Inclined support, monitoring and control method and device for widening roadbed differential settlement deformation

Through intelligent monitoring equipment and automatic repair equipment, the problem of differential settlement of new and old roadbeds in soft soil foundation roadbeds has been solved, the repair efficiency and safety are improved, the cost is reduced, and the efficient and intelligent repair of roadbeds has been achieved.

CN118360842BActive Publication Date: 2024-11-12TIANJIN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410790443.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-11-12
Estimated Expiration
2044-06-19

AI Technical Summary

Technical Problem

In the prior art, the problem of differential settlement of new and old roadbeds in soft soil foundation roadbed widening projects is serious, the degree of intelligence of monitoring is low, the cost of manual regular monitoring is high, and the roadbed that has differential settlement has low efficiency and poor effect, which affects driving safety.

Method used

Use intelligent monitoring equipment to obtain deformation data of road surface and piles, generate differential settlement and slope monitoring results based on the deformation monitoring model, control and repair equipment to automatically repair the roadbed, and use variable stiffness repair equipment and grouting equipment to actively promote the deformed piles in the roadbed. repair.

Benefits of technology

It improves the efficiency of roadbed restoration, reduces economic costs, avoids large-scale filling and concrete usage in traditional preventive measures, achieves more accurate roadbed restoration, and enhances driving safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118360842B_ABST
    Figure CN118360842B_ABST
Patent Text Reader

Abstract

The present invention provides a monitoring and control method and device for differential settlement deformation of a widened roadbed, which can be applied to the technical field of soft soil roadbed widening. The method comprises: using a target monitoring device to obtain target deformation data corresponding to the widened roadbed; based on the road surface deformation data and the deformation monitoring model, determining the deformation monitoring results corresponding to the road surface deformation data, wherein the deformation monitoring results include differential settlement monitoring results and slope monitoring results; and controlling the repair equipment to perform repair operations on the widened roadbed based on the slope monitoring results and the first pile deformation data. The above method is used to actively control the deformed piles in the serving roadbed, thereby avoiding the defects of the traditional technology that mainly takes preventive measures, has poor preventive effects, and lacks intelligent and effective repair measures for the serving roadbed. The method reduces the lateral deformation of the supporting piles and thus reduces the road surface deformation, thereby improving the repair efficiency and reducing the economic cost of roadbed repair and management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of soft soil roadbed widening, and in particular to a monitoring and control method and device for differential settlement deformation of a widened roadbed. Background Art

[0002] The roadbed reconstruction and expansion project on the soft soil foundation has serious differential settlement problems due to factors such as different consolidation degrees of the new and old roadbeds, different foundation treatment methods, and different additional stresses. In the relevant technology, the treatment measures for controlling the differential settlement of the new and old roadbeds are mainly prevention, including widening the roadbed filling, roadbed reinforcement, lightweight embankment, foundation treatment, retaining structure and comprehensive treatment of the roadbed and pavement; the monitoring method for the differential settlement of the new and old roadbeds is mainly through surveyors using measurement equipment (such as total stations, measuring tubes and ground vibration monitoring equipment, etc.) to regularly measure the soft soil foundation to obtain settlement data. There is a lack of reasonable and effective repair measures for the roadbed that has already experienced differential settlement.

[0003] The inventors found that in the related art, the measures for dealing with the differential settlement of new and old roadbeds are mainly prevention-oriented, with regular manual monitoring, low intelligence, and high labor and time costs. For the serving roadbed that has experienced differential settlement, it is limited to passive repair and management, with a long repair period and poor repair effect, and the settlement problem still exists, affecting driving safety. Summary of the invention

[0004] In view of the above problems, the present invention provides a monitoring and control method and device for differential settlement deformation of widened roadbed.

[0005] According to a first aspect of the present invention, a monitoring and control method for differential settlement deformation of a widened roadbed is provided, the method comprising:

[0006] Using target monitoring equipment to obtain target deformation data corresponding to the widened roadbed, wherein the target deformation data includes road surface deformation data and first pile body deformation data;

[0007] Based on the pavement deformation data and the deformation monitoring model, determining a deformation monitoring result corresponding to the pavement deformation data, wherein the deformation monitoring result includes a differential settlement monitoring result and a slope monitoring result, and the differential settlement monitoring result is an independent variable for determining the slope monitoring result; and

[0008] Based on the above slope monitoring result and the above first pile deformation data, the repair equipment is controlled to perform repair operations on the above widened roadbed.

[0009] According to an embodiment of the present invention, the above-mentioned control of the repair equipment based on the above-mentioned slope monitoring result and the above-mentioned first pile deformation data to perform repair operations on the above-mentioned widened roadbed includes: generating a control scheme corresponding to the above-mentioned widened roadbed based on the above-mentioned slope monitoring result, the above-mentioned first pile deformation data and a preset control strategy, wherein the above-mentioned control scheme includes control section distance result data and repair structure data corresponding to the above-mentioned widened roadbed; and controlling the above-mentioned repair equipment based on the above-mentioned control section distance result data and the above-mentioned repair structure data to perform repair operations on the above-mentioned widened roadbed.

[0010] According to an embodiment of the present invention, the above method also includes: using the above target monitoring equipment to monitor the above repair operation process and generate repair monitoring data; generating a repair result based on the above repair monitoring data and the above deformation monitoring model; and stopping the above repair operation when the above repair result meets a preset repair threshold.

[0011] According to an embodiment of the present invention, the above-mentioned pavement deformation data includes lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data, and the above-mentioned deformation monitoring model includes a differential settlement monitoring sub-model; wherein, the above-mentioned method of determining the deformation monitoring result corresponding to the above-mentioned pavement deformation data based on the above-mentioned pavement deformation data and the deformation monitoring model includes: inputting the above-mentioned lateral settlement data, the above-mentioned original roadbed settlement data, the above-mentioned newly built roadbed settlement data and the above-mentioned settlement position data into the above-mentioned differential settlement monitoring sub-model, and generating the above-mentioned differential settlement monitoring result corresponding to the above-mentioned pavement deformation data.

[0012] According to an embodiment of the present invention, the above-mentioned deformation monitoring model also includes a slope monitoring sub-model; wherein, the above-mentioned deformation monitoring result corresponding to the above-mentioned pavement deformation data is determined based on the above-mentioned pavement deformation data and the deformation monitoring model, and also includes: based on the differential settlement monitoring result, the above-mentioned settlement position data and the above-mentioned slope monitoring sub-model, determining the above-mentioned slope monitoring result corresponding to the above-mentioned widened roadbed.

[0013] According to an embodiment of the present invention, the control scheme corresponding to the above-mentioned widened roadbed is generated based on the above-mentioned slope monitoring results, the above-mentioned first pile deformation data and the preset control strategy, including: based on the above-mentioned slope monitoring results and the preset slope threshold, determining the control section data corresponding to the above-mentioned slope monitoring results, wherein the above-mentioned control section data includes section position data and section length data; and based on the above-mentioned section position data, the above-mentioned section length data and the above-mentioned slope monitoring results, determining the above-mentioned control section distance result data.

[0014] According to an embodiment of the present invention, the preset repair threshold includes a first repair threshold; wherein, when the repair result satisfies the preset repair threshold, the repair operation is stopped, including: comparing the slope monitoring result with the first repair threshold to generate a first comparison result, wherein the repair result is determined by the slope monitoring result; and when the first comparison result indicates that the slope monitoring result is a normal result, the repair operation is stopped.

