A bridge pier capable of resisting impact and erosion

The hydraulic chamber and piston rod drive cone block into the soil, combined with the UHPFRC-coated pier design, solves the structural damage and shaking of the bridge in water flow or wind and sand erosion environment, and significantly improves the impact and erosion resistance.

CN118653363BActive Publication Date: 2024-11-15HUNAN COMM RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411108921.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-15
Estimated Expiration
2044-08-13

AI Technical Summary

Technical Problem

Existing bridge structures are prone to damage in water flow or wind and sand erosion environments, and may cause shaking or offset when impacted by external forces across rivers or desert areas.

Method used

The design of bridge pier including hydraulic chamber, piston rod, cone block and UHPFRC coating is adopted. The piston rod and cone block are driven into the soil through the medium oil in the hydraulic chamber, which drives the expansion and solidification of the concrete casting frame, and enhances the bridge pier and soil. Connect to improve impact and erosion resistance.

Benefits of technology

It effectively improves the impact and erosion resistance of the bridge piers in water flow erosion and wind and sand erosion environments, enhances the stability and service life of the bridge, and prevents structural damage and shaking.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118653363B_ABST
    Figure CN118653363B_ABST
Patent Text Reader

Abstract

The present invention provides a bridge pier that is resistant to impact and erosion. The UHPFRC coating is arranged on the surface of the bridge pier to improve the effect of the bridge pier in resisting water flow erosion when used in a river-crossing bridge, or the effect of the bridge pier in resisting wind and sand erosion when used in a desert area. The bridge pier comprises a pile foundation and a pier column casting frame arranged on the pile foundation. The pier column casting frame is connected with a connecting cavity on the pile foundation, so that the cast concrete entering the pier column casting frame can drive a lifting plate in the connecting cavity to move, and the medium oil pushes the second piston rod to move through the movement of the lifting plate, thereby inserting a cone block into the soil and driving the folding cloth to unfold; the cast concrete enters the unfolded folding cloth through a guide cavity connected to the connecting cavity and solidifies, and the concrete solidified in the folding cloth improves the impact resistance of the bridge when it is impacted by external force.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge engineering, and in particular to a bridge pier capable of resisting impact and erosion. Background Art

[0002] Nowadays, bridge engineering has various applications, especially erosion-resistant bridge structures. The erosion-resistant bridge structures are divided into two common application environments: one is water erosion resistance (bridges across rivers), and the other is wind and sand erosion resistance (bridges in desert areas). Both water erosion and wind and sand erosion are serious hazards to bridge piers. Erosion can cause a series of problems such as structural damage to bridge piers and reduced bearing capacity, which seriously affects the service life of bridges. At the same time, when it is necessary to install bridges in cross-river areas or desert areas, because the soil in the river beach or sand is relatively loose, when the bridge itself is hit by external force or an earthquake occurs, the bridge piers installed in the river beach or sand may shake or shift.

[0003] In summary, there is an urgent need for a bridge pier that is impact-resistant and erosion-resistant to solve the problems existing in the prior art. Summary of the invention

[0004] The purpose of the present invention is to provide a bridge pier that is resistant to impact and erosion, aiming to solve the problem that water flow, wind and sand have erosion hazards on bridge piers, and bridge piers are prone to shaking or deflection due to external force impact in cross-river areas or desert areas. The specific technical solution is as follows:

[0005] A bridge pier capable of resisting impact and erosion, comprising:

[0006] A pile foundation, wherein a connecting chamber, a first hydraulic chamber and a second hydraulic chamber are provided on the pile foundation, wherein the connecting chamber is located above the first hydraulic chamber, and a plurality of second hydraulic chambers are arranged along the circumference of the pile foundation and are all connected to the lower end of the first hydraulic chamber; a first piston rod is provided in the first hydraulic chamber, a lifting plate is provided in the connecting chamber, and the lifting plate is connected to the first piston rod; a second piston rod is provided in the second hydraulic chamber, and the second piston rod is connected to a cone block;

[0007] A pier column casting frame, wherein the pier column casting frame is arranged on the pile foundation and the interior of the pier column casting frame is communicated with the connecting cavity, and a UHPFRC coating is provided on the surface of the pier column casting frame;

[0008] The first hydraulic chamber and the second hydraulic chamber are filled with medium oil. In the initial state, the first piston rod is in an extended state and the second piston rod is in a retracted state. Concrete is poured into the interior of the pier casting frame and the connecting cavity. The poured concrete acts on the lifting plate to retract the first piston rod, and the second piston rod extends with the cone block and inserts into the soil.

