatment is performed to obtain C outlet water, the cyclone separator pump is turned on, the C outlet water enters the cyclone separator through the I pipeline, the cyclone separator separates the crystal seeds from the C outlet water, and obtains D outlet water and E outlet water, the D outlet water enters the concentrated liquid tank through the H pipeline, the E outlet water enters the crystal seed circulation pipe through the G pipeline, the E outlet water enters the evaporator circulation pipe through the crystal seed circulation pipe, and the E outlet water enters the falling film evaporator under the action of the circulation pump;
[0018] S5, the E outlet water enters the falling film evaporator and is mixed with the B outlet water to obtain the B mixed liquid, which is evaporated and concentrated again to obtain steam and F outlet water;
[0019] S6, the steam enters the demister through the pipeline, and then enters the steam compressor to increase the steam saturation pressure and temperature to obtain high-temperature saturated pressure steam. The high-temperature saturated pressure steam returns to the falling film evaporator through the pipeline for heat exchange treatment and condenses into distilled water. The distilled water enters the distilled water tank through the D pipeline. The distilled water pump is turned on, and the distilled water enters the heat exchanger through the hot water inlet pipe, and then enters the circulating water make-up water system through the hot water outlet pipe;
[0020] S7, repeating steps S4 and S5 multiple times to continuously evaporate the water in the mixed solution B;
[0021] S8, turning on the concentrate pump, so that the D outlet water in the concentrate tank enters the concentrate tank through a part of the pipeline, and the other part enters the seed crystal circulation pipe;
[0022] S9, turning on the concentrate lift pump to transport the D outlet water in the concentrate tank to the buffer tank via a pipeline, and the buffer tank performs buffering treatment on the D outlet water;
[0023] S10, when the boiler is running, high-temperature flue gas is generated, and the high-temperature flue gas enters the SCR reactor through the pipeline for denitration treatment. The inlet electric regulating door is opened to open the inlet electric plug-in door, so that the high-temperature flue gas after denitration enters the spray drying tower through the A flue gas pipeline, and then the buffered D outlet water enters the spray drying tower through the pipeline. The D outlet water is sprayed out in a mist form through the rotary atomizer and fully mixed with the high-temperature flue gas after denitration to obtain A flue gas and dry matter. The outlet electric baffle door is opened, and the dry matter enters the dust collector through the B flue gas pipeline with the A flue gas for dust removal treatment. The dry matter not carried away by the A flue gas falls into the ash conveying device and enters the slag bin system of the power plant through the pipeline.
[0024] Compared with the prior art, the present invention is beneficial in that:
[0025] 1. Effectively delay scaling and reduce cleaning frequency: In view of the fact that desulfurization wastewater is saturated with calcium sulfate and prone to scaling, the seed crystal evaporation process is adopted to ensure that the required concentration multiple is achieved while effectively delaying the occurrence of scaling on the surface of the evaporator heat exchange tube. The system has a high online rate and only needs to be cleaned 1-2 times a year;
[0026] 2. No need for chemical softening, saving operating costs: The seed crystal evaporation process eliminates the complex pretreatment units such as upstream chemical softening, greatly reduces the consumption of chemical agents, and the seed crystals can be recycled, saving operating costs. Compared with the membrane process, the operating cost is more advantageous;
[0027] 3. Lower energy consumption: The mechanical vapor recompression process (MVR) is adopted, and the power consumption per ton of water is less than 20 degrees, which greatly reduces the operating cost compared with the ordinary multi-effect evaporation process;
[0028] 4. Compared with the direct injection evaporation treatment method in the flue, the bypass flue treatment method has no potential hidden dangers and improves the dust removal efficiency of the subsequent electrostatic precipitator;
[0029] 5. The drying tower adopts rotary atomization, and the core equipment is the rotary atomizer. This equipment has the advantages of reliability, easy maintenance, wear resistance, and uniform atomization. In addition, it has a wide adjustment range of the spraying amount, strong adaptability to changes in flue gas temperature, flue gas composition, flue gas volume, etc., and can quickly respond to changes in the unit operating conditions; the drying tower is equipped with a rotary atomizer, and the flue gas enters the drying tower after passing through the flue gas distributor to ensure that the flue gas and droplets are fully mixed to achieve heat transfer and mass transfer reactions. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the structure of the present invention;
[0031] Figure 2 It is a structural schematic diagram of the pretreatment system of the present invention;
[0032] Figure 3 It is a structural schematic diagram of the evaporation reduction system of the present invention;
[0033] Figure 4 It is a structural schematic diagram of the high-temperature bypass flue drying system of the present invention.
[0034] Figure numerals: 1-pretreatment system, 2-evaporation reduction system, 3-high temperature bypass flue drying system, 4-wastewater regulating tank, 5-reactor, 6-high efficiency clarifier, 7-clear water tank, 8-heat exchanger, 9-degassing tower, 10-falling film evaporator, 11-concentrate tank, 12-SCR reactor, 13-spray drying tower, 14-concentrate tank, 15-concentrate system delivery pump, 16-concentrate pump, 17-A pipeline, 18-B pipeline, 19-process water system, 20-sludge degassing Water machine, 21-A valve, 22-B valve, 23-wastewater delivery pump, 24-wastewater lifting pump, 25-high-efficiency clarifier outlet pipe, 26-sludge discharge pipe, 27-sludge tank, 28-sludge delivery pump, 29-electric mud bucket, 30-wastewater regulating tank mixer, 31-reactor mixer, 32-dosing machine, 33-A aeration device, 34-B aeration device, 35-A aeration pipe, 36-Roots blower, 37-B aeration pipe, 38-cold water inlet pipe, 39-cold water outlet pipe , 40-hot water inlet pipe, 41-hot water outlet pipe, 42-circulating water make-up water system, 43-acid dosing device, 44-scaling agent dosing device, 45-distilled water tank, 46-distilled water pump, 47-C pipeline, 48-D pipeline, 49-E pipeline, 50-F pipeline, 51-seed dosing device, 52-demister, 53-steam compressor, 54-evaporator circulation pipe, 55-circulation pump, 56-alkali dosing device, 57-defoaming agent dosing device, 58-seed circulation pipe , 59-cyclone separator, 60-G pipeline, 61-H pipeline, 62-I pipeline, 63-cyclone separator pump, 64-dust collector, 65-air preheater, 66-boiler, 67-buffer tank, 68-concentrated liquid lifting pump, 69-power plant slag bin system, 70-ash conveying device, 71-A flue gas duct, 72-rotary atomizer, 73-inlet electric plug-in door, 74-inlet electric regulating door, 75-B flue gas duct, 76-exit electric baffle door; 77-plant steam system.
