Vertical three-pass high-efficiency steam generator
Through the design of a vertical three-back high-efficiency steam generator, the burner directly heats the mode wall and realizes three-back heating. Combined with ultrasonic cleaning technology, the problems of low thermal efficiency and difficulty in cleaning of the steam boiler are solved, and the heating efficiency and cleaning efficiency are improved. , reducing production costs and environmental pollution.
Patent Information
- Application Number
- CN202410634100.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-05-21
AI Technical Summary
The existing steam boilers have problems such as large water capacity, slow temperature rise, large volume, long heating time, large fuel consumption, low thermal efficiency, as well as pipeline blockage and carbon black powder accumulation, resulting in high production costs and environmental pollution.
A vertical three-return high-efficiency steam generator is designed, using the burner to directly heat the mode wall to generate steam, use waste heat to perform three-return heating, and remove scale and carbon black powder through an ultrasonic cleaning mechanism to achieve cleaning in the pipeline without disassembly. .
It significantly improves thermal efficiency, saves fuel consumption, shortens heating time, reduces production costs, and achieves rapid and safe removal of scale and carbon black powder through ultrasonic cleaning, avoiding inefficient cleaning of pipeline disassembly.
Smart Images

Figure CN118346970B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steam boilers, in particular to a vertical three-pass high-efficiency steam generator. Background Art
[0002] The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's lives, or it can be converted into mechanical energy through a steam power device, or the mechanical energy can be converted into electrical energy through a generator. The boiler that provides hot water is called a hot water boiler.
[0003] Although the existing steam boilers on the market use internal combustion three-pass fire tubes, low-level symmetrically arranged furnace wet back structure, and high-temperature flue gas flushes the second and third return flue tubes in turn, they generally have problems such as large water capacity, slow temperature rise, large volume, and long heating time. Taking a two-ton boiler as an example, the water capacity is about 4.2 tons. When starting heating, it generally takes 35 minutes to preheat and generate steam, and the gas consumption is about 100 cubic meters. The thermal efficiency is generally about 92%, and there are disadvantages such as large water output, long preheating time, large fuel consumption, and high production cost;
[0004] At the same time, when the pipes in the boiler are used for long-term heating, the inside of the pipes is easily blocked by scale. The existing treatment methods are cleaning after disassembly of the pipes and cleaning with scale inhibitors. The former requires disassembly of the entire device and has low cleaning efficiency. The latter cleaning with scale inhibitors is easy to pollute the environment, and the scale inhibitors are toxic to a certain extent, which poses a safety hazard to the cleaning personnel.
[0005] When the mode wall is directly heated, incomplete combustion causes carbon black powder to adhere to the inner wall of the mode wall. If it is not cleaned in time, the heating time of the mode wall will be long and the combustion and heating cost will increase. Summary of the invention
[0006] The problem solved by the present invention is to provide a vertical three-pass high-efficiency steam generator, thereby solving the above-mentioned technical problems.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A vertical three-pass high-efficiency steam generator comprises a boiler shell, a burner, a lower collecting ring pipe, an upper collecting ring pipe, a mode wall, a first convection tube bundle and a second convection tube bundle, wherein a burner is installed at the middle of the top side of the boiler shell, a lower collecting ring pipe is installed at the bottom side of the inside of the boiler shell, an upper collecting ring pipe is installed at the top side of the inside of the boiler shell, an annular mode wall, a first convection tube bundle and a second convection tube bundle are installed between the lower collecting ring pipe and the upper collecting ring pipe, the lower collecting ring pipe is respectively connected with a first water inlet pipe, a drain valve and a cleaning pipe outside the boiler shell, an outlet pipe is connected and installed on the upper collecting ring pipe, and the outlet pipe is connected with a steam-water separator, a steam pipe is installed on the top side of the steam-water separator, a return pipe is installed on the bottom side of the steam-water separator, and the return pipe is connected with the top side wall of the atmospheric pressure water tank, a second water inlet pipe is installed on the top side wall of the atmospheric pressure water tank, and a drain pipe connected with the first water inlet pipe is installed on the top side wall of the atmospheric pressure water tank;
[0009] A smoke exhaust fan is installed at the bottom side of the boiler shell, and the smoke exhaust fan is connected with the top of the normal pressure water tank through a smoke exhaust pipe. A smoke outlet pipe is installed at the bottom of the normal pressure water tank.
