A main foundation pit and construction method of a subway station in a complex urban environment

By dividing the main foundation pit of the subway station into strongly sensitive areas and weakly sensitive areas under the complex urban environment, and using reinforced structures and monitoring points for zone construction, the problems of soil deformation and surrounding facilities during foundation pit construction are solved, and the problems of soil deformation and impact of surrounding facilities are achieved. The safety and environmental protection of foundation pit construction.

CN113404053BActive Publication Date: 2024-11-22HONGRUN CONSTRUCTION GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110916882.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-11
Publication Date
2024-11-22
Estimated Expiration
2041-08-11

AI Technical Summary

Technical Problem

In the complex urban environment, the construction of the main foundation pit of the subway station faces the problems of tight construction sites, tight construction periods, complex construction conditions and high environmental protection requirements for surrounding facilities. Especially in soft soil areas, it is difficult to effectively control the foundation pit excavation process during foundation pits. The deformation of the soil and the settlement of the surrounding surface affect the safety of surrounding buildings and underground pipelines.

Method used

Using the zoned and sectional construction method, the foundation pit is divided into strongly sensitive areas and weakly sensitive areas, and the construction is carried out separately. Reinforced structures such as lattice columns, rotary spray piles, multi-layer support units and isolation walls are set up in the foundation pit to form " Pile-board-wall" door structure to reduce the impact of heavy load around the foundation pit on sensitive buildings, and monitor the construction process in real time through monitoring points.

Benefits of technology

It effectively reduces the long-side effect of long foundation pits in subway stations, reduces the deformation of the main foundation pit enclosure structure and the settlement of the surrounding surface, ensures construction safety, and protects the surrounding complex environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113404053B_ABST
    Figure CN113404053B_ABST
Patent Text Reader

Abstract

The present invention discloses a main foundation pit of a subway station under a complex urban environment and a construction method, comprising an elevated bridge deck, a bridge pier, and a strong sensitive area foundation pit with a reinforcement structure, a first weak sensitive area foundation pit, and a second weak sensitive area foundation pit; the first weak sensitive area foundation pit and the second weak sensitive area foundation pit are arranged on the ground on both sides of the elevated bridge deck, and a strong sensitive area foundation pit is arranged between the two; a middle partition wall is fixedly connected between the strong sensitive area foundation pit and the first weak sensitive area foundation pit and the second weak sensitive area foundation pit respectively; the pit walls on both sides of the strong sensitive area foundation pit near the bridge pier are underground continuous walls; and the ground on both sides of the underground continuous wall is symmetrically buried with a first isolation wall and a second isolation wall; the bottom end of the underground continuous wall extends into the stable soil layer underground, and the top surface of the first isolation wall, the top surface of the second isolation wall and the top surface of the pit wall of the strong sensitive area foundation pit are respectively fixedly connected with a crown beam; the top surface of the crown beam is fixedly connected with a plurality of reinforced concrete slabs. The present invention realizes the safety of the main foundation pit itself and the protection of the surrounding complex environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of infrastructure construction, and in particular to a main foundation pit of a subway station in a complex urban environment and a construction method thereof. Background Art

[0002] With the rapid development of urban rail transit projects and the densification of operating lines, the utilization rate of underground space is getting higher and higher. In the field of rail transit subway station construction, most foundation pits are constructed using the open excavation method.

[0003] The geological conditions in coastal cities are more complex. The soft soil strata in coastal areas have the characteristics of high natural water content, large natural porosity, high compressibility, low shear strength, small consolidation coefficient, long consolidation time, high sensitivity, high disturbance, poor permeability, complex layered distribution of soil layers, and large differences in physical and mechanical properties between layers.

[0004] Subway stations are often located in densely populated urban areas, and there are likely to be urban facilities such as viaducts, underground pipelines, and high-rise buildings within the scope of construction. The subway station foundation pit itself has the characteristics of deep excavation depth and long foundation pit length. In addition, the foundation pit is often surrounded by various underground pipelines, various buildings, and traffic arteries. It has the characteristics of tight construction sites, tight construction periods, complex construction conditions, and high environmental protection requirements for surrounding facilities. When constructing the main foundation pit of the station in a complex urban environment, it is necessary to strictly control the displacement variables of the retaining structure and the surrounding surface settlement to avoid problems such as soil sliding, which will pose unnecessary safety threats to surrounding buildings, underground pipelines, and surrounding residents.