[0035] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. DETAILED DESCRIPTION
[0036] Embodiment 1 of the present invention: A desulfurization wastewater zero emission system comprises a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrate tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrate tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentration system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrate tank 11 is connected to the concentrate tank 14 by pipeline, and a concentrate pump 16 is arranged on the pipe section between the concentrate tank 11 and the concentrate tank 14.
[0037] Embodiment 2 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 and the heat exchanger 8 are connected in sequence through pipelines, the degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 are connected in sequence through pipelines, and the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, and the clear water tank 7 and the heat exchanger 8 are connected in sequence through pipelines. The pretreatment system 1 further comprises an A pipeline 17, a B pipeline 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipeline 17, the reactor 5 is connected to the clear water tank 7 through the A pipeline 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, and a wastewater pump 24 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5. A wastewater lifting pump 24 is provided on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is provided on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22. A sludge discharge pipe 26 is provided at the bottom of the high-efficiency clarifier 6, one end of the sludge discharge pipe 26 is connected to the bottom outlet of the high-efficiency clarifier 6, and a sludge tank 27 is provided at the other end of the sludge discharge pipe 26. The process water system 19 is connected to the reactor 5 by pipe, and the sludge dewatering machine 20 is connected to the sludge tank 27 by pipe. A sludge conveying pump 28 is arranged on the pipe section between the process water system 19 and the reactor 5, one end of the B pipe 18 is connected to the pipe section between the process water system 19 and the reactor 5, the other end of the B pipe 18 is connected to the sludge discharge pipe 26, and an electric mud bucket 29 is arranged at the bottom of the sludge dewatering machine 20; if the effluent of the high-efficiency clarifier 6 is qualified, the B valve 22 is opened, the effluent enters the A pipe 17 through the high-efficiency clarifier outlet pipe 25 and is transported to the clear water tank 7; if the effluent of the high-efficiency clarifier 6 is unqualified, the A valve 21 is opened, and the B valve 22 is closed, so that the effluent is returned to the reactor 5 through the A pipe 17 for secondary reaction.
[0038] Embodiment 3 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipelines The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36.
[0039] Embodiment 4 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipeline The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36;The heat exchanger 8 is provided with a cold water inlet pipe 38, a cold water outlet pipe 39, a hot water inlet pipe 40 and a hot water outlet pipe 41. The cold water inlet pipe 38 is connected to the side wall of the clean water tank 7, the cold water outlet pipe 39 is connected to the top inlet of the degassing tower 9, one end of the hot water outlet pipe 41 is connected to the heat exchanger 8, and the other end of the hot water outlet pipe 41 is provided with a circulating water supplementary water system 42. The cold water inlet pipe 38 is provided with an acid dosing device 43 and a scale inhibitor dosing device 44. ;
[0040] Embodiment 5 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipelines The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36;The heat exchanger 8 is provided with a cold water inlet pipe 38, a cold water outlet pipe 39, a hot water inlet pipe 40 and a hot water outlet pipe 41. The cold water inlet pipe 38 is connected to the side wall of the clean water tank 7, the cold water outlet pipe 39 is connected to the top inlet of the degassing tower 9, one end of the hot water outlet pipe 41 is connected to the heat exchanger 8, and the other end of the hot water outlet pipe 41 is provided with a circulating water supplementary water system 42. The cold water inlet pipe 38 is provided with an acid dosing device 43 and a scale inhibitor dosing device 44; the evaporation reduction system 2 also includes a distilled water tank 45, the bottom outlet of the distilled water tank 45 is connected to the hot water inlet pipe 40, a distilled water pump 46 is provided on the pipe section between the bottom outlet of the distilled water tank 45 and the hot water inlet pipe 40, and a C pipe 47 and a D pipe 48 are provided on the top of the distilled water tank 45. ;
[0041] Embodiment 6 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipeline The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36;The heat exchanger 8 is provided with a cold water inlet pipe 38, a cold water outlet pipe 39, a hot water inlet pipe 40 and a hot water outlet pipe 41. The cold water inlet pipe 38 is connected to the side wall of the clean water tank 7, the cold water outlet pipe 39 is connected to the top inlet of the degassing tower 9, one end of the hot water outlet pipe 41 is connected to the heat exchanger 8, and the other end of the hot water outlet pipe 41 is provided with a circulating water replenishment water system 42. The cold water inlet pipe 38 is provided with an acid dosing device 43 and a scale inhibitor dosing device 44; the evaporation reduction system 2 also includes a distilled water tank 45, the bottom outlet of the distilled water tank 45 is connected to the hot inlet A water pipe 40 is connected to the distilled water tank 45, a distilled water pump 46 is arranged on the pipe section between the bottom outlet of the distilled water tank 45 and the hot water inlet pipe 40, and a C pipe 47 and a D pipe 48 are arranged on the top of the distilled water tank 45; an E pipe 49 and an F pipe 50 are arranged between the degassing tower 9 and the falling film evaporator 10, one end of the C pipe 47 is connected to the top of the distilled water tank 45, and the other end of the C pipe 47 is connected to the E pipe 49, one end of the D pipe 48 is connected to the top of the distilled water tank 45, and the other end of the D pipe 48 is connected to the falling film evaporator 10. ;
