Gas extraction hole reinforcement device and method

By using reinforcement devices of stranded steel cables and membrane bags in the gas extraction hole, grouting and forming a closed space, the problem of insufficient filling of surrounding rock cracks in the traditional method is solved, and the filling support of the gas extraction hole is significantly improved Protection effect.

CN115199237BInactive Publication Date: 2024-11-26山西潞安集团潞宁煤业有限责任公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210859403.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-21
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional gas extraction hole sealing method is difficult to fully fill the surrounding rock cracks, resulting in poor filling and support effect.

Method used

Using a reinforcement device including twisted steel cables, membrane bags and conduits, grouting into the membrane bags through grouting pumps, the slurry solidifies and forms a closed space, increasing the filling pressure for the cracks in the hole wall of the gas extraction hole, thereby enhancing the filling Support effect.

Benefits of technology

It effectively enhances the filling and support effect of the gas extraction hole, improves the sealing property of the closed space and the slurry filling ability, and improves the reinforcement effect of the gas extraction hole.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115199237B_ABST
    Figure CN115199237B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a gas extraction hole reinforcement device and method, which relates to the technical field of mine hole sealers. The invention is to solve the problem of poor filling and supporting effect of gas extraction holes. The gas extraction hole reinforcement device includes: a twisted steel cable, a first film bag is provided at the first end of the twisted steel cable, a first end of a first conduit is connected to the first film bag, the first conduit is connected to the cavity of the first film bag, and the second end of the first conduit is connected to a grouting pump; a second film bag is provided at the second end of the twisted steel cable, a first end of a second conduit is connected to the second film bag, the second conduit is connected to the cavity of the second film bag, and the second end of the second conduit is connected to a grouting pump; and also includes a third conduit, the first end of the third conduit is located between the second film bag and the first film bag, and the second end of the third conduit is connected to a grouting pump. It is suitable for application scenarios where the filling and supporting effect of gas extraction holes needs to be enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mine hole sealers, and in particular to a gas extraction hole reinforcement device and method. Background Art

[0002] Gas is a major source of danger in coal mines, and gas extraction is the fundamental means to solve the problem. The traditional sealing and reinforcement method uses solid materials to seal the gas extraction holes at one time. Because the surrounding rock cracks in the gas extraction holes are deep, it is difficult to fully fill and reinforce the surrounding rock cracks in the gas extraction holes with the one-time sealing method, resulting in poor filling and support effects of the gas extraction holes. Summary of the invention

[0003] In view of this, an embodiment of the present invention provides a gas extraction hole reinforcement device and method, which can enhance the filling and supporting effect of the gas extraction hole.

[0004] To achieve the above object, the embodiments of the present invention adopt the following technical solutions:

[0005] In the first aspect, an embodiment of the present invention provides a gas extraction hole reinforcement device, comprising: a twisted steel cable, a first membrane bag is provided at the first end of the twisted steel cable, a first end of a first conduit is connected to the first membrane bag, the first conduit is communicated with the cavity of the first membrane bag, and the second end of the first conduit is connected to a grouting pump; a second membrane bag is provided at the second end of the twisted steel cable, a first end of a second conduit is connected to the second membrane bag, the second conduit is communicated with the cavity of the second membrane bag, and the second end of the second conduit is connected to the grouting pump; and a third conduit is also included, a first end of the third conduit is located between the second membrane bag and the first membrane bag, and a second end of the third conduit is connected to the grouting pump.

[0006] According to a specific implementation method of an embodiment of the present invention, a first through hole is provided on the second membrane bag, outside the cavity of the second membrane bag, and the first end of the third conduit passes through the first through hole and is located between the second membrane bag and the first membrane bag; a second through hole is provided on the second membrane bag, outside the cavity of the second membrane bag, and the first end of the first conduit passes through the second through hole and is connected to the first membrane bag.

