A fully automatic high temperature forklift quenching equipment for high yield steel
By using inert gas to heat and rotate the suspended workpiece in high-temperature forklift quenching equipment, the decarbonization problem caused by uneven heating is solved, a more uniform heat treatment effect is achieved, and the surface performance of the workpiece is improved.
Patent Information
- Application Number
- CN202211135369.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-09-19
AI Technical Summary
When the workpiece is heated in the quenching furnace, decarbonization is prone to occur due to uneven heating or excessive air contact area, which reduces the surface performance of the workpiece after heat treatment.
A fully automatic high-temperature forklift type quenching equipment is designed, which uses inert gas for heating, suspends the workpiece through the suspension mechanism and rotates in the quenching box. The heating element heats the inert gas, and uses uniform heat transfer of the inert gas to reduce decarbonization. Risk and ensure cooling effect through the design of the sealing plate and coolant.
It effectively improves the uniformity of heating, reduces the decarbonization caused by uneven heating of the workpiece, and improves the surface performance after heat treatment.
Smart Images

Figure CN115478137B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of heat treatment, and in particular to a fully automatic high-temperature forklift-type quenching equipment for high-yield steel. Background Art
[0002] Heat treatment refers to a metal hot processing technology in which the material is heated, kept warm and cooled in the solid state to obtain the expected structure and properties, including annealing, normalizing, quenching and tempering. Quenching is to heat the workpiece to a quenching temperature above the critical point and maintain it for a period of time, and then quickly take the workpiece out of the furnace and put it into the quenching liquid (oil or water) for quenching.
[0003] In the related art, a quenching furnace is used to heat the workpiece. The quenching furnace is composed of a furnace body, a furnace door, a heating element, a ventilation mechanism and a control system. The heating element uses a resistance belt of a high-resistance alloy, which is arranged on both sides of the inner wall of the furnace body through a special hook and is insulated from the inner tank. The ventilator is composed of a blower and an air guide plate. The blower motor and the heating element are electrically interlocked. The heating element can only be powered on when the blower is turned on, so that the heating element can work under ventilation circulation.
[0004] With respect to the above-mentioned related technologies, the inventors found that when a workpiece is heated in a quenching furnace, if the contact area between the workpiece and the air is large or the heating element is unevenly heated, decarburization is likely to occur on the workpiece surface, which will reduce the surface properties of the workpiece after heat treatment. Summary of the invention
[0005] In order to improve the problem of decarburization on the workpiece surface, the present application provides a fully automatic high-temperature forklift-type quenching equipment for high-yield steel.
[0006] The fully automatic high-temperature forklift quenching equipment for high-yield steel provided in this application adopts the following technical solution:
[0007] A fully automatic high-temperature forklift-type quenching equipment for high-yield steel, comprising a furnace body, a resistance belt is arranged on the inner wall of the furnace body, a blower is arranged on the furnace body, an air inlet pipe is connected to the blower, an air outlet is opened on the furnace body, and a connecting ring is arranged around the air outlet;
[0008] It also includes a feeding mechanism, which includes a loading and unloading forklift and a track. The loading and unloading forklift is detachably provided with a quenching box, and the loading and unloading forklift is arranged on the track. The loading and unloading forklift drives the quenching box to move in or out of the furnace body. The quenching box is provided with a suspension mechanism, and the suspension mechanism is rotatably connected to the top of the quenching box. The top of the quenching box is provided with an air inlet, and the bottom of the quenching box is provided with an air outlet. When the loading and unloading forklift drives the quenching box to enter the furnace body, the connecting ring is embedded in the air outlet.
[0009] By adopting the above technical solution, the workpiece is first suspended on the suspension mechanism, and the loading and unloading forklift places the quenching box into the furnace body along the track, and the connecting ring is embedded in the air outlet of the quenching box. After the blower is started, the blower continuously passes inert gas into the furnace body, so that the quenching box is surrounded by inert gas, and the resistance belt heats the inert gas, thereby heating the workpiece in the quenching furnace. On the one hand, the inert gas introduced into the furnace body can exhaust air to reduce the decarburization caused by the reaction of oxygen, carbon dioxide and hydrogen in the air with carbon on the surface of the workpiece; on the other hand, the workpiece is suspended in the quenching box through the suspension mechanism, which can increase the contact area between the workpiece and the inert gas, making it easier for the inert gas to evenly and comprehensively transfer heat to the workpiece, which helps to improve the uniformity of heating and reduce the possibility of decarburization caused by uneven heating of the workpiece.
