A vacuum ultra-high temperature sintering purification furnace and purification process

Through the design of vertical structure and full graphite heating body, combined with the use of copper electrodes and graphite muffles, the problems of electrode insulation and high-weight charge of traditional sintering furnaces are solved, and the stability and efficiency of the high-temperature purification process are achieved, ensuring that High purity and high weight handling capability of carbon materials.

CN114993033BActive Publication Date: 2024-11-12SHANGHAI ADVANCED METALLURGICAL TECH CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210644276.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-09
Publication Date
2024-11-12
Estimated Expiration
2042-06-09

AI Technical Summary

Technical Problem

Traditional horizontal structure vacuum ultra-high temperature sintering purification furnace cannot solve the insulation problem of electrode introduction, and it is difficult to achieve high-weight charges, affecting the purification effect of carbon materials.

Method used

Vacuum ultra-high temperature sintering purification furnace adopting vertical structure, using a full graphite heating body and insulation structure, combined with the design of copper electrodes and graphite muffle, high-weight charge is realized through the lead screw lifting system, and through the vacuum system and process gas system Perform high-temperature purification treatment.

Benefits of technology

A high-temperature sintering or purification process above 2200℃ is achieved, up to 2800℃, ensuring the stability and sufficient strength of the electrode under high temperature conditions, reducing the residual ash content, and achieving the flexibility of high-weight charges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114993033B_ABST
    Figure CN114993033B_ABST
Patent Text Reader

Abstract

The invention discloses a vacuum ultra-high temperature sintering purification furnace and purification process, including a furnace frame, a main furnace shell, a cooling water distributor system, a heating system, a heat preservation system, a bottom loading trolley, a screw lifting system, a vacuum system, a temperature control system, a process gas system and an equipment electronic control system, wherein the furnace frame is welded by profiles, and the main furnace shell is installed inside the furnace frame; the main furnace shell is welded by stainless steel plates, and the inner side of the shell of the main furnace shell is provided with a water channel interlayer for shell cooling; the cooling water distributor system is used to provide cooling water to the furnace equipment, and the cooling water distributor system has an inlet and outlet water pipe, an inlet and outlet water branch water pipe, a hand valve, a flow switch, a water pressure gauge, a water temperature gauge, and a cooling water distribution circuit composed of an inlet and outlet water pipe, an inlet and outlet water branch water pipe, a hand valve, etc. The invention can realize the sintering or purification processing needs of 200~5000kg heavy weight loading, and the purified molded graphite parts reach a residual ash content of ≤10ppm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of purification or sintering treatment of graphite materials, powder metallurgy ceramic materials and the like, and in particular to a vacuum ultra-high temperature sintering purification furnace and a purification process. Background Art

[0002] Unpurified solid carbon materials generally contain various impurities such as potassium, sodium, magnesium, calcium, and aluminum. At a temperature of about 2200°C, the introduction of chlorine gas and high-temperature calcination can cause the chlorine gas to react with the impurities in the solid carbon material. The chloride generated by the reaction has a low melting point and can be discharged in the form of gas, thereby improving the purity of the carbon material. For vacuum ultra-high temperature sintering purification furnaces above 2200°C, the traditional horizontal structure cannot solve the insulation problem of electrode introduction, because almost all ceramic insulating materials have high-temperature carbonization reactions, which quickly make the insulation properties ineffective. The vertical structure can realize a structure without insulation protection for the electrode; at the same time, the bottom loading method can replace the top loading to realize the structural design of heavy weight loading (≥200kg). Summary of the invention

[0003] The object of the present invention is to provide a vacuum ultra-high temperature sintering purification furnace and a purification process to solve the problems raised in the above background technology.

