Anti-crystallization method for tunnel drainage ditch based on local heating pre-precipitation
By setting up wells and heating tanks in the tunnel drainage ditch, and using heating rods to heat up and pre-precipitate calcium carbonate, the problem of calcium carbonate crystal blockage in the tunnel drainage system is solved, cleaning efficiency is improved, costs and environmental pollution are reduced, and it is suitable for many applications. tunnel situation.
Patent Information
- Application Number
- CN202211251718.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-10-13
AI Technical Summary
The blockage of calcium carbonate crystals in the existing tunnel drainage system has led to the paralysis of the drainage system. The existing treatment methods are inefficient, costly and have environmental pollution problems, making it difficult to effectively prevent the precipitation of insoluble substances.
The local area heating pre-precipitation method is adopted. By setting up wells in the tunnel drainage ditch, installing water storage tanks and heating tanks, and using heating rods to heat up the calcium carbonate to precipitate in advance and reduce its solubility, thereby preventing crystallization blockage.
It effectively reduces the risk of crystal blockage in tunnel drainage ditches, simplifies the treatment process of crystal precipitation, improves cleaning efficiency, reduces acid consumption and environmental pollution, is suitable for existing and unbuilt tunnels, and has a simple structure and energy saving.
Smart Images

Figure CN115419462B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of equipment or devices for treating crystallization blockage in tunnel drainage systems, and specifically relates to a device for preventing crystallization of tunnel drainage ditches by increasing the temperature in a local area to reduce the solubility of calcium carbonate and make it precipitate in advance. Background Art
[0002] Since a large amount of concrete is used in tunnel construction, in areas with abundant groundwater, water seeps into concrete materials and carries calcium ions out. The precipitated calcium ions react with CO2 in the air or CO3 in the seepage groundwater. 2- and HCO3 - The reaction generates insoluble substances such as calcium carbonate, which flow into the tunnel drainage system with the water. However, the longitudinal slope in the tunnel is small, the resistance along the long-distance drainage is large, the water flow rate in the drainage system is low, and the insoluble substances such as calcium carbonate have good adhesion to the tunnel drainage system. The insoluble substances will gradually accumulate in the drainage system, causing local blockage, and eventually causing the drainage system to be paralyzed, groundwater cannot be discharged, the lining strength is reduced and cracked, and the tunnel is shut down. In addition, since the tunnel lining is a hidden project, it is inconvenient to repair after damage, and the accumulation rate of insoluble substances will become faster and faster with the increase in the amount of sediment. Therefore, how to effectively prevent and slow down the precipitation of insoluble substances and keep the tunnel in normal operation is an urgent problem that needs to be solved.
[0003] At present, the common methods for treating crystal blockage in tunnel drainage systems are mainly divided into the following two types: (1) using physical crushing methods such as tool cutting, high-pressure water crushing and flushing, or chemical methods such as acid dissolution to clean existing crystals; (2) using physical methods such as electromagnetic technology and pipe wall flocking, or chemical and biological methods such as adding scale inhibitors and adding biological flora to prevent and inhibit the generation and attachment of crystals. Among the above methods, physical crushing and chemical acid dissolution are more commonly used due to the limitations of the actual engineering level. The defects of the above two methods are as follows:
[0004] 1. Regular cleaning method of crystals based on physics and chemistry:
[0005] 1) For physical methods, the most commonly used methods are tool cutting, high-pressure water crushing and flushing, etc. However, due to the hidden structure of tunnel drainage ditches, the long longitudinal length, and the strong adhesion of calcium carbonate and other crystals to the wall of tunnel drainage ditches, most drainage ditch crystal crushing devices can only use small motors equipped with tools to clean and crush forward, which also puts high requirements on the power of the motor and requires sufficiently long wires and water pipes for power supply and water supply. In other words, this method of direct physical crushing and cleaning in the pipe will inevitably lead to problems such as low efficiency, complicated process, and difficult to control the actual cleaning effect, and the current molding machinery is very expensive.
[0006] 2) For chemical methods, the most commonly used method is to use acid dissolution to remove crystals. However, since the liquid in the tunnel drainage ditch is in a constant flow state, when the chemical solution is input, it may be discharged by the drainage system before the crystal treatment effect is achieved. In addition, the crystals in the drainage pipe are generally blocks with a small specific surface area, resulting in low dissolution efficiency of chemical reagents. This requires that the amount of solution and acidity used when using acid solution to clean crystals should be large. In other words, this method of direct chemical acid dissolution in the drainage ditch will inevitably lead to problems such as high cost and environmental pollution caused by excessive acid usage.