[0010] Optionally, the suspension mechanism includes a rotating cylinder and a mounting assembly, the rotating cylinder is rotatably connected to the top of the quenching box, the air inlet is communicated with the rotating cylinder, a plurality of blades are evenly distributed in the rotating cylinder, and the mounting assembly is arranged on a side of the rotating cylinder facing away from the air inlet.
[0011] By adopting the above technical solution, the workpiece is arranged on the side of the rotating cylinder facing away from the air inlet through the mounting assembly, and the rotating cylinder is rotatably connected in the quenching box. The blower draws the inert gas into the furnace body. When the inert gas fills the furnace body, it enters the quenching box along the air inlet, and the blades are driven to rotate by the inert gas flow. This can not only make the inert gas in the quenching box flow, reducing the possibility of overheating or low temperature in the local area of the quenching box, but also make the workpiece rotate with the rotating cylinder in the quenching box, so that the inert gas can evenly transfer heat to the workpiece, which can effectively improve the heating effect and reduce the decarburization of the workpiece.
[0012] Optionally, the mounting assembly includes an extension rod and a mesh cage, the extension rod being fixed to a side of the rotating cylinder facing away from the air inlet via a bracket, the mesh cage being fixed to an end of the extension rod away from the rotating cylinder, and a feed door being provided on a side wall of the mesh cage.
[0013] By adopting the above technical solution, the mesh cage is fixed on the rotating cylinder through the extension rod. When the workpiece is placed into the mesh cage through the feed door, the extension rod and the mesh cage suspend the workpiece in the quenching box. At this time, after inert gas is introduced into the furnace body, the inert gas fills the quenching box and can surround the workpiece. The mesh cage can reduce the situation where the workpiece is not in sufficient contact with the inert gas and is heated unevenly.
[0014] Optionally, a mounting plate is provided on the outer wall of the quenching box, and when the loading and unloading forklift drives the quenching box to move into or out of the furnace body, the mounting plate is mounted on the forks of the loading and unloading forklift.
[0015] By adopting the above technical solution, a mounting plate is arranged on the outer wall of the quenching box, and the loading and unloading forklift can drive the quenching box to move in the horizontal or vertical direction by placing the fork against the mounting plate, which is easy to operate and can reduce the situation where the quenching box is damaged when the loading and unloading forklift drives the quenching box to move, thereby reducing the quenching effect.
[0016] Optionally, a feed port is provided on one side of the furnace body facing the track, a closed door is slidably provided at the feed port, a lift is provided on the top of the furnace body, the lift is connected to the closed door, and the lift drives the closed door to move in a vertical direction;
[0017] When the forklift is against the closed door, the connecting ring is located under the forks of the forklift.
[0018] By adopting the above technical solution, the quenching box enters the furnace body from the feed port. When the loading and unloading forklift is against the closed door, the connecting ring is located under the fork of the loading and unloading forklift. At this time, the loading and unloading forklift only needs to lower the quenching box in the vertical direction to make the connecting ring embedded in the air outlet, and the calibration step can be omitted. After the quenching box enters the furnace body, the closed door is lowered by the elevator. At this time, the furnace body is a closed structure, and the inert gas enters the furnace body through the air inlet pipe and is discharged from the air outlet, which can reduce the possibility of air entering the furnace body and causing decarburization on the workpiece surface.
[0019] Optionally, a limit plate is fixed to the rotating cylinder on the side facing away from the mounting assembly through a bracket, the limit plate is coaxially arranged with the rotating cylinder, there is a spacing between the limit plate and the rotating cylinder, the diameter of the rotating cylinder and the mounting assembly is smaller than the diameter of the air inlet, the diameter of the limit plate is larger than the diameter of the air inlet, a plurality of rotating wheels are provided on the side of the limit plate facing the rotating cylinder, the plurality of rotating wheels are evenly arranged around the outer edge of the limit plate, and the rotating wheels fit into the quenching box.