[0010] Preferably, a first cleaning mechanism for cleaning scale inside the lower collecting ring tube, the upper collecting ring tube, the mode wall, the first convection tube bundle and the second convection tube bundle is installed on the outer side of the boiler shell.
[0011] Preferably, the first cleaning mechanism comprises a cleaning tank, a transducer is installed on the bottom side of the cleaning tank, the cleaning tank is connected with a cleaning pipe through a connecting pipe, and a control valve is installed on the connecting pipe.
[0012] Preferably, a second cleaning mechanism for cleaning carbon black powder on the inner wall of the pattern wall is installed on the boiler shell, and the second cleaning mechanism includes a plurality of sliding columns penetrating the boiler shell, a lifting ring seat is installed at the bottom of the sliding column, and an annular scraper is installed on the top side of the lifting ring seat, and a plurality of pipe grooves are opened at equal intervals on the annular scraper, and the annular scraper is in contact with the inner wall of the pattern wall.
[0013] Preferably, a lifting plate is installed on the top of several of the sliding columns, a threaded barrel is installed through the bearing in the lifting plate, a threaded rod is installed through the inner thread of the threaded barrel, and the bottom end of the threaded rod is connected to the bottom side of the boiler shell.
[0014] Preferably, a reducer is installed on the top side of the lifting plate, the reducer input end is connected to the motor output end, the reducer output end is installed with rotating teeth, the outer side of the threaded barrel is provided with external teeth, and the external teeth are meshed with the rotating teeth.
[0015] Preferably, an annular water seat is installed on the bottom side of the lifting plate, and a spray hole is opened on the outer side of the annular water seat.
[0016] Preferably, one of the sliding columns is a hollow structure, and the bottom end of the sliding column is connected to the annular water seat, and the top end of the sliding column is connected to the water pump.
[0017] Preferably, an ash discharge valve for discharging carbon black powder is installed at the bottom of the boiler shell.
[0018] Preferably, the specific operating steps of the steam generator are as follows:
[0019] Step 1: The cleaning pipe is in a closed state, water is replenished into the atmospheric water tank through the second water inlet pipe, and enters the lower collecting ring pipe through the drain pipe and the first water inlet pipe, and automatically replenishes into the mode wall, the first convection tube bundle and the second convection tube bundle through the lower collecting ring pipe. The burner works in the boiler shell and directly heats the mode wall. The first convection tube bundle and the second convection tube bundle are heated by the waste heat dissipated by the mode wall to achieve the purpose of three-pass combustion. After the water in the mode wall, the first convection tube bundle and the second convection tube bundle reaches the boiling point, it is converted from liquid water to gaseous water vapor. The gaseous water vapor rises and enters the upper collecting ring pipe, enters the steam-water separator through the outlet pipe, and the steam enters the heat-using equipment. The liquid water enters the atmospheric pressure water tank through the reflux pipe for reuse. The smoke exhaust fan works, and the smoke enters the atmospheric pressure water tank through the smoke exhaust pipe for reheating;
[0020] Step 2: After the steam generator is used, the first cleaning mechanism is used to clean the scale inside the lower collecting ring tube, the upper collecting ring tube, the mode wall, the first convection tube bundle and the second convection tube bundle, and the second cleaning mechanism is used to clean the carbon black powder on the inner wall of the mode wall. The water in the pipeline in the boiler shell is discharged through the drain valve, and the control valve is opened to add cleaning liquid into the cleaning tank until the cleaning liquid fills the lower collecting ring tube, the upper collecting ring tube, the mode wall, the first convection tube bundle and the second convection tube bundle. At this time, the transducer converts the sound energy of the power ultrasonic frequency source into mechanical vibration and radiates ultrasonic waves to the cleaning liquid in the cleaning tank through the cleaning tank wall. The microbubbles in the cleaning tank and the liquid in the pipeline vibrate under the action of the sound waves, and the scale inside the pipeline is cleaned. Then, after being discharged through the drain valve, the pipeline is flushed with clean water;
[0021] Step three: The motor works and the speed reducer adjusts the speed, driving the rotating teeth to rotate and cooperate with the meshing external teeth to realize the rotation of the threaded barrel. The threaded connection between the threaded barrel and the threaded rod drives the lifting plate to rise and fall, and the lifting ring seat connected to the sliding column rises and falls synchronously. When the lifting ring seat descends, the carbon black powder on the pattern wall is scraped off by the annular scraper. At the same time, the water pump works to transport water through the sliding column to the annular water seat, and sprays it to the annular scraper through the spray hole to remove the carbon black powder attached to the annular scraper. The generated carbon black powder is discharged through the ash discharge valve.
