Detection method of phase sequence cycle mismatch between master and slave power grids and inverter parallel connection system
By using the host to send a check frame in the inverter parallel system to obtain the slave grid voltage, and judge the cyclic error phase based on the threshold, combined with the wiring adaptive module to automatically correct the error, the cyclic error phase detection and manual detection in the prior art are solved. The problem of operation errors achieves the security and cost-effectiveness of the system.
Patent Information
- Application Number
- CN202411124187.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-16
AI Technical Summary
In the prior art, the cyclic phase detection of inverter parallel systems relies on single-machine detection and standard accessories, which poses a risk of missed detection and manual operation may lead to errors.
The inverter master sends a check frame to the slave at the time of each phase grid voltage detection, obtains the slave grid voltage, and determines the cycle error phase detection result based on the preset judgment threshold, and uses the wiring adaptive module to automatically correct the wrong wiring.
Accurate cyclic and error-phase detection of the inverter parallel system is realized, avoiding system functions and device damage, improving system security, and reducing installation costs.
Smart Images

Figure CN118641848B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of energy storage, and in particular to a method for detecting phase mismatch of a master-slave electromechanical network phase sequence cycle and an inverter parallel system. Background Art
[0002] In order to meet the market demand for flexible expansion of energy storage inverters, the parallel connection technology of inverters came into being. In the inverter parallel system, the grid connection sequence between multiple inverter parallel modules is very important, which is the basis for the normal operation of the inverter. For the inverter parallel system that only runs in parallel in the grid-connected state, if the grid phase sequence of the master and slave machines is in a cyclic phase-out state, it will cause EMS (Energy Management System) management confusion. For the inverter parallel system that runs in parallel in both off-grid and grid-connected states, if a cyclic phase-out occurs, it will lead to the serious consequence of inverter phase-to-phase short circuit. Therefore, it is very important to identify and protect the cyclic phase-out of the master and slave grid phase sequence.
[0003] In the prior art, the detection of circulating phase mismatch in the inverter parallel system relies more on the detection of a single machine, and the inherent accessories such as the distribution box are combined to connect the terminals of the inverters to be connected in parallel together, and then connect to the power grid to perform phase sequence inspection. The defect of this method is that only single-machine detection puts forward certain requirements for the actual system wiring, and the occurrence of circulating phase mismatch cannot be completely eliminated by standard accessories. First, the standard accessories themselves may have the defect of confusing the line sequence. Secondly, in terms of power line connection, manual introduction may also cause errors. In addition, when the installation positions of the master and slave machines in the inverter parallel system are far apart due to actual conditions, or when the input lines of the master and slave machine power grids are two strands, the above-mentioned circulating phase mismatch problem may occur. Summary of the invention
[0004] The embodiments of the present invention aim to provide a method for detecting phase mismatch of a master-slave power grid and an inverter parallel system, so as to solve the problem that the prior art relies on single-machine detection and standard accessories to identify phase mismatch and may miss detection.
[0005] To solve the above technical problems, the embodiments of the present invention provide the following technical solutions:
[0006] According to one aspect of the present invention, a method for detecting phase mismatch of a master-slave electromechanical network is provided, which is applied to an inverter parallel system, and the method comprises:
[0007] Step A, the inverter master sends a check frame to the inverter slave in turn at the detection time of each phase grid voltage, wherein the check frame includes a check phase flag;
[0008] Step B, the inverter slave obtains the corresponding phase slave grid voltage at the detection time according to the inspection phase mark in the inspection frame;
[0009] Step C: the inverter master or the inverter slave determines the cyclic phase mismatch detection result of the inverter parallel system according to the corresponding phase slave grid voltage and a preset judgment threshold.
[0010] Optionally, before step A, the step further includes:
[0011] The inverter master and inverter slave respectively determine whether the power grid meets the reconnection requirements and whether the phase sequence of the single machine is correct;
[0012] When both the inverter master and the inverter slave determine that the power grid meets the reconnection requirements and the phase sequence of the single machine is correct, proceed to step A.
[0013] Optionally, when both the inverter master and the inverter slave determine that the power grid meets the reconnection requirements and the phase sequence of the single machine is correct, the method further includes:
[0014] The inverter master obtains a cycle phase error detection flag and / or obtains a detection request sent by the inverter slave;
[0015] If the cyclic phase error detection flag is true or a detection request sent by the inverter slave is received, proceed to step A;
[0016] If the cyclic phase error detection flag is false and the detection request sent by the inverter slave is not received, step A is not entered.
