A pipe reinforcement sleeve assembly welding device

By designing a pipe reinforcement sleeve group butt welding device, automatic assembly, positioning and welding of the pipe reinforcement sleeve is realized, solving the problems of high welding difficulties and low craftsmanship in the existing technology, and improving welding efficiency and quality. Improve the maintenance and emergency construction efficiency of oil and gas conveying pipelines.

CN115488561BActive Publication Date: 2025-02-07HUBEI SANJIANG AEROSPACE GRP HONGYANG ELECTROMECHANICAL
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211312620.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-25
Publication Date
2025-02-07
Estimated Expiration
2042-10-25

AI Technical Summary

Technical Problem

In the prior art, the welding of pipeline reinforcement sleeves is difficult, low in craftsmanship, and unstable welding quality, which seriously restricts the maintenance and repair construction efficiency of oil and gas conveying pipelines.

Method used

Provide a pipe reinforcement sleeve group butt welding device, including a butt welding bracket, a clamping pipe positioning unit, a sleeve rotation unit, a sleeve adsorption group pair unit and a welding unit, to realize the automatic combination of the pipe reinforcement sleeve, Positioning and welding.

Benefits of technology

Through the automated welding process, the difficulty of welding is reduced, the welding efficiency is improved, the welding quality is ensured, and the maintenance and emergency construction efficiency of oil and gas conveying pipelines is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115488561B_ABST
    Figure CN115488561B_ABST
Patent Text Reader

Abstract

The present application discloses a pipe reinforcement sleeve assembly welding device, comprising: an assembly welding bracket, a first pipe clamping positioning unit, a sleeve rotating unit, a sleeve adsorption assembly unit and a welding unit. The first pipe clamping positioning unit positions and fixes the pipe reinforcement sleeve assembly welding device, the sleeve adsorption assembly unit and the sleeve rotating unit adsorb the pipe reinforcement sleeve and rotate it to a preset position, and the welding unit welds the weld of the pipe reinforcement sleeve, thereby realizing automatic assembly, positioning and welding of the pipe reinforcement sleeve, changing the current situation that the pipe reinforcement sleeve needs manual assembly and welding, and the welding cladding amount is greatly reduced compared with manual welding, which reduces the welding difficulty while improving the welding efficiency, and improves the welding construction efficiency of the oil and gas pipeline maintenance and emergency repair, and at the same time, the pipe reinforcement sleeve assembly welding device can ensure the welding quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of in-service welding of oil and gas pipelines, and in particular relates to a pipeline reinforcement sleeve assembly welding device. Background Art

[0002] Currently, the pipeline reinforcement sleeves used in oil and gas pipelines are mainly Type A sleeves and Type B sleeves. This type of pipeline reinforcement sleeve is a paired semicircular structure, designed to be welded and installed while the pipeline is still in operation, and to withstand the design or operating pressure of the pipeline when leakage eventually occurs at the damaged part.

[0003] In the relevant technology, the installation and welding of pipeline reinforcement sleeves mainly adopt the process form of manual assembly and manual welding. In particular, the welding of the transverse welds of the reinforcement sleeve is difficult and the work efficiency is low. Not only is the welding quality of the reinforcement sleeve unstable, but it also seriously restricts the construction efficiency of the maintenance and repair of the oil and gas transmission pipeline.

[0004] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention

[0005] The present application aims to at least to some extent solve the technical problems of great difficulty, low efficiency, unstable welding quality and low construction efficiency in manual assembly and manual welding of pipeline reinforcement sleeves. To this end, the present application provides a pipeline reinforcement sleeve assembly welding device.

[0006] An embodiment of the present application provides a pipe reinforcement sleeve assembly welding device, the pipe reinforcement sleeve assembly welding device comprising:

[0007] Assemble welding brackets;

[0008] A first pipe clamp positioning unit comprises a first pipe clamp fixing frame arranged on the group welding bracket and a first swing arm hinged to the first pipe clamp fixing frame at one end, wherein the first swing arm swings relative to the first pipe clamp fixing frame to form a first annular pipe clamp with the first pipe clamp fixing frame;

[0009] The sleeve rotating unit comprises a crossbeam arranged on the pair welding bracket, a first gear mounting plate and a second gear mounting plate movably arranged on the crossbeam, a first semicircular gear rotatably arranged on the first gear mounting plate, and a second semicircular gear rotatably arranged on the second gear mounting plate, wherein the first semicircular gear and the second semicircular gear are arranged opposite to each other to close to form a circular gear, and the circular gear is coaxial with the first annular pipe clamp;

[0010] A sleeve adsorption assembly unit comprises a first sleeve adsorption assembly arranged on the first semicircular gear and a second sleeve adsorption assembly arranged on the second semicircular gear; and

[0011] The welding unit comprises a welder arranged on the welding bracket and a welding gun connected to the welder, wherein the welding gun can move in three-dimensional space relative to the welding bracket.

[0012] In some embodiments, the pipe reinforcement sleeve assembly welding device further comprises:

[0013] The second tube clamp positioning unit comprises a second tube clamp fixing frame and a second swing arm hinged to the second tube clamp fixing frame at one end, wherein the second swing arm swings relative to the second tube clamp fixing frame to form a second annular tube clamp with the first tube clamp fixing frame;

[0014] The pipe clamp positioning connection unit is arranged between the first pipe clamp fixing frame and the second pipe clamp fixing frame so that the first annular pipe clamp and the second annular pipe clamp are coaxial.

[0015] In some embodiments, the first tube clamp positioning unit further includes at least three first tube clamp positioning members which are arranged on the inner wall of the first annular tube clamp and can be synchronously extended and retracted; the second tube clamp positioning unit further includes at least three second tube clamp positioning members which are arranged on the inner wall of the second annular tube clamp and can be synchronously extended and retracted.

[0016] In some embodiments, the first pipe clamping fixture and / or the second pipe clamping fixture is provided with a sleeve push rod parallel to the central axis of the pipe reinforcement sleeve.

[0017] In some embodiments, a first swing arm locking member is provided on the first swing arm, and a second swing arm locking member is provided on the second swing arm.

[0018] In some embodiments, the first tube clamping positioning unit includes two first swing arms, and the two first swing arms are respectively arranged at two ends of the first tube clamping fixing frame;

[0019] The second tube clamping positioning unit includes two second swing arms, and the two second swing arms are respectively arranged at two ends of the second tube clamping fixing frame.

[0020] In some embodiments, the sleeve rotation unit further comprises:

[0021] A first screw assembly includes a first screw arranged in or on the crossbeam and a first screw nut arranged on the first screw;

[0022] A second screw assembly comprises a second screw arranged in parallel with the first screw in or on the crossbeam and a second screw nut arranged on the second screw;

[0023] The first gear mounting plate is connected to the first screw nut so as to move relative to the crossbeam under the drive of the first screw nut;

[0024] The second gear mounting plate is connected to the second screw nut so as to move relative to the crossbeam under the drive of the second screw nut.

[0025] In some embodiments, the crossbeam is provided with a first slide rail and a second slide rail;

[0026] The first gear mounting plate is slidably connected to the first slide rail or is slidably connected to the first slide rail through a first slide rail connecting plate;

[0027] The second gear mounting plate is slidably connected to the second slide rail or is slidably connected to the second slide rail via a second slide rail connecting plate.

[0028] In some embodiments, the ends of the first semicircular gear are respectively provided with a first positioning pin shaft and a first positioning pin hole, and the ends of the second semicircular gear are respectively provided with a second positioning pin hole and a second positioning pin shaft matching the first positioning pin shaft and the first positioning pin hole. When the first semicircular gear and the second semicircular gear are closed to form the circular gear, the first positioning pin shaft is inserted into the second positioning pin hole, and the second positioning pin shaft is inserted into the first positioning pin hole.

[0029] In some embodiments, the first semicircular gear is connected to the first gear mounting plate via a first semicircular split bearing; and the second semicircular gear is connected to the second gear mounting plate via a second semicircular split bearing.

[0030] In some embodiments, the first sleeve adsorption assembly includes a first adsorption group pair bracket disposed on the first semicircular gear and a first adsorption member telescopically disposed on the first adsorption group pair bracket;

[0031] The second sleeve adsorption assembly includes a second adsorption group bracket arranged on the second semicircular gear and a second adsorption member telescopically arranged on the second adsorption group bracket.