[0042] Embodiment 7 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipeline The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36;The heat exchanger 8 is provided with a cold water inlet pipe 38, a cold water outlet pipe 39, a hot water inlet pipe 40 and a hot water outlet pipe 41. The cold water inlet pipe 38 is connected to the side wall of the clean water tank 7, the cold water outlet pipe 39 is connected to the top inlet of the degassing tower 9, one end of the hot water outlet pipe 41 is connected to the heat exchanger 8, and the other end of the hot water outlet pipe 41 is provided with a circulating water replenishment water system 42. The cold water inlet pipe 38 is provided with an acid dosing device 43 and a scale inhibitor dosing device 44; the evaporation reduction system 2 also includes a distilled water tank 45, the bottom outlet of the distilled water tank 45 is connected to the hot water inlet pipe 40, a distilled water pump 46 is provided on the pipe section between the bottom outlet of the distilled water tank 45 and the hot water inlet pipe 40, and a C pipe 47 and a D pipe 48 are provided on the top of the distilled water tank 45; an E pipe 49 and an F pipe 50 are provided between the degassing tower 9 and the falling film evaporator 10, one end of the C pipe 47 is connected to the top of the distilled water tank 45, and the C pipe 47 is connected to the top of the distilled water tank 45. The other end of the C pipeline 47 is connected to the E pipeline 49, one end of the D pipeline 48 is connected to the top of the distilled water tank 45, and the other end of the D pipeline 48 is connected to the falling film evaporator 10; the falling film evaporator 10 is provided with a seed dosing device 51, a side pipeline of the falling film evaporator 10 is connected with a demister 52 and a steam compressor 53, the demister 52 is connected with the steam compressor 53 through a pipeline, the outlet of the steam compressor 53 is connected with the side wall pipeline of the falling film evaporator 10, the falling film evaporator 10 is provided with an evaporator circulation pipe 54, one end of the evaporator circulation pipe 54 is connected to the top of the falling film evaporator 10, and the other end of the evaporator circulation pipe 54 is connected to the bottom of the falling film evaporator 10, the evaporator circulation pipe 54 is provided with a circulation pump 55, and the pipe section between the circulation pump 55 and the bottom of the falling film evaporator 10 is provided with an alkali dosing device 56 and a defoaming agent dosing device 57. ;
[0043] Embodiment 8 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipeline The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36;The heat exchanger 8 is provided with a cold water inlet pipe 38, a cold water outlet pipe 39, a hot water inlet pipe 40 and a hot water outlet pipe 41. The cold water inlet pipe 38 is connected to the side wall of the clean water tank 7, the cold water outlet pipe 39 is connected to the top inlet of the degassing tower 9, one end of the hot water outlet pipe 41 is connected to the heat exchanger 8, and the other end of the hot water outlet pipe 41 is provided with a circulating water make-up water system 42. The cold water inlet pipe 38 is provided with an acid dosing device 43 and a scale inhibitor dosing device 44; the evaporation reduction system 2 also includes a distilled water tank 45, the bottom outlet of the distilled water tank 45 is connected to the hot water inlet pipe 40, and a distilled water pump 46 is provided on the pipe section between the bottom outlet of the distilled water tank 45 and the hot water inlet pipe 40. A C pipe 47 and a D pipe 48 are provided at the top of the tank 45; an E pipe 49 and an F pipe 50 are provided between the degassing tower 9 and the falling film evaporator 10, one end of the C pipe 47 is connected to the top of the distilled water tank 45, the other end of the C pipe 47 is connected to the E pipe 49, one end of the D pipe 48 is connected to the top of the distilled water tank 45, and the other end of the D pipe 48 is connected to the falling film evaporator 10; a seed dosing device 51 is provided on the falling film evaporator 10, a side pipe of the falling film evaporator 10 is connected to a demister 52 and a steam compressor 53, the demister 52 is connected to the steam compressor 53 through a pipe, and the outlet of the steam compressor 53 is connected to the outlet of the falling film evaporator 10 The side wall pipeline is connected, and an evaporator circulation pipe 54 is provided on the falling film evaporator 10, one end of the evaporator circulation pipe 54 is connected to the top of the falling film evaporator 10, and the other end of the evaporator circulation pipe 54 is connected to the bottom of the falling film evaporator 10, and a circulation pump 55 is provided on the evaporator circulation pipe 54, and an alkali dosing device 56 and a defoaming agent dosing device 57 are provided on the pipe section between the circulation pump 55 and the bottom of the falling film evaporator 10; the evaporation reduction system 2 also includes a seed circulation pipe 58 and a plant steam system 77, the outlet of the seed circulation pipe 58 is connected to the inlet pipe of the circulation pump 55, and the inlet of the seed circulation pipe 58 is connected to the pipe section between the concentrated liquid pump 16 and the concentrated liquid tank 14. , a cyclone separator 59 is provided on the seed circulation pipe 58, a G pipe 60, an H pipe 61 and an I pipe 62 are provided on the cyclone separator 59, the bottom of the cyclone separator 59 is connected to the seed circulation pipe 58 through the G pipe 60, the top of the cyclone separator 59 is connected to the top of the concentrated liquid tank 11 through the H pipe 61, one end of the I pipe 62 is connected to the pipe section between the outlet of the seed circulation pipe 58 and the circulation pump 55, the other end of the I pipe 62 is connected to the inlet of the cyclone separator 59, and a cyclone separator pump 63 is provided on the I pipe 62, and the plant steam system 77 pipeline is connected to the pipe section between the outlet of the steam compressor 53 and the side wall of the falling film evaporator 10. ;
[0044] Embodiment 9 of the present invention: A desulfurization wastewater zero discharge system, comprising a pretreatment system 1, an evaporation reduction system 2 and a high-temperature bypass flue drying system 3, wherein the pretreatment system 1 comprises a wastewater regulating tank 4, a reactor 5, a high-efficiency clarifier 6 and a clear water tank 7 connected in sequence through pipelines, the evaporation reduction system 2 comprises a heat exchanger 8, a degassing tower 9, a falling film evaporator 10 and a concentrated liquid tank 11 connected in sequence through pipelines, the high-temperature bypass flue drying system 3 comprises an SCR reactor 12, a spray drying tower 13 and a concentrated liquid tank 14 connected in sequence through pipelines, the clear water tank 7 is connected to the heat exchanger 8 by pipeline, a concentrating system delivery pump 15 is arranged on the pipe section between the clear water tank 7 and the heat exchanger 8, the concentrated liquid tank 11 is connected to the concentrated liquid tank 14 by pipeline The pretreatment system 1 further comprises an A pipe 17, a B pipe 18, a process water system 19 and a sludge dewatering machine 20, an A valve 21 and a B valve 22 are arranged on the A pipe 17, the reactor 5 is connected to the clean water tank 7 through the A pipe 17, a wastewater