[0007] 2. Crystal growth inhibition methods based on electromagnetic, scale inhibition, biological flora, etc.:
[0008] In recent years, some scholars have tried to use methods such as drainage ditch flocking, drainage pipe electromagnetic winding, antiscalant filtration, and biological flora arrangement to inhibit crystal growth in the study of drainage system prevention and control of crystallization, and verified the effectiveness of the above methods through experiments, but these methods only exist in the experimental stage, and if they are to be applied to actual projects, they must at least conduct a comprehensive assessment of environmental protection and cost. Therefore, with the current technology and means, the above methods still have the disadvantages of being expensive and inconvenient to construct. Summary of the invention
[0009] The technical problem to be solved by the present invention is to overcome the deficiencies of the above-mentioned prior art and provide a method for increasing the temperature in a local area to reduce the solubility of calcium carbonate so that it precipitates in advance, thereby preventing crystallization in a tunnel drainage ditch.
[0010] The technical solution adopted to solve the above technical problems is: a tunnel drainage ditch anti-crystallization method based on local heating pre-precipitation, comprising the following steps:
[0011] S1. Determine the number, parameters and location of anti-crystallization devices according to the design parameters of the tunnel drainage ditch:
[0012] Assume that the total length of tunnel drainage ditch 1 is L, and n placement wells are set, and the spacing between each placement well is l i , then the entire tunnel drainage ditch can be divided into n+1 sections;
[0013] For an existing tunnel, the inspection well of the tunnel drainage ditch is directly regarded as the placement well of the device. That is, the placement number n and the volume of the well bottom space A are known. The unit time drainage volume Q of each section of the tunnel drainage ditch is predicted based on the situation of similar tunnels and geological survey reports. i and the crystallization clogging risk of each drainage ditch, so as to determine the water storage tank capacity F in each device i1 , Heating tank capacity F i2 , the power of the heating rod, and the time required to heat to the specified temperature, let it settle, and pump out the liquid is Ti , thereby enhancing the adaptability of the original tunnel drainage system and the device. For the single slope drainage tunnel, the parameters of the device placed in the well for the i-th time need to meet the following requirements:
[0014]
[0015] F i1 +F i2 <A
[0016] For unbuilt tunnels, the maximum drainage volume per unit time Q at each location of the tunnel drainage ditch is first predicted and calculated. i On this basis, the water storage tank capacity F is installed i1 , Heating tank capacity F i2 , well spacing l i The placement wells are not limited to the location and quantity design of the inspection wells. For tunnels with single slope drainage, the flow rate at the top of the slope is small, so the size and power of the device are reduced, and the spacing between the placement wells is increased. The flow rate at the bottom of the slope is large due to the water flow from multiple horizontal drainage pipes, so the size and power of the device are increased, and the spacing between the placement wells is reduced. The parameters of each placement well and device are determined by environmental parameters.
[0017] S2. Installing an anti-crystallization device: installing a water storage tank, a heating tank, and a control device at the placement well, so that they are fixed to the wall of the placement well, the control device is located at the lower part of the water storage tank, the pumping device is connected to the heating tank, a guide plate is arranged at the water inlet section, a water level sensor is arranged in the water storage tank, a water level sensor and a temperature sensor are arranged in the heating tank, and the water level sensor, the temperature sensor and the control device are electrically connected;
[0018] S3. Control the water storage tank to store and drain water: The water in the tunnel drainage ditch enters the water storage tank through the water inlet section. When the water level in the water storage tank reaches the set height, the water level sensor transmits a signal to the control device, and the control device controls the motor to rotate forward to lift the baffle, so that the water flows into the heating tank;
[0019] S4, control heating of the heating tank: when the water level in the heating tank reaches the set height, the water level sensor transmits a signal to the control device, and the control device controls the motor to reverse and lower the baffle to prevent water from entering the heating tank, and at the same time controls the heating rod to heat, and the solution temperature is raised from E1 to E2, E2 is 40℃~80℃, and the specific value is determined by the tunnel crystallization risk;
[0020] S5, standing and settling: after the liquid temperature in the heating tank reaches E2, turn off the heating rod and stand for a set time to allow the insoluble matter to gradually settle in the settling tank. The length of time is determined by the solution separation time and the water storage volume of the water storage tank;
[0021] S6. Pumping out the liquid after sedimentation: After the sedimentation is completed, the control device controls the pump to work and discharge the liquid in the heating tank to the tunnel drainage ditch through the water outlet section;
[0022] S7. Inspection and cleaning of the sedimentation tank: During the operation of the device, the heating tank needs to be opened regularly to observe whether the sedimentation tank needs to be cleaned. If cleaning is required, take out the entire device, remove the heating rod and partition, use a hook to lift out the sedimentation tank, crush the crystal precipitate, put the sedimentation tank back into the seal, and repeat the above steps S3 to S6. The inspection period M is determined by the drainage flow rate of each drainage ditch and the crystallization risk.