[0017] Optionally, step C comprises:
[0018] The inverter master or the inverter slave compares the absolute value of the corresponding phase slave network voltage with the judgment threshold, and accumulates errors when the absolute value of the corresponding phase slave network voltage exceeds the judgment threshold. If the number of accumulated errors is greater than the preset error number threshold, it is determined that a cyclic phase error problem has occurred in the inverter parallel system.
[0019] Optionally, the detection moment is the moment when the voltage of each phase host power grid passes through a preset detection voltage value in the forward direction or reverse direction.
[0020] Optionally, the detection moment is the moment when the voltage of each phase host power grid crosses the zero point in the positive direction, and the upper limit of the judgment threshold is determined according to the theoretical value of the corresponding phase slave power grid voltage when the inverter parallel system is in a cyclic phase-out state.
[0021] Optionally, the detection time is the time when the voltage of each phase host grid crosses the zero point in the positive direction. When the inverter host or the inverter slave determines that the inverter parallel system has a cyclic phase error problem, the method further includes:
[0022] When the grid voltage of any phase host passes through zero in a positive direction, if the grid voltage of the corresponding phase slave is less than zero and its absolute value is greater than the judgment threshold, the inverter host or the inverter slave determines that the cyclic phase mismatch of the inverter parallel system is a lagging cyclic phase mismatch;
[0023] When the main grid voltage of any phase passes through the zero point in the positive direction, if the corresponding phase slave grid voltage is greater than zero and its absolute value is greater than the judgment threshold, the inverter main machine or the inverter slave machine determines that the cycle phase mismatch situation of the inverter parallel system is an advanced cycle phase mismatch.
[0024] Optionally, the inverter master and the inverter slave both include a wiring adaptive module. When the inverter master or the inverter slave determines that the cycle mismatch situation of the inverter parallel system is a lagging cycle mismatch or an advanced cycle mismatch, the method further includes:
[0025] The inverter slave modifies the slave wiring control state according to the cycle phase mismatch situation, so that the modified phase sequence of the inverter slave is consistent with the phase sequence of the inverter master.
[0026] According to another aspect of the present invention, there is provided an inverter parallel system, the system comprising an inverter master and a plurality of inverter slaves.
[0027] The inverter master is used to send a check frame to the inverter slave in sequence at the detection moment of each phase grid voltage, wherein the check frame includes a check phase flag;
[0028] The inverter slave is used to obtain the corresponding phase slave power grid voltage at the detection time according to the inspection phase flag in the inspection frame;
[0029] The inverter slave or the inverter master is further used to determine the cyclic phase mismatch detection result of the inverter parallel system according to the corresponding phase slave power grid voltage and a preset judgment threshold.
[0030] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program. When the computer program is executed by a processor, the processor executes the steps of the above-mentioned method for detecting phase mismatch of the master-slave electromechanical network phase sequence cycle.
[0031] The beneficial effects of the embodiments of the present invention are as follows: Different from the prior art, in the embodiments of the present invention, a detection method for phase sequence cycle mismatch of a master-slave power grid is provided. First, the inverter host sends a check frame to the inverter slave in turn at the detection time of each phase power grid voltage; then, the inverter slave obtains the corresponding phase slave power grid voltage at the detection time according to the check phase mark in the check frame; finally, the inverter host or the inverter slave determines the cycle mismatch detection result of the inverter parallel system according to the corresponding phase slave power grid voltage and a preset judgment threshold. The cycle mismatch detection method provided by the present invention can accurately identify the cycle mismatch operating conditions of the inverter parallel system of various power grid systems (including single-phase, dual-fire, three-phase, etc.) when the master and slave are only connected to the grid in parallel or off-grid and connected to the grid in parallel, effectively avoiding confusion in the function operation of the system and even damage to the components, and protecting the safety of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.
