An intelligent management method and system for fuel plant side
By automating the management of functional modules on the fuel plant side, receiving monitoring data for analysis and adjustment, the problems of errors and fraud caused by human manipulation are solved, achieving efficient management and profit maximization on the fuel plant side.
Patent Information
- Application Number
- CN202411103511.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-13
AI Technical Summary
In coal-fired power generation, existing technologies rely heavily on human intervention in processes such as sampling, preparation, and analysis. This can lead to errors or fraudulent activities, making it difficult to maximize profits for the fuel plant and reducing energy efficiency.
The system transforms multiple functional modules on the fuel plant side into an automated mode, receives monitoring data, analyzes and classifies characteristic monitoring data, filters out abnormal data, builds adjustment models to generate adjustment data, calculates management evaluation values, determines the optimal adjustment data, and formulates management strategies to avoid human error and fraudulent behavior.
It improved the accuracy and efficiency of management, maximized corporate profits, and ensured the timeliness of management and the normal operation of functional modules.
Smart Images

Figure CN118643992B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of intelligent management technology, and in particular to an intelligent management method and system for a fuel plant. Background Art
[0002] In the thermal power production with coal as the main fuel, how to maximize the use of coal resources has become the most important issue, which mainly requires strengthening management in terms of mining, processing and other work.
[0003] In the existing technology, the work modules such as procurement, processing and chemical processing are mostly controlled manually, which is prone to erroneous operations or fraud. Human control cannot detect abnormal data of multiple work modules of procurement, processing and chemical processing in time, making it difficult to maximize profits on the fuel plant side, thereby reducing energy utilization. Summary of the invention
[0004] In order to solve the above technical problems, the present application provides an intelligent management method and system for the fuel plant side, which converts multiple functional modules on the fuel plant side into an automated mode, and receives monitoring data of the functional modules on the fuel plant side, avoids errors caused by human factors, improves management accuracy, analyzes the monitoring data, determines characteristic monitoring data and divides it into independent variable data and corresponding dependent variable data, screens out abnormal independent variable data, obtains adjustment data of the independent variable data according to the adjustment model, and generates a management evaluation value of the adjustment data, obtains a comprehensive evaluation of the operating status of the corresponding functional module and the utilization growth rate by the adjustment data, determines the optimal adjustment data according to the management evaluation value and generates a management strategy, ensures management timeliness, and generates a management strategy in a timely manner, which not only avoids fraud but also improves management efficiency and maximizes corporate profits.
[0005] In some embodiments of the present application, a smart management method for a fuel plant is provided, including:
[0006] Receive monitoring data from the fuel plant side functional modules and calculate the impact of the monitoring data on the functional modules;
[0007] The monitoring data is divided according to the influence degree to obtain characteristic monitoring data, and the characteristic monitoring data in the same functional module is analyzed to determine first data and second data associated with the first data;
[0008] Analyze the first data, filter out abnormal data, build an adjustment model for each functional module, and input the abnormal data into the corresponding adjustment model to generate adjustment data;
[0009] A management evaluation value is calculated according to the adjustment data and the associated second data, the optimal adjustment data of each functional module is screened out according to the management evaluation value, and a management strategy is formulated according to the optimal adjustment data.
[0010] In some embodiments of the present application, calculating the influence of monitoring data on the corresponding functional module includes:
[0011] Determine the functional flow of each functional module and divide the functional flow into primary functional flow and secondary functional flow;
[0012] According to the utilization coefficient and importance coefficient of the monitoring data on the main functional process and the secondary functional process, the first impact degree of the monitoring data on the main functional process and the secondary functional process is calculated, so as to determine the impact degree of the monitoring data on the functional module to which it belongs;
[0013] ;
[0014] Among them, M is the impact of the monitoring data on the functional module to which it belongs, e1 is the weight coefficient of the first impact of the main functional process, n is the number of main functional processes, hi is the first impact of the i-th main functional process, ai is the weight coefficient of the i-th main functional process, e2 is the weight coefficient of the first impact of the secondary functional process, s is the number of secondary functional processes, gr is the first impact of the r-th secondary functional process, and bi is the weight coefficient of the i-th secondary functional process.
