By comprehensively considering the interactivity and climate change of the design parameters of the medium-deep underground heat exchanger, and optimizing the design parameters, the problems of unstable heating performance and high energy consumption are solved, achieving long-term stable operation of the system and cost reduction, and meeting the requirements Building heating needs.
Patent Information
- Application Number
- CN202310766866.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-27
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-06-27
AI Technical Summary
The existing design method of mid-deep underground pipe heat exchangers fails to effectively consider the interaction between multiple design parameters, resulting in unstable heating performance, inability to meet building heating load needs, and failure to fully assess the impact of climate change on heating loads. effects, resulting in increased energy consumption and reduced comfort.
The meteorological parameter model is used to obtain long-term meteorological parameters, combined with the building heat load model and the geothermal heating system numerical model, the heat exchanger inlet water temperature and operating energy consumption are calculated, and the investment and operating costs under different design parameters are calculated through the economic analysis model, using Optimization algorithms optimize design parameters to ensure long-term stable operation of the heating system and reduce overall investment costs.
By considering the interaction of design parameters and climate change, and optimizing the design parameters, the long-term stable operation of the medium-deep underground pipe geothermal heating system is achieved, the overall investment cost is reduced, and it is more in line with the long-term heating load demand of the building, improving the Design performance.
Smart Images

Figure CN117010157B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of heat exchangers, and in particular relates to a method and system for optimizing the heating design of a medium-deep buried pipe heat exchanger. Background Art
[0002] The creation of a thermally comfortable environment can significantly improve people's quality of life and sense of happiness. Winter building heating is a rigid demand in northern my country and some southern cities, and the energy consumption it brings cannot be underestimated. Data show that building heating in my country accounts for more than 24% of the total building energy consumption. Among them, the medium-deep buried pipe geothermal heating technology has received extensive attention and promotion and application in recent years. Under the premise of safe heating, it is very important to summarize and condense a complete and mature optimization design method for medium-deep buried pipe heat exchangers to meet the long-term heating needs of buildings and further promote the medium-deep buried pipe geothermal heating technology.
[0003] Most existing design methods for medium-deep buried pipe heat exchangers make the assumption that parameters are independent of each other and do not affect each other. Therefore, existing design methods for medium-deep buried pipe heat exchangers do not consider the interaction between multiple design parameters, and determine the design parameters individually (that is, determine one design parameter at a time) instead of determining multiple design parameters at the same time. However, in actual research, the effect of a certain design parameter on the heat extraction performance of the heat exchanger varies at different levels of another design parameter, that is, the parameters show interactivity. Therefore, the optimization results of the heating design of the medium-deep buried pipe heat exchanger based on the existing assumptions may not guarantee the design performance of the medium-deep buried pipe heat exchanger. The present invention proposes that the optimization of the heating design of the medium-deep buried pipe heat exchanger needs to consider the interaction between multiple design parameters, that is, multiple design parameters need to be determined at the same time. The continuous heat extraction of the circulating fluid in the heat exchanger tube will cause the thermal decay of high-temperature rock and soil, which is not conducive to the long-term stable operation of the heat exchanger (i.e., the long-term heating decline of medium-deep geothermal). Furthermore, it is easy to have the phenomenon of "a small horse pulling a big cart", that is, it cannot meet the heating load demand of the building, thus causing the adverse consequences of increased power consumption and reduced indoor comfort of the medium-deep buried pipe geothermal heating system. The present invention points out that: the global average temperature gradually rises, resulting in a decrease in building heating load; the reduction of building heating load helps to alleviate the long-term heating decline of medium-deep geothermal; therefore, the design of medium-deep buried pipe heat exchangers needs to consider the impact of climate change. Summary of the invention
[0004] The present application provides a method and system for optimizing the design of heating for medium-deep underground pipe heat exchangers. The design method has taken into account the interaction between design parameters to ensure the long-term stable operation of the heating system. At the same time, the present invention also takes into account the thermal attenuation of rock and soil caused by the long-term heat extraction of the heat exchanger. Compared with typical meteorological parameters, the present invention accurately evaluates the positive effects of climate change on the heating load of buildings. The design optimization results obtained based on the present invention can reduce the overall investment cost of the medium-deep casing underground pipe geothermal heating system to a certain extent, which can better meet the long-term heating heat load requirements of buildings.
[0005] To achieve the above-mentioned objectives, in the first aspect, the present application provides a method for optimizing the heating design of a medium-deep buried pipe heat exchanger, comprising the following steps: first, a meteorological parameter model is used to obtain long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system; and based on the meteorological parameters, a building heat load model is used to determine the winter heating load of the building; next, based on the winter heating load of the building, a numerical model of a medium-deep buried pipe geothermal heating system is constructed, the numerical model is used to calculate the inlet water temperature of the heat exchanger, and the operating safety status is determined based on the inlet water temperature; the numerical model of a medium-deep buried pipe geothermal heating system is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system; then an economic analysis model is established; and based on the economic analysis model and the operating energy consumption of the above-mentioned medium-deep buried pipe geothermal heating system, the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters are calculated; finally, based on the commonly used value ranges of the design parameters, an optimization algorithm is used to optimize the design parameters of the medium-deep buried pipe heat exchanger.
[0006] The meteorological parameter model is a climate change prediction model under the influence of human activities; the long-term meteorological parameters affecting building loads include outdoor air temperature, solar radiation, relative humidity, etc.
[0007] Based on meteorological parameters, a building heat load model is used to determine the building's winter heating load, including: building a building heat load model based on envelope structure parameters and indoor parameters; based on the building heat load model and meteorological parameters, obtaining the building's winter heating load within the expected service life of the medium-deep buried pipe heat exchanger heating system.
[0008] Based on the winter heating load of the building, a medium-deep buried pipe geothermal heating system model is established, including the following steps: based on the winter heating load of the building, a medium-deep buried pipe heat exchanger model and a ground heat pump unit model are established using numerical simulation software.