[0022] The beneficial effects of the present invention are as follows: the burner directly heats the heating surface of the mode wall to instantly generate steam, thus saving fuel and reducing costs. Meanwhile, the waste heat emitted by the mode wall directly heats the first convection tube bundle and the second convection tube bundle to achieve a three-pass heating effect. The flue gas enters the atmospheric pressure water tank for reheating to achieve the purpose of waste heat utilization and recycling. The waste heat of the tail flue is greatly utilized, fuel is greatly saved, and thermal efficiency is greatly improved. Meanwhile, the steam-water separator can achieve the purpose of steam-water separation, eliminating heat waste and ensuring the quality of steam.
[0023] The first cleaning mechanism is connected to the internal pipeline through the control valve. At this time, the transducer converts the sound energy of the power ultrasonic frequency source into mechanical vibration and radiates ultrasonic waves to the cleaning liquid in the cleaning tank through the cleaning tank wall. The microbubbles in the cleaning tank and the liquid in the pipeline vibrate under the action of the sound waves, and the scale inside the lower collecting ring pipe, the upper collecting ring pipe, the mode wall, the first convection tube bundle and the second convection tube bundle is cleaned without disassembling the pipeline. The cleaning method is simple and fast.
[0024] The lifting ring seat moves up and down, and the carbon black powder on the mode wall is scraped off by the annular scraper. At the same time, the water pump works to transport water to the annular water seat through the sliding column and spray it to the annular scraper through the spray hole to remove the carbon black powder attached to the annular scraper, so as to avoid the accumulation of carbon black powder and cause low heating efficiency of the mode wall, improve heating efficiency and save fuel resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the first structure of the present invention as a whole;
[0026] Figure 2 It is an overall cross-sectional view of the present invention;
[0027] Figure 3 It is a side view of the present invention;
[0028] Figure 4 It is a schematic diagram of the structure of the mode wall, the first convection tube bundle and the second convection tube bundle of the present invention;
[0029] Figure 5 It is a schematic diagram of the second structure of the present invention as a whole;
[0030] Figure 6 It is a schematic diagram of the structure of the annular scraper of the present invention.
[0031] Legend:
[0032] 1. Boiler shell; 2. Burner; 3. Lower collecting ring pipe; 4. Upper collecting ring pipe; 5. Model wall; 6. First convection tube bundle; 7. Second convection tube bundle; 8. First water inlet pipe; 9. Drain valve; 10. Outlet pipe; 11. Steam-water separator; 12. Steam pipe; 13. Reflux pipe; 14. Atmospheric water tank; 15. Second water inlet pipe; 16. Drain pipe; 17. Smoke exhaust fan; 18. Smoke exhaust pipe; 1 9. Smoke outlet pipe; 20. Cleaning pipe; 21. Connecting pipe; 22. Control valve; 23. Cleaning tank; 24. Transducer; 25. Ash discharge valve; 26. Sliding column; 27. Lifting ring seat; 28. Lifting plate; 29. Speed reducer; 30. Motor; 31. Rotating gear; 32. Threaded barrel; 33. External gear; 34. Threaded rod; 35. Annular scraper; 36. Pipe groove; 37. Annular water seat; 38. Spray hole. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Specific examples are given below.