[0015] In some embodiments of the present application, before analyzing the characteristic monitoring data in the same functional module, the following steps are included:
[0016] Based on the preset operation cycle of each functional module as a time reference line, a plurality of characteristic monitoring data curves of characteristic monitoring data of each functional module are established;
[0017] A plurality of time interception intervals are set according to the duration of the main functional process of the functional module, and a plurality of characteristic monitoring data curves are intercepted according to the time interception intervals to obtain the data curve segment of each functional module.
[0018] In some embodiments of the present application, determining first data and second data associated with the first data includes:
[0019] Analyze the data curve segments of the same time interception interval of the same functional module to obtain fluctuation information of the data curve segments, and determine the fluctuation coefficient of the corresponding data curve segments according to the fluctuation information;
[0020] If the basic attribute of the data curve segment is a control attribute, the data curve segment corresponding to the control attribute is used as the control center, and it is determined whether the fluctuation coefficient of the control center and the fluctuation coefficient of the remaining data curve segments in the same time interception interval of the same functional module meet the preset linear relationship. If so, the corresponding data curve segment is set as the first control subset of the control center;
[0021] Comprehensively analyze the characteristic monitoring data curve corresponding to the data curve segment in the first control subset and the characteristic monitoring data curve corresponding to the control center to obtain a comparison result of the fluctuation coefficient of each time interception interval, eliminate the data curve segment of the first control subset according to the comparison result, and generate a second control subset;
[0022] The characteristic monitoring data corresponding to the control center of each functional module is set as the first data of the corresponding functional module, and the characteristic monitoring data corresponding to the second control subset of the control center is set as the second data associated with the first data.
[0023] In some embodiments of the present application, screening out abnormal data includes:
[0024] The first data is compared with a preset standard data interval. If the first data is within the preset standard data interval, the first data is set as normal data. If the first data is not within the preset standard data interval, the first data is set as abnormal data.
[0025] In some embodiments of the present application, an adjustment model for each functional module is constructed, and abnormal data is input into the corresponding adjustment model to generate adjustment data, including:
[0026] Obtain historical abnormal data and corresponding historical operation and maintenance data of each functional module, filter the historical abnormal data to obtain first historical abnormal data, and construct a training data set and a test data set according to the first historical data and the corresponding historical operation and maintenance data;
[0027] Establishing an initial adjustment model based on the training data set, and generating the credibility of the initial adjustment model based on the test data set;
[0028] Pre-set credibility threshold;
[0029] If the credibility is less than the credibility threshold, iterative training is performed on the training data set, and the initial adjustment model is re-established;
[0030] If the credibility is greater than the credibility threshold, the initial adjustment model is set as the adjustment model.
[0031] In some embodiments of the present application, calculating the management evaluation value according to the adjustment data and the associated second data includes:
[0032] Based on the preset linear relationship and the degree of change of the adjustment data, second data associated with the adjustment data is predicted to obtain third data associated with the adjustment data;
[0033] The adjustment data and the associated third data are set as an adjustment data group, the data in the adjustment data group are compared with the corresponding preset standard data intervals respectively, the data not in the preset standard data interval is screened out according to the comparison result, and the deviation value of the current adjustment data group is calculated;
[0034] Calculate the predicted profit rate of the corresponding functional module according to the adjustment data group, and generate the profit growth rate of the corresponding functional module according to the predicted profit rate and the actual profit rate;
[0035] Generate management evaluation values based on deviation values and profit growth rates.
[0036] In some embodiments of the present application, generating a management evaluation value according to the deviation value and the profit growth rate includes:
[0037] The management evaluation value is:
[0038] ;
[0039] Wherein, Fy is the management evaluation value of the yth adjustment data group, q1 is the first weight coefficient, and u is the total amount of data in the yth adjustment data group that is not in the preset standard data interval. is the deviation value of the tth data in the yth adjusted data group, is the influence coefficient of the tth data in the yth adjustment data group, q2 is the second weight coefficient, and q1+q2=1, ly is the utilization growth rate generated by the yth adjustment data group on the corresponding functional module.
[0040] In some embodiments of the present application, the optimal adjustment data of the corresponding functional module is screened out according to the management evaluation value, including:
[0041] Mapping the adjustment data groups of the same functional module to the management evaluation values one by one and arranging them in order, and setting the adjustment data in the adjustment data group arranged first as the optimal adjustment data of the corresponding functional module;
[0042] A management strategy for each functional module is formulated based on the optimal adjustment data of each functional module, and the corresponding functional modules are managed according to the management strategy.
