A construction method for a building with a large-span special-shaped welded spherical grid roof
In the construction of large-span special-shaped welded ball mesh frame roof, the patio structure and slide rail shoe technology are used to achieve accurate lifting of the well blocks, and the ball hinge structure of the embedded rod is spliced to solve the special-shaped net The high cost and difficulty in position adjustment in roof construction have achieved an efficient and precise construction process.
Patent Information
- Application Number
- CN202211635882.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-16
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-12-16
AI Technical Summary
The high-span special-shaped mesh roof is expensive to assemble in situ during construction, and the lifting method is difficult to adjust the position within the plane.
Support columns are used to form a patio structure, and the well blocks are spliced together. The vertical sliding and lifting of the well blocks are achieved through slide rails and sliding boots, and the ball hinge structure of the insert rod is combined to accurately splice the mesh blocks. , use the roof panel as an aerial working platform to reduce construction difficulty.
It significantly reduces the horizontal deviation during the hoisting process, ensures the accuracy of the position of the grid frame blocks, avoids the need to build scaffolding, and reduces construction costs and construction periods.
Smart Images

Figure CN116290806B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of structures covering large-area spaces, and in particular to a construction method for a building with a large-span special-shaped welded spherical grid roof. Background Art
[0002] For large-span single buildings such as gymnasiums and railway stations, their roofs usually require trusses or grid structures. The basic unit of a truss is a triangle, while the basic unit of a grid is a triangular pyramid or a quadrangular pyramid. Generally speaking, the structural strength and stability of a grid are better than those of a truss, but it is also more difficult to assemble. To facilitate assembly (the basic unit of the grid is three-dimensional), the nodes of the grid are usually spherical, also known as welded balls (rods are welded on them) or bolted balls (rods are screwed on them). Among them, the bolted ball grid has a lower cost when the area is small (because its fixed cost is low), and the welded ball grid has a lower cost when the area is large (because its marginal cost is low).
[0003] There are two mainstream construction methods for grid roofs. One is to assemble the entire grid roof in situ on a full-floor scaffolding, and the other is to jack it up after assembling the grid roof on the ground. The former requires a large amount of scaffolding, and the construction cost is quite high. Therefore, during the construction process, the grid roof is usually constructed by jacking (it can be jacked up as a whole or jacked up in blocks and assembled at high altitude). After jacking to the installation height, the position in the plane is adjusted with the help of a hand winch. In addition to these two mainstream construction methods, there is also a lifting (also known as hoisting) construction method, but due to the limitation of the lifting weight, lifting is generally only used for small-span roofs and has a small scope of application.
[0004] In pursuit of aesthetic effects, some grid roofs need to make the grid into various shapes. The roof is no longer a flat grid, but a special-shaped grid with a curved surface, which brings many difficulties to the construction:
[0005] 1. Since the grid is curved, it is difficult to move horizontally on the lifting equipment, so it is very difficult to adjust its position in the plane (at this time, the adjustment range can only be provided by the deformation of the lifting equipment, but the deformation range allowed by the lifting equipment is very small, which is often not enough to complete the horizontal correction);
[0006] 2. Since the grid is curved, if the construction method of lifting in blocks is adopted, the grid blocks are usually not aligned after being lifted to the installation height, but it is very difficult to adjust their positions in the plane. If they are not aligned, it is difficult to connect them directly or with patching rods.
[0007] The above two points limit the use of jacking construction in special-shaped grid roofs. When constructing special-shaped grid roofs, the on-site assembly method of supporting full-floor scaffolding is usually adopted. Only the special-shaped grid roof with a smaller span can barely adjust its position in the plane due to its light weight and can be jacked up as a whole without high-altitude splicing. Only then can the jacking construction method be considered. However, when the span is small, the difference in construction cost and construction period between on-site assembly and jacking construction is very small, and there is no advantage in using the jacking construction method.