[0005] If the construction area is located in a soft soil area, thick layers of soft soil are widely distributed, which has the characteristics of "high natural water content, high compressibility, high sensitivity, high thixotropy, high rheology, low strength, and weak permeability". The soft soil layer of the proposed site consists of ①3b layer of gray silty clay; ②2b layer of gray silty soil; ③2 layers of gray silty clay; ④1 layer of gray silty soil and ④2 layers of gray clay, with a cumulative thickness of about 35-40m. The soil layers within the excavation range of the foundation pit mainly include ①a miscellaneous fill, ①2 clay, ①3b silty clay, and ②2b silty clay. The soil layer at the bottom of the pit is ②2b silty clay; the soil layer at the bottom of the wall is ④2 clay. The overall soil layer lacks ⑤1 layer of silty clay, and the ④1 layer of silty clay is thick and the soil quality is poor, which is very unfavorable for deformation control during the excavation of the foundation pit. At the same time, a large subway station needs to be built under the main bridge of urban traffic. The clearance between the foundation pit and the bridge is only 9.5m, and the foundation pit retaining structure is about 14m away from the bridge pile foundation. The great difficulty of construction and the high protection requirements for the bridge have put forward new requirements and challenges for the construction of the subway station.

[0006] Therefore, it is urgent to develop a subway station main foundation pit and construction method in a complex urban environment that can deal with the above-mentioned situations in a targeted manner. Summary of the invention

[0007] The purpose of the present invention is to provide a main foundation pit of a subway station in a complex urban environment and a construction method to solve the problems existing in the above-mentioned prior art.

[0008] To achieve the above object, the present invention provides the following solutions:

[0009] The present invention provides a main foundation pit of a subway station in a complex urban environment, comprising an elevated bridge deck, bridge piers and a main foundation pit arranged below the elevated bridge deck, characterized in that: the main foundation pit comprises a weakly sensitive area foundation pit and a strongly sensitive area foundation pit;

[0010] The strong sensitive area foundation pit is arranged within the projection range of the elevated bridge deck toward the ground; the weak sensitive area foundation pit includes a first weak sensitive area foundation pit and a second weak sensitive area foundation pit; the first weak sensitive area foundation pit and the second weak sensitive area foundation pit are arranged on the ground on both sides of the elevated bridge deck; a strong sensitive area foundation pit is arranged between the first weak sensitive area foundation pit and the second weak sensitive area foundation pit; a middle partition wall is fixedly connected between the strong sensitive area foundation pit and the first weak sensitive area foundation pit and the second weak sensitive area foundation pit respectively; the pit walls on both sides of the strong sensitive area foundation pit close to the pier are underground continuous walls; the first weak sensitive area foundation pit, the second weak sensitive area foundation pit and the strong sensitive area foundation pit are provided with reinforcement structures, and the ground on both sides of the underground continuous wall is symmetrically buried with a first isolation wall and a second isolation wall; the bottom end of the underground continuous wall extends into the stable soil layer underground, and the first isolation wall is close to the underground continuous wall; the top surface of the first isolation wall, the top surface of the second isolation wall and the top surface of the pit wall of the strong sensitive area foundation pit are respectively fixedly connected with crown beams; the top surface of the crown beam is fixedly connected with a plurality of reinforced concrete slabs.

[0011] Preferably, the reinforcement structure includes lattice columns; the bottom ends of the lattice columns extend into the stable soil layer underground, and a plurality of jet grouting piles are fixedly connected to the lower part of the lattice columns; the jet grouting piles are vertically embedded in the bottom of the foundation pit in the highly sensitive area, and a multi-layer support unit is fixedly connected to the upper part of the lattice columns; the two ends of the multi-layer support unit are respectively fixed to the two underground continuous walls.

[0012] Preferably, the multi-layer support unit includes a plurality of reinforced concrete support layers and a plurality of steel support layers; the two ends of the reinforced concrete support layer are respectively fixedly connected to the two underground continuous walls; the two ends of the steel support layer are respectively fixedly connected to the two underground continuous walls, and the plurality of reinforced concrete support layers and the plurality of steel support layers are separately arranged from top to bottom.

