By setting up a multi-layer supporting structure and anchoring system on the upper half section of the subway station, the risk of tall primary support side walls after excavation of the lower half section of the end wall is solved, achieving a safer and more efficient construction process.

CN114687757BActive Publication Date: 2024-10-01SHANGHAI URBAN CONSTRUCTION DESIGN & RESEARCH INSTITUTE (GROUP) CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202210337514.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-01
Publication Date
2024-10-01
Estimated Expiration
2042-04-01

AI Technical Summary

Technical Problem

After the platform level of the lower half section of the subway station end wall is excavated, the end wall position of the upper half section of the platform level faces the risk of the tall primary support side wall, posing construction safety hazards.

Method used

The fully enclosed arch method is adopted for the subway station support structure, which includes the first layer of initial support and the second layer of superimposed initial support on the upper half section of the station hall. The second layer of superimposed initial support is combined with multiple layers of cross-section first The initial support of the layer is anchored to the system anchor rods in the rock and soil layer, and the supporting structure is gradually completed through step-by-step excavation and concrete pouring to ensure the stability of the end wall.

Benefits of technology

It effectively eliminates the risk of instability, deformation and collapse of the end wall, improves construction safety and efficiency, and meets construction safety and progress requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114687757B_ABST
    Figure CN114687757B_ABST
Patent Text Reader

Abstract

The present invention discloses a fully enclosed arch cover method subway station support structure and a construction method thereof. The end wall support structure of the upper half section station hall layer of the subway station includes a first layer of initial support and a second layer of superimposed initial support. The present invention increases the stability of the end wall support structure face by adding a second layer of superimposed initial support to the end wall support structure of the subway station, solves the risk of high initial support side walls faced by the end wall support structure of the subway station after the lower half section platform layer below the end wall support structure of the subway station is excavated, makes up for the shortcomings of the superimposed initial support arch cover method in the prior art, and makes the construction of subway stations develop in a safer and more efficient direction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of subway station construction, in particular to a fully enclosed arch cover method subway station support structure and a construction method thereof. Background Art

[0002] In recent years, with the continuous improvement of social economy and scientific and technological levels, my country's urban rail transit construction has developed rapidly. Due to the high intensity of development in the central urban area, the contradiction between rail transit construction and urban environment and transportation has become increasingly serious. Therefore, the underground excavation method for building rail transit has been widely promoted and applied in major cities, generating great environmental and social benefits, and significant comprehensive economic benefits.

[0003] Among them, the arch cover method is a dark excavation method suitable for "soft on top and hard on bottom" strata created on the basis of open excavation method, cover excavation method and pile method. Its core is to transfer the upper load of the arch cover to the bedrock evenly through the large arch foot, so as to make full use of the bearing capacity of the rock. At present, the arch cover methods used in domestic subway projects mainly include primary support arch cover method, secondary lining arch cover method and double-layer superimposed primary support arch cover method, which have been widely used in the construction of subways in Guiyang, Chongqing, Qingdao and other cities.

[0004] In the existing technology, the primary arch cover method has low overall strength and weak rigidity; the construction joints of the arch wall of the secondary lining arch cover method are prone to water leakage, and the lower construction is prone to vibration damage to the completed secondary lining. The superimposed primary arch cover method that was born in recent years has better solved the above problems and basically met the requirements of on-site construction safety and progress.

[0005] However, there are still the following disadvantages in practical applications:

[0006] For example, the superimposed primary support arch cover method only considers the superimposed primary support of the longitudinal arch of the station, while only a single-layer primary support is set on the end wall of the station. After the rock and soil mass below the middle plate of the station is excavated, the end wall becomes a tall side wall, and coupled with unfavorable factors such as geological bedding, surrounding rock joints and fissures, and groundwater development, especially when the horse head gate is removed during the construction of the section tunnel, secondary disturbance is caused to the surrounding rock of the end wall, which can easily lead to instability, deformation, collapse and other disasters of the end wall, posing a great safety hazard in construction.