[0033] Figure 1 It is a wiring diagram of an inverter parallel system in a cyclic phase-shifting state that is operated in parallel only in a grid-connected state provided by an embodiment of the present invention;
[0034] Figure 2 It is a wiring diagram of an inverter parallel system operating in parallel in both grid-connected and off-grid states provided by an embodiment of the present invention in a cyclic phase-shifting state;
[0035] Figure 3 is a schematic diagram of a communication architecture of an inverter parallel system provided in an embodiment of the present invention;
[0036] Figure 4 It is a flow chart of a method for detecting phase mismatch of a master-slave electrical network phase sequence cycle provided by an embodiment of the present invention;
[0037] Figure 5 is a schematic diagram of a selection range of a judgment threshold provided by an embodiment of the present invention;
[0038] Figure 6 Schematic diagram of a wiring adaptation module provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0041] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0042] The present invention aims at the problem of the cyclic misphase condition of the grid phase sequence when the master and slave machines are connected to the grid in the inverter parallel system which runs in parallel only in the grid-connected state and in the grid-connected and off-grid states, and proposes a detection method for the cyclic misphase of the phase sequence of the master and slave grids. The detection method is based on the fast communication path in the inverter parallel system, and on the basis of the original hardware, a pure software detection method is used to realize the detection of the cyclic misphase of the phase sequence of the master and slave grids. Cyclic misphase in this article refers to the situation that in the inverter parallel system, the phase sequence of the master and slave connected to the grid is positive sequence, but the phase sequence of the master and slave is different, that is, the phase sequence of the grid connected to the master and slave is inconsistent, for example: taking a three-phase system as an example, the phase sequence of the host connected to the grid is: RST, and the phase sequence of the slave connected to the grid is: STR or TRS.
[0043] See also Figure 1 to Figure 2 , which are two cycle out-of-phase conditions that need to be identified in practical applications.
[0044] 1) Cyclic phase mismatch in inverter systems operating in parallel only in grid-connected state
[0045] like Figure 1 As shown in the figure, in the inverter parallel system that runs in parallel only in the grid-connected state, the phase sequence of the inverter host connected to the grid is RST, and the phase sequence of the grid connected to the slave is STR. At this time, the inverter parallel system has a cyclic phase error condition. Under this condition, the total current of the inverter parallel system from the grid or feeding the grid is collected by the CT (Current transformer) and collected to the host EMS to distribute the power behavior of the master and slave. However, the grid R-phase CT sampling current comes from the R phase of the host and the T phase of the slave. If the system cannot recognize this condition, it will cause confusion in the operation of the EMS function and the system will not work properly.
[0046] 2) Cyclic phase mismatch in an inverter system that operates in parallel in both on-grid and off-grid states
[0047] like Figure 2 As shown in the figure, in the inverter system that runs in parallel in both grid-connected and off-grid states, the phase sequence of the inverter master connected to the grid is RST, and the phase sequence of the slave connected to the grid is STR. At this time, the inverter parallel system has a cyclic phase error condition. Under this condition, the off-grid port of the inverter has parallel output, that is, the same-phase output point of the master and slave is the common point. At this time, if a cyclic phase error grid is connected, and the inverter parallel system fails to effectively identify this condition, the moment the master and slave close the grid-connected relay, Figure 2 The dotted path in the figure will create a loop, short-circuiting the two-phase live wires of the power grid, which will cause serious consequences.
[0048] See also Figure 3 , which is a schematic diagram of the communication architecture of the inverter parallel system provided in an embodiment of the present invention. It should be noted that the inverter parallel system provided by the present invention includes all inverter parallel systems of various power grid types (including single-phase, dual-fire, three-phase, etc.). The inverter parallel system includes an inverter master and a plurality of inverter slaves. Among them, the inverter master and the plurality of inverter slaves can be operated in parallel only in a grid-connected state, or in parallel in both a grid-connected and off-grid state. In this inverter parallel system, the inverter master and the inverter slave cooperate with each other to realize the detection of phase mismatch in the phase sequence cycle of the master-slave power grid. Specifically:
[0049] The inverter master is used to send a check frame to the inverter slave in sequence at the detection moment of each phase grid voltage, wherein the check frame includes a check phase flag.
[0050] In one embodiment, detection is performed based on each phase grid voltage, and the detection time is the time when the voltage of each phase host grid passes through a preset detection voltage value in the forward or reverse direction. In order to distinguish the two times corresponding to the same detection voltage value in one cycle, the time when the detection voltage value is passed for the first time in one cycle can be defined as the time when the detection voltage value is passed in the forward direction, and the time when the detection voltage value is passed for the second time can be defined as the time when the detection voltage value is passed in the reverse direction. Preferably, the detection time is the time when the voltage of each phase host grid passes through the zero point in the forward direction.
[0051] In one embodiment, a corresponding check phase flag is defined for each phase according to the current power grid standard. If the power grid standard is three-phase, a corresponding check phase flag is defined for each phase of RST.
[0052] In one embodiment, after the inverter master and the inverter slave are started, they respectively determine whether the power grid meets the reconnection requirements and whether the phase sequence of the single machine is correct; when the inverter master and the inverter slave both determine that the power grid meets the reconnection requirements and the phase sequence of the single machine is correct, the inverter master sends inspection frames to the inverter slave at the detection time of each phase power grid voltage.