[0013] Preferably, several reinforced concrete support layers on the same horizontal plane are arranged at equal intervals in the foundation pit of the highly sensitive area, and the interval is set to 6m-10m, and several steel support layers on the same horizontal plane are arranged at equal intervals in the foundation pit of the highly sensitive area, and the interval is set to 2m-5m; the interval between the reinforced concrete support layer and the adjacent steel support layer is 6m-9m, and the interval between adjacent steel support layers is 2.5m-4m; the reinforced concrete support layer and the steel support layer are arranged parallel to each other.

[0014] Preferably, the diameter of the jet grouting piles is 800 mm; the distance between adjacent jet grouting piles is 600 mm, and the overlap is 200 mm; the jet grouting piles are embedded 4 m into the bottom of the foundation pit in the highly sensitive area.

[0015] Preferably, the first isolation wall and the second isolation wall respectively include a number of isolation piles arranged at equal intervals, and the number of the isolation piles included in the first isolation wall is less than the number of the isolation piles included in the second isolation wall; the shortest distance between the isolation piles of the first isolation wall and the underground continuous wall is 1.5m-2.5m, and the shortest distance between the isolation piles of the second isolation wall and the underground continuous wall is 6.5m-8.5m; the shortest distance between the isolation piles of the second isolation wall and the bridge foundation of the pier is 6.5m-8.5m.

[0016] Preferably, the bottom ends of the isolation piles extend into the stable soil layer underground, and all the isolation piles are arranged parallel to each other; the spacing between adjacent isolation piles of the first isolation wall is 5m-6m; the spacing between adjacent isolation piles of the second isolation wall is 0.8m-1.5m.

[0017] Preferably, the underground continuous wall is 0.7m-0.9m thick, and its bottom end extends into the stable soil layer underground.

[0018] Preferably, monitoring points are arranged within a range of 3 times the depth of the foundation pit in the highly sensitive area from the edge of the foundation pit opening in the highly sensitive area.

[0019] A method for constructing a main foundation pit of a subway station in a complex urban environment according to claims 1 to 9, comprising three steps:

[0020] Zoning: The subway station main foundation pit is divided into highly sensitive areas and weakly sensitive areas according to the complexity of the environment.

[0021] Construction: Construction of foundation pits in weakly sensitive areas and construction of foundation pits in highly sensitive areas;

[0022] Connectivity: The main foundation pit of the station is connected.

[0023] The present invention discloses the following technical effects:

[0024] This technical solution can effectively reduce the long side effect of the long strip foundation pit of the subway station; can effectively reduce the impact of heavy loads around the main foundation pit on the horizontal displacement of the main foundation pit and sensitive buildings; can ensure that the supporting axial force is not lost and strengthen the support system; can reduce the deformation data of the main foundation pit during the bottoming stage; can effectively reduce the deformation of the main foundation pit retaining structure, the surrounding surface settlement and the deformation of the surrounding buildings; thereby achieving the safety of the main foundation pit itself and the protection of the surrounding complex environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0026] Figure 1 This is a schematic diagram of the main structure of the foundation pit in a highly sensitive area.

[0027] Figure 2 It is a schematic diagram of the main structure of the multi-layer support unit.

[0028] Figure 3 This is a schematic diagram of the main foundation pit structure from a bird's-eye view.

[0029] Figure 4 It is a schematic diagram of the top view structure of the multi-layer support unit.

[0030] Among them, elevated bridge deck-1, bridge pier-2, weakly sensitive area foundation pit-3, first weakly sensitive area foundation pit-31, second weakly sensitive area foundation pit-32, strong sensitive area foundation pit-4, underground continuous wall-5, stabilized soil layer-6, cap beam-7, reinforced concrete slab-8, reinforced structure-9, lattice column-91, jet jet pile-92, multi-layer support unit-93, reinforced concrete support layer-931, steel support layer-932, first isolation wall-10, second isolation wall-11, isolation piles-12, middle partition plate-13. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0033] The present invention provides a main foundation pit of a subway station in a complex urban environment, comprising an elevated bridge deck 1, a bridge pier 2 and a main foundation pit arranged below the elevated bridge deck 1, wherein the main foundation pit comprises a weakly sensitive area foundation pit 3 and a strongly sensitive area foundation pit 4;

