Hole wall treatment device and method for cast-in-place pile

By laying arc hole wall guards and springs layer by layer during the drilling process, a cylindrical protective layer is formed, which solves the problems of collapse of the hole wall of the cast pile and slow construction speed, and achieves stable and efficient hole wall guards and piles Body anti-segregation effect.

CN115012403BActive Publication Date: 2024-11-15CHINA COAL YANGTZE RIVER INFRASTRUCTURE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210742838.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-27
Publication Date
2024-11-15
Estimated Expiration
2042-06-27

AI Technical Summary

Technical Problem

During the drilling and filling pile process, especially in soft soil layers below the groundwater level, the hole walls are prone to collapse. The existing mud wall protection method is small in density and slow in forming, resulting in slow construction speed and unable to effectively prevent the hole walls from collapse.

Method used

A hole wall treatment device for cast-injected piles is designed, including a drill rod, a patch mechanism and a feeding mechanism. By laying arc hole wall guards layer by layer during the drilling process, and using hydraulic telescopic rods and springs to form a cylindrical shape. Protective layer to ensure stability of the hole wall.

Benefits of technology

It significantly accelerates the forming speed of the hole wall guard wall, improves construction efficiency, and can maintain the stability of the pile hole structure in the soft soil layer, reduces the construction cycle, and enhances the pile body in the soil layer through the combination of subsequent grouting and steel cages. Friction effect prevents settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115012403B_ABST
    Figure CN115012403B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of bored piles, and in particular to a hole wall processing device and method for bored piles, comprising: a drill rod, a steel casing, a patch mechanism and a feeding mechanism; while the drill rod is drilling a hole, a plurality of hole wall protection sheets are sequentially laid by the patch mechanism from shallow to deep layer by layer on the inner wall of the pile hole below the steel casing to form the protection layer, and according to the laying depth of the protection layer, a plurality of spring sheets are sequentially arranged by the feeding mechanism from top to bottom on the inner side of the hole wall protection sheets, so as to limit the hole wall protection sheets at the same height on the inner wall of the pile hole; the plurality of hole wall protection sheets forming the protection layer can support the soil layer structure on the inner side of the hole wall and prevent the soil layer from collapsing, so as to maintain the stability of the pile hole structure. Compared with the existing mud wall protection method, the wall protection structure has a faster forming speed and a stable wall protection effect, and can be used for pile holes such as soft sandy soil layers, and has a wider range of uses.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cast-in-place piles, and in particular to a hole wall processing device and method for cast-in-place piles. Background Art

[0002] Bored cast-in-place piles refer to piles that are made by forming pile holes in the foundation soil at the construction site through mechanical drilling, steel pipe squeezing or manual excavation, and placing steel cages inside and pouring concrete. The key to the success of drilling is to prevent the collapse of the hole wall. When the hole is deep, the hole wall soil below the groundwater level will collapse into the hole under hydrostatic pressure, and even sand flow may occur.

[0003] Generally, a steel casing is driven into the hole before drilling construction. However, the height of the steel casing is limited and it cannot protect the hole wall below the casing. Therefore, the wall is currently protected by pouring cement slurry. However, in some soft sandy soil layers, the drilling speed is relatively fast, while the mud density is small or the mud wall is formed slowly, resulting in slow water seepage in the hole wall and collapse. Clay needs to be backfilled and repair measures need to be taken, which seriously slows down the construction speed of the bored piles. Summary of the invention

[0004] The present invention aims to provide a hole wall processing device for a bored pile in view of the defects of the prior art, comprising: a drill rod, a rotatable drill bit is arranged at the bottom end, and the drilling operation is performed under the drive of a drilling machine; a mud conveying pipe is arranged at the top of the drill rod, connected to an external negative pressure device, and used to pump mud generated during drilling; a steel casing is arranged at the upper end of the pile hole;

[0005] A patch mechanism is arranged on the outer wall of the drill rod and can move up and down along the track on the outer wall of the drill rod;

[0006] A feeding mechanism, which is arranged on the outer wall of the drill rod and can move up and down along the track on the outer wall of the drill rod and is located above the patch mechanism;

[0007] A protective layer is arranged on the inner wall of the pile hole and is located below the steel casing and is surrounded by a plurality of hole wall protective sheets;

[0008] A spring sheet, arranged on the inner side wall of the protective layer and used to support the hole wall protective sheet to maintain the position state of the protective layer;

[0009] Wherein, while the drill rod is drilling, a plurality of hole wall protective sheets are laid in sequence from shallow to deep layers on the inner wall of the pile hole below the steel casing by the patch mechanism to form the protective layer, and according to the laying depth of the protective layer, a plurality of spring sheets are arranged in sequence from top to bottom on the inner side of the hole wall protective sheet by the feeding mechanism to limit the hole wall protective sheets at the same height on the inner wall of the pile hole.

[0010] Furthermore, the patch mechanism includes a first rail car capable of traveling on the track and a hydraulic telescopic rod fixed on the first rail car, the output end of the hydraulic telescopic rod is provided with a guard plate seat for loading the hole wall guard plate, and the hydraulic telescopic rod drives the guard plate seat to move radially and horizontally in the pile hole.

[0011] Furthermore, the hole wall guard piece is in the shape of an arc plate, and the radius of the pile hole is defined as r, and the arc length of the hole wall guard piece is π / 2r.

