Precast concrete installation facilities for municipal road construction
By using a rapid installation method for precast concrete culverts, and utilizing facilities such as mobile vehicles and jacks, the problem of time-consuming and labor-intensive culvert construction in municipal road construction has been solved, achieving efficient and stable culvert installation and enhancing structural strength and sealing.
Patent Information
- Application Number
- CN202210966684.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-08-12
AI Technical Summary
In municipal road construction, the direct excavation and on-site masonry of concrete culverts are time-consuming and labor-intensive, technically challenging, and greatly affected by the weather.
Precast concrete culverts are used, and rapid installation is achieved through interference fit and positioning rings using facilities such as mobile vehicles, jacks, and guide rods. Combined with the design of concrete bases and drainage channels, structural strength and sealing are ensured.
Shorten the construction period, save labor costs, improve construction efficiency, reduce the impact of weather, enhance the structural strength of the culvert and ensure its sealing.
Smart Images

Figure CN115522488B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of municipal road construction, in particular to precast concrete installation facilities for municipal road construction. Background Art
[0002] Part of the construction of municipal road infrastructure, involving common urban roads, bridges, subways, underground pipelines, tunnels, rivers, rail transit, sewage treatment, garbage disposal and other projects. Culverts refer to drainage channels (water channels) built under the roadbed and below the road surface in municipal road construction in order to allow the road to pass through the canal smoothly without hindering traffic. Through this structure, water can flow from under the road, which is used to drain floods across natural valleys and depressions, or across large and small roads as a traffic lane for people, livestock and vehicles, or as a canal for farmland irrigation. Culverts are mainly composed of tunnel bodies, foundations, ends and wing walls. Culverts are based on the principle of communicating vessels and are usually built with materials such as bricks, stones, concrete and reinforced concrete. They are generally small in diameter and have shapes such as pipes, boxes and arches. Most concrete culverts are directly excavated and built on site. This method is time-consuming and labor-intensive, and the construction technology is difficult. In order to shorten the construction period and save labor costs, we propose precast concrete installation facilities for municipal road construction. Summary of the invention
[0003] The main purpose of the present invention is to provide precast concrete installation facilities for municipal road construction, which can effectively solve the problems in the background technology.
[0004] To achieve the above object, the technical solution adopted by the present invention is:
[0005] Precast concrete installation facilities for municipal road construction, precast concrete culverts are set, including new and old connection grooves are set at the lower part of the two outer sides of the precast concrete culvert, several groups of side precast steel bars are evenly distributed in the new and old connection grooves, several groups of bottom precast steel bars are evenly distributed at the bottom of the precast concrete culvert, and several groups of positioning rings are fixedly installed at equal intervals at the center line position of the top of the precast concrete culvert;
[0006] Two groups of mobile vehicles are arranged at the bottom of the precast concrete culvert, the corners of the precast concrete culvert are stuck in the grooves of the mobile vehicles, and a plurality of groups of universal wheels are installed at the bottom of the mobile vehicles. The mobile vehicles drive the precast concrete culvert to move in the direction of the earth slope. An inner groove of the culvert is excavated in the earth slope for the precast concrete culvert to enter. The volume of the position above the middle of the inner groove of the culvert is the same as the size of the corresponding position of the precast concrete culvert. The middle position of the inner groove of the culvert is a narrow mouth, which is slightly smaller than the size of the corresponding position of the precast concrete culvert. The precast concrete culvert enters the narrow mouth position by squeezing, and the volume of the position below the middle of the inner groove of the culvert is smaller than the size of the corresponding position of the precast concrete culvert.
