A management system for pharmaceutical company tenants based on informatization
By introducing the leasing platform construction module and blind analysis into the pharmaceutical company tenant management system, multi-level authority management and data verification of pharmaceutical company tenants is achieved, and the problems of security and data bias in the existing system are solved, and the system is improved Safety and reliability of research results.
Patent Information
- Application Number
- CN202210442086.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-04-25
AI Technical Summary
The existing pharmaceutical company tenant management system fails to unified management platforms, tenants and projects, resulting in reduced security, increased logical verification time, error generation and project data information bias, affecting the authenticity and reliability of the research results.
An information-based management system was designed, including the leasing platform construction module, tenant management module, project configuration module, project personnel configuration module and central management module. Through platform adjustment, authority management, global configuration and blind analysis, the Multi-level control of user permissions and accuracy of data verification.
It improves the security and use effect of the pharmaceutical company's tenant management system, reduces logical verification time and error, and enhances the authenticity and reliability of project research results.
Smart Images

Figure CN114742621B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of user management, and in particular to a management system for pharmaceutical enterprise tenants based on informatization. Background Art
[0002] Pharmaceutical enterprise project management is the product of social and economic development to a certain stage and an important means of modern management. It strengthens the management of pharmaceutical enterprise project tenants, assigns roles to each tenant, and each role has its own functional permissions. The management and control of tenants and roles, roles and permissions can enable tenants to manage and use pharmaceutical enterprise projects more flexibly.
[0003] The existing pharmaceutical company tenant management system does not manage the platform, tenants and projects in a unified manner when managing tenants, resulting in the platform or tenants being able to operate the project independently, which is not conducive to the effective implementation of the project and reduces the security of the pharmaceutical company tenant management system. When tenants conduct logical verification of pharmaceutical company projects, they analyze the relevant project data one by one through abnormal data, which increases the logical verification time, and the verification process is prone to errors, which reduces the effectiveness of the tenant management system. When managing pharmaceutical company projects, project data information is prone to bias, thereby reducing the authenticity and reliability of project research results. Summary of the invention
[0004] The purpose of the present invention is to provide a management system for pharmaceutical enterprise tenants based on informatization to solve the problems raised in the above-mentioned background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: including a leasing platform construction module, a tenant management module, a project configuration module, a project personnel configuration module and a center control module;
[0006] The leasing platform construction module is used to adjust the platform leasing software according to the tenant leasing information, and transmit the platform leasing software adjustment information to the tenant management module for verification. The leasing platform construction module receives the verification result fed back by the tenant management module. If the verification result is unreasonable, the platform leasing software is adjusted again. If the verification result is reasonable, the tenant management authority is issued to the tenant management module;
[0007] The tenant management module is used to receive the platform leasing software adjustment information and tenant management authority issuance information transmitted by the leasing platform construction module. The tenant verifies whether the platform leasing software adjustment information is reasonable based on the leasing information, and feeds back the verification result to the leasing platform construction module. The tenant management module transmits the tenant management authority issuance information to the project configuration module;
[0008] The project configuration module is used to receive the tenant management authority issuance information transmitted by the tenant management module. The tenant performs global configuration of the project on the leasing platform based on the project content, and transmits the project global configuration information to the project personnel configuration module and the central control module;
[0009] The project personnel configuration module is used to receive the project global configuration information transmitted by the project configuration module, configure the project personnel authority and the project cooperation center based on the project global situation, and transmit the personnel authority configuration information and the project cooperation center configuration information to the central management and control module;
[0010] The central management and control module is used to receive the project global configuration information transmitted by the project configuration module and the personnel authority configuration information and project cooperation center configuration information transmitted by the project personnel configuration module, and to manage and control the project, project personnel and project cooperation center according to the received content.
[0011] Furthermore, the leasing platform construction module includes a platform leasing software adjustment unit and a tenant rights issuing unit;
[0012] The platform leasing software adjustment unit adjusts the application period and application permissions of the platform leasing software according to the tenant leasing information, and transmits the platform leasing software adjustment information to the tenant management module for verification. The leasing platform construction module receives the verification result fed back by the tenant management module. If the verification result is unreasonable, the platform leasing software is adjusted again. If the verification result is reasonable, the verification result is transmitted to the tenant permission issuing unit.
[0013] The authority issuing unit receives the verification result transmitted by the platform leasing software adjustment unit, and transmits the tenant authority issuing information to the tenant management module according to the verification result.
[0014] Furthermore, the tenant management module includes a rationality verification unit and a project online creation unit;
[0015] The rationality verification unit receives the platform leasing software adjustment information transmitted by the platform leasing software adjustment unit and the tenant authority issuance information transmitted by the authority issuance unit, verifies the rationality of the platform leasing software adjustment information based on the tenant leasing information, feeds back the verification result to the platform leasing software adjustment unit, and transmits the tenant authority issuance information to the project online creation unit;
[0016] The project online creation unit receives the tenant authority issuance information transmitted by the rationality verification unit. The tenant manager creates the tenant project online on the platform leasing software according to the authority issuance information, and transmits the online creation permission information to the project configuration module.