[0008] The roof of the Xinji Aosen National Fitness Center involved in the present invention is a special-shaped grid roof (wavy), with an area of 25,652 square meters and a height of 31 meters. If it is constructed by high-altitude in-situ assembly of a full-hall scaffolding, the cost and construction period will be unacceptable. Summary of the invention
[0009] The invention provides a construction method for a building with a large-span special-shaped welded spherical grid roof.
[0010] The technical problem to be solved is that the construction cost of large-span special-shaped grids by in-situ assembly is too high, and there are a series of difficulties in the construction by jacking.
[0011] In order to solve the above technical problems, the present invention adopts the following technical solutions: a construction method of a building with a large-span special-shaped welded ball grid roof, the building includes a special-shaped welded ball grid structure roof, the roof is erected on a base surface through support columns, the support columns are arranged at intervals and enclose a row of multiple common-wall patios, a top plate that is also a part of the roof and an aerial work platform during construction is laid above the support columns, the support columns are arranged through the top plate, and a ball hinge support for supporting the welded balls is arranged above the support columns;
[0012] The roof is composed of a well block located in the patio and a well wall block located above the patio wall; the joint between the well block and the well wall block is located above the top plate; among the well wall blocks, the one located between the two patios is recorded as an inter-well block, and the other well wall blocks are recorded as an outer wall block;
[0013] The construction method comprises the following steps:
[0014] Step 1: Assemble the well blocks in each patio;
[0015] Step 2: Slide the well block vertically to above the installation height, and the slide rails are arranged on the support columns at each corner of the well block. Each corner of the well block corresponds to a slide rail, and each slide rail is provided with at least one slide shoe, which is fixedly connected to the corresponding corner of the well block through an extension rod;
[0016] Step 3: Assemble a grid frame in situ along the inner block on the top plate, so that the inner block is expanded to the edge above the top plate; after assembly, the welded ball on the edge is located directly above the corresponding support column;
[0017] Step 4: Assemble the inter-well blocks on the top plate and connect the blocks in each well into one;
[0018] Step 5: Assemble the outer wall blocks outside the patio and hoist them above the patio so that the welding balls in the outer wall blocks are located above the corresponding support columns, and then assemble the patching rods between the outer wall blocks and the installed grid blocks in situ to complete the connection;
[0019] Step 6: Change the support so that the grid falls onto the support column.
[0020] Furthermore, in step 4 and step 5, the patching rods between adjacent grid blocks are installed in the following manner:
[0021] Among the welding balls at both ends of the patching rod, a socket corresponding to the patching rod is reserved on one welding ball, and a ball inner cylinder is arranged in the socket in the same direction as the length of the patching rod. The ball inner cylinder is a cylinder with open ends and an inner diameter larger than the outer diameter of the patching rod, and is welded to the outer shell of the welding ball; a limiting ball with an outer diameter equal to the inner diameter of the ball inner cylinder is welded to one end of the patching rod close to the ball inner cylinder, and a welding filling ring for filling the gap between the patching rod and the outer shell of the welding ball is also sleeved on the patching rod, and the welding filling ring is a reducing ring with an outer diameter gradually increasing from the end close to the ball inner cylinder, and the outer diameter of one end of the welding filling ring is smaller than the inner diameter of the ball inner cylinder, and the outer diameter of the other end is larger than the inner diameter of the ball inner cylinder;
[0022] During welding, one end of the patching rod with the limiting ball is inserted into the corresponding ball inner cylinder, and the position of the other end of the patching rod is adjusted so that it fits and welds with the spherical surface of the corresponding welding ball, and then the welding filling ring is slid to the opening of the ball inner cylinder, and the welding filling ring is melted to weld the opening of the ball inner cylinder and the patching rod into one.
[0023] Furthermore, the ball inner cylinder is inserted during the processing of the welding ball, and the ball inner cylinder is welded to the outer shell and inner ribs of the welding ball, and marks are left at the positions where the outer surface of the welding ball and each rod are connected; when installing the welding ball with the ball inner cylinder, the direction of the ball inner cylinder is consistent with the embedding rod by aligning the rod outside the embedding rod with the corresponding mark.