[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a vacuum ultra-high temperature sintering purification furnace and purification process, including a furnace frame, a main furnace shell, a cooling water distributor system, a heating system, a heat preservation system, a bottom loading trolley, a screw lifting system, a vacuum system, a temperature control system, a process gas system and an equipment electronic control system, wherein the furnace frame is welded by profiles, and the main furnace shell is installed on the inner side of the furnace frame; the main furnace shell is welded by stainless steel plates, and the inner side of the shell of the main furnace shell is provided with a water channel interlayer for shell cooling; The cooling water distributor system is used to provide cooling water to the furnace equipment. The cooling water distributor system has inlet and outlet water pipes, inlet and outlet water branch pipes, hand valves, flow switches, water pressure gauges, and water temperature gauges, and the inlet and outlet water pipes, inlet and outlet water branch pipes, hand valves, etc. form a cooling water distribution circuit; the heating system is installed on the inner side of the main furnace shell, and the heating system includes copper electrodes, graphite heating elements, and graphite rings, wherein the graphite heating elements are designed in a squirrel cage structure, and graphite rings are installed at the upper and lower ends of the graphite heating elements, and the graphite rings are equipped with copper electrodes; the insulation system is installed on Inside the main furnace shell, the insulation system includes graphite insulation hard felt A, hard felt fixing rods and graphite tubes, wherein the graphite insulation hard felt A is fixed to the inside of the main furnace shell, and the graphite insulation hard felt A surrounds the graphite heating element inside the main furnace shell into an independent space to block the outward heat transfer loss of the graphite heating element when heating; the bottom loading trolley is installed on one side of the furnace body frame, and the bottom loading trolley includes a trolley frame, wheels, a travel drive motor, a main furnace bottom cover, graphite insulation hard felt B, a graphite muffle, a process gas pipe and a ground track, wherein wheels are installed at the bottom of the trolley frame, The wheel can be driven by a travel drive motor and move along the pre-buried ground track. The trolley frame is equipped with a main furnace bottom cover, and the main furnace bottom cover is equipped with graphite insulation hard felt B and graphite muffle; the screw lifting system is installed on the furnace body frame and is used to lift the bottom loading trolley to a specified position to close the bottom loading trolley and the main furnace shell. The screw lifting system includes a screw lift, a motor, a coupling, etc., wherein the screw lift is driven by a motor, and the screw lift uses a screw to drive the supporting frame at its bottom to make the bottom loading trolley perform a lifting action and close it with the main furnace shell.

[0005] Preferably, nine copper electrodes are provided and distributed on the graphite ring, and the ends of the copper electrodes away from the graphite ring are fixed to the main furnace shell through flanges, and the graphite heating element, the graphite ring and the copper electrodes are connected to form a graphite hot zone.

[0006] Preferably, the graphite heating element and the graphite ring are both made of high-strength extruded graphite.

[0007] Preferably, the graphite tube is pre-buried in the top of the main furnace shell, the graphite tube is designed as a bent structure, and the upper end of the graphite tube is connected to the vacuum system.

[0008] Preferably, the graphite muffle is arranged on the graphite heat-insulating hard felt B, and the graphite muffle has a graphite cylinder, a graphite base and a graphite top cover, and the graphite base and the graphite top cover are respectively installed on the top side and the bottom side of the graphite cylinder.

[0009] Preferably, a process gas pipe is installed on the bottom side of the graphite cylinder, and the process gas pipe can pass the process gas into the graphite muffle.

[0010] Preferably, the graphite top cover is provided with a vent hole, which is connected to the pre-buried graphite tube of the thermal insulation system and to the vacuum system to extract the volatile gas.

[0011] Preferably, the present invention also provides a purification process of the above-mentioned vacuum ultra-high temperature sintering purification furnace, comprising the steps of:

[0012] S1: Open the bottom loading trolley;

[0013] S2: Put the graphite products to be purified into the graphite muffle, and use the screw lifting system to drive the bottom loading trolley to rise and close the main furnace shell;

[0014] S3: The furnace is evacuated to below 0.1 mbar to remove air and water vapor in the furnace;

[0015] S4: The furnace is vacuumed and heated to 1000°C at a rate of 5°C / min. After reaching the temperature, it is kept warm for 1 hour. The vacuum in the furnace is maintained below 0.2 mbar.

[0016] S5: The furnace is vacuumed and heated to 2000°C at a rate of 5°C / min. After reaching the temperature, it is kept warm for 1 hour. The vacuum in the furnace is maintained below 0.2 mbar.

