A prefabricated bridge deck steel-concrete shear connector structure and construction method thereof

Through the prefabricated steel-concrete shear connector structure of prefabricated bridge deck panels, double nut high-strength bolts and welded nails are embedded in the steel mesh, simple and fast connection between the bridge deck panels is achieved, solving the problems of difficulty in connection and long construction period in the existing technology, and improving the Construction efficiency and connection stability.

CN115305813BActive Publication Date: 2024-11-12SHANDONG EXPRESSWAY JIQING MIDDLE LINE HIGHWAY CO LTD +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211045256.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-30
Publication Date
2024-11-12
Estimated Expiration
2042-08-30

AI Technical Summary

Technical Problem

The existing prefabricated bridge deck connection method is prone to cracking the panel, with large construction errors, and high difficulty in construction of wet joints, long construction period, severe environmental impact, and low bonding strength of the interface between new and old concrete connections.

Method used

The structure of prefabricated steel-concrete shear joints is built, and the bridge deck is embedded and fixed in the steel mesh of the bridge deck is through double nut high-strength bolts and welded nails. The bridge deck is realized by using vertical steel plates, inverted J channel steel plates and U channel steel plates. Simple and quick connection between them reduces construction difficulty.

Benefits of technology

It improves construction efficiency, reduces labor and material costs, enhances the stability and shear stress resistance of bridge deck panel connections, and simplifies on-site seam connection operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115305813B_ABST
    Figure CN115305813B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated bridge deck steel-concrete shear connector structure and a construction method thereof, belonging to the technical field of bridge construction, wherein the connector structure comprises two first bridge decks and second bridge decks to be connected, and first connectors and second connectors respectively connected to the bottom and top of the first bridge deck and the second bridge deck; the first connector comprises a first connecting plate with double nuts and high-strength bolts embedded and fixed at the bottom of the first bridge deck end, and a first lap plate with welding nails embedded and fixed at the bottom of the second bridge deck end, and its extended lap portion is bolted and fixed to the first connecting plate; the second connector comprises a second connecting plate with double nuts and high-strength bolts embedded and fixed at the top of the second bridge deck end, and a second lap plate with welding nails embedded and fixed at the top of the first bridge deck end, and its extended lap portion is bolted and fixed to the second connecting plate. The structural design of the present invention is smart and compact, easy to operate in on-site construction, simplifies the difficulty of seam connection operations between on-site bridge decks, and improves construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a prefabricated bridge deck steel-concrete shear-resistant connector structure and a construction method thereof. Background Art

[0002] The bridge deck connection method of prefabricated composite beam bridge is the key to improving assembly efficiency. At present, the connection form of prefabricated bridge deck is mainly lap steel bar cast-in-place wet joint. The shrinkage creep of cast-in-place wet joint concrete can easily cause panel cracking. The longitudinal steel bar bending caused by construction error can easily cause lap difficulty. The low bonding strength of the new and old concrete connection interface is prone to cracking, which becomes a design difficulty. In addition, the construction of prefabricated bridge deck wet joint is difficult, the construction period is long, and it is seriously affected by the environment. Dry prefabricated bridge deck steel-concrete connectors can avoid the shrinkage creep of cast-in-place concrete and the cracking surface of new and old concrete, ensure the bearing capacity of the prefabricated structure, and make full use of the material properties of steel and concrete. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a prefabricated bridge deck steel-concrete shear connector structure and a construction method thereof. The structural design is smart and compact, easy to operate on-site construction, simplifies the difficulty of on-site joint connection operations between bridge decks, improves construction efficiency, and reduces labor and material costs during the construction process.

[0004] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0005] In a first aspect, the present invention provides a prefabricated bridge deck steel-concrete shear connector structure, which is applied to the positive and negative bending moment action sections of the bridge, and includes two first bridge decks and second bridge decks to be connected, and first connectors and second connectors respectively connected to the bottom and top between the first bridge deck and the second bridge deck;

[0006] The first connecting member comprises a first connecting plate embedded and fixed to the bottom of the first bridge deck end by double-nut high-strength bolts and a first strap embedded and fixed to the bottom of the second bridge deck end by welding nails, and the extended lap portion of the first strap is bolted and fixed to the first connecting plate;

[0007] The second connecting member comprises a second connecting plate embedded and fixed at the top of the second bridge deck end by double-nut high-strength bolts and a second strap embedded and fixed at the top of the first bridge deck end by welding nails, and the extended lap portion of the second strap is bolted and fixed to the second connecting plate.