[0020] By adopting the above technical solution, on the one hand, the suspension mechanism can be extended into the quenching box by placing the limit plate on the top of the quenching box, which makes the suspension mechanism detachable, so that the suspension mechanism can be lifted from the quenching box to remove the workpiece when the temperature of the quenching box is high; on the other hand, the rotating wheel is placed on the top of the rotating cylinder, and when the paddle drives the rotating cylinder to rotate, the rotating wheel rotates on the top of the rotating cylinder, which can reduce the situation where the rotating cylinder cannot rotate due to the large friction between the limit plate and the rotating cylinder.
[0021] Optionally, the quenching box is provided with an annular rail, the annular rail is arranged around the air inlet, and the rotating wheel is slidably arranged in the annular rail.
[0022] By adopting the above technical solution, the annular rail limits the rotating wheel so that the rotating wheel can only rotate around the air inlet, thereby reducing the situation where the rotating wheel moves into the air inlet and causes the rotating drum to fail.
[0023] Optionally, a cooling pool is provided between the rails, and a closing component is provided on the cooling pool. When the quenching box is placed on the closing component, the closing component moves in a vertical direction toward the bottom of the cooling pool.
[0024] By adopting the above technical solution, the closing component blocks the cooling pool, reducing the air dissolving into the coolant in the cooling pool. After the workpiece is heated in the furnace body with the quenching box, it is moved out of the furnace body by the loading and unloading forklift, and then the loading and unloading forklift places the quenching box on the closing component. The closing component moves toward the bottom of the cooling pool under the action of gravity, so that the workpiece enters the cooling pool with the quenching box for cooling.
[0025] Optionally, the closing assembly includes a sealing plate and a plurality of springs, wherein the spring is fixed to the bottom of the cooling pool, and one end of the spring away from the bottom of the cooling pool is fixed to the sealing plate, and the sealing plate is slidably arranged in the cooling pool, and the sealing plate is located at the pool mouth of the cooling pool. A plurality of abutment rods are provided on the side of the sealing plate facing away from the springs, and when the quenching box is placed on the sealing plate, the abutment rods abut against the mounting plate, and there is a distance between the quenching box and the sealing plate.
[0026] By adopting the above technical solution, the spring pushes the blocking plate so that the blocking plate blocks the opening of the cooling pool to reduce the possibility of air dissolving into the coolant in the cooling pool, resulting in poor quenching effect. After the quenching box is placed on the blocking plate, the abutting rod abuts against the mounting plate, so that there is a gap between the air outlet and the blocking plate, thereby facilitating the coolant in the cooling pool to enter the quenching box. After the spring is compressed, the blocking plate slides toward the bottom of the cooling pool, and the coolant in the cooling pool enters the quenching box to cool the workpiece.
[0027] Optionally, a plurality of through slots are formed on the blocking plate, and a cover plate is hinged at the through slots. The cover plate rotates in a direction away from the spring with the connection between the cover plate and the blocking plate as an axis.
[0028] By adopting the above technical solution, when the blocking plate is located at the pool mouth of the cooling pool, the cover plate blocks the through slot to improve the sealing performance of the blocking plate and reduce the possibility of air dissolving into the coolant in the cooling pool and causing poor quenching effect. When the blocking plate moves toward the bottom of the cooling pool, the flow of the coolant in the cooling pool causes the cover plate to flip, so that the coolant in the cooling pool passes through the through slot and enters the quenching box.
