A two-stage force-bearing bolt assembly and construction method thereof
By combining ordinary bolts with pullout-resistant but not shear-resistant bolts, and using the extrusion of the casing and collar to increase the bearing capacity, the problem of bolt breakage under extreme loads in the existing technology is solved, and the resistance and deformation of the structure are improved. capabilities, achieving green sustainable development and cost reduction.
Patent Information
- Application Number
- CN202111160561.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-30
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2041-09-30
AI Technical Summary
Under extreme load conditions, bolts in existing composite structures are prone to breakage, causing component separation, which may result in catastrophic consequences such as falling beams, overturning, and collapse. Existing technologies are difficult to effectively resist extreme loads such as overloading and earthquakes.
A two-stage stressed bolt group is used, which combines ordinary bolts with pull-out and non-shear-resistant bolts. The ordinary bolts slip during normal use, while the pull-out and non-shear bolts function under extreme loads. The extrusion of the pipe and the collar increases the bearing capacity, achieves a secondary rise in the load-slip curve, and increases the bearing capacity and slip capacity.
It improves the resistance and deformation capacity of the structure under extreme loads, avoids component separation, achieves continuous load-bearing of the structure after extreme loads, reduces the need for repairs, reduces costs, and achieves green and sustainable development.
Smart Images

Figure CN113684932B
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building structures, relates to a combined structure, and in particular to a two-stage force-bearing bolt group. Background Art
[0002] Since the composite structure can make full use of materials, the steel beams that are prone to instability under compression are placed in the tension zone, and the concrete that is prone to cracking under tension is placed in the compression zone. Therefore, the advantages of steel's tensile strength and concrete's compressive strength can be fully utilized, and the combination of the two can achieve the effect of reducing structural costs and improving performance. However, shear connectors are required between steel beams and concrete to transmit the horizontal shear force and vertical lifting force of the interface, so as to achieve the combined effect. Since the bolts are a flexible shear connector, the bearing capacity will not be reduced when a certain slip occurs between the concrete slab and the steel beam. At the same time, it has the advantages of simple manufacturing process, convenient construction, isotropy, and easy on-site welding, and is widely used in actual engineering.
[0003] Under normal design and use conditions, composite structures can exert their superior performance. However, when encountering extreme accidental loads such as rare earthquakes, overloads, impacts, explosions, etc., the structure is in a limit state, and the shear force and slip generated by the studs in the composite components exceed the normal level. Once the studs break and fail, the different components of the composite structure will be separated, which may lead to catastrophic consequences such as falling beams, overturning, and collapse. Summary of the invention
[0004] In order to overcome the shortcomings of the above-mentioned prior art, the purpose of the present invention is to provide a two-stage force-bearing bolt group, which realizes the two-stage force of the bolts by combining ordinary bolts and pull-out non-shear bolts, and the pull-out non-shear bolts serve as a bearing capacity reserve. When encountering extreme loads, the pull-out non-shear bolts play a role, thereby improving the resistance of the structure under extreme accidental loads. In the normal use stage, ordinary bolts are subjected to force and slip, while the sleeves and collars of the pull-out non-shear bolts are subjected to force and compression deformation, and the internal bolts are not subjected to force. When the slip of the ordinary bolts reaches a certain degree, the pull-out non-shear bolts begin to be stressed, so that the load-slip curve of the entire bolt group has a secondary rising section, the bearing capacity and slip increase, and the bolt group achieves the effect of two-stage force. This two-stage force-bearing bolt group can be used in important parts of super-high, large-span, heavy-loaded, and complex structures to improve the anti-collapse ability of the structure under extreme environments. After the extreme load has passed, the pull-out but not shear-resistant studs can replace ordinary studs to continue to bear the load, saving the structure from demolition and reconstruction, and achieving green and sustainable development of the building.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is:
[0006] A two-stage force-bearing bolt group consists of an ordinary bolt welded to a welded object along the axis of the welded object and a pull-out-resistant but not shear-resistant bolt. The ordinary bolt consists of a bolt rod and a bolt cap, and the pull-out-resistant but not shear-resistant bolt consists of a bolt rod, a sleeve sleeved on the outside of the bolt rod, a bolt cap and a ring sleeved on the outside of the bolt cap.
[0007] In one embodiment, the bolt rod 1 and the bolt rod 2 have the same diameter, and the spacing between the common bolt and the pull-out resistant but not shear resistant bolt is not less than six times the bolt rod diameter.
[0008] In one embodiment, when a plurality of bolt groups are welded on the object to be welded, a bolt that is pull-out resistant but not shear resistant is arranged between two adjacent common bolts.