[0008] Furthermore, the first connecting plate includes:

[0009] The first transverse steel plate,

[0010] A plurality of first vertical steel plates are arranged at intervals along the bridge width direction on the top of the first transverse steel plates and between adjacent longitudinal steel bars at the ends of the first bridge deck, and a plurality of transverse steel bars at the ends of the first bridge deck are also penetrated on the first vertical steel plates;

[0011] The first butt plate comprises:

[0012] The second transverse steel plate is provided with an extended overlap portion extending and overlapped to the first transverse steel plate and fixed thereto, and is flush with the bottom surfaces of the first bridge deck and the second bridge deck,

[0013] A plurality of second vertical steel plates are arranged at intervals along the bridge width direction on the top of the second transverse steel plate and between adjacent longitudinal steel bars at the end of the second bridge deck. The second vertical steel plates are also provided with a plurality of transverse steel bars at the end of the second bridge deck.

[0014] Furthermore, the first connecting plate is further provided with a plurality of first double-nut high-strength bolts, which are arranged between adjacent first vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length direction of the bridge;

[0015] The first butt plate is also provided with a plurality of first vertical welding nails, which are arranged between adjacent second vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length of the bridge.

[0016] Furthermore, the second connecting plate includes:

[0017] The third horizontal steel plate,

[0018] A plurality of third vertical steel plates are arranged at intervals along the bridge width direction at the bottom of the third transverse steel plate and between adjacent longitudinal steel bars at the end of the second bridge deck. The third vertical steel plates are also provided with a plurality of transverse steel bars at the end of the second bridge deck.

[0019] A plurality of second double-nut high-strength bolts are arranged between adjacent third vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length of the bridge;

[0020] The second butt plate comprises:

[0021] The fourth transverse steel plate is provided with an extended overlap portion extending and overlapped to the third transverse steel plate and is flush with the top surfaces of the first bridge deck and the second bridge deck.

[0022] A plurality of fourth vertical steel plates are arranged at intervals along the bridge width direction at the bottom of the fourth transverse steel plate and between adjacent longitudinal steel bars at the end of the first bridge deck. The fourth vertical steel plates are also provided with a plurality of transverse steel bars at the end of the first bridge deck.

[0023] A plurality of second vertical welding studs are arranged between adjacent fourth vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length of the bridge.

[0024] Furthermore, the first double-nut high-strength bolt and the second vertical welding nail, as well as the second double-nut high-strength bolt and the first vertical welding nail, extend toward each other in a staggered meshing state.

[0025] Furthermore, a plurality of bolt holes matching the first double-nut high-strength bolts are respectively provided on the extended overlapping portions of the first transverse steel plate and the second transverse steel plate, and the top ends of the first double-nut high-strength bolts sequentially pass through the bolt holes on the extended overlapping portions of the first transverse steel plate and the second transverse steel plate, and are fastened and connected by nuts on both sides of the extended overlapping portions of the first transverse steel plate and the second transverse steel plate;

[0026] A plurality of bolt holes matching the second double-nut high-strength bolts are respectively provided on the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate. The top ends of the second double-nut high-strength bolts sequentially pass through the bolt holes on the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate, and are fastened and connected by nuts on both sides of the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate.

[0027] Furthermore, the first vertical steel plate, the second vertical steel plate, the third vertical steel plate and the fourth vertical steel plate are located in the same straight line direction or the same vertical plane along the length direction of the bridge;

[0028] The first double-nut high-strength bolt, the second vertical welding nail, the second double-nut high-strength bolt and the first vertical welding nail are located in the same straight line direction or the same vertical plane along the bridge length direction.

[0029] Furthermore, the second connecting plate includes:

[0030] The third horizontal steel plate,

[0031] A plurality of first inverted J-slot steel plates are provided with a plurality of inverted J-shaped slot holes along the width direction of the bridge. The inverted J-slot steel plates are fixedly arranged at intervals along the length direction of the bridge at the bottom of the third transverse steel plate and are located between adjacent transverse steel bars at the end of the second bridge deck. A longitudinal steel bar provided with a fastening nut on the left side of the inverted J-shaped slot hole is fixedly passed through a plurality of the inverted J-shaped slot holes located in the same straight line direction along the length direction of the bridge between the first inverted J-slot steel plates.

[0032] A plurality of first U-channel steel plates are provided with U-shaped slots for passing the transverse steel bars, and the first U-channel steel plates are evenly spaced and fixedly arranged between adjacent first inverted J-channel steel plates and between adjacent longitudinal steel bars along the bridge width direction;

[0033] The second butt plate comprises:

[0034] The fourth transverse steel plate is provided with an extended overlap portion extending and overlapped to the third transverse steel plate and is flush with the top surfaces of the first bridge deck and the second bridge deck.