[0007] Therefore, how to solve the risk of high initial support side walls faced by the upper half section platform layer end wall after the lower half section platform layer of the subway station end wall is excavated has become a technical problem that technical personnel in this field need to solve urgently. Summary of the invention

[0008] In view of the above-mentioned defects of the prior art, the present invention provides a fully enclosed arch cover method subway station support structure and a construction method thereof, which aims to solve the risk of high initial support side walls faced by the upper half section station hall layer end wall support structure after the lower half section platform layer is excavated at the end wall of the subway station, thereby eliminating safety hazards.

[0009] To achieve the above object, the present invention discloses a fully enclosed arch cover method subway station support structure; the end wall support structure of the upper half section of the subway station hall layer includes a first layer of initial support and a second layer of superimposed initial support;

[0010] The first layer of initial support is closely attached to the rock and soil layer on one side facing the outside of the subway station, and the second layer of superimposed initial support is provided on one side facing the inside of the subway station;

[0011] The second layer of superimposed initial support is fixed with a plurality of system anchor rods that pass through the first layer of initial support and are anchored in the rock and soil layer.

[0012] Preferably, the second layer of laminated initial support is provided with longitudinal frame beams and transverse frame beams that cross each other;

[0013] The longitudinal frame beam and the transverse frame beam are both fixed along the length direction with a plurality of reinforcing anchor rods that pass through the first layer of initial support and are anchored in the rock and soil layer.

[0014] The construction method of the fully enclosed arch cover method subway station support structure comprises the following steps:

[0015] Step 1: excavating the upper half section of the subway station's concourse layer in sections; during the excavation process, dividing the upper half section of the concourse layer into a number of pilot tunnels of different sizes in the horizontal direction;

[0016] Each of the pilot tunnels is divided into an upper step and a lower step for step-by-step excavation;

[0017] Starting from the guide tunnel closest to the side walls of the station hall layer on both sides of the upper half section, the upper step and the lower step of each guide tunnel are excavated inwards step by step;

[0018] During the excavation process, initial support for the upper step and initial support for the lower step are respectively applied in the space of the upper step and the lower step where the excavation of each pilot tunnel is completed;

[0019] When the upper and lower steps of each pilot tunnel have penetrated 6m to 8m into the rock and soil layer, the upper and lower steps of another adjacent pilot tunnel are excavated;

[0020] When the pilot tunnel located in the middle of the station hall layer of the upper half section, i.e. the middle pilot tunnel, is excavated, initial arch support is applied above the middle pilot tunnel of the upper step of the middle pilot tunnel;

[0021] Step 2: after the station hall layer of the upper section is excavated to the designed position of the end wall support structure, excavate the construction space of the first layer of initial support and the second layer of superimposed initial support;

[0022] After completion, the first layer of initial support and the corresponding first layer of initial support steel frame are constructed, and a plurality of the system anchors are installed;

[0023] One end of each of the system anchor rods exposed from the first layer of initial support is reserved for connection with the second layer of overlapping initial support;

[0024] Step 3: After the first layer of initial support is closed, a plurality of reinforcing anchor rods are arranged along the designed positions of the longitudinal frame beams and the transverse frame beams of the second layer of superimposed initial support;

[0025] Each of the reinforcing anchor rods is perpendicular to the rock layer at the location, the anchoring length is not less than 35 times the diameter, the corresponding anchor hole diameter is not less than 80 mm, and the corresponding anchor holes are filled with cement mortar with a strength grade not less than M20, and the exposed anchor rod ends are reserved for connection with the corresponding longitudinal frame beams and the corresponding transverse frame beams;

[0026] Step 4: remove the initial support of the upper step and the initial support of the lower step within the range of the end wall support structure, and construct the transverse frame beam and the arch wall bottom longitudinal beam within 6 to 8 meters nearby;