[0043] In some embodiments of the present application, an intelligent management system for a fuel plant is also included:
[0044] A receiving module is used to receive monitoring data from the functional modules on the fuel plant side and calculate the impact of the monitoring data on the functional modules;
[0045] A division module, used to divide the monitoring data according to the influence degree to obtain characteristic monitoring data, analyze the characteristic monitoring data in the same functional module, and determine the first data and the second data associated with the first data;
[0046] A construction module, configured to analyze the first data, filter out abnormal data, construct an adjustment model for each functional module, and input the abnormal data into a corresponding adjustment model to generate adjustment data;
[0047] The management module is used to calculate a management evaluation value according to the adjustment data and the associated second data, screen out the optimal adjustment data of each functional module according to the management evaluation value, and formulate a management strategy according to the optimal adjustment data.
[0048] Compared with the prior art, the intelligent management method and system for a fuel plant in the embodiment of the present application have the following beneficial effects:
[0049] Convert multiple functional modules on the fuel plant side into automation mode, and receive monitoring data from functional modules on the fuel plant side to avoid errors caused by human factors and improve management accuracy. Analyze the monitoring data, determine the characteristic monitoring data and divide it into independent variable data and corresponding dependent variable data, screen out abnormal independent variable data, obtain adjustment data of the independent variable data according to the adjustment model, and generate management evaluation values for the adjustment data. Obtain a comprehensive evaluation of the operating status and utilization growth rate of the corresponding functional modules based on the adjustment data. Determine the optimal adjustment data based on the management evaluation value and generate a management strategy to ensure management timeliness and generate management strategies in a timely manner. This not only avoids fraud but also improves management efficiency and maximizes corporate profits. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 It is a flow chart of an intelligent management method for a fuel plant side in a preferred embodiment of the present application;
[0051] Figure 2 It is a schematic diagram of an intelligent management system for a fuel plant in a preferred embodiment of the present application. DETAILED DESCRIPTION
[0052] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.
[0053] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0054] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0055] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0056] like Figure 1 As shown, an intelligent management method for a fuel plant side according to a preferred embodiment of the present application includes:
[0057] Step S101: receiving monitoring data of the functional modules at the fuel plant side, and calculating the influence of the monitoring data on the functional modules;
[0058] Step S102: dividing the monitoring data according to the influence degree to obtain characteristic monitoring data, analyzing the characteristic monitoring data in the same functional module to determine first data and second data associated with the first data;
[0059] Step S103: Analyze the first data, filter out abnormal data, build an adjustment model for each functional module, and input the abnormal data into the corresponding adjustment model to generate adjustment data;
[0060] Step S104: Calculate a management evaluation value according to the adjustment data and the associated second data, select the optimal adjustment data of each functional module according to the management evaluation value, and formulate a management strategy according to the optimal adjustment data.
[0061] In this embodiment, the functional modules on the fuel plant side include an automatic sampling module, a testing module, an automatic metering module, a sample preparation module, and a coal blending module, etc. The monitoring data are classified according to the modules to which they belong, and the monitoring data of each module is obtained. The functional modules on the fuel plant side are managed in an automated and refined manner, which not only avoids fraud but also improves management efficiency and maximizes corporate profits.
[0062] In this embodiment, the first data set is an independent variable data set, and the second data set is a dependent variable data set. Abnormal data in the independent variable data set are screened and input into the adjustment model to obtain multiple adjustment data of the current abnormal data. Data prediction is performed based on the dependent variable data involved in the adjustment data, and a management evaluation value for each adjustment data is generated. The optimal adjustment data is screened out, and a management strategy is formulated according to the optimal adjustment data to ensure management timeliness and improve management efficiency.