[0035] A plurality of second inverted J-slot steel plates are provided with a plurality of inverted J-shaped slot holes along the width direction of the bridge. The inverted J-slot steel plates are fixedly arranged at intervals along the length direction of the bridge at the bottom of the fourth transverse steel plate and are located between adjacent transverse steel bars at the end of the first bridge deck. A longitudinal steel bar provided with a fastening nut on the left side of the inverted J-shaped slot hole is fixedly passed through a plurality of the inverted J-shaped slot holes located in the same straight line direction along the length direction of the bridge between the second inverted J-slot steel plates.

[0036] A plurality of second U-channel steel plates are provided with U-shaped slot holes for passing the transverse steel bars. The second U-channel steel plates are evenly spaced and fixedly arranged between adjacent second inverted J-channel steel plates and between adjacent longitudinal steel bars along the width direction of the bridge.

[0037] Furthermore, a plurality of bolt holes for inserting fastening bolts are respectively provided on the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate, and the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate are fastened and connected by fastening bolts.

[0038] Furthermore, the first vertical steel plate and the second vertical steel plate are butted against each other one by one and are located in the same straight line direction or the same vertical plane;

[0039] And / or, the longitudinal steel bars between the first bridge deck and the second bridge deck correspond one to one and are located in the same straight line direction, and the first U-channel steel plate and the second U-channel steel plate located between adjacent longitudinal steel bars are both located in the same straight line direction.

[0040] In a second aspect, the present invention provides a construction method for a prefabricated bridge deck steel-concrete shear connector structure as described in any one of the first aspects, comprising the following steps:

[0041] The first connecting plate and the first lap plate of the first connecting member are respectively embedded and fixed in a steel mesh formed by longitudinal steel bars and transverse steel bars on the bottom ends of the first bridge deck and the second bridge deck and prefabricated with concrete;

[0042] The second connecting plate and the second strap of the second connecting member are respectively embedded and fixed on the top of the second bridge deck and the first bridge deck in a steel mesh surrounded by longitudinal steel bars and transverse steel bars and prefabricated with concrete;

[0043] Firstly, the second bridge deck with the first butt plate and the second connecting plate embedded and fixed therein is hoisted and positioned by using a hoisting machine;

[0044] Then use a lifting machine to lift and position the first bridge deck embedded with the second strap and the first connecting plate, so that the ends of the first bridge deck and the second bridge deck are aligned, and the first strap is overlapped on the bottom of the first connecting plate and the second strap is overlapped on the top of the second connecting plate, adjust the bolt holes at the overlap, and fix the connection with bolts.

[0045] Compared with the prior art, the present invention has the following beneficial effects:

[0046] The prefabricated bridge deck steel-concrete shear connector structure provided by the present invention is applied to the first bridge deck and the second bridge deck to be connected in the positive and negative bending moment action sections of the bridge. The first connector and the second connector are respectively connected to the bottom and the top between the first bridge deck and the second bridge deck. The first connector and the second connector are respectively embedded in the transverse steel bars and the longitudinal steel bars fixed to the ends of the bridge deck, and are embedded and penetrated in the steel mesh surrounded by the transverse steel bars and the longitudinal steel bars through various vertical steel plates, double-nut high-strength bolts, vertical welding nails, inverted J-slot steel plates, U-slot steel plates, etc., and are overlapped and fixedly connected at the upper and lower ends of the bridge deck through the first connector and the second connector, thereby realizing simple and quick connection at the joints between the prefabricated bridge decks. The overall structural design is smart and compact, easy to operate in on-site construction, simplifies the difficulty of on-site joint connection operations between bridge decks, improves construction efficiency, and reduces labor and material cost investment during construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a structural schematic diagram of a prefabricated bridge deck steel-concrete shear connector structure provided according to an embodiment of the present invention;

[0048] Figure 2 It is a partial schematic diagram of a prefabricated bridge deck steel-concrete shear connector structure provided according to an embodiment of the present invention;

[0049] Figure 3 is a disassembled schematic diagram of a prefabricated bridge deck steel-concrete shear connector structure provided according to an embodiment of the present invention;

[0050] Figure 4 is a structural schematic diagram of another prefabricated bridge deck steel-concrete shear connector structure provided according to an embodiment of the present invention;

[0051] Figure 5 is a partial schematic diagram of another prefabricated bridge deck steel-concrete shear connector structure provided according to an embodiment of the present invention;

[0052] Figure 6 is a disassembled schematic diagram of another prefabricated bridge deck steel-concrete shear connector structure provided according to an embodiment of the present invention;

[0053] In the figure:

[0054] 1. First bridge deck; 2. Second bridge deck; 3. First connecting piece; 4. Second connecting piece; 5. First connecting plate; 6. First strap; 7. Second connecting plate; 8. Second strap; 9. First horizontal steel plate; 10. Second horizontal steel plate; 11. Third horizontal steel plate; 12. Fourth horizontal steel plate; 13. First vertical steel plate; 14. Second vertical steel plate; 15. Third vertical steel plate; 16. Fourth vertical steel plate; 17. First double-nut high-strength bolt; 18. First vertical welding nail; 19. Second double-nut high-strength bolt; 20. Second vertical welding nail; 21. First inverted J-slot steel plate; 22. Second inverted J-slot steel plate; 23. First U-slot steel plate; 24. Second U-slot steel plate; 25. Transverse reinforcement; 26. Longitudinal reinforcement; 27. Bolt hole; 28. Inverted J-shaped slot hole; 29. ​​U-shaped slot hole; 30. Opening; 31. Nut; 32. Screw. DETAILED DESCRIPTION

[0055] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0056] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0057] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0058] like Figure 1 and Figure 4As shown, a prefabricated bridge deck steel-concrete shear connector structure is provided in an embodiment of the present invention, which is applied to the positive and negative bending moment action sections of the bridge, including two first bridge decks 1 and second bridge decks 2 to be connected, and first connectors 3 and second connectors 4 respectively connected at the bottom and top between the first bridge deck 1 and the second bridge deck 2.

[0059] Among them, reference Figure 2 and Figure 5 The first connector 3 and the second connector 4 are respectively embedded and fixed in the steel mesh formed by precast concrete in the first bridge deck 1 and the second bridge deck 2 by welding nails, and the steel mesh is mainly connected by binding together transverse steel bars 25 and longitudinal steel bars 26. Thus, the first bridge deck 1 and the second bridge deck 2 are assembled and connected by the first connector 3 and the second connector 4, forming a steel-concrete connection structure between precast bridge decks.

[0060] The above-mentioned first connecting member 3 and second connecting member 4 are both prefabricated in the factory. When the prefabricated bridge deck is produced, they are pre-embedded and fixed in the first bridge deck 1 and the second bridge deck 2, and are formed by pouring concrete. After being cured to meet the construction performance requirements, they are hoisted to the site for assembly.

[0061] Specifically, the first connecting member 3 comprises a first connecting plate 5 embedded in the bottom of the first bridge deck 1 and a first connecting plate 6 embedded in the bottom of the second bridge deck 2 and overlapped and fixed with the first connecting plate 5;

[0062] The second connecting member 4 comprises a second connecting plate 7 embedded in the top of the second bridge deck 2 and a second connecting plate 8 embedded in the top of the first bridge deck 1 and overlapped and fixed with the second connecting plate 7 .

[0063] In some embodiments, reference Figure 2 , Figure 3 , Figure 5 , Figure 6 The specific structure of the first connecting plate 5 is described as follows, including:

[0064] The first transverse steel plate 9,

[0065] A plurality of first vertical steel plates 13 are spaced apart along the bridge width direction at the top of the first transverse steel plate 9 and located between adjacent longitudinal steel bars 26 at the end of the first bridge deck 1 . The first vertical steel plates 13 are also provided with a plurality of transverse steel bars 25 located at the end of the first bridge deck 1 .

[0066] In this embodiment, the specific structure of the first butt plate 6 is described as follows, specifically including:

[0067] The second transverse steel plate 10 is provided with an extended overlap portion extending and overlapped to the first transverse steel plate 9 and fixed thereto, and is flush with the bottom surfaces of the first bridge deck 1 and the second bridge deck 2.

[0068] A plurality of second vertical steel plates 14 are spaced apart along the bridge width direction at the top of the second transverse steel plates 10 and located between adjacent longitudinal steel bars 26 at the end of the second bridge deck 2 . A plurality of transverse steel bars 25 located at the end of the second bridge deck 2 are also penetrated through the second vertical steel plates 14 .

[0069] Specifically, the first vertical steel plate 13 and the second vertical steel plate 14 both have a cloud-like or corrugated structure on the side away from the bottom surface of the bridge deck.

[0070] A plurality of openings 30 are provided in the first vertical steel plate 13 and the second vertical steel plate 14 for passing transverse steel bars 25 to form a PBL shear key structure.

[0071] Example 1

[0072] In order to replace the traditional wet joint on-site welding and pouring processes, avoid a large number of welding and pouring operations on the construction site, and improve the stability of bridge deck connection, reference Figure 2 and Figure 3 The first connecting plate 5 is also provided with a plurality of first double-nut high-strength bolts 17, which are arranged between adjacent first vertical steel plates 13 and are arranged between adjacent transverse steel bars 25 at intervals along the bridge length direction;

[0073] A plurality of first vertical welding studs 18 are also provided on the first buttress plate 6 . The first vertical welding studs 18 are arranged between adjacent second vertical steel plates 14 , and are arranged between adjacent transverse steel bars 25 at intervals along the length direction of the bridge.