[0009] In one embodiment, the sleeve and the collar are made of a low elastic modulus material.
[0010] In one embodiment, the low elastic modulus material is foam plastic, EVA foam, artificial sponge or low elastic modulus rubber.
[0011] In one embodiment, the inner diameter of the sleeve is the same as the diameter of the second bolt rod, the wall thickness is 1 to 5 mm, and the height is 3 to 10 mm lower than the height of the second bolt rod. The inner diameter of the ring is the same as the diameter of the second bolt cap, the wall thickness is 1 to 5 mm, and the height is the same as the height of the second bolt cap.
[0012] In one embodiment, the object to be welded is a steel section, a steel plate or a steel pipe.
[0013] The present invention also provides a construction method of the two-stage force-bearing bolt group, comprising:
[0014] Step 1, welding common studs and pull-out resistant but non-shear resistant studs to the object to be welded;
[0015] Among them, the welding method of pull-out but not shear-resistant studs is as follows:
[0016] ① First, insert the sleeve into the second bolt rod from the bottom of the second bolt rod, and put the sleeve around the second bolt rod as a whole;
[0017] ② Fold the sleeve outside the second bolt rod from bottom to top at the lower 1 / 3 of its height to leave space for the ceramic ring used for welding;
[0018] ③ Use a stud welding machine to perform arc stud welding. The welding gun clamps the stud cap 2 and tightens the porcelain ring, and welds the stud rod 2 to the surface of the object to be welded.
[0019] ④ Fold the sleeve which has been folded 1 / 3 of the height back to a cylindrical shape to completely wrap the second bolt rod;
[0020] ⑤Put the ring on the second bolt cap;
[0021] Step 2: After all the bolt groups are welded, formwork is supported and concrete is poured to cast the bolt groups inside.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] The present invention has the following advantages:
[0024] (1) Two-stage force. Figure 4 As shown in the figure, the stud group has greater resistance and deformation capacity than ordinary studs under extreme conditions. As a bearing capacity reserve, the pull-out non-shear studs are squeezed when the ordinary studs are subjected to a certain degree of stress and deformation. The thickness of the sleeve and ring of the pull-out non-shear studs is squeezed, and the internal studs come into play only after they contact the concrete. This causes the load-slip curve to rise twice, and the shear bearing capacity and slip of the stud group are increased, which can resist the increased shear force and deformation under extreme load conditions. The load-slip curve of the two-stage force stud group can be adjusted by adjusting the thickness of the sleeve and ring wall.
[0025] (2) Convenient construction. The construction methods of ordinary studs and pull-out but not shear-resistant studs are the same, and both are welded using a stud welding machine. The sleeve has been put on the stud rod and folded before welding the pull-out but not shear-resistant studs. After welding, you only need to fold the sleeve back into a tubular shape and install the ring on the bolt cap, which is simple to construct.
[0026] (3) Flexible use. A second-stage load-bearing bolt group can be set at local important locations as a bearing capacity reserve, and ordinary bolts can still be used in other locations.
[0027] (4) Sustainable and repair-free. When ordinary bolts break after an accidental extreme load, the pull-out but not shear-resistant bolts can still replace the ordinary bolts, so that the structure can continue to bear the load and avoid repair, thus realizing the concept of green and sustainable building development.
[0028] (5) Low cost. Compared with ordinary bolts, pull-out but not shear-resistant bolts only need to add sleeves and rings made of low elastic modulus materials, and the cost increase is negligible. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a three-dimensional schematic diagram of the two-stage force-bearing bolt group of the present invention when used in a composite beam.
[0030] Figure 2 for Figure 1 A magnified view of area in center.
[0031] Figure 3 for Figure 1 A three-dimensional schematic diagram of a common stud in a two-stage force-bearing stud group is shown.
[0032] Figure 4for Figure 1 A three-dimensional schematic diagram of the assembly of the pull-out but not shear-resistant studs in the two-stage load-bearing stud group is shown.
[0033] Figure 5 It is a schematic diagram of the load-slip curve of the two-stage stressed stud group of the present invention.
[0034] Figure 6 It is a three-dimensional schematic diagram of the two-stage force-bearing bolt group of the present invention when used for a corrugated steel plate. DETAILED DESCRIPTION
[0035] The embodiments of the present invention are described in detail below with reference to the accompanying drawings and examples.
[0036] like Figure 1 and Figure 2 As shown, the present invention is a two-stage force-bearing bolt group, each bolt group consists of a common bolt 1 and a pull-out resistant but not shear resistant bolt 2, and the two are welded to the welded object 3 along the axis of the welded object 3.