[0017] Further, the project configuration module includes a project global setting unit, a data collection application setting unit, a follow-up application setting unit, a central random application setting unit and a project global evaluation unit;
[0018] The project global setting unit receives the online creation permission information transmitted by the project online creation unit, and the tenant manager sets the project global framework online, and transmits the set project global framework to the data collection application setting unit, the follow-up application setting unit and the central random application setting unit;
[0019] The data acquisition application setting unit receives the project global framework transmitted by the project global setting unit. Based on the project global framework, the data acquisition application setting unit sets a visit plan. If the visit plan is set with a cycle, the project data is input into the project global framework. During the visit, the project data verification logic is automatically calculated, and the laboratory standard value is set. The project data and the laboratory standard value that meet the logical verification are transmitted to the central random application setting unit. If the visit plan is not set with a cycle, the visit cycle is set for the visit plan in the data acquisition application setting unit. The project data includes disease diagnosis data, patient medical history data, patient treatment data, patient inclusion criteria and patient exclusion criteria;
[0020] The follow-up application setting unit receives the project global framework transmitted by the project global setting unit. Based on the project global framework, the follow-up application setting unit sets a follow-up plan. If the follow-up plan has a cycle, the project follow-up exception rule is set. If the follow-up plan has no cycle, the follow-up cycle is set for the follow-up plan in the follow-up application setting unit, and the follow-up exception rule is transmitted to the project global evaluation unit.
[0021] The central random application setting unit receives the project global framework transmitted by the project global setting unit and the project data and laboratory standard values that are logically verified and transmitted by the data acquisition application setting unit. Based on the project global framework, the central random application setting unit analyzes the project data using a blind method, sets a proportional relationship between the project test group and the control group to analyze the project completion, and transmits the project analysis results to the project global evaluation unit. The blind method refers to a method that can be used in the design to avoid information bias that is prone to occur in the design, data collection or analysis stage, so that the researcher or the research subject is not clear about the allocation of intervention measures, and the research results are more real and reliable;
[0022] The project global evaluation unit receives the follow-up abnormality rules transmitted by the follow-up application setting unit and the project analysis results transmitted by the central random application setting unit, and constructs an evaluation model based on the received content to evaluate the project globally. If the evaluation result indicates that the project meets the standard, the evaluation result is transmitted to the project personnel configuration module and the central control module. If the evaluation result indicates that the project does not meet the standard, the evaluation result is fed back to the project global setting unit. The specific formula of the evaluation model Y is:
[0023]
[0024] Among them, x represents the number of abnormal rules that appear during the project follow-up. Indicates the number of exception rules set for the project. It represents the probability of abnormal rules appearing in the project, As a coefficient used to improve the project completion standard, M% represents the project completion degree. When Y≥S, it means that the evaluation result does not meet the project standard. When Y<S, it means that the evaluation result meets the project standard.
[0025] Further, the project personnel configuration module includes a project personnel authority configuration unit and a cooperation center configuration unit;
[0026] The project personnel authority configuration unit receives the evaluation result transmitted by the project global evaluation unit. Based on the evaluation result, the tenant manager allocates authority to the project personnel according to the project global situation, and transmits the authority allocation result to the cooperation center configuration unit.
[0027] The cooperation center configuration unit receives the project personnel authority allocation result transmitted by the project personnel authority configuration unit. The tenant manager configures the cooperation center according to the overall project situation and transmits the configuration result and the project personnel authority allocation result to the center management and control module.
[0028] Furthermore, the central control module receives the project global evaluation results transmitted by the project global evaluation unit and the project personnel authority and allocation results of the cooperation center transmitted by the project personnel allocation module, and performs online control of the tenant project according to the received content.