[0027] During the construction process, each of the reinforcing anchor rods is welded to the inner steel bars of the corresponding second layer of superimposed initial support;

[0028] When the transverse frame beam and the arch wall bottom longitudinal beam within 6 to 8 meters nearby reach the design strength, the second layer of superimposed initial support and the reinforcement binding of the arch wall superimposed initial support within 6 to 8 meters nearby are constructed;

[0029] During the reinforcement binding process of the arch wall superimposed initial support, each of the system anchor rods is welded to the inner reinforcement of the corresponding second layer of superimposed initial support; each of the reinforcement anchor rods is welded to the inner reinforcement of the longitudinal frame beam of the second layer of superimposed initial support;

[0030] After completion, concrete pouring and curing operations are carried out;

[0031] Step 5, sequentially carry out the construction of the second layer of superimposed primary support of the arch wall part of the end wall support structure position on one side of the upper half section station hall layer of the subway station, and according to steps 1 to 4, carry out the construction of the upper step primary support and the lower step primary support of the arch wall part of the end wall support structure position on the other side of the upper half section station hall layer, and finally carry out the partial grooving excavation of the lower half section platform layer of the subway station, carry out the end wall primary support below the end wall support structure, and finally close the corresponding inverted arch primary support, and carry out the construction of breaking the horse head gate of the first section tunnel and the second section tunnel under the first layer of primary support and the second layer of superimposed primary support, and complete the excavation operation of the entire fully enclosed arch cover;

[0032] Step 6: construct the secondary lining and internal structure of the subway station from bottom to top.

[0033] Preferably, in step 1, the upper half section of the station hall layer is divided into three guide tunnels in the horizontal direction.

[0034] Preferably, the initial support of the arch includes the construction of steel frames, sprayed concrete, system anchor rods, steel mesh and locking anchor rods.

[0035] Preferably, the sprayed concrete thickness of the end wall supporting structure is 300 mm.

[0036] Preferably, each of the system anchor rods is a mortar anchor rod, and the length is 3m to 4m;

[0037] A plurality of the system anchor rods are arranged in a plum blossom shape;

[0038] The distance between each two adjacent system anchors is 1.0m×1.0m;

[0039] The installation direction of each system anchor is perpendicular to the corresponding rock layer.

[0040] Preferably, the length of each of the reinforcing anchor rods is 6 meters; and the distance between every two of the reinforcing anchor rods is 1.5 meters.

[0041] Preferably, each of the reinforcing anchor rods is double-sided welded to the corresponding inner steel bars of the second layer of superimposed initial support, and the welding length is not less than 5 times the diameter of the corresponding reinforcing anchor rod.

[0042] Preferably, each of the system anchor rods and the corresponding inner steel bars of the second layer of overlapping initial support, as well as each of the reinforcing anchor rods and the inner steel bars of the longitudinal frame beam of the second layer of overlapping initial support are double-sided welded, and the welding length is not less than 5 times the diameter of the corresponding reinforcing anchor rod or 5 times the diameter of the corresponding system anchor rod.

[0043] Beneficial effects of the present invention:

[0044] The application of the present invention solves the risk of high primary support side walls faced by the end wall of the upper half section platform layer after the platform layer of the lower half section of the end wall of the subway station is excavated, makes up for the shortcomings of the overlapping primary support arch cover method in the prior art, and makes the construction of subway stations develop in a safer and more efficient direction.

[0045] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 A schematic diagram showing the state of the excavation surface after the initial support of the upper step and the initial support of the lower step in one embodiment of the present invention is shown.

[0047] Figure 2 A schematic diagram showing the planar state of completing the initial support for the upper step and the initial support for the lower step in one embodiment of the present invention.

[0048] Figure 3 A schematic diagram of the structure of a system anchor rod is shown in one embodiment of the present invention.

[0049] Figure 4 A schematic diagram showing the state of an excavation surface after the reinforcing anchor rods are installed in one embodiment of the present invention is shown.