[0035] See also Figure 1 to Figure 6 A vertical three-pass high-efficiency steam generator comprises a boiler shell 1, a burner 2, a lower collecting ring tube 3, an upper collecting ring tube 4, a pattern wall 5, a first convection tube bundle 6 and a second convection tube bundle 7. The water storage volume in the lower collecting ring tube 3, the upper collecting ring tube 4, the pattern wall 5, the first convection tube bundle 6 and the second convection tube bundle 7 is less than 30L. The burner 2 is installed in the middle of the top side of the boiler shell 1, the lower collecting ring tube 3 is installed on the bottom side of the boiler shell 1, the upper collecting ring tube 4 is installed on the top side of the boiler shell 1, and the annular pattern wall 5, the first convection tube bundle 6 and the second convection tube bundle 7 are installed between the lower collecting ring tube 3 and the upper collecting ring tube 4. and the second convection tube bundle 7, the lower collecting ring pipe 3 is respectively connected with the first water inlet pipe 8, the drain valve 9 and the cleaning pipe 20 outside the boiler shell 1, the upper collecting ring pipe 4 is connected with the lead-out pipe 10, and the lead-out pipe 10 is connected with the steam-water separator 11, the steam pipe 12 is installed on the top side of the steam-water separator 11, the return pipe 13 is installed on the bottom side of the steam-water separator 11, and the return pipe 13 is connected with the top side wall of the atmospheric pressure water tank 14, the second water inlet pipe 15 is installed on the top side wall of the atmospheric pressure water tank 14, and the drainage pipe 16 connected with the first water inlet pipe 8 is installed on the top side wall of the atmospheric pressure water tank 14;
[0036] A smoke exhaust fan 17 is installed at the bottom side of the boiler shell 1 . The smoke exhaust fan 17 is connected to the top of the atmospheric pressure water tank 14 through a smoke exhaust pipe 18 . A smoke outlet pipe 19 is installed at the bottom of the atmospheric pressure water tank 14 .
[0037] A first cleaning mechanism for cleaning scale inside the lower collecting ring tube 3, the upper collecting ring tube 4, the mode wall 5, the first convection tube bundle 6 and the second convection tube bundle 7 is installed on the outer side of the boiler shell 1. The first cleaning mechanism includes a cleaning tank 23. A transducer 24 is installed on the bottom side of the cleaning tank 23. The cleaning tank 23 is connected with the cleaning pipe 20 through a connecting pipe 21. A control valve 22 is installed on the connecting pipe 21. The opening and closing of the control valve 22 realizes the connection and sealing of the first cleaning mechanism and the internal pipeline of the boiler shell 1. When connected, cleaning liquid is added into the cleaning tank 23 until the cleaning liquid fills the lower collecting ring tube 3, the upper collecting ring tube 4, the mode wall 5, the first convection tube bundle 6 and the second convection tube bundle 7. At this time, the transducer 24 converts the sound energy of the power ultrasonic frequency source into mechanical vibration and radiates ultrasonic waves to the cleaning liquid in the cleaning tank 23 through the wall of the cleaning tank 23. The microbubbles in the cleaning tank 23 and the liquid in the pipeline vibrate under the action of the sound waves to clean the scale inside the pipeline.