[0012] Furthermore, the hole wall processing device comprises four patch mechanisms, with two opposite patch mechanisms forming a group, and the distance between the two groups of patch mechanisms in the height direction is equal to the height of the hole wall guard plate;

[0013] The four tracks corresponding to the four patch mechanisms are arranged in a centrally symmetrical manner.

[0014] Furthermore, the feeding mechanism includes a second rail vehicle capable of traveling on the rail, and a claw arm fixed to the circumference of the second rail vehicle, and the end of the claw arm is provided with a clamping claw for clamping / releasing the spring sheet.

[0015] Furthermore, both the patch mechanism and the feeding mechanism are equipped with an electronic meter for measuring the depth, and the electronic meter is electrically connected to an external power supply.

[0016] Furthermore, the upper and lower ends of the outer side wall of the hole wall guard are provided with protruding positioning plug shafts, and the fitting surfaces of the guard seat and the hole wall guard are provided with vacuum suction cups, and the vacuum suction cups are electrically connected to an external power supply.

[0017] Furthermore, the outer wall of the hole wall guard is provided with protruding friction ribs, the inner wall of the hole wall guard is provided with a protruding plug-in shaft group, and the fitting surface between the guard seat and the hole wall guard is provided with a socket hole matching with the plug-in shaft group.

[0018] Furthermore, the hole wall guard is a prefabricated reinforced concrete slab.

[0019] The present invention provides another technical solution, a method for treating the hole wall of a cast-in-place pile, comprising the following steps:

[0020] Step S1, prefabricating the protective plate: define the radius of the pile hole as r, place a steel skeleton in the mold, and pour concrete to form a hole wall protective plate with an arc length of π / 2r;

[0021] Step S2, drilling: placing a steel casing at a predetermined hole position, and driving a drill rod by a drilling machine to drill a hole vertically downward at the predetermined hole position through a drill bit at the bottom end thereof, and while drilling, pumping out mud through a mud delivery pipe;

[0022] Step S3, laying the guard sheet: when the drilling depth is below the steel casing, the patch mechanism starts to work, and the initial position of the patch mechanism is on the track of the outer wall of the drill pipe and above the steel casing. After the staff places the prefabricated hole wall guard sheet on the guard sheet seat, the first rail car moves downward along the track to below the steel casing, and then the hydraulic telescopic rod squeezes the guard sheet seat with the hole wall guard sheet toward the hole wall, so that the hole wall guard sheet is laid on the hole wall;

[0023] The patch mechanism is configured as two groups staggered in the upper and lower directions, the spacing between the two groups is the height of the hole wall guard sheet, each group is configured as two patch mechanisms symmetrically distributed on both sides of the drill pipe, each group of patch mechanisms simultaneously lays two hole wall guard sheets in relative positions, and the two groups of patch mechanisms complete the laying of two adjacent layers of hole wall guard sheets in the upper and lower directions every two times of lifting and lowering, and the lifting height of the patch mechanism is fed back by an electronic meter to ensure that the laying position of the hole wall guard sheet is accurate;

[0024] Step S4, fixing the protective sheet: after two layers of the hole wall protective sheet are laid, the feeding mechanism starts to work, and the initial position of the feeding mechanism is above the patch mechanism. The staff places the spring sheet on the clamp and fixes it, and then the second rail car moves downward to the height position of the hole wall protective sheet with the clamp through the claw arm and stops, and the clamp releases the spring sheet, so that the spring sheet is elastically attached to the inner walls of the four hole wall protective sheets on the same layer, and the position of the hole wall protective sheet is limited. The process is repeated according to the laying depth of the hole wall protective sheet until the laying is completed, so that a plurality of the hole wall protective sheets form a cylindrical protective layer on the inner side of the hole wall.

[0025] The present invention provides another technical solution, a method for processing a cast-in-place pile, comprising the following steps:

[0026] Step S1, prefabricating the protective plate: define the radius of the pile hole as r, place a steel skeleton in the mold, and pour concrete to form a hole wall protective plate with an arc length of π / 2r;

[0027] Step S2, drilling: placing a steel casing at a predetermined hole position, and driving a drill rod by a drilling machine to drill a hole vertically downward at the predetermined hole position through a drill bit at the bottom end thereof, and while drilling, pumping out mud through a mud delivery pipe;

[0028] Step S3, laying the guard sheet: when the drilling depth is below the steel casing, the patch mechanism starts to work, and the initial position of the patch mechanism is on the track of the outer wall of the drill pipe and above the steel casing. After the staff places the prefabricated hole wall guard sheet on the guard sheet seat, the first rail car moves downward along the track to below the steel casing, and then the hydraulic telescopic rod squeezes the guard sheet seat with the hole wall guard sheet toward the hole wall, so that the hole wall guard sheet is laid on the hole wall;

[0029] The patch mechanism is configured as two groups staggered in the upper and lower directions, the spacing between the two groups is the height of the hole wall guard sheet, each group is configured as two patch mechanisms symmetrically distributed on both sides of the drill pipe, each group of patch mechanisms simultaneously lays two hole wall guard sheets in relative positions, and the two groups of patch mechanisms complete the laying of two adjacent layers of hole wall guard sheets in the upper and lower directions every two times of lifting and lowering, and the lifting height of the patch mechanism is fed back by an electronic meter to ensure that the laying position of the hole wall guard sheet is accurate;

[0030] Step S4, fixing the guard sheet: after two layers of the hole wall guard sheet are laid, the feeding mechanism starts to work, and the initial position of the feeding mechanism is above the patch mechanism. The staff places the spring sheet on the clamping claw for clamping and fixing, and then the second rail vehicle moves downward to the height position of the hole wall guard sheet through the claw arm with the clamping claw and stops, and the clamping claw releases the spring sheet, so that the spring sheet is attached to the inner wall of the four hole wall guard sheets on the same layer under the action of elasticity, and the position of the hole wall guard sheet is limited, and the process is repeated according to the laying depth of the hole wall guard sheet until the laying is completed, so that the plurality of hole wall guard sheets form a cylindrical protective layer on the inner side of the hole wall;

[0031] Step S5, grouting to form piles: grouting is performed into the cylindrical protective layer, and a steel cage is implanted, so that the hole wall guard sheet, the steel cage and the concrete form a whole.