[0015] According to an embodiment of the present invention, the above-mentioned repair result includes the second pile body deformation deflection curve data and the second pile body deformation data, and the above-mentioned preset repair threshold also includes the second repair threshold; wherein, the method for determining the above-mentioned slope monitoring result includes: comparing the above-mentioned second pile body deformation deflection curve data and the above-mentioned second pile body deformation data with the above-mentioned second repair threshold to generate a second comparison result; and continuing to perform the above-mentioned repair operation when the above-mentioned second comparison result indicates that the target pile body deformation is in a normal state, and determining the above-mentioned slope monitoring result.

[0016] According to an embodiment of the present invention, the above-mentioned first pile body deformation data includes first pile body deformation deflection curve data and first pile body lateral deformation deflection value data; wherein, the above-mentioned control scheme corresponding to the above-mentioned widened roadbed is generated based on the above-mentioned slope monitoring results, the above-mentioned first pile body deformation data and the preset control strategy, and also includes: based on the above-mentioned slope monitoring results, the above-mentioned first pile body deformation deflection curve data, the above-mentioned first pile body lateral deformation deflection value and the above-mentioned preset control strategy, the above-mentioned repair structure data corresponding to the above-mentioned widened roadbed is generated.

[0017] A second aspect of the present invention provides a monitoring and control device for differential settlement deformation of a widened roadbed, comprising:

[0018] A target deformation data acquisition module, used to acquire target deformation data corresponding to the widened roadbed using a target monitoring device, wherein the target deformation data includes road surface deformation data and first pile body deformation data;

[0019] a deformation monitoring result determination module, used to determine a deformation monitoring result corresponding to the pavement deformation data based on the pavement deformation data and the deformation monitoring model, wherein the deformation monitoring result includes a differential settlement monitoring result and a slope monitoring result, and the differential settlement monitoring result is an independent variable for determining the slope monitoring result; and

[0020] A repair operation module is used to control the repair equipment to perform repair operations on the widened roadbed based on the slope monitoring result and the first pile deformation data.

[0021] A third aspect of the present invention provides an electronic device, comprising: one or more processors; a memory for storing one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors execute the above method.

[0022] The fourth aspect of the present invention also provides a computer-readable storage medium having executable instructions stored thereon, which, when executed by a processor, causes the processor to execute the above method.

[0023] The fifth aspect of the present invention also provides a computer program product, including a computer program, which implements the above method when executed by a processor.

[0024] According to the monitoring and control method and device for differential settlement deformation of a widened roadbed provided by the present invention, the pavement deformation data and pile deformation data of the widened roadbed are automatically obtained through intelligent monitoring equipment, thereby automatically generating differential settlement monitoring results and slope monitoring results based on the ground pavement deformation data and the deformation monitoring model, and then controlling the repair equipment to perform automatic repair operations on the widened roadbed based on the slope monitoring results and the pile deformation data. Since the repair operation is not a large-scale earth filling and concrete usage operation in traditional preventive disposal measures, but an active repair of the deformed piles in the roadbed by using the repair equipment arranged in the roadbed, the defects of the traditional technology that mainly takes preventive measures and has poor preventive effects, and the lack of intelligent and effective repair measures for the serving roadbed are avoided, the pavement deformation is automatically reduced by reducing the lateral deformation of the supporting piles, the repair efficiency is improved, and the economic cost of roadbed repair and management is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The above contents and other objects, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings, in which:

[0026] Figure 1 An application scenario diagram showing a monitoring and control method, device, equipment, medium and program product for differential settlement deformation of a widened roadbed according to an embodiment of the present invention;

[0027] Figure 2 A flow chart showing a method for monitoring and controlling differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown;

[0028] Figure 3 Schematic diagrams of a control group and a non-control group according to an embodiment of the present invention are shown, wherein (a) shows a schematic diagram of a key control position, and (b) shows a schematic diagram of a control interval distance result;

[0029] Figure 4 A schematic diagram of road surface deformation and pile deformation data according to an embodiment of the present invention is shown;

[0030] Figure 5 Schematic diagrams of a repair device for widening a soft soil roadbed according to an embodiment of the present invention are shown, wherein (a) shows a schematic diagram of a variable stiffness support structure for widening a roadbed on a soft soil foundation, (b) shows a schematic diagram of the structure of a variable stiffness repair device, and (c) shows a schematic diagram of the structure of a grouting device;

[0031] Figure 6 A schematic diagram of the arrangement of target monitoring equipment according to an embodiment of the present invention is shown;

[0032] Figure 7 A system architecture diagram showing a method for monitoring and controlling differential settlement deformation of a widened roadbed according to an embodiment of the present invention;

[0033] Figure 8 It shows a structural block diagram of a monitoring and control device for differential settlement deformation of widened roadbed according to an embodiment of the present invention;

[0034] Fig. 9 A block diagram of an electronic device suitable for implementing a monitoring and control method for differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0035] Below, embodiments of the present invention will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are exemplary only and are not intended to limit the scope of the present invention. In the following detailed description, for ease of explanation, many specific details are set forth to provide a comprehensive understanding of embodiments of the present invention. However, it is apparent that one or more embodiments may also be implemented without these specific details. In addition, in the following description, descriptions of known structures and technologies are omitted to avoid unnecessary confusion of concepts of the present invention.

[0036] The terms used herein are only for describing specific embodiments and are not intended to limit the present invention. The terms "comprise", "include", etc. used herein indicate the existence of the features, steps, operations and / or components, but do not exclude the existence or addition of one or more other features, steps, operations or components.

[0037] All terms (including technical and scientific terms) used herein have the meanings commonly understood by those skilled in the art unless otherwise defined. It should be noted that the terms used herein should be interpreted as having a meaning consistent with the context of this specification and should not be interpreted in an idealized or overly rigid manner.

[0038] When using expressions such as "at least one of A, B, and C, etc.", they should generally be interpreted according to the meaning of the expression commonly understood by those skilled in the art (for example, "a system having at least one of A, B, and C" should include but is not limited to a system having A alone, B alone, C alone, A and B, A and C, B and C, and / or A, B, C, etc.).

[0039] In the technical solution of the present invention, the user information (including but not limited to user personal information, user image information, user device information, such as location information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved are all information and data authorized by the user or fully authorized by all parties, and the collection, storage, use, processing, transmission, provision, disclosure and application of the relevant data comply with relevant laws, regulations and standards, take necessary confidentiality measures, do not violate public order and good morals, and provide corresponding operation entrances for users to choose to authorize or refuse.

[0040] In the process of conceiving the present invention, the inventor found that in the related art, the measures for the differential settlement of the new and old roadbeds are mainly prevention-oriented, and are monitored regularly by manual labor, with a low degree of intelligence and high labor and time costs; for the in-service roadbed that has experienced differential settlement, it is limited to passive repair and management, with a long repair period and poor repair effect, and the settlement problem still exists, affecting driving safety. In view of this, the present invention obtains the pavement deformation data and pile deformation data of the widened roadbed through intelligent monitoring equipment, so as to automatically generate differential settlement monitoring results and slope monitoring results based on the ground pavement deformation data and deformation monitoring model, and then control the repair equipment to automatically repair the widened roadbed based on the slope monitoring results and pile deformation data. Since the repair operation is not a large-scale earth filling and concrete usage operation in traditional preventive treatment measures, but an active repair of the deformed piles in the roadbed using the repair equipment set in the roadbed, it avoids the defects of the traditional technology that is mainly preventive measures, poor prevention effect, and lack of intelligent and effective repair measures for the in-service roadbed, and automatically reduces the pavement deformation by reducing the lateral deformation of the supporting pile body, thereby improving the repair efficiency and reducing the economic cost of the roadbed repair and management.