[0050] Figure 5 A schematic diagram of the connection structure between the reinforcing anchor rods and the longitudinal frame beams and the transverse frame beams in one embodiment of the present invention is shown.

[0051] Figure 6 A schematic diagram of the structure of a longitudinal frame beam and a transverse frame beam completed in one embodiment of the present invention is shown.

[0052] Figure 7 A schematic diagram showing the state of the upper half section of the station hall layer end wall completed in one embodiment of the present invention.

[0053] Figure 8 A schematic diagram showing the state of completing the lower half-section platform layer in one embodiment of the present invention. DETAILED DESCRIPTION

[0054] Example

[0055] A subway station was constructed using the dark excavation arch cover method. The surrounding rock level is Grade IV and the overlying rock and soil thickness is about 15m. The maximum excavation span of the station is 29.5m, the maximum excavation height is 23.2m, and the excavation area is 482m 2 , which belongs to a large-section dark-excavated tunnel. Its support structure and construction method are as follows:

[0056] like Figure 1 and Figures 3 to 5 As shown, the fully enclosed arch cover method subway station support structure; the end wall support structure of the upper half section of the subway station hall layer A includes a first layer of initial support 21 and a second layer of superimposed initial support 22;

[0057] The first layer of initial support 21 is close to the rock layer on one side facing the outside of the subway station, and the second layer of superimposed initial support 22 is provided on the other side facing the inside of the subway station;

[0058] The second layer of superimposed primary support 22 is fixed to a plurality of system anchor rods 20 that pass through the first layer of primary support 21 and are anchored in the rock and soil layer.

[0059] In some embodiments, the second layer of laminated initial support 22 is provided with longitudinal frame beams 31 and transverse frame beams 32 that cross each other;

[0060] The longitudinal frame beams 31 and the transverse frame beams 32 are both fixed along the length direction with a plurality of reinforcing anchor rods 33 that pass through the first layer of initial support 21 and are anchored in the rock and soil layer.

[0061] like Figures 1 to 8 As shown, the present invention also provides a construction method of a fully enclosed arch cover method subway station support structure, comprising the following steps:

[0062] Step 1: excavate the upper section of the subway station hall layer A in sections; during the excavation process, divide the upper section of the subway station hall layer A into a number of pilot holes of different sizes in the horizontal direction;

[0063] Each pilot tunnel is divided into upper step 1 and lower step 2 for step-by-step excavation;

[0064] Starting from the pilot tunnel closest to the side walls of the station hall layer A on both sides of the upper half section, excavate the upper step 1 and lower step 2 of each pilot tunnel step by step inwards;

[0065] During the excavation process, the upper step initial support 11 and the lower step initial support 12 are respectively applied in the space of the upper step 1 and the lower step 2 where the excavation of each pilot tunnel is completed;

[0066] When the upper step 1 and lower step 2 of each pilot tunnel have penetrated 6m to 8m into the rock and soil layer, the upper step 1 and lower step 2 of another adjacent pilot tunnel on the inner side are excavated;

[0067] When the pilot tunnel located in the middle of the station hall layer A of the upper half section, i.e. the middle pilot tunnel 4, is excavated, an initial arch support 13 is applied above the middle pilot tunnel 3 on the upper step of the middle pilot tunnel 4;

[0068] Step 2: After excavating the station hall layer A in the upper half section to the designed position of the end wall support structure, excavate the construction space for the first layer of initial support 21 and the second layer of superimposed initial support 22;

[0069] After completion, the first layer of initial support 21 and the corresponding first layer of initial support steel frame 22b are constructed, and a plurality of system anchors 20 are set;

[0070] One end of each system anchor rod 20 exposed from the first layer of initial support 21 is reserved for connection with the second layer of overlapping initial support 22;