[0009] Based on geological parameters and design parameters, calculate the heat exchanger inlet water temperature and determine the safe operation status, including:
[0010] Based on geological parameters, design parameters and building winter heating load, the heat exchanger inlet water temperature is obtained;
[0011] Based on the inlet water temperature of the heat exchanger, and taking the degree of dissatisfaction as the safe operation index, the operation safety status is determined; the definition of the safe operation index is shown in formula (1):
[0012]
[0013] Among them, UD is the degree of dissatisfaction;
[0014] It is the total number of operating hours when the inlet water temperature of the medium-deep buried pipe heat exchanger is lower than the low temperature threshold of safe operation during the long-term heat extraction process, in h;
[0015] It is the total heating time in the long-term heating process, in h; Calculated from heating time and intermittent operation mode.
[0016] The numerical model of medium-deep buried pipe geothermal heating system is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system, including:
[0017] Determination of the heat extraction power Q of the medium-deep underground pipe heat exchanger based on the numerical model of the medium-deep underground pipe geothermal heating system DBHE and the heat pump unit evaporator inlet temperature;
[0018] Based on the inlet temperature of the evaporator of the heat pump unit, the performance coefficient of the heat pump unit is determined by an empirical formula. The performance coefficient of the heat pump unit is related to the evaporator and condenser temperatures. When the condenser end temperature remains constant, the performance coefficient of the heat pump unit is only related to the evaporator temperature. The empirical formula is shown in formula (2):
[0019] COP=a+bT e (2)
[0020] Among them, T e is the evaporator inlet temperature of the heat pump unit, ℃. The selection of coefficients a and b is related to the model of the heat pump unit.
[0021] Based on the heat exchanger heat extraction performance and the heat pump unit performance coefficient, the operating energy consumption of the ground heat pump unit is determined. The operating energy consumption of the heat pump unit is shown in formula (3):
[0022]
[0023] Among them, Q DBHE is the heat extraction power of the medium-deep underground heat exchanger, kW; W HP is the operating energy consumption of the heat pump unit, kW.
[0024] Based on the pressure drop in the pipe, the circulation flow rate and the pump efficiency, the energy consumption of the circulating water pump is determined. The energy consumption of the circulating water pump is shown in formula (4):
[0025]
[0026] Where ΔP is the pressure drop of the circulating fluid in the deep underground heat exchanger, Pa; q is the volume flow rate of the circulating fluid, m 3 / s; η WP The efficiency of the water pump.
[0027] Establish an economic analysis model; and based on the economic analysis model and the operating energy consumption of the above-mentioned medium-deep buried pipe geothermal heating system, calculate the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters;
[0028] The initial investment includes the drilling cost of the medium-deep buried pipe heat exchanger, the purchase cost of the ground heat pump and the water pump, and the calculation formula is shown in formula (5) to formula (7); the operating cost includes the power consumption of the ground heat pump and the circulating water pump, and the operating cost calculation formula considering the discount rate and inflation rate is shown in formula (8); the total investment cost calculation formula is shown in formula (9);
[0029] C i,DBHE =D×c i,DBHE (5)
[0030] C i,WP =P e,WP ×c i,WP (6)
[0031] C i,HP =Q c ×c i,HP (7)
[0032]
[0033]
[0034] Among them, C i,DBHE is the drilling cost of the medium-deep buried pipe heat exchanger, in yuan; D is the total length of the medium-deep buried pipe heat exchanger, in m; c i,DBHE is the unit length cost of medium-deep buried pipe heat exchanger (including pipe material), in Yuan / m; C i,WP is the purchase cost of the water pump, in yuan; P e,WP is the rated power of the circulating water pump, in kW; c i,WP is the unit power cost of the circulating water pump, in yuan / kW; C i,HP is the purchase cost of the heat pump unit, in yuan; Q c is the capacity of the heat pump unit, in kW; c i,HP is the unit heating cost of the heat pump unit, in yuan / kW; C o,jis the operating cost in the jth year, in yuan; EC j is the power consumption in the jth year, in kW·h; p e is the unit electricity price, in yuan / (kW·h); ir is the inflation rate; dr is the discount rate; C t is the total investment cost, in Yuan.
[0035] Based on the commonly used value ranges of the design parameters, an optimization algorithm is used to optimize the design parameters of the medium-deep buried pipe heat exchanger, including: taking the long-term stable operation of the medium-deep buried pipe geothermal heating system as a constraint condition, the constraint condition is a condition that meets the user's requirements for dissatisfaction, taking the minimum investment cost as the optimization goal, and using an optimization algorithm to determine the optimization results of the medium-deep buried pipe heat exchanger under climate change conditions.
[0036] In the second aspect, the embodiment of the present application also provides a medium-deep buried pipe heat exchanger heating design optimization system, including a meteorological parameter acquisition module, a building heat load acquisition module, a safe operating range acquisition and operation energy consumption calculation module, an economic calculation module and an optimization module connected in sequence; the meteorological parameter acquisition module is used to obtain long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system; the building heat load acquisition module uses a building heat load model based on the acquired meteorological parameters to obtain the building's winter heating load; the safe operating range acquisition and operation energy consumption calculation module constructs a numerical model of the medium-deep buried pipe geothermal heating system based on the acquired winter heating load of the building, uses the numerical model to calculate the inlet water temperature of the heat exchanger, and determines the operating safety status based on the inlet water temperature; the medium-deep buried pipe geothermal heating system numerical model is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system. The economic calculation module is used to establish an economic analysis model; and based on the economic analysis model and the operating energy consumption of the above-mentioned medium-deep buried pipe geothermal heating system, the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters are calculated; the optimization module uses an optimization algorithm to optimize the design parameters of the medium-deep buried pipe heat exchanger based on the commonly used value range of the design parameters.
[0037] Compared with the prior art, this application has the following beneficial effects:
[0038] The present application provides a method and system for optimizing the heating design of a medium-deep buried pipe heat exchanger, the method comprising the following steps: first, using a meteorological parameter model to obtain long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system; and based on the meteorological parameters, using a building heat load model to determine the winter heating load of the building; next, based on the winter heating load of the building, constructing a numerical model of a medium-deep buried pipe geothermal heating system, using the numerical model to calculate the inlet water temperature of the heat exchanger, and determining the operating safety status based on the inlet water temperature; using the numerical model of a medium-deep buried pipe geothermal heating system to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system; then establishing an economic analysis model; and based on the economic analysis model and the operating energy consumption of the above-mentioned medium-deep buried pipe geothermal heating system, calculating the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters; finally, based on the commonly used value ranges of the design parameters, using an optimization algorithm to optimize the design parameters of the medium-deep buried pipe heat exchanger.