[0041] The embodiment of the present invention provides a monitoring and control method and device for differential settlement deformation of a widened roadbed. The method comprises: using a target monitoring device to obtain target deformation data corresponding to the widened roadbed, wherein the target deformation data comprises road surface deformation data and first pile deformation data; based on the road surface deformation data and a deformation monitoring model, determining a deformation monitoring result corresponding to the road surface deformation data, wherein the deformation monitoring result comprises a differential settlement monitoring result and a slope monitoring result, and the differential settlement monitoring result is an independent variable for determining the slope monitoring result; and controlling a repair device to perform a repair operation on the widened roadbed based on the slope monitoring result and the first pile deformation data.

[0042] Figure 1 An application scenario diagram of a monitoring and control method, device, equipment, medium and program product for differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown.

[0043] like Figure 1 As shown, the application scenario according to this embodiment may include a first terminal device 101, a second terminal device 102, a third terminal device 103, a network 104, a server 105, and a monitoring device 106. The network 104 is used to provide a medium for a communication link between the first terminal device 101, the second terminal device 102, the third terminal device 103, and the server 105. The network 104 may include various connection types, such as wired, wireless communication links, or optical fiber cables, etc.

[0044] The monitoring device 106 can be used to monitor the deformation data of the widened embankment. The monitoring device 106 can include road deformation monitoring equipment and pile monitoring equipment, including but not limited to optical fiber sensors, laser displacement sensors, settlement tubes, inclinometers, steel stress gauges and strain gauges. The pile monitoring equipment is set on the support structure (pile body) in the widened embankment, and the support pile body can include straight piles and inclined piles. The network 104 is used to provide a medium for the communication link between the monitoring device 106 and the server 105.

[0045] The user may use at least one of the first terminal device 101, the second terminal device 102, and the third terminal device 103 to interact with the server 105 through the network 104 to receive or send messages, etc. Various communication client applications may be installed on the first terminal device 101, the second terminal device 102, and the third terminal device 103, such as shopping applications, web browser applications, search applications, instant messaging tools, email clients, social platform software, etc. (only for example).

[0046] The first terminal device 101, the second terminal device 102, and the third terminal device 103 may be various electronic devices having display screens and supporting web browsing, including but not limited to smart phones, tablet computers, laptop computers, desktop computers, and the like.

[0047] The server 105 may be a server that provides various services, such as a background management server (only as an example) that provides support for websites browsed by users using the first terminal device 101, the second terminal device 102, and the third terminal device 103. The background management server may analyze and process the received data such as user requests, and feed back the processing results (such as web pages, information, or data obtained or generated according to user requests) to the terminal device.

[0048] It should be noted that the monitoring and control method for differential settlement deformation of widened roadbed provided in the embodiment of the present invention can generally be executed by the server 105. Accordingly, the monitoring and control device for differential settlement deformation of widened roadbed provided in the embodiment of the present invention can generally be arranged in the server 105. The monitoring and control method for differential settlement deformation of widened roadbed provided in the embodiment of the present invention can also be executed by a server or server cluster that is different from the server 105 and can communicate with the first terminal device 101, the second terminal device 102, the third terminal device 103 and / or the server 105. Accordingly, the monitoring and control device for differential settlement deformation of widened roadbed provided in the embodiment of the present invention can also be arranged in a server or server cluster that is different from the server 105 and can communicate with the first terminal device 101, the second terminal device 102, the third terminal device 103 and / or the server 105.

[0049] It should be understood that Figure 1 The number of terminal devices, networks, monitoring devices and servers in the embodiment is only for illustration. Any number of terminal devices, networks, monitoring devices and servers may be provided according to implementation requirements.

[0050] Figure 2 A flow chart of a method for monitoring and controlling differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown.

[0051] like Figure 2 As shown, the monitoring and control method for differential settlement deformation of widened roadbed of this embodiment includes operations S210 to S230.

[0052] In operation S210, target deformation data corresponding to the widened roadbed is acquired by using a target monitoring device, wherein the target deformation data includes road surface deformation data and first pile deformation data.

[0053] According to an embodiment of the present invention, the widened roadbed can be characterized as a roadbed that is rebuilt and expanded on the original roadbed to meet traffic requirements. The pavement deformation data can represent the surface deformation data of the widened roadbed obtained in real time using the target monitoring equipment, and can include lateral settlement data, original roadbed (old roadbed) settlement data, newly built roadbed settlement data and settlement position data. The original roadbed (old roadbed) settlement data may include a minimum settlement value, and the newly built roadbed settlement data may include a maximum settlement value. The first pile deformation data can represent the deformation data of the pile body that plays a supporting role in the widened roadbed obtained in real time using the target monitoring equipment. The pile body may include a straight pile and an inclined pile. The first pile body deformation data may include first pile body deformation deflection curve data and first pile body lateral deformation deflection value.

[0054] In operation S220, based on the road deformation data and the deformation monitoring model, a deformation monitoring result corresponding to the road deformation data is determined, wherein the deformation monitoring result includes a differential settlement monitoring result and a slope monitoring result, and the differential settlement monitoring result is an independent variable for determining the slope monitoring result.

[0055] According to an embodiment of the present invention, the deformation monitoring model includes a differential settlement monitoring sub-model and a slope monitoring sub-model. The original roadbed (old roadbed) settlement data and the newly built roadbed settlement data in the road deformation data can be input into the differential settlement monitoring sub-model to obtain the differential settlement monitoring result, that is, the transverse differential settlement value of the road surface of the target roadbed. Then, the differential settlement result and the settlement position data can be input into the slope monitoring sub-model to generate the slope monitoring result, that is, the transverse slope value of the road crown of the old roadbed and the newly built roadbed.

[0056] In operation S230, the repairing equipment is controlled to perform a repairing operation on the widened roadbed based on the slope monitoring result and the first pile deformation data.

[0057] According to an embodiment of the present invention, a settlement control scheme can be generated using the slope monitoring result and the first pile deformation data, so that the settlement control scheme can be used to control the repair equipment to repair the widened roadbed. The repair equipment may include a variable stiffness repair equipment and a grouting equipment.

[0058] In a feasible embodiment, when the differential settlement of the roadbed reaches the warning value, an alarm can be sent to the terminal control device, and an analysis report and suggested treatment methods can be provided; relevant personnel operate the terminal control device, use the intelligent control variable stiffness repair equipment and grouting equipment, and perform tensioning or grouting operations through the tensioning end of the upper fastener set on the top of the crown beam and the reserved grouting port; the deformation monitoring equipment continuously uploads deformation data, thereby using real-time deformation data and deformation monitoring models to monitor pavement deformation and pile deformation in real time, and stops the intelligent control variable stiffness repair equipment and grouting equipment when the preset threshold is reached. After the monitoring is stable, it can be confirmed that the differential settlement repair work is completed, and the monitoring work can continue to continuously monitor and control the differential settlement of the road during the service stage.