[0007] Insert the plunger horizontally into the soil layer above the center line of the excavated culvert inner groove to form a fixed structure. The parallel guide rod below the plunger is located on the inner center line of the culvert inner groove. Both are connected at the ends through a lifting regulator for height adjustment. When the mobile vehicle drives the precast concrete culvert to move, the guide rod is lifted to a suitable position to allow several groups of positioning rings to pass through the guide rod in sequence, so that the two sides of the precast concrete culvert enter the culvert inner groove symmetrically, completing the positioning of the precast concrete culvert;
[0008] Remove the two groups of mobile vehicles, and let the insertion rods and guide rods serve as the supporting parts of the precast concrete culvert. At the removed position, that is, a group of jacks are installed under each of the four corners of the precast concrete culvert. The four groups of jacks are controlled by a driving motor. The four groups of jacks are lifted up at the same time, driving the precast concrete culvert to move upward, so that the arc top of the precast concrete culvert completely enters the arc top of the inner groove of the culvert to form a fit, and it is an interference fit. After lifting, a space is formed between the lower end of the precast concrete culvert and the bottom of the inner groove of the culvert. In this space, several groups of bottom precast steel bars are matched, and a concrete base is built. Two groups of drainage grooves are reserved inside the concrete base. After they are completely dried, the diversion port is opened downward from the inside of the precast concrete culvert to communicate with the drainage groove;
[0009] Turn off the switch of the jack, return its four sets of lifting rods to their original positions, remove the jack, and then pour a mixture of concrete and gravel into the gaps on both sides of the precast concrete culvert, that is, the new and old connecting grooves and the outward position. Because the precast concrete culvert is located in the middle position, the size of the gaps on both sides is not much different, and the same concrete materials are used for pouring, thereby ensuring that the filling density on both sides is similar. The poured material will flow into the position of the concrete base in advance, and after stacking, it will rise to completely fill the upper gap to form a filling part. After waiting for drying, the installation of the precast concrete culvert is completed.
[0010] Preferably, the prefabricated concrete culvert is loaded into a mobile vehicle and installed by a crane, and the force-bearing parts of the crane hook are the middle groups of positioning rings.
[0011] Preferably, the inner trench of the culvert is excavated in advance inside the earth slope, below the construction road, and the shape is the same as that of the precast concrete culvert. During excavation, care is taken to ensure that the two sides of the inner trench of the culvert are symmetrical, with the arc top as the central symmetry point.
[0012] Preferably, the insertion rod includes a spike at the end, a drilling device is used for insertion of the insertion rod, and a level measuring instrument is used, and the guide rod and the lifting adjuster are installed after the insertion rod is fixed in position, and the diameter of the guide rod is slightly smaller than the ring diameter of the positioning ring.
[0013] Preferably, the four groups of jacks are installed symmetrically, all located at the bottom corners of the precast concrete culvert, the upper ends of the jacking rods are connected to a support plate for expanding the force-bearing area, and the support plate is in contact with the bottom surface of the precast concrete culvert.
[0014] Preferably, the bottom surface of the drainage ditch is concave. At the new and old connecting grooves, the newly poured concrete will form a junction between the new and old concrete with the precast concrete culvert itself. Due to the connecting effect of several groups of side precast steel bars, the junction is in a tightly connected state. The front and rear end surfaces of the filling part are leveled with bricks or large stones for beautification and waterproofing.
[0015] The present invention provides a precast concrete installation facility for municipal road construction by improving the present invention, which has the following significant improvements and advantages compared with the prior art:
[0016] (1) Prefabricated concrete culverts are used for direct installation, thereby shortening the construction period and saving labor costs. In addition, this method is prefabricated in the factory and is not affected by external weather conditions. The main structure of the culvert is stronger.
[0017] (2) Insert rods horizontally into the soil layer above the center line of the excavated culvert inner channel to form a fixed structure. When the mobile vehicle drives the precast concrete culvert to move, the guide rods are raised and lowered to a suitable position to allow several groups of positioning rings to pass through the guide rods in sequence, so that the two sides of the precast concrete culvert enter the culvert inner channel symmetrically to complete the positioning of the precast concrete culvert. The purpose of this step is that the precast concrete culvert is located in the middle position after positioning, so the size of the gap on both sides is not much different, and the concrete material used during pouring is the same, thereby ensuring that the filling density on both sides is similar.
[0018] (3) A set of jacks is installed under each of the four corners of the precast concrete culvert. The four sets of jacks are controlled by a driving motor. The four sets of jacks are lifted simultaneously, driving the precast concrete culvert to move upward, so that the arc top of the precast concrete culvert completely enters the arc top of the inner groove of the culvert to form a fit, and it is an interference fit, thereby ensuring the fixing effect of the upper part of the culvert.
[0019] (4) A concrete base is set up to support the upper part and fill the bottom gap. On the other hand, a drainage ditch is opened inside the base to drain water and prevent water accumulation in the culvert. Several groups of side precast steel bars and bottom precast steel bars are set up to serve as connection and reinforcement.