[0039] The present application provides a method and system for optimizing the heating design of a medium-deep underground pipe heat exchanger, which comprehensively considers the interactivity of design parameters and climate change, fully guarantees the long-term stable operation of the medium-deep underground pipe geothermal heating system, and improves the design performance of the medium-deep underground pipe heat exchanger. Compared with the prior art, the present application has taken into account the interaction between the design parameters. At the same time, the present invention also takes into account the thermal attenuation of the rock and soil caused by the long-term heat extraction of the heat exchanger. Compared with typical meteorological parameters, the present invention accurately evaluates the positive effects of climate change on the heating load of the building. The design optimization results obtained based on the present invention can reduce the overall investment cost of the medium-deep casing underground pipe geothermal heating system to a certain extent, which can better meet the long-term heating heat load requirements of the building.
[0040] The meteorological parameter models in the present invention include but are not limited to the CNRM-CM5 model and the RCP4.5 model. Only changing the meteorological parameter model (such as changing the RCP4.5 model to the RCP8.5 model) still falls within the protection scope of the present invention.
[0041] The building heat load model in the present invention includes but is not limited to the TRNSYS software building heat load model. Only changing the building heat load model (such as changing the TRNSYS software building heat load model to the EnergyPlus software building heat load model) still falls within the protection scope of the present invention.
[0042] The medium-deep buried pipe geothermal heating system model in the present invention includes but is not limited to a MATLAB simulation software simulation model. Only changing the medium-deep buried pipe geothermal heating system model (such as changing the MATLAB simulation software simulation model to a Fluent simulation software simulation model) still falls within the protection scope of the present invention.
[0043] The optimization algorithm in the present invention includes but is not limited to a genetic algorithm. Only changing the optimization algorithm (such as changing the genetic algorithm to a PSO algorithm) still falls within the protection scope of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplifications do not constitute limitations on the embodiments. Unless otherwise stated, the pictures in the drawings do not constitute proportional limitations.
[0045] Figure 1 A schematic diagram of a flow chart of a method for optimizing the design of a medium-deep coaxial casing-type underground heat exchanger provided in an embodiment of the present application;
[0046] Figure 2A A schematic diagram of the heating season operation of a medium-deep casing-type buried pipe geothermal heating system provided in an embodiment of the present application;
[0047] Figure 2B A schematic diagram of the non-heating season operation of the medium-deep casing-type buried pipe geothermal heating system provided in an embodiment of the present application;
[0048] Figure 3 A specific flow chart of the optimization design method for the medium-deep coaxial sleeve-type buried pipe heat exchanger provided in the embodiment of the present application;
[0049] Figure 4A A comparison result diagram between the benchmark parameters and the optimized design parameters obtained using the genetic algorithm when the research object provided in the embodiment of the present application is the inner and outer diameter ratio;
[0050] Figure 4B A comparison result diagram between the benchmark parameters and the optimized design parameters obtained using the genetic algorithm when the research object provided in the embodiment of the present application is the drilling depth;
[0051] Figure 4C A comparison result diagram between the benchmark parameters and the optimized design parameters obtained using the genetic algorithm when the research object provided in the embodiment of the present application is the inlet flow rate;
[0052] Figure 5A A comparison chart of the power consumption of a water pump and heat pump with the baseline parameters and the optimized design parameters provided in the embodiment of the present application;
[0053] Figure 5B A comparison result diagram of the investment cost of the benchmark parameters and the optimized design parameters provided in the embodiment of the present application;
[0054] Fig. 6A The optimal design performance energy consumption result diagram under different geological conditions, economic conditions and system safety requirements provided in the embodiments of this application;
[0055] Figure 6BThe optimal design performance investment cost result diagram under different geological conditions, economic conditions and system safety requirements provided in the embodiments of the present application;
[0056] Figure 7 A schematic structural diagram of an optimization design method for a medium-deep coaxial sleeve-type underground heat exchanger provided in an embodiment of the present application;
[0057] Among them, Figure 2A and Figure 2B In the figure, 1 is a medium-deep coaxial shell-and-tube buried pipe heat exchanger, 2 is a ground heat pump unit, 3 is a circulating pump, 4 is an inner pipe, 5 is an outer pipe, and 6 is an annular cavity. DETAILED DESCRIPTION
[0058] From the background technology, it can be seen that the existing design methods of medium-deep buried pipe heat exchangers mostly make assumptions that parameters are independent of each other and do not affect each other. Taking into account the gradual increase in the global average temperature, the heating load of buildings has been reduced to a certain extent. Therefore, considering climate change, it will be more in line with the actual process to optimize the heating design of medium-deep buried pipe heat exchangers.
[0059] In order to solve the above technical problems, the present application provides a medium-deep buried pipe heat exchanger, a medium-deep buried pipe heat exchanger heating design optimization method and system, including the following steps: first, a meteorological parameter model is used to obtain long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system; and based on the meteorological parameters, a building heat load model is used to determine the building's winter heating load; next, based on the building's winter heating load, a numerical model of the medium-deep buried pipe geothermal heating system is constructed, and the numerical model is used to calculate the heat exchanger inlet water temperature, and the operating safety status is determined based on the inlet water temperature; the medium-deep buried pipe geothermal heating system numerical model is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system; then an economic analysis model is established; and based on the economic analysis model and the operating energy consumption of the above-mentioned medium-deep buried pipe geothermal heating system, the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters are calculated; finally, based on the commonly used value ranges of the design parameters, the design parameters of the medium-deep buried pipe heat exchanger are optimized using an optimization algorithm. The present application provides a method for optimizing the design of heating for medium-deep underground pipe heat exchangers. The design method has taken into account the interaction between design parameters to ensure the long-term stable operation of the heating system. At the same time, the present invention also takes into account the thermal attenuation of rock and soil caused by the long-term heat extraction of the heat exchanger. Compared with typical meteorological parameters, the present invention accurately evaluates the positive effects of climate change on the heating load of buildings. The design optimization results obtained based on the present invention can reduce the overall investment cost of the medium-deep casing underground pipe geothermal heating system to a certain extent, which can better meet the long-term heating heat load requirements of buildings.
[0060] The following will describe the various embodiments of the present application in detail with reference to the accompanying drawings. However, it will be appreciated by those skilled in the art that in the various embodiments of the present application, many technical details are provided in order to enable the reader to better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical solution claimed in the present application can be implemented.