[0032] The embodiments of the present application have at least the following beneficial effects:

[0033] The above-mentioned pipeline reinforcement sleeve assembly welding device, the first pipe clamping positioning unit is used to position and fix the pipeline reinforcement sleeve assembly welding device on the transmission pipeline, and then the pipeline reinforcement sleeve is adsorbed by the sleeve adsorption assembly unit, and the pipeline reinforcement sleeve is rotated to a preset position by the sleeve rotation unit, and finally the weld of the pipeline reinforcement sleeve is welded by the welding unit, thereby realizing automatic assembly, positioning and welding of the pipeline reinforcement sleeve, changing the current situation that manual assembly and welding of the pipeline reinforcement sleeve are required, and the welding cladding amount is greatly reduced compared with manual welding, which reduces the welding difficulty and improves the welding efficiency, improves the welding construction efficiency of the oil and gas transmission pipeline maintenance and emergency repair, and at the same time, the welding quality can be ensured by the pipeline reinforcement sleeve assembly welding device. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following is a brief introduction to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0035] Figure 1 A schematic diagram of the three-dimensional structure of a pipe reinforcement sleeve assembly welding device in an embodiment of the present application is shown;

[0036] Figure 2 Shows Figure 1 A front view of the pipe reinforcement sleeve assembly welding device;

[0037] Figure 3 Shows Figure 2 A top view of the pipe reinforcement sleeve assembly welding device;

[0038] Figure 4 Shows Figure 2 AA cross-sectional schematic diagram of the pipe reinforcement sleeve assembly welding device;

[0039] Figure 5 Shows Figure 2 A schematic diagram of the opening state of the sleeve rotating unit in the pipe reinforcement sleeve group and the welding device;

[0040] Figure 6 Shows Figure 5 A local schematic diagram of the B direction.

[0041] Reference numerals:

[0042] 10. Delivery channel; 20. Pipeline reinforcement sleeve;

[0043] 100. Assemble and weld the bracket;

[0044] 200, first clamp tube positioning unit; 210, first clamp tube fixing frame; 220, first swing arm; 230, first clamp tube positioning member; 260, first swing arm driving cylinder; 270, first swing arm hinge; 300, second clamp tube positioning unit; 310, second clamp tube fixing frame; 320, second swing arm; 330, second clamp tube positioning member; 340, second sleeve push rod; 350, second swing arm locking member; 360, second swing arm driving cylinder; 370, first Second swing arm hinge; 400, clamp tube positioning connection unit; 500, sleeve rotation unit; 510, crossbeam; 511, first slide rail; 512, second slide rail; 520, first gear mounting plate; 521, first semicircular split bearing; 522, first rotation drive gear; 523, first rotation drive motor; 524, first slide rail connection plate; 530, first semicircular gear; 531, first positioning pin shaft; 540, second gear mounting plate; 542, The second rotary drive gear; 543, the second rotary drive motor; 544, the second slide rail connecting plate; 550, the second semicircular gear; 563, the first screw motor; 570, the second screw assembly; 571, the second screw; 572, the second screw nut; 573, the second screw motor; 600, the sleeve adsorption assembly unit; 610, the first sleeve adsorption assembly; 611, the first adsorption assembly bracket; 612, the first adsorption member; 613, the first adsorption Guide sleeve; 614, first adsorption drive cylinder; 620, second sleeve adsorption assembly; 621, second adsorption group bracket; 622, second adsorption member; 623, second adsorption guide sleeve; 624, second adsorption drive cylinder; 700, welding unit; 710, welding gun; 720, welding machine; 730, X-axis linear module; 740, Y-axis linear module; 750, Z-axis linear module; 760, transfer arm; Q1, hoisting work station; Q2, welding work station. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0046] In addition, the present application may repeat reference numbers and / or reference letters in different examples, and such repetition is for the purpose of simplicity and clarity, and does not in itself indicate the relationship between the various embodiments and / or settings discussed. In addition, the present application provides various specific examples of processes and materials, but those of ordinary skill in the art may recognize the application of other processes and / or the use of other materials.

[0047] The present application is described below with reference to the accompanying drawings and specific embodiments:

[0048] The embodiment of the present application provides a welding device for a pipe reinforcement sleeve 20, such as Figures 1 to 6 As shown, the pipe reinforcement sleeve 20 assembly welding device of this embodiment includes:

[0049] Assemble and weld the bracket 100;

[0050] The first pipe clamp positioning unit 200 includes a first pipe clamp fixing frame 210 disposed on the assembly welding bracket 100 and a first swing arm 220 hinged at one end to the first pipe clamp fixing frame 210, and the first swing arm 220 swings relative to the first pipe clamp fixing frame 210 to form a first annular pipe clamp with the first pipe clamp fixing frame 210;

[0051] The sleeve rotating unit 500 includes a crossbeam 510 disposed on the assembly welding bracket 100, a first gear mounting plate 520 and a second gear mounting plate 540 movably disposed on the crossbeam 510, a first semicircular gear 530 rotatably disposed on the first gear mounting plate 520, and a second semicircular gear 550 rotatably disposed on the second gear mounting plate 540, wherein the first semicircular gear 530 and the second semicircular gear 550 are disposed opposite to each other to close to form a circular gear, and the circular gear is coaxial with the first annular pipe clamp;

[0052] The sleeve adsorption assembly unit 600 includes a first sleeve adsorption assembly 610 disposed on the first semicircular gear 530 and a second sleeve adsorption assembly 620 disposed on the second semicircular gear 550; and,

[0053] The welding unit 700 includes a welder 720 disposed on the assembly welding bracket 100 and a welding gun 710 connected to the welder 720 . The welding gun 710 can move in a three-dimensional space relative to the assembly welding bracket 100 .

[0054] The pipeline reinforcement sleeve 20 assembly welding device of the present embodiment has a first pipe clamping positioning unit 200 for positioning and fixing the pipeline reinforcement sleeve 20 assembly welding device on the conveying pipeline, and then the pipeline reinforcement sleeve 20 is adsorbed by the sleeve adsorption assembly unit 600, and the pipeline reinforcement sleeve 20 is rotated to a preset position by the sleeve rotation unit 500, and finally the weld of the pipeline reinforcement sleeve 20 is welded by the welding unit 700, thereby realizing automatic assembly, positioning and welding of the pipeline reinforcement sleeve 20, changing the current situation that the pipeline reinforcement sleeve 20 needs manual assembly and welding, and the welding cladding amount is greatly reduced compared with manual welding, which reduces the welding difficulty while improving the welding efficiency, thereby improving the welding construction efficiency of the oil and gas pipeline maintenance and emergency repair.

[0055] Furthermore, the installation process and welding quality of the pipe reinforcement sleeve 20 will have a decisive impact on the final construction quality. The pipe reinforcement sleeve 20 group welding device of this embodiment can improve the welding efficiency while ensuring the welding quality to ensure the construction quality.

[0056] In the pipe reinforcement sleeve 20 group welding device of this embodiment, the main function of the group welding bracket 100 is to connect the units of the pipe reinforcement sleeve 20 group welding device together, and play a supporting and bridging role. The specific structure of the group welding bracket 100 is adaptively adjusted according to the structure and relative position of each unit. Figures 1 to 3 As shown, in this embodiment, the first tube clamping positioning unit 200, the sleeve rotating unit 500 and the welding unit 700 are directly provided on the assembly welding bracket 100, and the sleeve adsorption assembly unit 600 is indirectly provided on the assembly welding bracket 100 through the sleeve rotating unit 500.