[0017] S6: vacuum heating to the purification temperature of 2200-2800°C, the heating rate is 1-10°C / min, and the temperature is kept for purification for 50-100 hours after reaching the temperature. During the heating and insulation, the purification process gas R14 is introduced, and the purification process gas flow rate is 2-20 liters / min. The vacuum in the furnace is between 10-100 mbar;

[0018] S7: Vacuum and cool down to 1000℃, keep the temperature down to 1 hour, introduce 99.999% or more high-purity argon gas during cooling and heat preservation, and the vacuum in the furnace is between 10mbar and 100mbar;

[0019] S8: Vacuum and cool down to near room temperature, with a cooling rate of about 10-30℃ / hour. During cooling, high-purity argon gas of more than 99.999% is introduced, and the vacuum in the furnace is between 500mbar-800mbar;

[0020] S9: When the temperature reaches the desired level, introduce 99.999% or higher pure argon gas and re-pressurize to one atmospheric pressure, open the furnace door to take out the graphite purification product pieces, and complete the purification process.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. The present invention adopts all-graphite heating elements and heat preservation structures, which can realize vacuum ultra-high temperature sintering (or purification) process above 2200°C in new material applications, and can reach up to 2800°C.

[0023] 2. The present invention adopts a squirrel cage graphite heating element structure to achieve a graphite hot zone power layout with a heating power of more than 500KW.

[0024] 3. The present invention adopts a non-insulated structure between the electrode and the insulation layer, and the cold end adopts multiple copper electrodes for introduction and connection, so that the graphite hot zone can operate at a temperature above 2200°C without using the traditional structure of using ceramic materials as the supporting insulating material for the insulation layer, and the overall structure of the copper electrode and the high-strength graphite part maintains sufficient strength.

[0025] 4. In the connection structure between the graphite muffle and the vacuum pipeline of the present invention, the inner and outer spaces of the muffle are separated; the volatilization generated under high temperature conditions in the muffle is directly discharged from the vacuum pipeline without causing pollution to the overall hot zone outside the muffle.

[0026] 5. The heating element and electrode structure of the present invention are installed on a fixed furnace body, and the bottom loading furnace door structure is completely independent. It adopts a synchronous screw structure, which can meet the sintering (or purification) processing needs of 200 to 5000 kg of heavy loads. The residual ash content of the purified molded graphite parts is within 10ppm. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0028] Figure 2 It is a structural schematic diagram of the heating system of the present invention;

[0029] Figure 3 It is a structural schematic diagram of the heat preservation system of the present invention;

[0030] Figure 4 It is a structural schematic diagram of the bottom loading trolley of the present invention;

[0031] Figure 5 It is a schematic diagram of the structure of the graphite muffle of the present invention;

[0032] Figure 6 It is a structural schematic diagram of the screw lifting system of the present invention.

[0033] In the figure: 1. furnace frame; 2. main furnace shell; 3. cooling water distributor system; 4. heating system; 5. insulation system; 6. bottom loading trolley; 7. screw lifting system; 8. vacuum system; 9. temperature control system; 10. process gas system; 11. equipment electronic control system; 12. copper electrode; 13. graphite heating element; 14. graphite ring; 15. flange; 16. graphite insulation hard felt A; 17. felt fixing rod; 18. graphite tube; 19. trolley frame; 20. wheel; 21. travel drive motor; 22. main furnace bottom cover; 23. graphite insulation hard felt B; 24. graphite muffle; 25. process gas pipe; 26. ground track; 27. graphite cylinder; 28. graphite base; 29. ​​graphite top cover; 30. screw lift; 31. motor; 32. coupling. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] In the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0036] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] like Figure 1 As shown, the present invention provides a technical solution: a vacuum ultra-high temperature sintering purification furnace, including a furnace body frame 1, a main furnace shell 2, a cooling water distributor system 3, a heating system 4, a heat preservation system 5, a bottom loading trolley 6, a screw lifting system 7, a vacuum system 8, a temperature control system 9, a process gas system 10, an equipment electronic control system 11 and the like.

[0038] In this embodiment, the furnace frame 1 is mainly formed by welding profiles, and serves as a supporting frame, skeleton and panel of the equipment.

[0039] In this embodiment, a main furnace shell 2 is installed inside the furnace body frame 1. The main furnace shell 2 is mainly welded from stainless steel plates. A water channel interlayer is made inside the shell to use cooling water to cool the furnace shell to prevent overheating of the furnace shell.