[0053] In one embodiment, when the inverter host and the inverter slave both determine that the power grid meets the reconnection requirements and the phase sequence of the single machine is correct, the inverter host is also used to obtain a cyclic phase error detection flag and / or obtain a detection request sent by the inverter slave; if the cyclic phase error detection flag is true or the detection request sent by the inverter slave is received, the inverter host starts the cyclic phase error inspection process; if the cyclic phase error detection flag is false and the detection request sent by the inverter slave is not received, it means that the inverter parallel system has previously performed a cyclic phase error check and there is no cyclic phase error condition, so the inverter parallel system can directly execute the grid-connected action.
[0054] The inverter slave is used to obtain the corresponding phase slave power grid voltage at the detection time according to the inspection phase mark in the inspection frame.
[0055] After receiving the inspection frame, the inverter slave can determine the current inspection phase according to the inspection phase mark in the inspection frame, and then obtain the slave power grid voltage of the inspection phase.
[0056] The inverter master or inverter slave is further used to determine the cyclic phase mismatch detection result of the inverter parallel system according to the corresponding phase slave power grid voltage and a preset judgment threshold.
[0057] In one embodiment, the inverter slave is also used to send the acquired corresponding phase slave power grid voltage to the inverter host through a communication bus such as CAN, and the inverter host is also used to determine the cyclic phase mismatch detection result of the inverter parallel system based on the corresponding phase slave power grid voltage and a preset judgment threshold.
[0058] In other embodiments, the inverter slave is also used to determine the cyclic phase mismatch detection result of the inverter parallel system based on the corresponding phase slave power grid voltage and a preset judgment threshold, and send the cyclic phase mismatch detection result to the inverter host via a communication bus such as CAN.
[0059] The method for selecting the judgment threshold and the method for determining the cycle misphase detection result are detailed below.
[0060] See also Figure 4 , is a flow chart of a method for detecting phase mismatch of a master-slave electromechanical network provided by an embodiment of the present invention, the method comprising the following steps:
[0061] Step S401: the inverter master sends a check frame to the inverter slave in sequence at the detection moment of each phase grid voltage, wherein the check frame includes a check phase flag.
[0062] In one embodiment, detection is performed based on each phase grid voltage, and the detection time is the time when each phase host grid voltage passes through a preset detection voltage value in the forward or reverse direction. In order to distinguish the two times corresponding to the same detection voltage value in one cycle, the time when the detection voltage value is passed for the first time in one cycle can be defined as the time when the detection voltage value is passed in the forward direction, and the time when the detection voltage value is passed for the second time can be defined as the time when the detection voltage value is passed in the reverse direction.
[0063] In one embodiment, a corresponding check phase flag is defined for each phase according to the current power grid standard. If the power grid standard is three-phase, a corresponding check phase flag is defined for each phase of RST.
[0064] In one embodiment, before step S401, the process further includes: the inverter master and the inverter slave respectively determine whether the power grid meets the reconnection requirements and whether the phase sequence of the single machine is correct. The reconnection requirements refer to the conditions that need to be met when the inverter is connected to the grid for output, such as the minimum grid voltage condition that the grid allows for reconnection. The inverter master and the inverter slave can only perform grid-connected output when the grid meets the reconnection requirements.
[0065] The inverter host and the inverter slave both have sampling and capturing functions, and can identify the access to the grid of the single-module inverter, so as to ensure that the grid to which the single-module inverter is connected is a grid with the correct phase sequence that meets the grid connection requirements, which is the premise for the execution of the cyclic phase mismatch detection method proposed in the present invention. The grid to which the single-module inverter is connected is a grid with the correct phase sequence that meets the grid connection requirements, which means that the phase sequence of the inverter module is consistent with the phase sequence of the grid. For example, if the phase sequence of the grid is (R, S, T), then the phase sequence of the inverter can be (R, S, T), (S, T, R) or (T, R, S). The phase-locking function of the inverter can ensure that the AC power output is completely synchronized with the grid in terms of power, phase and phase sequence. In one embodiment, the detection moment is the moment when the voltage of the host grid of each phase passes through a preset detection voltage value in the forward or reverse direction. There is a fast communication path between the master and slave machines of the inverter parallel system, such as CAN (Controller Area Network) communication. The master and slave machines complete the transmission of instructions and corresponding actions through the fast communication path. In one embodiment, the inverter master sequentially sends a check frame to the inverter slave through the CAN bus when the voltage of each phase of the host power grid passes through a detection voltage value in a forward direction or a reverse direction.