[0063] In some embodiments of the present application, calculating the influence of monitoring data on the corresponding functional module includes:
[0064] Determine the functional flow of each functional module and divide the functional flow into primary functional flow and secondary functional flow;
[0065] According to the utilization coefficient and importance coefficient of the monitoring data on the main functional process and the secondary functional process, the first impact degree of the monitoring data on the main functional process and the secondary functional process is calculated, so as to determine the impact degree of the monitoring data on the functional module to which it belongs;
[0066] ;
[0067] Among them, M is the impact of the monitoring data on the functional module to which it belongs, e1 is the weight coefficient of the first impact of the main functional process, n is the number of main functional processes, hi is the first impact of the i-th main functional process, ai is the weight coefficient of the i-th main functional process, e2 is the weight coefficient of the first impact of the secondary functional process, s is the number of secondary functional processes, gr is the first impact of the r-th secondary functional process, and bi is the weight coefficient of the i-th secondary functional process.
[0068] In this embodiment, the priority of the functional flow is set according to the degree of influence of the functional flow on the output results of the functional modules.
[0069] In this embodiment, the utilization coefficient refers to the frequency of utilization of the monitoring data in the main functional process and the secondary functional process and the degree of data utilization. The data utilization degree includes complete data utilization and random data utilization. If the utilization frequency is high and the data utilization degree is high, the utilization coefficient is large, otherwise the utilization coefficient is small. The importance coefficient refers to the influence of the monitoring data on the results of the main functional process and the secondary functional process. If the influence on the results of the main functional process and the secondary functional process is large, the importance coefficient is large, otherwise the importance coefficient is small.
[0070] In this embodiment, by dividing the functional flow of each functional module into main functional flow and secondary functional flow, the impact of monitoring data is determined, laying the foundation for subsequent determination of characteristic monitoring data, reducing the amount of data analysis, improving management timeliness, and thus improving management efficiency.
[0071] In some embodiments of the present application, before analyzing the characteristic monitoring data in the same functional module, the following steps are included:
[0072] Based on the preset operation cycle of each functional module as a time reference line, a plurality of characteristic monitoring data curves of characteristic monitoring data of each functional module are established;
[0073] A plurality of time interception intervals are set according to the duration of the main functional process of the functional module, and a plurality of characteristic monitoring data curves are intercepted according to the time interception intervals to obtain the data curve segment of each functional module.
[0074] In this embodiment, a preset operation cycle is set according to the historical complete operation cycle of the functional module, and the operation time of the main functional process in each functional module is set to a time interception interval to obtain a data curve segment of each functional module.
[0075] In this embodiment, the time interception interval is determined according to the operation cycle and the duration of the main functional process, and the data curve segment is intercepted and analyzed to obtain the first data and the associated second data, laying the foundation for the subsequent calculation of the management evaluation value.
[0076] In some embodiments of the present application, determining first data and second data associated with the first data includes:
[0077] Analyze the data curve segments of the same time interception interval of the same functional module to obtain fluctuation information of the data curve segments, and determine the fluctuation coefficient of the corresponding data curve segments according to the fluctuation information;
[0078] If the basic attribute of the data curve segment is a control attribute, the data curve segment corresponding to the control attribute is used as the control center, and it is determined whether the fluctuation coefficient of the control center and the fluctuation coefficient of the remaining data curve segments in the same time interception interval of the same functional module meet the preset linear relationship. If so, the corresponding data curve segment is set as the first control subset of the control center;
[0079] Comprehensively analyze the characteristic monitoring data curve corresponding to the data curve segment in the first control subset and the characteristic monitoring data curve corresponding to the control center to obtain a comparison result of the fluctuation coefficient of each time interception interval, eliminate the data curve segment of the first control subset according to the comparison result, and generate a second control subset;
[0080] The characteristic monitoring data corresponding to the control center of each functional module is set as the first data of the corresponding functional module, and the characteristic monitoring data corresponding to the second control subset of the control center is set as the second data associated with the first data.
[0081] In this embodiment, the fluctuation information includes a fluctuation trend and a fluctuation magnitude. The fluctuation trend is quantified, with an upward fluctuation amplitude of 1 and a downward fluctuation amplitude of -1. The fluctuation coefficient is obtained based on the fluctuation amplitude and the fluctuation magnitude.
[0082] In this embodiment, the preset linear relationship means that two fluctuation coefficients have a linear functional relationship or a linear relationship through variable substitution.
[0083] In this embodiment, the first attribute is set according to the basic attributes of the feature monitoring data, and the basic attributes include control attributes and non-control attributes. The control attribute refers to data that can be regulated by intelligent management methods, and the non-control attribute refers to data that cannot be regulated by intelligent management methods. If the basic attribute of the feature monitoring data is the control attribute, the corresponding data curve segment is the control attribute.