[0007] According to a specific implementation method of the embodiment of the present invention, a first connector is provided on the first membrane bag, and the first connector is threadedly connected to the first conduit; a second connector is provided on the second membrane bag, and the second connector is threadedly connected to the second conduit; or, a first connector is provided on the first membrane bag, and the first conduit is located in the first connector, and when the first conduit is located in the first connector, a first fastener is provided on the outside of the first connector and at the first conduit in the first connector; a second connector is provided on the second membrane bag, and the second conduit is located in the second connector, and when the second conduit is located in the second connector, a second fastener is provided on the outside of the second connector and at the second conduit in the second connector.

[0008] According to a specific implementation method of an embodiment of the present invention, the second membrane bag includes a membrane bag main body and a spike portion, and the spike portion is connected to the membrane bag main body; after injecting slurry into the second membrane bag and standing for a preset time, the membrane bag main body is located in the gas extraction hole, and the spike portion is located in the crack of the hole wall of the gas extraction hole, and abuts against the crack of the hole wall in the axial direction of the gas extraction hole.

[0009] According to a specific implementation method of the embodiment of the present invention, a first clamping piece is provided on the first membrane bag, and a first clamping portion is provided at the first end of the twisted steel cable, and the first clamping piece is engaged with the first clamping portion; a second clamping piece is provided on the second membrane bag, and a second clamping portion is provided at the second end of the twisted steel cable, and the second clamping piece is engaged with the second clamping portion.

[0010] According to a specific implementation method of an embodiment of the present invention, a third through hole is provided on the second membrane bag, outside the cavity of the second membrane bag, and the third through hole is adjacent to the first through hole; it also includes a return pipe, the first end of the return pipe passes through the third through hole, and is located between the first membrane bag and the second membrane bag, close to the first membrane bag, the end of the first end of the return pipe is at a preset distance from the first membrane bag, and the second end of the return pipe is located outside the gas extraction hole.

[0011] According to a specific implementation of the embodiment of the present invention, an anti-retreat structure is further provided on the twisted steel cable, and the anti-retreat structure includes at least two legs, and the at least two legs are symmetrically arranged relative to the axis of the twisted steel cable.

[0012] According to a specific implementation manner of the embodiment of the present invention, the anti-retreat structure is hinged to the twisted steel cable.

[0013] According to a specific implementation of the embodiment of the present invention, it also includes a compression spring, one end of the compression spring is connected to the side of the leg close to the twisted steel cable, and the other end of the compression spring is connected to the twisted steel cable.

[0014] In a second aspect, an embodiment of the present invention provides a method for reinforcing a gas extraction hole, using any of the gas extraction hole reinforcement devices described in the first aspect to perform grouting and hole sealing, including: connecting a first film bag to a first end of a twisted steel cable, connecting a second film bag to a second end of the twisted steel cable, placing a first end of a third conduit between the first film bag and the second film bag, passing a first end of a return slurry pipe through a third through hole, and pushing the first end of the return slurry pipe to a position between the first film bag and the second film bag close to the first film bag to form the gas extraction hole reinforcement device; cleaning the gas extraction hole, and pushing the gas extraction hole reinforcement device into a preset position in the gas extraction hole; connecting the second end of the first conduit connected to the first film bag to a grouting pump The second end of the second conduit connected to the second membrane bag is connected to the grouting pump, and the second end of the third conduit is connected to the grouting pump; the grouting pump is used to inject grout into the first membrane bag through the first conduit, and the grouting pump is used to inject grout into the second membrane bag through the second conduit, so that the spike portion of the second membrane bag is located in the crack of the hole wall of the gas extraction hole; let it stand for a preset time to allow the slurry in the first membrane bag to solidify, and the slurry in the second membrane bag to solidify, so that the spike portion is engaged with the crack of the hole wall; the grouting pump is used to inject grout into the closed space formed by the first membrane bag, the second membrane bag and the surrounding rock wall through the third conduit until slurry flows out of the return grouting pipe.