[0066] In one embodiment, the detection moment is the moment when the grid voltage of each phase host passes through the positive zero point. The moment of the positive zero point is the zero point moment when the grid voltage changes from negative to positive. Without special instructions, the detection moments in subsequent cases are all the moments of positive zero points, that is, the inverter host sends a check frame to the inverter slave when the grid voltage of each phase host passes through the positive zero point. Specifically, within one cycle of the three-phase power grid, the inverter host sends a check frame to the inverter slave at the positive zero point of the R phase, the positive zero point of the S phase, and the positive zero point of the T phase, respectively. After receiving the check frame, the inverter slave checks the instantaneous voltage of the grid of the corresponding phase. To reduce errors, the inverter host can send a check frame within multiple cycles to complete the cyclic mismatch detection. For example, the inverter parallel system checks 15 positive zero points within 5 cycles.
[0067] Step S402: the inverter slave obtains the corresponding phase slave grid voltage at the detection moment according to the check phase flag in the check frame.
[0068] After receiving the inspection frame sent by the inverter host through the CAN bus, the inverter slave parses the inspection phase flag and obtains the corresponding phase slave grid voltage at the detection time. For example, if the inspection phase flag corresponds to the R phase, the inverter slave obtains the R phase slave grid voltage through the R phase grid voltage sampling unit at the positive zero crossing point of the host R phase after receiving the inspection frame.
[0069] Step S403: the inverter master or the inverter slave determines the cyclic phase mismatch detection result of the inverter parallel system according to the corresponding phase slave grid voltage and a preset judgment threshold.
[0070] In one embodiment, the inverter host or the inverter slave compares the absolute value of the corresponding phase slave network voltage with a preset judgment threshold. If the absolute value of the corresponding phase slave network voltage exceeds the judgment threshold, errors are accumulated. If the number of accumulated errors is greater than the preset error number threshold, it is determined that a cyclic phase error problem has occurred in the inverter parallel system.
[0071] It can be understood that if the phase sequence of the inverter slave and the inverter host connected to the power grid is consistent (for example, the phase sequence of the inverter host connected to the power grid is RST, and the phase sequence of the inverter slave connected to the power grid is also RST), then after the inverter host triggers the check frame at the positive zero-crossing moment, the corresponding phase slave power grid voltage obtained by the inverter slave should also be zero. If the phase sequence of the inverter slave and the inverter host connected to the power grid is inconsistent, after the inverter host triggers the check frame at the positive zero-crossing moment, the corresponding phase slave power grid voltage obtained by the inverter slave is not zero. Based on the above theory, the selection range of the judgment threshold can be determined. Specifically, the upper limit of the effective identification range of the judgment threshold when the cycle mismatch occurs is first determined, and then the value range of the judgment threshold is determined according to the upper limit of the effective identification range, and a suitable value is selected from the value range of the judgment threshold as the judgment threshold.
[0072] When a lagging cycle phase error occurs, assuming that the phase sequence of the inverter host connected to the grid is RST, and the phase sequence of the inverter slave connected to the grid is STR, then when the R-phase host grid voltage positively passes through the zero point, the theoretical value of the R-phase slave grid voltage UslaveR is:
[0073]
[0074] When the leading cycle phase mismatch occurs, assuming that the phase sequence of the inverter host connected to the grid is RST, and the phase sequence of the inverter slave connected to the grid is TRS, then when the R-phase host grid voltage positively passes through the zero point, the theoretical value of the R-phase slave grid voltage UslaveR is:
[0075]
[0076] Among them, 195.5V is the lower limit of reconnection effective value voltage. Taking German standard as an example, the lower limit of reconnection effective value voltage is 0.85 Rated voltage, i.e. reconnection lower limit effective value voltage = 230 0.85=195.5V.
[0077] Through the above calculation, it can be seen that when the lagging cycle phase error occurs, the upper limit of the effective identification range of the judgment threshold is -239.4, and when the leading cycle phase error occurs, the upper limit of the effective identification range of the judgment threshold is 239.4. The above calculation is based on the premise that the grid voltage has a good sinusoidal degree. The real grid may have some harmonics, resulting in a lower absolute value of the real voltage.
[0078] In some embodiments, the selection of the judgment threshold also considers the influence of the following errors:
[0079] 1) Intrinsic error of the hardware capture circuit: that is, the time difference between the capture time triggering moment and the moment when the real power grid passes the preset detection voltage value in the forward or reverse direction. In order to reduce the error, the zero-crossing moment is selected as the capture event triggering moment. At this moment, the real voltage of the power grid can be below 1V, so the impact is small.