[0023] The anti-crystallization device of the present invention is as follows: a placement well is reserved in the concrete lining of the tunnel drainage ditch, a water storage tank and a heating tank are arranged in the placement well, the water storage tank and the heating tank are an integrated structure connected in the middle, a pumping device is arranged on the top of the heating tank, one end of the pumping device extends into the heating tank, and the other end is connected to the water outlet section of the installation tank, a control device is arranged at the bottom of the water storage tank on the installation tank, and the control device is electrically connected to the heating rod arranged on the side wall of the heating tank.
[0024] The tunnel drainage ditch of the present invention is as follows: a placement well is reserved in the concrete lining, a water storage tank and a heating tank are placed in the placement well, one end of the top of the placement well is a water inlet section, and the other end is a water outlet section, and a guide plate is arranged on the inner side of the water inlet section near one end of the placement well.
[0025] The water storage tank of the present invention is as follows: a supporting leg is arranged at the bottom of the water storage tank body, a water storage tank top plate is arranged at the top, a trapezoidal groove is arranged in the middle of one side of the top plate, a trapezoidal enclosure is arranged on the top of the trapezoidal groove, the trapezoidal enclosure corresponds to the guide plate, a slide groove is processed on the side wall of the water storage tank body connected with the heating tank, the baffle is installed in the slide groove, fixed plates are symmetrically arranged on one side of the top of the water storage tank body close to the heating tank, a rotating shaft is arranged between the fixed plates, one end of the flexible rope is wound around the rotating shaft, and the other end is fixed on the top of the baffle, a driven wheel is installed at one end of the rotating shaft, a motor bracket is arranged at the bottom of the water storage tank body, the motor is arranged on the motor bracket and is electrically connected to the control device, a driving wheel is arranged on the output shaft of the motor, a belt and a guide wheel are arranged between the driving wheel and the driven wheel, and the belt is vertical after passing through the guide wheel.
[0026] The heating tank of the present invention comprises: a heating tank top plate is arranged on the top of the heating tank body, a sedimentation tank is arranged on the bottom of the heating tank body, a partition is arranged on the top of the sedimentation tank, a heating rod extending into the heating tank is arranged on the side wall of the heating tank body, and a plurality of hooks are arranged on the bottom of the sedimentation tank.
[0027] The water pumping device of the present invention is as follows: a water pump is arranged on the top plate of the heating tank, one end of the water inlet pipe is connected to the water inlet end of the water pump, and the other end extends into the heating tank body, one end of the water outlet pipe is connected to the water outlet end of the water pump, and the other end is connected to the water outlet section, and the water pump is electrically connected to the control device.
[0028] Compared with the prior art, the present invention has the following advantages:
[0029] 1. The present invention is different from the current regular cleaning type and growth inhibition type crystallization treatment methods for tunnel drainage systems. It proposes a concept and method to prevent crystallization blockage in the entire tunnel drainage ditch by pre-concentrated crystallization in local areas, which can effectively avoid the problem of long-distance hidden treatment.
[0030] 2. The present invention improves the original tunnel drainage system and adds a pre-crystallization device based on local area heating, which greatly reduces the risk of crystallization blockage in the tunnel drainage ditch and to a certain extent avoids the problem of difficult cleaning of the drainage ditch due to its concealment and long distance. The openable placement well and pre-crystallization device also make the treatment of crystal precipitation a simple, intuitive, easy and efficient task.
[0031] 3. The present invention has corresponding adaptability for both built tunnels and unbuilt tunnels. The well placement location, size, number and equipment parameters can be optimized according to the drainage volume and crystallization degree on site, forming a more reasonable pre-crystallization system.
[0032] 4. The present invention adopts a method of installing the control device under the water storage tank, which effectively prevents splashing of water and disturbance of the control device by sand and gravel, thereby ensuring the safety and durability of the device.
[0033] 5. The present invention adopts a method in which the water storage tank is higher than the heating tank, conforming to the natural law that water flows to lower places, and at the same time adopts belt transmission and flexible rope rotation to realize the lifting of the baffle, which has a simple structure and is energy-saving.