[0029] Furthermore, the specific method of automatically calculating the project data verification logic in the data acquisition application setting unit and comparing the calculation result with the laboratory standard value is:
[0030] Step 1: Enter the project data into the form according to the category, find the abnormal data in the form, and mark the abnormal data;
[0031] Step 2: Construct an analysis model K to calculate the abnormal range of the project data related to the labeled data. The specific formula of the analysis model K is:
[0032]
[0033] H = mX + n;
[0034] Among them, H=mX+n represents the linear relationship between the marked abnormal data and the standard related project data when the marked abnormal data is the standard value, H represents the standard value of the related project data, X represents the standard value corresponding to the marked abnormal data, m represents the coefficient, n represents the intercept of the linear equation, h represents the abnormal range allowed by the project data, X1 and X2 represent the marked abnormal data and the standard value corresponding to the marked abnormal data respectively, and mX2+n represents the standard related project data corresponding to the marked abnormal data when the marked abnormal data is the standard value. It represents the ratio between the marked abnormal data and the standard value corresponding to the marked abnormal data. represents the relevant project data corresponding to the marked abnormal data, and K represents the abnormal range of the relevant project data corresponding to the marked abnormal data;
[0035] Step 3: Based on the calculation results of step 2, filter the relevant project data within the abnormal range, and verify the logic between the filtered project data and the abnormal data. The specific calculation formula is:
[0036] G = β * a;
[0037] Among them, G represents the calculated related project data, β represents the conversion coefficient between the marked abnormal data and the related project data, and a represents the marked abnormal data;
[0038] Step 4: Extract the relevant data of the project data filtered in step 3, and use the logic verification calculation formula to verify the logic between the filtered data and the project data related to the filtered data. If the calculation result is only the same as the abnormal data, it means that the logic verification result is accurate. If the calculation result is the same as two or more related data, it means that the logic verification result is inaccurate and steps 1 to 4 need to be repeated.
[0039] Furthermore, the specific method for setting the follow-up exception rule globally for the project in the follow-up application setting unit is:
[0040] 1) Set up a follow-up plan for pharmaceutical companies based on the overall situation of pharmaceutical company projects, follow up on the basic information of pharmaceutical company projects in the early stage of pharmaceutical company projects, follow up on the progress of each part of pharmaceutical company projects and the quality of project execution in the middle stage of pharmaceutical company projects, and follow up on the project completion and completion quality in the late stage of pharmaceutical company projects;
[0041] 2) At the beginning of a pharmaceutical project, the basic information of the project is first divided into irrelevant basic information and relevant basic information. Irrelevant basic information means that the basic information has no impact on the project at the beginning of the project, and relevant basic information means that the basic information has a greater impact on the project at the beginning of the project. The set follow-up exception rule is that the relevant basic information of the project does not meet the standards;
[0042] 3) In the middle of a pharmaceutical project, the follow-up exception rule is set as follows: the progress of the sub-project in the pharmaceutical project is not within the specified range, the execution quality of the sub-project does not meet the standard, and the specified range of the project progress is [q, p];
[0043] 4) In the later stage of the pharmaceutical enterprise project, the follow-up exception rule is set as the completion degree of the pharmaceutical enterprise project is lower than W and the completion quality does not meet the standard.
[0044] Furthermore, the specific method of the central random application setting unit (S34) using a blind method to analyze the global information of the project and set the proportional relationship between the project test group and the control group is:
[0045] Step 1: Project managers collect data from the control group and test group based on the triple-blind method. The triple-blind method not only prevents researchers and research subjects from knowing the grouping situation, but also prevents the personnel responsible for data collection and analysis from knowing the grouping situation, thus better avoiding bias. The control group includes the real drug control, placebo control and blank control.
[0046] Step 2: Set the ratio between the project test group and the control group to 1:2, randomly select two control groups from the control group and the project test group for analysis, and the three unblindings are performed by the project management personnel. Setting the ratio between the project test group and the control group to 1:2 is conducive to the combined and effective analysis of the test group data, and compared with the 1:1 ratio set by the double-blind method, the analysis efficiency is higher while ensuring the analysis quality;
[0047] Step 3: When the drawn control groups are the tested real drug control and the placebo control, if the test group data and the tested real drug control data are both greater than the placebo control data, and the difference between the test group data and the tested real drug control data is within the allowable error range, it means that the data of the project test group belongs to positive feedback. When the drawn control groups are the tested real drug control and the blank control, if the test group data and the tested real drug control data are both less than the blank control data, and the difference between the test group data and the tested real drug control data is within the allowable error range, it means that the data of the project test group belongs to negative feedback. When the drawn control groups are the blank control and the placebo control, if the test group data is between the blank control data and the placebo control data, then the blank control data is determined to be the negative feedback critical value, and the placebo control data is determined to be the positive feedback critical value.
[0048] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0049] 1. The present invention transmits platform adjustment information to the tenant management module to realize tenant authorization of the platform, transmits project global setting information to the project personnel configuration module to realize project authorization of the tenant, and transmits platform online creation information to the project configuration module to realize platform authorization of the project. It realizes the management and control of user rights based on three different levels: platform authorization, tenant authorization and project authorization, avoids the platform or tenant operating the project alone, is conducive to the effective implementation of the project, and further improves the security of the pharmaceutical company tenant management system.
[0050] 2. The present invention constructs an analysis model to calculate the abnormal range of project data related to project abnormal data, screens related project data based on the calculation results, verifies and calculates the logic between the screened project data and the abnormal data, and ensures the accuracy of the logic verification results through positive and negative logic verification, further reducing the logic verification time and logic verification content, reducing the generation of logic verification errors, and improving the use effect of the tenant management system.