[0024] Furthermore, if a well block has a horizontal displacement exceeding the design allowable range during the sliding process of step 2, the well block with the excessive horizontal displacement is chamfered to increase the corners of the well block and increase the number of slide rails corresponding to the corners in step 2;
[0025] When installing the top plate in step one, the top plate is extended to below the chamfered position of the well block, and the gap formed at the chamfered position of the well block is filled by in-situ assembly in step three.
[0026] Furthermore, the roof is wavy, and the extension direction of the wave is consistent with the arrangement direction of the patio.
[0027] Furthermore, in step 2, a jacking device is used as a driving force for the vertical sliding of the well block, the jacking device includes a jack whose lower end is fixed on a steel base, and a plurality of bolt ball truss standard sections stacked up and down and connected to each other are arranged between the upper end of the jack and the well block, the upper end of the jack is detachably connected to the bottom of the truss standard section, and the height of each bolt ball truss standard section is less than the maximum stroke of the jack;
[0028] During the vertical sliding process, each time the jack is lifted to a space below that is greater than the height of a standard section of a bolt-ball truss, a standard section of a bolt-ball truss is connected to the bottom of the installed standard section of the bolt-ball truss, and then the jack falls back, allowing the newly installed standard section of the bolt-ball truss to fall into the pit of the base below; the jack continues to fall back and separates from the standard section of the bolt-ball truss, and the jack is removed and installed on the newly installed standard section of the bolt-ball truss; and the next cycle is continued.
[0029] Furthermore, if there is a stepped stand around the patio, the following method is used to assemble the blocks in the patio in step 1:
[0030] Assemble the central part of the well block at the bottom of the patio, then install the jacking equipment under the central part of the well block, jack it up to the height of the stepped stands, then assemble the well block on the stepped stands, and install the jacking equipment on the stepped stands.
[0031] Furthermore, the lifting equipment located above the stepped stands is recorded as on-stage equipment, and an anti-lifting support structure is provided below the portion of the stepped stands located at the on-stage equipment to prevent the lifting equipment from crushing the stepped stands.
[0032] Furthermore, the following method is used to reinforce the rods with a stress ratio exceeding 0.9 during construction: a pair of angle steels with the same length as the rods and openings facing the rods are arranged on the rods, and both ends of the angle steels are welded to the welding balls; the angle steels are removed after the construction is completed.
[0033] Furthermore, the top of the ball joint support is provided with a recess which matches the welding ball. In step three and step five, the elevation of each grid block is fine-tuned by using a jack located on the top plate.
[0034] Compared with the prior art, the construction method of a building with a large-span special-shaped welded spherical grid roof of the present invention has the following beneficial effects:
[0035] In the present invention, the supporting columns are first arranged into a skylight structure, and then the vertical slide rails on the skylight are used as the limiting structure to accurately lift the well block along the slide rails to the position, thereby significantly reducing the horizontal deviation that occurs during the lifting process. After lifting to the position, a grid is assembled in situ along the grid block and the welding balls at the edge are located directly above the corresponding supporting columns, thereby ensuring that the position of the edge of the well block accurately meets the design requirements. Even if there is a horizontal deviation during the lifting process, it will not affect the splicing with other grid blocks (because the newly added edges The welding ball is located directly above the corresponding support column, and the horizontal deviation is limited to a grid assembled in situ); at the same time, since the shaft wall block is located above the support column and the top plate, the welding ball in the shaft wall block is aligned with the corresponding support column up and down during hoisting (people can stand on the top plate and are close to the welding ball and the support column, which makes it convenient to verify whether the two are aligned up and down) to ensure the accuracy of the shaft wall block position; the above two points are combined to ensure the accuracy of the grid frame position after jacking / lifting under the premise that it is difficult to adjust the position of the grid frame in the horizontal plane.