[0038] A second cleaning mechanism for cleaning the carbon black powder on the inner wall of the mode wall 5 is installed on the boiler shell 1. The second cleaning mechanism includes a plurality of slide columns 26 penetrating the boiler shell 1. A lifting ring seat 27 is installed at the bottom of the slide column 26. A lifting plate 28 is installed on the top of the plurality of slide columns 26. A threaded barrel 32 is installed through the bearing in the lifting plate 28. A threaded rod 34 is installed through the inner thread of the threaded barrel 32. The bottom end of the threaded rod 34 is connected to the bottom side of the boiler shell 1. A reducer 29 is installed on the top side of the lifting plate 28. The input end of the reducer 29 is connected to the output end of the motor 30. A rotating tooth 31 is installed at the output end of the reducer 29. External teeth 33 are arranged on the outer side of the threaded barrel 32, and the external teeth 33 are meshed with the rotating teeth 31. When the motor 30 works, the reducer 29 adjusts the speed, drives the rotating teeth 31 to rotate, and cooperates with the meshing external teeth 33 to realize the rotation of the threaded barrel 32. The lifting plate 28 is driven by the threaded connection and cooperation between the threaded barrel 32 and the threaded rod 34. The lifting ring seat 27 connected to the sliding column 26 is lifted and lowered synchronously, an annular scraper 35 is installed on the top side of the lifting ring seat 27, and a number of pipe grooves 36 are opened on the annular scraper 35 at equal intervals, and the annular scraper 35 contacts the inner wall of the mode wall 5, and an annular water seat 37 is installed on the bottom side of the lifting plate 28, and a spray hole 38 is opened on the outer side of the annular water seat 37. One of the sliding columns 26 is a hollow structure, and the bottom end of the sliding column 26 is connected to the annular water seat 37, and the top of the sliding column 26 is connected to the water pump. When the lifting ring seat 27 descends, the carbon black powder on the mode wall 5 is scraped off by the annular scraper 35. At the same time, the water pump works to transport water through the sliding column 26 to the annular water seat 37, and spray it to the annular scraper 35 through the spray hole 38 to remove the carbon black powder attached to the annular scraper 35. A ash discharge valve 25 for discharging carbon black powder is installed at the bottom of the boiler shell 1. The ash discharge valve 25 is opened regularly to discharge the carbon black powder on the bottom side of the boiler shell 1.
[0039] The specific operation steps of the steam generator are as follows:
[0040] Step 1: The cleaning pipe 20 is in a closed state, water is replenished into the atmospheric water tank 14 through the second water inlet pipe 15, and enters the lower ring pipe 3 through the drain pipe 16 and the first water inlet pipe 8, and automatically replenishes into the mode wall 5, the first convection tube bundle 6 and the second convection tube bundle 7 through the lower ring pipe 3. The burner 2 works in the boiler shell 1, directly heats the mode wall 5, and heats the first convection tube bundle 6 and the second convection tube bundle 7 through the waste heat dissipated by the mode wall 5, so as to achieve the purpose of three-pass combustion. After the water in the mode wall 5, the first convection tube bundle 6 and the second convection tube bundle 7 reaches the boiling point, it is converted from liquid water to gaseous water vapor. The gaseous water vapor rises and enters the upper ring pipe 4, enters the steam-water separator 11 through the outlet pipe 10, and the steam enters the heat-using equipment. The liquid water enters the atmospheric water tank 14 through the reflux pipe 13 for reuse. The smoke exhaust fan 17 works, and the smoke enters the atmospheric water tank 14 through the smoke exhaust pipe 18 for reheating.
[0041] Step 2: After the steam generator is used, the first cleaning mechanism is used to clean the scale inside the lower collecting ring tube 3, the upper collecting ring tube 4, the mode wall 5, the first convection tube bundle 6 and the second convection tube bundle 7, and the second cleaning mechanism is used to clean the carbon black powder on the inner wall of the mode wall 5. The water in the pipeline in the boiler shell 1 is discharged through the drain valve 9, and the control valve 22 is opened to add cleaning liquid into the cleaning tank 23 until the cleaning liquid fills the lower collecting ring tube 3, the upper collecting ring tube 4, the mode wall 5, the first convection tube bundle 6 and the second convection tube bundle 7. At this time, the transducer 24 converts the sound energy of the power ultrasonic frequency source into mechanical vibration and radiates ultrasonic waves to the cleaning liquid in the cleaning tank 23 through the wall of the cleaning tank 23. The microbubbles in the cleaning tank 23 and the liquid in the pipeline vibrate under the action of the sound waves, and the scale inside the pipeline is cleaned. Then, after being discharged through the drain valve 9, the pipeline is flushed with clean water;
[0042] Step three: The motor 30 works, the reducer 29 adjusts the speed, drives the rotating gear 31 to rotate, and cooperates with the meshing external teeth 33 to realize the rotation of the threaded barrel 32. The threaded connection between the threaded barrel 32 and the threaded rod 34 drives the lifting plate 28 to rise and fall, and the lifting ring seat 27 connected to the sliding column 26 rises and falls synchronously. When the lifting ring seat 27 descends, the carbon black powder on the mode wall 5 is scraped off by the annular scraper 35. At the same time, the water pump works to transport water through the sliding column 26 to the annular water seat 37, and sprays it to the annular scraper 35 through the spray hole 38 to remove the carbon black powder attached to the annular scraper 35. The generated carbon black powder is discharged through the ash discharge valve 25.
