A pipe jacking construction process
By assembling pipe jacking on-site with pipe jacking printing equipment, the problem of component supply and progress during pipe jacking construction is solved, and rapid assembly and cost reduction are achieved.
Patent Information
- Application Number
- CN202311014013.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-08-11
AI Technical Summary
During the pipe jacking construction process, emergency repairs, mismatching of finishing lengths, error correction, etc., and the inability to supply pipe jacking components in time will cause the construction progress to stagnate and increase the construction cost.
The pipe jacking printing equipment is used to print the inner pipe and the outer pipe respectively, and the jacking pipe is formed by socketing and high-pressure grouting to achieve on-site assembly. The jacking equipment is used to jack the pipe into the soil layer, shortening the construction time and reducing costs. .
There is no need to wait for a long time to complete the pipe jacking assembly, shortening the construction time, reducing unnecessary construction costs, and solving the problems of pipe jacking component supply and special requirements.
Smart Images

Figure CN116877778B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pipe jacking construction, in particular to a pipe jacking construction process. Background Art
[0002] Pipe jacking construction is a method of underground pipeline construction developed after shield construction. It does not require excavation of the surface layer and can cross roads, railways, rivers, ground buildings, underground structures and various underground pipelines. Pipe jacking construction uses the thrust of the main jacking cylinder and the pipeline relay room to push the tool pipe or tunnel boring machine from the working well through the soil layer to the receiving well for lifting. At the same time, the pipeline following the tool pipe or tunnel boring machine is buried between the two wells in order to realize the construction method of trenchless laying of underground pipelines. However, in the process of pipe jacking construction, when the pipe jacking components cannot be supplied in time due to emergency repairs, mismatched tail lengths, error correction, etc., it often takes a long time to wait for subsequent construction, which will undoubtedly affect the progress of the project. It will also generate a lot of additional charges due to emergencies such as weather, increasing construction costs. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a pipe jacking construction process.
[0004] The present invention provides a pipe jacking construction process, comprising the following steps:
[0005] The inner tube and the outer tube are formed by printing respectively using a pipe jacking printing device;
[0006] Sleeving the outer tube onto the inner tube so that the outer tube and the inner tube are fixedly connected to form a jacking tube;
[0007] Cleaning the construction site, digging a shaft on the surface, and installing jacking equipment on the inner wall of the shaft;
[0008] Lifting the jacking pipe into the hoistway and aligning it with the jacking equipment;
[0009] The jacking equipment is used to push the jacking pipes hoisted into the shaft into the soil layer in sequence until all the jacking pipes are pushed into the soil layer;
[0010] The jacking equipment is removed and the shaft is backfilled.
[0011] In one embodiment, before the step of sleeve-fitting the outer tube onto the inner tube, the method further comprises: laying a steel mesh on the outer surface of the inner tube.
[0012] In one embodiment, the step of hoisting the jacking pipe into the hoistway and aligning it with the jacking equipment includes:
[0013] Secure the lifting equipment on the outside of the shaft opening;
[0014] Connecting the jacking pipe to be constructed to the lifting end of the lifting equipment;
[0015] The lifting equipment is started to lift the jacking pipe into the shaft until the jacking pipe is lifted to a position aligned with the jacking equipment.
[0016] In one embodiment, the step of sleeve-fitting the outer tube onto the inner tube so that the outer tube and the inner tube are fixedly connected to form a top tube comprises:
[0017] A grouting hole connected to the interior of the outer pipe is provided on the surface of the outer pipe;
[0018] Sleeving the outer tube onto the inner tube;
[0019] The slurry is injected from the grouting hole by high-pressure grouting, so that the slurry flows into the gap between the outer pipe and the inner pipe, until the slurry is hardened and formed, and the outer pipe is connected with the inner pipe to form a top pipe.
[0020] In one embodiment, the pipe jacking printing device comprises:
[0021] Pedestal;
[0022] A core mold, the core mold can be lifted and lowered through the base along a first direction;
[0023] A rotating member, the rotating member being mounted on one end of the core mold facing the base;
[0024] A printing ring is connected to the power output end of the rotating member so as to rotate under the drive of the rotating member. The printing ring has a cavity. A plurality of injection holes connected to the cavity are provided on the surface of the printing ring facing the base, and a conveying hole for injecting slurry is provided on the outer surface of the printing ring.