[0051] 3. The present invention analyzes the project data by utilizing the triple-blind method, and by setting the ratio between the project test group and the control group to 1:2, the bias of the project data information is avoided, and the authenticity and reliability of the project research results are further improved. The ratio is set to 1:2, which is conducive to the combined effective analysis of the test group data, and compared with the 1:1 ratio set by the double-blind method, the efficiency of project data analysis is improved while ensuring the analysis quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0053] Figure 1 It is a schematic diagram of the working principle structure of a management system for pharmaceutical enterprise tenants based on informatization according to the present invention. DETAILED DESCRIPTION
[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] See also Figure 1, the present invention provides a technical solution: including a leasing platform construction module S1, a tenant management module S2, a project configuration module S3, a project personnel configuration module S4 and a center management and control module S5;
[0056] The leasing platform construction module S1 is used to adjust the platform leasing software according to the tenant leasing information, and transmit the platform leasing software adjustment information to the tenant management module S2 for verification. The leasing platform construction module S1 receives the verification result fed back by the tenant management module S2. If the verification result is unreasonable, the platform leasing software is adjusted again. If the verification result is reasonable, the tenant management authority is issued to the tenant management module S2; the leasing platform construction module S1 includes a platform leasing software adjustment unit S11 and a tenant authority issuing unit S12;
[0057] The platform leasing software adjustment unit S11 adjusts the application period and application permissions of the platform leasing software according to the tenant leasing information, and transmits the platform leasing software adjustment information to the tenant management module S2 for verification. The leasing platform construction module S1 receives the verification result fed back by the tenant management module S2. If the verification result is unreasonable, the platform leasing software is adjusted again. If the verification result is reasonable, the verification result is transmitted to the tenant permission issuing unit S12.
[0058] The permission issuing unit S12 receives the verification result transmitted by the platform leasing software adjustment unit S11, and transmits the tenant permission issuing information to the tenant management module S2 according to the verification result;
[0059] The tenant management module S2 is used to receive the platform leasing software adjustment information and tenant management authority issuance information transmitted by the leasing platform construction module S1. The tenant verifies whether the platform leasing software adjustment information is reasonable based on the leasing information, and feeds back the verification result to the leasing platform construction module S1. The tenant management module S2 transmits the tenant management authority issuance information to the project configuration module S3; the tenant management module S2 includes a rationality verification unit S21 and a project online creation unit S22;
[0060] The rationality verification unit S21 receives the platform leasing software adjustment information transmitted by the platform leasing software adjustment unit S11 and the tenant authority issuance information transmitted by the authority issuance unit S12, verifies the rationality of the platform leasing software adjustment information based on the tenant leasing information, feeds back the verification result to the platform leasing software adjustment unit S11, and transmits the tenant authority issuance information to the project online creation unit S22;
[0061] The project online creation unit S22 receives the tenant authority issuance information transmitted by the rationality verification unit S21. The tenant manager creates the tenant project online on the platform leasing software according to the authority issuance information, and transmits the online creation permission information to the project configuration module S3.
[0062] The project configuration module S3 is used to receive the tenant management authority issuance information transmitted by the tenant management module S2. The tenant performs global configuration of the project on the leasing platform based on the project content, and transmits the project global configuration information to the project personnel configuration module S4 and the central control module S5; the project configuration module S3 includes a project global setting unit S31, a data collection application setting unit S32, a follow-up application setting unit S33, a central random application setting unit S34 and a project global evaluation unit S35;
[0063] The project global setting unit S31 receives the online creation permission information transmitted by the project online creation unit S22, and the tenant manager sets the project global framework online, and transmits the set project global framework to the data collection application setting unit S32, the follow-up application setting unit S33 and the central random application setting unit S34;
[0064] The data collection application setting unit S32 receives the project global framework transmitted by the project global setting unit S31. Based on the project global framework, the data collection application setting unit S32 sets a visit plan. If the visit plan is set with a cycle, the project data is input into the project global framework. During the visit, the project data verification logic is automatically calculated, and the laboratory standard value is set. The automatic calculation result of the project data verification logic and the laboratory standard value are transmitted to the central random application setting unit S34. If the visit plan is not set with a cycle, the visit cycle is set for the visit plan in the data collection application setting unit S32. The project data includes disease diagnosis data, patient medical history data, patient treatment data, patient inclusion criteria and patient exclusion criteria.