[0074] The second connecting plate 7 comprises:

[0075] The third transverse steel plate 11,

[0076] A plurality of third vertical steel plates 15 are arranged at intervals along the bridge width direction at the bottom of the third transverse steel plate 11 and between adjacent longitudinal steel bars 26 at the end of the second bridge deck 2. The third vertical steel plates 15 are also provided with a plurality of transverse steel bars 25 at the end of the second bridge deck 2.

[0077] A plurality of second double-nut high-strength bolts 19 are arranged between adjacent first vertical steel plates 13 and are arranged between adjacent transverse steel bars 25 at intervals along the length of the bridge;

[0078] The second butt plate 8 comprises:

[0079] The fourth transverse steel plate 12 is provided with an extended overlap portion extending and overlapped to the third transverse steel plate 11 and is flush with the top surfaces of the first bridge deck 1 and the second bridge deck 2.

[0080] A plurality of fourth vertical steel plates 16 are arranged at intervals along the bridge width direction at the bottom of the fourth transverse steel plate 12 and between adjacent longitudinal steel bars 26 at the end of the first bridge deck 1. The fourth vertical steel plates 16 are also provided with a plurality of transverse steel bars 25 at the end of the first bridge deck 1.

[0081] A plurality of second vertical welding studs 20 are disposed between adjacent fourth vertical steel plates 16 and are spaced apart between adjacent transverse steel bars 25 along the length of the bridge.

[0082] Specifically, the first double-nut high-strength bolt 17 and the second vertical weld nail 20, as well as the second double-nut high-strength bolt 19 and the first vertical weld nail 18, extend toward each other in a staggered meshing state, so as to enhance the connection stability of the connecting piece on the bridge deck.

[0083] In this embodiment, by adopting the above-mentioned vertical welding nails, the connection stability and shear resistance performance between the two connecting parts and the bridge deck can be improved, and finally the connection stability and reliability between the bridge decks can be improved.

[0084] Specifically, the third vertical steel plate 15 and the fourth vertical steel plate 16 both have a cloud-like or corrugated structure on the side away from the bottom surface of the bridge deck.

[0085] A plurality of openings 30 are provided in the third vertical steel plate 15 and the fourth vertical steel plate 16 for passing transverse steel bars 25 to form a PBL shear key structure.

[0086] In order to replace the traditional wet joint on-site welding, pouring and other processes and avoid a large number of welding and pouring operations on the construction site, a plurality of bolt holes 27 matching the first double-nut high-strength bolts 17 are respectively opened on the extended overlapping parts of the first transverse steel plate 9 and the second transverse steel plate 10. The top ends of the first double-nut high-strength bolts 17 pass through the bolt holes 27 on the extended overlapping parts of the first transverse steel plate 9 and the second transverse steel plate 10 in sequence, and are fastened and connected by nuts 31 on both sides of the extended overlapping parts of the first transverse steel plate 9 and the second transverse steel plate 10;

[0087] A plurality of bolt holes 27 matching the second double-nut high-strength bolts 19 are respectively provided on the extended overlapping portions of the third transverse steel plate 11 and the fourth transverse steel plate 12. The top ends of the second double-nut high-strength bolts 19 pass through the bolt holes 27 on the extended overlapping portions of the third transverse steel plate 11 and the fourth transverse steel plate 12 in sequence, and are fastened together by nuts 31 on both sides of the extended overlapping portions of the third transverse steel plate 11 and the fourth transverse steel plate 12.

[0088] In this embodiment, bolts and nuts 31 are used for connection, replacing the traditional welding process, which is convenient for on-site assembly and connection, easy for construction, and easy for promotion and application.

[0089] In some embodiments, the first vertical steel plate 13, the second vertical steel plate 14, the third vertical steel plate 15 and the fourth vertical steel plate 16 are located in the same straight line direction or the same vertical plane along the length of the bridge;

[0090] The first double-nut high-strength bolt 17 , the first vertical welding nail 18 , the second double-nut high-strength bolt 19 and the second vertical welding nail 20 are located in the same straight line direction or the same vertical plane along the bridge length direction.

[0091] Example 2

[0092] In this embodiment, reference Figure 5 and Figure 6 The specific structure of the second connecting plate 7 includes:

[0093] The third transverse steel plate 11,

[0094] A plurality of first inverted J-groove steel plates 21 are provided with a plurality of inverted J-shaped slot holes 28 along the width direction of the bridge. The inverted J-groove steel plates are fixedly arranged at intervals along the length direction of the bridge at the bottom of the third transverse steel plate 11 and between adjacent transverse steel bars 25 at the end of the second bridge deck 2. A longitudinal steel bar 26 with a fastening nut 31 on the left side of the inverted J-shaped slot hole 28 is passed through and fixed in the plurality of inverted J-shaped slot holes 28 located in the same straight line direction along the length direction of the bridge between the first inverted J-groove steel plates 21.