[0009] Preferably in the above technical solution, a storage cavity for accommodating the cone block is provided on the pile foundation, a folding cloth is provided between the storage cavity and the cone block, and the storage cavity and the connecting cavity are connected through a guide cavity; the folding cloth can be extended and retracted along with the cone block, and the concrete poured in the connecting cavity enters into the space formed by the folding cloth, the cone block and the storage cavity through the guide cavity.

[0010] Preferably in the above technical solution, a receiving chute connected to the receiving cavity is provided on the pile foundation, the length direction of the receiving chute is parallel to the movement direction of the second piston rod, a connecting steel bar is movably provided in the receiving chute, and one end of the connecting steel bar close to the cone block is fixedly connected to the cone block.

[0011] Preferably in the above technical solution, when the second piston rod is fully extended with the cone block, the connecting steel bar and the receiving chute do not separate; a gap is left between the connecting steel bar and the receiving chute to allow concrete to flow through.

[0012] Preferably, the above technical solution further includes a limiting rod movably arranged on the pile foundation, and a clamping hole is provided on the lifting plate; the end of the limiting rod is inserted into the clamping hole to limit the lifting plate in the initial state.

[0013] Preferably in the above technical solution, the pile foundation is provided with an internal thread ring, the limiting rod is provided with an external thread, the limiting rod is arranged in the internal thread ring and the two are threadedly connected.

[0014] Preferably, the above technical solution also includes N first supporting steel bars located inside the pier casting frame, the lower ends of the first supporting steel bars extend into the connecting cavity and are fixedly connected to the bottom surface of the connecting cavity; N guide holes are correspondingly provided on the lifting plate, and the lifting plate is movably mounted on the first supporting steel bars through the guide holes, wherein N is a natural number greater than or equal to 1.

[0015] Preferably in the above technical solution, a plurality of transverse steel bar groups are arranged at vertical intervals inside the pier casting frame, and the transverse steel bar groups are connected to the first supporting steel bars.

[0016] Preferably, the above technical solution further comprises a beam-column casting frame, wherein a steel bar skeleton is provided inside the beam-column casting frame, and the beam-column casting frame is arranged on the pier-column casting frame and the two are interconnected.

[0017] Preferably in the above technical solution, the surface of the beam-column casting frame is provided with a UHPFRC coating.

[0018] The application of the technical solution of the present invention has the following beneficial effects:

[0019] The impact-resistant and erosion-resistant bridge piers of the present invention can improve the effect of the bridge piers in resisting water erosion when used in a cross-river bridge, or the effect of resisting wind and sand erosion when used in a desert area, by setting a UHPFRC coating; the pier column casting frame is connected to the connecting cavity on the pile foundation, so that the concrete entering the pier column casting frame can drive the lifting plate in the connecting cavity to move, and the medium oil pushes the second piston rod to move through the movement of the lifting plate, thereby inserting the cone block into the soil and driving the folding cloth to unfold, and the concrete enters the unfolded folding cloth through the guide cavity and solidifies, and the concrete solidified in the folding cloth improves the impact resistance of the bridge when it is impacted by external force.

[0020] In addition to the above-described objects, features and advantages, the present invention has other objects, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0022] Figure 1 It is a structural cross-sectional view of the bridge pier of the present invention when concrete is not poured;

[0023] Figure 2 This is a structural cross-sectional view of the bridge pier of the present invention after pouring concrete;

[0024] Figure 3 It is a schematic diagram of the axonometric cross-sectional structure of the bridge pier of the present invention when concrete is not poured;

[0025] Figure 4 is a schematic diagram of the bridge pier of the present invention in an installed state;

[0026] Among them: 1. pile foundation; 2. connecting cavity; 3. first piston rod; 4. internal thread ring; 5. pier column casting frame; 6. first supporting steel bar; 7. third supporting steel bar; 8. UHPFRC coating; 9. beam column casting frame; 10. lifting plate; 11. clamping hole; 12. limit rod; 13. guide cavity; 14. first hydraulic cavity; 15. cone block; 16. storage cavity; 17. fourth supporting steel bar; 18. second piston rod; 19. folding cloth; 20. connecting steel bar; 21. second supporting steel bar; 22. storage slide groove; 23. external thread; 24. second hydraulic cavity. DETAILED DESCRIPTION

[0027] In order to facilitate the understanding of the present invention, the present invention will be described more fully below, and preferred embodiments of the present invention are provided. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.