[0034] 6. The present invention adopts a sedimentation tank and a partition structure to separate the sedimentation tank from the heating tank, thereby reducing the influence of water discharge from the pump on the sediment to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a flow chart of the present invention.
[0036] Figure 2 It is a schematic structural diagram of an embodiment of the present invention.
[0037] Figure 3 yes Figure 2 sectional view of .
[0038] Figure 4 yes Figure 2 Schematic diagram of the structure of the middle tunnel drainage ditch 1.
[0039] Figure 5 yes Figure 2 Schematic diagram of the structure of the middle water storage tank 2.
[0040] Figure 6 yes Figure 2 Schematic diagram of the structure of the heating tank 3.
[0041] Figure 7 yes Figure 6 sectional view of .
[0042] Figure 8 yes Figure 7 Top view of the .
[0043] Fig. 9 yes Figure 2 Schematic diagram of the structure of the water pumping device 4.
[0044] Fig.10 This is a schematic diagram of the principle of temperature rise precipitation.
[0045] Fig.11 It is a schematic diagram of the design of the well placement of the present invention.
[0046] In the figure: 1, tunnel drainage ditch; 2, water storage tank; 3, heating tank; 4, pumping device; 5, control device; 1-1, water inlet section; 1-2, guide plate; 1-3, placement well; 1-4, water outlet section; 1-5, concrete lining; 2-1, water storage tank body; 2-2, support legs; 2-3, water storage tank top plate; 2-4, baffle; 2-5, flexible rope; 2-6, rotating shaft; 2-7, belt; 2-8, guide wheel; 2-9, driving wheel; 2-10, motor; 2-11, motor bracket; 2-12, trapezoidal enclosure; 2-13, fixed plate; 2-14, driven wheel; 3-1, top plate of heating tank; 3-2, heating tank body; 3-3, sedimentation tank; 3-4, partition; 3-5, heating rod; 3-6, hook; 4-1, water pump; 4-2, water inlet pipe; 4-3, water outlet pipe. DETAILED DESCRIPTION
[0047] The present invention is further described in detail below with reference to the accompanying drawings and embodiments, but the present invention is not limited to these embodiments.
[0048] Example 1
[0049] exist Figures 1 to 9 The present invention relates to a method for preventing crystallization of a tunnel drainage ditch based on local heating pre-precipitation, comprising the following steps:
[0050] S1. Determine the number, parameters and location of anti-crystallization devices according to the design parameters of tunnel drainage ditch 1:
[0051] like Fig.11 As shown, the tunnel drainage ditch 1 is assumed to have a total length of L, and n placement wells 1-3 are set, with the spacing between each placement well being l i , then the entire tunnel drainage ditch can be divided into n+1 sections;
[0052] For an existing tunnel, the inspection well of the tunnel drainage ditch 1 is directly regarded as the placement wells 1-3 of the device, that is, the placement number n and the volume A of the well bottom space are known, and the unit time drainage volume Q of each section of the tunnel drainage ditch is predicted based on the situation of similar tunnels and geological survey reports. i and the crystallization clogging risk of each drainage ditch, so as to determine the capacity F of the water storage tank 2 in each device i1 、Heating tank 3 capacity F i2 , the power of heating rods 3-5, assuming that the time required to heat to a specified temperature, let it settle, and pump out the liquid is T i , thereby enhancing the adaptability of the original tunnel drainage system and the device. For the single slope drainage tunnel, the parameters of the device placed in the well for the i-th time need to meet the following requirements:
[0053]
[0054] F i1 +F i2 <A
[0055] For unbuilt tunnels, the maximum unit time drainage volume Q at each location of the tunnel drainage ditch 1 is first predicted and calculated. i On this basis, the water storage tank 2 capacity F is installed i1 、Heating tank 3 capacity F i2 , well spacing l i And the number n is determined, the placement wells 1-3 are not limited to the location and number design of inspection wells, for the single-slope drainage tunnel, the flow at the top of the slope is small, the size and power of the device are reduced, and the spacing between the placement wells is increased. The flow rate of water flowing into the bottom of the slope in multiple horizontal drainage pipes is large, so the size and power of the device are increased, and the spacing between the placement wells is reduced. The parameters of each placement well and device are determined by environmental parameters; the placement wells 1-3 are not limited to the location and number design of inspection wells; from the perspective of preventing and controlling crystallization, the number of settings can be appropriately increased or decreased locally, so as to optimize the entire anti-crystallization system.