[0080] 2) Sampling error: For a 230V power grid, the sampling error accounts for a very small proportion and can generally be controlled within 0.5%, which can be ignored.
[0081] 3) Errors caused by communication delay and program execution time: When the inverter host passes the preset detection voltage value in the forward or reverse direction, the check frame is triggered to be sent. When the inverter slave obtains the slave grid voltage of the corresponding phase, the communication transmission time + program execution time has actually passed. This part of the error must be controlled within a reasonable range, otherwise it may lead to misjudgment.
[0082] Errors in sampling, capturing or communication delays can cause the inverter slave to obtain the sampling value ahead of or behind the detection time, making the sampled voltage too large or too small. Therefore, when selecting the judgment threshold, the influence of these factors should be considered. At the same time, in order to avoid missing judgments in extreme cases, the influence of harmonics should also be considered. In one embodiment, the upper limit of the judgment threshold should be less than ||Uslave|- |, the lower limit of the judgment threshold should be greater than | |, where is the theoretical value of the corresponding phase slave network voltage when the inverter parallel system is in a cyclic phase-staggered state, is the margin value, is the error impact value.
[0083] like Figure 5 As shown, when the leading cycle phase mismatch occurs, the upper limit of the effective identification range of the judgment threshold is at point E. After considering the influence of margin and error, the selection range of the judgment threshold is within the BF double-arrow line interval. When the lagging cycle phase mismatch occurs, the upper limit of the effective identification range of the judgment threshold is at point H. After considering the influence of margin and error, the selection range of the judgment threshold is within the DG double-arrow line interval. It can be understood that in the above two leading cycle phase mismatch situations, the lower limit of the effective identification range of the judgment threshold is zero.
[0084] Generally, the error caused by sampling, capturing or communication delay can be controlled within 10V, and the error limit voltage when the cycle mismatch occurs is about 240V. Therefore, the range of the judgment threshold can be selected is relatively wide, which makes the characteristics of identifying the cycle mismatch condition very prominent, greatly improving the effectiveness of the cycle mismatch detection. For simplicity, the value of the judgment threshold can also be set to Uslave Coefficient P, where the value range of coefficient P is [0.25, 0.5].
[0085] When the detection time is the moment when the voltage of each phase of the host power grid crosses zero in the reverse direction, the value range of the judgment threshold can be obtained based on a similar method. For the case where the detection time is not the moment when the voltage of each phase of the host power grid crosses zero in the forward direction or the reverse direction, the value range of the judgment threshold can be determined based on the host power grid voltage at the detection time and the theoretical value of the slave power grid voltage when the cycle mismatch occurs.
[0086] In one embodiment, both the inverter master and the inverter slave include a wiring adaptive module. When the inverter master or the inverter slave determines that the inverter parallel system has a cycle mismatch problem, it is also used to determine the specific cycle mismatch situation, and control the wiring adaptive module to modify the slave wiring control state according to the specific cycle mismatch situation, so that the modified phase sequence of the inverter slave is consistent with the phase sequence of the inverter master. The method for determining the cycle mismatch situation is:
[0087] When the main power grid voltage of any phase passes through the zero point in the positive direction, if the corresponding phase slave power grid voltage is less than zero and its absolute value is greater than the judgment threshold, the inverter host or the inverter slave determines that the circulating phase mismatch situation of the inverter parallel system is a lagging circulating phase mismatch; when the main power grid voltage of any phase passes through the zero point in the positive direction, if the corresponding phase slave power grid voltage is greater than zero and its absolute value is greater than the judgment threshold, the inverter host or the inverter slave determines that the circulating phase mismatch situation of the inverter parallel system is an leading circulating phase mismatch.
[0088] For example, taking the phase sequence of the inverter host connected to the power grid as a reference, the first phase, second phase, and third phase of the inverter host connected to the power grid are respectively recorded as R1, S1, and T1, and the first phase, second phase, and third phase of the inverter slave are respectively recorded as R2, S2, and T2.
[0089] If when R1 crosses zero in the positive direction, the voltage of R2 is less than zero and its absolute value is greater than the judgment threshold; when S1 crosses zero in the positive direction, the voltage of S2 is less than zero and its absolute value is greater than the judgment threshold; when T1 crosses zero in the positive direction, the voltage of T2 is less than zero and its absolute value is greater than the judgment threshold; then it can be inferred that the corresponding relationship of the actual grid input line is R1-T2, S1-R2, T1-S2, that is, the cyclic phase mismatch situation of the inverter parallel system is a lagging cyclic phase mismatch.