[0061] See also Figure 1 The embodiment of the present application provides a method for optimizing the design of a medium-deep coaxial tube-in-tube buried heat exchanger, comprising the following steps:
[0062] Step S1: using a meteorological parameter model to obtain long-term meteorological parameters that affect building loads within the expected service life of a medium-deep buried pipe heat exchanger heating system.
[0063] Step S2: Based on meteorological parameters, a building heat load model is used to determine the building's winter heating load.
[0064] Step S3: Based on the winter heating load of the building, a numerical model of the medium-deep buried pipe geothermal heating system is constructed, the numerical model is used to calculate the inlet water temperature of the heat exchanger, and the operating safety status is determined based on the inlet water temperature; the numerical model of the medium-deep buried pipe geothermal heating system is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system.
[0065] Step S4, establishing an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculating the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters.
[0066] Step S5: Based on the commonly used value ranges of the design parameters, the design parameters of the medium-deep buried pipe heat exchanger are optimized using an optimization algorithm.
[0067] The present application discloses a method and system for optimizing the design of a medium-deep underground pipe heat exchanger, considering that the medium-deep casing underground pipe heat exchanger is widely used. Specifically, the optimization design method is a heating optimization design method for a medium-deep coaxial casing underground pipe heat exchanger that considers the interactivity of design parameters and climate change, fully ensuring the long-term stable operation of the medium-deep underground pipe geothermal heating system, and improving the design performance of the medium-deep underground pipe heat exchanger. Compared with the prior art, the design optimization results obtained based on the present invention can better meet the long-term heating heat load requirements of the building.
[0068] Specifically, the medium-deep coaxial sleeve type buried pipe heat exchanger heating optimization design method provided in the embodiment of the present application includes the following steps: using the CNRM-CM5 model and the RCP4.5 meteorological parameter model to obtain the long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system; inputting the atmospheric parameters into the building heat load model to determine the winter heating load of a typical building; based on the winter heating load of the building, constructing a numerical model of the medium-deep buried pipe geothermal heating system; and based on the geological parameters and design parameters, calculating the heat exchanger inlet water temperature to determine the safe operating range, and calculating the operating energy consumption of the medium-deep buried pipe geothermal heating system; establishing an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculating the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters; based on the commonly used value range of the design parameters, using the optimization algorithm to optimize the design parameters of the medium-deep buried pipe heat exchanger.
[0069] It should be noted that the meteorological parameter models in the present invention include but are not limited to the CNRM-CM5 model and the RCP4.5 model. Only changing the meteorological parameter model (such as changing the RCP4.5 model to the RCP8.5 model) still falls within the protection scope of the present invention.
[0070] The heat supply optimization design method of the medium-deep coaxial tube-type underground heat exchanger provided in the embodiment of the present application is a medium-deep coaxial tube-type underground heat exchanger. By optimizing the design parameters, the medium-deep underground geothermal heating system is guaranteed to operate stably in the long term and meet the heating load requirements of the building in winter. Figure 2A and Figure 2B The medium-deep buried pipe geothermal heating system includes a medium-deep buried pipe heat exchanger 1, a ground heat pump unit 2 and a circulating pump 3, wherein the medium-deep buried pipe heat exchanger 1 contains an inner pipe 4 and an outer pipe 5 coaxial pipes, and an annular cavity 6 is formed between the outer pipe 4 and the outer pipe 5. Figure 2A The heat pump here refers to the ground heat pump unit, the inner pipe refers to the inner pipe of the medium-deep coaxial shell-and-tube buried pipe heat exchanger, the annular space refers to the annular cavity of the medium-deep coaxial shell-and-tube buried pipe heat exchanger, the grout refers to the backfill material, the borehole wall refers to the borehole wall, the geothermal heat flow refers to the geothermal heat flow, and the heat extraction mode refers to the heat extraction mode in the heating season. Figure 2B The non-heat extraction mode is the heat recovery mode in the non-heating season.
[0071] During the heating season, the circulating medium (including but not limited to water, ammonia, carbon dioxide, etc.) flows into the outer annular cavity 6 of the medium-deep coaxial tube-type underground heat exchanger, extracts the heat of the surrounding high-temperature rock and soil, and then flows through the inner tube 4 of the heat exchanger to the inlet side of the evaporator of the ground heat pump unit. The refrigerant in the heat pump unit evaporates by absorbing the heat at the evaporator end, and the gaseous refrigerant will be sucked into the heat pump compressor components. The high-temperature and high-pressure steam refrigerant releases heat at the condenser end, and the heat is further transported to the building end through the hydraulic transmission and distribution system to meet the winter heating needs. The continuous heat extraction of the circulating fluid in the heat exchanger tube will cause the thermal attenuation of the high-temperature rock and soil. During the non-heating season, considering that the building has no heating demand, the internal circulating medium of the medium-deep coaxial tube-type underground heat exchanger remains stationary. After a long period of thermal recovery, the rock and soil around the heat exchanger are restored, which can ensure the long-term heating performance of the medium-deep coaxial tube-type underground heat exchanger.
[0072] See also Figure 3 , which is the core of this application. The models required are divided into the following categories, including meteorological parameter models under the influence of human activities, building heat load models for evaluating winter heating loads, medium-deep underground pipe geothermal heating system models that can reflect the inlet water temperature of the heat exchanger and the heating performance of the system, and economic analysis models that can quantify investment costs and cover economic factors such as discount rates and inflation rates. Based on the above models, the optimization algorithm is used to optimize the design parameters of the medium-deep coaxial sleeve underground pipe heat exchanger and obtain the corresponding results.
[0073] In some embodiments, a meteorological parameter model is used in step S1 to obtain long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system, including: the meteorological parameter model is a climate change prediction model under the influence of human activities, including but not limited to the CNRM-CM5 and RCP4.5 models; the long-term meteorological parameters that affect the building load include outdoor air temperature, solar radiation, relative humidity, etc.
[0074] In some embodiments, in step S2, based on meteorological parameters, a building heat load model is used to determine the building's winter heating load, including: building a building heat load model based on envelope structure parameters and indoor parameters; and obtaining the building's winter heating load based on the building heat load model and meteorological parameters.