[0029] In summary, the present application includes at least one of the following beneficial technical effects:
[0030] 1. First, hang the workpiece on the suspension mechanism, and use the loading and unloading forklift to place the quenching box into the furnace body along the track, and embed the connecting ring in the air outlet of the quenching box. After starting the blower, the blower continuously passes the inert gas in the inert gas bottle into the furnace body, so that the quenching box is surrounded by the inert gas, and the resistance belt heats the inert gas, thereby heating the workpiece in the quenching furnace. On the one hand, passing inert gas into the furnace body can exhaust air to reduce the decarburization caused by the reaction of oxygen, carbon dioxide and hydrogen in the air with the carbon on the surface of the workpiece; on the other hand, the workpiece is suspended in the quenching box by the suspension mechanism, which can increase the contact area between the workpiece and the inert gas, making it easier for the inert gas to evenly and comprehensively transfer heat to the workpiece, which helps to improve the uniformity of heating and reduce the possibility of decarburization caused by uneven heating of the workpiece;
[0031] 2. The workpiece is installed on the side of the rotating drum facing away from the air inlet through the installation assembly. The rotating drum is rotatably connected to the quenching box. The blower draws the inert gas into the furnace body. When the inert gas fills the furnace body, it enters the quenching box along the air inlet. The blades are driven by the inert gas flow to rotate the rotating drum. This can not only make the inert gas in the quenching box flow, reducing the possibility of overheating or low temperature in the quenching box, but also make the workpiece rotate with the rotating drum in the quenching box, so that the inert gas can evenly transfer heat to the workpiece, which can effectively improve the heating effect and reduce the decarburization of the workpiece;
[0032] 3. The spring pushes the blocking plate so that it blocks the opening of the cooling pool to reduce the possibility of air dissolving into the coolant in the cooling pool, resulting in poor quenching effect. After the quenching box is placed on the blocking plate, the abutting rod abuts against the limit plate, so that there is a gap between the air outlet and the blocking plate, which facilitates the coolant in the cooling pool to enter the quenching box. After the spring is compressed, the blocking plate slides toward the bottom of the cooling pool, and the coolant in the cooling pool enters the quenching box to cool the workpiece. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of a fully automatic high-temperature forklift-type quenching equipment for high-yield steel in an embodiment of the present application.
[0034] Figure 2 It is a cross-sectional view of the furnace body in the embodiment of the present application.
[0035] Figure 3 It is an exploded view of the suspension mechanism in the embodiment of the present application.
[0036] Figure 4 Schematic diagram of the quenching box in the embodiment of the present application.
[0037] Figure 5It is a cross-sectional view of the cooling pool in the embodiment of the present application.
[0038] Figure numerals: 1. base; 2. furnace body; 22. feed port; 3. resistance belt; 4. blower; 5. air inlet pipe; 6. connecting ring; 7. feed mechanism; 71. track; 72. loading and unloading forklift; 8. quenching box; 81. air inlet; 82. air outlet; 9. suspension mechanism; 91. rotating cylinder; 92. mounting assembly; 921. extension rod; 922. mesh cage; 10. paddle; 11. feed door; 12. mounting plate; 13. closing door; 14. lift; 15. limit plate; 16. rotating wheel; 17. handle; 18. ring rail; 19. cooling pool; 20. closing assembly; 201. blocking plate; 2011. through groove; 202. spring; 23. abutting rod; 24. cover plate. DETAILED DESCRIPTION
[0039] The following is combined with Figure 1-5 This application is described in further detail.
[0040] The present application embodiment discloses a fully automatic high temperature forklift type quenching equipment for high yield steel. Figure 1 , comprising a furnace body 2 mounted on a base 1, referring to Figure 2 The inner wall of the furnace body 2 is provided with a resistance belt 3, and also includes a feeding mechanism 7 arranged on the base 1. The feeding mechanism 7 can transport the workpiece into the furnace body 2. The resistance belt 3 heats the air in the furnace body 2, and the air transfers the heat to the workpiece, thereby heating the workpiece. Specifically, a feeding port 22 is opened on the side wall of the furnace body 2, and a lift 14 is installed on the top of the furnace body 2. A closed door 13 is connected to the lift 14, and the closed door 13 is slidably arranged at the feeding port 22, that is, the lift 14 can drive the closed door 13 to close the feeding port 22, which helps to improve the sealing of the furnace body 2, and then improve the heating effect of the resistance belt 3 on the workpiece. The feeding mechanism 7 includes a track 71 installed on the base 1 and a loading and unloading forklift 72 moving on the track 71. The track 71 extends from the feeding port 22 of the furnace body 2 toward a direction away from the furnace body 2. A cooling pool 19 is also provided on the base 1 between the tracks 71. The cooling pool 19 is filled with a coolant. The coolant is selected according to the material of the workpiece, and can be oil, water or salt water. When the workpiece is heated in the furnace body 2, the loading and unloading forklift 72 moves the workpiece to the cooling pool 19 for cooling to obtain a high-hardness martensitic structure.