[0043] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. Vertical three-pass high-efficiency steam generator, characterized in that: The boiler comprises a boiler shell (1), a burner (2), a lower collecting ring tube (3), an upper collecting ring tube (4), a pattern wall (5), a first convection tube bundle (6) and a second convection tube bundle (7), wherein the burner (2) is installed in the middle of the top side of the boiler shell (1), the lower collecting ring tube (3) is installed on the bottom side of the boiler shell (1), the upper collecting ring tube (4) is installed on the top side of the boiler shell (1), an annular pattern wall (5), a first convection tube bundle (6) and a second convection tube bundle (7) are installed between the lower collecting ring tube (3) and the upper collecting ring tube (4), and the lower collecting ring tube (3) is connected to the first convection tube bundle (6) and the second convection tube bundle (7) on the outside of the boiler shell (1). A water inlet pipe (8), a sewage valve (9) and a cleaning pipe (20) are connected, an outlet pipe (10) is installed on the upper collecting ring pipe (4), and the outlet pipe (10) is connected to a steam-water separator (11), a steam pipe (12) is installed on the top side of the steam-water separator (11), a return pipe (13) is installed on the bottom side of the steam-water separator (11), and the return pipe (13) is connected to the top side wall of the atmospheric pressure water tank (14), a second water inlet pipe (15) is installed on the top side wall of the atmospheric pressure water tank (14), and a drainage pipe (16) connected to the first water inlet pipe (8) is installed on the top side wall of the atmospheric pressure water tank (14); A smoke exhaust fan (17) is installed on the bottom side of the boiler shell (1), and the smoke exhaust fan (17) is connected to the top of the atmospheric pressure water tank (14) through a smoke exhaust pipe (18). A smoke outlet pipe (19) is installed at the bottom of the atmospheric pressure water tank (14); The boiler shell (1) is provided with a second cleaning mechanism for cleaning the carbon black powder on the inner wall of the mode wall (5), the second cleaning mechanism comprising a plurality of slide columns (26) penetrating the boiler shell (1), a lifting ring seat (27) being installed at the bottom of the slide column (26), an annular scraper (35) being installed on the top side of the lifting ring seat (27), a plurality of pipe grooves (36) being provided at equal intervals on the annular scraper (35), and the annular scraper (35) being in contact with the inner wall of the mode wall (5), a lifting plate (28) being installed on the top of the plurality of slide columns (26), a threaded cylinder (32) being installed through the inner bearing of the lifting plate (28), a threaded rod (34) being installed through the inner thread of the threaded cylinder (32), and the bottom end of the threaded rod (34) being in contact with the boiler shell (1), The bottom side of the shell (1) is connected, a reducer (29) is installed on the top side of the lifting plate (28), the input end of the reducer (29) is connected to the output end of the motor (30), the output end of the reducer (29) is installed with a rotating tooth (31), the outer side of the threaded cylinder (32) is provided with an external tooth (33), and the external tooth (33) is meshed with the rotating tooth (31), an annular water seat (37) is installed on the bottom side of the lifting plate (28), and a spray hole (38) is opened on the outer side of the annular water seat (37), one of the sliding columns (26) is a hollow structure, and the bottom end of the sliding column (26) is connected to the annular water seat (37), and the top end of the sliding column (26) is connected to a water pump, and an ash discharge valve (25) for discharging carbon black powder is installed at the bottom of the boiler shell (1).
2. The vertical three-pass high-efficiency steam generator according to claim 1 is characterized in that: A first cleaning mechanism for cleaning scale inside the lower collecting ring tube (3), the upper collecting ring tube (4), the mode wall (5), the first convection tube bundle (6) and the second convection tube bundle (7) is installed on the outer side of the boiler shell (1).