[0056] S2, installing the anti-crystallization device: installing the water storage tank 2, the heating tank 3, and the control device 5 at the placement well 1-3, so that they are fixed to the wall of the placement well 1-3, the control device 5 is located at the lower part of the water storage tank 3, the pumping device 4 is connected to the heating tank 3, and the guide plate 1-2 is arranged at the water inlet section 1-1, so that the water flow flows smoothly into the water storage tank 2, thereby preventing the water flow from splashing and affecting the normal operation of the control device 5, and a water level sensor is arranged in the water storage tank 2, and a water level sensor and a temperature sensor are arranged in the heating tank 3, and the water level sensor, the temperature sensor and the control device 5 are electrically connected;
[0057] S3, control the water storage tank 2 to store and discharge water: the water in the tunnel drainage ditch 1 enters the water storage tank 2 through the water inlet section 1-1. When the water level in the water storage tank 2 reaches the set height, the water level sensor transmits a signal to the control device 5. The control device 5 controls the motor 2-1 to rotate forward to lift the baffle 2-4, so that the water flows into the heating tank 3;
[0058] S4, control heating tank 3 to heat: when the water level in heating tank 3 reaches the set height, the water level sensor transmits a signal to control device 5, and control device 5 controls motor 2-1 to reverse and lower baffle 2-4 to prevent water from entering heating tank 3, and controls heating rod 3-5 to heat at the same time, and the solution temperature is increased from E1 to E2, where E2 is 40°C to 80°C, and the specific value is determined by the risk of tunnel crystallization; Fig.10 It can be seen that at this time, the solubility of calcium carbonate gradually decreases exponentially, and the insoluble matter in the solution gradually increases;
[0059] S5, standing and settling: after the liquid temperature in the heating tank 3 reaches E2, the heating rods 3-5 are turned off, and the liquid is allowed to stand for a set time, so that the insoluble substances gradually settle into the settling tank. The length of time is determined by the solution separation time and the water storage volume of the water storage tank 2;
[0060] S6, pumping out the liquid after sedimentation: after the sedimentation is completed, the control device 5 controls the pumping pump 4-1 to work, and discharges the liquid in the heating tank 3 to the tunnel drainage ditch 1 through the water outlet section 1-4;
[0061] S7. Inspection and cleaning of the sedimentation tank 3-3: During the operation of the device, the heating tank 3 needs to be opened regularly to check whether the sedimentation tank 3-3 needs to be cleaned. If cleaning is required, the entire device is taken out, the heating rod 3-5 and the partition 3-4 are removed, and the sedimentation tank 3-3 is lifted out using the hook 3-6. After the crystal precipitate therein is crushed, the sedimentation tank 3-3 is put back into the seal and the above steps S3 to S6 are repeated. The inspection period M is determined by the drainage flow rate of each drainage ditch and the crystallization risk.
[0062] The above-mentioned anti-crystallization device is composed of a tunnel drainage ditch 1, a water storage tank 2, a heating tank 3, a pumping device 4, and a control device 5. Specifically, the tunnel drainage ditch 1 is composed of an inlet section 1-1, a guide plate 1-2, a placement well 1-3, a water outlet section 1-4, and a concrete lining 1-5. The tunnel drainage ditch 1 is drained at a certain slope. A number of placement wells 1-3 are reserved in the concrete lining 1-5 at regular intervals. The tunnel drainage ditch 1 can be divided into a drainage ditch inlet section 1-1 and a drainage ditch outlet section 1-4 with the placement wells 1-3 as the boundary. The water storage tank 2 and the heating tank 3 are placed in the placement well 1-3. The water storage tank 2 and the heating tank 3 are an integrated structure connected in the middle. A guide plate 1-2 is installed on the inner side of the water inlet section 1-1 near one end of the placement well 1-3, so that the water flow can shrink the cross-section at the port of the water inlet section 1-1 and flow smoothly into the water storage tank 2. A pumping device 4 is installed on the top of the heating tank 3, one end of the pumping device 4 extends into the heating tank 3, and the other end is connected to the water outlet section 1-4 of the tunnel drainage ditch 1. A control device 5 is installed at the bottom of the water storage tank 2 in the placement well 1-3. Furthermore, the control device of this embodiment is a PLC controller with a model of LK2N-32MRT, which is powered by a battery pack. The control device 5 is electrically connected to the heating rods 3-5 arranged on the side wall of the heating tank 3. The water in the tunnel drainage ditch 1 flows through the water storage tank 2 and the heating tank 3 in turn, and is discharged into the water outlet section 1-4 by the pumping device 4 after being heated and precipitated in the heating tank 3.