[0032] The present invention provides another technical solution, a cast-in-place pile, which is formed by the above cast-in-place pile processing method.

[0033] Compared with the prior art, the bored pile hole wall processing device and bored pile processing method proposed in the present invention have the following significant beneficial effects:

[0034] 1. Hole wall protection: During the drilling process, hole wall protection sheets are laid. Multiple hole wall protection sheets form a protective layer that can support the soil structure on the inner side of the hole wall and prevent soil collapse to maintain the stability of the pile hole structure. Compared with the existing mud wall protection method, the wall protection structure is formed faster and has a more stable wall protection effect. It can be used for pile holes such as soft sandy soil layers that are not suitable for mud wall protection, and has a wider range of uses.

[0035] 2. Anti-settling: The hole wall guard of the present invention becomes one with the pile body after the subsequent grouting and planting cage. The convex structure of the outer wall of the hole wall guard can be embedded in the soil layer, so that the formed cast-in-place pile body has the effect of a friction pile, thereby enhancing the stability of the pile body structure in the soil layer.

[0036] 3. Reduce construction period: It should be understood that all combinations of the aforementioned concepts and the additional concepts described in more detail below can be considered as part of the inventive subject matter of the present disclosure as long as such concepts do not contradict each other. In addition, all combinations of the claimed subject matter are considered as part of the inventive subject matter of the present disclosure.

[0037] The foregoing and other aspects, embodiments and features of the present invention can be more fully understood from the following description in conjunction with the accompanying drawings. Other additional aspects of the present invention, such as the features and / or beneficial effects of the exemplary embodiments, will be apparent from the following description or learned from the practice of the specific embodiments according to the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The drawings are not intended to be drawn to scale. In the drawings, each identical or nearly identical component shown in various figures may be represented by the same reference numeral. For clarity, not every component is labeled in every figure. Embodiments of various aspects of the present invention will now be described by way of example and with reference to the accompanying drawings, in which:

[0039] Figure 1 is a schematic diagram of a hole wall treatment device for a cast-in-place pile shown in an embodiment of the present invention;

[0040] Figure 2 It is a schematic diagram of a device in patch construction in a hole wall treatment method of a cast-in-place pile shown in an embodiment of the present invention;

[0041] Figure 3 It is a schematic diagram of a hole wall guard sheet and a spring sheet in patch construction in a hole wall treatment method of a cast-in-place pile shown in an embodiment of the present invention;

[0042] Figure 4 1 is a schematic diagram of a top view of a patch mechanism in a hole wall processing device for a bored pile shown in an embodiment of the present invention;

[0043] Figure 5 1 is a schematic diagram of a top view of a feeding mechanism in a hole wall processing device for a bored pile shown in an embodiment of the present invention;

[0044] Figure 6 It is a schematic diagram of the matching structure of the hole wall guard plate and the guard plate seat in the hole wall processing device of the bored pile shown in the embodiment of the present invention;

[0045] Figure 7 It is a schematic diagram of the distribution structure of installing the hole wall protection piece at one time in the embodiment of the hole wall treatment method of the cast-in-place pile shown in the embodiment of the present invention;

[0046] Figure 8 It is a schematic diagram of the matching structure of another hole wall guard plate and a guard plate seat in the hole wall processing device of the bored pile shown in an embodiment of the present invention. DETAILED DESCRIPTION

[0047] In order to better understand the technical content of the present invention, specific embodiments are given and described as follows in conjunction with the accompanying drawings.

[0048] Various aspects of the invention are described in this disclosure with reference to the accompanying drawings, in which many illustrative embodiments are shown. The embodiments of the present disclosure are not necessarily intended to include all aspects of the present invention. It should be understood that the various concepts and embodiments introduced above, as well as those described in more detail below, can be implemented in any of the hole wall treatment devices and methods for cast-in-place piles in many ways, because the concepts and embodiments disclosed in the present invention are not limited to any implementation. In addition, some aspects of the present disclosure can be used alone or in any appropriate combination with other aspects of the present disclosure.

[0049]

Hole wall treatment device for cast-in-place pile

[0050] Combination Figure 1 As shown, the first aspect of the present invention proposes a technical solution, a hole wall processing device for a bored pile, which mainly includes: a drill rod 1, a patch mechanism 2, a feeding mechanism 4, a hole wall protective plate 3 and a spring plate 5.

[0051] Among them, a rotatable drill bit 11 is set at the bottom end of the drill rod 1, and drilling operations are performed under the drive of the drilling machine 10. The mud delivery pipe 20 is set at the top of the drill rod 1, connected to the external negative pressure device, and used to pump the mud generated during drilling. This part of the drilling process and drilling equipment are existing technologies.