[0065] The specific method of the data acquisition application setting unit S32 automatically calculating the project data verification logic and comparing the calculation result with the laboratory standard value is as follows:
[0066] Step 1: Enter the project data into the form according to the category, find the abnormal data in the form, and mark the abnormal data;
[0067] Step 2: Construct an analysis model K to calculate the abnormal range of the project data related to the labeled data. The specific formula of the analysis model K is:
[0068]
[0069] H = mX + n;
[0070] Among them, H=mX+n represents the linear relationship between the marked abnormal data and the standard related project data when the marked abnormal data is the standard value, H represents the standard value of the related project data, X represents the standard value corresponding to the marked abnormal data, m represents the coefficient, n represents the intercept of the linear equation, h represents the abnormal range allowed by the project data, X1 and X2 represent the marked abnormal data and the standard value corresponding to the marked abnormal data respectively, and mX2+n represents the standard related project data corresponding to the marked abnormal data when the marked abnormal data is the standard value. It represents the ratio between the marked abnormal data and the standard value corresponding to the marked abnormal data. represents the relevant project data corresponding to the marked abnormal data, and K represents the abnormal range of the relevant project data corresponding to the marked abnormal data;
[0071] Step 3: Based on the calculation results of step 2, filter the relevant project data within the abnormal range, and verify the logic between the filtered project data and the abnormal data. The specific calculation formula is:
[0072] G = β * a;
[0073] Among them, G represents the calculated related project data, β represents the conversion coefficient between the marked abnormal data and the related project data, and a represents the marked abnormal data;
[0074] Step 4: Extract the relevant data of the project data screened in step 3, and use the logic verification calculation formula to verify the logic between the screened data and the project data related to the screened data. If the calculation result is only the same as the abnormal data, it means that the logic verification result is accurate. If the calculation result is the same as two or more related data, it means that the logic verification result is inaccurate and steps 1 to 4 need to be repeated;
[0075] The follow-up application setting unit S33 receives the project global framework transmitted by the project global setting unit S31. Based on the project global framework, the follow-up application setting unit S33 sets a follow-up plan. If the follow-up plan has a cycle, the project follow-up exception rule is set. If the follow-up plan has no cycle, the follow-up cycle is set for the follow-up plan in the follow-up application setting unit S33, and the follow-up exception rule is transmitted to the project global evaluation unit S35.
[0076] The follow-up exception rule set by the follow-up application setting unit S33 for the project globally is:
[0077] 1) Set up a follow-up plan for pharmaceutical companies based on the overall situation of pharmaceutical company projects, follow up on the basic information of pharmaceutical company projects in the early stage of pharmaceutical company projects, follow up on the progress of each part of pharmaceutical company projects and the quality of project execution in the middle stage of pharmaceutical company projects, and follow up on the project completion and completion quality in the late stage of pharmaceutical company projects;
[0078] 2) At the beginning of a pharmaceutical project, the basic information of the project is first divided into irrelevant basic information and relevant basic information. Irrelevant basic information means that the basic information has no impact on the project at the beginning of the project, and relevant basic information means that the basic information has a greater impact on the project at the beginning of the project. The set follow-up exception rule is that the relevant basic information of the project does not meet the standards;
[0079] 3) In the middle of a pharmaceutical project, the abnormal follow-up rule is set as follows: the progress of the sub-project in the pharmaceutical project is not within the specified range, and the execution quality of the sub-project does not meet the standard. The specified range of the project progress is [q, p], where [q, p] can be expressed as [40%, 60%], and the specific data is determined according to the actual situation;
[0080] 4) In the later stage of the pharmaceutical project, the follow-up abnormal rule is set as the completion degree of the pharmaceutical project is lower than W, and the completion quality does not meet the standard, where W can be expressed as 100%, and the specific data is determined according to the actual situation;
[0081] The central random application setting unit S34 receives the project global framework transmitted by the project global setting unit S31 and the project data verification logic automatic calculation results and laboratory standard values transmitted by the data collection application setting unit S32. Based on the project global framework, the central random application setting unit S34 uses the blind method to analyze the project data, sets a proportional relationship between the project test group and the control group to analyze the project completion, and transmits the project analysis results to the project global evaluation unit S35. The blind method refers to a method that can be used in the design to avoid information bias that is prone to occur in the design, data collection or analysis stage, so that the researcher or the research subject is not clear about the allocation of intervention measures, and the research results are more real and reliable;
[0082] The specific method by which the central random application setting unit S34 uses a blind method to analyze the global information of the project and sets the proportional relationship between the project test group and the control group is:
[0083] Step 1: Project managers collect data from the control group and test group based on the triple-blind method. The triple-blind method not only prevents researchers and research subjects from knowing the grouping situation, but also prevents the personnel responsible for data collection and analysis from knowing the grouping situation, thus better avoiding bias. The control group includes the real drug control, placebo control and blank control.