[0075] Specifically, input the building envelope parameters (including window-to-wall ratio, heat transfer coefficient, etc.) and indoor parameters (including winter indoor design temperature, indoor infiltration ventilation times, indoor ventilation ventilation times, etc.) into the TRNSYS software to build a building heat load model, and link the meteorological module (including relative humidity, outdoor air temperature, solar radiation, etc.) to obtain the real-time dynamic building load of the building. In this embodiment, the medium-deep buried pipe geothermal heating system is used for heating two three-story office buildings. For specific parameters, see the reference Chai, J., Huang, P., & Sun, Y. (2020). Differential evolution-based system design optimization for net zero energy buildings under climate change. Sustainable Cities and Society, 55, 102037.
[0076] It should be noted that the building heat load model in the present invention includes but is not limited to the TRNSYS software building heat load model. Only changing the building heat load model (such as changing the TRNSYS software building heat load model to the EnergyPlus software building heat load model) still falls within the protection scope of the present invention.
[0077] In some embodiments, in step S3, a numerical model of a medium-deep buried pipe geothermal heating system is constructed, and the numerical model is used to calculate the inlet water temperature of the heat exchanger and determine the safe operating range, including the following steps:
[0078] The Tri-diagonal matrix algorithm (TDMA) is used to discretize the energy control equations of the circulating medium, backfill materials and high-temperature rock and soil, and the heat exchange in the well is simplified to a one-dimensional heat transfer process, and the heat conduction of the rock and soil outside the well is simplified to a two-dimensional heat transfer process. The top boundary of the model control body follows the first-class boundary condition of constant surface temperature, and the side of the control body is set to no heat flux, that is, an adiabatic boundary. The second-class boundary condition of constant heat flux is set at the bottom of the control body to realize the assignment of geothermal gradient, rock and soil thermal conductivity and volume specific heat capacity of the control body. The radial logarithmic distribution of the rock and soil body is used for grid division, and the additional source term method is used to process the control equations of the rock and soil body boundary points to improve the calculation efficiency of the model. The numerical model of the deep coaxial sleeve-type buried pipe heat exchanger constructed in the application embodiment was compared and verified with the field measured data, and the relative error of the outlet water temperature was controlled within 1%.
[0079] It should be noted that the medium-deep buried pipe geothermal heating system model in the present invention includes but is not limited to the MATLAB simulation software simulation model. Only changing the medium-deep buried pipe geothermal heating system model (such as changing the MATLAB simulation software simulation model to the Fluent simulation software simulation model) still falls within the protection scope of the present invention.
[0080] In some embodiments, the geological parameters include geothermal gradient, rock thermal conductivity, and rock specific heat capacity.
[0081] In some embodiments, the design parameters include the ratio of the inner and outer diameters of the heat exchanger, the drilling depth, and the inlet flow rate. In order to accurately summarize the design parameters, the present application determines the range of the design parameters of the present application based on the existing heat exchanger design parameters, and the various design parameters interact with each other.
[0082] In some exemplary embodiments, the heat exchanger inlet water temperature is calculated using a numerical model in step S3, and the operation safety condition is determined based on the inlet water temperature, including: obtaining the heat exchanger inlet water temperature based on geological parameters, design parameters and winter heating load of the building;
[0083] Based on the inlet water temperature of the heat exchanger, and taking the degree of dissatisfaction as the safe operation index, the operation safety status is determined; the definition of the safe operation index is shown in formula (1):
[0084]
[0085] Among them, UD is the degree of dissatisfaction; It is the total number of hours of operation when the inlet water temperature of the medium-deep coaxial tube-type ground heat exchanger is lower than the low temperature threshold of safe operation during long-term heat extraction, in units of h. The low temperature threshold of the inlet water temperature of the medium-deep coaxial tube-type ground heat exchanger is mostly distributed in the range of 1 to 5°C. In the exemplary embodiment, the safe operation range of the present invention is based on the premise that the inlet water temperature of the medium-deep coaxial tube-type ground heat exchanger is higher than 3°C. The total heating time required for the building in long-term operation, in hours; Calculated from heating time and intermittent operation mode.
[0086] It should be noted that the inlet water temperature of the medium-deep buried pipe heat exchanger is obtained through numerical simulation, and the present application also proposes a safety operation index "dissatisfaction degree", as shown in the above formula (1).
[0087] In some exemplary embodiments, the step S3 uses a numerical model of a medium-deep buried geothermal heating system to calculate the operating energy consumption of the medium-deep buried geothermal heating system, including:
[0088] Determination of the heat extraction power Q of the medium-deep underground pipe heat exchanger based on the numerical model of the medium-deep underground pipe geothermal heating system DBHE and the heat pump unit evaporator inlet temperature;
[0089] Based on the inlet temperature of the evaporator of the heat pump unit, the performance coefficient of the heat pump unit is determined by an empirical formula. The performance coefficient of the heat pump unit is related to the evaporator and condenser temperatures. When the condenser end temperature remains constant, the performance coefficient of the heat pump unit is only related to the evaporator temperature. The empirical formula is shown in formula (2):
[0090] COP=a+bT e (2)
[0091] Among them, T e is the heat pump unit evaporator inlet temperature, ℃, the selection of coefficients a and b is related to the heat pump unit model. In this embodiment, the values of a and b are 3.042 and 0.073 respectively. Compared with the heat pump unit test sample, the performance empirical formula has a goodness of fit of up to 99%.
[0092] Based on the heat exchanger heat extraction performance and the heat pump unit performance coefficient, the operating energy consumption of the ground heat pump unit is determined. The operating energy consumption of the heat pump unit is shown in formula (3):
[0093]
[0094] Among them, Q DBHE is the heat extraction power of the medium-deep underground heat exchanger, kW; W HP is the operating energy consumption of the heat pump unit, kW.
[0095] Based on the pressure drop in the pipe, the circulation flow rate and the pump efficiency, the energy consumption of the circulating water pump is determined. The energy consumption of the circulating water pump is shown in formula (4):
[0096]
[0097] Where ΔP is the pressure drop of the circulating fluid in the deep underground heat exchanger, Pa; q is the volume flow rate of the circulating fluid, m 3 / s; η WP The efficiency of the water pump.