[0057] In the pipe reinforcement sleeve 20 assembly welding device of the present embodiment, the first pipe clamping and positioning unit 200 includes a first pipe clamping and fixing frame 210 and a first swing arm 220 hinged to the first pipe clamping and fixing frame 210. The first swing arm 220 swings relative to the first pipe clamping and fixing frame 210 to form a first annular pipe clamp that can be opened and closed, so that the pipe can be clamped on the conveying pipe by the first annular pipe clamp. In the present embodiment, the first pipe clamping and fixing frame 210 can be half-wound on the conveying flow channel 10 by swinging the first swing arm 220 open, and then the first pipe clamping and positioning unit 200 can be clamped on the conveying pipe by closing the first swing arm 220, that is, the sleeve rotating unit 500, the sleeve adsorption assembly unit 600 and the welding unit 700 of the pipe reinforcement sleeve 20 assembly welding device are directly or indirectly connected to the first pipe clamping and positioning unit 200 through the assembly welding bracket 100 and fixed on the conveying pipe, so that the pipe reinforcement sleeve 20 assembly welding device is clamped and fixed on the conveying pipe as a whole. In this embodiment, the first pipe clamp fixing frame 210

[0058] In the pipe reinforcement sleeve 20 assembly welding device of the present embodiment, the sleeve rotating unit 500 includes a crossbeam 510 and a first gear mounting plate 520 and a second gear mounting plate 540 movably arranged on the crossbeam 510. The first gear mounting plate 520 and the second gear mounting plate 540 can move toward and away from each other on the crossbeam 510, and at the same time drive the first semicircular gear 530 arranged on the first gear mounting plate 520 and the second semicircular gear 550 on the second gear mounting plate 540 to move toward and away from each other synchronously; after the first semicircular gear 530 and the second semicircular gear 550 move away from each other, there is a gap between the first semicircular gear 530 and the second semicircular gear 550. The open space can accommodate the conveying pipe and the pipe reinforcement sleeve 20, so that the sleeve rotation unit 500 can be mounted on the conveying pipe; after the first semicircular gear 530 and the second semicircular gear 550 move toward each other and approach each other, the first semicircular gear 530 and the second semicircular gear 550 are closed to form a circular gear, and the circular gear is wound around the conveying pipe and is coaxial with the first annular pipe clamp; at the same time, the first semicircular gear 530 is rotatably arranged on the first gear mounting plate 520, and the second semicircular gear 550 is rotatably arranged on the second gear mounting plate 540. After the first semicircular gear 530 and the second semicircular gear 550 are closed to form a circular gear, the circular gear can rotate as a whole. Correspondingly, the sleeve adsorption assembly pair unit 600 includes a first sleeve adsorption assembly 610 arranged on the first semicircular gear 530 and a second sleeve adsorption assembly 620 arranged on the second semicircular gear 550. Therefore, when the first semicircular gear 530 and the second semicircular gear 550 are closed to form a circular gear and rotate as a whole, the first sleeve adsorption assembly 610 and the second sleeve adsorption assembly 620 can rotate synchronously with the circular gear, that is, the first sleeve adsorption assembly 610 and the second sleeve adsorption assembly 620 can rotate around the conveying pipeline. After the cylinder adsorption assembly 610 and / or the second sleeve adsorption assembly 620 adsorb the semicircular structure of the pipe reinforcement sleeve 20, the semicircular structure of the pipe reinforcement sleeve 20 can be driven to rotate synchronously around the conveying pipe, so that the two adsorbed semicircular structures of the pipe reinforcement sleeve 20 can be paired, that is, the adsorption and pairing of the semicircular structure of the pipe reinforcement sleeve 20 are realized through the sleeve adsorption pairing unit 600, and at the same time, the adsorption, pairing and rotation of the semicircular structure of the pipe reinforcement sleeve 20 are realized through the sleeve adsorption pairing unit 600 and the sleeve rotation unit 500.

[0059] In the pipe reinforcement sleeve 20 assembly welding device of this embodiment, the welding unit 700 includes a welder 720 disposed on the assembly welding bracket 100 and a welding gun 710 connected to the welder 720, and the welding gun 710 can move in three-dimensional space relative to the assembly welding bracket 100. Since the welding gun 710 can move in three-dimensional space relative to the assembly welding bracket 100, when the semicircular structure of the adsorbed pipe reinforcement sleeve 20 is assembled, the welding gun 710 can be moved to the transverse weld of the semicircular structure of the pipe reinforcement sleeve 20, and can move along the transverse weld to perform welding.

[0060] In the pipe reinforcement sleeve 20 assembly welding device of the present embodiment, the assembly welding bracket 100, the first pipe clamping positioning unit 200, the sleeve rotation unit 500, and the sleeve adsorption assembly unit 600 are all symmetrical with respect to the vertical plane of the axis of the conveying pipeline, that is, the pipe reinforcement sleeve 20 assembly welding device as a whole is symmetrical with respect to the vertical plane of the axis of the conveying pipeline.

[0061] Optionally, in the pipe reinforcement sleeve 20 assembly welding device of the present embodiment, the welding groove of the pipe reinforcement sleeve 20 is a narrow gap U-shaped groove or a narrow gap V-shaped groove for automatic pipe welding.

[0062] As an optional implementation, the pipe reinforcement sleeve 20 set welding device of this embodiment further includes:

[0063] The second tube clamp positioning unit 300 includes a second tube clamp fixing frame 310 and a second swing arm 320 hinged at one end to the second tube clamp fixing frame 310, and the second swing arm 320 swings relative to the second tube clamp fixing frame 310 to form a second annular tube clamp with the first tube clamp fixing frame 210;

[0064] The pipe clamp positioning connection unit 400 is disposed between the first pipe clamp fixing frame 210 and the second pipe clamp fixing frame 310 so that the first annular pipe clamp and the second annular pipe clamp are coaxial.

[0065] In this embodiment, if Figures 1 to 3 As shown, the second tube clamping positioning unit 300 has the same setting principle as the first tube clamping positioning unit 200, and includes a second tube clamping fixing frame 310 and a second swing arm 320 hinged to the second tube clamping fixing frame 310. The second swing arm 320 swings relative to the second tube clamping fixing frame 310 to form a second annular tube clamp that can be opened and closed, so that the second annular tube clamp can be clamped on the conveying pipe; in this embodiment, the second tube clamping fixing frame 310 can be half-wrapped around the conveying flow channel 10 by swinging open the second swing arm 320, and then the second tube clamping positioning unit 300 can be clamped on the conveying pipe by closing the second swing arm 320.

[0066] At the same time, a pipe clamping positioning connection unit 400 is provided between the first pipe clamping fixing frame 210 and the second pipe clamping fixing frame 310, so that the first pipe clamping fixing frame 210 and the second pipe clamping fixing frame 310 form a rigid whole through the pipe clamping positioning connection unit 400, and at the same time, the first annular pipe clamp formed by the first pipe clamping positioning unit 200 and the second annular pipe clamp formed by the second pipe clamping positioning unit 300 are coaxial. Therefore, the pipe reinforcement sleeve 20 group welding device of this embodiment can be fixed on the conveying pipe through the first pipe clamping positioning unit 200 and the second pipe clamping positioning unit 300, and under the joint fixing action of the first pipe clamping positioning unit 200 and the second pipe clamping positioning unit 300, not only the pipe reinforcement sleeve 20 group welding device is fixed on the conveying pipe more firmly, but also the coaxiality of the pipe reinforcement sleeve 20 group welding device relative to the conveying pipe can be ensured to remain unchanged.

[0067] In this embodiment, the tube clamping positioning connection unit 400 may optionally include four tube clamping positioning connection rods, such as Figures 1 to 3 As shown, four tube clamp positioning connecting rods are symmetrically connected between the first tube clamp fixing frame 210 and the second tube clamp fixing frame 310, so that the first tube clamp fixing frame 210 and the second tube clamp fixing frame 310 are parallel to each other and the distance is stable, so as to ensure that the coaxiality of the first annular tube clamp in the first tube clamp positioning unit 200 and the second annular tube clamp in the second tube clamp positioning unit 300 remains unchanged.

[0068] In this embodiment, the sleeve rotation unit 500, the first tube clamping positioning unit 200, and the second tube clamping positioning unit 300 are coaxial with the axis of the conveying pipeline and are arranged in sequence and are axially symmetrical relative to the conveying pipeline, wherein the sleeve rotation unit 500 and the first tube clamping positioning unit 200 are fixedly connected by a group welding bracket 100, the first tube clamping fixing frame 210 in the first tube clamping positioning unit 200 and the second tube clamping fixing frame 310 in the second tube clamping positioning unit 300 are fixedly connected by a tube clamping positioning connection unit 400, the sleeve adsorption assembly in the sleeve adsorption assembly unit 600 is divided into two groups, which are symmetrically installed on the first semicircular gear 530 and the second semicircular gear 550 in the sleeve rotation unit 500, and the welding unit 700 is installed on the group welding bracket 100.

[0069] As an optional implementation, Figures 1 to 4 As shown, the first tube clamping positioning unit 200 of this embodiment also includes at least three first tube clamping positioning members 230 which are arranged on the inner wall of the first annular tube clamp and can be synchronously extended and retracted; the second tube clamping positioning unit 300 also includes at least three second tube clamping positioning members 330 which are arranged on the inner wall of the second annular tube clamp and can be synchronously extended and retracted.