[0052] Before drilling, it is necessary to pre-drive a steel casing 30 into the hole position so that the steel casing 30 can be located at the upper end of the pile hole. Although the steel casing 30 can stabilize the hole wall and prevent hole collapse, it can also isolate surface water, guide the drill bit 11, fix the pile position, and protect the original operating ground, but because the drilling depth is generally greater than the depth of the steel casing 30, it cannot protect the hole wall below the casing.

[0053] Patch mechanism

[0054] In order to keep the hole wall drilled at a depth below the steel casing 30 protected and avoid collapse, a track 12 is provided on the outer wall of the drill rod 1 in the present solution, and a patch mechanism 2 that can move up and down is provided on the track 12. The patch mechanism 2 is used to lay a hole wall protective plate 3 on the inner side of the drilled hole wall.

[0055] Therefore, while the drill rod 1 is drilling, multiple hole wall protective sheets 3 are laid in sequence from shallow to deep on the inner wall of the pile hole below the steel casing 30 by the patch mechanism 2 to form a protective layer. The protective layer formed by multiple hole wall protective sheets 3 can support the soil layer structure on the inner side of the hole wall and prevent soil collapse, so as to maintain the stability of the pile hole structure.

[0056] Combination Figure 4 As shown, in a preferred embodiment, the patch mechanism 2 includes a first rail car 21 that can travel on the track 12 and a hydraulic telescopic rod 22 fixed to the first rail car 21, and the output end of the hydraulic telescopic rod 22 is provided with a guard plate seat 23 for loading the hole wall guard plate 3, and the hydraulic telescopic rod 22 drives the guard plate seat 23 to move radially and horizontally in the pile hole.

[0057] Among them, the track 12 adopts a toothed track, and the first track car 21 has a traveling gear that cooperates with the track, so that the first track car 21 can move up and down along the track 12. The telescopic direction of the hydraulic telescopic rod 22 is the radial direction of the pile hole, and its end is installed with a guard plate seat 23 in a screw-fixed manner. The guard plate seat 23 is made of stainless steel and is used to install the hole wall guard plate 3. Under the drive of the hydraulic telescopic rod 22, the hole wall guard plate 3 is pressed and laid on the hole wall.

[0058] Furthermore, the width of the guard plate seat 23 is more than 2 / 3 of the arc length of the hole wall guard plate 3, and the height is more than 2 / 3 of the hole wall guard plate 3, so as to increase the contact surface and reduce the pressure on the hole wall guard plate 3, so as to avoid the hole wall guard plate 3 from being broken when the guard plate seat 23 presses the hole wall guard plate 3 against the hole wall, and the guard plate seat 23 can adopt a hollow structure to reduce the overall weight.

[0059] Feeding mechanism

[0060] In order to ensure that the laid hole wall guard sheet 3 can be stably attached to the inner wall of the pile hole, a feeding mechanism 4 that can move up and down is also arranged on the track 12, and the feeding mechanism 4 is located above the attachment mechanism 2. The feeding mechanism 4 is used to install a spring sheet 5 on the inner side of the laid hole wall guard sheet 3, and the spring sheet 5 is arranged on the inner wall of the protective layer, and is used to support the hole wall guard sheet 3 to maintain the position state of the protective layer.

[0061] Therefore, according to the laying depth of the protective layer, a plurality of spring sheets 5 are sequentially arranged on the inner side of the hole wall guard sheet 3 by the feeding mechanism 4 from top to bottom, so as to limit the hole wall guard sheet 3 at the same height on the inner wall of the pile hole.

[0062] Combination Figure 5 As shown, in a preferred embodiment, the feeding mechanism 4 includes a second rail vehicle 41 capable of traveling on the rail 12 , and a claw arm 42 fixed to the periphery of the second rail vehicle 41 , and a clamping claw 43 for clamping / releasing the spring sheet 5 is provided at the end of the claw arm 42 .

[0063] Among them, the second rail car 41 is also provided with a traveling gear that can cooperate with the teeth on the track 12, so that the second rail car 41 can move up and down along the track 12, and the claw arm 42 is arranged on the peripheral side of the second rail car 41 and arranged horizontally. The clamping claw 43 at its end is driven by electricity or pneumatic power to clamp the elastically contracted annular spring sheet 5. After reaching the position inside the hole wall guard sheet 3, the clamping claw 43 releases the contracted annular spring sheet 5, and the annular spring sheet 5 will expand outward and be fixed to the inner side of the hole wall guard sheet 3 at the same height by elastic force, so as to limit the hole wall guard sheet 3 and prevent the hole wall guard sheet 3 from falling off the hole wall.

[0064] Furthermore, the annular spring sheet 5 is an arc-shaped thin spring, which is a closed ring in the clamped state and a C-shape in the released state. The notch is smaller than the width of a single hole wall guard sheet 3 to ensure stable elastic support for the hole wall guard sheet 3.

[0065] In an optional embodiment, the length of the claw arm 42 is smaller than the radius of the pile hole. When in use, the annular spring sheet 5 in the contracted state can be 100 to 200 mm away from the inner wall of the hole wall guard sheet 3. The number of claw arms 42 can be set to one to four. Accordingly, in order to ensure the stability of the clamping of the annular spring sheet 5, at least one claw 43 on the claw arm 42 needs to clamp the staggered parts of the fracture of the annular spring sheet 5.