[0090] If when R1 crosses zero in the positive direction, the voltage of R2 is greater than zero and its absolute value is greater than the judgment threshold; when S1 crosses zero in the positive direction, the voltage of S2 is greater than zero and its absolute value is greater than the judgment threshold; when T1 crosses zero in the positive direction, the voltage of T2 is greater than zero and its absolute value is greater than the judgment threshold; then it can be inferred that the corresponding relationship of the actual grid input line is R1-S2, S1-T2, T1-R2, that is, the cycle mismatch situation of the inverter parallel system is leading cycle mismatch.
[0091] After the cycle mismatch is identified, it can be corrected by manually adjusting the wiring, but this method will bring additional time and labor costs. To this end, the present invention designs a wiring adaptive module that can automatically correct the cycle mismatch wiring error. Figure 6 As shown, the wiring adaptive module consists of three single-pole three-throw relays and a control circuit, wherein the control circuit is connected to the inverter main control chip.
[0092] See also Figure 6 , the input end of the wiring adaptive module is connected to the output line of the inverter itself, the outer side is connected to the input power line of the grid, and the inside is composed of three groups of relays. The closed state of the three groups of relays is identified by the function Sabc(g1,g2,g3). For example, Sabc(1,2,3) indicates that the three input power lines are connected to the output power lines in sequence. After the inverter parallel system identifies the cycle mismatch situation, it changes the input control signal of the wiring adaptive module to achieve the purpose of automatically correcting the wrong wiring. Specifically, when the inverter parallel system determines that a lagging cycle mismatch has occurred, the wiring adaptive module of the inverter slave changes the control state from Sabc(1,2,3) to Sabc(3,1,2), and the control state of the inverter master remains unchanged. When the inverter parallel system determines that an advanced cycle mismatch has occurred, the wiring adaptive module of the inverter slave changes the control state from Sabc(1,2,3) to Sabc(2,3,1), and the control state of the inverter master remains unchanged.
[0093] Step S403 can be executed by the inverter master or the inverter slave. When step S403 is executed by the inverter master, the inverter slave obtains the corresponding phase slave grid voltage and sends it to the inverter master through a communication bus such as CAN. When step S403 is executed by the inverter slave, the inverter slave determines the cyclic phase mismatch detection result of the inverter parallel system based on the corresponding phase slave grid voltage and a preset judgment threshold, and then sends the cyclic phase mismatch detection result to the inverter master through a communication bus such as CAN.
[0094] In an embodiment of the present invention, if the inverter slave or the inverter master detects that there is no cyclic phase mismatch problem in the phase sequence of the master-slave power grid, it means that the detection is passed and the grid-connected operation is directly performed; if the inverter slave or the inverter master detects that there is a cyclic phase mismatch problem in the phase sequence of the master-slave power grid and corrects the incorrect wiring through the wiring adaptive module, the inverter parallel system will actively recheck until the detection is passed, and then perform the grid-connected operation.
[0095] The detection method for phase mismatch of the master-slave power grid phase sequence provided by the embodiment of the present invention can accurately identify the phase mismatch of the master-slave cycle in the parallel inverter system, and effectively protect the safety of the system. The detection method can complete the fault identification with only a small communication overhead, which is beneficial to reduce the pressure on the system CAN bus. At the same time, the detection strategy cooperates with the integrated wiring adaptive module to enable the system to have automatic correction capabilities, realize maintenance integration, increase system safety and reduce the installation cost of the system. In addition, the principle of the phase mismatch detection method provided by the present invention is simple, and it can be applied to all inverter parallel systems of various power grid systems based on parallel connection with communication lines (including two parallel modes of parallel connection in grid-connected state only and parallel connection in grid-connected and off-grid states), and has wide and universal applicability.
[0096] According to an embodiment of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program. When the computer program is executed by a processor, the processor executes the steps of the above-mentioned method for detecting phase mismatch of the master-slave electromechanical network phase sequence cycle.