[0041] Reference Figure 1 The forks of the loading and unloading forklift 72 are detachably provided with a quenching box 8, referring to Figure 3A suspension mechanism 9 is detachably provided in the quenching box 8. After the workpiece is suspended in the quenching box 8 by the suspension mechanism 9, the loading and unloading forklift 72 delivers the quenching box 8 into the furnace body 2 for heating, thereby heating the workpiece in the quenching box 8. A blower 4 is installed on the side wall of the furnace body 2. The blower 4 is connected to an air inlet pipe. The end of the air inlet pipe away from the blower 4 can be connected to a container storing an inert gas, such as a high-pressure storage tank. An air outlet is provided at the bottom of the furnace body 2. The air outlet is connected to an air outlet pipe, which extends in a direction away from the furnace body 2, and a connecting ring 6 is provided around the side of the air outlet facing away from the air outlet pipe.
[0042] Reference Figure 4 An air inlet 81 is provided at the top of the quenching box 8, and an air outlet 82 is provided at the bottom of the quenching box 8. The size of the air outlet 82 is the same as that of the connecting ring 6. When the quenching box 8 is placed in the furnace body 2, the connecting ring 6 is embedded in the air outlet 82. On the one hand, the quenching box 8 can be fixed in the furnace body 2 by being embedded in the connecting ring 6, which can reduce the shaking and tipping of the quenching box 8 in the furnace body 2; on the other hand, the quenching box 8 is connected to the air outlet through the connecting ring 6, so that air can only enter the quenching box 8 from the air inlet 81 and be discharged from the quenching box 8 from the air outlet 82, thereby forming a directional airflow.
[0043] Reference Figure 2 When the quenching box 8 is placed in the furnace body 2 and embedded in the connecting ring 6, refer to Figure 3 , first start the blower 4, the blower 4 passes the inert gas into the furnace body 2 along the air inlet pipe, the inert gas enters the quenching box 8 from the air inlet 81, and then is discharged from the quenching box 8 from the air outlet 82, and is discharged from the furnace body 2 from the air outlet. On the one hand, the inert gas can discharge the air with oxygen, carbon dioxide and hydrogen from the air outlet, so that the inert gas fills the furnace body 2 and the quenching furnace, so as to reduce the oxygen, carbon dioxide and hydrogen in the air and the carbon on the surface of the workpiece to react and cause decarburization; on the other hand, the resistance belt 3 on the inner wall of the furnace body 2 heats the inert gas, and then the inert gas heats the workpiece in the quenching box 8. The workpiece is suspended in the quenching box 8 by the suspension mechanism 9. The inert gas can fully contact with the workpiece, so as to evenly transfer the heat to the workpiece, thereby reducing the possibility of decarburization caused by uneven heating of the workpiece. The air outlet is connected with an air outlet pipe, and the discharged gas can be collected, processed and recycled through the air outlet pipe, which is green and environmentally friendly.