[0020] (5) The entire method is simple in design and easy to operate. It uses facilities such as cranes, mobile vehicles, adjustment rods and jacks, which meet actual usage standards, reduce production costs, and improve work efficiency. The effect of use is better than that of traditional methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1This is a schematic diagram of loading a prefabricated concrete culvert according to the present invention;
[0022] Figure 2 This is a schematic diagram of the positioning of the precast concrete culvert of the present invention;
[0023] Figure 3 This is a schematic diagram of the jacking of the precast concrete culvert of the present invention;
[0024] Figure 4 This is a schematic diagram of the on-site base of the prefabricated concrete culvert of the present invention;
[0025] Figure 5 This is a schematic diagram of the present invention after the jack is removed;
[0026] Figure 6 It is a cross-sectional view of the precast concrete culvert of the present invention after installation;
[0027] Figure 7 It is a flow chart of all installation facilities and steps of the present invention.
[0028] In the figure: 1. Precast concrete culvert; 2. New and old connecting grooves; 3. Side precast steel bars; 4. Bottom precast steel bars; 5. Positioning ring; 6. Mobile vehicle; 7. Universal wheel; 8. Guide rod; 9. Lifting adjuster; 10. Insert rod; 11. Spike; 12. Jack; 13. Concrete base; 14. Drainage trough; 15. Diversion port; 16. Earth slope; 17. Construction road; 18. Culvert inner groove; 19. Narrow mouth; 20. Filling part. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] like Figure 1-7 As shown, a precast concrete installation facility for municipal road construction is provided, and a precast concrete culvert 1 is provided, including new and old connection grooves 2 are provided at the lower parts of the two outer sides of the precast concrete culvert 1, and a plurality of groups of side precast steel bars 3 are evenly distributed in the new and old connection grooves 2, a plurality of groups of bottom precast steel bars 4 are evenly distributed at the bottom of the precast concrete culvert 1, and a plurality of groups of positioning rings 5 are evenly fixedly installed at the center line position of the top of the precast concrete culvert 1;
[0031] Two groups of mobile vehicles 6 are arranged at the bottom of the precast concrete culvert 1. The corners of the precast concrete culvert 1 are stuck in the grooves of the mobile vehicles 6. A plurality of groups of universal wheels 7 are installed at the bottom of the mobile vehicles 6. The mobile vehicles 6 drive the precast concrete culvert 1 to move in the direction of the earth slope 16. A culvert inner groove 18 is excavated in the earth slope 16 for the precast concrete culvert 1 to enter. The volume of the position above the middle of the culvert inner groove 18 is the same as the size of the corresponding position of the precast concrete culvert 1. The middle position of the culvert inner groove 18 is a narrow opening 19, which is slightly smaller than the size of the corresponding position of the precast concrete culvert 1. The precast concrete culvert 1 enters the narrow opening 19 by squeezing. The volume of the position below the middle of the culvert inner groove 18 is smaller than the size of the corresponding position of the precast concrete culvert 1.
[0032] Insert the rod 10 horizontally into the soil layer above the center line of the excavated culvert inner groove 18 to form a fixed structure. The parallel guide rod 8 below the rod 10 is located on the inner center line of the culvert inner groove 18. Both are connected at the ends through the lifting regulator 9 for height adjustment. When the mobile vehicle 6 drives the precast concrete culvert 1 to move, the guide rod 8 is lifted to a suitable position to allow several groups of positioning rings 5 to pass through the guide rod 8 in sequence, so that the two sides of the precast concrete culvert 1 enter the culvert inner groove 18 symmetrically, completing the positioning of the precast concrete culvert 1;