[0097] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may also be combined, the steps may be implemented in any order, and there are many other changes in different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for detecting phase mismatch of a master-slave electromechanical network, characterized in that: Applied to an inverter parallel system, the method comprises: Step A, the inverter master sends a check frame to the inverter slave in turn at the detection time of each phase grid voltage, wherein the check frame includes a check phase flag; Step B, the inverter slave obtains the corresponding phase slave grid voltage at the detection time according to the inspection phase mark in the inspection frame; Step C, the inverter master or the inverter slave determines the cyclic phase mismatch detection result of the inverter parallel system according to the corresponding phase slave grid voltage and a preset judgment threshold; The detection time is the time when the voltage of each phase host grid crosses the zero point in the positive direction. When the inverter host or the inverter slave determines that the inverter parallel system has a cyclic phase error problem, the method further includes: When the grid voltage of any phase host passes through zero in a positive direction, if the grid voltage of the corresponding phase slave is less than zero and its absolute value is greater than the judgment threshold, the inverter host or the inverter slave determines that the cyclic phase mismatch of the inverter parallel system is a lagging cyclic phase mismatch; When the main grid voltage of any phase passes through the zero point in the positive direction, if the corresponding phase slave grid voltage is greater than zero and its absolute value is greater than the judgment threshold, the inverter main machine or the inverter slave machine determines that the cycle phase mismatch situation of the inverter parallel system is an advanced cycle phase mismatch.
2. The method according to claim 1, characterized in that The step A also includes: The inverter master and inverter slave respectively determine whether the power grid meets the reconnection requirements and whether the phase sequence of the single machine is correct; When both the inverter master and the inverter slave determine that the power grid meets the reconnection requirements and the phase sequence of the single machine is correct, proceed to step A.
3. The method according to claim 2, characterized in that When both the inverter master and the inverter slave determine that the power grid meets the reconnection requirements and the phase sequence of the single machine is correct, the method further includes: The inverter master obtains a cycle phase error detection flag and / or obtains a detection request sent by the inverter slave; If the cyclic phase error detection flag is true or a detection request sent by the inverter slave is received, proceed to step A; If the cyclic phase error detection flag is false and the detection request sent by the inverter slave is not received, step A is not entered.
4. The method according to claim 1, characterized in that: The step C comprises: The inverter master or the inverter slave compares the absolute value of the corresponding phase slave network voltage with the judgment threshold, and accumulates errors when the absolute value of the corresponding phase slave network voltage exceeds the judgment threshold. If the number of accumulated errors is greater than the preset error number threshold, it is determined that a cyclic phase error problem has occurred in the inverter parallel system.
5. The method according to any one of claims 1 to 4, characterized in that: The detection time is the time when the voltage of each phase host power grid passes through a preset detection voltage value in the forward direction or reverse direction.
6. The method according to any one of claims 1 to 4, characterized in that: The detection time is the time when the voltage of each phase host grid crosses the zero point in the positive direction, and the upper limit of the judgment threshold is determined according to the theoretical value of the corresponding phase slave grid voltage when the inverter parallel system is in a cyclic phase-out state.
7. The method according to claim 1, characterized in that The inverter master and the inverter slave both include a wiring adaptive module. When the inverter master or the inverter slave determines that the cycle mismatch situation of the inverter parallel system is a lagging cycle mismatch or an advanced cycle mismatch, the method further includes: The inverter slave modifies the slave wiring control state according to the cycle phase mismatch situation, so that the modified phase sequence of the inverter slave is consistent with the phase sequence of the inverter master.
8. An inverter parallel system, characterized in that: The system includes an inverter master and a plurality of inverter slaves. The inverter master is used to send a check frame to the inverter slave in sequence at the detection moment of each phase grid voltage, wherein the check frame includes a check phase flag; The inverter slave is used to obtain the corresponding phase slave power grid voltage at the detection time according to the inspection phase flag in the inspection frame; The inverter slave or the inverter master is further used to determine the cyclic phase mismatch detection result of the inverter parallel system according to the corresponding phase slave power grid voltage and a preset judgment threshold; The detection moment is the moment when the voltage of each phase host grid crosses the zero point in the positive direction. When the inverter master or the inverter slave determines that a circulating phase error problem occurs in the inverter parallel system, the inverter slave or the inverter master is also used to determine that the circulating phase error of the inverter parallel system is a lagging circulating phase error when the voltage of any phase host grid crosses the zero point in the positive direction, if the corresponding phase slave grid voltage is less than zero and its absolute value is greater than the judgment threshold; when the voltage of any phase host grid crosses the zero point in the positive direction, if the corresponding phase slave grid voltage is greater than zero and its absolute value is greater than the judgment threshold, then the circulating phase error of the inverter parallel system is a leading circulating phase error.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program. When the computer program is executed by a processor, the processor executes the steps of the method for detecting phase sequence cycle mismatch of a master-slave electromechanical network as described in any one of claims 1 to 7.