[0098] In some embodiments, step S4 establishes an economic analysis model, and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculates the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters, including the following steps:
[0099] The economic analysis model includes the initial investment and operating costs of the medium-deep buried pipe geothermal heating system. The initial investment includes the drilling cost of the medium-deep buried pipe heat exchanger and the purchase cost of the ground heat pump and water pump. The calculation formulas are shown in formulas (5) to (8); the operating cost includes the power consumption of the ground heat pump and the circulating water pump. The operating cost calculation formula considering the discount rate and inflation rate is shown in formula (9); the total investment cost calculation formula is shown in formula (10).
[0100] C i,DBHE =10.36×(58×D+900)+74000 (5)
[0101]
[0102]
[0103] C i,HP =1882×Q c (8)
[0104]
[0105]
[0106] Among them, C i,DBHE is the drilling cost of the medium-deep coaxial tube-type underground heat exchanger, in yuan; D is the total length of the medium-deep coaxial tube-type underground heat exchanger, in m; C i,WP is the purchase cost of the water pump, in yuan; α is the design factor; P WP is the pump power, in kW; Δp is the friction resistance; p1 is the local resistance; V is the volume flow, in m 3 / s; δ is the pump efficiency; C i,HP is the purchase cost of the ground heat pump unit, in yuan; Q c is the capacity of the heat pump unit, in kW; C o,j is the operating cost in the jth year, in yuan; EC j is the power consumption in the jth year, in kW·h; p e is the unit electricity price, in yuan / (kW·h); ir is the inflation rate; dr is the discount rate; C t is the total investment cost, in Yuan.
[0107] In addition, the economic analysis model constructed in this application will also take into account economic indicators such as discount rate and inflation rate.
[0108] In some embodiments, step S5 optimizes the design parameters of the medium-deep coaxial sleeve type buried pipe heat exchanger based on the commonly used value range of the design parameters using an optimization algorithm, including: taking the long-term stable operation of the medium-deep buried pipe geothermal heating system as a constraint condition (i.e., meeting the user's requirements for UD), taking the minimum investment cost as the optimization goal, and using a genetic algorithm including selection, crossover and mutation operators to determine the optimization results of the medium-deep coaxial sleeve type buried pipe heat exchanger under climate change conditions.
[0109] It should be noted that the optimization algorithm in the present invention includes but is not limited to a genetic algorithm, and only changing the optimization algorithm (such as changing the genetic algorithm to a PSO algorithm) still falls within the protection scope of the present invention.
[0110] The following is a comparison result diagram between the baseline parameters and the optimized design parameters obtained using the genetic algorithm, as well as a comparison result diagram between the power consumption and investment cost of the water pump heat pump under the baseline parameters and the optimized design parameters, to verify the heating optimization design method for the medium-deep coaxial sleeve type buried pipe heat exchanger provided in the embodiment of the present application.
[0111] See also FIG. 4A to FIG. 4C According to the heat exchanger parameters in the prior art, the heat exchanger inner and outer diameter ratio of the present application is selected in the range of 0.3-0.7, the drilling depth is changed from 1500 to 3500m, and the inlet flow rate is 0.3-0.9m / s. The optimal design parameters under climate change conditions are as follows, where the heat exchanger inner and outer diameter ratio is 0.62, the optimal drilling depth is 3400m, and the optimal inlet flow rate is 0.79m / s. Compared with the baseline parameters, the heat exchanger inner and outer diameter ratio (increased from 0.50 to 0.62) and the inlet flow rate (increased from 0.60m / s to 0.79m / s) will be improved, while the drilling depth (reduced from 3500m to 3400m) will be reduced.
[0112] See also Figure 5A and Figure 5B ,based on FIG. 4A to FIG. 4C The optimization results obtained further explore and quantify the power consumption and investment cost of the medium-deep buried pipe geothermal heating system calculated by the two different results of the optimization parameters and the baseline parameters. Compared with the baseline parameters, the power consumption and investment cost of the medium-deep buried pipe geothermal heating system solved according to the optimization results are greatly reduced. The total power consumption can be reduced from 7279870kW·h to 6004104kW·h, a reduction of 17.5% ( Figure 5A ), and the overall cost can be reduced from 7433218 yuan to 6616009 yuan, a decrease of 11.0% ( Figure 5B ), the above data fully demonstrates the energy-saving potential of the heating optimization design method of the medium-deep coaxial shell-and-tube buried pipe heat exchanger.
[0113] See also Fig. 6A and Figure 6B Compared with the mid-deep coaxial tube-type underground heat exchanger heating optimization design method without climate change, the design performance corresponding to the optimization design results obtained based on this application has been significantly improved. The energy consumption reduction range is between 9.3% and 44.4% ( Fig. 6A ), and the investment cost can be reduced by 3.9% to 21.8% ( Figure 6B ). Under different design conditions, the optimization design of medium-deep coaxial tube-in-tube underground heat exchanger considering climate change can meet the long-term heating heat load demand of buildings.
[0114] See also Figure 7 The present application includes a meteorological parameter acquisition module 101, a building heat load acquisition module 102, a safe operation range acquisition and operation energy consumption calculation module 103, an economic calculation module 104 and an optimization module 105 which are connected in sequence.
[0115] The meteorological parameter acquisition module 101 is used to use the meteorological parameter model to obtain the long-term meteorological parameters that affect the building load within the expected service life of the medium-deep buried pipe heat exchanger heating system; specifically, the meteorological parameter acquisition module 101 obtains meteorological parameters such as outdoor air temperature, solar radiation and relative humidity based on the CNRM-CM5 model and the RCP4.5 model. The building heat load acquisition module 102 is used to obtain the building winter heating load based on the meteorological parameters using the building heat load model; specifically, the building heat load acquisition module 102 is used to build a building heat load model based on the enclosure structure parameters and indoor parameters; based on the building heat load model and meteorological parameters, the building winter heating load is obtained. The safe operation range acquisition and operation energy consumption calculation module 103 is used to establish a model of a medium-deep buried pipe geothermal heating system according to the winter heating load of the building; and based on the geological parameters and design parameters, the inlet water temperature of the heat exchanger is calculated to determine the safe operation range, and the operation energy consumption of the medium-deep buried pipe geothermal heating system is calculated using the medium-deep buried pipe geothermal heating system numerical model; the economic calculation module 104 is used to establish an economic analysis model; and based on the economic analysis model and the operation energy consumption of the medium-deep buried pipe geothermal heating system, the initial investment and operation cost of the medium-deep buried pipe geothermal heating system under different design parameters are calculated; the optimization module 105 is used to optimize the medium-deep coaxial sleeve type buried pipe heat exchanger using an optimization algorithm according to the optimization parameter value range.