[0066] Hole wall guard

[0067] Furthermore, in order to allow the hole wall guard piece 3 to have a certain range of movement in the pile hole and facilitate installation, the hole wall guard piece 3 is in the shape of an arc plate.

[0068] Combination Figure 2 , Figure 3 and Figure 7 As shown, in a preferred embodiment, in order to improve the installation efficiency of the hole wall guard 3, the arc length of the hole wall guard 3 is π / 2r. Four patch mechanisms 2 are provided, and the corresponding four tracks 12 are arranged in a central symmetric manner.

[0069] Two opposite patch mechanisms 2 form a group, and the distance between the two groups of patch mechanisms 2 in the height direction is equal to the height of the hole wall guard plate 3.

[0070] In this way, during the installation of the hole wall guard plate 3, the four patch mechanisms 2 are offset at a certain height to keep the relative position fixed, and move up and down in pairs at the same time to lay the hole wall guard plates 3 on the inner wall of the hole wall. Eight hole wall guard plates 3 (corresponding to two layers of complete cylindrical hole wall guard plates 3) can be laid every two round trips. After laying two layers, the feeding mechanism 4 starts to install the annular spring plate 5.

[0071] Furthermore, both the patch mechanism 2 and the feeding mechanism 4 are equipped with an electronic meter 6 for measuring the depth, and the electronic meter 6 is electrically connected to an external power supply. In this way, the depth of each downward movement of the patch mechanism 2 is coordinated with the depth of the downward movement of the drill rod 1, and the total depth of the downward position of the patch mechanism 2 can be obtained. The distance that the patch mechanism 2 and the feeding mechanism 4 need to move each time is calculated accordingly, so as to improve the accuracy of laying the hole wall guard plate 3 and installing the annular spring plate 5.

[0072] Combination Figure 6 As shown, in an optional embodiment, the upper and lower ends of the outer wall of the hole wall guard plate 3 are provided with protruding positioning shafts 31, and the mating surfaces of the guard plate seat 23 and the hole wall guard plate 3 are provided with vacuum suction cups 231, and the vacuum suction cups 231 are electrically connected to an external power supply. When the hole wall guard plate 3 is laid, the positioning shafts 31 on the hole wall guard plate 3 can ensure that they are stably attached to the hole wall for a certain period of time and will not fall off.

[0073] Combination Figure 8 As shown, in a preferred embodiment, a protruding friction rib 32 is provided on the outer wall of the hole wall guard plate 3, a protruding plug-in shaft group 33 is provided on the inner wall of the hole wall guard plate 3, and a socket 232 cooperating with the plug-in shaft group 33 is provided on the fitting surface between the guard plate seat 23 and the hole wall guard plate 3, wherein the protruding friction rib 32 is pressed into the soil layer during paving, which can enhance the longitudinal friction force with the soil layer, and the plug-in shaft group 33 protrudes inwardly, and in the subsequent grouting process, it can increase the adhesion area with the slurry, so that the pile body formed by the hole wall guard plate 3 and the subsequent pouring liquid solidification is more solid.

[0074] Furthermore, in a specific embodiment, the hole wall guard plate 3 is a prefabricated reinforced concrete slab. In this way, the hole wall guard plate 3 can be integrated with the pile body during the later pile casting process, so that the hole wall guard plate 3 can not only play the role of hole wall protection, but also can cooperate with the subsequent steel cage and concrete to form a friction pile body, thereby improving the stability of the pile body in the soil layer.

[0075] [Hole wall treatment method for cast-in-place piles]

[0076] The second aspect of the present invention proposes a technical solution, a method for treating the hole wall of a cast-in-place pile, comprising the following steps:

[0077] Step S1, prefabricating the protective sheet: define the radius of the pile hole as r, place a steel skeleton in the mold, and pour concrete to form a hole wall protective sheet 3 with an arc length of π / 2r, wherein the thickness of the hole wall protective sheet 3 is 15mm-20mm, and the diameter of the built-in steel bar is 5mm-8mm;

[0078] Step S2, drilling: a steel casing 30 is placed at a predetermined hole position, the diameter of the steel casing 30 is 600 mm, and the thickness is 15 mm, and the drilling machine 10 drives the drill rod 1 through the drill bit 11 at its bottom end, the diameter of the drill bit 11 is 450 mm, and the hole is drilled vertically downward at the predetermined hole position, and while drilling, the mud is pumped out by the mud delivery pipe 20;

[0079] Step S3, laying the guard sheet: when the drilling depth is below the steel casing 30, the patch mechanism 2 starts to work, and the initial position of the patch mechanism 2 is on the track 12 of the outer wall of the drill pipe 1 and above the steel casing 30. After the staff places the prefabricated hole wall guard sheet 3 on the guard sheet seat 23, the first rail car 21 moves downward along the track 12 to below the steel casing 30, and then the hydraulic telescopic rod 22 squeezes the guard sheet seat 23 with the hole wall guard sheet 3 toward the hole wall, so that the hole wall guard sheet 3 is laid on the hole wall;

[0080] Among them, the patch mechanism 2 is set to two groups of upper and lower staggered distribution, the distance between the upper and lower groups is the height of the hole wall guard sheet 3, each group is set to two patch mechanisms 2 symmetrically distributed on both sides of the drill rod 1, each group of patch mechanisms 2 simultaneously lays two hole wall guard sheets 3 at relative positions, and the two groups of patch mechanisms 2 complete the laying of two adjacent layers of hole wall guard sheets 3 each time they are lifted and lowered twice. The lifting height of the patch mechanism 2 is fed back by the electronic meter 6 to ensure the accurate laying position of the hole wall guard sheet 3;