[0084] In this embodiment, the control center is set according to the characteristic monitoring data of the control attributes of each functional module, and the second control subset of each control center is obtained, thereby obtaining the first data and the associated second data, laying a data foundation for the subsequent judgment of abnormal data and calculation of management evaluation values, reducing the amount of data processing, ensuring the timeliness of management, and thus improving management efficiency.
[0085] In some embodiments of the present application, screening out abnormal data includes:
[0086] The first data is compared with a preset standard data interval. If the first data is within the preset standard data interval, the first data is set as normal data. If the first data is not within the preset standard data interval, the first data is set as abnormal data.
[0087] In this embodiment, the preset standard data interval is constructed based on the historical standard data of each functional module. The first data is compared with the corresponding preset standard data interval to determine whether the first data is abnormal. If an abnormality occurs, it is set as abnormal data and filtered out, laying a data foundation for the subsequent generation of adjustment data and ensuring the accuracy of the adjustment data.
[0088] In some embodiments of the present application, an adjustment model for each functional module is constructed, and abnormal data is input into the corresponding adjustment model to generate adjustment data, including:
[0089] Obtain historical abnormal data and corresponding historical operation and maintenance data of each functional module, filter the historical abnormal data to obtain first historical abnormal data, and construct a training data set and a test data set according to the first historical data and the corresponding historical operation and maintenance data;
[0090] Establishing an initial adjustment model based on the training data set, and generating the credibility of the initial adjustment model based on the test data set;
[0091] Pre-set credibility threshold;
[0092] If the credibility is less than the credibility threshold, iterative training is performed on the training data set, and the initial adjustment model is re-established;
[0093] If the credibility is greater than the credibility threshold, the initial adjustment model is set as the adjustment model.
[0094] In this embodiment, the first historical abnormal data refers to the historical abnormal data of the first data in each functional module, and the historical operation and maintenance data refers to the correct adjustment data of the historical abnormal data.
[0095] In this embodiment, the credibility is set based on the deviation between the operation and maintenance data output by the initial adjustment model and the historical operation and maintenance data. The smaller the deviation, the greater the credibility. The credibility threshold is set based on a deviation of 5%.
[0096] In this embodiment, an initial adjustment model is constructed based on the first historical abnormal data and the corresponding historical operation and maintenance data, and the credibility of the initial adjustment model is judged and the adjustment model is obtained, laying the foundation for subsequent adjustment data, improving the accuracy of the adjustment data, and thus improving management accuracy and efficiency.
[0097] In some embodiments of the present application, calculating the management evaluation value according to the adjustment data and the associated second data includes:
[0098] Based on the preset linear relationship and the degree of change of the adjustment data, second data associated with the adjustment data is predicted to obtain third data associated with the adjustment data;
[0099] The adjustment data and the associated third data are set as an adjustment data group, the data in the adjustment data group are compared with the corresponding preset standard data intervals respectively, the data not in the preset standard data interval is screened out according to the comparison result, and the deviation value of the current adjustment data group is calculated;
[0100] Calculate the predicted profit rate of the corresponding functional module according to the adjustment data group, and generate the profit growth rate of the corresponding functional module according to the predicted profit rate and the actual profit rate;
[0101] Generate management evaluation values based on deviation values and profit growth rates.
[0102] In this embodiment, second data associated with the adjustment data is determined based on first data corresponding to the adjustment data, and the associated second data is predicted based on a preset linear relationship between the first data and the associated second data and a degree of change from the first data to the adjustment data, thereby obtaining third data associated with the adjustment data.
[0103] In this embodiment, the deviation value can be used to determine whether the adjustment data group ensures the normal operation of the functional module, and the growth rate can be used to determine whether the adjustment data group reduces the cost of the functional module and increases the profit. The adjustment data group is evaluated based on the deviation value and the profit growth rate, so as to obtain the optimal adjustment data of the functional module, ensure the normal operation of the functional module and increase the profit, improve management efficiency, and maximize the enterprise profit.