[0070] In this embodiment, if Figures 1 to 4As shown, at least three synchronously retractable first tube clamp positioning members 230 are arranged on the inner wall of the first annular tube clamp, that is, the inner diameter of the first annular tube clamp can be adjusted by synchronously retracting the first tube clamp positioning members 230, so that the first tube clamp positioning unit 200 can adjust the inner diameter of the first annular tube clamp according to the outer diameter of the conveying pipe, so that the inner diameter of the first annular tube clamp matches the outer diameter of the conveying pipe, and at the same time, the synchronous retracting of the first tube clamp positioning members 230 can ensure the concentric positioning of the first annular tube clamp and the conveying pipe.

[0071] In this embodiment, if Figures 1 to 4 As shown, when the pipe reinforcing sleeve 20 group welding device is provided with the first pipe clamping positioning unit 200 and the second pipe clamping positioning unit 300 at the same time, the setting principle is the same as that of the first pipe clamping positioning member 230 in the first pipe clamping positioning unit 200, and at least three second pipe clamping positioning members 330 that can be synchronously retracted are provided on the inner wall of the second annular pipe clamp, that is, the inner diameter of the second annular pipe clamp can be adjusted by the synchronous retraction of the second pipe clamping positioning members 330, so that the second pipe clamping positioning unit 300 can adjust the inner diameter of the second annular pipe clamp according to the outer diameter of the conveying pipe, so that the inner diameter of the second annular pipe clamp matches the outer diameter of the conveying pipe, and at the same time, the concentric positioning of the second annular pipe clamp, the circular gear and the conveying pipe can be ensured by the synchronous retraction of the second pipe clamping positioning members 330; further, in order to ensure the concentric positioning of the first annular pipe clamp and the second annular pipe clamp, the first pipe clamping positioning member 230 and the second pipe clamping positioning member 330 also need to be synchronously retracted.

[0072] In this embodiment, if Figures 1 to 4 As shown, in order to ensure the concentric positioning of the first annular pipe clamp, the second annular pipe clamp and the conveying pipe, the first pipe clamp positioning members 230 are evenly distributed on the inner side wall of the first annular pipe clamp, and the second pipe clamp positioning members 330 are evenly distributed on the inner side wall of the second annular pipe clamp.

[0073] As an optional implementation, the first pipe clamping fixing frame 210 and / or the second pipe clamping fixing frame 310 is provided with a sleeve push rod parallel to the central axis of the pipeline reinforcement sleeve 20 .

[0074] In this embodiment, if Figure 1 As shown, the sleeve push rod can be a manual screw push rod, and the sleeve push rod can be extended and retracted by manually rotating the screw. The sleeve push rod is extended and retracted to push the pipeline reinforcement sleeve 20 to reach a preset position.

[0075] In this embodiment, a sleeve push rod is provided on the second tube clamp fixing frame 310 , and the sleeve push rod is rotated to extend toward the first tube clamp fixing frame 210 , thereby pushing the pipeline reinforcement sleeve 20 to move toward the second tube clamp fixing frame 310 .

[0076] In this embodiment, optionally, while a sleeve push rod is provided on the second tube clamp fixing frame 310, a sleeve push rod is also provided on the first tube clamp fixing frame 210. By rotating the sleeve push rod to extend it toward the first tube clamp fixing frame 210, the pipeline reinforcement sleeve 20 can be pushed to move toward the second tube clamp fixing frame 310; at the same time, by rotating the sleeve push rod to extend it toward the second tube clamp fixing frame 310, the pipeline reinforcement sleeve 20 can be pushed to move toward the first tube clamp fixing frame 210. Therefore, the position can be adjusted by moving in two directions axially on the conveying pipeline through the two sleeve push rods.

[0077] In other embodiments, the sleeve push rod may also be a hydraulic cylinder, and the position of the pipeline reinforcement sleeve 20 is adjusted by extending and retracting the hydraulic cylinder.

[0078] As an optional implementation, a first swing arm 220 locking piece is provided on the first swing arm 220 , and at the same time, a second swing arm locking piece 350 is provided on the second swing arm 320 .

[0079] In this embodiment, if Figure 1 and Figure 2 As shown, a first swing arm 220 locking member is provided on the first swing arm 220. When the first swing arm 220 is closed to be fixed on the conveying pipeline, the first swing arm 220 and the first pipe clamping fixing frame 210 are fixed together by the first swing arm 220 locking member, so that the first pipe clamping positioning unit 200 can be fixed on the conveying pipeline. Similarly, a second swing arm locking member 350 is provided on the second swing arm 320. When the second swing arm 320 is closed to be fixed on the conveying pipeline, the second swing arm 320 and the second pipe clamping fixing frame 310 are fixed together by the second swing arm locking member 350, so that the second pipe clamping positioning unit 300 can be fixed on the conveying pipeline.

[0080] As an optional implementation, the first tube clamping and positioning unit 200 includes two first swing arms 220, and the two first swing arms 220 are respectively arranged at two ends of the first tube clamping and fixing frame 210;

[0081] The second tube clamping positioning unit 300 includes two second swing arms 320 , and the two second swing arms 320 are respectively disposed at two ends of the second tube clamping fixing frame 310 .

[0082] In this embodiment, if Figure 1As shown, the first pipe clamping positioning unit 200 includes two first swing arms 220, and the two first swing arms 220 are respectively arranged at the two ends of the first pipe clamping fixing frame 210. By closing the two swing arms, the first pipe clamping positioning unit 200 can be clamped in the conveying pipe. Since two first swing arms 220 are provided in this embodiment, the swing amplitude and swing range of the first swing arm 220 are smaller than the swing amplitude and swing range of the first pipe clamping positioning unit 200 with only one first swing arm 220, and it can be applied to the construction environment of the conveying pipe is relatively compact or there are many obstacles. The principle and function of the second pipe clamping positioning unit 300 having two second swing arms 320 are the same as the principle and function of the first pipe clamping positioning unit 200 having two first swing arms 220, and will not be repeated here.

[0083] As an optional implementation, the sleeve rotating unit 500 of this embodiment further includes:

[0084] A first screw assembly includes a first screw disposed in or on the crossbeam 510 and a first screw nut disposed on the first screw;

[0085] The second screw assembly 570 includes a second screw 571 disposed in parallel with the first screw in or on the crossbeam 510 and a second screw nut 572 disposed on the second screw 571;

[0086] The first gear mounting plate 520 is connected to the first screw nut so as to move relative to the crossbeam 510 under the drive of the first screw nut;

[0087] The second gear mounting plate 540 is connected to the second screw nut 572 so as to move relative to the crossbeam 510 driven by the second screw nut 572 .

[0088] In this embodiment, the first screw in the first screw assembly can rotate relative to the cross beam 510 but cannot move laterally. At the same time, the first screw nut is threadedly connected to the first screw. When the first screw rotates relative to the cross beam 510, the first screw nut can move laterally relative to the cross beam 510 under the joint action of the first screw and the cross beam 510. Since the first gear mounting plate 520 is connected to the first screw nut, the first gear mounting plate 520 and the first screw nut move synchronously relative to the cross beam 510, achieving the purpose of the first gear mounting plate 520 being movably set on the cross beam 510. Similarly, the setting method and function of the second screw assembly 570 and the second gear mounting plate 540 are the same as those of the first screw assembly and the first gear mounting plate 520, and will not be repeated here.

[0089] As an optional implementation, the crossbeam 510 of this embodiment is provided with a first slide rail 511 and a second slide rail 512;

[0090] The first gear mounting plate 520 is slidably connected to the first slide rail 511 or is slidably connected to the first slide rail 511 through the first slide rail connecting plate 524;

[0091] The second gear mounting plate 540 is slidably connected to the second slide rail 512 or is slidably connected to the second slide rail 512 via a second slide rail connecting plate 544 .