[0034] The strong sensitive area foundation pit 4 is arranged within the projection range of the elevated bridge deck 1 toward the ground; the weak sensitive area foundation pit 3 includes a first weak sensitive area foundation pit 31 and a second weak sensitive area foundation pit 32; the first weak sensitive area foundation pit 31 and the second weak sensitive area foundation pit 32 are arranged on the ground on both sides of the elevated bridge deck 1; the strong sensitive area foundation pit 4 is arranged between the first weak sensitive area foundation pit 31 and the second weak sensitive area foundation pit 32; the strong sensitive area foundation pit 4 is respectively fixedly connected with the first weak sensitive area foundation pit 31 and the second weak sensitive area foundation pit 32 with a middle partition wall 13; the strong sensitive area foundation pit 4 is close to the bridge The pit walls on both sides of the pier 2 are underground continuous walls 5; a reinforcement structure 9 is arranged in the first weakly sensitive area foundation pit 31, the second weakly sensitive area foundation pit 32, and the strongly sensitive area foundation pit 4, and a first isolation wall 10 and a second isolation wall 11 are symmetrically buried on the ground on both sides of the underground continuous wall 5; the bottom end of the underground continuous wall 5 extends into the stable soil layer 6 underground, and the first isolation wall 10 is close to the underground continuous wall 5; the top surface of the first isolation wall 10, the top surface of the second isolation wall 11 and the top surface of the pit wall of the strongly sensitive area foundation pit 4 are respectively fixed with crown beams 7; the top surface of the crown beam 7 is fixed with a number of reinforced concrete slabs 8.

[0035] Furthermore, the underground stable soil layer 6 is a stable stratum that can provide a large load support for the underground continuous wall 5 .

[0036] Furthermore, the underground continuous wall 5, the first isolation wall 10 and the second isolation wall 11 are parallel to each other, thereby optimizing the installation area of ​​the first isolation wall 10 and the second isolation wall 11 and reducing the construction cost.

[0037] Furthermore, an 800 mm thick intermediate partition wall 13 is provided between the highly sensitive area foundation pit 4 and the first weakly sensitive area foundation pit 31 and the second weakly sensitive area foundation pit 32 , respectively, so as to assist the highly sensitive area foundation pit 4 in resisting the internal stress of the first weakly sensitive area foundation pit 31 and the second weakly sensitive area foundation pit 32 .

[0038] Furthermore, the reinforced concrete slab 8, the first isolation wall 10, the second isolation wall 11 cooperate with the crown beam 7 to form a "pile-slab-wall" portal structure, which not only provides a stable underground environment for the construction of the foundation pit 4 in the highly sensitive area, but also provides stable support for the construction on the ground.

[0039] A further optimization scheme, the reinforcement structure 9 includes a lattice column 91; the bottom surface of the lattice column 91 is in conflict with the stable soil layer 6, and a plurality of jet grouting piles 92 are fixedly connected to the lower part of the lattice column 91; the jet grouting piles 92 are vertically embedded in the bottom of the foundation pit 4 in the highly sensitive area, and a multi-layer support unit 93 is fixedly connected to the upper part of the lattice column 91; the two ends of the multi-layer support unit 93 are respectively fixedly connected to the two underground continuous walls 5.

[0040] Furthermore, the highly sensitive area foundation pit 4 is partially or completely set within the projection range of the elevated bridge deck 1 toward the ground; the pit bottom of the highly sensitive area foundation pit 4 within the projection range of the elevated bridge deck 1 only needs to be reinforced with rotary jet piles 92, and the pit bottom of the highly sensitive area foundation pit 4 outside the projection range of the elevated bridge deck 1 is reinforced with three-axis mixing piles, the three-axis mixing piles have a pile diameter of 850mm, a spacing of 600mm, an overlap of 250mm, and a reinforcement depth of 4m below the bottom of the cushion layer. The use of three-axis mixing piles can achieve strong isolation of the aquifer outside the foundation pit in the highly sensitive area and avoid collapse of the foundation pit in the highly sensitive area;

[0041] Furthermore, the lattice column 91 is fixedly connected to a plurality of jet-jet piles 92 and multi-layer support units 93 through reinforced concrete slabs, thereby improving the flexibility of the reinforced structure 9 and avoiding deformation and failure of the reinforced structure 9 due to squeezing of the foundation pit wall in a highly sensitive area due to geological stress.

[0042] A further optimization scheme is that the multi-layer support unit 93 includes a plurality of reinforced concrete support layers 931 and a plurality of steel support layers 932; both ends of the reinforced concrete support layer 931 are respectively fixedly connected to the two underground continuous walls 5; both ends of the steel support layer 932 are respectively fixedly connected to the two underground continuous walls 5, and the plurality of reinforced concrete support layers 931 and the plurality of steel support layers 932 are separately arranged from top to bottom.