[0025] In one embodiment, a through hole is provided in the middle of the printing ring and is sleeved with the power output end of the rotating member.
[0026] In one embodiment, the printing ring has a first projection on the reference plane along the first direction, the base has a second projection on the reference plane along the first direction, and the first projection is located within the second projection.
[0027] In one embodiment, a lifting power member is further included, wherein a power output end of the lifting power member is connected to an end of the core mold away from the base, and is used to drive the core mold to pass through the base along a first direction.
[0028] In one embodiment, the lifting power component includes a jack and a fixed plate, the fixed end of the jack is fixedly connected to the fixed plate, the end of the core mold away from the base is provided with a mounting hole, and the movable end of the jack extends into the mounting hole and is fixedly connected to the core mold.
[0029] In one embodiment, it further comprises a feed pipe, one end of which is connected to the delivery hole, and the other end of which is used to be connected to an external slurry supply device.
[0030] Compared with the prior art, the above technical solution provided by the embodiment of the present application has the following beneficial effects:
[0031] The outer pipe and the inner pipe are printed separately using the jacking pipe printing equipment, and then the outer pipe and the inner pipe are connected to form a jacking pipe. The formed jacking pipe is then hoisted into the shaft and pushed into the soil layer by the jacking equipment. All the jacking pipes are pushed into the soil layer repeatedly in this way. The jacking pipe printing equipment is cleverly used to realize the on-site assembly of the jacking pipes. There is no need to wait for a long time, which is conducive to shortening the construction time and reducing unnecessary construction costs. At the same time, it also solves the problem of not being able to provide jacking pipe components in time or having special requirements for jacking pipe components. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of a process of a pipe jacking construction process of the present application;
[0033] Figure 2 This is a production flow chart of pipe jacking printing in a pipe jacking construction process of the present application;
[0034] Figure 3 This is a schematic diagram of the structure of a pipe jacking construction process of the present application for hoisting a pipe jacking into a shaft;
[0035] Figure 4 It is a structural schematic diagram of a jacking pipe in a jacking pipe construction process of the present application;
[0036] Figure 5 It is a structural schematic diagram of a pipe jacking printing device in a pipe jacking construction process of the present application;
[0037] Figure 6 It is a top view schematic diagram of a pipe jacking printing device in a pipe jacking construction process of the present application.
[0038] Numbers in the figure:
[0039] 10. Hoistway; 20. Jacking equipment; 30. Jacking pipe; 30a. Inner pipe; 30b. Outer pipe; 40. Lifting equipment; 50. Jacking pipe printing equipment; 51. Base; 52. Core mold; 53. Rotating part; 54. Printing ring; 54a. Delivery hole; 54b. Injection hole; 55. Lifting power part; 551. Fixed plate; 552. Jack; 60. Feed pipe; 70. Steel mesh; 80. Casting hole. DETAILED DESCRIPTION
[0040] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific embodiments of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "back", "up", "down", "left", "right", "longitudinal", "horizontal", "vertical", "horizontal", "top", "bottom", "inside", "outside", "head", "tail", etc. are based on the directions or positional relationships shown in the accompanying drawings, are constructed and operated in a specific direction, and are only for the convenience of describing the present technical solution, rather than indicating that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.
[0041] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0042] Please refer to Figure 1 The present application embodiment provides a pipe jacking construction process, comprising the following steps:
[0043] S100, using the top tube printing device 50 to print and form the inner tube 30a and the outer tube 30b respectively.
[0044] At present, in the process of pipe jacking 30 construction, pipe jacking is often processed in advance according to the set drawings, and then the manufactured pipe jacking 30 is transported to the construction site for pipe jacking construction. However, if the pipe jacking components cannot be supplied in time due to emergency repairs, mismatched tail lengths, error correction, etc., the progress of pipe jacking construction will be stopped, and the construction can only be continued after the required pipe jacking is remade according to the needs, which will undoubtedly affect the construction progress and increase the construction cost. Therefore, in this embodiment, the pipe jacking printing device 50 can be used to print the inner pipe 30a and the outer pipe 30b of the corresponding size according to the requirements of the construction site, so that the inner pipe 30a and the outer pipe 30b can be used to assemble the required pipe jacking 30 at any time later, without waiting for a long time, which is conducive to shortening the construction time and reducing unnecessary construction costs.