[0063] The water storage tank 2 of this embodiment is composed of a water storage tank body 2-1, legs 2-2, a water storage tank top plate 2-3, a baffle 2-4, a flexible rope 2-5, a rotating shaft 2-6, a belt 2-7, a guide wheel 2-8, a driving wheel 2-9, a motor 2-10, a motor bracket 2-11, a trapezoidal enclosure 2-12, a fixed plate 2-13, and a driven wheel 2-14. The water storage tank body 2-1 is a rectangular hollow tank body, with legs 2-2 welded on the bottom and a water storage tank top plate 2-3 installed on the top through a threaded fastening connector. A trapezoidal groove is processed in the middle of one side of the water storage tank top plate 2-3 close to the water inlet section 1-1, and a trapezoidal enclosure 2-12 is arranged on the top of the trapezoidal groove. The trapezoidal enclosure 2-12 corresponds to the guide plate 1-2. This design allows water to enter the water storage tank 2 to the greatest extent, preventing water from splashing onto the water storage tank top plate 2-3 and then flowing into the control device 5 to cause equipment damage. A slide groove is processed on the side wall of the water storage tank body 2-1 connected to the heating tank 3. The baffle plate 2-4 is installed in the slide groove and can slide up and down along the slide groove. A fixed plate 2-13 is symmetrically welded on one side of the top of the water storage tank body 2-1 close to the heating tank 3. A rotating shaft 2-6 is installed between the fixed plates 2-13. The rotating shaft 2-6 can rotate relative to the fixed plates 2-13. One end of the flexible rope 2-5 is wound around the rotating shaft 2-6 and the other end is fixed to the top of the baffle plate 2-4. A driven wheel 2-14 is installed at one end of the rotating shaft 2-6. A motor support is installed at the bottom of the water storage tank body 2-1. The motor 2-10 is arranged on the motor bracket 2-11 and is electrically connected to the control device 5. A driving wheel 2-9 is installed on the output shaft of the motor 2-10. A belt 2-7 is installed between the driving wheel 2-9 and the driven wheel 2-14. The control device 5 controls the motor 2-10 to rotate, and drives the driven wheel 2-14 to rotate through the rotating wheel 2-9, thereby driving the rotating shaft 2-6 to rotate, so that the flexible rope 2-5 is wound around the rotating shaft 2-6 or stretched, thereby lifting or lowering the baffle 2-4, and controlling the water flow between the water storage tank 2 and the heating tank 3. Furthermore, a guide wheel 2-8 is installed on the side wall of the water storage tank body 2-1, and the belt 2-7 is vertical after passing through the guide wheel 2-8.
[0064] The heating tank 3 is composed of a heating tank top plate 3-1, a heating tank body 3-2, a sedimentation tank 3-3, a partition 3-4, a heating rod 3-5, and a hook 3-6. The heating tank body 3-2 is fixedly connected with the heating tank top plate 3-1 on the top by a threaded fastener. A sedimentation tank 3-3 is placed at the bottom of the heating tank body 3-2. Several groups of hooks 3-6 are welded at the bottom of the sedimentation tank 3-3. The sedimentation tank 3-3 is lifted out of the heating tank body 3-2 by the hooks 3-6. A sealing strip is installed between the sedimentation tank 3-3 and the heating tank body 3-2 to prevent water from entering the two and forming crystals, which affects the removal of the sedimentation tank 3-3. The sedimentation tank 3-3 is cleaned regularly. A partition 3-4 is installed on the top of the sedimentation tank 3-3, and a plurality of groups of long strip grooves are processed on the partition 3-4 to facilitate the entry of water to form crystals and limit the crystals from flowing back into the water body in the upper part of the heating tank 3. A heating rod 3-5 extending into the interior of the heating tank 3 is installed on the side wall of the heating tank body 3-2. Furthermore, a plurality of heating rods 3-5 can be arranged in a height direction or a width direction of the heating tank body 3-2 to ensure the water heating effect.
[0065] The pumping device 4 is composed of a pumping pump 4-1, an inlet pipe 4-2, and an outlet pipe 4-3. The pumping pump 4-1 is installed on the top plate 3-1 of the heating tank and is used to discharge the precipitated solution. One end of the inlet pipe 4-2 is connected to the water inlet end of the pumping pump 4-1, and the other end extends into the heating tank body 3-2. The tail of the pumping pipe 4-2 needs to be higher than the partition 3-4 by a certain distance to prevent the sediment from being disturbed during pumping. One end of the outlet pipe 4-3 is connected to the outlet end of the pumping pump 4-1, and the other end is connected to the outlet section 1-4. The pumping pump 4-1 is electrically connected to the control device 5.