[0040] In this embodiment, the cooling water distributor system 3 is mainly composed of inlet and outlet water pipes, inlet and outlet water branch pipes, hand valves, flow switches, water pressure gauges, water temperature gauges, etc., which are used to provide cooling water to important components on the equipment that need to be cooled so that the components can operate within a reasonable temperature range.

[0041] like Figure 2 As shown, in this embodiment, the heating system 4 is installed inside the main furnace shell 2. The heating system 4 is mainly composed of nine copper electrodes 12, a graphite heating element 13, a graphite ring 14, etc., forming a graphite hot zone. The nine copper electrodes are fixed to the main furnace shell 2 through a flange 15. The arrangement of the graphite heating element 13 adopts a squirrel cage structure design. The graphite heating element 13 and the graphite ring 14 are both made of high-strength extruded graphite, so that the copper electrode 12 and the overall structure of the graphite hot zone can maintain sufficient strength under the working temperature condition of 2000°C, and the structure is stable and reliable.

[0042] like Figure 3 As shown, in this embodiment, the insulation system 5 is installed on the inner side of the main furnace shell 2, and the insulation system 5 is mainly composed of graphite insulation hard felt A16, hard felt fixing rods 17, etc. The graphite insulation hard felt A16 is used to surround the graphite heating element 13 into an independent space, thereby blocking unnecessary outward heat transfer loss of the graphite heating element 13 during heating. A graphite tube 18 is pre-buried on the top of the insulation system 5, and the graphite tube 18 is connected to the vacuum system 8. The pre-buried graphite tube 18 adopts a bending structure, which can effectively prevent heat from overflowing through the pre-buried graphite tube 18 and reduce heat loss.

[0043] like Figure 4 As shown, in this embodiment, the bottom loading trolley 6 is installed on one side of the furnace body frame 1, and the bottom loading trolley 6 is mainly composed of a trolley frame 19, wheels 20, a travel drive motor 21, a main furnace bottom cover 22, a graphite insulation hard felt B23, a graphite muffle 24, a process gas pipe 25, a ground track 26, etc.;

[0044] like Figure 5 As shown, the graphite muffle 24 is divided into a graphite cylinder 27 , a graphite base 28 and a graphite top cover 29 .

[0045] In this embodiment, after the graphite bottom cover 29 is removed, the graphite workpiece can be placed on the graphite base 28. When the graphite workpiece is sintered at high temperature, some gas will be volatilized. The graphite muffle 24 can prevent the volatilized gas from diffusing easily, thus protecting other parts in the furnace from being contaminated. The process gas pipe 25 is made of molybdenum material and has high temperature resistance. The process gas can be passed into the graphite muffle 24 through the process gas pipe 25. The graphite top cover 29 has a reserved vent hole, which can be connected to the pre-buried graphite tube 18 in the insulation system, thereby connecting to the vacuum pipeline, and using the vacuum system 8 to extract the volatilized gas.

[0046] like Figure 6 As shown, in this embodiment, the screw lifting system 7 is mainly composed of a screw lifting machine 30, a motor 31, a coupling 32, etc. The screw lifting system 7 is used to lift the bottom loading trolley 6 to a specified position so that the bottom loading trolley 6 is closed with the main furnace shell 2. The screw lifting machine 30 has a large bearing capacity and stable performance, and can realize the lifting function of heavy weight loading (≥200 kg).

[0047] In this embodiment, the temperature control system 9 is mainly composed of thermocouples, infrared thermometers, temperature meters, transformers, etc. Thermocouples are used to measure temperature at low temperatures, and infrared thermometers are used to measure temperature at high temperatures. After receiving the temperature signal, the temperature meter controls the output of the transformer, thereby controlling the calorific value of the graphite heating element, thereby realizing the function of precise temperature control.

[0048] In this embodiment, the process gas system 10 is mainly composed of gas pipelines, valves, mass flow meters, atmosphere analyzers, etc. When the graphite sintering process is running, the process gas system 10 uses the process gas pipe 25 to pass the process gas into the graphite muffle 24 according to the process requirements.