[0033] Remove the two groups of mobile vehicles 6, and let the insertion rod 10 and the guide rod 8 serve as the supporting parts of the precast concrete culvert 1. At the removed position, that is, a group of jacks 12 are installed under the four corners of the precast concrete culvert 1. The four groups of jacks 12 are controlled by a driving motor. The four groups of jacks 12 are lifted at the same time, driving the precast concrete culvert 1 to move upward, so that the arc top of the precast concrete culvert 1 completely enters the arc top of the culvert inner groove 18 to form a fit, and it is an interference fit. After lifting, a space is formed between the lower end of the precast concrete culvert 1 and the bottom of the culvert inner groove 18. In this space, several groups of bottom precast steel bars 4 are matched, and a concrete base 13 is built. Two groups of drainage grooves 14 are reserved inside the concrete base 13. After they are completely dried, a diversion port 15 is opened downward from the inside of the precast concrete culvert 1 to communicate with the drainage groove 14;
[0034] Turn off the switch of the jack 12, let its four sets of jacking rods return to their original positions, and remove the jack 12, and then pour the mixture of concrete and gravel into the gaps on both sides of the precast concrete culvert 1, that is, the new and old connecting grooves 2 and the outward position. Because the precast concrete culvert 1 is located in the middle position, the size difference of the gaps on both sides is not large. The same concrete material is used during pouring, thereby ensuring that the filling density on both sides is similar. The poured material will flow into the position of the concrete base 13 in advance, and after being stacked, it will rise and completely fill the upper gap to form a filling part 20. After waiting for drying, the installation of the precast concrete culvert 1 is completed;
[0035] The precast concrete culvert 1 is loaded into a mobile vehicle 6 and installed by a crane. The force-bearing part of the crane hook is the middle several groups of positioning rings 5; inside the earth slope 16, below the construction road 17, a culvert inner groove 18 is pre-excavated, and the shape is the same as that of the precast concrete culvert 1. During excavation, care should be taken to ensure that the two sides of the culvert inner groove 18 are symmetrical, with the arc top as the central symmetry point; the insertion rod 10 includes a spike 11 at the end, and the insertion of the insertion rod 10 uses a drilling device, and cooperates with a level measuring instrument. The guide rod 8 and the lifting regulator 9 are installed after the insertion rod 10 is fixed in position. The diameter of the guide rod 8 is slightly smaller than the ring diameter of the positioning ring 5; the installation positions of the four groups of jacks 12 are symmetrical, all located at the bottom corners of the precast concrete culvert 1, and the upper end of the jacking rod The support plate is used to expand the force-bearing area, and the support plate contacts the bottom surface of the precast concrete culvert 1; the bottom surface of the drainage trough 14 is concave, and at the new and old connecting grooves 2, the newly poured concrete will form a new and old concrete junction with the precast concrete culvert 1 itself. Because of the connection effect of several groups of side precast steel bars 3, the junction is in a tightly connected state, and the front and rear end surfaces of the filling part 20 are flattened with bricks or large stones for beautification and waterproofing; the new and old connecting grooves 2 are reserved structures, which are convenient for subsequent concrete pouring, and cooperate with the connecting steel bars to enhance the connection effect; after the moving vehicle 6 is removed, the precast concrete culvert 1 will drop a distance only supported by the guide rod, because the previous lifting regulator 9 has risen a distance to cooperate with the positioning.
[0036] It should be noted that the present invention is a precast concrete installation facility for municipal road construction, such as Figure 7 As shown, the following steps are included: S1 precast concrete culvert 1 is loaded, S2 positioning rods (i.e., insertion rods 10 and guide rods 8) are installed, S3 precast concrete culvert 1 and horizontal rods (i.e., guide rods 8) are docked, S4 loading vehicle (i.e., mobile vehicle 6) is moved out, S5 jack 12 is installed, S6 jack 12 is lifted, S7 concrete base 13 is built at the bottom of precast concrete culvert 1, S8 drainage groove 14 is opened inside concrete base 13, S9 jack 12 is moved out, S10 concrete material is poured into the gap of culvert (i.e., new and old connection grooves 2 and the outward position).