[0015] The gas extraction hole reinforcement device and method provided in the embodiment of the present invention can fill the first film bag with grout through the first conduit, fill the second film bag with grout through the second conduit, and after standing for a preset time to allow the slurry in the first film bag and the second film bag to solidify, a closed space can be formed by the first film bag, the second film bag and the hole wall of the gas extraction hole, thereby achieving the blocking of the target position in the gas extraction hole. Furthermore, after the first film bag, the second film bag and the hole wall of the gas extraction hole form a closed space, the pressure of the slurry injected into the target position in the gas extraction hole through the third conduit can be increased, so that the slurry can fully fill the cracks in the hole wall at the target position in the gas extraction hole, thereby enhancing the filling and supporting effect of the gas extraction hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 A schematic diagram of a gas extraction hole of a gas extraction hole reinforcement device according to an embodiment of the present invention;

[0018] Figure 2 A schematic diagram of a gas extraction hole reinforcement device according to an embodiment of the present invention reinforcing a gas extraction hole;

[0019] Figure 3 This is a schematic structural diagram of a first membrane bag without grouting in a gas extraction hole reinforcement device according to an embodiment of the present invention;

[0020] Figure 4 This is a schematic structural diagram of a first membrane bag for grouting of a gas extraction hole reinforcement device according to an embodiment of the present invention;

[0021] Figure 5 The figure is a schematic flow chart of a method for reinforcing a gas extraction hole according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0023] It should be clear that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] Embodiment 1

[0025] See also Figures 1 to 4 As shown, the gas extraction hole reinforcement device provided by the embodiment of the present invention includes: a twisted steel cable 1, a first membrane bag 2 is provided at the first end of the twisted steel cable 1, a first end of a first conduit 3 is connected to the first membrane bag 2, the first conduit 3 is communicated with the cavity of the first membrane bag 2, and the second end of the first conduit 3 is connected to a grouting pump; a second membrane bag is provided at the second end of the twisted steel cable 1, a first end of a second conduit is connected to the second membrane bag, the second conduit is communicated with the cavity of the second membrane bag, and the second end of the second conduit is connected to the grouting pump; and a third conduit is also included, a first end of the third conduit is located between the second membrane bag and the first membrane bag 2, and a second end of the third conduit is connected to the grouting pump.

[0026] The twisted steel cable 1 can be a steel wire rope or a steel strand. When the twisted steel cable 1 is a steel strand, specifically, the twisted steel cable 1 can also be an anchor cable. The first film bag 2 and the second film bag are made of the same material, and can be made of plastic or rubber. The grouting pump can have three grouting ports, which are respectively connected to the second end of the first conduit 3, the second end of the second conduit, and the second end of the third conduit.

[0027] The gas extraction hole reinforcement device provided in the embodiment of the present invention can fill the first film bag 2 with grout through the first conduit 3, fill the second film bag with grout through the second conduit, and after standing for a preset time to solidify the slurry 4 in the first film bag 2 and the second film bag, a closed space can be formed by the first film bag 2, the second film bag and the hole wall of the gas extraction hole 5, thereby achieving the blocking of the target position in the gas extraction hole 5. Furthermore, after the first film bag 2, the second film bag and the hole wall of the gas extraction hole 5 form a closed space, the pressure of the slurry 4 injected into the target position in the gas extraction hole 5 through the third conduit can be increased, so that the slurry 4 can fully fill the cracks in the hole wall at the target position in the gas extraction hole 5, thereby enhancing the filling and supporting effect of the gas extraction hole 5.

[0028] In one embodiment, a first through hole is provided on the second membrane bag outside the cavity of the second membrane bag, and the first end of the third conduit passes through the first through hole and is located between the second membrane bag and the first membrane bag 2; a second through hole is provided on the second membrane bag outside the cavity of the second membrane bag, and the first end of the first conduit 3 passes through the second through hole and is connected to the first membrane bag 2.