[0049] The embodiment of the present invention also provides a purification process of a vacuum ultra-high temperature sintering purification furnace, comprising the steps of:

[0050] S1: Open the bottom loading trolley 6;

[0051] S2: Put the graphite product to be purified into the graphite muffle 24, and use the screw lifting system 7 to drive the bottom loading trolley 6 to rise and close the main furnace shell 2;

[0052] S3: The furnace is evacuated to below 0.1 mbar to remove air and water vapor in the furnace;

[0053] S4: The furnace is vacuumed and heated to 1000°C at a rate of 5°C / min. After reaching the temperature, it is kept warm for 1 hour. The vacuum in the furnace is maintained below 0.2 mbar.

[0054] S5: The furnace is vacuumed and heated to 2000°C at a rate of 5°C / min. After reaching the temperature, it is kept warm for 1 hour. The vacuum in the furnace is maintained below 0.2 mbar.

[0055] S6: vacuum heating to the purification temperature of 2200-2800°C, the heating rate is 1-10°C / min, and the temperature is kept for purification for 50-100 hours after reaching the temperature. During the heating and insulation, the purification process gas R14 is introduced, and the purification process gas flow rate is 2-20 liters / min. The vacuum in the furnace is between 10-100 mbar;

[0056] S7: Vacuum and cool down to 1000℃, keep the temperature down to 1 hour, introduce 99.999% or more high-purity argon gas during cooling and heat preservation, and the vacuum in the furnace is between 10mbar and 100mbar;

[0057] S8: Vacuum and cool down to near room temperature, with a cooling rate of about 10-30℃ / hour. During cooling, high-purity argon gas of more than 99.999% is introduced, and the vacuum in the furnace is between 500mbar-800mbar;

[0058] S9: When the temperature reaches the desired level, introduce 99.999% or higher pure argon gas and re-pressurize to one atmospheric pressure, open the furnace door and take out the graphite purification product, thus completing the purification process.

[0059] It is worth noting that the entire purification furnace system is controlled by a main control button. Since the equipment matched with the control button is a commonly used equipment and belongs to the existing mature technology, its electrical connection relationship and specific circuit structure will not be described in detail here.

[0060] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A vacuum ultra-high temperature sintering purification furnace, It is characterized in that The invention comprises a furnace frame (1), a main furnace shell (2), a cooling water distributor system (3), a heating system (4), a heat preservation system (5), a bottom loading trolley (6), a screw lifting system (7), a vacuum system (8), a temperature control system (9), a process gas system (10) and an equipment electric control system (11), wherein the furnace frame (1) is welded from profiles, and the main furnace shell (2) is installed inside the furnace frame (1); the main furnace shell (2) is welded from stainless steel plates, and a water channel interlayer for cooling the shell is provided inside the shell of the main furnace shell (2); The cooling water distributor system (3) is used to provide cooling water to the furnace equipment. The cooling water distributor system (3) has an inlet and outlet water pipe, an inlet and outlet water branch pipe, a hand valve, a flow switch, a water pressure gauge, and a water temperature gauge. The inlet and outlet water pipe, the inlet and outlet water branch pipe, and the hand valve form a cooling water distribution circuit. The heating system (4) is installed inside the main furnace shell (2), and the heating system (4) comprises a copper electrode (12), a graphite heating element (13), and a graphite ring (14), wherein the graphite heating element (13) is designed as a squirrel cage structure, and graphite rings (14) are installed at the upper and lower ends of the graphite heating element (13), and the copper electrode (12) is installed on the graphite ring (14); The heat insulation system (5) is installed inside the main furnace shell (2), and the heat insulation system (5) includes a graphite heat insulation hard felt A (16), a hard felt fixing rod (17) and a graphite tube (18), wherein the graphite heat insulation hard felt A (16) is fixed inside the main furnace shell (2), and the graphite heat insulation hard felt A (16) surrounds the graphite heating element (13) inside the main furnace shell (2) into an independent space, so as to block the outward heat transfer loss of the graphite heating element (13) when heating; The bottom loading trolley (6) is installed on one side of the furnace body frame (1), and the bottom loading trolley (6) comprises a trolley frame (19), wheels (20), a travel drive motor (21), a main furnace bottom cover (22), a graphite heat insulation hard felt B (23), a graphite muffle (24), a process gas pipe (25) and a ground track (26), wherein the bottom of the trolley frame (19) is provided with wheels (20), the wheels (20) can be driven by the travel drive motor (21) and move along the pre-buried ground track (26), the main furnace bottom cover (22) is installed on the trolley frame (19), and the main furnace bottom cover (22) is provided with graphite heat insulation hard felt B (23) and a graphite muffle (24); The screw lifting system (7) is installed on the furnace body frame (1) and is used to lift the bottom loading trolley (6) to a specified position so that the bottom loading trolley (6) and the main furnace shell (2) are closed. The screw lifting system (7) comprises a screw lift (30) and a motor (31), wherein the screw lift (30) is driven by the motor (31). The screw lift (30) uses a screw to drive a support frame at its bottom to make the bottom loading trolley (6) perform a lifting action and close it with the main furnace shell (2).