[0059] According to an embodiment of the present invention, the pavement deformation data and pile deformation data of the widened roadbed are obtained through intelligent monitoring equipment, so that based on the pavement deformation data and the deformation monitoring model, the differential settlement monitoring results and the slope monitoring results are automatically generated, and then based on the slope monitoring results and the pile deformation data, the repair equipment is controlled to perform automatic repair operations on the widened roadbed. Since the repair operation is not a large-scale earth filling and concrete usage operation in traditional preventive disposal measures, but an active repair of the deformed piles in the roadbed using the repair equipment arranged in the roadbed, the defects of the traditional technology that mainly takes preventive measures, has poor preventive effects, and lacks intelligent and effective repair measures for the serving roadbed are avoided. The pavement deformation is automatically reduced by reducing the lateral deformation of the supporting piles, thereby improving the repair efficiency and reducing the economic cost of roadbed repair and management.

[0060] According to an embodiment of the present invention, repairing equipment is controlled to perform repairing operations on the widened roadbed based on the slope monitoring result and the first pile deformation data, including: generating a control scheme corresponding to the widened roadbed based on the slope monitoring result, the first pile deformation data and a preset control strategy, wherein the control scheme includes control section distance result data and repair structure data corresponding to the widened roadbed; and controlling the repairing equipment to perform repairing operations on the widened roadbed based on the control section distance result data and the repair structure data.

[0061] Figure 3 Schematic diagrams of a control group and a non-control group according to an embodiment of the present invention are shown, wherein (a) shows a schematic diagram of a key control position, and (b) shows a schematic diagram of a control interval distance result.

[0062] like Figure 3 As shown in Figure (a), according to the calculated slope monitoring result (road crown transverse slope value) R, the position where the road crown transverse slope value R is close to the warning value (preset slope threshold) can be used as the key control position. The key control position may include the first key control position y1, the second key control position y2, ..., the kth key control position y k, a total of k, so that the segment position data Y can be determined k ; Segment length data L k It may include the first segment length data l1, the second segment length data l2, ..., the kth segment length data l k , a total of k. According to the kth key control position, that is, the control section position is Y k , the length of the control section is L k The cross slope value R of the road crown at k , the control interval distance result H can be determined k .like Figure 3 As shown in Figure (b), the control section distance result H k The distance value between each control group 310 can be represented, and a non-control group 320 can be set between each control group 310. The control group 310 may include a pair of adjacent straight piles and inclined piles, as well as variable stiffness repair equipment and grouting equipment on the pile body, that is, a variable stiffness support system, and according to the slope monitoring results and the first pile body deformation data, the variable stiffness repair equipment and grouting equipment have been automatically enabled; while the non-control group 320 includes a variable stiffness support system, but the variable stiffness repair equipment and grouting equipment are in an unactivated state. The number of control groups 310 can be n, and the number of non-control groups 320 can be m, m≥n≥1, and m and n are both integers. The repair structure data may include the grouting pressure P k , Grouting volume G k and the tension force F at the tension end of the upper fastener k . Through the control group 320, the variable stiffness repair equipment and grouting equipment are intelligently controlled to repair the target roadbed that has settled or has the risk of settling.

[0063] According to an embodiment of the present invention, the method also includes: using a target monitoring device to monitor the repair operation process and generate repair monitoring data; generating a repair result based on the repair monitoring data and a deformation monitoring model; and stopping the repair operation when the repair result meets a preset repair threshold.

[0064] According to an embodiment of the present invention, the repair monitoring data may be the road deformation data and pile deformation data obtained by monitoring the repaired roadbed in real time using the target monitoring equipment. Thus, the road deformation data and pile deformation data can be input into the deformation monitoring model to generate real-time road deformation monitoring results and real-time pile deformation results, and the real-time road deformation monitoring results may include real-time differential settlement monitoring results and real-time slope monitoring results. While ensuring that the maximum deflection value of the lateral deformation of the pile body is within a safe range, the real-time slope monitoring value is continuously reduced, and when the real-time slope monitoring value enters the preset repair threshold range, the repair work of the variable stiffness repair equipment and the grouting equipment is stopped. It should be noted that the safe value (set repair threshold) range of the maximum deflection of the lateral deformation of the pile body and the cross slope value of the road crown (slope monitoring value) is determined by the actual situation and the specific project, and is not specifically limited here.

[0065] According to an embodiment of the present invention, repair equipment arranged in the roadbed is used to actively repair deformed piles in the roadbed, and road surface deformation is automatically reduced by enhancing the bending resistance of the piles. The repair results generated by the repair operation are monitored and updated in real time through monitoring equipment, thereby achieving real-time monitoring and repair of the widened roadbed, avoiding the passive repair defects in traditional roadbed monitoring, and improving the efficiency and accuracy of roadbed repair.

[0066] According to an embodiment of the present invention, the pavement deformation data includes lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data, and the deformation monitoring model includes a differential settlement monitoring sub-model; wherein, based on the pavement deformation data and the deformation monitoring model, the deformation monitoring result corresponding to the pavement deformation data is determined, including: inputting the lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data into the differential settlement monitoring sub-model, and generating a differential settlement monitoring result corresponding to the pavement deformation data.

[0067] Figure 4 A schematic diagram of road surface deformation and pile deformation data according to an embodiment of the present invention is shown.

[0068] like Figure 4 As shown, the lateral settlement data can represent the lateral settlement curve of the road surface. The original roadbed settlement data can include the minimum settlement value S0 of the original roadbed (old roadbed) road surface, and the new roadbed settlement data can include the maximum settlement value S max The settlement position data x can represent the distance between the maximum settlement point and the center line of the widened roadbed. The differential settlement sub-model can be used to monitor the road surface differential settlement monitoring results corresponding to the road surface deformation data. The specific method for obtaining the differential settlement monitoring results S corresponding to the road surface deformation data is shown in the following formula (1):

[0069] S=S max-S0 (1);

[0070] Among them, S max is the maximum settlement of the newly built roadbed and pavement, and S0 is the minimum settlement of the original roadbed (old roadbed) and pavement.

[0071] According to an embodiment of the present invention, the deformation monitoring model also includes a slope monitoring sub-model; wherein, based on the pavement deformation data and the deformation monitoring model, the deformation monitoring result corresponding to the pavement deformation data is determined, and it also includes: based on the differential settlement monitoring results, the settlement position data and the slope monitoring sub-model, the slope monitoring result corresponding to the widened roadbed is determined.

[0072] According to an embodiment of the present invention, the slope monitoring sub-model can be used to monitor the slope monitoring result R corresponding to the widened roadbed. The slope monitoring result R is calculated as shown in the following formula (2):

[0073] R = S / x (2);

[0074] Among them, x is the settlement position data, that is, the position of the maximum settlement value.

[0075] In a feasible embodiment, according to the calculated slope monitoring result (road crown transverse slope value) R, the position where the road crown transverse slope value R is close to the warning value (preset slope threshold) can be used as the key control position, a total of k, so that the section position data Y can be determined k , segment length data L k It is understandable that the warning value can be determined according to the actual situation and the relevant specifications of the specific project, and is not specifically limited here. Therefore, the cross slope value of the road crown at the kth key control position is R k , R k The specific calculation method of is shown in the following formula (3):

[0076] R k =S k / x (3);

[0077] Among them, S k It is the differential settlement monitoring result of the kth key control position.