[0104] In some embodiments of the present application, generating a management evaluation value according to the deviation value and the profit growth rate includes:
[0105] The management evaluation value is:
[0106] ;
[0107] Wherein, Fy is the management evaluation value of the yth adjustment data group, q1 is the first weight coefficient, and u is the total amount of data in the yth adjustment data group that is not in the preset standard data interval. is the deviation value of the tth data in the yth adjusted data group, is the influence coefficient of the tth data in the yth adjustment data group, q2 is the second weight coefficient, and q1+q2=1, ly is the utilization growth rate generated by the yth adjustment data group on the corresponding functional module.
[0108] In this embodiment, a management evaluation value is generated based on the deviation value and the utilization growth rate to judge the management effect of multiple adjustment data groups of the same functional module, and a comprehensive analysis is performed on the management evaluation values of multiple adjustment data groups of the same functional module to determine the optimal adjustment data, thereby ensuring the safe operation of the functional module and increasing the profit margin, thereby improving management efficiency.
[0109] In some embodiments of the present application, the optimal adjustment data of the corresponding functional module is screened out according to the management evaluation value, including:
[0110] Mapping the adjustment data groups of the same functional module to the management evaluation values one by one and arranging them in order, and setting the adjustment data in the adjustment data group arranged first as the optimal adjustment data of the corresponding functional module;
[0111] A management strategy for each functional module is formulated based on the optimal adjustment data of each functional module, and the corresponding functional modules are managed according to the management strategy.
[0112] In some embodiments of the present application, Figure 2 As shown, it also includes an intelligent management system for the fuel plant side:
[0113] A receiving module is used to receive monitoring data from the functional modules on the fuel plant side and calculate the impact of the monitoring data on the functional modules;
[0114] A division module, used to divide the monitoring data according to the influence degree to obtain characteristic monitoring data, analyze the characteristic monitoring data in the same functional module, and determine the first data and the second data associated with the first data;
[0115] A construction module, configured to analyze the first data, filter out abnormal data, construct an adjustment model for each functional module, and input the abnormal data into a corresponding adjustment model to generate adjustment data;
[0116] The management module is used to calculate a management evaluation value according to the adjustment data and the associated second data, screen out the optimal adjustment data of each functional module according to the management evaluation value, and formulate a management strategy according to the optimal adjustment data.
[0117] In this embodiment, multiple functional modules on the fuel plant side are converted into an automated mode, and a receiving module receives monitoring data from the functional modules on the fuel plant side, thereby avoiding errors caused by human factors and improving management accuracy.
[0118] In this embodiment, the division module divides the characteristic monitoring data into independent variable data and corresponding dependent variable data, laying a data foundation for the subsequent calculation of management evaluation values, reducing the amount of data processing and improving calculation efficiency.
[0119] In this embodiment, the construction module screens out abnormal independent variable data, obtains adjustment data of the independent variable data according to the adjustment model, ensures the authenticity and accuracy of the adjustment data, and thus ensures the normal operation of each functional module.
[0120] In this embodiment, the management module generates a management evaluation value for the adjustment data, obtains a comprehensive evaluation of the adjustment data on the operating status of the corresponding functional module and the utilization growth rate, determines the optimal adjustment data based on the management evaluation value and generates a management strategy, ensures management timeliness, and generates a management strategy in a timely manner, which not only avoids fraud but also improves management efficiency and maximizes corporate profits.
[0121] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.