[0044] Reference Figure 3The suspension mechanism 9 includes a rotating cylinder 91 and a mounting assembly 92, wherein the rotating cylinder 91 is rotatably connected to the air inlet 81 of the quenching box 8, the rotating cylinder 91 is communicated with the quenching box 8, the mounting assembly 92 is arranged on the rotating cylinder 91, and the mounting assembly 92 extends into the quenching box 8, and the workpiece is detachably arranged in the mounting assembly 92. A limit plate 15 is fixed to the side of the rotating cylinder 91 facing away from the mounting assembly 92 through a bracket. The limit plate 15 is coaxially arranged with the rotating cylinder 91, and there is a gap between the limit plate 15 and the rotating cylinder 91. A handle 17 is provided on the side of the limit plate 15 facing away from the rotating cylinder 91. The diameter of the rotating cylinder 91 and the mounting assembly 92 is smaller than the diameter of the air inlet 81, and the diameter of the limit plate 15 is larger than the diameter of the air inlet 81, so that both the rotating cylinder 91 and the mounting assembly 92 can be taken out of the quenching box 8 through the air inlet 81, which is convenient for loading and unloading workpieces or cleaning the rotating cylinder 91 and the mounting assembly 92. The limit plate 15 limits the suspension mechanism 9 to reduce the situation where the suspension mechanism 9 falls into the quenching box 8. A plurality of rotating wheels 16 are provided on the side of the limit plate 15 facing the rotating cylinder 91 through a bracket, and the rotating wheels 16 can roll on the quenching box 8. The mounting assembly 92 includes an extension rod 921 and a mesh cage 922. The extension rod 921 is vertically fixed at the center of the limiting plate 15. The extension rod 921 passes through the rotating cylinder 91 and extends into the quenching box 8. The mesh cage 922 is fixed to the end of the extension rod 921 away from the limiting plate 15. The outer wall of the extension rod 921 is surrounded by a paddle 10, and the paddle 10 is located in the rotating cylinder 91. A ring rail 18 is also provided around the air inlet 81 at the top of the quenching box 8, and the rotating wheel 16 is slidably arranged in the ring rail 18.
[0045] Reference Figure 3During operation, the rotating wheel 16 is first placed in the annular rail 18. The annular rail 18 and the rotating wheel 16 can position the suspension mechanism 9, so that after the blower 4 passes the inert gas into the furnace body 2, the inert gas enters the quenching box 8 from the air inlet 81 and is discharged from the quenching box 8 from the air outlet 82, that is, the inert gas forms a directional airflow between the air inlet 81 and the air outlet 82. When the airflow enters the air inlet 81, the rotating cylinder 91 guides the airflow so that the airflow impacts the blade 10. The blade 10 rotates after being blown by the airflow, and drives the mesh cage 922 to rotate through the extension rod 921. The mesh cage 922 is provided with a feed door 11. The workpiece is placed in the mesh cage 922 through the feed door 11. The mesh cage 922 drives the workpiece to rotate, so that the inert gas evenly heats the workpiece, which can improve the heating effect, and then improve the quenching effect of the workpiece, so as to improve the yield degree of the workpiece. When the mesh cage 922 rotates, the rotating wheel 16 rolls in the annular rail 18, which can reduce the possibility that the friction between the suspension mechanism 9 and the quenching box 8 is too large, causing the suspension mechanism 9 to be difficult to rotate. The annular rail 18 limits the rotating wheel 16, which can ensure that the suspension mechanism 9 rotates around the central axis and reduce the collision between the mesh cage 922 and the quenching box 8, and also reduce the possibility that the rotating wheel 16 slides into the air inlet 81 and causes the suspension mechanism 9 to fail.
[0046] Reference Figure 5 The cooling pool 19 is located on the side of the closed door 13 facing away from the furnace body 2. A closing component 20 is provided in the cooling pool 19. The closing component 20 includes a sealing plate 201 and a plurality of springs 202, wherein the sealing plate 201 is slidably arranged in the cooling pool 19, one end of the spring 202 is fixed to the bottom of the cooling pool 19, and the other end of the spring 202 is fixed to the sealing plate 201. The sealing plate 201 is parallel to the bottom of the cooling pool 19. The spring 202 pushes the sealing plate 201 to the pool mouth of the cooling pool 19, which can reduce the contact area between the air and the coolant in the cooling pool 19, so as to reduce the possibility of poor cooling effect caused by air dissolving into the coolant in the cooling pool 19, thereby ensuring the quenching effect. The blocking plate 201 is provided with a plurality of through slots 2011, and a plurality of cover plates 24 corresponding to the through slots 2011 are hingedly connected on the side of the blocking plate 201 facing away from the cooling pool 19. The cover plates 24 are covered on the through slots 2011 to reduce the possibility of air entering the cooling pool 19 through the through slots 2011. When the quenching box 8 is placed on the blocking plate 201, the blocking plate 201 slides toward the bottom of the cooling pool 19 along the height direction under the action of gravity. At this time, the cover plates 24 are turned toward the side away from the spring 202, so that the coolant can flow through the through slots 2011 to the side of the blocking plate 201 facing away from the spring 202, and then the coolant enters the quenching box 8 to cool the workpiece in the mesh cage 922.