[0037] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. Precast concrete installation facilities for municipal road construction, characterized by: A precast concrete culvert (1) is provided, including providing new and old connection grooves (2) at the lower parts of both outer sides of the precast concrete culvert (1), a plurality of groups of side precast steel bars (3) being evenly distributed in the new and old connection grooves (2), a plurality of groups of bottom precast steel bars (4) being evenly distributed at the bottom of the precast concrete culvert (1), and a plurality of groups of positioning rings (5) being evenly fixedly installed at the center line position of the top of the precast concrete culvert (1); Two groups of mobile vehicles (6) are arranged at the bottom of the precast concrete culvert (1). The corners of the precast concrete culvert (1) are stuck in the grooves of the mobile vehicles (6). A plurality of groups of universal wheels (7) are installed at the bottom of the mobile vehicles (6). The mobile vehicles (6) drive the precast concrete culvert (1) to move in the direction of the earth slope (16). A culvert inner groove (18) is excavated in the earth slope (16) for the precast concrete culvert (1) to enter. The volume of the position above the middle of the culvert inner groove (18) is the same as the size of the corresponding position of the precast concrete culvert (1). The middle position of the culvert inner groove (18) is a narrow opening (19) which is slightly smaller than the size of the corresponding position of the precast concrete culvert (1). The precast concrete culvert (1) enters the narrow opening (19) by squeezing. The volume of the position below the middle of the culvert inner groove (18) is smaller than the size of the corresponding position of the precast concrete culvert (1). Inserting a rod (10) horizontally into the soil layer above the center line of the excavated culvert inner groove (18) to form a fixed structure, a parallel guide rod (8) below the rod (10) is located on the inner center line of the culvert inner groove (18), and both are connected at the ends through a lifting regulator (9) for height adjustment. When the mobile vehicle (6) drives the precast concrete culvert (1) to move, the guide rod (8) is lifted to a suitable position to allow a plurality of sets of positioning rings (5) to pass through the guide rod (8) in sequence, so that the two sides of the precast concrete culvert (1) enter the culvert inner groove (18) symmetrically, thereby completing the positioning of the precast concrete culvert (1); The two groups of mobile vehicles (6) are removed, and the insertion rods (10) and the guide rods (8) are used as supporting components of the precast concrete culvert (1). A group of jacks (12) are installed at the removed positions, that is, below the four corners of the precast concrete culvert (1). The four groups of jacks (12) are controlled by a driving motor. The four groups of jacks (12) are lifted simultaneously to drive the precast concrete culvert (1) to move upward, so that the arc top of the precast concrete culvert (1) completely enters the culvert inner groove (1). 8), a fit is formed at the arc top, and it is an interference fit. After the jacking, a space is formed between the lower end of the precast concrete culvert (1) and the bottom of the culvert inner groove (18). In this space, a plurality of groups of bottom precast steel bars (4) are matched, and a concrete base (13) is built. Two groups of drainage grooves (14) are reserved inside the concrete base (13). After they are completely dried, a diversion port (15) is opened downward from the inside of the precast concrete culvert (1) to communicate with the drainage groove (14); The switch of the jack (12) is turned off, and the four sets of jacking rods are returned to their original positions. The jack (12) is removed, and a mixture of concrete and gravel is poured into the gaps on both sides of the precast concrete culvert (1), that is, the new and old connecting grooves (2) and the outward position. Because the precast concrete culvert (1) is located in the middle, the gaps on both sides are not much different in size. The same concrete material is used during the pouring, thereby ensuring that the filling density on both sides is similar. The poured material will flow into the position of the concrete base (13) in advance, and after being stacked, it will rise to completely fill the upper gap to form a filling part (20). After waiting for drying, the installation of the precast concrete culvert (1) is completed.
2. The precast concrete installation facility for municipal road construction according to claim 1 is characterized in that: The prefabricated concrete culvert (1) is loaded into a mobile vehicle (6) and installed by a crane, wherein the force-bearing parts of the crane hook are the middle groups of positioning rings (5).
3. The precast concrete installation facility for municipal road construction according to claim 2 is characterized in that: Inside the earth slope (16), below the construction road (17), a culvert inner trench (18) is excavated in advance, the shape of which is the same as that of the precast concrete culvert (1). During the excavation, care is taken to ensure that the two sides of the culvert inner trench (18) are symmetrical, with the arc top as the central symmetry point.
4. The precast concrete installation facility for municipal road construction according to claim 3 is characterized by: The insertion rod (10) includes a spike (11) at the end. The insertion of the insertion rod (10) uses a drilling device and cooperates with a level measuring instrument. The guide rod (8) and the lifting regulator (9) are installed after the insertion rod (10) is fixed in position. The diameter of the guide rod (8) is slightly smaller than the diameter of the ring opening of the positioning ring (5).
5. The precast concrete installation facility for municipal road construction according to claim 4 is characterized in that: The four groups of jacks (12) are installed symmetrically, all located at the bottom corners of the precast concrete culvert (1), and the upper ends of the jacking rods are connected to a support plate for expanding the force-bearing area, and the support plate is in contact with the bottom surface of the precast concrete culvert (1).
6. The precast concrete installation facility for municipal road construction according to claim 5, characterized in that: The bottom surface of the drainage ditch (14) is concave. At the new and old connecting grooves (2), the newly poured concrete will form a junction between the new and old concrete with the precast concrete culvert (1) itself. Due to the connection effect of several groups of side precast steel bars (3), the junction is in a tightly connected state. The front and rear end surfaces of the filling part (20) are leveled with bricks or large stones for beautification and waterproofing.