delivery pump 23 is arranged on the pipe section between the wastewater regulating tank 4 and the reactor 5, a wastewater lifting pump 24 is arranged on the pipe section between the reactor 5 and the high-efficiency clarifier 6, a high-efficiency clarifier outlet pipe 25 is arranged on the high-efficiency clarifier 6, and the high-efficiency clarifier outlet pipe 25 is connected to the pipe section between the A valve 21 and the B valve 22, a mud discharge pipe 26 is arranged at the bottom of the high-efficiency clarifier 6, and the mud discharge pipe 2 One end of pipe A 18 is connected to the bottom outlet of high-efficiency clarifier 6, the other end of sludge discharge pipe 26 is provided with sludge pool 27, process water system 19 is connected to reactor 5 pipe, sludge dewatering machine 20 is connected to sludge pool 27 pipe, sludge conveying pump 28 is provided on the pipe section between sludge dewatering machine 20 and sludge pool 27, one end of pipe B 18 is connected to the pipe section between process water system 19 and reactor 5, the other end of pipe B 18 is connected to sludge discharge pipe 26, and electric mud bucket 29 is provided at the bottom of sludge dewatering machine 20; if the effluent of high-efficiency clarifier 6 is qualified, valve B 22 is opened, the effluent enters pipe A 17 through outlet pipe 25 of high-efficiency clarifier and is transported to clear water pool 7, if the effluent of high-efficiency clarifier 6 is unqualified, valve A 2 is opened 1. Close the B valve 22 to allow the effluent to flow back to the reactor 5 through the A pipe 17 for secondary reaction; a wastewater regulating tank mixer 30 is provided in the wastewater regulating tank 4, a reactor mixer 31 is provided in the reactor 5, a dosing machine 32 is provided on the top of the reactor 5, an A aeration device 33 is provided in the clean water tank 7, a B aeration device 34 is provided in the sludge tank 27, an A aeration pipe 35 is provided on the A aeration device 33, one end of the A aeration pipe 35 is connected to the A aeration device 33, and the other end of the A aeration pipe 35 is provided with a Roots blower 36, and a B aeration pipe 37 is provided on the B aeration device 34, one end of the B aeration pipe 37 is connected to the B aeration device 34, and the other end of the B aeration pipe 37 is connected to the Roots blower 36;The heat exchanger 8 is provided with a cold water inlet pipe 38, a cold water outlet pipe 39, a hot water inlet pipe 40 and a hot water outlet pipe 41. The cold water inlet pipe 38 is connected to the side wall of the clean water tank 7, the cold water outlet pipe 39 is connected to the top inlet of the degassing tower 9, one end of the hot water outlet pipe 41 is connected to the heat exchanger 8, and the other end of the hot water outlet pipe 41 is provided with a circulating water make-up water system 42. The cold water inlet pipe 38 is provided with an acid dosing device 43 and a scale inhibitor dosing device 44; the evaporation reduction system 2 also includes a distilled water tank 45, the bottom outlet of the distilled water tank 45 is connected to the hot water inlet pipe 40, and a distilled water pump 46 is provided on the pipe section between the bottom outlet of the distilled water tank 45 and the hot water inlet pipe 40. A C pipe 47 and a D pipe 48 are provided at the top of the tank 45; an E pipe 49 and an F pipe 50 are provided between the degassing tower 9 and the falling film evaporator 10, one end of the C pipe 47 is connected to the top of the distilled water tank 45, the other end of the C pipe 47 is connected to the E pipe 49, one end of the D pipe 48 is connected to the top of the distilled water tank 45, and the other end of the D pipe 48 is connected to the falling film evaporator 10; a seed dosing device 51 is provided on the falling film evaporator 10, a side pipe of the falling film evaporator 10 is connected to a demister 52 and a steam compressor 53, the demister 52 is connected to the steam compressor 53 through a pipe, and the outlet of the steam compressor 53 is connected to the outlet of the falling film evaporator 10 The side wall pipeline is connected, and an evaporator circulation pipe 54 is provided on the falling film evaporator 10, one end of the evaporator circulation pipe 54 is connected to the top of the falling film evaporator 10, and the other end of the evaporator circulation pipe 54 is connected to the bottom of the falling film evaporator 10, and a circulation pump 55 is provided on the evaporator circulation pipe 54, and an alkali dosing device 56 and a defoaming agent dosing device 57 are provided on the pipe section between the circulation pump 55 and the bottom of the falling film evaporator 10; the evaporation reduction system 2 also includes a seed circulation pipe 58 and a plant steam system 77, the outlet of the seed circulation pipe 58 is connected to the inlet pipe of the circulation pump 55, and the inlet of the seed circulation pipe 58 is connected to the pipe section between the concentrated liquid pump 16 and the concentrated liquid tank 14. , a cyclone separator 59 is provided on the seed circulation pipe 58, a G pipe 60, an H pipe 61 and an I pipe 62 are provided on the cyclone separator 59, the bottom of the cyclone separator 59 is connected to the seed circulation pipe 58 through the G pipe 60, the top of the cyclone separator 59 is connected to the top of the concentrated liquid tank 11 through the H pipe 61, one end of the I pipe 62 is connected to the pipe section between the outlet of the seed circulation pipe 58 and the circulation pump 55, the other end of the I pipe 62 is connected to the inlet of the cyclone separator 59, and the I pipe 62 is provided with a cyclone separator pump 63, and the plant steam system 77 pipeline is connected to the pipe section between the outlet of the steam compressor 53 and the side wall of the falling film evaporator 10;The high-temperature bypass flue drying system 3 also includes a dust collector 64, an air preheater 65 and a boiler 66 connected in sequence. The dust collector 64 is connected to the flue of the air preheater 65. A buffer box 67 is provided on the pipe section between the spray drying tower 13 and the concentrate tank 14. A concentrate lifting pump 68 is provided on the pipe section between the buffer box 67 and the concentrate tank 14. The bottom outlet pipe of the spray drying tower 13 is connected to a power plant slag bin system 69. An ash conveying device 70 is provided on the pipe section between the bottom outlet of the spray drying tower 13 and the power plant slag bin system 69. A flue gas pipeline A 71 is provided on the top of the spray drying tower 13. A rotary atomizer 72 is provided in the spray drying tower 13. A flue gas pipeline A An inlet electric gate 73 and an inlet electric regulating gate 74 are provided on 71. The inlet electric regulating gate 74 is arranged at one end close to the spray drying tower 13. The outlet of the A flue gas duct 71 is connected to the inlet of the rotary atomizer 72. The inlet end of the A flue gas duct 71 is connected to the pipe section between the air preheater 65 and the outlet of the SCR reactor 12. A B flue gas duct 75 is provided at the bottom flue gas outlet of the spray drying tower 13. The B flue gas duct 75 is provided with an outlet electric damper door 76. One end of the B flue gas duct 75 is connected to the bottom flue gas outlet of the spray drying tower 13. The other end of the B flue gas duct 75 is connected to the flue between the dust collector 64 and the air preheater 65. ;