[0078] According to an embodiment of the present invention, a control scheme corresponding to the widening of the roadbed is generated based on the slope monitoring results, the deformation data of the first pile body and the preset control strategy, including: determining the control section data corresponding to the slope monitoring results based on the slope monitoring results and the preset slope threshold, wherein the control section data includes section position data and section length data; and determining the control section distance result data based on the section position data, the section length data and the slope monitoring results.

[0079] According to an embodiment of the present invention, the preset slope threshold may represent the threshold at which the slope monitoring result is close to the risk slope. The risk slope represents the slope at which the widened roadbed needs to be repaired using variable stiffness repair equipment and grouting equipment. The control section data may include the section position data Y k and segment length data L k The control section distance result data can be obtained through the section position data Y k , Segment length data L k And the slope monitoring result R k to confirm.

[0080] In a feasible embodiment, according to the kth key control position, that is, the control section position is Y k , the length of the control section is L k The cross slope value R of the road crown at k , the control interval distance result H can be determined k . In the road crown cross slope value R k The larger the section, the smaller the control interval distance. k , at the cross slope value R k The smaller the section, the larger the control interval distance. k :Control interval distance result H k Represents the spacing distance between adjacent control groups in the control section; each control group may include a group of adjacent straight piles and inclined piles, and variable stiffness repair equipment and grouting equipment attached thereto. Control spacing distance result H k The specific calculation method of is shown in the following formula (4):

[0081] H k =β / R k (4);

[0082] Where k represents the kth key control position, R k represents the R value at the kth critical control position, and β is the coefficient for determining the spacing distance. It should be noted that β is determined by the actual situation and the specific project and is not limited here.

[0083] According to an embodiment of the present invention, the preset repair threshold includes a first repair threshold; wherein, when the repair result meets the preset repair threshold, the repair operation is stopped, including: comparing the slope monitoring result with the first repair threshold to generate a first comparison result, wherein the repair result is determined by the slope monitoring result; and when the first comparison result characterizes that the slope monitoring result is a normal result, the repair operation is stopped.

[0084] According to an embodiment of the present invention, the first repair threshold can represent the road crown transverse slope value R kThe corresponding thresholds that meet relevant specifications and standards. During the repair operation of the widened embankment using variable stiffness repair equipment and grouting equipment, the real-time slope monitoring results (road crown cross slope value) R' are continuously monitored. k , and R' k Compare with the first repair threshold, and the comparison result represents the real-time slope monitoring result R' k In case of normal results (meeting specification standards), the repair operation can be stopped.

[0085] According to an embodiment of the present invention, the repair result includes the second pile body deformation deflection curve data and the second pile body deformation data, and the preset repair threshold also includes the second repair threshold; wherein, the method for determining the slope monitoring result includes: comparing the second pile body deformation deflection curve data and the second pile body deformation data with the second repair threshold to generate a second comparison result; and continuing to perform the repair operation when the second comparison result indicates that the target pile body deformation is in a normal state to determine the slope monitoring result.

[0086] According to an embodiment of the present invention, the second pile deformation deflection curve data can represent the real-time pile deformation deflection curve data monitored during the repair operation, and the second pile deformation data can represent the real-time pile maximum deformation data D' monitored during the repair operation. max Due to the role of variable stiffness repair equipment and grouting equipment, real-time pavement deformation data can include: real-time lateral settlement data, real-time minimum settlement value S'0 of the original roadbed (old roadbed) pavement, real-time maximum settlement value S' of the newly built roadbed pavement max and the position x' of the real-time maximum settlement value; the real-time pile deformation data may include: the real-time second pile deformation deflection curve data and the real-time maximum pile deformation data D' max ,Thus, the deformation monitoring results (transverse differential settlement value of the road surface) S' during the repair operation and the slope monitoring results (transverse slope value of the road crown) R' of the original embankment and the newly built embankment can be calculated.

[0087] In a feasible embodiment, the variable stiffness repair equipment and the grouting equipment continuously upload the real-time road surface deformation monitoring results and the real-time pile deformation monitoring results during the repair operation, while ensuring the maximum lateral deformation deflection value D' of the straight pile in the pile body. max While within the specified safety range, the slope monitoring result (road crown transverse slope value) R' is continuously reduced, and when the road crown transverse slope value R' enters the specified safety range, the variable stiffness repair equipment and grouting equipment repair operation can be stopped. It should be noted that the maximum lateral deformation of the straight pile D' max The safety range of the road crown transverse slope value R' is determined by the actual situation and specific project, and is not specifically limited here.

[0088] In a feasible embodiment, after the monitoring of the widening roadbed repair operation is completed and the cross slope value of the road crown is stabilized within the standard safety range, it can be confirmed that the differential settlement repair work is completed, and the monitoring work of the widening roadbed can be continued to continuously monitor and control the differential settlement of the road during the service stage.

[0089] According to an embodiment of the present invention, by continuously monitoring the in-service widened roadbed, the differential settlement problem of the widened roadbed can be discovered and dealt with in a timely manner, the speed of roadbed settlement can be effectively slowed down, the service life of the roadbed can be extended, and maintenance costs can be reduced. At the same time, the automated monitoring model can reduce the demand for human resources, save labor costs, and can provide continuous and uninterrupted monitoring without being restricted by time and manpower.

[0090] According to an embodiment of the present invention, the first pile body deformation data includes first pile body deformation deflection curve data and first pile body lateral deformation deflection value; wherein, based on the slope monitoring result, the first pile body deformation data and the preset control strategy, a control scheme corresponding to the widening of the roadbed is generated, and also includes: based on the slope monitoring result, the first pile body deformation deflection curve data, the first pile body deformation data and the preset control strategy, the repair structure data corresponding to the widening of the roadbed is generated.

[0091] According to an embodiment of the present invention, the first pile deformation data may include the maximum deflection value D of the lateral deformation of the straight pile body. max , such as Figure 4 The repair structure data may include grouting data and fastener tension end data, and the grouting data may include grouting pressure P k and grouting volume G k , the fastener tension end data may include the tension force F of the upper fastener tension end k .

[0092] Figure 5 A schematic diagram of a repair device for widening a soft soil roadbed according to an embodiment of the present invention is shown, wherein (a) shows a schematic diagram of a variable stiffness support structure for widening a roadbed on a soft soil foundation, (b) shows a schematic diagram of the structure of the variable stiffness repair device, and (c) shows a schematic diagram of the structure of a grouting device.

[0093] like Figure 5 As shown in Figure (a), the support structure of straight piles 511 and inclined piles 512 can be alternately arranged in the soft soil widening roadbed. The straight piles 511 and the inclined piles 512 are connected as a whole through the binding cap beam 520. The bottoms of the straight piles 511 and the inclined piles 512 extend into the soft soil layer below the newly built roadbed, and the lower end of the inclined pile 512 is inclined toward the outside of the embankment. At the same time, a variable stiffness repair device 530 can be attached to the upper part of the straight pile 511, and a grouting device 540 is arranged at the bottom of the inclined pile 512. Figure 5As shown in Figure (b), the variable stiffness repair device 530 may include a variable stiffness plate 531, a lower fastener 532, an upper fastener fixing end 533, an upper fastener tensioning end 534 and a steel strand 535. Figure 5 As shown in Figure (c), the grouting equipment 540 may include a bag 541, a grouting pipeline 542, and a reserved grouting port 543. The reserved grouting port 543 is arranged at the top of the crown beam 520, and the grouting expansion of the bag 541 is used to push the inclined pile 512 to reduce the displacement of the pile top.