[0029] The first conduit 3 can be closely connected to the first film bag 2 along the wall of the gas extraction hole 5, and the third conduit can be closely connected to the wall of the gas extraction hole 5 and reach between the second film bag and the first film bag 2. At this time, after grouting into the second film bag through the second conduit, grouting into the first film bag 2 through the first conduit 3, and standing for a preset time, the first conduit 3 and the third conduit are wrapped by the film bag and the hole wall to form a closed space with the first film bag 2 and the hole wall of the gas extraction hole 5. In the embodiment of the present invention, a first through hole and a second through hole are provided on the second film bag and outside the cavity of the second film bag, so that the first conduit 3 is connected to the film bag through the first through hole, and the third conduit is located between the second film bag and the first film bag 2 through the second through hole. At this time, after grouting into the second film bag through the second conduit, grouting into the first film bag 2 through the first conduit 3, and standing for a preset time, the first conduit 3 and the third conduit are wrapped by the film bag to form a closed space with the first film bag 2 and the hole wall of the gas extraction hole 5. Compared with the aforementioned scheme, because the slurry 4 can fit the shapes of the first conduit 3 and the third conduit when injected, the closed space obtained by the embodiment of the present invention has better airtightness and the pressure provided to the slurry 4 is stronger, so that the slurry 4 can fully fill the hole wall cracks at the target position in the gas extraction hole 5, thereby enhancing the filling and supporting effect of the gas extraction hole 5.

[0030] In one embodiment, the position of the third conduit between the second film bag and the first film bag 2 is determined based on a material distance comparison table.

[0031] The material distance comparison table can be obtained according to the solidification time of the slurry 4 of the common grouting pump. Specifically, if the solidification time of the slurry 4 is less than the first preset time, the third conduit is located at a first distance from the second film bag. If the solidification time of the slurry 4 is greater than the first preset time and less than the second preset time, the third conduit is located at a second distance from the second film bag. The specific material distance comparison table can be obtained according to the actual project.

[0032] By determining the position of the third conduit between the second film bag and the first film bag 2 through the material distance comparison table, when the solidification time of the slurry 4 is relatively short, the end of the first end of the third conduit can be close to the first film bag 2, so that the slurry 4 can fully fill the closed space between the first film bag 2 and the second film bag; when the solidification time of the slurry 4 is relatively long, the end of the first end of the third conduit can be close to the second film bag, thereby reducing the material used for the third conduit. It can be understood that in practical applications, multiple third conduits are required. By reducing the material used for the third conduit, the production cost of the gas extraction hole reinforcement device can be reduced.

[0033] In one embodiment, a first connector is provided on the first membrane bag 2, and the first connector is threadedly connected to the first conduit 3; a second connector is provided on the second membrane bag, and the second connector is threadedly connected to the second conduit; or, a first connector is provided on the first membrane bag 2, and the first conduit 3 is located in the first connector, and when the first conduit 3 is located in the first connector, a first fastener is provided on the outside of the first connector and at the first conduit 3 in the first connector; a second connector is provided on the second membrane bag, and the second conduit is located in the second connector, and when the second conduit is located in the second connector, a second fastener is provided on the outside of the second connector and at the second conduit in the second connector.

[0034] The first connector can be bonded to the first membrane bag 2, and a connecting hole is provided on the first connector, and an internal thread is provided on the connecting hole, and an external thread is provided on the first conduit 3 accordingly, so that the first membrane bag 2 can be threadedly connected to the first conduit 3 through the first connector, and similarly, the second membrane bag can be threadedly connected to the second conduit through the second connector. Alternatively, the first connector is made of a flexible material, such as rubber, and the first conduit 3 is made of a rigid material, such as a steel pipe, and the first fastener is a fastening steel ring with a variable diameter on the first conduit 3. After the first conduit 3 is inserted into the first connector of the first membrane bag 2, the first fastener is moved to the connection between the first connector and the first conduit 3, and the diameter of the first fastener is contracted and reinforced, so that the first membrane bag 2 can be fixedly connected to the first conduit 3 through the first fastener and the first connector, and similarly, the second membrane bag can be fixedly connected to the second conduit through the second fastener and the second connector.