2. A vacuum ultra-high temperature sintering purification furnace according to claim 1, Features: Nine copper electrodes (12) are provided and distributed on the graphite ring (14); the end of the copper electrode (12) away from the graphite ring (14) is fixed to the main furnace shell (2) through a flange (15); the graphite heating element (13), the graphite ring (14) and the copper electrode (12) are connected to form a graphite hot zone.

3. A vacuum ultra-high temperature sintering purification furnace according to claim 2, Features: The graphite heating element (13) and the graphite ring (14) are both made of high-strength extruded graphite.

4. A vacuum ultra-high temperature sintering purification furnace according to claim 1, Features: The graphite tube (18) is pre-buried in the top of the main furnace shell (2); the graphite tube (18) is designed as a bent structure; the upper end of the graphite tube (18) is connected to the vacuum system (8).

5. A vacuum ultra-high temperature sintering purification furnace according to claim 1, Features: The graphite muffle (24) is arranged on the graphite heat-insulating hard felt B (23). The graphite muffle (24) comprises a graphite cylinder (27), a graphite base (28) and a graphite top cover (29). The graphite base (28) and the graphite top cover (29) are respectively mounted on the top side and the bottom side of the graphite cylinder (27).

6. A vacuum ultra-high temperature sintering purification furnace according to claim 5, Features: A process gas pipe (25) is arranged on the bottom side of the graphite cylinder (27), and the process gas pipe (25) can pass the process gas into the graphite muffle (24).

7. A vacuum ultra-high temperature sintering purification furnace according to claim 5, Features: The graphite top cover (29) is provided with a vent hole, which is connected to the pre-buried graphite tube (18) of the thermal insulation system (5) and is connected to the vacuum system (8) to extract the volatile gas.

8. A purification process of a vacuum ultra-high temperature sintering purification furnace according to any one of claims 1 to 7, Features: Includes steps: S1: Open the bottom loading trolley (6); S2: Place the graphite product to be purified into the graphite muffle (24), and use the screw lifting system (7) to drive the bottom loading trolley (6) to rise and close the main furnace shell (2); S3: The furnace is evacuated to below 0.1 mbar to remove air and water vapor in the furnace; S4: The furnace is vacuumed and heated to 1000°C at a rate of 5°C / min. After reaching the temperature, it is kept warm for 1 hour. The vacuum in the furnace is maintained below 0.2 mbar. S5: The furnace is vacuumed and heated to 2000°C at a rate of 5°C / min. After reaching the temperature, it is kept warm for 1 hour. The vacuum in the furnace is maintained below 0.2 mbar. S6: vacuum heating to the purification temperature of 2200-2800°C, the heating rate is 1-10°C / min, and the temperature is kept for purification for 50-100 hours after reaching the temperature. During the heating and insulation, the purification process gas R14 is introduced, and the purification process gas flow rate is 2-20 liters / min. The vacuum in the furnace is between 10-100 mbar; S7: Vacuum and cool down to 1000℃, keep the temperature down to 1 hour, introduce 99.999% or more high-purity argon gas during cooling and heat preservation, and the vacuum in the furnace is between 10mbar and 100mbar; S8: Vacuum and cool down to near room temperature, with a cooling rate of 10-30℃ / hour. During cooling, high-purity argon gas of more than 99.999% is introduced, and the vacuum in the furnace is between 500mbar-800mbar; S9: When the temperature reaches the desired level, introduce 99.999% or higher pure argon gas and re-pressurize to one atmospheric pressure, open the furnace door to take out the graphite purification product pieces, and complete the purification process.