[0081] Step S4, fixing the protective sheet: After two layers of the hole wall protective sheet 3 are laid, the feeding mechanism 4 starts to work. The initial position of the feeding mechanism 4 is above the patch mechanism 2. The staff places the spring sheet 5 on the clamp 43 for clamping and fixing. Then the second rail vehicle 41 moves downward to the height position of the hole wall protective sheet 3 through the claw arm 42 with the clamp 43 and stops. The spring sheet 5 is released by the clamp 43, so that the spring sheet 5 is elastically attached to the inner wall of the four hole wall protective sheets 3 on the same layer, and the position of the hole wall protective sheet 3 is limited. The process is repeated according to the laying depth of the hole wall protective sheet 3 until the laying is completed, so that multiple hole wall protective sheets 3 form a cylindrical protective layer on the inner side of the hole wall.

[0082] In this way, the hole wall protection sheet 3 begins to be laid during the drilling process. Compared with the existing mud wall protection method, the wall protection structure is formed faster and the wall protection effect is stable. It can be used for pile holes such as soft sandy soil layers that are not suitable for mud wall protection methods. It has a wider range of uses. The protective layer formed by multiple hole wall protection sheets 3 can support the soil layer structure on the inner side of the hole wall and prevent soil collapse, so as to maintain the stability of the pile hole structure.

[0083]

Casting pile processing method

[0084] The third aspect of the present invention provides a technical solution, a method for processing a cast-in-place pile, comprising the following steps:

[0085] Step S1, prefabricating the protective plate: define the radius of the pile hole as r, place a steel skeleton in the mold, and pour concrete to form a hole wall protective plate 3 with an arc length of π / 2r;

[0086] Step S2, drilling: placing a steel casing 30 at a predetermined hole position, and driving the drill rod 1 by the drilling machine 10 to drill a hole vertically downward at the predetermined hole position through the drill bit 11 at the bottom thereof, and while drilling, pumping out the mud by using the mud delivery pipe 20;

[0087] Step S3, laying the guard sheet: when the drilling depth is below the steel casing 30, the patch mechanism 2 starts to work, and the initial position of the patch mechanism 2 is on the track 12 of the outer wall of the drill pipe 1 and above the steel casing 30. After the staff places the prefabricated hole wall guard sheet 3 on the guard sheet seat 23, the first rail car 21 moves downward along the track 12 to below the steel casing 30, and then the hydraulic telescopic rod 22 squeezes the guard sheet seat 23 with the hole wall guard sheet 3 toward the hole wall, so that the hole wall guard sheet 3 is laid on the hole wall;

[0088] Among them, the patch mechanism 2 is set to two groups of upper and lower staggered distribution, the distance between the upper and lower groups is the height of the hole wall guard sheet 3, each group is set to two patch mechanisms 2 symmetrically distributed on both sides of the drill rod 1, each group of patch mechanisms 2 simultaneously lays two hole wall guard sheets 3 at relative positions, and the two groups of patch mechanisms 2 complete the laying of two adjacent layers of hole wall guard sheets 3 each time they are lifted and lowered twice. The lifting height of the patch mechanism 2 is fed back by the electronic meter 6 to ensure the accurate laying position of the hole wall guard sheet 3;

[0089] Step S4, fixing the guard sheet: after two layers of the hole wall guard sheet 3 are laid, the feeding mechanism 4 starts to work, and the initial position of the feeding mechanism 4 is above the patch mechanism 2. The staff places the spring sheet 5 on the clamping claw 43 for clamping and fixing, and then the second rail vehicle 41 moves downward to the height position of the hole wall guard sheet 3 through the claw arm 42 with the clamping claw 43 and stops, and the clamping claw 43 releases the spring sheet 5, so that the spring sheet 5 is elastically attached to the inner wall of the four hole wall guard sheets 3 of the same layer, and the position of the hole wall guard sheet 3 is limited, and the process is repeated according to the laying depth of the hole wall guard sheet 3 until the laying is completed, so that multiple hole wall guard sheets 3 form a cylindrical protective layer on the inner side of the hole wall;

[0090] Step S5, grouting to form piles: grouting is performed into the cylindrical protective layer, and a steel cage is implanted, so that the hole wall guard sheet 3, the steel cage and the concrete form a whole.

[0091] In this way, the present invention constructs a wall protection patch on the hole wall during the drilling process, and after the drilling is completed, grouting can be poured into the pile hole and a steel cage can be lowered, so that the problem of hole wall collapse during the drilling process can be avoided, so as to speed up the construction speed and reduce the construction period. In addition, the formed pile body and the hole wall protection sheet 3 become one body, and there is no need to remove the hole wall protection sheet 3. The axial friction effect between the hole wall protection sheet 3 and the hole wall is utilized to enhance the anti-settling effect of the pile body in the soil layer.

[0092] [A type of cast-in-place pile]

[0093] The fourth aspect of the present invention proposes a technical solution, a bored pile, which is formed by the above-mentioned bored pile processing method, and has an inner core with a steel mesh cage body and an outer layer formed by a hole wall guard plate 3. The outer wall of the hole wall guard plate 3 has a raised structure that can be embedded in the soil layer, so that the formed bored pile body has the effect of a friction pile, thereby enhancing the structural stability of the pile body in the soil layer and playing an anti-settlement effect.