[0035] In one embodiment, the second membrane bag includes a membrane bag main body and a spike portion, and the spike portion is connected to the membrane bag main body; after injecting slurry 4 into the second membrane bag and standing for a preset time, the membrane bag main body is located in the gas extraction hole 5, and the spike portion is located in the crack of the hole wall of the gas extraction hole 5, and abuts against the crack of the hole wall in the axial direction of the gas extraction hole.

[0036] From the above, it can be seen that the second membrane bag is located in the shallow part of the gas extraction hole 5. It can be understood that in the shallow part of the gas extraction hole 5, the cracks in the hole wall are relatively large. By arranging a spike portion on the second membrane bag, after injecting the slurry 4 into the second membrane bag through the second conduit, the second membrane bag can enter the cracks in the hole wall of the gas extraction hole 5 and stand for a preset time. After the slurry 4 solidifies, the spike portion of the second membrane bag can be abutted against the cracks in the hole wall in the axial direction of the gas extraction hole 5, thereby increasing the stability of the connection between the second membrane bag and the cracks in the hole wall of the gas extraction hole 5, and then increasing the pressure provided by the closed space to the slurry 4, so that the slurry 4 can fully fill the cracks in the hole wall at the target position in the gas extraction hole 5, thereby enhancing the filling and support effect of the gas extraction hole 5.

[0037] In another embodiment, the position of the protrusion on the membrane bag body corresponds to a pre-acquired crack in the hole wall of the second membrane bag at a preset position in the gas extraction hole 5.

[0038] The spikes can be arbitrarily set on the membrane bag body of the second membrane bag. Because the material of the second membrane bag is a flexible material, after the slurry 4 is injected into the second bag, the spikes that have not entered the cracks in the hole wall can fit on the hole wall of the gas extraction hole 5, and the spikes and the membrane bag body can fit together, which will not affect the sealing of the closed space. In the embodiment of the present invention, by pre-obtaining the hole wall crack conditions of the second membrane bag at a preset position in the gas extraction hole 5, compared with the aforementioned scheme, the spikes of the second membrane bag are set according to the hole wall crack cleaning, so that the spikes can be located in the hole wall cracks as much as possible, so that more parts are in contact with the hole wall cracks, thereby increasing the stability of the connection between the second membrane bag and the hole wall cracks of the gas extraction hole 5, and then increasing the pressure provided by the closed space to the slurry 4, so that the slurry 4 can fully fill the hole wall cracks at the target position in the gas extraction hole 5, and enhance the filling and support effect of the gas extraction hole 5.

[0039] In one embodiment, a first clamping piece is provided on the first membrane bag 2, and a first clamping portion is provided on the first end of the twisted steel cable 1, and the first clamping piece is engaged with the first clamping portion; a second clamping piece is provided on the second membrane bag, and a second clamping portion is provided on the second end of the twisted steel cable 1, and the second clamping piece is engaged with the second clamping portion.

[0040] The first clamping member can be bonded to the first film bag 2, and the second clamping member can be bonded to the second film bag. The first clamping member and the second clamping member can be buckles, and the first clamping portion and the second clamping portion can be slots, so that the first film bag 2 and the twisted steel cable 1 can be clamped through the first clamping member and the first clamping portion, and the second film bag and the twisted steel cable 1 can be clamped through the second clamping member and the second clamping portion.

[0041] In another embodiment, guide plates are respectively provided on both sides of the first clamping portion and the second clamping portion, and both outer sides of the first clamping member and the second clamping member are respectively in contact with the corresponding guide plates.

[0042] By setting a guide plate, the movement direction of the first clamping part can be limited, so that the first clamping part can slide into the first clamping part along the direction of the guide plate. Similarly, the second clamping part can slide into the second clamping part, so as to facilitate the first membrane bag 2 and the second membrane bag to be clamped with the twisted steel cable 1 respectively.