[0043] Furthermore, the use of a servo system at both ends of the steel support layer 932 within the projection range of the viaduct can prevent the side walls of the foundation pit 4 in the highly sensitive area at both ends of the steel support layer 932 from collapsing outwards due to the high-load piers 2 and the soft geological environment, resulting in a decrease in the supporting force at both ends of the steel support layer 932, thereby causing the entire reinforced structure 9 to fail.

[0044] A further optimization scheme is that several reinforced concrete support layers 931 on the same horizontal plane are arranged at equal intervals in the foundation pit 4 in the highly sensitive area, and the interval is set to 6m-10m, and several steel support layers 932 on the same horizontal plane are arranged at equal intervals in the foundation pit 4 in the highly sensitive area, and the interval is set to 2m-5m; the interval between the reinforced concrete support layer 931 and the adjacent steel support layer 932 is 6m-9m, and the interval between adjacent steel support layers 932 is 2.5m-4m; the reinforced concrete support layer 931 and the steel support layer 932 are arranged parallel to each other.

[0045] According to a further optimization plan, the diameter of the jet grouting piles 92 is 800 mm; the distance between adjacent jet grouting piles 92 is 600 mm, and the overlap is 200 mm. The jet grouting piles 92 are embedded 4 m into the bottom of the foundation pit 4 in the highly sensitive area.

[0046] A further optimization scheme is that the first isolation wall 10 and the second isolation wall 11 respectively include a number of isolation piles 12 arranged at equal intervals, and the number of isolation piles 12 included in the first isolation wall 10 is less than the number of isolation piles 12 included in the second isolation wall 11; the shortest distance between the isolation piles 12 of the first isolation wall 10 and the underground continuous wall 5 is 1.5m-2.5m, and the shortest distance between the isolation piles 12 of the second isolation wall 11 and the underground continuous wall 5 is 6.5m-8.5m; the shortest distance between the isolation piles 12 of the second isolation wall 11 and the bridge foundation of the pier 2 is 6.5m-8.5m.

[0047] Furthermore, the top of the isolation pile 12 exceeds the base of the pier 2 by 2 m, which facilitates subsequent construction operations on the top of the isolation pile 12 .

[0048] According to a further optimization scheme, the bottom ends of the isolation piles 12 extend into the underground stable soil layer 6, and all the isolation piles 12 are arranged parallel to each other; the spacing between adjacent isolation piles 12 of the first isolation wall 10 is 5m-6m; the spacing between adjacent isolation piles 12 of the second isolation wall 11 is 0.8m-1.5m.

[0049] According to a further optimization scheme, the underground continuous wall 5 has a wall thickness of 0.7m-0.9m, and its bottom end extends into the stable soil layer 6 underground.

[0050] A further optimization plan is to arrange monitoring points within the range of three times the depth of the highly sensitive area foundation pit 4 at the edge of the pit mouth of the highly sensitive area foundation pit 4.

[0051] Furthermore, the monitoring point arranged directly below the bottom of the foundation pit 4 in the highly sensitive area includes a variety of sensors and is electrically connected to an external monitoring processor; it is capable of realizing settlement monitoring of the ground surface and pipelines around the foundation pits in the highly sensitive area and the weakly sensitive area, groundwater level monitoring outside the pit, vertical and horizontal displacement monitoring of the foundation pits in the highly sensitive area and the weakly sensitive area, horizontal displacement and settlement monitoring of the pile tops of the isolation piles 12 and the rotary jet piles 92, vertical and horizontal displacement monitoring of the soil outside the foundation pits in the highly sensitive area and the weakly sensitive area, support axial force monitoring, and horizontal displacement and settlement monitoring of the pier 2 columns.

[0052] A method for constructing a main foundation pit of a subway station in a complex urban environment according to claims 1 to 9, comprising three steps:

[0053] Zoning: The subway station main foundation pit is divided into highly sensitive areas and weakly sensitive areas according to the complexity of the environment.

[0054] Construction: Construction of foundation pits in weakly sensitive areas and construction of foundation pits in highly sensitive areas;

[0055] Connectivity: The main foundation pit of the station is connected.