[0092] In this embodiment, in order to make the movement of the first gear mounting plate 520 on the beam 510 safer and more reliable, a first slide rail 511 is provided on the first beam 510, so that the first gear mounting plate 520 is directly slidably connected to the first slide rail 511, or the first gear mounting plate 520 is indirectly slidably connected to the first slide rail 511 through the first slide rail connecting plate 524, so that the first gear mounting plate 520 can slide smoothly in the horizontal direction along the first slide rail 511 on the beam 510, and can also bear the weight of the first gear mounting plate 520 in the longitudinal direction through the first slide rail 511, thereby improving the reliability of the installation of the first gear mounting plate 520 on the beam 510. Optionally, the first gear mounting plate 520 is provided with a slider, so that the slider is embedded in the first slide rail 511 to realize the sliding connection between the first gear mounting plate 520 and the first slide rail 511, or the first gear mounting plate 520 is connected to the first slide rail connecting plate 524, and the first slide rail connecting plate 524 is provided with a slider, so that the slider is embedded in the first slide rail 511 to realize the indirect sliding connection between the first gear mounting plate 520 and the first slide rail 511. Similarly, the arrangement and function of the second gear mounting plate 540, the second slide rail connecting plate 544 and the second slide rail 512 are the same as those of the first gear mounting plate 520, the first slide rail connecting plate 524 and the first slide rail 511, and are not repeated here.

[0093] In this embodiment, the positions of the first slide rail 511 and the second slide rail 512 on the crossbeam 510 can be adaptively adjusted according to the structures of the first gear mounting plate 520, the second gear mounting plate 540 and / or the first slide rail connecting plate 524, the second slide rail connecting plate 544, as long as it is ensured that the first gear mounting plate 520 and the second gear mounting plate 540 can be assembled into one after moving toward each other, and can be split into two parts after moving away from each other. For example, the first slide rail 511 and the second slide rail 512 can be respectively arranged on the front and rear sides or the upper and lower sides of the crossbeam 510; for another example, the first slide rail 511 and the second slide rail 512 can be arranged on the same side of the crossbeam 510 and divided into the first slide rail 511 area and the second slide rail 512 area by the middle of the crossbeam 510.

[0094] As an optional embodiment, the ends of the first semicircular gear 530 of this embodiment are respectively provided with a first positioning pin shaft 531 and a first positioning pin hole, and the ends of the second semicircular gear 550 are respectively provided with a second positioning pin hole and a second positioning pin shaft matching the first positioning pin shaft 531 and the first positioning pin hole. When the first semicircular gear 530 and the second semicircular gear 550 are closed to form a circular gear, the first positioning pin shaft 531 is inserted into the second positioning pin hole, and the second positioning pin shaft is inserted into the first positioning pin hole.

[0095] In this embodiment, if Figure 5 and Figure 6 As shown, one end of the first semicircular gear 530 is provided with a first locating pin shaft 531, and correspondingly, the end of the second semicircular gear 550 that is connected to the first semicircular gear 530 is provided with a second locating pin hole that matches the first locating pin shaft 531. When the first semicircular gear 530 and the second semicircular gear 550 are connected to form a circular gear, the first locating pin shaft 531 is inserted into the second locating pin hole; at the same time, the other end of the first semicircular gear 530 is provided with a first locating pin hole, and correspondingly, the end of the second semicircular gear 550 that is connected to the first semicircular gear 530 is provided with a second locating pin shaft that matches the first locating pin hole. When the first semicircular gear 530 and the second semicircular gear 550 are connected to form a circular gear, the second locating pin shaft is inserted into the first locating pin hole; through the docking and fixing of the first locating pin shaft 531 with the second locating pin hole and the docking and fixing of the second locating pin shaft with the first locating pin hole, the integrity of the formed circular gear can be improved, and the stability of the rotation of the circular gear is facilitated.

[0096] As an optional implementation, the first semicircular gear 530 of this embodiment is connected to the first gear mounting plate 520 via a first semicircular split bearing 521; the second semicircular gear 550 is connected to the second gear mounting plate 540 via a second semicircular split bearing.

[0097] In this embodiment, if Figure 6As shown, a first arc-shaped groove is opened on the first gear mounting plate 520 according to the size of the first semicircular gear 530, and a first semicircular split bearing 521 is arranged in the first arc-shaped groove. At the same time, a first arc-shaped shaft matching the first arc-shaped groove is arranged on the first semicircular gear 530, and the first arc-shaped shaft is arranged in the first arc-shaped groove through the first semicircular split bearing 521, and can slide in the first arc-shaped groove; similarly, a second arc-shaped groove is opened on the second gear mounting plate 540 according to the size of the second semicircular gear 550, and a second semicircular split bearing is arranged in the second arc-shaped groove. At the same time, a second arc-shaped shaft matching the second arc-shaped groove is arranged on the second semicircular gear 550, and the second arc-shaped shaft is arranged in the second arc-shaped groove through the second semicircular split bearing, and can slide in the second arc-shaped groove. After the first gear mounting plate 520 and the second gear mounting plate 540 are closed, the first arc-shaped groove and the second arc-shaped groove are connected to form a circular groove, the first semicircular split bearing 521 and the second semicircular split bearing are connected to form a circular bearing, the first semicircular gear 530 and the second semicircular gear 550 are connected to form a circular gear, the first arc-shaped shaft and the second arc-shaped shaft are connected to form a circular shaft, and the circular shaft rotates in the circular bearing, so that the circular gear rotates on the plane formed by the splicing of the gear mounting plate and the second gear mounting plate 540.

[0098] As an optional implementation, the first sleeve adsorption assembly 610 of this embodiment includes a first adsorption group bracket 611 disposed on the first semicircular gear 530 and a first adsorption member 612 telescopically disposed on the first adsorption group bracket 611;

[0099] The second sleeve adsorption assembly 620 includes a second adsorption group bracket 621 disposed on the second semicircular gear 550 and a second adsorption member 622 telescopically disposed on the second adsorption group bracket 621 .

[0100] In this embodiment, if Figures 1 to 4 As shown, by making the first adsorption member 612 expand and contract relative to the first adsorption group bracket 611, the first adsorption member 612 can contact the semicircular structure of the pipeline reinforcement sleeve 20 to adsorb and fix it. Similarly, by making the second adsorption member 622 expand and contract relative to the second adsorption group bracket 621, the second adsorption member 622 can contact the semicircular structure of the pipeline reinforcement sleeve 20 to adsorb and fix it.

[0101] In the embodiments of the present application, Figures 1 to 4As shown, the first tube clamping positioning unit 200 includes a first tube clamping fixing frame 210, two first swing arms 220, two first swing arm hinges 270, two first swing arm driving cylinders 260, four first tube clamping positioning members 230 and a first swing arm 220 locking member. Among them, the structure of the first tube clamp fixing frame 210 is roughly arc-shaped, and it is the installation base of the first tube clamp positioning unit 200. The two ends of the arc-shaped structure of the first tube clamp fixing frame 210 are respectively hinged with the first swing arm 220 through the first swing arm hinge 270 to form a swing pair. At the same time, optionally, the first swing arm driving cylinder 260 is respectively connected to the first tube clamp fixing frame 210 and the first swing arm 220. The first swing arm driving cylinder 260 can drive the first swing arm 220 to swing open and close relative to the first tube clamp fixing frame 210, thereby realizing the automatic expansion and closure of the first tube clamp positioning unit 200, so that the pipeline reinforcement sleeve 20 group welding device can be automatically fixed to the conveying pipeline or automatically removed from the conveying pipeline through the first tube clamp fixing unit. Further optionally, four first pipe clamping positioning members 230 are respectively and evenly symmetrically arranged on the arc surface inside the first pipe clamping fixing frame 210 and the two first swing arms 220, for concentric positioning of the first pipe clamping positioning unit 200 and the conveying pipe, thereby concentric positioning of the entire pipe reinforcement sleeve 20 group against the welding device and the conveying pipe. Further optionally, the first swing arm 220 locking member is arranged at the free end of the first swing arm 220 that is not hinged to the first pipe clamping fixing frame 210, for locking the free ends of the two first swing arms 220. Optionally, the first swing arm 220 locking member can be a hydraulic cylinder, by arranging a hydraulic cylinder at the free end of one first swing arm 220, opening a through hole or groove matching the hydraulic cylinder at the free end of the other first swing arm 220, and locking the two first swing arms 220 by extending the hydraulic cylinder into the through hole or groove, and unlocking the two first swing arms 220 by contracting the hydraulic cylinder and withdrawing from the through hole or groove.