[0043] In one embodiment, a third through hole is provided on the second membrane bag, outside the cavity of the second membrane bag, and the third through hole is adjacent to the first through hole; a return pipe is also included, the first end of the return pipe passes through the third through hole, and is located between the first membrane bag 2 and the second membrane bag, close to the first membrane bag 2, the end of the first end of the return pipe is at a preset distance from the first membrane bag 2, and the second end of the return pipe is located outside the gas extraction hole 5.

[0044] By setting up a return slurry pipe, it is possible to avoid excessive injection of slurry 4, which would cause the pressure of the slurry 4 acting on the first membrane bag 2 and the second membrane bag to exceed the pressure threshold that the first membrane bag 2 and the second membrane bag can withstand, thereby damaging the connection between the first membrane bag 2 and the twisted steel cable 1, and / or the connection between the second membrane bag and the twisted steel cable 1, thereby preventing the first membrane bag 2 and / or the second membrane bag from being separated from the preset position, and further preventing the target position in the gas extraction hole 5 from being filled with the slurry 4, resulting in poor filling and support effect of the gas extraction hole 5.

[0045] Optionally, the return slurry pipe may not be provided, and the volume of the sealing space can be determined by the predetermined sealing height and sealing hole diameter. The correction coefficient of the volume of the sealing space and the volume of the slurry 4 injected into the sealing space can be obtained through engineering practice, thereby determining the volume of the slurry 4 injected into the sealing space.

[0046] In one embodiment, an anti-retreat structure is further provided on the twisted steel cable 1 , and the anti-retreat structure includes at least two legs, and the at least two legs are symmetrically arranged relative to the axis of the twisted steel cable 1 .

[0047] The first end of the leg is connected to the twisted steel cable 1, and the second end of the leg faces the edge of the opening of the gas extraction hole 5, that is, there is an angle between the axis of the leg and the axis of the twisted steel cable 1. The second end of the leg can be set as a sharp end, so that when the twisted steel cable 1 moves out of the gas extraction hole 5, the second end of the leg can be inserted into the crack of the hole wall, thereby blocking the movement trend of the twisted steel cable 1 out of the gas extraction hole 5.

[0048] In one embodiment, the anti-retraction structure is hinged to the twisted steel cable 1 .

[0049] The anti-retreat structure is hinged to the twisted steel cable 1, that is, the anti-retreat structure and the twisted steel cable 1 are movably connected. In this way, when the twisted steel cable 1 moves toward the gas extraction hole 5, when the wall of the gas extraction hole 5 applies a reverse force to the anti-retreat structure, the anti-retreat structure can move toward the twisted steel cable 1, thereby reducing the reaction force of the wall of the gas extraction hole 5 that the twisted steel cable 1 bears in the moving direction toward the gas extraction hole 5, making it easier to place the twisted steel cable 1 at the preset position.

[0050] In one embodiment, a compression spring is further included, one end of the compression spring is connected to a side of the leg close to the twisted steel cable 1 , and the other end of the compression spring is connected to the twisted steel cable 1 .

[0051] By setting a compression spring, when the wall of the gas extraction hole 5 applies a reverse force to the leg, the work done by the reaction will be converted into the elastic potential energy of the spring, which can reduce the reaction force of the wall of the gas extraction hole 5 that the twisted steel cable 1 bears in the direction of movement toward the inside of the gas extraction hole 5, and play a role in vibration reduction. When the twisted steel cable 1 moves toward the outside of the gas extraction hole 5, the second end of the leg can be reset under the action of the compression spring, so that the second end of the leg is inserted into the crack of the hole wall, thereby blocking the movement trend of the twisted steel cable 1 toward the outside of the gas extraction hole 5, and facilitating the placement of the twisted steel cable 1 at the preset position.