Claims
1. A tunnel drainage ditch anti-crystallization method based on local heating pre-precipitation, characterized in that The following steps are involved: S1. Determine the number, parameters and location of the anti-crystallization device according to the design parameters of the tunnel drainage ditch (1): Assume that the total length of tunnel drainage ditch 1 is L, and n placement wells (1-3) are set, and the spacing between each placement well is l i , then the entire tunnel drainage ditch can be divided into n+1 sections; For an existing tunnel, the inspection wells of the tunnel drainage ditch (1) are directly regarded as the placement wells (1-3) of the device. That is, the placement number n and the volume A of the well bottom space are known. The unit time drainage volume Q of each section of the tunnel drainage ditch is predicted based on the situation of similar tunnels and geological survey reports. i and the risk of crystallization blockage in each section of the drainage ditch, so as to determine the capacity F of the water storage tank (2) in each device i1 、Heating tank (3) capacity F i2 , the power of the heating rod (3-5), and the time required to heat to a specified temperature, let it settle, and pump out the liquid is T i , thereby enhancing the adaptability of the original tunnel drainage system and the device. For the single slope drainage tunnel, the parameters of the device placed in the well for the i-th time need to meet the following requirements: HAVE BEEN i1 +F i2 <A For unbuilt tunnels, the maximum drainage volume per unit time Q at each location of the tunnel drainage ditch (1) is first predicted and calculated. i On this basis, the water storage tank (2) capacity F is installed i1 、Heating tank (3) capacity F i2 , well spacing l i and the number n is determined. The placement wells (1-3) are not limited to the location and number design of the inspection wells. For a tunnel with single slope drainage, the flow at the top of the slope is small, so the size and power of the device are reduced, and the spacing between the placement wells is increased. The flow at the bottom of the slope is large due to the flow of water from multiple horizontal drainage pipes, so the size and power of the device are increased, and the spacing between the placement wells is reduced. The parameters of each placement well and device are determined by environmental parameters. S2, installing an anti-crystallization device: installing a water storage tank (2), a heating tank (3), and a control device (5) at the placement well (1-3), so that they are fixed to the wall of the placement well (1-3), the control device (5) is located at the lower part of the water storage tank (2), the pumping device (4) is connected to the heating tank (3), a guide plate (1-2) is arranged at the water inlet section (1-1), a water level sensor is arranged in the water storage tank (2), a water level sensor and a temperature sensor are arranged in the heating tank (3), and the water level sensor, the temperature sensor and the control device (5) are electrically connected; S3, controlling the water storage tank (2) to store and discharge water: the water in the tunnel drainage ditch (1) enters the water storage tank (2) through the water inlet section (1-1), and when the water level in the water storage tank (2) reaches a set height, the water level sensor transmits a signal to the control device (5), and the control device (5) controls the motor (2-1) to rotate forward to lift the baffle (2-4), so that the water flows into the heating tank (3); S4, controlling the heating tank (3) to heat: when the water level in the heating tank (3) reaches a set height, the water level sensor transmits a signal to the control device (5), and the control device (5) controls the motor (2-1) to reverse and lower the baffle (2-4) to prevent water from entering the heating tank (3), and at the same time controls the heating rod (3-5) to heat, and the solution temperature is increased from E1 to E2, where E2 is 40° C. to 80° C., and the specific value is determined by the tunnel crystallization risk; S5, standing and settling: after the liquid temperature in the heating tank (3) reaches E2, the heating rod (3-5) is turned off and the liquid is allowed to stand for a set time to allow the insoluble matter to gradually settle in the settling tank. The length of time is determined by the solution separation time and the water storage volume of the water storage tank (2); S6, pumping out the liquid after sedimentation: after the sedimentation is completed, the control device (5) controls the pumping pump (4-1) to work, and discharges the liquid in the heating tank (3) to the tunnel drainage ditch (1) through the water outlet section (1-4); S7. Inspection and cleaning of the sedimentation tank (3-3): During the operation of the device, the heating tank (3) needs to be opened regularly to check whether the sedimentation tank (3-3) needs to be cleaned. If cleaning is required, the entire device is taken out, the heating rod (3-5) and the partition (3-4) are removed, and the sedimentation tank (3-3) is lifted out using the hook (3-6). After the crystal precipitate therein is crushed, the sedimentation tank (3-3) is put back into the seal and the above steps S3 to S6 are repeated. The inspection period M is determined by the drainage flow rate of each drainage ditch and the crystallization risk.