[0036] In the present invention, by making one end of the patching rod located at the splicing position of the grid blocks into a retractable ball joint structure, the welding of the patching rod is completed when the spacing between the welding balls at both ends of the patching rod does not match the length of the patching rod, or the relative position of the welding balls does not match the angle of the patching rod (for example, if one of the welding balls is too high or too low, the angle between the patching rod and the horizontal plane will change when connecting the welding balls at both ends, resulting in the end face of the patching rod and the spherical surface of the welding ball not being completely attached to each other, but only partially attached to each other, affecting the welding), thereby allowing the two blocks of the grid to be successfully spliced even if they are not precisely aligned.
[0037] In the present invention, the splicing position of the grid is arranged above the support column with the top plate, so that the top plate can be used as an aerial work platform without the need to build a scaffold. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a structural schematic diagram of a building with a large-span special-shaped welded spherical grid roof in the present invention;
[0039] Figure 2 for Figure 1 The picture after removing the roof;
[0040] Figure 3 The schematic diagram of the arrangement of grid blocks;
[0041] Figure 4 is a structural schematic diagram of the slide rail;
[0042] Figure 5 The schematic diagram of the location of the patching rod is shown in FIG. 1 , in which the patching rod is located between two grid blocks being spliced;
[0043] Figure 6 It is a schematic diagram of the structure of the end of the patching rod;
[0044] Figure 7 It is a schematic diagram of the structure of the lifting equipment;
[0045] 11-well inner block, 12-outer wall block, 13-inter-well block, 2-support column, 3-slide rail, 4-slide shoe, 5-extension rod, 6-embedded rod, 7-ball inner cylinder, 8-limiting ball, 9-welding filling ring. DETAILED DESCRIPTION
[0046] Take Xinji City Aosen National Fitness Center as an example. Figure 1-2 As shown, a construction method for a building with a large-span special-shaped welded ball grid roof, the building includes a roof of a special-shaped welded ball grid structure, the roof is erected on a base surface through support columns 2, the support columns 2 are arranged at intervals and enclose a row of multiple patios with a common wall, and a top plate that serves as a part of the roof and an aerial work platform during construction is laid above the support columns 2. The support columns 2 penetrate the top plate, and a ball hinge support for supporting the welded balls is arranged above the support columns 2.
[0047] like Figure 3 As shown, the roof is composed of the well block 11 located in the patio and the well wall block located above the patio wall; the joint between the well block 11 and the well wall block is located above the top plate; among the well wall blocks, the one located between the two patios is recorded as the well block 13, and the other well wall blocks are recorded as the outer wall blocks 12. The patio structure is used to limit the horizontal displacement of the well block 11, and the arrangement of them in a row of multiple common walls is used to make the area of the well block 11 as large as possible in the entire grid. Because the outer wall blocks 12 are limited by the weight and the number is large, and the well block 13 needs to be assembled in situ, both are not as convenient to construct as the well block 11.
[0048] The main content of aerial work is to splice grid blocks, and the joints of the grid blocks here are all set on the top plate, so the top plate can be used directly as an aerial work platform without the need to build additional scaffolding. At the same time, the position of the top plate makes it convenient for construction workers to observe the relative position between the welding balls in the grid and the corresponding support columns 2, which helps to control the position of the grid blocks.
[0049] The construction method includes the following steps:
[0050] Step 1: Assemble the well blocks 11 in each patio.
[0051] Step 2: Slide the well block 11 vertically to above the installation height. The slide rails 3 are arranged on the support columns 2 at each corner of the well block 11. Each corner of the well block 11 corresponds to a slide rail 3. Figure 4As shown, at least one sliding shoe 4 is arranged in each slide rail 3, and the sliding shoe 4 is fixedly connected to the corner corresponding to the well block 11 through the extension rod 5; the sliding shoe 4 here is a steel plate stuck in the slide rail 3 made of channel steel, and one sliding shoe 4 can be arranged on one slide rail 3, or multiple sliding shoes 4 can be arranged up and down to adapt to grids of different thicknesses. One end of the extension rod 5 is welded to the sliding shoe 4, and the other end is welded to the welding ball. The reason why the slide rail 3 is arranged at the corner position is that the limiting effect of setting the slide rail 3 at other positions is poor. One end of each extension rod 5 is welded to the sliding shoe 4, and the other end is welded to different welding balls in the well block 13 respectively, so as to avoid affecting the limiting effect due to the deformation of the extension rod 5 itself.