[0094] In a feasible embodiment, m straight piles and n inclined piles can be arranged alternately, m≥1, n≥1, the pile spacing in the variable rigid support structure is 1.5 to 2 times the equivalent pile diameter of the straight piles or inclined piles, the spatial angle range between the straight piles and the inclined piles can be 15 degrees to 25 degrees, both the straight piles and the inclined piles are hollow piles, the outer shape of the hollow piles is square column or cylindrical, and the internal hollow is cylindrical, the straight piles and the inclined piles can use precast concrete piles or steel pipe piles, and the pile bottom depth of the straight piles and the inclined piles can be 1.5 to 3 times the embankment height. The variable rigidity plate is a component with a certain bending stiffness. It is set in the upper bending moment section of the straight pile. The variable rigidity plate is attached to the outer side of the straight pile away from the roadbed. The lower fastener fastens the lower end of the variable rigidity plate to the pile body. The upper end of the variable rigidity plate is fixed to the pile body through the upper fastener fixed end, the upper fastener tensioning end and the steel strand. The upper fastener tensioning end is set on the top of the crown beam. The degree of fit between the variable rigidity plate and the pile body is controlled by tensioning the steel strand, thereby changing the bending stiffness of the straight pile and reducing the flexural deformation of the pile body. The variable rigidity plate can also be set in the hollow inside the straight pile to play its role in changing the bending stiffness of the straight pile through appropriate means.

[0095] Figure 6 A schematic diagram of the arrangement of target monitoring equipment according to an embodiment of the present invention is shown.

[0096] like Figure 6 As shown, the target monitoring equipment may include road deformation monitoring equipment and pile monitoring equipment. The road deformation monitoring equipment may include a horizontal settlement monitoring tube 610, which may be buried under the roadbed along the road cross-section direction, and may measure road deformation data. The pile monitoring equipment may include a strain gauge 620 and an inclinometer tube 630, etc. The strain gauge 620 is distributed along the pile body and fixed outside the pile; the inclinometer tube 630 may be arranged in the soil outside the pile, and may measure pile deformation data.

[0097] In a feasible embodiment, a monitoring and control method for differential settlement deformation of a widened roadbed may include: constructing a monitoring and control platform, the monitoring and control platform may receive and analyze target deformation data from monitoring equipment, and using the monitoring and control platform to analyze the target deformation data. When the differential settlement value in the analysis result reaches a warning value, a warning may be issued to the terminal device, and an analysis report and a suggested processing method may be provided, and the analysis report and the processing method may be sent to the corresponding management personnel; the management personnel control the variable stiffness repair equipment and the grouting equipment by operating the terminal device, that is, the tensioning end of the upper fastener and the reserved grouting port set at the top of the crown beam perform tensioning or grouting operations to perform repair operations; during the repair process, the target monitoring equipment continuously uploads deformation data (monitoring data), obtains deformation monitoring results in real time, and stops the variable stiffness repair equipment and the grouting equipment when the deformation monitoring results reach the control value; after the repair is completed and the monitoring is stable, the monitoring and control platform confirms that the differential settlement repair work of the widened roadbed is completed, continues to continuously monitor the repaired widened roadbed, and controls the differential settlement of the road during the service stage.

[0098] Figure 7 A system architecture diagram of a method for monitoring and controlling differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown.

[0099] like Figure 7 As shown, target deformation data corresponding to the widened roadbed is obtained by using target monitoring equipment 710, and the target deformation data includes road surface deformation data 721 and first pile deformation data 722; based on the road surface deformation data 721 and the deformation monitoring model 730, a deformation monitoring result 740 corresponding to the road surface deformation data is determined, and the deformation monitoring result 740 includes a differential settlement monitoring result 741 and a slope monitoring result 742; then, based on the slope monitoring result 740 and the first pile deformation data 722, the repair equipment is controlled to perform a repair operation on the widened roadbed, and the deformation monitoring model is used to generate a repair result 750.

[0100] Based on the above-mentioned monitoring and control method for differential settlement deformation of widened roadbed, the present invention also provides a monitoring and control device for differential settlement deformation of widened roadbed. Figure 8 The device is described in detail.

[0101] Figure 8 A structural block diagram of a monitoring and control device for differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown.

[0102] like Figure 8 As shown, the monitoring and control device for differential settlement deformation of widened roadbed in this embodiment includes a target deformation data acquisition module 810 , a deformation monitoring result determination module 820 and a repair operation module 830 .

[0103] The target deformation data acquisition module 810 is used to acquire target deformation data corresponding to the widened roadbed using the target monitoring device, wherein the target deformation data includes road surface deformation data and first pile deformation data. In one embodiment, the target deformation data acquisition module 810 can be used to perform the operation S210 described above, which will not be repeated here.

[0104] The deformation monitoring result determination module 820 is used to determine the deformation monitoring result corresponding to the road deformation data based on the road deformation data and the deformation monitoring model, wherein the deformation monitoring result includes the differential settlement monitoring result and the slope monitoring result, and the differential settlement monitoring result is an independent variable for determining the slope monitoring result. In one embodiment, the deformation monitoring result determination module 820 can be used to perform the operation S220 described above, which will not be repeated here.

[0105] The repair operation module 830 is used to control the repair equipment to perform a repair operation on the widened roadbed based on the slope monitoring result and the first pile deformation data. In one embodiment, the repair operation module 830 can be used to perform the operation S230 described above, which will not be repeated here.

[0106] According to an embodiment of the present invention, through the target deformation data acquisition module 810, the deformation monitoring result determination module 820 and the repair operation module 830 in the monitoring and control device for differential settlement deformation of the widened roadbed, the pavement deformation data and the pile deformation data of the widened roadbed are acquired through the intelligent monitoring equipment, so that based on the ground pavement deformation data and the deformation monitoring model, the differential settlement monitoring results and the slope monitoring results are automatically generated, and then based on the slope monitoring results and the pile deformation data, the repair equipment is controlled to perform automatic repair operations on the widened roadbed. Since the repair operation is not a large-scale earth filling and concrete usage operation in traditional preventive disposal measures, but an active repair of the deformed piles in the roadbed by using the repair equipment arranged in the roadbed, the defects of the traditional technology that mainly takes preventive measures and has poor prevention effects, and the lack of intelligent and effective repair measures for the serving roadbed are avoided, the pavement deformation is automatically reduced by reducing the lateral deformation of the supporting piles, the repair efficiency is improved, and the economic cost of roadbed repair and management is reduced.

[0107] According to an embodiment of the present invention, the repair operation module includes: a control scheme generation submodule and a repair operation submodule.

[0108] The control scheme generation submodule is used to generate a control scheme corresponding to the widened roadbed based on the slope monitoring results, the first pile deformation data and the preset control strategy, wherein the control scheme includes the control section distance result data and the repair structure data corresponding to the widened roadbed.

[0109] The repair operation submodule is used to control the repair equipment to perform repair operations on the widened roadbed based on the control section distance result data and the repair structure data.

[0110] According to an embodiment of the present invention, the device further comprises: a repair monitoring data generating module, a repair result generating module and a repair operation stopping module.