[0071] Step 3: After the first layer of initial support 21 is closed, a plurality of reinforcing anchor rods 33 are arranged along the designed positions of the longitudinal frame beams 31 and the transverse frame beams 32 of the second layer of superimposed initial support 22;

[0072] Each reinforcing anchor rod 33 is perpendicular to the rock layer at the location, the anchoring length is not less than 35 times the diameter, the corresponding anchor hole diameter is not less than 80 mm, and the corresponding anchor hole is filled with cement mortar with a strength grade not less than M20, and the exposed anchor rod ends are reserved for connection with the corresponding longitudinal frame beam 31 and the corresponding transverse frame beam 32;

[0073] Step 4: Remove the upper step initial support 11 and the lower step initial support 12 within the end wall support structure, and construct the transverse frame beam 32 and the arch wall bottom longitudinal beam 24 within the vicinity of 6 meters to 8 meters;

[0074] During the construction process, each reinforcing anchor rod 33 is welded to the inner steel bars of the corresponding second layer of superimposed initial support 22;

[0075] When the transverse frame beam 32 and the arch wall bottom longitudinal beam 24 within the vicinity of 6 to 8 meters reach the design strength, the second layer of superimposed initial support 22 and the reinforcement binding of the arch wall superimposed initial support 23 within the vicinity of 6 to 8 meters are constructed;

[0076] During the reinforcement binding process of the arch wall superposition primary support 23, each system anchor rod 20 is welded to the inner side reinforcement of the corresponding second layer superposition primary support 22; each reinforcement anchor rod 33 is welded to the inner side reinforcement of the longitudinal frame beam 31 of the second layer superposition primary support 22;

[0077] After completion, concrete pouring and curing operations are carried out;

[0078] Step 5, sequentially carry out the construction of the second layer of superimposed primary support of the arch wall part at the position of the end wall support structure on one side of the upper half section of the station hall layer A of the subway station, and according to steps 1 to 4, carry out the construction of the upper step primary support 11 and the lower step primary support 12 of the arch wall part at the position of the end wall support structure on the other side of the upper half section of the station hall layer A, and finally carry out the partial grooving excavation of the lower half section of the platform layer B of the subway station, construct the end wall primary support 25 below the end wall support structure, and finally close the corresponding inverted arch primary support 26, and carry out the construction of breaking the horse head gate of the first section tunnel 5 and the second section tunnel 6 under the first layer of primary support 21 and the second layer of superimposed primary support 22, and complete the excavation operation of the entire fully enclosed arch cover;

[0079] Step 6: Carry out the secondary lining and internal structure construction of the subway station from bottom to top.

[0080] The principle of the present invention is as follows:

[0081] The present invention increases the stability of the end wall face by arranging the first layer of initial support 21 and the second layer of superimposed initial support 22 on the end wall of the upper half section station hall layer A of the subway station, solves the risk of high initial support side walls faced by the end wall position after the lower half section platform layer B below the end wall is excavated, and makes up for the shortcomings of the superimposed initial support arch cover method in the prior art.

[0082] Under the requirements of harsh environment, tight construction period and safety assurance, it can ensure the stability of large end walls of stations of all sizes during the construction phase, and safely and efficiently complete the excavation and backbuilding of the platform layer of the arch-covered subway station and the removal of the horse head gate of the section tunnel.

[0083] In some embodiments, in step 1, the upper half section of the station hall layer A is divided into three guide tunnels in the horizontal direction.

[0084] In some embodiments, the arch initial support 13 includes the construction of steel frames, shotcrete, system anchors, steel mesh and locking anchors.

[0085] In some embodiments, the thickness of the sprayed concrete of the end wall support structure is 300 mm.

[0086] In some embodiments, each system anchor 20 is a mortar anchor, and the length is 3m to 4m;

[0087] The plurality of system anchor rods 20 are arranged in a plum blossom shape;

[0088] The distance between every two adjacent system anchors 20 is 1.0m×1.0m;

[0089] The installation direction of each system anchor 20 is perpendicular to the corresponding rock layer.