[0102] In other embodiments, the pipe reinforcement sleeve 20 assembly welding device can only be provided with the first pipe clamping positioning unit 200, and the assembly welding bracket 100 is provided on the first pipe clamping positioning unit 200 to be connected with the sleeve rotating unit 500, the sleeve adsorption assembly unit 600 and the welding unit 700 to form the pipe reinforcement sleeve 20 assembly welding device as a whole, and the first pipe clamping positioning unit 200 is used to fix the pipe reinforcement sleeve 20 assembly welding device on the conveying pipeline.

[0103] In the embodiment of the present application, in order to ensure the coaxiality between the pipe reinforcement sleeve 20 group welding device and the conveying pipe as a whole, the pipe reinforcement sleeve 20 group welding device is also provided with a second pipe clamping positioning unit 300, and the second pipe clamping positioning unit 300 includes a second pipe clamping fixing frame 310, two second swing arms 320, two second swing arm hinges 370, two second swing arm drive cylinders 360, four second pipe clamping positioners 330, a second swing arm locking member 350 and a second sleeve push rod 340, wherein the second pipe clamping fixing frame 310, two second swing arms 320, two second swing arm hinges 370, two second swing arm drive cylinders 360, four second pipe clamping positioners and the second swing arm locking member 350 in the second pipe clamping positioning unit 300 are similar in structure and function to the corresponding components in the first pipe clamping positioning unit 200, and are not described in detail here. Optionally, as Figure 2 and Figure 3 As shown, the second sleeve push rod 340 in the first clamp tube positioning unit 200 is disposed on the second clamp tube fixing frame 310, and the second sleeve push rod is parallel to the central axis of the pipeline reinforcement sleeve 20, and the second sleeve push rod 340 can be pushed relative to the second clamp tube fixing frame 310 toward the first clamp tube fixing frame 210. Optionally, the second sleeve push rod 340 can be a threaded rod and is threadedly connected to the second clamp tube fixing frame 310, and the threaded rod is extended and retracted relative to the second clamp tube fixing member by rotating the threaded rod.

[0104] When the semicircular structure of the pipeline reinforcement sleeve 20 is hoisted onto the conveying pipeline, in order to avoid interference of the sleeve adsorption group pair unit 600 or the welding unit 700 in the pipeline reinforcement sleeve 20 group welding device, the semicircular structure of the pipeline reinforcement sleeve 20 needs to be hoisted to the position as shown in the figure. Figure 2 and Figure 3 The hoisting work station Q1 is shown, and then the threaded rod serving as the second sleeve push rod 340 is rotated so that the threaded rod is extended relative to the second pipe clamp fixing frame 310 to push the semicircular structure of the pipe reinforcement sleeve 20 to the welding work station Q2, so as to facilitate the adsorption and alignment of the sleeve adsorption assembly unit 600 and the welding of the welding unit 700.

[0105] In other embodiments, optionally, a first sleeve push rod may be provided on the first pipe clamp fixing frame 210 of the first pipe clamp positioning unit 200. The structure and setting principle of the first sleeve push rod are the same as those of the second sleeve push rod 340, and will not be described in detail here. Through the cooperation of the first sleeve push rod and the second sleeve push rod 340, the setting position of the pipeline reinforcement sleeve 20 on the conveying pipeline and the position of the pipeline reinforcement sleeve 20 relative to the pipeline reinforcement sleeve 20 group welding device can be adjusted.

[0106] In the embodiments of the present application, Figures 1 to 6As shown, the sleeve rotating unit 500 includes a crossbeam 510, a first screw rod, a first screw rod nut, a first screw rod motor 563, a first gear mounting plate 520, a first slide rail connecting plate 524, a first semicircular gear 530, a first rotation driving gear 522, a second screw rod 571, a second screw rod nut 572, a second screw rod motor 573, a second gear mounting plate 540, a second slide rail connecting plate 544, a second semicircular gear 550 and a second rotation driving gear 542; wherein the crossbeam 510 is a sleeve rotating The installation base of the rotating unit 500 is provided with a first screw rod and a second screw rod 571 symmetrically and parallelly installed inside the cross beam 510. A first screw rod nut is provided on the first screw rod to form a spiral transmission cooperation with the first screw rod, and a first screw rod motor 563 is provided at the end of the first screw rod to drive the first screw rod to rotate; similarly, a second screw rod nut 572 is provided on the second screw rod 571 to form a spiral transmission cooperation with the second screw rod 571, and a second screw rod motor 573 is provided at the end of the second screw rod 571 to drive the second screw rod 571 to rotate. The first gear mounting plate 520 is connected to the first screw nut and is located below the bottom of the beam 510, and the second gear mounting plate 540 is connected to the second screw nut 572 and is located below the bottom of the beam 510. The first gear mounting plate 520 and the second gear mounting plate 540 are symmetrically distributed on both sides of the bottom of the beam 510 and can be assembled together. The first gear mounting plate 520 and the second gear mounting plate 540 are respectively driven by the first screw nut and the second screw nut 572 to move toward each other to be assembled together, and move away from each other to be split into two parts. Further optionally, as Figure 4 As shown, a linear slide rail is fixedly installed on the outer side of the beam 510, and the linear slide rail is divided into a first slide rail 511 area and a second slide rail 512 area. The first gear mounting plate 520 is connected to the first slide rail 511 area through the first slide rail connecting plate 524, and the second gear mounting plate 540 is connected to the second slide rail 512 area through the second slide rail connecting plate 544.

[0107] Further, the first semicircular gear 530 is mounted on the first gear mounting plate 520 through the first semicircular split bearing 521, and the second semicircular gear 550 is mounted on the second gear mounting plate 540 through the second semicircular split bearing. A first positioning pin 531 is mounted on one end of the first semicircular gear 530, and a first positioning pin hole is provided at the other end of the first semicircular gear 530. A second positioning pin hole is provided at one end of the second semicircular gear 550 that is connected to the first semicircular gear 530 with the first positioning pin 531, and a second positioning pin is installed at one end of the second semicircular gear 550 that is connected to the first semicircular gear 530 with the first positioning pin hole. When the first gear mounting plate 520 and the second gear mounting plate 540 are assembled together, the first semicircular gear 530 and the second semicircular gear 550 can rotate in a circle through the first semicircular split bearing 521 and the second semicircular split bearing.

[0108] Further optionally, a first rotating driving gear 522 is provided on the first gear mounting plate 520, the first rotating driving gear 522 meshes with the first semicircular gear 530 to form a gear transmission pair, and a first rotating driving motor 523 is also provided on the first gear mounting plate 520 to drive the first rotating driving gear 522 to rotate. The first rotating driving motor 523 can be provided on the side of the first gear mounting plate 520 opposite to the first rotating driving gear 522, or on the same side of the first gear mounting plate 520 as the first rotating driving gear 522. Similarly, the second rotating driving gear 542 and the second rotating driving motor 543 provided on the second gear mounting plate 540 are provided in the same manner as the first rotating driving gear 522 and the first rotating driving motor 523 provided on the first gear mounting plate 520, and are not described in detail herein.

[0109] In the embodiments of the present application, Figures 1 to 4 As shown, the sleeve adsorption assembly unit 600 includes a first sleeve adsorption assembly 610 and a second sleeve adsorption assembly 620 which are symmetrically arranged. The first sleeve adsorption assembly 610 includes a first adsorption assembly bracket 611, a first adsorption member 612, a first adsorption guide sleeve 613 and a first adsorption drive cylinder 614. The second sleeve adsorption unit includes a second adsorption assembly bracket 621, a second adsorption member 622, a second adsorption guide sleeve 623 and a second adsorption drive cylinder 624. The first adsorption assembly bracket 611 is the installation base of the first sleeve adsorption assembly 610. The first adsorption assembly bracket 611 is fixedly connected to the first semicircular gear 530. The first adsorption guide sleeve 613 is provided on the first adsorption assembly bracket 611. The columnar portion of the first adsorption member 612 can be slidably arranged in the first adsorption guide sleeve 613. The first adsorption drive cylinder 614 is arranged on the first adsorption assembly bracket 611 and can drive the columnar portion of the first adsorption member 612 to perform linear motion in the first adsorption guide sleeve 613. Optionally, the adsorption part of the first adsorption member 612 is an electromagnetic adsorber, which relies on electromagnetic suction to adsorb the pipe reinforcement sleeve 20. The first adsorption member 612 is driven by the first adsorption drive cylinder 614 to extend and retract relative to the first adsorption group pair bracket 611 to contact the pipe reinforcement sleeve 20, so that the pipe reinforcement sleeve 20 is contacted and adsorbed by electromagnetic suction. At the same time, the first adsorption group pair bracket 611 rotates under the drive of the first semicircular gear 530, thereby driving the pipe reinforcement sleeve 20 to rotate. Similarly, the structure and setting method of the second sleeve adsorption assembly 620 are the same as those of the first sleeve adsorption assembly 610, and will not be repeated here.