[0116] Based on the above technical scheme, the present application provides a method and system for optimizing the heating design of a medium-deep buried pipe heat exchanger, the method comprising the following steps: first, using a meteorological parameter model to obtain meteorological parameters; and based on the meteorological parameters, using a building heat load model to determine the winter heating load of the building; next, based on the winter heating load of the building, establishing a medium-deep buried pipe geothermal heating system model; and based on geological parameters and design parameters, determining the operating safety status based on the inlet water temperature, and using a medium-deep buried pipe geothermal heating system numerical model to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system; establishing an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculating the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters; finally, based on the optimization parameter value range, using an optimization algorithm to optimize the medium-deep coaxial sleeve buried pipe heat exchanger.
[0117] The embodiment of the present application provides a method for optimizing the design of heating of a medium-deep coaxial tube-type underground pipe heat exchanger, which comprehensively considers the interactivity of design parameters and climate change, takes the long-term stable operation of the medium-deep tube-type underground pipe geothermal heating system as a constraint condition, takes the minimum investment cost as the optimization goal, and uses a genetic algorithm to determine the optimization results of the design parameters of the medium-deep coaxial tube-type underground pipe heat exchanger under the influence of design parameter interactivity and climate change, fully guarantees the long-term stable operation of the medium-deep tube-type underground pipe geothermal heating system, and improves the design performance of the medium-deep tube-type underground pipe heat exchanger. The design optimization results obtained based on the present invention can reduce the overall investment cost of the medium-deep tube-type underground pipe geothermal heating system to a certain extent, and can better meet the long-term heating heat load requirements of buildings.
[0118] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for optimizing the design of heating for a medium-deep underground heat exchanger, characterized in that: Simultaneous optimization of multiple design parameters under climate change includes the following steps: The meteorological parameter model is used to obtain the long-term meteorological parameters that affect the building load during the expected service life of the medium-deep underground heat exchanger heating system; Based on the meteorological parameters, a building heat load model is used to determine the winter heating load of the building; Based on the obtained winter heating load of the building, a numerical model of the medium-deep buried pipe geothermal heating system is constructed, the inlet water temperature of the heat exchanger is calculated using the numerical model, and the operating safety status is determined based on the inlet water temperature; The operating energy consumption of the medium-deep buried pipe geothermal heating system is calculated using the numerical model of the medium-deep buried pipe geothermal heating system. Establish an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculate the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters; Based on the commonly used value range of design parameters, the optimization algorithm is used to optimize the design parameters of the medium-deep buried pipe heat exchanger; Among them, the numerical model of the medium-deep buried pipe geothermal heating system is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system, including: Based on the numerical model of the medium-deep buried pipe geothermal heating system, the heating power of the medium-deep buried pipe heat exchanger and the evaporator inlet temperature of the heat pump unit are determined; Based on the inlet temperature of the evaporator of the heat pump unit, the coefficient of performance of the heat pump unit is determined by an empirical formula; the empirical formula is as follows: COP=a+bT e (1) Among them, T e is the heat pump unit evaporator inlet temperature, °C; a and b are the heat pump unit performance coefficient calculation parameters; Based on the heat extraction power of the heat exchanger and the performance coefficient of the heat pump unit, the operating energy consumption of the ground heat pump unit is determined. The operating energy consumption of the heat pump unit is as follows: Among them, Q DBHE is the heat extraction power of the medium-deep underground heat exchanger, kW; W HP is the operating energy consumption of the heat pump unit, kW; Based on the pressure drop in the pipe, the circulation flow rate and the pump efficiency, the energy consumption of the circulating water pump is determined. The energy consumption of the circulating water pump is as follows: Among them, W wP is the energy consumption of the circulating water pump; ΔP is the pressure drop of the circulating fluid in the deep underground heat exchanger, Pa; q is the volume flow rate of the circulating fluid, m 3 / s; η WP is the efficiency of the water pump; Establish an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculate the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters; The initial investment includes the drilling cost of the medium-deep buried pipe heat exchanger, the purchase cost of the ground heat pump and the water pump, and the calculation formula is shown in formula (4) to formula (6); the operating cost includes the power consumption of the ground heat pump and the circulating water pump, and the operating cost calculation formula considering the discount rate and inflation rate is shown in formula (7); the total investment cost calculation formula is shown in formula (8); C i,DBHE =D×c i,DBHE (4) C i,WP =P e,WP ×c i,WP (5) C i,HP =Q c ×c i,HP (6) Among them, C i,DBHE is the drilling cost of the medium-deep buried pipe heat exchanger, in yuan; D is the total length of the medium-deep buried pipe heat exchanger, in m; c i,DBHE is the unit length cost of medium-deep buried pipe heat exchanger, in yuan / m; C i,WP is the purchase cost of the water pump, in yuan; P e,WP is the rated power of the circulating water pump, in kW; c i,WP is the unit power cost of the circulating water pump, in yuan / kW; C i,HP is the purchase cost of the heat pump unit, in yuan; Q c is the capacity of the heat pump unit, in kW; c i,HP is the unit heating cost of the heat pump unit, in yuan / kW; C o,j is the operating cost in the jth year, in yuan; EC j is the power consumption in the jth year, in kW·h; p e is the unit electricity price, in yuan / (kW·h); ir is the inflation rate; dr is the discount rate; C t is the total investment cost, in Yuan.
2. The method for optimizing heating design of a medium-deep underground heat exchanger according to claim 1, characterized in that: The meteorological parameter model is a climate change prediction model under the influence of human activities; The long-term meteorological parameters affecting building loads include outdoor air temperature, solar radiation, and relative humidity.
3. The method for optimizing heating design of a medium-deep underground heat exchanger according to claim 1, characterized in that: Based on the meteorological parameters, the building heat load model is used to determine the winter heating load of the building, including: Build a building heat load model based on the building envelope parameters and indoor parameters; Based on the building heat load model and meteorological parameters, the winter heating load of the building within the expected service life of the medium-deep buried pipe heat exchanger heating system is obtained.