3. The vertical three-pass high-efficiency steam generator according to claim 2 is characterized in that: The first cleaning mechanism comprises a cleaning tank (23), a transducer (24) is installed on the bottom side of the cleaning tank (23), the cleaning tank (23) is connected to the cleaning pipe (20) through a connecting pipe (21), and a control valve (22) is installed on the connecting pipe (21).
4. The vertical three-pass high-efficiency steam generator according to claim 3 is characterized in that: The specific operation steps of the steam generator are as follows: Step 1: The cleaning pipe (20) is in a closed state, water is replenished into the atmospheric water tank (14) through the second water inlet pipe (15), and enters the lower collecting ring pipe (3) through the drainage pipe (16) and the first water inlet pipe (8), and automatically replenishes into the mode wall (5), the first convection tube bundle (6) and the second convection tube bundle (7) through the lower collecting ring pipe (3), and the burner (2) works in the boiler shell (1) to directly heat the mode wall (5), and the residual heat dissipated by the mode wall (5) heats the first convection tube bundle (6) and the second convection tube bundle (7). 7) to achieve the purpose of three-pass combustion. After the water in the model wall (5), the first convection tube bundle (6) and the second convection tube bundle (7) reaches the boiling point, it is converted from liquid water to gaseous water vapor. The gaseous water vapor rises and enters the upper ring pipe (4), enters the steam-water separator (11) through the outlet pipe (10), and the steam enters the heat-using equipment. The liquid water enters the atmospheric pressure water tank (14) through the return pipe (13) for reuse. The smoke exhaust fan (17) is operated, and the smoke enters the atmospheric pressure water tank (14) through the smoke exhaust pipe (18) for reheating. Step 2: After the steam generator is used, the first cleaning mechanism is used to clean the scale inside the lower collecting ring tube (3), the upper collecting ring tube (4), the mode wall (5), the first convection tube bundle (6) and the second convection tube bundle (7), and the second cleaning mechanism is used to clean the carbon black powder on the inner wall of the mode wall (5). The water in the pipeline inside the boiler shell (1) is discharged through the drain valve (9), and the control valve (22) is opened to add cleaning liquid into the cleaning tank (23) until the cleaning liquid fills the lower collecting ring tube (3), the upper collecting ring tube (4), the mode wall (5), the first convection tube bundle (6) and the second convection tube bundle (7). At this time, the transducer (24) converts the sound energy of the power ultrasonic frequency source into mechanical vibration and radiates ultrasonic waves to the cleaning liquid in the cleaning tank (23) through the wall of the cleaning tank (23). The microbubbles in the liquid in the cleaning tank (23) and the pipeline vibrate under the action of the sound waves, and the scale inside the pipeline is cleaned. After the water is discharged through the drain valve (9), the pipeline is flushed with clean water. Step 3: The motor (30) operates and the speed reducer (29) is adjusted to drive the rotating gear (31) to rotate and cooperate with the meshing external gear (33) to realize the rotation of the threaded barrel (32). The threaded connection between the threaded barrel (32) and the threaded rod (34) drives the lifting plate (28) to rise and fall, and the lifting ring seat (27) connected to the slide column (26) rises and falls synchronously. When the lifting ring seat (27) descends, the carbon black powder on the mode wall (5) is scraped off by the annular scraper (35). At the same time, the water pump works to transport water through the slide column (26) to the annular water seat (37), and sprays the water to the annular scraper (35) through the spray hole (38), so as to remove the carbon black powder attached to the annular scraper (35). The generated carbon black powder is discharged through the ash discharge valve (25).
Citation Information
Patent Citations
Three-return-stroke vertical gas boiler
CN111998329A
Pipe coupling plate premixing water-cooling combustion and enhanced heat exchange gas-steam boiler
CN116792734A
Vertical diaphragm type water pipe fuel boiler furnace
CN205048410U
Vertical living beings steam generator
CN205746754U
Water wall gasification furnace
CN209397163U