[0056] In one embodiment of the present invention, the present invention is solved by the following technical solution, a method for constructing the main foundation pit of a subway station in a complex urban environment, comprising: zoning and segmenting the main foundation pit of the subway station according to the complexity of the environment in which the main foundation pit is located, dividing it into a highly sensitive area and a weakly sensitive area; constructing the foundation pit in the weakly sensitive area (i.e., the weakly sensitive area foundation pit 3) and the foundation pit in the strongly sensitive area (i.e., the strongly sensitive area foundation pit 4), respectively; and connecting the main foundation pits of the station.

[0057] The details are as follows:

[0058] In order to reduce the impact of the subway station foundation pit construction on the surrounding complex environment, the main foundation pit is divided into several small foundation pits. The weakly sensitive area foundation pit 3 is constructed first, and then the strong sensitive area foundation pit 4 is constructed. During the construction period, the deformation of surrounding buildings and structures during the foundation pit construction is monitored and measured.

[0059] Among them, the construction of foundation pit 3 in weakly sensitive area includes: site leveling, heavy-loaded access road setting → enclosure structure construction → pit reinforcement structure 9 construction → crown beam 7 and the first reinforced concrete support layer 931 construction → earthwork layering, installation of reinforced concrete support layer 931 and steel support layer 932 → cushion layer, waterproofing construction → bottom plate construction → side wall, column, middle plate construction → side wall, column, top plate construction → external waterproofing and protective layer construction;

[0060] The construction process of foundation pit 4 in highly sensitive area includes: site leveling and setting up heavy-load access roads → construction of underground continuous walls → construction of reinforcement structure 9 in the pit → construction of isolation piles 12 outside the pit within the foundation range of sensitive buildings → construction of crown beams 7 and the first reinforced concrete supporting layer 931 → construction of isolation piles 12, crown beams 7, and reinforced concrete slabs 8 outside the pit → earthwork layering, installation of reinforced concrete supporting layer 931 and steel supporting layer 932 → cushion layer and waterproofing construction → reinforced concrete slab construction → side wall, column and middle plate construction → side wall, column and top plate construction → external waterproofing and protective layer construction.

[0061] Among them, the foundation pit 4 in the highly sensitive area needs to set isolation piles 12 around the foundation of the sensitive building. The isolation piles 12, the main foundation pit and the reinforcement structure 9 are connected by a crown beam + reinforced concrete slab structure to form a "pile-slab-wall" portal structure.

[0062] The specific construction method is that the foundation pit 4 in the highly sensitive area is located below the viaduct deck 1, with a clearance of about 9.5m. The land in the highly sensitive area is now leveled and the access road for heavy-loaded vehicles is repaired to facilitate the transportation of construction equipment and materials; the foundation pits 3 in the weakly sensitive area are respectively the first weakly sensitive area foundation pit 31 and the second weakly sensitive area foundation pit 32. The length of the first weakly sensitive area foundation pit 31 is 121m, the excavation depth is 16.8m, and the pit wall of the first weakly sensitive area foundation pit 31 is about 47.5m away from the viaduct pier; the length of the second weakly sensitive area foundation pit 32 is 140m, the excavation depth is 16.2m, and the pit wall of the second weakly sensitive area foundation pit 32 is about 31.9m away from the viaduct pier; the length of the foundation pit 4 in the highly sensitive area is 88m, the excavation depth is 16.5m, and the pit wall of the foundation pit 4 in the highly sensitive area is about 14.0m away from the viaduct pier.

[0063] Then, the earth and stone inside the foundation pit 4 in the highly sensitive area are transported away by equipment, and then underground continuous walls 5 are constructed on the two opposite pit walls of the foundation pit 4 in the highly sensitive area near the bridge pier 2. The underground continuous walls extend from the top of the pit wall of the foundation pit 4 in the highly sensitive area to the underground stable soil layer 6; then, the reinforcement structure 9 in the foundation pit 4 in the highly sensitive area is constructed between the two underground continuous walls 5, specifically, high-pressure rotary jet piles 92 are used to reinforce the pit bottom within the projection range of the viaduct. The high-pressure rotary jet piles 92 have a pile diameter of 800mm, a spacing of 600mm, an overlap of 200mm, and a reinforcement depth of 4m below the bottom of the foundation pit 4 in the highly sensitive area; three-axis mixing piles are used to reinforce the pit bottom outside the projection range of the viaduct. The three-axis mixing piles have a pile diameter of 850mm, a spacing of 600mm, an overlap of 250mm, and a reinforcement depth of 4m below the bottom of the foundation pit 4 in the highly sensitive area. The use of three-axis mixing piles can achieve effective isolation of the external aquifer of the foundation pit 4 in the highly sensitive area, and avoid collapse of the foundation pit 4 in the highly sensitive area;