[0045] A method for zero discharge of desulfurization wastewater, comprising the following steps:
[0046] S1, turn on the wastewater regulating tank mixer 30 and the wastewater delivery pump 23, and deliver the desulfurized wastewater to the reactor 5 via a pipeline. At the same time, turn on the reactor mixer 31, add the integrated adsorption flocculant into the dosing machine 32, and the reactor mixer 31 stirs the mixed solution of the integrated adsorption flocculant and the desulfurized wastewater in the reactor 5. Turn on the wastewater lifting pump 24, and deliver the mixed solution of the integrated adsorption flocculant and the desulfurized wastewater to the high-efficiency clarifier 6 via a pipeline to remove suspended matter in the desulfurized wastewater, so that the suspended matter is ≤70mg / L, and obtain A effluent and sludge;
[0047] S2, open valve B 22, the A outlet water enters A pipeline 17 through the high-efficiency clarifier outlet pipe 25 and is transported to the clean water tank 7, the sludge is transported to the sludge tank 27 through the sludge discharge pipe 26, turn on the A aeration device 33, the B aeration device 34 and the Roots blower 36 in sequence, the A aeration device 33 aerates the A outlet water in the clean water tank 7, the B aeration device 34 aerates the sludge in the sludge tank 27, turn on the sludge delivery pump 28, and transport the sludge to the sludge dewatering machine 20 through the pipeline for dehydration, and the dehydrated sludge enters the electric mud bucket 29;
[0048] S3, if the suspended solids are greater than 70 mg / L, open valve A 21, close valve B 22, and allow effluent A to flow back to reactor 5 through pipe A 17 for secondary reaction, so that the suspended solids in the mixed solution of integrated adsorption flocculant and wastewater are less than or equal to 70 mg / L, then close valve A 21, open valve B 22, and allow effluent A from the secondary reaction to be transported to clear water tank 7 through pipe A 17, and repeat step S2;
[0049] S4, turn on the concentration system delivery pump 15, and deliver the pretreated A outlet water to the cold water inlet pipe 38, the acid dosing device 43 adds acid into the cold water inlet pipe 38, and the scale inhibitor dosing device 44 adds scale inhibitor into the cold water inlet pipe 38. The pretreated A outlet water is mixed with the acid and the scale inhibitor to obtain a mixed solution A, which enters the heat exchanger 8 through the cold water inlet pipe 38. After heat exchange treatment, the A mixed solution enters the degassing tower 9 through the cold water outlet pipe 39 for degassing treatment to remove oxygen and dissolved carbon dioxide and other gases in the wastewater to obtain B outlet water, which enters the falling film evaporator 10 through the F pipeline 50, the seed dosing device 51 adds seeds into the falling film evaporator 10, and the alkali dosing device 56 adds alkali into the evaporator circulation pipe 54 to defoam. The agent dosing device 57 adds defoaming agent into the evaporator circulation pipe 54, and the crystal seeds in the crystal seed circulation pipe 58 also enter the evaporator circulation pipe 54. The circulation pump 55 is turned on to make the alkali, defoaming agent and crystal seeds enter the falling film evaporator 10 to react with the B outlet water, and perform evaporation and concentration treatment to obtain C outlet water. The cyclone separator pump 63 is turned on to make the C outlet water enter the cyclone separator 59 through the I pipeline 62. The cyclone separator 59 separates the crystal seeds from the C outlet water to obtain D outlet water and E outlet water. The D outlet water enters the concentrated liquid tank 11 through the H pipeline 61, and the E outlet water enters the crystal seed circulation pipe 58 through the G pipeline 60. The E outlet water enters the evaporator circulation pipe 54 through the crystal seed circulation pipe 58. Under the action of the circulation pump 55, the E outlet water enters the falling film evaporator 10;
[0050] S5, the E outlet water enters the falling film evaporator 10 and is mixed with the B outlet water to obtain a B mixed liquid, which is evaporated and concentrated again to obtain steam and F outlet water;
[0051] S6, the steam enters the demister 52 through the pipeline, and then enters the steam compressor 53, the steam saturation pressure and temperature are increased, and the high-temperature saturated pressure steam is obtained. The high-temperature saturated pressure steam returns to the falling film evaporator 10 through the pipeline for heat exchange treatment and condenses into distilled water. The distilled water enters the distilled water tank 45 through the D pipeline 48, the distilled water pump 46 is turned on, and the distilled water enters the heat exchanger 8 through the hot water inlet pipe 40, and then enters the circulating water supplementary water system 42 through the hot water outlet pipe 41;
[0052] S7, repeating steps S4 and S5 multiple times to continuously evaporate the water in the mixed solution B;
[0053] S8, turn on the concentrate pump 16, so that the D outlet water in the concentrate tank 11 enters the concentrate tank 14 through a part of the pipeline, and the other part enters the seed crystal circulation pipe 58;
[0054] S9, turn on the concentrate lift pump 68, and transport the D outlet water in the concentrate tank 14 to the buffer tank 67 via a pipeline, and the buffer tank 67 performs buffering treatment on the D outlet water;
[0055] S10, when the boiler 66 is in operation, high-temperature flue gas is generated, and the high-temperature flue gas enters the SCR reactor 12 through the pipeline for denitration treatment. The inlet electric regulating door 74 is opened to open the inlet electric plug-in door 73, so that the high-temperature flue gas after denitration enters the spray drying tower 13 through the A flue gas pipeline 71, and then the buffered D outlet water enters the spray drying tower 13 through the pipeline. The D outlet water is sprayed out in a mist form through the rotary atomizer 72 and is fully mixed with the high-temperature flue gas after denitration to obtain A flue gas and dry matter. The outlet electric damper door 76 is opened, and the dry matter enters the dust collector 64 with the A flue gas through the B flue gas pipeline 75 for dust removal treatment. The dry matter not carried away by the A flue gas falls into the ash conveying device 70 and enters the power plant slag bin system 69 through the pipeline.