[0111] The repair monitoring data generation module is used to monitor the repair operation process using the target monitoring device and generate repair monitoring data.

[0112] The repair result generation module is used to generate the repair result based on the repair monitoring data and the deformation monitoring model.

[0113] The repair operation stopping module is used to stop the repair operation when the repair result meets the preset repair threshold.

[0114] According to an embodiment of the present invention, the pavement deformation data includes lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data, and the deformation monitoring model includes a differential settlement monitoring sub-model; wherein the deformation monitoring result determination module includes: a differential settlement monitoring result generation sub-module, which is used to input the lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data into the differential settlement monitoring sub-model to generate a differential settlement monitoring result corresponding to the pavement deformation data.

[0115] According to an embodiment of the present invention, the deformation monitoring model also includes a slope monitoring sub-model; wherein the deformation monitoring result determination module also includes: a slope monitoring result determination sub-module, which is used to determine the slope monitoring results corresponding to the widened roadbed based on the differential settlement monitoring results, settlement position data and the slope monitoring sub-model.

[0116] According to an embodiment of the present invention, the control scheme generating submodule includes: a control section data determining unit and a control section distance result data determining unit.

[0117] The control section data determining unit is used to determine the control section data corresponding to the slope monitoring result based on the slope monitoring result and a preset slope threshold, wherein the control section data includes section position data and section length data.

[0118] The control section distance result data determination unit is used to determine the control section distance result data based on the section position data, the section length data and the slope monitoring result.

[0119] According to an embodiment of the present invention, the preset repair threshold includes a first repair threshold; wherein the repair operation stopping module includes: a first comparison result generating submodule and a repair operation stopping submodule.

[0120] The first comparison result generating submodule is used to compare the slope monitoring result with the first repair threshold value to generate a first comparison result, wherein the repair result is determined by the slope monitoring result.

[0121] The repair operation stopping submodule is used to stop the repair operation when the first comparison result indicates that the slope monitoring result is a normal result.

[0122] According to an embodiment of the present invention, the repair result includes the second pile body deformation deflection curve data and the second pile body deformation data, and the preset repair threshold also includes the second repair threshold; wherein, the method for determining the slope monitoring result includes: comparing the second pile body deformation deflection curve data and the second pile body deformation data with the second repair threshold to generate a second comparison result; and continuing to perform the repair operation when the second comparison result indicates that the target pile body deformation is in a normal state to determine the slope monitoring result.

[0123] According to an embodiment of the present invention, the first pile deformation data includes first pile deformation deflection curve data and first pile lateral deformation deflection value data; wherein, the control scheme generation submodule includes: a data generation unit, which is used to generate repair structure data corresponding to the widened roadbed based on the slope monitoring results, the first pile deformation deflection curve data, the first pile lateral deformation deflection value and the preset control strategy.

[0124] According to an embodiment of the present invention, any multiple modules among the target deformation data acquisition module 810, the deformation monitoring result determination module 820 and the repair operation module 830 can be combined into one module for implementation, or any one of the modules can be split into multiple modules. Alternatively, at least part of the functions of one or more of these modules can be combined with at least part of the functions of other modules and implemented in one module. According to an embodiment of the present invention, at least one of the target deformation data acquisition module 810, the deformation monitoring result determination module 820 and the repair operation module 830 can be at least partially implemented as a hardware circuit, such as a field programmable gate array (FPGA), a programmable logic array (PLA), a system on a chip, a system on a substrate, a system on a package, an application specific integrated circuit (ASIC), or can be implemented by hardware or firmware such as any other reasonable way of integrating or packaging the circuit, or implemented in any one of the three implementation modes of software, hardware and firmware or in any appropriate combination of any of them. Alternatively, at least one of the target deformation data acquisition module 810, the deformation monitoring result determination module 820 and the repair operation module 830 can be at least partially implemented as a computer program module, and when the computer program module is run, the corresponding function can be executed.

[0125] Fig. 9A block diagram of an electronic device suitable for implementing a monitoring and control method for differential settlement deformation of a widened roadbed according to an embodiment of the present invention is shown.

[0126] like Fig. 9 As shown, the electronic device according to an embodiment of the present invention includes a processor 901, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 902 or a program loaded from a storage part 908 into a random access memory (RAM) 903. The processor 901 may include, for example, a general-purpose microprocessor (e.g., a CPU), an instruction set processor and / or a related chipset and / or a dedicated microprocessor (e.g., an application-specific integrated circuit (ASIC)), etc. The processor 901 may also include an onboard memory for caching purposes. The processor 901 may include a single processing unit or multiple processing units for performing different actions of the method flow according to an embodiment of the present invention.

[0127] In RAM 903, various programs and data required for the operation of electronic device 900 are stored. Processor 901, ROM 902 and RAM 903 are connected to each other via bus 904. Processor 901 performs various operations of the method flow according to the embodiment of the present invention by executing the program in ROM 902 and / or RAM 903. It should be noted that the program can also be stored in one or more memories other than ROM 902 and RAM 903. Processor 901 can also perform various operations of the method flow according to the embodiment of the present invention by executing the program stored in the one or more memories.

[0128] According to an embodiment of the present invention, the electronic device 900 may further include an input / output (I / O) interface 905, which is also connected to the bus 904. The electronic device 900 may further include one or more of the following components connected to the input / output (I / O) interface 905: an input portion 906 including a keyboard, a mouse, etc.; an output portion 907 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage portion 908 including a hard disk, etc.; and a communication portion 909 including a network interface card such as a LAN card, a modem, etc. The communication portion 909 performs communication processing via a network such as the Internet. A drive 910 is also connected to the input / output (I / O) interface 905 as needed. A removable medium 911, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 910 as needed, so that a computer program read therefrom is installed into the storage portion 908 as needed.

[0129] The present invention also provides a computer-readable storage medium, which may be included in the device / apparatus / system described in the above embodiment; or may exist independently without being assembled into the device / apparatus / system. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the method according to the embodiment of the present invention is implemented.

[0130] According to an embodiment of the present invention, the computer-readable storage medium may be a non-volatile computer-readable storage medium, for example, it may include but is not limited to: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, an apparatus or a device. For example, according to an embodiment of the present invention, the computer-readable storage medium may include the ROM 902 and / or RAM 903 described above and / or one or more memories other than ROM 902 and RAM 903.

[0131] The embodiment of the present invention also includes a computer program product, which includes a computer program, and the computer program contains program code for executing the method shown in the flowchart. When the computer program product is run in a computer system, the program code is used to enable the computer system to implement the monitoring and control method for differential settlement deformation of widened roadbed provided in the embodiment of the present invention.

[0132] The computer program executes the above functions defined in the system / device of the embodiment of the present invention when it is executed by the processor 901. According to the embodiment of the present invention, the system, device, module, unit, etc. described above can be implemented by a computer program module.

[0133] In one embodiment, the computer program may be based on a tangible storage medium such as an optical storage device, a magnetic storage device, etc. In another embodiment, the computer program may also be transmitted and distributed in the form of a signal on a network medium, and downloaded and installed through the communication part 909, and / or installed from a removable medium 911. The program code contained in the computer program may be transmitted using any appropriate network medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.

[0134] In such an embodiment, the computer program can be downloaded and installed from the network through the communication part 909, and / or installed from the removable medium 911. When the computer program is executed by the processor 901, the above functions defined in the system of the embodiment of the present invention are performed. According to the embodiment of the present invention, the system, device, means, module, unit, etc. described above can be implemented by a computer program module.