[0052] Step 3: Assemble a grid frame in situ along the inner block 11 on the top plate, so that the inner block 11 is expanded to the edge above the top plate; after assembly, the welding ball on the edge is located directly above the corresponding support column 2; the assembly process here is carried out under the premise of limiting the position of the welding ball, so the position of the welding ball on the edge must meet the requirements. Note that some operations here, such as painting, need to be carried out with the help of a high-altitude horseway, which can be installed in step 1.
[0053] Step 4: Assemble the inter-well block 13 on the top plate, and connect the inner well blocks 11 into one; the reason why the inter-well block 13 is assembled in situ is that if it is to be hoisted, six patching rods need to be set on both sides, which does not save time. However, the part that is located above the top plate and not cantilevered outside the top plate can be easily assembled in situ.
[0054] Step 5: Assemble the outer wall block 12 outside the patio and hoist it above the patio so that the welding ball in the outer wall block 12 is located above the corresponding support column 2, and then assemble the patching rod 6 between the outer wall block 12 and the installed grid block in situ to complete the connection; the setting method of the patching rod 6 is as follows Figure 5 As shown, it is a rod member arranged between two grid blocks. Usually, if two grid blocks cannot be connected together by directly connecting them, they can be connected together by using a patching rod 6.
[0055] Step 6: Change the support so that the grid falls on the support column 2. This is a common step in steel structure. After the construction of the steel structure is completed, it needs to be changed from the temporary support structure to the permanent support structure. This process is also called unloading, which will not be described here.
[0056] In step 4 and step 5, the patching rods 6 between adjacent grid blocks are installed in the following manner:
[0057] like Figure 6As shown, among the welding balls at both ends of the patching rod 6, a socket corresponding to the patching rod 6 is reserved on one welding ball, and a ball inner cylinder 7 which is consistent with the length direction of the patching rod 6 is arranged in the socket, and the ball inner cylinder 7 is a cylinder with open ends and an inner diameter larger than the outer diameter of the patching rod 6, and is welded to the outer shell of the welding ball; a limiting ball 8 with the same outer diameter as the inner diameter of the ball inner cylinder 7 is welded at one end of the patching rod 6 close to the ball inner cylinder 7, and a welding filling ring 9 for filling the gap between the patching rod 6 and the outer shell of the welding ball is also sleeved on the patching rod 6. The welding filling ring 9 is a reducing ring with an outer diameter gradually increasing from the end close to the ball inner cylinder 7, and at both ends of the welding filling ring 9, the outer diameter of one end is smaller than the inner diameter of the ball inner cylinder 7, and the outer diameter of the other end is larger than the inner diameter of the ball inner cylinder 7.
[0058] The limiting ball 8 here is used to form a ball joint to ensure that the end of the patching rod 6 does not move around in the ball inner tube 7 while being able to adjust the angle. During welding, the limiting ball 8 can also prevent the end of the patching rod 6 from moving around and affecting welding. The two ends of the ball inner tube 7 are open to ensure sufficient adjustment range. At the same time, the patching rod 6 here should be several centimeters longer than the ordinary patching rod 6, so that the adjustment range can adapt to the situation where the two welding balls are too close or too far apart. The role of the welding filling ring 9 is to reduce the difficulty of welding, because there is a clear gap between the patching rod 6 and the ball inner tube 7. In actual operation, we found that only very experienced welders can ensure that the weld is full and does not damage the patching rod 6 in this case. Therefore, a welding filling ring 9 is set here to fill this gap. During welding, the ring is melted with an electric welding rod and filled into the gap together with the electric welding rod.