[0084] Step 2: Set the ratio between the project test group and the control group to 1:2, randomly select two control groups from the control group and the project test group for analysis, and the three unblindings are performed by the project management personnel. Setting the ratio between the project test group and the control group to 1:2 is conducive to the combined and effective analysis of the test group data, and compared with the 1:1 ratio set by the double-blind method, the analysis efficiency is higher while ensuring the analysis quality;
[0085] Step 3: When the drawn control groups are the tested real drug control and the placebo control, if the test group data and the tested real drug control data are both greater than the placebo control data, and the difference between the test group data and the tested real drug control data is within the allowable error range, it means that the data of the project test group belongs to positive feedback. When the drawn control groups are the tested real drug control and the blank control, if the test group data and the tested real drug control data are both less than the blank control data, and the difference between the test group data and the tested real drug control data is within the allowable error range, it means that the data of the project test group belongs to negative feedback. When the drawn control groups are the blank control and the placebo control, if the test group data is between the blank control data and the placebo control data, the blank control data is determined to be the negative feedback critical value, and the placebo control data is determined to be the positive feedback critical value.
[0086] The project global evaluation unit S35 receives the follow-up abnormality rules transmitted by the follow-up application setting unit S33 and the project analysis results transmitted by the central random application setting unit S34, and constructs an evaluation model based on the received content to evaluate the project globally. If the evaluation result indicates that the project meets the standard, the evaluation result is transmitted to the project personnel configuration module S4 and the central control module S5. If the evaluation result indicates that the project does not meet the standard, the evaluation result is fed back to the project global setting unit S31. The specific formula of the evaluation model Y is:
[0087]
[0088] Among them, x represents the number of abnormal rules that appear during the project follow-up, X represents the number of abnormal rules set by the project, It represents the probability of abnormal rules appearing in the project, As a coefficient used to improve the completion standard of the project, M% represents the project completion. When Y≥S, it means that the evaluation result does not meet the project standard. When Y<S, it means that the evaluation result meets the project standard.
[0089] The project personnel configuration module S4 is used to receive the project global configuration information transmitted by the project configuration module S3, configure the project personnel authority and the project cooperation center based on the project global, and transmit the personnel authority configuration information and the project cooperation center configuration information to the center management and control module S5; the project personnel configuration module S4 includes a project personnel authority configuration unit S41 and a cooperation center configuration unit S42;
[0090] The project personnel authority configuration unit S41 receives the evaluation result transmitted by the project global evaluation unit S35. Based on the evaluation result, the tenant manager allocates authority to the project personnel according to the overall project situation, and transmits the authority allocation result to the cooperation center configuration unit S42.
[0091] The cooperation center configuration unit S42 receives the project personnel authority allocation result transmitted by the project personnel authority configuration unit S41, and the tenant manager configures the cooperation center according to the overall project situation, and transmits the configuration result and the project personnel authority allocation result to the center management and control module S5;
[0092] The central control module S5 is used to receive the project global evaluation results transmitted by the project global evaluation unit S35 and the project personnel authority and allocation results of the cooperation center transmitted by the project personnel allocation module S4, and perform online control of the tenant project according to the received content.
[0093] Example: Assume x=1, X=24, S=10%, and the project completion rate is 93%. Based on the evaluation model Y, we know that:
[0094]
[0095] Y = 3.9% < 10% = S;
[0096] This means that the evaluation results meet the project standards.
[0097] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0098] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A management system for pharmaceutical enterprise tenants based on informatization, characterized by: It includes a leasing platform construction module (S1), a tenant management module (S2), a project configuration module (S3), a project staffing module (S4) and a center management and control module (S5); The leasing platform construction module (S1) is used to adjust the platform leasing software according to the tenant leasing information, and transmit the platform leasing software adjustment information to the tenant management module (S2) for verification. The leasing platform construction module (S1) receives the verification result fed back by the tenant management module (S2). If the verification result is unreasonable, the platform leasing software is adjusted again. If the verification result is reasonable, the tenant management authority is issued to the tenant management module (S2); The rental platform construction module (S1) includes a platform rental software adjustment unit (S11) and a tenant authority issuing unit (S12); The platform leasing software adjustment unit (S11) adjusts the application period and application authority of the platform leasing software according to the tenant leasing information, and transmits the platform leasing software adjustment information to the tenant management module (S2) for verification. The leasing platform construction module (S1) receives the verification result fed back by the tenant management module (S2). If the verification result is unreasonable, the platform leasing software is adjusted again. If the verification result is reasonable, the verification result is transmitted to the tenant authority issuing unit (S12); The authority issuing unit (S12) receives the verification result transmitted by the platform leasing software adjustment unit (S11), and transmits the tenant authority issuing information to the tenant management module (S2) according to the verification result; The tenant management module (S2) is used to receive the platform leasing software adjustment information and tenant management authority issuance information transmitted by the leasing platform construction module (S1); the tenant verifies whether the platform leasing software adjustment information is reasonable based on the leasing information, and feeds back the verification result to the leasing platform construction module (S1); the tenant management module (S2) transmits the tenant management authority issuance information to the project configuration module (S3); The tenant management module (S2) includes a rationality verification unit (S21) and a project online creation unit (S22); The rationality verification unit (S21) receives the platform leasing software adjustment information transmitted by the platform leasing software adjustment unit (S11) and the tenant authority issuance information transmitted by the authority issuance unit (S12), verifies the rationality of the platform leasing software adjustment information based on the tenant leasing information, feeds back the verification result to the platform leasing software adjustment unit (S11), and transmits the tenant authority issuance information to the project online creation unit (S22); The project online creation unit (S22) receives the tenant authority issuance information transmitted by the rationality verification unit (S21), and the tenant manager creates the tenant project online on the platform leasing software according to the authority issuance information, and transmits the online creation permission information to the project configuration module (S3); The project configuration module (S3) is used to receive the tenant management authority issuance information transmitted by the tenant management module (S2); the tenant performs global configuration of the project on the leasing platform based on the project content, and transmits the project global configuration information to the project personnel configuration module (S4) and the central control module (S5); The project configuration module (S3) includes a project global setting unit (S31), a data acquisition application setting unit (S32), a follow-up application setting unit (S33), a central random application setting unit (S34) and a project global evaluation unit (S35); The project global setting unit (S31) receives the online creation permission information transmitted by the project online creation unit (S22), and the tenant manager sets the project global framework online, and transmits the set project global framework to the data collection application setting unit (S32), the follow-up application setting unit (S33) and the central random application setting unit (S34); The data acquisition application setting unit (S32) receives the project global framework transmitted by the project global setting unit (S31), and based on the project global framework, the data acquisition application setting unit (S32) sets a visit plan. If the visit plan is provided with a cycle, the project data is input into the project global framework, the project data verification logic is automatically calculated during the visit, and the laboratory standard value is set, and the project data and laboratory standard value that meet the logical verification are transmitted to the central random application setting unit (S34). If the visit plan is not provided with a cycle, the visit cycle is set for the visit plan in the data acquisition application setting unit (S32); The follow-up application setting unit (S33) receives the project global framework transmitted by the project global setting unit (S31), and based on the project global framework, the follow-up application setting unit (S33) sets a follow-up plan. If the follow-up plan is provided with a cycle, the project follow-up exception rule is set. If the follow-up plan is not provided with a cycle, the follow-up cycle is set for the follow-up plan in the follow-up application setting unit (S33), and the follow-up exception rule is transmitted to the project global evaluation unit (S35); The central random application setting unit (S34) receives the project global framework transmitted by the project global setting unit (S31) and the project data and laboratory standard values that are logically verified and transmitted by the data acquisition application setting unit (S32). Based on the project global framework, the central random application setting unit (S34) analyzes the project data using a blind method, sets a proportional relationship between the project test group and the control group to analyze the project completion, and transmits the project analysis results to the project global evaluation unit (S35); The project global evaluation unit (S35) receives the follow-up abnormality rules transmitted by the follow-up application setting unit (S33) and the project analysis results transmitted by the central random application setting unit (S34), and constructs an evaluation model based on the received content to evaluate the project globally. If the evaluation result indicates that the project meets the standard, the evaluation result is transmitted to the project personnel configuration module (S4) and the central management and control module (S5). If the evaluation result indicates that the project does not meet the standard, the evaluation result is fed back to the project global setting unit (S31). The specific formula of the evaluation model Y is: Among them, x represents the number of abnormal rules that appear during the project follow-up. Indicates the number of exception rules set for the project. It indicates the probability of abnormal rules appearing in the project, M% indicates the project completion degree, when Y≥S, it indicates that the evaluation result does not meet the project standard, when Y<S, it indicates that the evaluation result meets the project standard; The project personnel configuration module (S4) is used to receive the project global configuration information transmitted by the project configuration module (S3), configure the project personnel authority and the project cooperation center based on the project global situation, and transmit the personnel authority configuration information and the project cooperation center configuration information to the center management and control module (S5); The central management and control module (S5) is used to receive the project global configuration information transmitted by the project configuration module (S3) and the personnel authority configuration information and project cooperation center configuration information transmitted by the project personnel configuration module (S4), and to manage and control the project, project personnel and project cooperation center according to the received content.
2. According to claim 1, a management system for pharmaceutical enterprise tenants based on informatization is characterized by: The project personnel configuration module (S4) includes a project personnel authority configuration unit (S41) and a cooperation center configuration unit (S42); The project personnel authority configuration unit (S41) receives the evaluation result transmitted by the project global evaluation unit (S35), and based on the evaluation result, the tenant manager allocates authority to the project personnel according to the project global situation, and transmits the authority allocation result to the cooperation center configuration unit (S42); The cooperation center configuration unit (S42) receives the project personnel authority allocation results transmitted by the project personnel authority configuration unit (S41), and the tenant manager configures the cooperation center according to the overall project situation, and transmits the configuration results and the project personnel authority allocation results to the center management and control module (S5).