[0135] According to an embodiment of the present invention, the program code for executing the computer program provided by the embodiment of the present invention can be written in any combination of one or more programming languages. Specifically, these computing programs can be implemented using high-level process and / or object-oriented programming languages, and / or assembly / machine languages. Programming languages ​​include, but are not limited to, Java, C++, python, "C" language or similar programming languages. The program code can be executed entirely on the user computing device, partially on the user device, partially on the remote computing device, or entirely on the remote computing device or server. In the case of a remote computing device, the remote computing device can be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computing device (e.g., using an Internet service provider to connect through the Internet).

[0136] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present invention. In this regard, each box in the flow chart or block diagram can represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0137] It will be appreciated by those skilled in the art that the features described in the various embodiments and / or claims of the present invention may be combined and / or combined in various ways, even if such combinations and / or combinations are not explicitly described in the present invention. In particular, the features described in the various embodiments and / or claims of the present invention may be combined and / or combined in various ways without departing from the spirit and teachings of the present invention. All of these combinations and / or combinations fall within the scope of the present invention.

[0138] The embodiments of the present invention are described above. However, these embodiments are only for the purpose of illustration, and are not intended to limit the scope of the present invention. Although each embodiment is described above, it does not mean that the measures in each embodiment cannot be used in combination. The scope of the present invention is defined by the attached claims and their equivalents. Without departing from the scope of the present invention, those skilled in the art may make various substitutions and modifications, which should all fall within the scope of the present invention.

Claims

1. A monitoring and control method for differential settlement deformation of widened roadbed, characterized in that: The method comprises: Utilizing the target monitoring device to obtain target deformation data corresponding to the widened roadbed, wherein the target deformation data includes road surface deformation data and first pile deformation data, the road surface deformation data includes lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data, the first pile deformation data represents the deformation data of the piles that play a supporting role in the widened roadbed obtained in real time by utilizing the target monitoring device, the piles include straight piles and inclined piles; Based on the pavement deformation data and the deformation monitoring model, a deformation monitoring result corresponding to the pavement deformation data is determined, wherein the deformation monitoring result includes a differential settlement monitoring result and a slope monitoring result, the differential settlement monitoring result is an independent variable for determining the slope monitoring result, and the deformation monitoring model includes a differential settlement monitoring sub-model and a slope monitoring sub-model; Controlling a repair device to perform a repair operation on the widened roadbed based on the slope monitoring result and the first pile deformation data; Wherein, controlling the repair equipment to perform the repair operation on the widened roadbed based on the slope monitoring result and the first pile deformation data includes: Based on the slope monitoring result, the first pile deformation data and the preset control strategy, a control scheme corresponding to the widened roadbed is generated, wherein the control scheme includes the control section distance result data and the repair structure data corresponding to the widened roadbed; Controlling the repair equipment to perform repair operations on the widened roadbed based on the control section distance result data and the repair structure data; The method further comprises: Using the target monitoring device to monitor the repair operation process and generate repair monitoring data; generating a repair result based on the repair monitoring data and the deformation monitoring model; and When the repair result meets a preset repair threshold, the repair operation is stopped.

2. The method according to claim 1, characterized in that in, The step of determining a deformation monitoring result corresponding to the road surface deformation data based on the road surface deformation data and the deformation monitoring model includes: The lateral settlement data, the original roadbed settlement data, the newly built roadbed settlement data and the settlement position data are input into the differential settlement monitoring sub-model to generate the differential settlement monitoring result corresponding to the road surface deformation data.

3. The method according to claim 2, characterized in that in, The determining, based on the pavement deformation data and the deformation monitoring model, a deformation monitoring result corresponding to the pavement deformation data further includes: Based on the differential settlement monitoring result, the settlement location data and the slope monitoring sub-model, the slope monitoring result corresponding to the widened roadbed is determined.

4. The method according to claim 1, characterized in that The step of generating a control scheme corresponding to the roadbed widening based on the slope monitoring result, the first pile deformation data and a preset control strategy includes: Based on the slope monitoring result and a preset slope threshold, determining control section data corresponding to the slope monitoring result, wherein the control section data includes section position data and section length data; and The control section distance result data is determined based on the section position data, the section length data and the slope monitoring result.

5. The method according to claim 1, characterized in that The preset repair threshold includes a first repair threshold; Wherein, when the repair result meets a preset repair threshold, stopping the repair operation includes: Comparing the slope monitoring result with the first repair threshold to generate a first comparison result, wherein the repair result is determined by the slope monitoring result; and When the first comparison result indicates that the slope monitoring result is a normal result, the repair operation is stopped.

6. The method according to claim 5, characterized in that The repair result includes the second pile deformation deflection curve data and the second pile deformation data, and the preset repair threshold also includes the second repair threshold; Wherein, the method for determining the slope monitoring result includes: comparing the second pile deformation deflection curve data and the second pile deformation data with the second repair threshold to generate a second comparison result; and When the second comparison result indicates that the deformation of the target pile body is in a normal state, the repair operation is continued to be performed to determine the slope monitoring result.

7. The method according to claim 4, characterized in that The first pile deformation data includes first pile deformation deflection curve data and first pile lateral deformation deflection value data; Wherein, the generating of a control scheme corresponding to the widening roadbed based on the slope monitoring result, the first pile deformation data and a preset control strategy further includes: The repair structure data corresponding to the widened roadbed is generated based on the slope monitoring result, the first pile body deformation deflection curve data, the first pile body lateral deformation deflection value data and the preset control strategy.

8. A monitoring and control device for differential settlement deformation of widened roadbed used in the method of claim 1, characterized in that: The device comprises: A target deformation data acquisition module is used to acquire target deformation data corresponding to the widened roadbed by using a target monitoring device, wherein the target deformation data includes road surface deformation data and first pile deformation data, the road surface deformation data includes lateral settlement data, original roadbed settlement data, newly built roadbed settlement data and settlement position data, the first pile deformation data represents the deformation data of piles that play a supporting role in the widened roadbed acquired in real time by using the target monitoring device, and the piles include straight piles and inclined piles; a deformation monitoring result determination module, used to determine a deformation monitoring result corresponding to the pavement deformation data based on the pavement deformation data and a deformation monitoring model, wherein the deformation monitoring result includes a differential settlement monitoring result and a slope monitoring result, the differential settlement monitoring result is an independent variable for determining the slope monitoring result, and the deformation monitoring model includes a differential settlement monitoring sub-model and a slope monitoring sub-model; A repair operation module, used for controlling a repair device to perform a repair operation on the widened roadbed based on the slope monitoring result and the first pile deformation data; The repair operation module includes: A control scheme generating submodule, for generating a control scheme corresponding to the widened roadbed based on the slope monitoring result, the first pile deformation data and the preset control strategy, wherein the control scheme includes the control section distance result data and the repair structure data corresponding to the widened roadbed; A repair operation submodule, used for controlling the repair equipment to perform repair operations on the widened roadbed based on the control section distance result data and the repair structure data; The device also includes: A repair monitoring data generation module is used to monitor the repair operation process using a target monitoring device and generate repair monitoring data; A repair result generation module, used to generate a repair result based on the repair monitoring data and the deformation monitoring model; The repair operation stopping module is used to stop the repair operation when the repair result meets the preset repair threshold.