[0059] During welding, one end of the patching rod 6 with the limiting ball 8 is inserted into the corresponding ball inner cylinder 7, and the position of the other end of the patching rod 6 is adjusted so that it fits and welds with the spherical surface of the corresponding welding ball, and then the welding filling ring 9 is slid to the opening of the ball inner cylinder 7, and the welding filling ring 9 is melted to weld the opening of the ball inner cylinder 7 and the patching rod 6 into one.
[0060] In the welded ball grid, the ends of the rods and the welded balls need to be fully fitted with the spherical surface of the welded balls for effective welding. The purpose of setting a retractable ball hinge at the end of the patching rod 6 is to allow the ends of the rods to be fully fitted with the spherical surface of the welded balls to complete the welding of the patching rod 6 even when the spacing between the welded balls at both ends of the patching rod 6 does not match the length of the patching rod 6, or the relative position of the welded balls does not match the angle of the patching rod 6, thereby allowing the two blocks of the grid to be smoothly spliced even if they are not precisely aligned. If this structure is not set, it is necessary to use bolting to connect the welded balls and the patching rod 6, which affects the strength. Of course, in addition to the patching rod 6, other positions (such as the grid around the well block 11 after it is lifted into place) can use this structure whenever there is a problem that the rods are difficult to weld at high altitude.
[0061] The ball inner cylinder 7 is inserted during the processing of the welding ball. The ball inner cylinder 7 is welded to the outer shell and inner ribs of the welding ball, and marks are left at the positions where the outer surface of the welding ball and each rod are connected. When installing the welding ball with the ball inner cylinder 7, the direction of the ball inner cylinder 7 is consistent with the embedding rod 6 by aligning the rods outside the embedding rod 6 with the corresponding marks.
[0062] The welding ball is two hemispheres welded together during processing, and the ball inner cylinder 7 can be easily set in the processing. Note that the welding ball with the ball inner cylinder 7 can be larger than other welding balls to facilitate the setting of these additional structures.
[0063] If any of the blocks 11 in the well have a horizontal displacement that exceeds the design allowable range during the sliding process in step two, the block 11 in the well with the excessive horizontal displacement is chamfered to increase the number of corners of the block 11 in the well and increase the number of slide rails 3 corresponding to the corners in step two; when installing the top plate in step one, the top plate is extended to below the chamfered position of the block 11 in the well, and the gap formed at the chamfered position of the block 11 in the well is filled by in-situ assembly in step three.
[0064] The grid blocks in the present application are all rectangular. Generally speaking, a slide rail 3 is set at each of the four corners, and limiting them can ensure that they do not deviate horizontally after jacking. However, when the area is large, since the grid is heavy and has low rigidity, the horizontal deviation may exceed the standard due to large force fluctuations and its own deformation. At this time, more slide rails 3 need to be set.
[0065] The roof is wavy, and the wave extension direction is consistent with the arrangement direction of the patio. For a wavy roof, the wave extension direction is usually the longest, so here it is made consistent with the arrangement direction of the patio.
[0066] like Figure 7 As shown, in step 2, a jacking device is used as the power for the vertical sliding of the well block 11. The jacking device includes a jack whose lower end is fixed to a steel base. A plurality of bolt-ball truss standard sections that are stacked up and down and interconnected are arranged between the upper end of the jack and the well block 11. The upper end of the jack is detachably connected to the bottom of the truss standard section, and the height of each bolt-ball truss standard section is less than the maximum stroke of the jack.
[0067] This is a very commonly used jacking equipment. When it is used for jacking, each time the jack is lifted to the space below that is greater than the height of a standard section of a bolt-ball truss, a standard section of a bolt-ball truss is connected to the bottom of the installed standard section of the bolt-ball truss, and then the jack falls back, allowing the newly installed standard section of the bolt-ball truss to fall into the pit of the base below; the jack continues to fall back and separates from the standard section of the bolt-ball truss, and the jack is removed and installed on the newly installed standard section of the bolt-ball truss; and the next cycle continues.