3. According to claim 2, a management system for pharmaceutical enterprise tenants based on informatization is characterized by: The central control module (S5) receives the project global evaluation results transmitted by the project global evaluation unit (S35) and the project personnel authority and allocation results of the cooperation center transmitted by the project personnel allocation module (S4), and performs online control of the tenant project based on the received content.
4. According to claim 3, a management system for pharmaceutical enterprise tenants based on informatization is characterized by: The specific method of the data acquisition application setting unit (S32) automatically calculating the project data verification logic and comparing the calculation result with the laboratory standard value is: Step 1: Enter the project data into the form according to the category, find the abnormal data in the form, and mark the abnormal data; Step 2: Construct an analysis model K to calculate the abnormal range of the project data related to the labeled data. The specific formula of the analysis model K is: H = mX + n; Among them, H=mX+n represents the linear relationship between the marked abnormal data and the standard related project data when the marked abnormal data is the standard value, H represents the standard value of the related project data, X represents the standard value corresponding to the marked abnormal data, m represents the coefficient, n represents the intercept of the linear equation, h represents the abnormal range allowed by the project data, X1 and X2 represent the marked abnormal data and the standard value corresponding to the marked abnormal data respectively, and mX2+n represents the standard related project data corresponding to the marked abnormal data when the marked abnormal data is the standard value. It represents the ratio between the marked abnormal data and the standard value corresponding to the marked abnormal data. represents the relevant project data corresponding to the marked abnormal data, and K represents the abnormal range of the relevant project data corresponding to the marked abnormal data; Step 3: Based on the calculation results of step 2, filter the relevant project data within the abnormal range, and verify the logic between the filtered project data and the abnormal data. The specific calculation formula is: G = β * a; Among them, G represents the calculated related project data, β represents the conversion coefficient between the marked abnormal data and the related project data, and a represents the marked abnormal data; Step 4: Extract the relevant data of the project data filtered in step 3, and use the logic verification calculation formula to verify the logic between the filtered data and the project data related to the filtered data. If the calculation result is only the same as the abnormal data, it means that the logic verification result is accurate. If the calculation result is the same as two or more related data, it means that the logic verification result is inaccurate and steps 1 to 4 need to be repeated.
5. According to claim 4, a management system for pharmaceutical enterprise tenants based on informatization is characterized by: The follow-up application setting unit (S33) sets the follow-up exception rule for the project globally as follows: 1) Set up a follow-up plan for pharmaceutical companies based on the overall situation of pharmaceutical company projects, follow up on the basic information of pharmaceutical company projects in the early stage of pharmaceutical company projects, follow up on the progress of each part of pharmaceutical company projects and the quality of project execution in the middle stage of pharmaceutical company projects, and follow up on the project completion and completion quality in the late stage of pharmaceutical company projects; 2) At the beginning of a pharmaceutical project, the basic information of the project is first divided into irrelevant basic information and relevant basic information, and the follow-up exception rule is set for the relevant basic information of the project not meeting the standards; 3) In the middle of a pharmaceutical project, the follow-up exception rule is set as follows: the progress of the sub-project in the pharmaceutical project is not within the specified range, the execution quality of the sub-project does not meet the standard, and the specified range of the project progress is [q, p]; 4) In the later stage of the pharmaceutical enterprise project, the follow-up exception rule is set as the completion degree of the pharmaceutical enterprise project is lower than W and the completion quality does not meet the standard.
6. According to claim 5, a management system for pharmaceutical enterprise tenants based on informatization is characterized by: The specific method of the central random application setting unit (S34) analyzing the global information of the project by using the blind method and setting the proportional relationship between the project test group and the control group is: Step 1: Project managers collect data from the control group and test group based on the triple-blind method. The control group includes the tested real drug control, placebo control, and blank control; Step 2: Set the ratio between the experimental group and the control group to 1:2, randomly select two control groups from the control group and the experimental group for analysis, and the three unblinding operations are performed by the project management personnel; Step 3: When the drawn control groups are the tested real drug control and the placebo control, if the test group data and the tested real drug control data are both greater than the placebo control data, and the difference between the test group data and the tested real drug control data is within the allowable error range, it means that the data of the project test group belongs to positive feedback. When the drawn control groups are the tested real drug control and the blank control, if the test group data and the tested real drug control data are both less than the blank control data, and the difference between the test group data and the tested real drug control data is within the allowable error range, it means that the data of the project test group belongs to negative feedback. When the drawn control groups are the blank control and the placebo control, if the test group data is between the blank control data and the placebo control data, then the blank control data is determined to be the negative feedback critical value, and the placebo control data is determined to be the positive feedback critical value.