Claims
1. An intelligent management method for a fuel plant, characterized in that: include: Receive monitoring data from the fuel plant side functional modules and calculate the impact of the monitoring data on the functional modules; The monitoring data is divided according to the influence degree to obtain characteristic monitoring data, and the characteristic monitoring data in the same functional module is analyzed to determine first data and second data associated with the first data; Analyze the first data, filter out abnormal data, build an adjustment model for each functional module, and input the abnormal data into the corresponding adjustment model to generate adjustment data; Calculating a management evaluation value according to the adjustment data and the associated second data, selecting the optimal adjustment data of each functional module according to the management evaluation value, and formulating a management strategy according to the optimal adjustment data; Calculate the impact of monitoring data on the corresponding functional modules, including: Determine the functional flow of each functional module and divide the functional flow into primary functional flow and secondary functional flow; According to the utilization coefficient and importance coefficient of the monitoring data on the main functional process and the secondary functional process, the first impact degree of the monitoring data on the main functional process and the secondary functional process is calculated, so as to determine the impact degree of the monitoring data on the functional module to which it belongs; ; Among them, M is the influence of the monitoring data on the functional module to which it belongs, e1 is the weight coefficient of the first influence of the main functional process, n is the number of main functional processes, hi is the first influence of the i-th main functional process, ai is the weight coefficient of the i-th main functional process, e2 is the weight coefficient of the first influence of the secondary functional process, s is the number of secondary functional processes, gr is the first influence of the r-th secondary functional process, and br is the weight coefficient of the r-th secondary functional process; Before analyzing the characteristic monitoring data in the same functional module, it includes: Based on the preset operation cycle of each functional module as a time reference line, a plurality of characteristic monitoring data curves of characteristic monitoring data of each functional module are established; According to the duration of the main functional process of the functional module, multiple time interception intervals are set, and several characteristic monitoring data curves are intercepted according to the time interception intervals to obtain the data curve segment of each functional module; Determining first data and second data associated with the first data includes: Analyze the data curve segments of the same time interception interval of the same functional module to obtain fluctuation information of the data curve segments, and determine the fluctuation coefficient of the corresponding data curve segments according to the fluctuation information; If the basic attribute of the data curve segment is a control attribute, the data curve segment corresponding to the control attribute is used as the control center, and it is determined whether the fluctuation coefficient of the control center and the fluctuation coefficient of the remaining data curve segments in the same time interception interval of the same functional module meet the preset linear relationship. If so, the corresponding data curve segment is set as the first control subset of the control center; Comprehensively analyze the characteristic monitoring data curve corresponding to the data curve segment in the first control subset and the characteristic monitoring data curve corresponding to the control center to obtain a comparison result of the fluctuation coefficient of each time interception interval, eliminate the data curve segment of the first control subset according to the comparison result, and generate a second control subset; Setting the characteristic monitoring data corresponding to the control center of each functional module as the first data of the corresponding functional module, and setting the characteristic monitoring data corresponding to the second control subset of the control center as the second data associated with the first data; Filter out abnormal data, including: Compare the first data with a preset standard data interval, if the first data is within the preset standard data interval, set the first data as normal data, if the first data is not within the preset standard data interval, set the first data as abnormal data; Build an adjustment model for each functional module and input abnormal data into the corresponding adjustment model to generate adjustment data, including: Obtain historical abnormal data and corresponding historical operation and maintenance data of each functional module, filter the historical abnormal data to obtain first historical abnormal data, and construct a training data set and a test data set according to the first historical data and the corresponding historical operation and maintenance data; Establishing an initial adjustment model based on the training data set, and generating the credibility of the initial adjustment model based on the test data set; Pre-set credibility threshold; If the credibility is less than the credibility threshold, iterative training is performed on the training data set, and the initial adjustment model is re-established; If the credibility is greater than the credibility threshold, the initial adjustment model is set as the adjustment model.
2. The intelligent management method for the fuel plant side according to claim 1, characterized in that: Calculating a management evaluation value according to the adjustment data and the associated second data includes: Based on the preset linear relationship and the degree of change of the adjustment data, second data associated with the adjustment data is predicted to obtain third data associated with the adjustment data; The adjustment data and the associated third data are set as an adjustment data group, the data in the adjustment data group are compared with the corresponding preset standard data intervals respectively, the data not in the preset standard data interval is screened out according to the comparison result, and the deviation value of the current adjustment data group is calculated; Calculate the predicted profit rate of the corresponding functional module according to the adjustment data group, and generate the profit growth rate of the corresponding functional module according to the predicted profit rate and the actual profit rate; Generate management evaluation values based on deviation values and profit growth rates.
3. The intelligent management method for fuel plant side according to claim 2, characterized in that: Generate management evaluation values based on deviation values and profit growth rate, including: The management evaluation value is: ; Wherein, Fy is the management evaluation value of the yth adjustment data group, q1 is the first weight coefficient, and u is the total amount of data in the yth adjustment data group that is not in the preset standard data interval. is the deviation value of the tth data in the yth adjusted data group, is the influence coefficient of the tth data in the yth adjustment data group, q2 is the second weight coefficient, and q1+q2=1, ly is the utilization growth rate generated by the yth adjustment data group on the corresponding functional module.