[0045] S200 , sleeve the outer tube 30 b onto the inner tube 30 a , so that the outer tube 30 b and the inner tube 30 a are fixedly connected to form the top tube 30 .
[0046] For example, after the outer tube 30b and the inner tube 30a are printed using the top tube printing device 50, the outer tube 30b and the inner tube 30a need to be cured for at least one day so that the newly printed outer tube 30b and the inner tube 30a can have sufficient strength to avoid damage to the outer tube 30b or the inner tube 30a during the assembly process, thereby affecting the assembly quality of the top tube 30.
[0047] S300 , cleaning the construction site, digging a shaft 10 on the surface, and installing a jacking device 20 on the inner wall of the shaft 10 .
[0048] Exemplarily, the area to be constructed is cleaned according to the construction drawings to avoid being affected during the subsequent construction process, and then the surface is excavated using excavation tools to form a shaft 10. After the shaft excavation is completed, the jacking equipment 20 is installed on the inner wall of the shaft 10.
[0049] Here, it should be noted that the jacking device 20 is mainly used to push the jacking pipe 30 hoisted into the shaft 10 into the soil layer. Therefore, the jacking device 20 can be a pipe jacking machine in the prior art, or other components in the prior art that can push the jacking pipe 30 into the soil layer, which is not limited.
[0050] S400, hoisting the jacking pipe 30 into the shaft 10 and aligning it with the jacking equipment 20.
[0051] For example, the jacking pipe 30 can be hoisted into the shaft 10 by using the hoisting equipment 40 in the prior art, or by using a winch, etc., without limitation. It should be noted that the jacking pipe 30 is hoisted to be aligned with the active end of the jacking equipment 20 so that the jacking pipe 30 can be accurately pushed into the soil layer later, avoiding deviations in the process of pushing the jacking pipe 30 into the soil layer and causing quality problems in the construction.
[0052] S500, using the jacking equipment 20 to push the jacking pipes 30 hoisted into the shaft 10 into the soil layer in sequence, until the jacking pipes 30 are pushed into the soil layer.
[0053] S600 , dismantling the jacking equipment 20 and backfilling the shaft 10 .
[0054] Based on the jacking construction process of the above technical features, the jacking printing equipment 50 is used to print the outer pipe 30b and the inner pipe 30a respectively, and then the outer pipe 30b and the inner pipe 30a are connected together to form a jacking pipe, and then the formed jacking pipe 30 is hoisted into the shaft 10, and the jacking equipment 20 is used to push the jacking pipe 30 into the soil layer. In this way, all the jacking pipes 30 are repeatedly pushed into the soil layer. The jacking printing equipment 50 is cleverly used to realize the on-site assembly of the jacking pipe 30, without waiting for a long time, which is conducive to shortening the construction time and reducing unnecessary construction costs. At the same time, it also solves the problem that the jacking components cannot be provided in time or the jacking components have special requirements.
[0055] Please refer to Figure 2 and Figure 4 In one embodiment, before the step of sleeve-fitting the outer tube 30b onto the inner tube 30a, the method further includes: laying a steel mesh on the outer surface of the inner tube 30a.
[0056] Exemplarily, a steel mesh is laid on the outer surface of the inner tube 30a, and then the outer tube 30b is sleeved on the inner tube 30a. At this time, the steel mesh is located between the inner tube 30a and the outer tube 30b, so that after the inner tube 30a and the outer tube 30b are fixedly connected to form the top tube 30, the steel mesh can ensure that the top tube 30 has a high tensile performance, and the problem of tensile damage during the subsequent lifting of the top tube 30 can be avoided.
[0057] In addition, it should be noted that in addition to the steel mesh, other mesh structures that can enhance the tensile performance can also be used, and this is not limited.
[0058] In one embodiment, the steps of lifting the jacking pipe 30 into the shaft 10 and aligning it with the jacking equipment 20 include: fixing the lifting equipment on the outside of the opening of the shaft 10; connecting the jacking pipe 30 to be constructed to the lifting end of the lifting equipment 40; starting the lifting equipment 40 to lift the jacking pipe 30 into the shaft 10 until the jacking pipe 30 is lifted to a position aligned with the jacking equipment 20.