[0095] A plurality of first U-channel steel plates 23 are provided with U-shaped slot holes 29 for passing transverse steel bars 25 . The first U-channel steel plates 23 are evenly spaced and fixedly arranged between adjacent first inverted J-channel steel plates 21 and between adjacent longitudinal steel bars 26 along the bridge width direction.

[0096] Specifically, the lower end of the inverted J-shaped slot 28 is open. When in use, the longitudinal steel bar 26 can be put in from the lower end opening and moved to the top underhang of the inverted J-shaped slot 28 .

[0097] The longitudinal reinforcement 26 is made of ribbed reinforcement or reinforced reinforcement, and a nut 31 is fixedly provided on the side of the inverted J-shaped slot 28 close to the bridge deck joint for restraint and fixation.

[0098] In this embodiment, the specific structure of the second butt plate 8 includes:

[0099] The fourth transverse steel plate 12 is provided with an extended overlap portion extending and overlapped to the third transverse steel plate 11 and is flush with the top surfaces of the first bridge deck 1 and the second bridge deck 2.

[0100] A plurality of second inverted J-groove steel plates 22 are provided with a plurality of inverted J-shaped slot holes 28 along the width direction of the bridge. The inverted J-groove steel plates are fixedly arranged at intervals along the length direction of the bridge at the bottom of the fourth transverse steel plate 12 and located between adjacent transverse steel bars 25 at the end of the first bridge deck 1. A longitudinal steel bar 26 with a fastening nut 31 on the left side of the inverted J-shaped slot hole 28 is passed through and fixed in the plurality of inverted J-shaped slot holes 28 located in the same straight line direction along the length direction of the bridge between the second inverted J-groove steel plates 22.

[0101] A plurality of second U-channel steel plates 24 are provided with U-shaped slot holes 29 for passing transverse reinforcement bars 25 . The second U-channel steel plates 24 are evenly spaced and fixedly arranged between adjacent second inverted J-channel steel plates 22 and between adjacent longitudinal reinforcement bars 26 along the bridge width direction.

[0102] In order to facilitate quick assembly on site, a plurality of bolt holes 27 for inserting fastening bolts are respectively opened on the extended overlapping parts of the third transverse steel plate 11 and the fourth transverse steel plate 12. The extended overlapping parts of the third transverse steel plate 11 and the fourth transverse steel plate 12 are connected by inserting screws 32 and fastening the bolts with nuts 31.

[0103] The first vertical steel plate 13 and the second vertical steel plate 14 are butted against each other and are located in the same straight line direction or the same vertical plane;

[0104] And / or, the longitudinal steel bars 26 between the first bridge deck 1 and the second bridge deck 2 correspond one to one and are located in the same straight line direction, and the first U-channel steel plates 23 and the second U-channel steel plates 24 located between adjacent longitudinal steel bars 26 are both located in the same straight line direction.

[0105] In addition, an embodiment of the present invention further provides a construction method of the above-mentioned prefabricated bridge deck steel-concrete shear connector structure, comprising the following steps:

[0106] The first connecting plate 5 and the first strap 6 of the first connecting member 3 are respectively embedded and fixed to the bottom ends of the first bridge deck 1 and the second bridge deck 2 using welding nails;

[0107] The second connecting plate 7 and the second strap 8 of the second connecting member 4 are respectively embedded and fixed to the top of the second bridge deck 2 and the top of the first bridge deck 1 by using welding nails;

[0108] In Example 1, the end transverse reinforcement 25 is inserted into the cloud-shaped opening 30 steel plate, and the longitudinal annular reinforcements are arranged at intervals and tied with the transverse reinforcement 25 before pouring concrete;

[0109] In Example 2, the longitudinal steel bars 26 are inserted into the inverted J-groove plate, and the end transverse steel bars 25 are inserted into the U-shaped groove hole 29 plate and the cloud-shaped opening 30 steel plate. After the steel cage is tied, concrete is poured;

[0110] Firstly, the second bridge deck 2 embedded and fixed with the first butt plate 6 and the second connecting plate 7 is hoisted and positioned by using a hoisting machine;

[0111] Then use a lifting machine to lift and position the first bridge deck 1 embedded with the second strap 8 and the first connecting plate 5, so that the ends of the first bridge deck 1 and the second bridge deck 2 are aligned, and the first strap 6 is overlapped on the bottom of the first connecting plate 5, and the second strap 8 is overlapped on the top of the second connecting plate 7, adjust the bolt holes 27 at the overlap, and fix them with bolts.