[0094] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. A person with ordinary knowledge in the technical field to which the present invention belongs may make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be determined by the definition of the claims.

Claims

1. A hole wall treatment device for a bored pile, characterized in that: include: A drill rod (1) having a rotatable drill bit (11) at the bottom end thereof, and a drilling operation is performed under the drive of a drilling machine (10); A mud delivery pipe (20), which is arranged at the top of the drill rod (1), connected to an external negative pressure device, and is used to pump mud generated during drilling; A steel casing (30) is arranged at the upper end of the pile hole; A patch mechanism (2) is arranged on the outer wall of the drill rod (1) and is capable of moving up and down along a track (12) on the outer wall of the drill rod (1); A feeding mechanism (4) is arranged on the outer wall of the drill rod (1) and is capable of moving up and down along a track (12) on the outer wall of the drill rod (1), and is located above the patch mechanism (2); A protective layer, arranged on the inner wall of the pile hole and located below the steel casing (30), and surrounded by a plurality of hole wall protective sheets (3); A spring sheet (5) arranged on the inner side wall of the protective layer and used to support the hole wall protective sheet (3) to maintain the position state of the protective layer; Wherein, while the drill rod (1) is drilling a hole, a plurality of the hole wall protection sheets (3) are sequentially laid layer by layer from shallow to deep on the inner wall of the pile hole below the steel casing (30) by the patch mechanism (2) to form the protection layer, and according to the laying depth of the protection layer, a plurality of the spring sheets (5) are sequentially arranged from top to bottom by the feeding mechanism (4) on the inner side of the hole wall protection sheet (3) to limit the hole wall protection sheets (3) at the same height on the inner wall of the pile hole; When the drilling depth is below the steel casing (30), the patch mechanism (2) starts to work and lays the hole wall protection sheet (3) on the hole wall. The outer wall of the hole wall protection sheet (3) is provided with a protruding friction rib (32), and the inner wall of the hole wall protection sheet (3) is provided with a protruding plug-in shaft group (33). The protruding friction rib (32) is pressed into the soil layer during laying, which can enhance the longitudinal friction force between the soil layer and the plug-in shaft group (33). The plug-in shaft group (33) protrudes inwardly, and in the subsequent grouting process, it can increase the adhesion area with the grout, so that the pile body formed by the hole wall protection sheet (3) and the subsequent pouring liquid solidification is more solid; The hole wall protection piece (3) is a prefabricated reinforced concrete plate. During the later pouring process of the pile body, the hole wall protection piece (3) can be integrated with the pile body, so that the formed cast-in-place pile body has the effect of a friction pile, thereby enhancing the structural stability of the pile body in the soil layer.

2. The hole wall treatment device for a bored pile according to claim 1, characterized in that: The patch mechanism (2) comprises a first rail vehicle (21) capable of traveling on the rail (12) and a hydraulic telescopic rod (22) fixed to the first rail vehicle (21), wherein an output end of the hydraulic telescopic rod (22) is provided with a plate holder (23) for loading the hole wall protective plate (3), and the hydraulic telescopic rod (22) is configured to drive the plate holder (23) to move radially and horizontally in the pile hole.

3. The hole wall treatment device for a bored pile according to claim 2, characterized in that: The hole wall protection plate (3) is in the shape of an arc plate, and the arc length of the hole wall protection plate (3) is π / 2r, wherein r is the radius of the pile hole.

4. The hole wall treatment device for a bored pile according to claim 2, characterized in that: The hole wall processing device comprises four patch mechanisms (2), with two opposite patch mechanisms (2) forming a group, and the distance between the two groups of patch mechanisms (2) in the height direction being equal to the height of the hole wall protective sheet (3); The four tracks (12) corresponding to the four patch mechanisms (2) are arranged in a centrally symmetrical manner.

5. The hole wall treatment device for a bored pile according to claim 2, characterized in that: The feeding mechanism (4) comprises a second rail vehicle (41) capable of traveling on the rail (12), and a claw arm (42) fixed to the circumference of the second rail vehicle (41), wherein the end of the claw arm (42) is provided with a clamping claw (43) for clamping / releasing the spring sheet (5).

6. The hole wall treatment device for a bored pile according to claim 1, characterized in that: The patch mechanism (2) and the feeding mechanism (4) are both equipped with an electronic meter (6) for measuring the depth.

7. The hole wall treatment device for a bored pile according to any one of claims 2 to 4, characterized in that: The upper and lower ends of the outer wall of the hole wall guard plate (3) are both provided with protruding positioning plug shafts (31); a vacuum suction cup (231) is provided on the contact surface between the guard plate seat (23) and the hole wall guard plate (3); the vacuum suction cup (231) is electrically connected to an external power supply for controlling the state of the vacuum suction cup.

8. The hole wall treatment device for a bored pile according to any one of claims 2 to 4, characterized in that: A socket hole (232) that cooperates with the insert shaft assembly (33) is provided on the mating surface between the guard plate seat (23) and the hole wall guard plate (3).