4. The method for optimizing heating design of a medium-deep underground heat exchanger according to claim 1, characterized in that: Based on the winter heating load of the building, a model of a medium-deep buried pipe geothermal heating system is established, including the following steps: Based on the winter heating load of the building, numerical simulation software is used to establish a medium-deep buried pipe heat exchanger model and a ground heat pump unit model.
5. The method for optimizing heating design of a medium-deep underground heat exchanger according to claim 4, characterized in that: Based on geological parameters and design parameters, calculate the heat exchanger inlet water temperature and determine the safe operation status, including: Based on geological parameters, design parameters and building winter heating load, the heat exchanger inlet water temperature is obtained; Based on the inlet water temperature of the heat exchanger, and taking the degree of dissatisfaction as the safe operation index, the operation safety status is determined; the definition of the safe operation index is shown in formula (9): Among them, UD is the degree of dissatisfaction; It is the total number of operating hours when the inlet water temperature of the medium-deep buried pipe heat exchanger is lower than the low temperature threshold of safe operation during the long-term heat extraction process, in h; It is the total heating time in the long-term heating process, in h; Calculated from heating time and intermittent operation mode; The numerical model of medium-deep buried pipe geothermal heating system is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system.
6. The method for optimizing heating design of a medium-deep underground heat exchanger according to claim 1, characterized in that: Based on the commonly used value range of design parameters, the optimization algorithm is used to optimize the design parameters of the medium-deep buried pipe heat exchanger, including: Taking the long-term stable operation of the medium-deep buried pipe geothermal heating system as a constraint condition, which is a condition that meets the user's requirements for dissatisfaction, and the minimum investment cost as the optimization goal, an optimization algorithm is used to determine the optimization results of the medium-deep buried pipe heat exchanger under climate change conditions.
7. A heating design optimization system for medium-deep underground heat exchangers, characterized in that: It includes a meteorological parameter acquisition module, a building heat load acquisition module, a safe operation range acquisition and operation energy consumption calculation module, an economic calculation module and an optimization module which are connected in sequence; The meteorological parameter acquisition module is used to obtain long-term meteorological parameters that affect building loads within the expected service life of the medium-deep buried pipe heat exchanger heating system; The building heat load acquisition module acquires the winter heating load of the building using a building heat load model based on the acquired meteorological parameters; The safe operation range acquisition and operation energy consumption calculation module constructs a numerical model of the medium-deep buried pipe geothermal heating system based on the acquired winter heating load of the building, calculates the inlet water temperature of the heat exchanger using the numerical model, and determines the operation safety status based on the inlet water temperature; The operating energy consumption of the medium-deep buried pipe geothermal heating system is calculated using the numerical model of the medium-deep buried pipe geothermal heating system. The economic calculation module is used to establish an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters are calculated; The optimization module optimizes the design parameters of the medium-deep buried pipe heat exchanger using an optimization algorithm based on the commonly used value ranges of the design parameters; Among them, the numerical model of the medium-deep buried pipe geothermal heating system is used to calculate the operating energy consumption of the medium-deep buried pipe geothermal heating system, including: Based on the numerical model of the medium-deep buried pipe geothermal heating system, the heating power of the medium-deep buried pipe heat exchanger and the evaporator inlet temperature of the heat pump unit are determined; Based on the inlet temperature of the evaporator of the heat pump unit, the coefficient of performance of the heat pump unit is determined by an empirical formula; the empirical formula is as follows: COP=a+bT e (1) Among them, T e is the heat pump unit evaporator inlet temperature, °C; a and b are the heat pump unit performance coefficient calculation parameters; Based on the heat extraction power of the heat exchanger and the performance coefficient of the heat pump unit, the operating energy consumption of the ground heat pump unit is determined. The operating energy consumption of the heat pump unit is as follows: Among them, Q DBHE is the heat extraction power of the medium-deep underground heat exchanger, kW; W HP is the operating energy consumption of the heat pump unit, kW; Based on the pressure drop in the pipe, the circulation flow rate and the pump efficiency, the energy consumption of the circulating water pump is determined. The energy consumption of the circulating water pump is as follows: Among them, W wP is the energy consumption of the circulating water pump; ΔP is the pressure drop of the circulating fluid in the deep underground heat exchanger, Pa; q is the volume flow rate of the circulating fluid, m 3 / s; η WP is the efficiency of the water pump; Establish an economic analysis model; and based on the economic analysis model and the operating energy consumption of the medium-deep buried pipe geothermal heating system, calculate the initial investment and operating cost of the medium-deep buried pipe geothermal heating system under different design parameters; The initial investment includes the drilling cost of the medium-deep buried pipe heat exchanger, the purchase cost of the ground heat pump and the water pump, and the calculation formula is shown in formula (4) to formula (6); the operating cost includes the power consumption of the ground heat pump and the circulating water pump, and the operating cost calculation formula considering the discount rate and inflation rate is shown in formula (7); the total investment cost calculation formula is shown in formula; C i,DBHE =D×c i,DBHE (4) C i,WP =P e,WP ×c i,WP (5) C i,HP =Q c ×c i,HP (6) Among them, C i,DBHE is the drilling cost of the medium-deep buried pipe heat exchanger, in yuan; D is the total length of the medium-deep buried pipe heat exchanger, in m; c i,DBHE is the unit length cost of medium-deep buried pipe heat exchanger, in yuan / m; C i,WP is the purchase cost of the water pump, in yuan; P e,WP is the rated power of the circulating water pump, in kW; c i,WP is the unit power cost of the circulating water pump, in yuan / kW; C i,HP is the purchase cost of the heat pump unit, in yuan; Q c is the capacity of the heat pump unit, in kW; c i,HP is the unit heating cost of the heat pump unit, in yuan / kW; C o,j is the operating cost in the jth year, in yuan; EC j is the power consumption in the jth year, in kW·h; p e is the unit electricity price, in yuan / (kW·h); ir is the inflation rate; dr is the discount rate; C t is the total investment cost, in Yuan.
Citation Information
Patent Citations
Design method for medium-deep geothermal buried pipe heat pump heat supply system
CN113776120A
Design method and device for medium-deep layer buried pipe heat pump heating system
CN114201797A
Economic efficiency evaluation method for medium-deep layer U-shaped buried pipe heat supply system
CN115906529A
Full-life-cycle economical efficiency evaluation method for medium-deep layer coaxial sleeve type buried pipe heat supply system
CN116128369A