[0110] In the embodiments of the present application, Figures 1 to 6As shown, the welding unit 700 includes a welding machine 720, a welding gun 710, an X-axis linear module 730, a Y-axis linear module 740, a Z-axis linear module 750 and a transfer arm 760. The welding machine 720 is fixedly mounted on the top of the assembly welding bracket 100 and connected to the welding gun 710 through a welding pipeline; the Z-axis linear module 750 is fixedly mounted on the top of the assembly welding bracket 100, providing the welding gun 710 with movement in the Z direction; the Y-axis linear module 740 is connected to the slider of the Z-axis linear module 750, providing the welding gun 710 with movement in the Y direction; one end of the transfer arm 760 is connected to the slider of the Y-axis linear module 740, and the other end of the transfer arm 760 is fixedly mounted with the X-axis linear module 730; the welding gun 710 is fixedly mounted on the output end of the X-axis linear module 730, providing the welding gun 710 with movement in the X direction. The welding unit 700 realizes the movement of the welding gun 710 in three-dimensional space through the cooperation of the X-axis linear module 730 , the Y-axis linear module 740 , the Z-axis linear module 750 and the transfer arm 760 .

[0111] The pipe reinforcement sleeve 20 set welding device of the present application will be further described below in conjunction with the method of using the pipe reinforcement sleeve 20 set welding device of the present embodiment.

[0112] When the pipe reinforcement sleeve 20 assembly welding device is in the initial state, the first swing arm 220 of the first tube clamping positioning unit 200, the second swing arm 320 of the second tube clamping positioning unit 300, the first gear mounting plate 520 and the second gear mounting plate 540 in the sleeve rotating unit 500 are all in the open state, and the first sleeve adsorption assembly 610 and the second sleeve adsorption assembly 620 of the sleeve adsorption assembly unit 600 are in a relatively horizontal position.

[0113] When the pipe reinforcement sleeve 20 set welding device is in working state, after the entire device of the pipe reinforcement sleeve 20 set welding device is hoisted onto the conveying pipe by an external lifting machine, the first swing arm 220 of the first pipe clamping and positioning unit 200 is closed under the drive of the first swing arm driving cylinder 260, and the two first swing arms 220 are locked by the first swing arm 220 locking member; at the same time, the second swing arm 320 of the second pipe clamping and positioning unit 300 is closed under the drive of the second swing arm driving cylinder 360, and the two second swing arms 320 are locked by the second swing arm locking member 350. Afterwards, the first pipe clamping and positioning member 230 of the first pipe clamping and positioning unit 200 and the second pipe clamping and positioning member 330 of the second pipe clamping and positioning unit 300 are pushed out to clamp the pipe reinforcement sleeve 20 set welding device and the conveying pipe and complete the coaxial positioning. After the above actions are completed, the first gear mounting plate 520 and the second gear mounting plate 540 in the sleeve rotating unit 500 are respectively driven by the first screw assembly and the second screw assembly 570 along the first slide rail 511 and the second slide rail 512 on the beam 510 to move toward each other until the first gear mounting plate 520 and the second gear mounting plate 540 are closed. During the closing process, the positioning pin shafts and positioning pin holes on the first semicircular gear 530 and the second semicircular gear 550 in the sleeve rotating unit 500 are inserted into each other for positioning, and are assembled to form a complete circular gear.

[0114] After the above actions are completed, the first semicircular pipe reinforcement sleeve 20 is hoisted to the welding work position Q2 at the twelve o'clock direction on the top of the conveying pipeline by using an external lifting device. At this time, the first rotary drive motor 523 and the first rotary drive motor 523 in the sleeve rotation unit 500 are started, driving the first rotary drive gear 522 and the second rotary drive gear 542 and synchronously driving the circular gear formed by the first semicircular gear 530 and the second semicircular gear 550 to rotate, and the first sleeve adsorption assembly 6 installed on the first semicircular gear 530 is sucked. 10 rotates to the twelve o'clock direction and stops. At this time, the first adsorption drive cylinder 614 in the first sleeve adsorption assembly 610 extends out, and under the action of the first adsorption guide sleeve 613, the electromagnetic adsorber as the first adsorbent 612 moves toward the first semicircular pipe reinforcement sleeve 20 and stops after contact. The electromagnetic adsorber generates a strong adsorption force to firmly adsorb the first semicircular pipe reinforcement sleeve 20, and then the first adsorption drive cylinder 614 is slightly retracted to make the first semicircular pipe reinforcement sleeve 20 separate from the surface of the conveying pipeline by 3mm to 5mm. Then the first rotation drive motor 523 and the first rotation drive motor 523 in the sleeve rotation unit 500 are started, driving the first rotation drive gear 522 and the second rotation drive gear 542 and synchronously driving the circular gear formed by the first semicircular gear 530 and the second semicircular gear 550 to rotate, so that the first sleeve adsorption assembly 610 adsorbing the first semicircular pipe reinforcement sleeve 20 rotates 180 degrees to the six o'clock direction at the bottom of the conveying pipeline.

[0115] After the above actions are completed, an external lifting device is used to hoist the second semicircular pipe reinforcement sleeve 20 to the hoisting work position Q1 at the twelve o'clock direction on the top of the conveying pipeline, and then the second sleeve push rod 340 set on the second pipe clamping positioning unit 300 is operated to extend the second sleeve push rod 340 to push the second semicircular pipe reinforcement sleeve 20 to the welding work position Q2 and align it with the end face of the first semicircular pipe reinforcement sleeve 20. Then, the second adsorption drive cylinder 624 in the second sleeve adsorption assembly 620 is extended, and under the action of the second adsorption guide sleeve 623, the electromagnetic absorber serving as the second adsorption component 622 is moved toward the second semicircular pipe reinforcement sleeve 20 and stops after contact. The electromagnetic absorber generates a strong adsorption force to firmly adsorb the second semicircular pipe reinforcement sleeve 20, and then the second adsorption drive cylinder 624 is operated to retract slightly, so that the second semicircular pipe reinforcement sleeve 20 is also separated from the surface of the conveying pipeline by 3mm to 5mm. Afterwards, the first sleeve adsorption assembly 610 and the second sleeve adsorption assembly 620 in the sleeve adsorption assembly unit 600 can be operated separately to complete the weld assembly of the two semicircular pipe reinforcement sleeves 20 and ensure that the gap between the assembled pipe reinforcement sleeves 20 and the conveying pipe is uniform.

[0116] After the above actions are completed, the first rotary drive motor 523 and the first rotary drive motor 523 in the sleeve rotation unit 500 are started, driving the first rotary drive gear 522 and the second rotary drive gear 542 and synchronously driving the circular gear formed by the first semicircular gear 530 and the second semicircular gear 550 to rotate, and the weld of the assembled pipe reinforcement sleeve 20 is rotated to the twelve o'clock direction of the top of the conveying pipe and then stopped, and then the Z-axis linear module 750, the Y-axis linear module 740, and the X-axis linear module 730 in the welding unit 700 are controlled, and the welding gun 710 is used to complete the spot welding positioning of the weld. Afterwards, the first rotary drive motor 523 and the first rotary drive motor 523 in the sleeve rotation unit 500 are started to drive the first rotary drive gear 522 and the second rotary drive gear 542 and synchronously drive the circular gear formed by the first semicircular gear 530 and the second semicircular gear 550 to rotate, and the assembled pipe reinforcement sleeve 20 is rotated 180 degrees, so that the other weld is rotated to the twelve o'clock direction at the top of the conveying pipe and then stops, and then the Z-axis linear module 750, the Y-axis linear module 740, and the X-axis linear module 730 in the welding unit 700 are controlled, and the welding gun 710 is used to complete the spot welding positioning of the weld.

[0117] After the above actions are completed, the welding unit 700 starts the automatic welding program to perform continuous root welding and continuous single-pass multi-layer filling cap welding on the narrow gap groove weld. During the welding process, the pipe reinforcement sleeve 20 can also be reciprocated by the sleeve rotating unit 500 for symmetrical welding to ensure the uniformity of welding stress and reduce welding deformation. Optionally, the electromagnetic absorber in the sleeve adsorption assembly unit 600 can be turned off during continuous welding to avoid the occurrence of welding magnetic blow.