9. A method for treating the hole wall of a bored pile using the device of claim 5, characterized in that: The following steps are involved: Step S1, prefabricating the protective plate: define the radius of the pile hole as r, place a steel skeleton in the mold, and pour concrete to form a hole wall protective plate (3) with an arc length of π / 2r; Step S2, drilling: placing a steel casing (30) at a predetermined hole position, and driving a drill rod (1) by a drilling machine (10) to drill a hole vertically downward at the predetermined hole position through a drill bit (11) at its bottom end, and while drilling, pumping out mud using a mud delivery pipe (20); Step S3, laying the protective sheet: when the drilling depth is below the steel casing (30), the patch mechanism (2) starts to work, and the initial position of the patch mechanism (2) is on the track (12) of the outer wall of the drill rod (1) and is located above the steel casing (30). After the staff places the prefabricated hole wall protective sheet (3) on the protective sheet seat (23), the first track vehicle (21) moves downward along the track (12) to below the steel casing (30), and then the hydraulic telescopic rod (22) squeezes the protective sheet seat (23) with the hole wall protective sheet (3) toward the hole wall, so that the hole wall protective sheet (3) is laid on the hole wall; The patch mechanism (2) is configured as two groups that are staggered in an upper and lower position, the distance between the two groups being the height of the hole wall guard sheet (3), each group being configured as two patch mechanisms (2) symmetrically distributed on both sides of the drill rod (1), each group of patch mechanisms (2) simultaneously paving two hole wall guard sheets (3) at opposite positions, the two groups of patch mechanisms (2) complete the paving work of two upper and lower adjacent layers of the hole wall guard sheets (3) each time they are lifted and lowered twice, the lifting height of the patch mechanism (2) being fed back by an electronic meter (6) so that the paving position of the hole wall guard sheets (3) is accurate; Step S4, fixing the protective sheet: After two layers of the hole wall protective sheet (3) are laid, the feeding mechanism (4) starts to work. The initial position of the feeding mechanism (4) is above the patch mechanism (2). The staff places the spring sheet (5) on the clamping claw (43) to clamp and fix it. Then the second rail vehicle (41) moves downward to the height position of the hole wall protective sheet (3) through the claw arm (42) with the clamping claw (43) and stops. The clamping claw (43) releases the spring sheet (5), so that the spring sheet (5) is elastically attached to the inner walls of the four hole wall protective sheets (3) in the same layer, and the position of the hole wall protective sheet (3) is limited. The process is repeated according to the laying depth of the hole wall protective sheet (3) until the laying is completed, so that the plurality of hole wall protective sheets (3) form a cylindrical protective layer on the inner side of the hole wall.

10. A method for processing a bored pile using the device of claim 5, characterized in that: The following steps are involved: Step S1, prefabricating the protective plate: define the radius of the pile hole as r, place a steel skeleton in the mold, and pour concrete to form a hole wall protective plate (3) with an arc length of π / 2r; Step S2, drilling: placing a steel casing (30) at a predetermined hole position, and driving a drill rod (1) by a drilling machine (10) to drill a hole vertically downward at the predetermined hole position through a drill bit (11) at its bottom end, and while drilling, pumping out mud using a mud delivery pipe (20); Step S3, laying the protective sheet: when the drilling depth is below the steel casing (30), the patch mechanism (2) starts to work, and the initial position of the patch mechanism (2) is on the track (12) of the outer wall of the drill rod (1) and is located above the steel casing (30). After the staff places the prefabricated hole wall protective sheet (3) on the protective sheet seat (23), the first track vehicle (21) moves downward along the track (12) to below the steel casing (30), and then the hydraulic telescopic rod (22) squeezes the protective sheet seat (23) with the hole wall protective sheet (3) toward the hole wall, so that the hole wall protective sheet (3) is laid on the hole wall; The patch mechanism (2) is configured as two groups that are staggered in an upper and lower position, the distance between the two groups being the height of the hole wall guard sheet (3), each group being configured as two patch mechanisms (2) symmetrically distributed on both sides of the drill rod (1), each group of patch mechanisms (2) simultaneously paving two hole wall guard sheets (3) at opposite positions, the two groups of patch mechanisms (2) complete the paving work of two upper and lower adjacent layers of the hole wall guard sheets (3) each time they are lifted and lowered twice, the lifting height of the patch mechanism (2) being fed back by an electronic meter (6) so that the paving position of the hole wall guard sheets (3) is accurate; Step S4, fixing the protective sheet: after two layers of the hole wall protective sheet (3) are laid, the feeding mechanism (4) starts to work. The initial position of the feeding mechanism (4) is above the patch mechanism (2). The staff places the spring sheet (5) on the clamping claw (43) to clamp and fix it. Then the second rail vehicle (41) moves downward to the height position of the hole wall protective sheet (3) through the claw arm (42) with the clamping claw (43) and stops. The clamping claw (43) releases the spring sheet (5), so that the spring sheet (5) is elastically attached to the inner wall of the four hole wall protective sheets (3) on the same layer, and the position of the hole wall protective sheet (3) is limited. The process is repeated according to the laying depth of the hole wall protective sheet (3) until the laying is completed, so that the plurality of hole wall protective sheets (3) form a cylindrical protective layer on the inner side of the hole wall. Step S5, grouting to form piles: grouting is performed into the cylindrical protective layer, and a steel cage is implanted, so that the hole wall protection sheet (3) forms a whole with the steel cage and concrete.

11. A cast-in-place pile, characterized in that: The method according to claim 10 is used to process and form the pile, wherein the inner core has a steel mesh cage body and an outer layer formed by a hole wall guard sheet (3), and the outer wall of the hole wall guard sheet (3) has a convex structure that can be embedded in the soil layer, so that the formed cast-in-place pile body has the effect of a friction pile, thereby enhancing the structural stability of the pile body in the soil layer.