[0052] Embodiment 2

[0053] See also Figure 5 The embodiment of the present invention provides a method for grouting and sealing a gas extraction hole using any of the gas extraction hole reinforcement devices described in the first embodiment, comprising:

[0054] S100, connect the first membrane bag to the first end of the twisted steel cable (for example, clamp the first membrane bag to the first end of the twisted steel cable), connect the second membrane bag to the second end of the twisted steel cable (for example, clamp the second membrane bag to the second end of the twisted steel cable), place the first end of the third conduit between the first membrane bag and the second membrane bag, pass the first end of the return slurry pipe through the third through hole, and push it between the first membrane bag and the second membrane bag close to the first membrane bag to form the gas extraction hole reinforcement device.

[0055] S102, cleaning the gas extraction hole, and pushing the gas extraction hole reinforcement device into the preset position in the gas extraction hole. The preset position of the gas extraction hole reinforcement device in the gas extraction hole can be determined according to the actual project.

[0056] S104, connecting the second end of the first conduit connected to the first membrane bag to a grouting pump, connecting the second end of the second conduit connected to the second membrane bag to the grouting pump, and connecting the second end of the third conduit to the grouting pump.

[0057] S106, using the grouting pump to inject grout into the first membrane bag through the first conduit, and using the grouting pump to inject grout into the second membrane bag through the second conduit, so that the spike portion of the second membrane bag is located in the crack of the hole wall of the gas extraction hole. As described above, by setting the position of the spike portion on the membrane bag body of the second membrane bag, the membrane bag can be located in the crack of the hole wall of the gas extraction hole as much as possible.

[0058] S108, standing for a preset time to solidify the slurry in the first membrane bag and the slurry in the second membrane bag, so that the spikes are engaged with the cracks in the hole wall. The length of the preset standing time can be determined according to actual engineering practice.

[0059] S110, using the grouting pump to inject grout into the closed space formed by the first membrane bag, the second membrane bag and the surrounding rock wall through the third conduit until slurry 4 flows out of the return grouting pipe.

[0060] The gas extraction hole reinforcement method provided by the embodiment of the present invention is to grout the first film bag through the first conduit, grout the second film bag through the second conduit, and after standing for a preset time to solidify the slurry in the first film bag and the second film bag, a closed space can be formed by the first film bag, the second film bag and the hole wall of the gas extraction hole, thereby achieving the blocking of the target position in the gas extraction hole. Furthermore, after the first film bag, the second film bag and the hole wall of the gas extraction hole form a closed space, the pressure of the slurry injected into the target position in the gas extraction hole through the third conduit can be increased, so that the slurry can fully fill the cracks in the hole wall at the target position in the gas extraction hole, thereby enhancing the filling and supporting effect of the gas extraction hole.

[0061] It should be noted that, in this article, the emphasis of the scheme described in each embodiment is different, but each embodiment has a certain interrelated relationship. When understanding the scheme of the present invention, each embodiment can refer to each other; in addition, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0062] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims

1. A gas extraction hole reinforcement device, characterized in that: include: A twisted steel cable, wherein a first membrane bag is provided at a first end of the twisted steel cable, a first end of a first conduit is connected to the first membrane bag, the first conduit is communicated with a cavity of the first membrane bag, and a second end of the first conduit is connected to a grouting pump; A second membrane bag is provided at the second end of the twisted steel cable, a first end of a second conduit is connected to the second membrane bag, the second conduit is communicated with the cavity of the second membrane bag, and a second end of the second conduit is connected to the grouting pump; It also includes a third conduit, wherein a first end of the third conduit is located between the second film bag and the first film bag, and a second end of the third conduit is connected to the grouting pump; A first connector is provided on the first film bag, and the first connector is threadedly connected to the first conduit; a second connector is provided on the second film bag, and the second connector is threadedly connected to the second conduit; or, A first connector is provided on the first membrane bag, the first conduit is located in the first connector, and when the first conduit is located in the first connector, a first fastener is provided on the outside of the first connector and at the first conduit in the first connector; a second connector is provided on the second membrane bag, the second conduit is located in the second connector, and when the second conduit is located in the second connector, a second fastener is provided on the outside of the second connector and at the second conduit in the second connector; The first conduit is closely attached to the wall of the gas extraction hole and connected to the first film bag, the third conduit is closely attached to the wall of the gas extraction hole and reaches between the second film bag and the first film bag, grout is injected into the second film bag through the second conduit, grout is injected into the first film bag through the first conduit, and after standing for a preset time, the first conduit and the third conduit are wrapped by the film bag and the hole wall, forming a closed space with the first film bag and the wall of the gas extraction hole; The second film bag comprises a film bag body and a spike portion, wherein the spike portion is connected to the film bag body; After injecting slurry into the second membrane bag and letting it stand for a preset time, the membrane bag body is located in the gas extraction hole, the spike portion is located in the crack in the hole wall of the gas extraction hole, and abuts against the crack in the hole wall in the axial direction of the gas extraction hole.