[0118] After the above actions are completed, after the two narrow gap longitudinal welds of the pipe reinforcement sleeve 20 are welded, the electromagnetic absorber in the sleeve adsorption assembly unit 600 is closed, and the first adsorption drive cylinder 614 and the second adsorption drive cylinder 624 are retracted to release the welded pipe reinforcement sleeve 20; then the first rotation drive motor 523 and the first rotation drive motor 523 in the sleeve rotation unit 500 are started, driving the first rotation drive gear 522 and the second rotation drive gear 542 and synchronously driving the first semicircular gear 530, the first semicircular gear 531 and the second semicircular gear 532. The circular gear formed by the two semicircular gears 550 rotates, causing the joint of the circular gears to rotate to the second point direction of the conveying pipeline; then the first gear mounting plate 520 and the second gear mounting plate 540 in the sleeve rotating unit 500 are driven by the first screw assembly and the second screw assembly 570 respectively and move in opposite directions along the first slide rail 511 and the second slide rail 512 on the beam 510, opening the first gear mounting plate 520 together with the first semicircular gear 530 and the second gear mounting plate 540 together with the second semicircular gear 550.

[0119] After the above actions are completed, the first swing arm 220 locking piece in the first tube clamping positioning unit 200 unlocks the two first swing arms 220, the first swing arm 220 is opened under the drive of the first swing arm driving cylinder 260, and the first tube clamping positioning piece 230 is retracted synchronously; at the same time, the second swing arm locking piece 350 in the second tube clamping positioning unit 300 unlocks the two second swing arms 320, the second swing arm 320 is opened under the drive of the second swing arm driving cylinder 360, and the second tube clamping positioning piece 330 is retracted synchronously.

[0120] After the above actions are completed, the entire pipeline reinforcement sleeve 20 group welding device returns to the initial state, and then the pipeline reinforcement sleeve 20 group welding device is lifted away from the conveying pipeline by an external lifting machinery, completing a pipeline reinforcement sleeve 20 group welding work cycle.

[0121] The above-mentioned pipeline reinforcement sleeve 20 assembly welding device proposed in the embodiment of the present application realizes the automated assembly welding of narrow gap grooves, changes the current situation that the pipeline reinforcement sleeve 20 needs to be manually assembled, and the welding coverage amount is only about 35% of manual welding, which greatly improves the welding construction efficiency of oil and gas pipeline maintenance and repair.

[0122] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0123] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", and "counterclockwise" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. It should be noted that all directional indications in the embodiments of the present application are only used to explain the relative positional relationship, movement, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0124] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0125] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A pipe reinforcement sleeve assembly welding device, characterized in that: The pipeline reinforcement sleeve assembly welding device comprises: Assemble welding brackets; A first pipe clamp positioning unit comprises a first pipe clamp fixing frame arranged on the group welding bracket and a first swing arm hinged to the first pipe clamp fixing frame at one end, wherein the first swing arm swings relative to the first pipe clamp fixing frame to form a first annular pipe clamp with the first pipe clamp fixing frame; The sleeve rotating unit comprises a crossbeam arranged on the pair welding bracket, a first gear mounting plate and a second gear mounting plate movably arranged on the crossbeam, a first semicircular gear rotatably arranged on the first gear mounting plate, and a second semicircular gear rotatably arranged on the second gear mounting plate, wherein the first semicircular gear and the second semicircular gear are arranged opposite to each other to close to form a circular gear, and the circular gear is coaxial with the first annular pipe clamp; A sleeve adsorption assembly unit comprises a first sleeve adsorption assembly arranged on the first semicircular gear and a second sleeve adsorption assembly arranged on the second semicircular gear; and A welding unit, comprising a welder disposed on the pair welding bracket and a welding gun connected to the welder, wherein the welding gun can move in a three-dimensional space relative to the pair welding bracket; Wherein, the first sleeve adsorption assembly comprises a first adsorption group bracket arranged on the first semicircular gear and a first adsorption member telescopically arranged on the first adsorption group bracket; The second sleeve adsorption assembly comprises a second adsorption group bracket arranged on the second semicircular gear and a second adsorption member telescopically arranged on the second adsorption group bracket; The first pipe clamping positioning unit is used to position and fix the pipe reinforcement sleeve assembly welding device on the conveying pipe, the sleeve adsorption assembly unit is used to adsorb the pipe reinforcement sleeve, the sleeve rotation unit is used to rotate the pipe reinforcement sleeve to a preset position, and the welding unit is used to weld the weld of the pipe reinforcement sleeve.

2. The pipe reinforcement sleeve assembly welding device according to claim 1, characterized in that: The pipeline reinforcement sleeve assembly welding device also includes: A second tube clamp positioning unit comprises a second tube clamp fixing frame and a second swing arm hinged to the second tube clamp fixing frame at one end, wherein the second swing arm swings relative to the second tube clamp fixing frame to form a second annular tube clamp with the second tube clamp fixing frame; The pipe clamp positioning connection unit is arranged between the first pipe clamp fixing frame and the second pipe clamp fixing frame so that the first annular pipe clamp and the second annular pipe clamp are coaxial.

3. The pipe reinforcement sleeve assembly welding device according to claim 2, characterized in that: The first tube clamping positioning unit also includes at least three first tube clamping positioning members which are arranged on the inner wall of the first annular tube clamp and can be retracted synchronously; the second tube clamping positioning unit also includes at least three second tube clamping positioning members which are arranged on the inner wall of the second annular tube clamp and can be retracted synchronously.

4. The pipe reinforcement sleeve assembly welding device according to claim 2, characterized in that: The first pipe clamp fixing frame and / or the second pipe clamp fixing frame are provided with a sleeve push rod parallel to the central axis of the pipeline reinforcement sleeve.

5. The pipe reinforcement sleeve assembly welding device according to claim 2, characterized in that: The first swing arm is provided with a first swing arm locking piece, and the second swing arm is provided with a second swing arm locking piece.

6. The pipe reinforcement sleeve assembly welding device according to claim 2, characterized in that: The first tube clamping positioning unit comprises two first swing arms, and the two first swing arms are respectively arranged at two ends of the first tube clamping fixing frame; The second tube clamping positioning unit includes two second swing arms, and the two second swing arms are respectively arranged at two ends of the second tube clamping fixing frame.

7. The pipe reinforcement sleeve assembly welding device according to any one of claims 1 to 6, characterized in that: The sleeve rotating unit also includes: A first screw assembly includes a first screw arranged in or on the crossbeam and a first screw nut arranged on the first screw; A second screw assembly comprises a second screw arranged in parallel with the first screw in or on the crossbeam and a second screw nut arranged on the second screw; The first gear mounting plate is connected to the first screw nut so as to move relative to the crossbeam under the drive of the first screw nut; The second gear mounting plate is connected to the second screw nut so as to move relative to the crossbeam under the drive of the second screw nut.

8. The pipe reinforcement sleeve assembly welding device according to claim 7, characterized in that: The crossbeam is provided with a first slide rail and a second slide rail; The first gear mounting plate is slidably connected to the first slide rail or is slidably connected to the first slide rail through a first slide rail connecting plate; The second gear mounting plate is slidably connected to the second slide rail or is slidably connected to the second slide rail via a second slide rail connecting plate.

9. The pipe reinforcement sleeve assembly welding device according to claim 7, characterized in that: The ends of the first semicircular gear are respectively provided with a first positioning pin shaft and a first positioning pin hole, and the ends of the second semicircular gear are respectively provided with a second positioning pin hole and a second positioning pin shaft matching the first positioning pin shaft and the first positioning pin hole. When the first semicircular gear and the second semicircular gear are closed to form the circular gear, the first positioning pin shaft is inserted into the second positioning pin hole, and the second positioning pin shaft is inserted into the first positioning pin hole.

10. The pipe reinforcement sleeve assembly welding device according to claim 7, characterized in that: The first semicircular gear is connected to the first gear mounting plate via a first semicircular split bearing; the second semicircular gear is connected to the second gear mounting plate via a second semicircular split bearing.

Citation Information

Patent Citations

  • Process and apparatus for sleeve repair of pipe line

    CA1237682A

  • Transverse rail rapid fixing clamp, device and method for automatic pipeline welding

    CN113118697A