[0037] For example, when a plurality of stud groups are welded on the object 3 to be welded, it should be ensured that the two types of studs are arranged at intervals, that is, a pull-out resistant but non-shear resistant stud 2 should be arranged at intervals between two adjacent common studs 1 .
[0038] refer to Figure 3 The common bolt 1 is composed of a bolt rod 1-1 and a bolt cap 1-2, and is a mature molded product on the market.
[0039] refer to Figure 4 The pull-out-resistant but not shear-resistant bolt 2 is composed of a bolt rod 2-1, a sleeve 2-2 sleeved outside the bolt rod 2-1, a bolt cap 2-3, and a sleeve ring 2-4 sleeved outside the bolt cap 2-3. For example, the sleeve 2-2 and the sleeve ring 2-4 are made of low elastic modulus materials, such as foam plastics, EVA foam, artificial sponge or low elastic modulus rubber.
[0040] In one embodiment, the bolt rod 1-1 and the bolt rod 2-1 have the same diameter, and the spacing between the ordinary bolt 1 and the pull-out but not shear-resistant bolt 2 should not be less than six times the bolt rod diameter according to the requirements of the "Standard for Design of Steel Structures" GB 50017-2017.
[0041] In one embodiment, the inner diameter of the sleeve 2-2 is the same as the diameter of the second stud rod 2-1, the wall thickness is 1-5 mm, and the height is 3-10 mm lower than the height of the second stud rod 2-1, because the height of the second stud rod 2-1 will be reduced due to the melting of the stud root during welding. The inner diameter of the collar 2-4 is the same as the diameter of the second stud cap 2-3, the wall thickness is 1-5 mm, and the height is the same as the height of the second stud cap 2-3.
[0042] In one embodiment, the object to be welded 3 is a steel section, a steel plate or a steel pipe.
[0043] According to the structure of the present invention, during normal use, the ordinary bolt 1 is subjected to shear force and slips, while the sleeve 2-2 and the ring 2-4 of the pull-out-resistant but not shear-resistant bolt 2 are subjected to force and compressive deformation. At this time, the bolts in the sleeve 2-2 and the ring 2-4 are not subjected to force as a bearing capacity reserve. Figure 5 As shown, the bolt group has greater resistance and deformation capacity than the ordinary bolt 1 under extreme conditions.
[0044] When encountering extreme accidental loads such as rare earthquakes, overloads, impacts, explosions, etc., the pull-out non-shear bolt 2 begins to bear force after the slippage of the ordinary bolt 1 reaches a certain degree, so that the load-slip curve of the entire bolt group has a secondary rising section, and the bearing capacity and slippage increase, thereby improving the resistance of the structure under extreme accidental loads. It has the advantages of two-stage force, convenient construction, flexible use, and low cost. This two-stage force bolt group can be used in important parts of super-high, large-span, heavy-loaded, and complex structures to improve the structure's ability to resist overturning and collapse under extreme environments. After the extreme accidental load has passed, the pull-out non-shear bolt 2 can replace the ordinary bolt 1 to continue to bear force, so that the structure is exempted from demolition and reconstruction, and realize green and sustainable development of the building. It is particularly suitable for composite structures in bridges and industrial and civil buildings.
[0045] The present invention also provides a construction method of the two-stage force-bearing bolt group, comprising:
[0046] Step 1, welding a common stud 1 and a pull-out-resistant but non-shear-resistant stud 2 to a welded object 3 by arc stud welding or the like;
[0047] The welding method of the pull-out resistant but not shear resistant stud 2 is as follows:
[0048] ① First, insert the sleeve 2-2 into the bolt rod 2-1 from the bottom of the bolt rod 2-1, and put the sleeve 2-2 on the outside of the bolt rod 2-1;
[0049] ② Fold the sleeve 2-2 that is sleeved outside the bolt rod 2-1 upward from bottom to top at the lower 1 / 3 position of its height to leave space for the ceramic ring used for welding;
[0050] ③ Use a stud welding machine to perform arc stud welding, clamp the stud cap 2-3 with the welding gun and tighten the porcelain ring, and weld the stud rod 2-1 to the surface of the object 3 to be welded.
[0051] ④ Fold the sleeve 2-2 which has been folded back to a cylindrical shape by 1 / 3 of the height, and completely wrap the bolt rod 2-1;
[0052] ⑤Put the collar 2-4 onto the bolt cap 2-3;
[0053] Step 2: After all the bolt groups are welded, formwork is supported and concrete is poured 4.
[0054] exist Figure 1 and Figure 6 In the structure shown, the objects to be welded 3 are respectively a steel beam and a corrugated steel plate.