2. The method for preventing crystallization of tunnel drainage ditch based on local heating pre-precipitation according to claim 1 is characterized in that The anti-crystallization device comprises: a placement well (1-3) is reserved in a concrete lining (1-5) of a tunnel drainage ditch (1); a water storage tank (2) and a heating tank (3) are arranged in the placement well (1-3); the water storage tank (2) and the heating tank (3) are an integrated structure connected in the middle; a pumping device (4) is arranged on the top of the heating tank (3); one end of the pumping device (4) extends into the heating tank (3) and the other end is connected to the water outlet section (1-4) of the installation tank (1); a control device (5) is arranged at the bottom of the water storage tank (2) on the installation tank (1); and the control device (5) is electrically connected to a heating rod (3-5) arranged on the side wall of the heating tank (3).
3. The method for preventing crystallization of tunnel drainage ditch based on local heating pre-precipitation according to claim 2 is characterized in that The tunnel drainage ditch (1) is as follows: a placement well (1-3) is reserved in a concrete lining (1-5), a water storage tank (2) and a heating tank (3) are placed in the placement well (1-3), one end of the top of the placement well (1-3) is a water inlet section (1-1), and the other end is a water outlet section (1-4), and a guide plate (1-2) is arranged on the inner side of the water inlet section (1-1) near one end of the placement well (1-3).
4. The method for preventing crystallization of tunnel drainage ditch based on local heating pre-precipitation according to claim 1 is characterized in that The water storage tank (2) comprises: a water storage tank body (2-1) having legs (2-2) at the bottom and a water storage tank top plate (2-3) at the top; a trapezoidal groove is arranged in the middle of one side of the top plate (2-3); a trapezoidal enclosure (2-12) is arranged on the top of the trapezoidal groove; the trapezoidal enclosure (2-12) corresponds to the guide plate (1-2); a slide groove is processed on the side wall of the water storage tank body (2-1) communicating with the heating tank (3); a baffle (2-4) is installed in the slide groove; a fixing plate (2-13) is symmetrically arranged on one side of the top of the water storage tank body (2-1) close to the heating tank (3); a rotating shaft (2-6) is arranged between the fixing plates (2-13); One end of the flexible rope (2-5) is wound around the rotating shaft (2-6), and the other end is fixed to the top of the baffle (2-4); a driven wheel (2-14) is installed at one end of the rotating shaft (2-6); a motor bracket (2-11) is arranged at the bottom of the water storage tank body (2-1); the motor (2-10) is arranged on the motor bracket (2-11) and is electrically connected to the control device (5); a driving wheel (2-9) is arranged on the output shaft of the motor (2-10); a belt (2-7) and a guide wheel (2-8) are arranged between the driving wheel (2-9) and the driven wheel (2-14); and the belt (2-7) is in a vertical shape after passing through the guide wheel (2-8).
5. The method for preventing crystallization of tunnel drainage ditch based on local heating pre-precipitation according to claim 1 is characterized in that The heating tank (3) is as follows: a heating tank top plate (3-1) is arranged on the top of the heating tank body (3-2), a sedimentation tank (3-3) is arranged on the bottom of the heating tank body (3-2), a partition (3-4) is arranged on the top of the sedimentation tank (3-3), a heating rod (3-5) extending into the interior of the heating tank (3) is arranged on the side wall of the heating tank body (3-2), and a plurality of groups of hooks (3-6) are arranged on the bottom of the sedimentation tank (3-3).
6. The method for preventing crystallization of tunnel drainage ditch based on local heating pre-precipitation according to claim 5 is characterized in that The pumping device (4) comprises: a pumping pump (4-1) arranged on the top plate (3-1) of the heating tank; a water inlet pipe (4-2) having one end connected to the water inlet end of the pumping pump (4-1) and the other end extending into the heating tank body (3-2); a water outlet pipe (4-3) having one end connected to the water outlet end of the pumping pump (4-1) and the other end communicating with the water outlet section (1-4); and the pumping pump (4-1) being electrically connected to the control device (5).
Citation Information
Patent Citations
Test device and method for simulating crystallization blockage of high-pressure water seepage tunnel
CN111044311A
Crystallization and pipe blockage prevention and control device for tunnel drainage pipe
CN113339061A