[0028] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0029] Example:

[0030] See also Figure 1-Figure 4 This embodiment provides a bridge pier capable of resisting impact and erosion, comprising:

[0031] A pile foundation 1, wherein a connecting chamber 2, a first hydraulic chamber 14 and a second hydraulic chamber 24 are provided on the pile foundation 1, wherein the connecting chamber 2 is located above the first hydraulic chamber 14, and a plurality of second hydraulic chambers 24 are arranged along the circumference of the pile foundation 1 and are all connected to the lower end of the first hydraulic chamber 14; a first piston rod 3 is provided in the first hydraulic chamber 14, a lifting plate 10 is provided in the connecting chamber 2, and the lifting plate 10 is connected to the first piston rod 3; a second piston rod 18 is provided in the second hydraulic chamber 24, and the second piston rod 18 is connected to a cone block 15;

[0032] A pier column casting frame 5, wherein the pier column casting frame 5 is arranged on the pile foundation 1 and the interior of the pier column casting frame 5 is connected with the connecting cavity 2;

[0033] The first hydraulic chamber 14 and the second hydraulic chamber 24 are filled with medium oil. In the initial state, the first piston rod 3 is in an extended state, and the second piston rod 18 is in a retracted state. Concrete is poured into the interior of the pier casting frame 5 and the connecting chamber 2. The poured concrete acts on the lifting plate 10 to retract the first piston rod 3, and the second piston rod 18 extends with the cone block 15 and inserts into the soil.

[0034] Preferably, the first hydraulic chamber 14 is arranged along the vertical direction, and the length direction of the second hydraulic chamber 24 is parallel to the horizontal direction; multiple second hydraulic chambers 24 are arranged along the circumference of the pile foundation 1 with the lower end of the first hydraulic chamber 14 as the center. Furthermore, multiple second hydraulic chambers 24 are symmetrically arranged on the pile foundation 1 with the lower end of the first hydraulic chamber 14 as the center. The symmetrical arrangement is to ensure that the pile foundation 1 can maintain force balance when each cone block 15 is inserted into the soil.

[0035] Specifically, the concrete poured in the connection chamber 2 will fall completely or partially on the lifting plate 10. As more and more concrete is poured into the connection chamber 2, the concrete gravity acting on the lifting plate 10 will also become greater and greater, thereby driving the first piston 3 to move downward (i.e., retract), and the force transmitted through the medium oil will push the second piston rod 18 to extend with the cone block 15 and insert into the soil, thereby increasing the connection stability between the pile foundation 1 and the soil and enhancing the impact resistance of the bridge pier. Preferably, in some embodiments, the horizontal cross-section of the connection chamber 2 may be designed to match the shape of the lifting plate 10, so that all the poured concrete falls on the lifting plate 10, increasing the force (i.e., gravity) of the concrete on the lifting plate, and ensuring that the first piston rod can be retracted smoothly.

[0036] Furthermore, a receiving chamber 16 for accommodating the cone block 15 is provided on the pile foundation 1, and a folding cloth 19 is provided between the receiving chamber 16 and the cone block 15, one end of the folding cloth 19 is connected to the cone block 15, and the other end thereof is connected to the inner wall of the receiving chamber 16, and the receiving chamber 16 and the connecting chamber 2 are connected through the guide chamber 13; the folding cloth 19 can be extended and retracted along with the cone block 15, and when the second piston rod 18 is extended to drive the cone block 15 to move, the folding cloth 19 will also be extended accordingly, forming a space between the cone block 15, the folding cloth 19 and the receiving chamber 16, and the concrete poured in the connecting chamber 2 The concrete enters the space formed by the folding cloth 19, the cone block 15 and the storage cavity 16 through the guide cavity 13. The solidified concrete in the folding cloth 19 increases the connection strength of the pile foundation 1 in the soil or sand, thereby improving the impact resistance of the entire bridge. Furthermore, the peripheral side of the pile foundation 1 is reinforced with the soil through the concrete protruding from the pile foundation. On the basis of the reinforced connection by driving the cone block into the soil, the concrete in the folding cloth 19 can further increase the contact area with the soil. At the same time, the concrete in the folding cloth 19 has the advantage of a longer service life and will not cause failure of the reinforced connection due to rust, corrosion, etc.

[0037] Preferably, the position in the connecting cavity 2 that is connected to the guide cavity 13 (i.e., the setting position of the guide cavity in the connecting cavity) is higher than the upper surface of the lifting plate 10 when it is in the lowest position in the connecting cavity, so as to prevent the lifting plate 10 from blocking the guide cavity 13 when it moves to the lowest position, resulting in the concrete being unable to enter the space formed by the folding cloth 19, the cone block 15 and the storage cavity 16.