[0059] For example, the “lifting equipment 40” mentioned above can refer to the lifting device in the prior art, and its specific structure and usage method are not elaborated in detail.
[0060] In one embodiment, the steps of sleeve-fitting the outer tube 30b onto the inner tube 30a so that the outer tube 30b and the inner tube 30a are fixedly connected to form the top tube 30 include: opening a grouting hole (not shown) on the surface of the outer tube 30b that is connected to the interior thereof; sleeve-fitting the outer tube 30b onto the inner tube 30a; injecting slurry from the grouting hole by high-pressure grouting so that the slurry flows into the gap between the outer tube 30b and the inner tube 30a, until the slurry hardens and takes shape, and the outer tube 30b is connected to the inner tube 30a to form the top tube.
[0061] For example, when opening grouting holes on the surface of the outer tube 30b, it is necessary to wait for at least one day after the printed outer tube 30b is cured to avoid damage to the outer tube 30b during the process of opening the grouting holes.
[0062] Exemplarily, the outer tube 30b is first sleeved on the inner tube 30a, and then slurry is injected from the grouting hole by high-pressure grouting, so that the slurry flows into the gap between the outer tube 30b and the inner tube 30a. After the slurry hardens and takes shape, the outer tube 30b and the inner tube 30a will bond to the chamber to form the top tube 30. In this way, the on-site assembly of the top tube can be achieved without waiting for a long time, which is conducive to shortening the construction time and reducing unnecessary construction costs.
[0063] Please refer to Figure 5 and Figure 6 In one embodiment, the pipe top printing device includes a base 51, a core mold 52, a rotating member 53, and a printing ring 54. The core mold 52 can be lifted and lowered through the base along a first direction; the rotating member 53 is installed at one end of the core mold 52 facing the base 51; the printing ring 54 is connected to the power output end of the rotating member 53 so as to rotate under the drive of the rotating member 53, and the printing ring 54 has a cavity, and a plurality of injection holes 54a connected to the cavity are opened on the surface of the printing ring 54 facing the base, and a conveying hole 54b for injecting slurry is provided on the outer surface of the printing ring 54.
[0064] In order to facilitate the understanding of the working principle of the pipe jacking printing equipment, the working principle is explained below, as follows:
[0065] The slurry required for printing enters the cavity of the printing ring 54 from the conveying hole 54b, and the slurry entering the cavity is sprayed onto the base 51 from the spray hole 54a. At this time, the lower surface of the printing ring 54 contacts the slurry sprayed on the surface of the base 51, and then the printing ring 54 is driven to rotate by the rotating member 53 to print the slurry sprayed on the base 51 to form a jacking pipe component, and the driving core mold 52 drives the printing ring 54 to move upward, so as to print out the jacking pipe component, so as to provide the jacking pipe component required for assembling the jacking pipe 30, and cleverly realize the on-site assembly of the jacking pipe without waiting for a long time, which is conducive to shortening the construction time and reducing unnecessary construction costs. At the same time, it also solves the problem that the jacking pipe components cannot be provided in time or the jacking pipe components have special requirements.
[0066] In one embodiment, a through hole is formed in the middle of the printing ring 54 and is sleeved with the power output end of the rotating member 53 .
[0067] In one embodiment, the printing ring 54 has a first projection on the reference plane along the first direction, the base 51 has a second projection on the reference plane along the first direction, and the first projection is located within the second projection.
[0068] By adopting the above solution, the slurry sprayed from the spray hole of the printing ring 54 can fall onto the base 51, avoiding unnecessary waste of slurry, and also ensuring that the top pipe component after printing has better molding quality.
[0069] Here, it should be noted that the “reference plane” mentioned above is a virtual plane used to compare the positions of the base 51 and the print ring 54 .
[0070] In one embodiment, a lifting power member 55 is further included, wherein a power output end of the lifting power member 55 is connected to an end of the core mold 52 away from the base 51 , and is used to drive the core mold 52 to pass through the base 51 along the first direction.
[0071] Specifically, the lifting power component 55 includes a jack 552 and a fixed plate 551. The fixed end of the jack 552 is fixedly connected to the fixed plate 551. A mounting hole is provided at one end of the core mold 52 away from the base 51. The movable end of the jack 552 extends into the mounting hole and is fixedly connected to the core mold 52.