[0090] In some embodiments, the length of each reinforcement anchor rod 33 is 6 meters; the distance between every two reinforcement anchor rods 33 is 1.5 meters.

[0091] In some embodiments, each reinforcing anchor rod 33 is double-sided welded to the inner steel bars of the corresponding second layer of laminated initial support 22 , and the welding length is not less than 5 times the diameter of the corresponding reinforcing anchor rod 33 .

[0092] In some embodiments, each system anchor 20 and the inner steel bar of the corresponding second layer of composite initial support 22, as well as each reinforcing anchor 33 and the inner steel bar of the longitudinal frame beam 31 of the second layer of composite initial support 22 are double-sided welded, and the welding length is not less than 5 times the diameter of the corresponding reinforcing anchor 33 or 5 times the diameter of the corresponding system anchor 20.

[0093] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A construction method for a fully enclosed arch cover method subway station support structure, wherein the end wall support structure of the upper half section of the subway station hall layer (A) comprises a first layer of initial support (21) and a second layer of superimposed initial support (22); The first layer of initial support (21) is closely attached to the rock soil layer on one side facing the outside of the subway station, and the second layer of superimposed initial support (22) is provided on one side facing the inside of the subway station; The second layer of superimposed initial support (22) is fixed to a plurality of system anchor rods (20) that pass through the first layer of initial support (21) and are anchored in the rock layer; The second layer of laminated initial support (22) is provided with longitudinal frame beams (31) and transverse frame beams (32) that intersect each other; The longitudinal frame beam (31) and the transverse frame beam (32) are both fixed along the length direction to a plurality of reinforcing anchor rods (33) that pass through the first layer of initial support (21) and are anchored in the rock layer; Features: The construction method comprises the following steps: Step 1, excavating the upper half section of the station hall layer (A) of the subway station in sections; during the excavation process, dividing the upper half section of the station hall layer (A) into a plurality of pilot tunnels of different sizes along the horizontal direction; Each of the pilot tunnels is divided into an upper step (1) and a lower step (2) for step-by-step excavation; Starting from the guide tunnel closest to the side walls of the station hall layer (A) on both sides of the upper half section, excavating the upper step (1) and the lower step (2) of each guide tunnel inwards step by step; During the excavation process, an upper step initial support (11) and a lower step initial support (12) are respectively applied in the space between the upper step (1) and the lower step (2) where the excavation of each pilot tunnel is completed; After the face of the upper step (1) and the lower step (2) of each pilot tunnel has penetrated 6m to 8m into the rock and soil layer, the upper step (1) and the lower step (2) of another adjacent pilot tunnel on the inner side are excavated; When the guide tunnel located in the middle of the station hall layer (A) of the upper half section, i.e. the middle guide tunnel (4), is excavated, an initial arch support (13) is applied above the middle guide tunnel (3) on the upper step of the middle guide tunnel (4); Step 2: after excavating the station hall layer (A) of the upper section to the designed position of the end wall support structure, excavate the construction space of the first layer of initial support (21) and the second layer of superimposed initial support (22); After completion, the first layer of initial support (21) and the corresponding first layer of initial support steel frame (22b) are constructed, and a plurality of the system anchor rods (20) are arranged; One end of each of the system anchor rods (20) exposed from the first layer of initial support (21) is reserved for connection with the second layer of superimposed initial support (22); Step 3, after the first layer of initial support (21) is closed, a plurality of reinforcing anchor rods (33) are arranged at designed positions of the longitudinal frame beam (31) and the transverse frame beam (32) along the second layer of superimposed initial support (22); Each of the reinforcing anchor rods (33) is perpendicular to the rock layer at the location, the diameter of the corresponding anchor hole is not less than 80 mm, and the corresponding anchor hole is filled with cement mortar with a strength grade not less than M20, and the exposed anchor rod ends are reserved for connection with the corresponding longitudinal frame beam (31) and the corresponding transverse frame beam (32); Step 4, removing the upper step initial support (11) and the lower step initial support (12) within the range of the end wall support structure, and constructing the transverse frame beam (32) and the arch wall bottom longitudinal beam (24) within a range of 6 meters to 8 meters nearby; During the construction process, each of the reinforcing anchor rods (33) is welded to the inner steel bars of the corresponding second layer of superimposed initial support (22); When the transverse frame beam (32) and the arch wall bottom longitudinal beam (24) within a range of 6 to 8 meters nearby reach the designed strength, the second layer of superimposed initial support (22) and the reinforcement binding of the arch wall superimposed initial support (23) within a range of 6 to 8 meters nearby are constructed; During the steel bar binding process of the arch wall superimposed initial support (23), each of the system anchor rods (20) is welded to the inner steel bar of the corresponding second layer superimposed initial support (22); each of the reinforcing anchor rods (33) is welded to the inner steel bar of the longitudinal frame beam (31) of the second layer superimposed initial support (22); After completion, concrete pouring and curing operations are carried out; Step 5, sequentially carry out the construction of the second layer of superimposed primary support of the arch wall portion of the end wall support structure position on one side of the upper half section station hall layer (A) of the subway station, and according to steps 1 to 4, carry out the construction of the upper step initial support (11) and the lower step initial support (12) of the arch wall portion of the end wall support structure position on the other side of the upper half section station hall layer (A), and finally carry out the partial grooving excavation of the lower half section platform layer (B) of the subway station, carry out the end wall initial support (25) below the end wall support structure, and finally close the corresponding inverted arch initial support (26), and carry out the construction of breaking the horse head gate of the first section tunnel (5) and the second section tunnel (6) under the first layer of initial support (21) and the second layer of superimposed primary support (22), so as to complete the excavation operation of the entire fully enclosed arch cover; Step 6: construct the secondary lining and internal structure of the subway station from bottom to top.

2. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: In step 1, the upper half section of the station hall layer (A) is divided into three guide tunnels in the horizontal direction.

3. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: The arch initial support (13) includes the construction of a steel frame, sprayed concrete, system anchor rods, steel mesh and locking anchor rods.

4. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: The sprayed concrete thickness of the end wall supporting structure is 300mm.

5. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: Each of the system anchor rods (20) is a mortar anchor rod, and has a length of 3m to 4m; The plurality of system anchor rods (20) are arranged in a plum blossom shape; The installation direction of each system anchor rod (20) is perpendicular to the corresponding rock layer surface.

6. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: The length of each of the reinforcing anchor rods (33) is 6 meters; and the distance between each two of the reinforcing anchor rods (33) is 1.5 meters.

7. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: Each of the reinforcing anchor rods (33) is double-sided welded to the inner steel bars of the corresponding second layer of superimposed initial support (22), and the welding length is not less than 5 times the diameter of the corresponding reinforcing anchor rod (33).

8. The construction method of the fully enclosed arch cover method subway station support structure according to claim 1 is characterized in that: Each of the system anchor rods (20) and the corresponding inner steel bars of the second layer of superimposed initial support (22), as well as each of the reinforcing anchor rods (33) and the inner steel bars of the longitudinal frame beam (31) of the second layer of superimposed initial support (22), are double-sided welded, and the welding length is not less than 5 times the diameter of the corresponding reinforcing anchor rod (33) or 5 times the diameter of the corresponding system anchor rod (20).

Citation Information

Patent Citations

  • Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum

    CN104763433A

  • Rock stratum underground excavation three-story subway station umbrella cover structure and construction method thereof

    CN106337686A

  • Full underground excavation construction method for underground station

    CN107965328A

  • Construction method of arch-foot-enlarging initial supporting arch covering method

    CN110486036A

  • Underground excavation arch cover method joint structure and construction method thereof

    CN112096417A