4. The intelligent management method for fuel plant side according to claim 3, characterized in that: Filter out the optimal adjustment data of the corresponding functional modules according to the management evaluation value, including: Mapping the adjustment data groups of the same functional module to the management evaluation values one by one and arranging them in order, and setting the adjustment data in the adjustment data group arranged first as the optimal adjustment data of the corresponding functional module; A management strategy for each functional module is formulated based on the optimal adjustment data of each functional module, and the corresponding functional modules are managed according to the management strategy.
5. An intelligent management system for a fuel plant, characterized in that: include: A receiving module is used to receive monitoring data from the functional modules on the fuel plant side and calculate the impact of the monitoring data on the functional modules; A division module, used to divide the monitoring data in the same functional module according to the influence degree to obtain characteristic monitoring data, analyze the characteristic monitoring data in the same functional module, and determine the first data and the second data associated with the first data; A construction module, configured to analyze the first data, filter out abnormal data, construct an adjustment model for each functional module, and input the abnormal data into a corresponding adjustment model to generate adjustment data; A management module, used to calculate a management evaluation value according to the adjustment data and the associated second data, screen out the optimal adjustment data of each functional module according to the management evaluation value, and formulate a management strategy according to the optimal adjustment data; Calculate the impact of monitoring data on the corresponding functional modules, including: Determine the functional flow of each functional module and divide the functional flow into primary functional flow and secondary functional flow; According to the utilization coefficient and importance coefficient of the monitoring data on the main functional process and the secondary functional process, the first impact degree of the monitoring data on the main functional process and the secondary functional process is calculated, so as to determine the impact degree of the monitoring data on the functional module to which it belongs; ; Among them, M is the influence of the monitoring data on the functional module to which it belongs, e1 is the weight coefficient of the first influence of the main functional process, n is the number of main functional processes, hi is the first influence of the i-th main functional process, ai is the weight coefficient of the i-th main functional process, e2 is the weight coefficient of the first influence of the secondary functional process, s is the number of secondary functional processes, gr is the first influence of the r-th secondary functional process, and br is the weight coefficient of the r-th secondary functional process; Before analyzing the characteristic monitoring data in the same functional module, it includes: Based on the preset operation cycle of each functional module as a time reference line, a plurality of characteristic monitoring data curves of characteristic monitoring data of each functional module are established; According to the duration of the main functional process of the functional module, multiple time interception intervals are set, and several characteristic monitoring data curves are intercepted according to the time interception intervals to obtain the data curve segment of each functional module; Determining first data and second data associated with the first data includes: Analyze the data curve segments of the same time interception interval of the same functional module to obtain fluctuation information of the data curve segments, and determine the fluctuation coefficient of the corresponding data curve segments according to the fluctuation information; If the basic attribute of the data curve segment is a control attribute, the data curve segment corresponding to the control attribute is used as the control center, and it is determined whether the fluctuation coefficient of the control center and the fluctuation coefficient of the remaining data curve segments in the same time interception interval of the same functional module meet the preset linear relationship. If so, the corresponding data curve segment is set as the first control subset of the control center; Comprehensively analyze the characteristic monitoring data curve corresponding to the data curve segment in the first control subset and the characteristic monitoring data curve corresponding to the control center to obtain a comparison result of the fluctuation coefficient of each time interception interval, eliminate the data curve segment of the first control subset according to the comparison result, and generate a second control subset; Setting the characteristic monitoring data corresponding to the control center of each functional module as the first data of the corresponding functional module, and setting the characteristic monitoring data corresponding to the second control subset of the control center as the second data associated with the first data; Filter out abnormal data, including: Compare the first data with a preset standard data interval, if the first data is within the preset standard data interval, set the first data as normal data, if the first data is not within the preset standard data interval, set the first data as abnormal data; Build an adjustment model for each functional module and input abnormal data into the corresponding adjustment model to generate adjustment data, including: Obtain historical abnormal data and corresponding historical operation and maintenance data of each functional module, filter the historical abnormal data to obtain first historical abnormal data, and construct a training data set and a test data set according to the first historical data and the corresponding historical operation and maintenance data; Establishing an initial adjustment model based on the training data set, and generating the credibility of the initial adjustment model based on the test data set; Pre-set credibility threshold; If the credibility is less than the credibility threshold, iterative training is performed on the training data set, and the initial adjustment model is re-established; If the credibility is greater than the credibility threshold, the initial adjustment model is set as the adjustment model.