[0055] The present invention innovatively combines ordinary studs and pull-out-resistant but not shear-resistant studs to form a two-stage force-bearing stud group, which increases the shear bearing capacity and improves the deformation capacity, so that the structure has higher resistance under extreme accidental loads, and can avoid catastrophic consequences such as beam drop, overturning, and collapse of the combined structure. The load-slip curve of the two-stage force-bearing stud group can also be adjusted by adjusting the thickness of the sleeve and the ring to achieve the optimal design of this example.
Claims
1. A two-stage force-bearing bolt group, characterized in that: The invention comprises a plurality of two-stage force-bearing bolt groups, each of which comprises a common bolt (1) welded to a welded object (3) along the axis of the welded object (3) and a pull-out resistant but not shear resistant bolt (2), wherein the common bolt (1) comprises a bolt rod (1-1) and a bolt cap (1-2), and the pull-out resistant but not shear resistant bolt (2) comprises a bolt rod (2-1), a sleeve (2-2) sleeved outside the bolt rod (2-1), a bolt cap (2-3) and a sleeve ring (2-4) sleeved outside the bolt cap (2-3), and the bolt rod (1-1) and the bolt cap (2-2) are connected to the welded object (3) along the axis of the welded object (3). 1) is the same as the diameter of the second bolt rod (2-1), the spacing between the ordinary bolt (1) and the pull-out non-shear bolt (2) is not less than six times the bolt rod diameter, a plurality of two-stage force-bearing bolt groups are welded on the welded object (3), and a pull-out non-shear bolt (2) is arranged between two adjacent ordinary bolts (1); the pull-out non-shear bolt (2) serves as a bearing capacity reserve, and when the ordinary bolt (1) is stressed and deformed to a certain extent, the thickness of the sleeve (2-2) and the sleeve ring (2-4) of the pull-out non-shear bolt (2) is squeezed, and the internal bolt comes into play only after contacting the concrete.
2. The two-stage force-bearing bolt group according to claim 1, characterized in that: The materials of the sleeve (2-2) and the sleeve ring (2-4) are low elastic modulus materials.
3. The two-stage force-bearing bolt group according to claim 2, characterized in that: The low elastic modulus material is foam plastic, EVA foam, artificial sponge or low elastic modulus rubber.
4. The two-stage force-bearing bolt group according to claim 1, characterized in that: The inner diameter of the sleeve (2-2) is the same as the diameter of the second bolt rod (2-1), the wall thickness is 1-5 mm, and the height is 3-10 mm lower than the height of the second bolt rod (2-1); the inner diameter of the sleeve ring (2-4) is the same as the diameter of the second bolt cap (2-3), the wall thickness is 1-5 mm, and the height is the same as the height of the second bolt cap (2-3).
5. The two-stage force-bearing bolt group according to claim 1, characterized in that: The object to be welded (3) is a steel section, a steel plate or a steel pipe.
6. The construction method of the two-stage force-bearing bolt group according to claim 1 is characterized in that: The steps include: Step 1, welding a common bolt (1) and a pull-out resistant but non-shear resistant bolt (2) to a welded object (3); The welding method of the pull-out resistant but not shear resistant stud (2) is as follows: ① First, insert the sleeve (2-2) into the second bolt rod (2-1) from the bottom of the second bolt rod (2-1), and sleeve the sleeve on the outside of the second bolt rod (2-1); ② Fold the sleeve (2-2) outside the second bolt rod (2-1) from bottom to top at the lower 1 / 3 of its height to leave space for the ceramic ring used for welding; ③ Using a stud welding machine to perform arc stud welding, the welding gun clamps the stud cap 2 (2-3) and presses the porcelain ring tightly, and welds the stud rod 2 (2-1) to the surface of the object to be welded (3); ④ Fold the sleeve (2-2) which has been folded back to a cylindrical shape by 1 / 3 of its height, so as to completely wrap the second bolt rod (2-1); ⑤Put the collar (2-4) onto the second bolt cap (2-3); Step 2: After all the bolt groups are welded, a formwork is supported and concrete is poured (4) to cast the bolt groups inside.
Citation Information
Patent Citations
Composite interface pre-tightened connection high-performance steel and ultrahigh performance concrete (UHPC) sheet combination structure system
CN109736198A
Composite beam with perforated steel plate connecting pieces and split stud connecting pieces and construction method
CN112854596A
Pulling-resistant non-shearing-resistant connecting piece and construction method
CN113373791A
Two-stage stress stud group
CN215716083U
An all metal device for fixing nails or screws in precast concrete joists or other structural members
GB601399A