[0047] In order to reduce the situation where the coolant has difficulty entering the quenching box 8 due to the tight fit between the quenching box 8 and the sealing plate 201, a plurality of abutting rods 23 corresponding to the mounting plate 12 are provided on the side of the sealing plate 201 facing away from the spring 202. When the loading and unloading forklift 72 places the quenching box 8 on the sealing plate 201, the abutting rods 23 abut against the mounting plate 12. At this time, there is a gap between the bottom of the quenching box 8 and the sealing plate 201, which allows the coolant to flow to the side of the sealing plate 201 facing away from the spring 202, and then enter the quenching box 8 through the air outlet 82, so as to reduce the situation where the coolant has difficulty entering the quenching box 8, causing the quenching box 8 to float and tip over in the cooling pool 19.
[0048] The implementation principle of the fully automatic high-temperature forklift quenching equipment for high-yield steel in the embodiment of the present application is as follows: first, the workpiece is placed in the mesh cage 922 through the feed door 11, and the mesh cage 922 is extended into the quenching box 8 through the handle 17, so that the rotating wheel 16 is slidably set in the ring rail 18, and the elevator 14 drives the closed door 13 to move upward in the vertical direction, and the fork of the loading and unloading forklift 72 lifts the mounting plate 12 and moves the quenching box 8 into the furnace body 2, and the connecting ring 6 is embedded in the air outlet 82, and then the blower 4 is started, so that the furnace body 2 is filled with inert gas. Gas, then start the resistance belt 3 for heating, the heat on the resistance belt 3 is transferred to the workpiece through the inert gas, the inert gas enters the quenching box 8 from the air inlet 81 and is discharged from the air outlet 82, the blade 10 drives the suspension mechanism 9 to rotate under the drive of the air flow, after the heating is completed, the elevator 14 drives the closed door 13 to move upward in the vertical direction, the loading and unloading forklift 72 lifts the mounting plate 12 and places the quenching box 8 on the sealing plate 201, the sealing plate 201 and the quenching box 8 are sunk into the cooling pool 19 together, and the coolant in the cooling pool 19 cools the workpiece.
[0049] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A fully automatic high-temperature forklift quenching equipment for high-yield steel, comprising a furnace body (2), a resistance belt (3) being arranged on the inner wall of the furnace body (2), characterized in that: The furnace body (2) is provided with a blower (4), the blower (4) is connected with an air inlet pipe, the furnace body (2) is provided with an air outlet, and a connecting ring (6) is provided around the air outlet; The furnace (2) further comprises a feeding mechanism (7), wherein the feeding mechanism (7) comprises a loading and unloading forklift (72) and a track (71), wherein a quenching box (8) is detachably arranged on the loading and unloading forklift (72), wherein the loading and unloading forklift (72) is arranged on the track (71), wherein the loading and unloading forklift (72) drives the quenching box (8) to move into or out of the furnace body (2), wherein a suspension mechanism (9) is arranged inside the quenching box (8), wherein the suspension mechanism (9) is rotatably connected to the top of the quenching box (8), wherein an air inlet (81) is provided at the top of the quenching box (8), and an air outlet (82) is provided at the bottom of the quenching box (8), wherein when the loading and unloading forklift (72) drives the quenching box (8) to enter the furnace body (2), the connecting ring (6) is embedded in the air outlet (82).
2. The fully automatic high-temperature forklift-type quenching equipment for high-yield steel according to claim 1, characterized in that: The suspension mechanism (9) comprises a rotating cylinder (91) and a mounting assembly (92); the rotating cylinder (91) is rotatably connected to the top of the quenching box (8); the air inlet (81) is connected to the rotating cylinder (91); a plurality of blades (10) are evenly arranged in the rotating cylinder (91); and the mounting assembly (92) is arranged on a side of the rotating cylinder (91) facing away from the air inlet (81).