[0072] Exemplarily, the lifting of the jack 552 is used to drive the core mold 52 to move, and the rotation of the printing ring 54 is coordinated to form the top pipe components (inner pipe and outer pipe) continuously upward on the base 51. The top pipe components of different heights can be printed by controlling the distance that the jack 552 drives the core mold 52 to lift.
[0073] In addition, the movable end of the jack 552 is fixedly connected to the core mold 52 by extending into the mounting hole, which facilitates the subsequent replacement or maintenance of the jack 552 or the core mold 52 to adapt to the printing of jacking pipe components of different sizes.
[0074] In one embodiment, a feeding pipe 60 is further included, one end of which is connected to the feeding hole 54a, and the other end of which is used to connect to an external slurry supply device. In this way, the feeding pipe 60 can be used to pass the external slurry into the feeding hole 54a and into the cavity of the printing ring 54, thereby realizing automatic feeding of the slurry, with a simple structure and convenient operation.
[0075] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A pipe jacking construction process, characterized in that: The following steps are involved: The inner tube and the outer tube are formed by printing respectively using a pipe jacking printing device; Sleeving the outer tube onto the inner tube so that the outer tube and the inner tube are fixedly connected to form a top tube; Cleaning the construction site, digging a shaft on the surface, and installing jacking equipment on the inner wall of the shaft; Lifting the jacking pipe into the hoistway and aligning it with the jacking equipment; The jacking equipment is used to push the jacking pipes hoisted into the shaft into the soil layer in sequence until all the jacking pipes are pushed into the soil layer; dismantling the jacking equipment and backfilling the shaft; Wherein, the pipe jacking printing equipment comprises: Pedestal; A core mold, the core mold can be lifted and lowered through the base along a first direction; A rotating member, the rotating member being mounted on one end of the core mold facing the base; A printing ring is connected to the power output end of the rotating member so as to rotate under the drive of the rotating member. The printing ring has a cavity. A plurality of injection holes connected to the cavity are provided on the surface of the printing ring facing the base, and a conveying hole for injecting slurry is provided on the outer surface of the printing ring.
2. The pipe jacking construction process according to claim 1, characterized in that: Before the step of sleeve-fitting the outer tube onto the inner tube, the method further includes: laying a steel mesh on the outer surface of the inner tube.
3. The pipe jacking construction process according to claim 1, characterized in that: The step of hoisting the jacking pipe into the hoistway and aligning it with the jacking equipment includes: Secure the lifting equipment on the outside of the shaft opening; Connecting the jacking pipe to be constructed to the lifting end of the lifting equipment; The lifting equipment is started to lift the jacking pipe into the shaft until the jacking pipe is lifted to a position aligned with the jacking equipment.
4. The pipe jacking construction process according to claim 1, characterized in that: The step of sleeve-fitting the outer tube onto the inner tube so that the outer tube and the inner tube are fixedly connected to form a jacking tube comprises: A grouting hole connected to the interior of the outer pipe is provided on the surface of the outer pipe; Sleeving the outer tube onto the inner tube; The slurry is injected from the grouting hole by high-pressure grouting, so that the slurry flows into the gap between the outer pipe and the inner pipe, until the slurry is hardened and formed, and the outer pipe is connected with the inner pipe to form a top pipe.
5. The pipe jacking construction process according to claim 1, characterized in that: A through hole which is sleeved with the power output end of the rotating member is provided in the middle of the printing ring.
6. The pipe jacking construction process according to claim 5, characterized in that: The printing ring has a first projection on the reference plane along the first direction, the base has a second projection on the reference plane along the first direction, and the first projection is located within the second projection.
7. The pipe jacking construction process according to claim 1, characterized in that: It also includes a lifting power member, wherein a power output end of the lifting power member is connected to an end of the core mold away from the base, and is used to drive the core mold to pass through the base along a first direction.
8. The pipe jacking construction process according to claim 7, characterized in that: The lifting power component includes a jack and a fixed plate, the fixed end of the jack is fixedly connected to the fixed plate, the end of the core mold away from the base is provided with a mounting hole, and the movable end of the jack extends into the mounting hole and is fixedly connected to the core mold.
9. The pipe jacking construction process according to claim 1, characterized in that: It also includes a feed pipe, one end of which is connected to the delivery hole, and the other end of which is used to be connected to an external slurry supply device.