[0064] The support system of foundation pit 4 in the highly sensitive area consists of five vertical supports. The first one is a reinforced concrete support layer 931 with a cross-section of 800mm×1000mm, the second one is a steel support layer 932 with a cross-section of Φ800mm (a servo system is used within the projection range of the viaduct), the third one is a 800mm×1000mm reinforced concrete support layer 931, the fourth one is a Φ800 steel support layer 932 (a servo system is used within the projection range of the viaduct), and the fifth one is a Φ800 steel support layer 932 (a servo system is used within the projection range of the viaduct).

[0065] In the above technical solution, the first isolation wall 10 and the second isolation wall 11 are arranged between the pit wall of the highly sensitive area foundation pit 4 and the bridge pier, the isolation pile 12 has a diameter of Φ800mm, the distance between the first isolation wall 10 and the pit wall of the highly sensitive area foundation pit 4 is 1100mm, the distance between the first isolation wall 10 and the second isolation wall 11 is 4950mm, the distance between the second isolation wall 11 and the bridge foundation of the bridge pier 2 is 7700mm, and the isolation pile 12 is 33m long. A crown beam 7 with a cross-section of 800mm×800mm is arranged on the top of the isolation pile 12, and a reinforced concrete slab 8 is used to connect with the crown beam 7 of the main foundation pit, forming a "pile-slab-wall" portal structure.

[0066] Monitoring points are arranged within the range of three times the depth of the strong sensitive area foundation pit 4 at the edge of the pit mouth of the strong sensitive area foundation pit 4, and monitoring is carried out during the construction process. The monitoring items include: monitoring of the surface and pipeline settlement around the strong sensitive area foundation pit and the weak sensitive area foundation pit, monitoring of the groundwater level outside the pit, monitoring of the vertical horizontal displacement of the strong sensitive area foundation pit and the weak sensitive area foundation pit, monitoring of the pile top horizontal displacement and settlement of the isolation pile 12 and the rotary jet pile 92, monitoring of the vertical horizontal displacement of the soil outside the strong sensitive area foundation pit and the weak sensitive area foundation pit, monitoring of the supporting axial force, and monitoring of the horizontal displacement and settlement of the column of the bridge pier 2. By monitoring various parameters of the geological environment around the strong sensitive area foundation pit 4, the implementation of the construction environment is realized, and the stagnation of the construction progress due to the sudden change of the geological environment is avoided, and even the collapse and rework are avoided.