3. The fully automatic high-temperature forklift quenching equipment for high-yield steel according to claim 2, characterized in that: The mounting assembly (92) comprises an extension rod (921) and a mesh cage (922); the extension rod (921) is fixed to a side of the rotating cylinder (91) facing away from the air inlet (81) via a bracket; the mesh cage (922) is fixed to an end of the extension rod (921) away from the rotating cylinder (91); and a feed door (11) is provided on a side wall of the mesh cage (922).
4. The fully automatic high-temperature forklift quenching equipment for high-yield steel according to claim 3, characterized in that: A mounting plate (12) is provided on the outer wall of the quenching box (8), and when the loading and unloading forklift (72) drives the quenching box (8) to move into or out of the furnace body (2), the mounting plate (12) is mounted on the fork of the loading and unloading forklift (72).
5. The fully automatic high-temperature forklift quenching equipment for high-yield steel according to claim 2, characterized in that: A feed port (22) is provided on one side of the furnace body (2) facing the track (71), a closed door (13) is slidably provided at the feed port (22), a lift (14) is provided on the top of the furnace body (2), the lift (14) is connected to the closed door (13), and the lift (14) drives the closed door (13) to move in a vertical direction; When the loading and unloading forklift (72) is against the closed door (13), the connecting ring (6) is located below the fork of the loading and unloading forklift (72).
6. The fully automatic high-temperature forklift-type quenching equipment for high-yield steel according to claim 5, characterized in that: A limiting plate (15) is fixed to the side of the rotating cylinder (91) facing away from the mounting assembly (92) through a bracket. The limiting plate (15) is coaxially arranged with the rotating cylinder (91). There is a spacing between the limiting plate (15) and the rotating cylinder (91). The diameters of the rotating cylinder (91) and the mounting assembly (92) are smaller than the diameter of the air inlet (81). The diameter of the limiting plate (15) is larger than the diameter of the air inlet (81). A plurality of rotating wheels (16) are arranged on the side of the limiting plate (15) facing the rotating cylinder (91). The plurality of rotating wheels (16) are evenly arranged around the outer edge of the limiting plate (15). The rotating wheels (16) fit the quenching box (8).
7. The fully automatic high-temperature forklift-type quenching equipment for high-yield steel according to claim 6, characterized in that: The quenching box (8) is provided with an annular rail (18), the annular rail (18) is arranged around the air inlet (81), and the rotating wheel (16) is slidably arranged in the annular rail (18).
8. The fully automatic high-temperature forklift quenching equipment for high-yield steel according to claim 4, characterized in that: A cooling pool (19) is provided between the rails (71), and a closing component (20) is provided on the cooling pool (19). When the quenching box (8) is placed on the closing component (20), the closing component (20) moves in a vertical direction toward the bottom of the cooling pool (19).
9. The fully automatic high-temperature forklift-type quenching equipment for high-yield steel according to claim 8, characterized in that: The closing assembly (20) comprises a blocking plate (201) and a plurality of springs (202), wherein the spring (202) is fixed to the bottom of the cooling pool (19), and one end of the spring (202) away from the bottom of the cooling pool (19) is fixed to the blocking plate (201), and the blocking plate (201) is slidably arranged in the cooling pool (19), and the blocking plate (201) is located at the pool mouth of the cooling pool (19). A plurality of abutting rods (23) are arranged on the side of the blocking plate (201) facing away from the spring (202), and when the quenching box (8) is placed on the blocking plate (201), the abutting rods (23) abut against the mounting plate (12), and there is a distance between the quenching box (8) and the blocking plate (201).
10. The fully automatic high-temperature forklift-type quenching equipment for high-yield steel according to claim 9, characterized in that: The blocking plate (201) is provided with a plurality of through slots (2011), and a cover plate (24) is hingedly connected to the through slots (2011). The cover plate (24) rotates in a direction away from the spring (202) with the connection between the cover plate (24) and the blocking plate (201) as an axis.