2. The gas extraction hole reinforcement device according to claim 1, characterized in that: A first through hole is provided on the second film bag and outside the cavity of the second film bag, and the first end of the third conduit passes through the first through hole and is located between the second film bag and the first film bag; A second through hole is provided on the second membrane bag outside the cavity of the second membrane bag, and the first end of the first conduit passes through the second through hole and is connected to the first membrane bag.

3. The gas extraction hole reinforcement device according to claim 1, characterized in that: A first clamping piece is provided on the first film bag, and a first clamping portion is provided at the first end of the twisted steel cable, and the first clamping piece is clamped with the first clamping portion; A second clamping piece is provided on the second film bag, and a second clamping portion is provided on the second end of the twisted steel cable, and the second clamping piece is clamped with the second clamping portion.

4. The gas extraction hole reinforcement device according to claim 2, characterized in that: A third through hole is provided on the second film bag and outside the cavity of the second film bag, and the third through hole is adjacent to the first through hole; It also includes a return pipe, the first end of which passes through the third through hole and is located between the first membrane bag and the second membrane bag close to the first membrane bag. The end of the first end of the return pipe is at a preset distance from the first membrane bag, and the second end of the return pipe is located outside the gas extraction hole.

5. The gas extraction hole reinforcement device according to claim 1, characterized in that: The twisted steel cable is also provided with an anti-retreat structure, which includes at least two legs, and the at least two legs are symmetrically arranged relative to the axis of the twisted steel cable.

6. The gas extraction hole reinforcement device according to claim 5, characterized in that: The anti-retraction structure is hinged to the twisted steel cable.

7. The gas extraction hole reinforcement device according to claim 5, characterized in that: It also includes a compression spring, one end of which is connected to a side of the leg close to the twisted steel cable, and the other end of the compression spring is connected to the twisted steel cable.

8. A method for reinforcing a gas extraction hole, characterized in that: The gas extraction hole reinforcement device according to any one of claims 1 to 7 is used for grouting and sealing the hole, comprising: Connect the first membrane bag to the first end of the twisted steel cable, connect the second membrane bag to the second end of the twisted steel cable, place the first end of the third conduit between the first membrane bag and the second membrane bag, pass the first end of the return slurry pipe through the third through hole, and push it to between the first membrane bag and the second membrane bag near the first membrane bag to form the gas extraction hole reinforcement device; Cleaning the gas extraction hole, and pushing the gas extraction hole reinforcement device into the preset position in the gas extraction hole; Connecting the second end of the first conduit connected to the first membrane bag to a grouting pump, connecting the second end of the second conduit connected to the second membrane bag to the grouting pump, and connecting the second end of the third conduit to the grouting pump; Using the grouting pump to inject grout into the first membrane bag through the first conduit, and using the grouting pump to inject grout into the second membrane bag through the second conduit, so that the protrusion of the second membrane bag is located in the crack of the hole wall of the gas extraction hole; Standing for a preset time to solidify the slurry in the first membrane bag and the slurry in the second membrane bag, so that the spike portion is engaged with the crack of the hole wall; The grouting pump is used to inject grout into the closed space formed by the first membrane bag, the second membrane bag and the surrounding rock wall through the third conduit until slurry flows out of the return grouting pipe.