[0067] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0068] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A main foundation pit of a subway station in a complex urban environment, comprising an elevated bridge deck (1), bridge piers (2) and a main foundation pit arranged below the elevated bridge deck (1), characterized in that: The main foundation pit comprises a weakly sensitive area foundation pit (3) and a strongly sensitive area foundation pit (4); The strong sensitive area foundation pit (4) is arranged within the projection range of the elevated bridge deck (1) toward the ground; the weak sensitive area foundation pit (3) comprises a first weak sensitive area foundation pit (31) and a second weak sensitive area foundation pit (32); the first weak sensitive area foundation pit (31) and the second weak sensitive area foundation pit (32) are arranged on the ground at both sides of the elevated bridge deck (1); a strong sensitive area foundation pit (4) is arranged between the first weak sensitive area foundation pit (31) and the second weak sensitive area foundation pit (32); a middle partition wall (13) is fixedly connected between the strong sensitive area foundation pit (4) and the first weak sensitive area foundation pit (31) and the second weak sensitive area foundation pit (32); the strong sensitive area foundation pit (4) is close to the bridge pier. The pit walls on both sides of (2) are underground continuous walls (5); the first weakly sensitive area foundation pit (31), the second weakly sensitive area foundation pit (32), and the strong sensitive area foundation pit (4) are provided with reinforcement structures (9), and the ground on both sides of the underground continuous wall (5) is symmetrically buried with a first isolation wall (10) and a second isolation wall (11); the bottom end of the underground continuous wall (5) extends into the stable soil layer (6) underground, and the first isolation wall (10) is close to the underground continuous wall (5); the top surface of the first isolation wall (10), the top surface of the second isolation wall (11) and the top surface of the pit wall of the strong sensitive area foundation pit (4) are respectively fixedly connected with crown beams (7); the top surface of the crown beam (7) is fixedly connected with a plurality of reinforced concrete slabs (8); The reinforcement structure (9) of the foundation pit (4) in the highly sensitive area comprises a lattice column (91); the bottom end of the lattice column (91) extends into the stable soil layer (6) underground, and the lower part of the lattice column (91) is fixedly connected to a plurality of jet grouting piles (92); the jet grouting piles (92) are vertically embedded in the bottom of the foundation pit (4) in the highly sensitive area, and the upper part of the lattice column (91) is fixedly connected to a multi-layer support unit (93); the two ends of the multi-layer support unit (93) are respectively fixedly connected to the two underground continuous walls (5); The multi-layer support unit (93) comprises a plurality of reinforced concrete support layers (931) and a plurality of steel support layers (932); the two ends of the reinforced concrete support layer (931) are respectively fixedly connected to the two underground continuous walls (5); the two ends of the steel support layer (932) are respectively fixedly connected to the two underground continuous walls (5), and the plurality of reinforced concrete support layers (931) and the plurality of steel support layers (932) are separately arranged from top to bottom; The first isolation wall (10) and the second isolation wall (11) respectively include a plurality of isolation piles (12) arranged at equal intervals, and the number of the isolation piles (12) included in the first isolation wall (10) is less than the number of the isolation piles (12) included in the second isolation wall (11); the shortest distance between the isolation piles (12) of the first isolation wall (10) and the underground continuous wall (5) is 1.5m-2.5m, and the shortest distance between the isolation piles (12) of the second isolation wall (11) and the underground continuous wall (5) is 6.5m-8.5m; the shortest distance between the isolation piles (12) of the second isolation wall (11) and the bridge foundation of the pier (2) is 6.5m-8.5m.

2. The main foundation pit of a subway station in a complex urban environment according to claim 1, characterized in that: Several reinforced concrete support layers (931) on the same horizontal plane are arranged at equal intervals in the foundation pit (4) in the highly sensitive area, and the intervals are set to 6m-10m; several steel support layers (932) on the same horizontal plane are arranged at equal intervals in the foundation pit (4) in the highly sensitive area, and the intervals are set to 2m-5m; the interval between the reinforced concrete support layer (931) and the adjacent steel support layer (932) is 6m-9m, and the interval between the adjacent steel support layers (932) is 2.5m-4m; the reinforced concrete support layer (931) and the steel support layer (932) are arranged parallel to each other.

3. The main foundation pit of a subway station in a complex urban environment according to claim 1, characterized in that: The jet grouting piles (92) have a diameter of 800 mm; the spacing between adjacent jet grouting piles (92) is 600 mm, and the overlap is 200 mm; the jet grouting piles (92) are embedded 4 m into the bottom of the foundation pit (4) in the highly sensitive area.

4. The main foundation pit of a subway station in a complex urban environment according to claim 1, characterized in that: The bottom ends of the isolation piles (12) extend into the stable soil layer (6) underground, and all the isolation piles (12) are arranged parallel to each other; the spacing between adjacent isolation piles (12) of the first isolation wall (10) is 5m-6m; the spacing between adjacent isolation piles (12) of the second isolation wall (11) is 0.8m-1.5m.

5. The main foundation pit of a subway station in a complex urban environment according to claim 1, characterized in that: The underground continuous wall (5) has a wall thickness of 0.7m-0.9m, and its bottom end extends into the stable soil layer (6) underground.

6. The main foundation pit of a subway station in a complex urban environment according to claim 1, characterized in that: Monitoring points are arranged within a range of three times the depth of the foundation pit (4) in the highly sensitive area at the edge of the pit opening of the foundation pit (4) in the highly sensitive area.

7. A method for constructing a main foundation pit of a subway station in a complex urban environment according to any one of claims 1 to 6, characterized in that: It includes three steps: Zoning: The subway station main foundation pit is divided into highly sensitive areas and weakly sensitive areas according to the complexity of the environment. Construction: Construction of foundation pits in weakly sensitive areas and construction of foundation pits in highly sensitive areas; Connectivity: The main foundation pit of the station is connected.