[0112] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A prefabricated bridge deck steel-concrete shear connector structure, comprising a first bridge deck and a second bridge deck to be connected, characterized in that: A first connecting member and a second connecting member connected to the bottom and the top between the first bridge deck and the second bridge deck respectively; The first connecting member comprises a first connecting plate embedded and fixed to the bottom of the first bridge deck end by double-nut high-strength bolts and a first strap embedded and fixed to the bottom of the second bridge deck end by welding nails, and the extended lap portion of the first strap is bolted and fixed to the first connecting plate; The second connecting member comprises a second connecting plate fixed to the top of the second bridge deck end by double-nut high-strength bolts and a second strap plate fixed to the top of the first bridge deck end by welding nails, and an extended lap portion of the second strap plate is bolted and fixed to the second connecting plate; The first connecting plate comprises: The first transverse steel plate, A plurality of first vertical steel plates are arranged at intervals along the bridge width direction on the top of the first transverse steel plates and between adjacent longitudinal steel bars at the ends of the first bridge deck, and a plurality of transverse steel bars at the ends of the first bridge deck are also penetrated on the first vertical steel plates; The first butt plate comprises: The second transverse steel plate is provided with an extended overlap portion extending and overlapped to the first transverse steel plate and fixed thereto, and is flush with the bottom surfaces of the first bridge deck and the second bridge deck, A plurality of second vertical steel plates are arranged at intervals along the bridge width direction on the top of the second transverse steel plates and between adjacent longitudinal steel bars at the ends of the second bridge deck, and a plurality of transverse steel bars at the ends of the second bridge deck are also penetrated on the second vertical steel plates; The first connecting plate is also provided with a plurality of first double-nut high-strength bolts, which are arranged between adjacent first vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length of the bridge; The first butt plate is also provided with a plurality of first vertical welding nails, which are arranged between adjacent second vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length direction of the bridge; The second connecting plate comprises: The third horizontal steel plate, A plurality of third vertical steel plates are arranged at intervals along the bridge width direction at the bottom of the third transverse steel plate and between adjacent longitudinal steel bars at the end of the second bridge deck. The third vertical steel plates are also provided with a plurality of transverse steel bars at the end of the second bridge deck. A plurality of second double-nut high-strength bolts are arranged between adjacent third vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length of the bridge; The second butt plate comprises: The fourth transverse steel plate is provided with an extended overlap portion extending and overlapped to the third transverse steel plate and is flush with the top surfaces of the first bridge deck and the second bridge deck. A plurality of fourth vertical steel plates are arranged at intervals along the bridge width direction at the bottom of the fourth transverse steel plate and between adjacent longitudinal steel bars at the end of the first bridge deck. The fourth vertical steel plates are also provided with a plurality of transverse steel bars at the end of the first bridge deck. A plurality of second vertical welding nails are arranged between adjacent fourth vertical steel plates and are arranged between adjacent transverse steel bars at intervals along the length of the bridge; The first double-nut high-strength bolt and the second vertical welding nail, as well as the second double-nut high-strength bolt and the first vertical welding nail, extend toward each other in a staggered meshing state; A plurality of bolt holes matching the first double-nut high-strength bolts are respectively provided on the extended overlapping portions of the first transverse steel plate and the second transverse steel plate, and the top ends of the first double-nut high-strength bolts sequentially pass through the bolt holes on the extended overlapping portions of the first transverse steel plate and the second transverse steel plate, and are fastened and connected by nuts on both sides of the extended overlapping portions of the first transverse steel plate and the second transverse steel plate; A plurality of bolt holes matching the second double-nut high-strength bolts are respectively provided on the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate, and the top ends of the two double-nut high-strength bolts sequentially pass through the bolt holes on the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate, and are fastened and connected by nuts on both sides of the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate; The first vertical steel plate, the second vertical steel plate, the third vertical steel plate and the fourth vertical steel plate are located in the same straight line direction or the same vertical plane along the length direction of the bridge; The first double-nut high-strength bolt, the second vertical welding nail, the second double-nut high-strength bolt and the first vertical welding nail are located in the same straight line direction or the same vertical plane along the bridge length direction.