[0068] If there is a stepped stand around the patio, the following method is used to assemble the well blocks 11 in step 1:
[0069] The central part of the well block 11 is assembled at the bottom of the patio, and then a lifting device is installed under the central part of the well block 11, and it is lifted to the height of the step stand, and then the well block 11 is assembled on the step stand, and the lifting device is installed on the step stand. The step stand will affect the assembly of the well block 11, so that it cannot be assembled in one time, so it is assembled in two times here, and tire frames are set at the bottom and the step stand.
[0070] The lifting equipment located above the stepped stands is referred to as on-stage equipment, and an anti-lifting support structure is provided below the portion of the stepped stands located at the on-stage equipment to prevent the lifting equipment from crushing the stepped stands.
[0071] The following method is used to reinforce the rods with a stress ratio exceeding 0.9 during construction: a pair of angle steels with the same length as the rods and openings facing the rods are set on the rods, and both ends of the angle steels are welded to the welding balls; the angle steels are removed after the construction is completed.
[0072] The top of the ball joint support has a pit that matches the welding ball. The pit here is generally composed of a circle of multiple ribs, which can prevent the welding ball from moving around on the ball joint support. It can also help determine the accurate relative position between the ball joint support and the welding ball.
[0073] In step 3 and step 5, the elevation of each grid block is fine-tuned using the jack located on the top plate.
[0074] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A construction method for a building with a large-span special-shaped welded spherical grid roof, the building comprising a special-shaped welded spherical grid roof, the roof being erected on a base surface via support columns (2), characterized in that: The support columns (2) are arranged at intervals and enclose a row of multiple common-wall patios; a top plate which is also a part of the roof and an aerial work platform during construction is laid above the support columns (2); the support columns (2) are arranged to penetrate the top plate; a ball joint support for supporting a welding ball is arranged above the support columns (2); The roof is composed of an inner well block (11) located in the patio and a well wall block located above the patio wall; the joint between the inner well block (11) and the well wall block is located above the top plate; among the well wall blocks, the one located between the two patios is referred to as an inter-well block (13), and the other well wall blocks are referred to as outer wall blocks (12); The construction method comprises the following steps: Step 1: Assemble the well blocks (11) in each well; Step 2: Slide the well block (11) in the vertical direction to above the installation height, and arrange the slide rails (3) on the support columns (2) at the corner positions of the well block (11). Each corner of the well block (11) corresponds to a slide rail (3), and each slide rail (3) is provided with at least one slide shoe (4). The slide shoe (4) is fixedly connected to the corresponding corner of the well block (11) via an extension rod (5); Step 3: Assemble a grid frame in situ on the top plate along the inner well block (11) so that the inner well block (11) is expanded to an edge above the top plate; after assembly, the welded ball at the edge is located directly above the corresponding support column (2); Step 4: Assemble the inter-well blocks (13) on the top plate to connect the inner well blocks (11) into one; Step 5: Assemble the outer wall block (12) outside the patio and hoist it above the patio so that the welding ball in the outer wall block (12) is located above the corresponding support column (2), and then assemble the outer wall block (12) and the embedded rod (6) between the installed grid blocks in situ to complete the connection; Step 6: Change the support so that the grid falls onto the support column (2).
2. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 1, characterized in that: In step 4 and step 5, the patching rods (6) between adjacent grid blocks are installed in the following manner: In the welding balls at both ends of the patching rod (6), a socket corresponding to the patching rod (6) is reserved on one welding ball, and a ball inner cylinder (7) is arranged in the socket in the same length direction as the patching rod (6), and the ball inner cylinder (7) is a cylinder with open ends and an inner diameter larger than the outer diameter of the patching rod (6), and is welded to the outer shell of the welding ball; a limiting ball (8) with an outer diameter equal to the inner diameter of the ball inner cylinder (7) is welded to the end of the patching rod (6) close to the ball inner cylinder (7), and a welding filling ring (9) for filling the gap between the patching rod (6) and the outer shell of the welding ball is also sleeved on the patching rod (6), and the welding filling ring (9) is a reducing ring with an outer diameter gradually increasing from the end close to the ball inner cylinder (7), and at the two ends of the welding filling ring (9), the outer diameter of one end is smaller than the inner diameter of the ball inner cylinder (7), and the outer diameter of the other end is larger than the inner diameter of the ball inner cylinder (7); During welding, one end of the patching rod (6) with the limiting ball (8) is inserted into the corresponding ball inner cylinder (7), and the position of the other end of the patching rod (6) is adjusted so that it fits with the spherical surface of the corresponding welding ball and is welded. Then, the welding filling ring (9) is slid to the opening of the ball inner cylinder (7), and the welding filling ring (9) is melted to weld the opening of the ball inner cylinder (7) and the patching rod (6) together.
3. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 2, characterized in that: The ball inner cylinder (7) is inserted during the processing of the welding ball, and the ball inner cylinder (7) is welded to the outer shell and inner ribs of the welding ball, and the positions where the outer surface of the welding ball and each rod are connected are marked; when the welding ball with the ball inner cylinder (7) is installed, the rods outside the embedded rod (6) are aligned with the corresponding marks, so that the direction of the ball inner cylinder (7) is consistent with the embedded rod (6).
4. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 1, characterized in that: If a well block (11) has a horizontal displacement exceeding the design allowable range during the sliding process in step 2, the well block (11) with the excessive horizontal displacement is chamfered so that the well block (11) has more corners and the number of slide rails (3) corresponding to the corners in step 2 increases; When installing the top plate in step one, the top plate is extended to below the chamfered position of the well block (11), and the gap formed at the chamfered position of the well block (11) is filled by in-situ assembly in step three.
5. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 1, characterized in that: The roof is wavy in shape, and the extending direction of the wave is consistent with the arrangement direction of the patio.
6. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 1, characterized in that: In step 2, a jacking device is used as a driving force for the vertical sliding of the well block (11), the jacking device comprising a jack whose lower end is fixed to a steel base, a plurality of bolt ball truss standard sections stacked up and down and connected to each other are arranged between the upper end of the jack and the well block (11), the upper end of the jack is detachably connected to the bottom of the truss standard section, and the height of each bolt ball truss standard section is less than the maximum stroke of the jack; During the vertical sliding process, each time the jack is lifted to a space below that is greater than the height of a standard section of a bolt-ball truss, a standard section of a bolt-ball truss is connected to the bottom of the installed standard section of the bolt-ball truss, and then the jack falls back, allowing the newly installed standard section of the bolt-ball truss to fall into the pit of the base below; the jack continues to fall back and separates from the standard section of the bolt-ball truss, and the jack is removed and installed on the newly installed standard section of the bolt-ball truss; and the next cycle is continued.
7. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 6, characterized in that: If there is a stepped stand around the patio, the following method is used to assemble the well block (11) in step 1: The central part of the well block (11) is assembled at the bottom of the patio, and then a lifting device is installed under the central part of the well block (11) to lift it to the height of the stepped stand. Then, the well block (11) is assembled on the stepped stand, and the lifting device is installed on the stepped stand.
8. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 7, characterized in that: The lifting equipment located above the stepped stands is referred to as on-stage equipment, and an anti-lifting support structure is provided below the portion of the stepped stands located at the on-stage equipment to prevent the lifting equipment from crushing the stepped stands.
9. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 1, characterized in that: The following method is used to reinforce the rods with a stress ratio exceeding 0.9 during construction: a pair of angle steels with the same length as the rods and openings facing the rods are set on the rods, and both ends of the angle steels are welded to the welding balls; the angle steels are removed after the construction is completed.
10. The construction method of a building with a large-span special-shaped welded spherical grid roof according to claim 1, characterized in that: The top of the ball joint support is provided with a pit which matches the welding ball. In steps three and five, the elevation of each grid block is fine-tuned using a jack located on the top plate.