[0056] The working principle of an embodiment of the present invention: when the present invention is in working state, the wastewater regulating tank agitator 30 and the wastewater delivery pump 23 are turned on, and the desulfurized wastewater is delivered to the reactor 5 via a pipeline. At the same time, the reactor agitator 31 is turned on, and the integrated adsorption flocculant is added into the dosing machine 32. The reactor agitator 31 stirs the mixed liquid of the integrated adsorption flocculant and the desulfurized wastewater in the reactor 5. The wastewater lifting pump 24 is turned on, and the mixed liquid of the integrated adsorption flocculant and the desulfurized wastewater is delivered to the high-efficiency clarifier 6 via a pipeline to remove suspended matter in the desulfurized wastewater, so that the suspended matter is ≤70 mg / L, and A effluent and sludge are obtained; the B valve 22 is opened, and the A effluent enters the A pipeline 17 through the high-efficiency clarifier outlet pipe 25 and is delivered to the clear water tank 7, and the sludge is delivered to the sludge tank via the sludge discharge pipeline 26. 27, open the A aeration device 33, the B aeration device 34 and the Roots blower 36 in sequence, the A aeration device 33 aerates the A effluent in the clean water tank 7, the B aeration device 34 aerates the sludge in the sludge tank 27, and the sludge delivery pump 28 is turned on to deliver the sludge to the sludge dewatering machine 20 via the pipeline for dewatering, and the dewatered sludge enters the electric mud bucket 29; if the suspended solids are greater than 70 mg / L, open the A valve 21, close the B valve 22, and make the A effluent flow back to the reactor 5 via the A pipeline 17 for secondary reaction, so that the suspended solids in the mixed solution of the integrated adsorption flocculant and the wastewater are ≤70 mg / L, then close the A valve 21, open the B valve 22, and make the A effluent of the secondary reaction be delivered to the clean water tank 7 via the A pipeline 17, and repeat the previous step;The delivery pump 15 of the concentration system is turned on to deliver the pretreated A outlet water to the cold water inlet pipe 38. The acid dosing device 43 adds acid into the cold water inlet pipe 38. The scale inhibitor dosing device 44 adds scale inhibitor into the cold water inlet pipe 38. The pretreated A outlet water is mixed with the acid and the scale inhibitor to obtain a mixed liquid A. The mixed liquid A enters the heat exchanger 8 through the cold water inlet pipe 38. After heat exchange treatment, the mixed liquid A enters the degassing tower 9 through the cold water outlet pipe 39 for degassing treatment to remove oxygen and dissolved carbon dioxide and other gases in the wastewater to obtain B outlet water. The B outlet water enters the falling film evaporator 10 through the F pipeline 50. The crystal The seed adding device 51 adds seed crystals into the falling film evaporator 10, the alkali adding device 56 adds alkali into the evaporator circulation pipe 54, the defoaming agent adding device 57 adds defoaming agent into the evaporator circulation pipe 54, and the seed crystals in the seed circulation pipe 58 also enter the evaporator circulation pipe 54. The circulation pump 55 is turned on to allow the alkali, defoaming agent and seed crystals to enter the falling film evaporator 10 to react with the B outlet water, and perform evaporation and concentration treatment to obtain C outlet water. The cyclone separator pump 63 is turned on to allow the C outlet water to enter the cyclone separator 59 through the I pipeline 62. The cyclone separator 59 separates the seed crystals from the C outlet water to obtain D outlet water. The E outlet water enters the concentrated liquid tank 11 through the H pipeline 61, the E outlet water enters the seed circulation pipe 58 through the G pipeline 60, and the E outlet water enters the evaporator circulation pipe 54 through the seed circulation pipe 58. Under the action of the circulation pump 55, the E outlet water enters the falling film evaporator 10; after entering the falling film evaporator 10, the E outlet water is mixed with the B outlet water to obtain the B mixed liquid, which is evaporated and concentrated again to obtain steam and F outlet water; the steam enters the demister 52 through the pipeline, and then enters the steam compressor 53 to increase the steam saturation pressure and temperature to obtain high-temperature saturated pressure steam, and the high-temperature saturated pressure steam The steam is returned to the falling film evaporator 10 through the pipeline for heat exchange treatment and condensed into distilled water. The distilled water enters the distilled water tank 45 through the D pipeline 48. The distilled water pump 46 is turned on, and the distilled water enters the heat exchanger 8 through the hot water inlet pipe 40, and then enters the circulating water replenishment system 42 through the hot water outlet pipe 41; the concentrate pump 16 is turned on, so that the D outlet water in the concentrate tank 11 enters the concentrate tank 14 through a part of the pipeline, and the other part enters the seed circulation pipe 58; the concentrate lifting pump 68 is turned on, and the D outlet water in the concentrate tank 14 is transported to the buffer tank 67 through the pipeline, and the buffer tank 67 performs buffer treatment on the D outlet water;When the boiler 66 is in operation, high-temperature flue gas is generated. The high-temperature flue gas enters the SCR reactor 12 through the pipeline for denitration treatment. The inlet electric regulating door 74 is opened to open the inlet electric gate door 73, so that the high-temperature flue gas after denitration enters the spray drying tower 13 through the A flue gas pipeline 71, and then the buffered D outlet water enters the spray drying tower 13 through the pipeline. The D outlet water is sprayed out in a mist form through the rotary atomizer 72 and fully mixed with the high-temperature flue gas after denitration to obtain A flue gas and dried matter. The outlet electric damper door 76 is opened, and the dried matter enters the dust collector 64 through the B flue gas pipeline 75 with the A flue gas for dust removal treatment. The dried matter not carried away by the A flue gas falls into the ash conveying device 70 and enters the power plant slag bin system 69 through the pipeline. ;
Claims
1. A desulfurization wastewater zero discharge system, It is characterized in that The invention comprises a pretreatment system (1), an evaporation reduction system (2) and a high-temperature bypass flue drying system (3), wherein the pretreatment system (1) comprises a wastewater regulating tank (4), a reactor (5), a high-efficiency clarifier (6) and a clear water tank (7) which are connected in sequence through pipelines, the evaporation reduction system (2) comprises a heat exchanger (8), a degassing tower (9), a falling film evaporator (10) and a concentrate tank (11) which are connected in sequence through pipelines, and the high-temperature bypass flue drying system (3) comprises an SCR reactor (12), a spray drying tower (13) and a concentrate tank (14) which are connected in sequence through pipelines. The clear water tank (7) is connected to the heat exchanger (8) by a pipeline, and a concentration system delivery pump (15) is provided on the pipe section between the clear water tank (7) and the heat exchanger (8). The concentrate tank (11) is connected to the concentrate tank (14) by a pipeline, and a concentrate pump (16) is provided on the pipe section between the concentrate tank (11) and the concentrate tank (14). The pretreatment system (1) further comprises an A pipeline (17), a B pipeline (18), a process water system (19) and a sludge dewatering machine (20). The A pipeline (17) is provided with an A valve (21) and a B valve (22). The reactor (5) is connected to the reactor (14) by a pipeline. The wastewater regulating tank (4) is connected to the clean water tank (7) through an A pipe (17); a wastewater delivery pump (23) is provided on the pipe section between the wastewater regulating tank (4) and the reactor (5); a wastewater lifting pump (24) is provided on the pipe section between the reactor (5) and the high-efficiency clarifier (6); a high-efficiency clarifier outlet pipe (25) is provided on the high-efficiency clarifier (6); the high-efficiency clarifier outlet pipe (25) is connected to the pipe section between the A valve (21) and the B valve (22); a mud discharge pipe (26) is provided at the bottom of the high-efficiency clarifier (6); one end of the mud discharge pipe (26) is connected to the bottom of the high-efficiency clarifier (6). The outlet of the A pipe (18) is connected to the reactor (5), a sludge tank (27) is provided at the other end of the sludge discharge pipe (26), the process water system (19) is connected to the reactor (5) pipe, the sludge dewatering machine (20) is connected to the sludge tank (27) pipe, a sludge delivery pump (28) is provided on the pipe section between the sludge dewatering machine (20) and the sludge tank (27), one end of the A pipe (18) is connected to the pipe section between the process water system (19) and the reactor (5), the other end of the B pipe (18) is connected to the sludge discharge pipe (26), and an electric sludge bucket (29) is provided at the bottom of the sludge dewatering machine (20);The falling film evaporator (10) is provided with a seed adding device (51), a pipeline on one side of the falling film evaporator (10) is connected to a demister (52) and a steam compressor (53), the demister (52) is connected to the steam compressor (53) pipeline, the outlet of the steam compressor (53) is connected to the side wall pipeline of the falling film evaporator (10), and an evaporator circulation pipe (54) is provided on the falling film evaporator (10), one end of the evaporator circulation pipe (54) is connected to the top of the falling film evaporator (10), and the other end of the evaporator circulation pipe (54) is connected to the bottom of the falling film evaporator (10). , a circulation pump (55) is provided on the evaporator circulation pipe (54), and an alkali dosing device (56) and a defoaming agent dosing device (57) are provided on the pipe section between the circulation pump (55) and the bottom of the falling film evaporator (10); the high-temperature bypass flue drying system (3) also includes a dust collector (64), an air preheater (65) and a boiler (66) connected in sequence, the dust collector (64) is connected to the flue of the air preheater (65), a buffer box (67) is provided on the pipe section between the spray drying tower (13) and the concentrate tank (14), and a concentrate tank (67) is provided on the pipe section between the buffer box (67) and the concentrate tank (14). a liquid lifting pump (68); the bottom outlet pipe of the spray drying tower (13) is connected to a power plant slag bin system (69); an ash conveying device (70) is provided on the pipe section between the bottom outlet of the spray drying tower (13) and the power plant slag bin system (69); a flue gas duct A (71) is provided on the top of the spray drying tower (13); a rotary atomizer (72) is provided in the spray drying tower (13); an inlet electric plug-in door (73) and an inlet electric regulating door (74) are provided on the flue gas duct A (71); the inlet electric regulating door (74) is arranged at one end close to the spray drying tower (13); The outlet of the A flue gas duct (71) is connected to the inlet of the rotary atomizer (72), the inlet end of the A flue gas duct (71) is connected to the pipe section between the air preheater (65) and the outlet of the SCR reactor (12), a B flue gas duct (75) is provided at the bottom flue gas outlet of the spray drying tower (13), an outlet electric damper door (76) is provided on the B flue gas duct (75), one end of the B flue gas duct (75) is connected to the bottom flue gas outlet of the spray drying tower (13), and the other end of the B flue gas duct (75) is connected to the flue between the dust collector (64) and the air preheater (65). ; 2. A desulfurization wastewater zero discharge system according to claim 1, It is characterized in that The wastewater regulating tank (4) is provided with a wastewater regulating tank mixer (30), the reactor (5) is provided with a reactor mixer (31), the top of the reactor (5) is provided with a dosing machine (32), the clean water tank (7) is provided with an A aeration device (33), the sludge tank (27) is provided with a B aeration device (34), the A aeration device (33) is provided with an A aeration pipe (35), one end of the A aeration pipe (35) is connected to the A aeration device (33), and the other end of the A aeration pipe (35) is provided with a Roots blower (36), and the B aeration device (34) is provided with a B aeration pipe (37), one end of the B aeration pipe (37) is connected to the B aeration device (34), and the other end of the B aeration pipe (37) is connected to the Roots blower (36).
3. A desulfurization wastewater zero discharge system according to claim 1, It is characterized in that The heat exchanger (8) is provided with a cold water inlet pipe (38), a cold water outlet pipe (39), a hot water inlet pipe (40) and a hot water outlet pipe (41); the cold water inlet pipe (38) is connected to the clean water tank (7); the cold water outlet pipe (39) is connected to the top inlet of the degassing tower (9); one end of the hot water outlet pipe (41) is connected to the heat exchanger (8); the other end of the hot water outlet pipe (41) is provided with a circulating water supplementary water system (42); and the cold water inlet pipe (38) is provided with an acid dosing device (43) and a scale inhibitor dosing device (44).
4. A desulfurization wastewater zero discharge system according to claim 3, It is characterized in that The evaporation reduction system (2) further comprises a distilled water tank (45), the bottom outlet of the distilled water tank (45) being connected to the hot water inlet pipe (40), a distilled water pump (46) being arranged on the pipe section between the bottom outlet of the distilled water tank (45) and the hot water inlet pipe (40), and a C pipe (47) and a D pipe (48) being arranged on the top of the distilled water tank (45).
5. A desulfurization wastewater zero discharge system according to claim 4, It is characterized in that An E pipe (49) and an F pipe (50) are provided between the degassing tower (9) and the falling film evaporator (10); one end of the C pipe (47) is connected to the top of the distilled water tank (45); the other end of the C pipe (47) is connected to the E pipe (49); one end of the D pipe (48) is connected to the top of the distilled water tank (45); and the other end of the D pipe (48) is connected to the falling film evaporator (10).
6. A desulfurization wastewater zero discharge system according to claim 1, It is characterized in that The evaporation reduction system (2) further comprises a seed crystal circulation pipe (58) and a plant steam system (77), wherein the outlet of the seed crystal circulation pipe (58) is connected to the inlet pipe of the circulation pump (55), and the inlet of the seed crystal circulation pipe (58) is connected to the pipe section between the concentrated liquid pump (16) and the concentrated liquid tank (14). A cyclone separator (59) is arranged on the seed crystal circulation pipe (58), and a G pipe (60), an H pipe (61) and an I pipe (62) are arranged on the cyclone separator (59). The bottom of the cyclone separator (59) is connected to the concentrated liquid tank (14) through the G pipe (60). The cyclone separator (59) is connected to the seed crystal circulation pipe (58), the top of the cyclone separator (59) is connected to the top of the concentrated liquid tank (11) through the H pipe (61), one end of the I pipe (62) is connected to the pipe section between the outlet of the seed crystal circulation pipe (58) and the circulation pump (55), the other end of the I pipe (62) is connected to the inlet of the cyclone separator (59), the I pipe (62) is provided with a cyclone separator pump (63), and the plant steam system (77) pipe is connected to the pipe section between the outlet of the steam compressor (53) and the side wall of the falling film evaporator (10).