2. A prefabricated bridge deck steel-concrete shear connector structure, comprising a first bridge deck and a second bridge deck to be connected, characterized in that: A first connecting member and a second connecting member connected to the bottom and the top between the first bridge deck and the second bridge deck respectively; The first connecting member comprises a first connecting plate embedded and fixed to the bottom of the first bridge deck end by double-nut high-strength bolts and a first strap embedded and fixed to the bottom of the second bridge deck end by welding nails, and the extended lap portion of the first strap is bolted and fixed to the first connecting plate; The second connecting member comprises a second connecting plate fixed to the top of the second bridge deck end by double-nut high-strength bolts and a second strap plate fixed to the top of the first bridge deck end by welding nails, and an extended lap portion of the second strap plate is bolted and fixed to the second connecting plate; The first connecting plate comprises: The first transverse steel plate, A plurality of first vertical steel plates are arranged at intervals along the bridge width direction on the top of the first transverse steel plates and between adjacent longitudinal steel bars at the ends of the first bridge deck, and a plurality of transverse steel bars at the ends of the first bridge deck are also penetrated on the first vertical steel plates; The first butt plate comprises: The second transverse steel plate is provided with an extended overlap portion extending and overlapped to the first transverse steel plate and fixed thereto, and is flush with the bottom surfaces of the first bridge deck and the second bridge deck, A plurality of second vertical steel plates are arranged at intervals along the bridge width direction on the top of the second transverse steel plates and between adjacent longitudinal steel bars at the ends of the second bridge deck, and a plurality of transverse steel bars at the ends of the second bridge deck are also penetrated on the second vertical steel plates; The second connecting plate comprises: The third horizontal steel plate, A plurality of first inverted J-slot steel plates are provided with a plurality of inverted J-shaped slot holes along the width direction of the bridge. The inverted J-slot steel plates are fixedly arranged at intervals along the length direction of the bridge at the bottom of the third transverse steel plate and are located between adjacent transverse steel bars at the end of the second bridge deck. A longitudinal steel bar provided with a fastening nut on the left side of the inverted J-shaped slot hole is fixedly passed through a plurality of the inverted J-shaped slot holes located in the same straight line direction along the length direction of the bridge between the first inverted J-slot steel plates. A plurality of first U-channel steel plates are provided with U-shaped slots for passing the transverse steel bars, and the first U-channel steel plates are evenly spaced and fixedly arranged between adjacent first inverted J-channel steel plates and between adjacent longitudinal steel bars along the bridge width direction; The second butt plate comprises: The fourth transverse steel plate is provided with an extended overlap portion extending and overlapped to the third transverse steel plate and is flush with the top surfaces of the first bridge deck and the second bridge deck. A plurality of second inverted J-slot steel plates are provided with a plurality of inverted J-shaped slot holes along the width direction of the bridge. The inverted J-slot steel plates are fixedly arranged at intervals along the length direction of the bridge at the bottom of the fourth transverse steel plate and are located between adjacent transverse steel bars at the end of the first bridge deck. A longitudinal steel bar provided with a fastening nut on the left side of the inverted J-shaped slot hole is fixedly passed through a plurality of the inverted J-shaped slot holes located in the same straight line direction along the length direction of the bridge between the second inverted J-slot steel plates. A plurality of second U-channel steel plates, each having a U-shaped slot hole for passing the transverse steel bars, wherein the second U-channel steel plates are evenly spaced and fixedly arranged between adjacent second inverted J-channel steel plates and between adjacent longitudinal steel bars along the bridge width direction; A plurality of bolt holes for inserting fastening bolts are respectively provided on the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate, and the extended overlapping portions of the third transverse steel plate and the fourth transverse steel plate are fastened and connected by the fastening bolts; The first vertical steel plate and the second vertical steel plate are butted against each other one by one and are located in the same straight line direction or the same vertical plane; and / or, The longitudinal steel bars between the first bridge deck and the second bridge deck correspond to each other one by one and are located in the same straight line direction, and the first U-channel steel plate and the second U-channel steel plate located between adjacent longitudinal steel bars are both located in the same straight line direction.

3. A construction method for the prefabricated bridge deck steel-concrete shear connector structure as claimed in claim 1 or 2, characterized in that: The steps include: The first connecting plate and the first lap plate of the first connecting member are respectively embedded and fixed on the bottom ends of the first bridge deck and the second bridge deck using double-nut high-strength bolts and vertical welding nails, and are surrounded by longitudinal steel bars and transverse steel bars to form a steel mesh and precast with concrete; The second connecting plate and the second lap plate of the second connecting member are respectively embedded and fixed on the second bridge deck and the top of the first bridge deck using double-nut high-strength bolts and vertical welding nails, and are surrounded by longitudinal steel bars and transverse steel bars to form a steel mesh and prefabricated with concrete; Firstly, the second bridge deck with the first butt plate and the second connecting plate embedded and fixed therein is hoisted and positioned by using a hoisting machine; Then use a lifting machine to lift and position the first bridge deck embedded with the second strap and the first connecting plate, so that the ends of the first bridge deck and the second bridge deck are aligned, and the first strap is overlapped on the bottom of the first connecting plate and the second strap is overlapped on the top of the second connecting plate, adjust the bolt holes at the overlap, and fix the connection with bolts.