7. A method for achieving zero discharge of desulfurization wastewater using the system according to any one of claims 1 to 6, It is characterized in that The following steps are involved: S1, turning on the wastewater regulating tank mixer (30) and the wastewater delivery pump (23), delivering the desulfurized wastewater to the reactor (5) via a pipeline, and at the same time turning on the reactor mixer (31), adding the integrated adsorption flocculant into the dosing machine (32), the reactor mixer (31) stirring the mixed solution of the integrated adsorption flocculant and the desulfurized wastewater in the reactor (5), turning on the wastewater lifting pump (24), delivering the mixed solution of the integrated adsorption flocculant and the desulfurized wastewater to the high-efficiency clarifier (6) via a pipeline, removing suspended matter in the desulfurized wastewater, making the suspended matter ≤70 mg / L, and obtaining effluent A and sludge; S2, open valve B (22), the A outlet water enters pipe A (17) through the high-efficiency clarifier outlet pipe (25) and is transported to the clean water tank (7), the sludge is transported to the sludge tank (27) through the sludge discharge pipe (26), the A aeration device (33), the B aeration device (34) and the Roots blower (36) are turned on in sequence, the A aeration device (33) aerates the A outlet water in the clean water tank (7), the B aeration device (34) aerates the sludge in the sludge tank (27), the sludge delivery pump (28) is turned on, the sludge is transported to the sludge dewatering machine (20) through the pipeline for dewatering, and the dewatered sludge enters the electric mud bucket (29); S3, if the suspended solids are greater than 70 mg / L, open valve A (21) and close valve B (22), so that the effluent A flows back to the reactor (5) through pipe A (17) for secondary reaction, so that the suspended solids in the mixed solution of the integrated adsorption flocculant and wastewater are less than or equal to 70 mg / L, then close valve A (21), open valve B (22), so that the effluent A after the secondary reaction flows back to the clean water tank (7) through pipe A (17), and repeat step S2; S4, turn on the delivery pump (15) of the concentration system to deliver the pretreated A outlet water to the cold water inlet pipe (38), the acid dosing device (43) dosing acid into the cold water inlet pipe (38), the scale inhibitor dosing device (44) dosing scale inhibitor into the cold water inlet pipe (38), the pretreated A outlet water is mixed with the acid and the scale inhibitor to obtain a mixed solution A, the mixed solution A enters the heat exchanger (8) through the cold water inlet pipe (38), after heat exchange treatment, the mixed solution A enters the degassing tower (9) through the cold water outlet pipe (39), degassing treatment is carried out to remove oxygen and dissolved carbon dioxide gas in the wastewater, and B outlet water is obtained, the B outlet water enters the falling film evaporator (10) through the F pipe (50), the seed dosing device (51) dosing seed into the falling film evaporator (10), the alkali dosing device (56) dosing alkali into the evaporator circulation pipe (54), the defoaming agent dosing device (56) dosing alkali into the evaporator circulation pipe (54), The device (57) adds a defoaming agent into the evaporator circulation pipe (54), and the seed crystals in the seed crystal circulation pipe (58) also enter the evaporator circulation pipe (54). The circulation pump (55) is turned on to allow the alkali, defoaming agent and seed crystals to enter the falling film evaporator (10) to react with the B outlet water, and perform evaporation and concentration treatment to obtain C outlet water. The cyclone separator pump (63) is turned on to allow the C outlet water to enter the cyclone separator (59) through the I pipe (62). The cyclone separator (59) separates the seed crystals from the C outlet water to obtain D outlet water and E outlet water. The D outlet water enters the concentrated liquid tank (11) through the H pipe (61), and the E outlet water enters the seed crystal circulation pipe (58) through the G pipe (60). The E outlet water enters the evaporator circulation pipe (54) through the seed crystal circulation pipe (58). Under the action of the circulation pump (55), the E outlet water enters the falling film evaporator (10); S5, the E outlet water enters the falling film evaporator (10) and is mixed with the B outlet water to obtain a B mixed liquid, which is evaporated and concentrated again to obtain steam and F outlet water; S6, the steam enters the demister (52) through the pipeline, and then enters the re-steam compressor (53), the saturated pressure and temperature of the steam are increased, and high-temperature saturated pressure steam is obtained. The high-temperature saturated pressure steam returns to the falling film evaporator (10) through the pipeline for heat exchange treatment and condenses into distilled water. The distilled water enters the distilled water tank (45) through the D pipeline (48). The distilled water pump (46) is turned on, and the distilled water enters the heat exchanger (8) through the hot water inlet pipe (40), and then enters the circulating water supplementary water system (42) through the hot water outlet pipe (41); S7, repeating steps S4 and S5 multiple times to continuously evaporate the water in the mixed solution B; S8, turning on the concentrate pump (16), allowing the D outlet water in the concentrate tank (11) to enter the concentrate tank (14) through a part of the pipeline, and the other part to enter the seed crystal circulation pipe (58); S9, turning on the concentrate lifting pump (68) to transport the D outlet water in the concentrate tank (14) to the buffer tank (67) via a pipeline, and the buffer tank (67) performs buffering treatment on the D outlet water; S10, when the boiler (66) is in operation, high-temperature flue gas is generated. The high-temperature flue gas enters the SCR reactor (12) through the pipeline for denitration treatment. The inlet electric regulating door (74) is opened to open the inlet electric plug door (73), so that the high-temperature flue gas after denitration enters the spray drying tower (13) through the A flue gas pipeline (71), and then the buffered D outlet water enters the spray drying tower (13) through the pipeline. The D outlet water is sprayed out in a mist form through the rotary atomizer (72) and is fully mixed with the high-temperature flue gas after denitration to obtain A flue gas and dried matter. The outlet electric damper door (76) is opened, and the dried matter enters the dust collector (64) through the B flue gas pipeline (75) with the A flue gas for dust removal treatment. The dried matter not carried away by the A flue gas falls into the ash conveying device (70) and then enters the slag bin system (69) of the power plant through the pipeline.