[0038] See also Figure 1-Figure 3 The pile foundation 1 is provided with a receiving chute 22 connected to the receiving chamber 16, the length direction of the receiving chute 22 is parallel to the movement direction of the second piston rod 18, and a connecting steel bar 20 is movably provided in the receiving chute 22, and one end of the connecting steel bar 20 close to the cone block 15 is fixedly connected to the cone block 15. Figure 2As shown, when the second piston rod 18 extends to drive the cone block 15 to move, it will simultaneously drive the connecting steel bar 20 to move together, that is, the connecting steel bar 20 will enter the space formed by the folding cloth 19, the cone block 15 and the storage cavity 16, and will be subsequently embedded in the concrete in the folding cloth 19. The strength of the concrete in the folding cloth 19 can be improved by the connecting steel bar 20, thereby preventing the concrete in the folding cloth 19 from being subjected to stress and causing structural damage.

[0039] Preferably, a plurality of connecting steel bars 20 are embedded in the concrete of a folding cloth 19 to ensure that the concrete has sufficient strength after solidification; the connecting steel bars 20 are arranged in a one-to-one correspondence with the receiving chute 22, that is, one connecting steel bar 20 is placed in one receiving chute 22.

[0040] Furthermore, the length of the connecting steel bar 20 should satisfy the following requirements: when the second piston rod 18 is fully extended (i.e., the second piston rod reaches the maximum extension stroke), the connecting steel bar 20 and the receiving chute 22 will not be separated; the maximum outer diameter of the connecting steel bar 20 is smaller than the inner diameter of the receiving chute 22, i.e., there is a gap between the connecting steel bar 20 and the receiving chute 22, through which the concrete can flow into the receiving chute 22. This arrangement allows the concrete to flow into the receiving chute 22, thereby increasing the connection strength between the concrete in the folding cloth and the pile foundation 1, increasing the shear resistance of the concrete in the folding cloth, and making the concrete in the folding cloth and the pile foundation become a whole.

[0041] Furthermore, the bridge pier in this embodiment also includes a limiting rod 12 movably arranged on the pile foundation 1, and a clamping hole 11 is provided on the lifting plate 10; the end of the limiting rod 12 is inserted into the clamping hole 11 to limit the lifting plate 10 in the initial state, and through the cooperation of the limiting rod 12 and the clamping hole 11, the first piston rod 3 is in an extended state and the second piston rod 18 is in a retracted state and both are locked in the initial state, thereby preventing the cone block 15 from extending during the lifting process of the pile foundation 1 and affecting the subsequent installation of the pile foundation 1.

[0042] Specifically, in this embodiment, the pile foundation 1 is provided with an internal thread ring 4, and the limiting rod 12 is provided with an external thread 23. The limiting rod 12 is arranged in the internal thread ring 4 and the two are threadedly connected. By twisting the limiting rod, the end of the limiting rod 12 can be inserted into the clamping hole 11 to limit the lifting plate, or the lifting plate can be removed from the clamping hole 11 to release the limitation of the lifting plate; preferably, the internal thread ring 4 can be directly embedded in the pile foundation 1, and the limiting rod 12 can be directly selected from bolts.

[0043] Preferably, in some embodiments, the limiting rod 12 may be a limiting pin, and inserting the limiting pin into the clamping hole can also achieve the effect of limiting and locking the lifting plate.

[0044] For further information, see Figure 1-Figure 3 The bridge pier also includes N first support steel bars 6 located inside the pier column casting frame 5, the lower end of the first support steel bar 6 extends into the connection cavity 2 and is fixedly connected to the bottom surface of the connection cavity 2; the lifting plate 10 is correspondingly provided with N guide holes, and the lifting plate 10 is movably sleeved on the first support steel bar 6 through the guide holes, wherein N is a natural number greater than or equal to 1. The cooperation of the N first support steel bars 6 and the N guide holes can guide the movement of the lifting plate 10, ensure the stability of the movement of the lifting plate 10, and prevent the lifting plate 10 and the first piston rod 3 from tilting due to uneven distribution of concrete on the lifting plate 10, and the first piston rod 3 from being stuck.

[0045] See also Figure 1-Figure 3 , a plurality of transverse reinforcement groups are arranged vertically at intervals inside the pier column casting frame 5, and the transverse reinforcement groups are connected to the first support reinforcement 6. Specifically, the transverse reinforcement group includes a second support reinforcement 21, a plurality of second support reinforcements 21 are arranged around the circumference of the first support reinforcement 6, and both ends of the second support reinforcement 21 are connected to the inner wall of the pier column casting frame 5, and the second support reinforcement 21 is connected to the first support reinforcement 6, and the strength of the concrete entering the pier column casting frame 5 after solidification is improved by the second support reinforcement 21 and the first support reinforcement 6.

[0046] Preferably, the bridge pier in this embodiment further includes a beam-column casting frame 9, wherein a steel bar skeleton is provided inside the beam-column casting frame 9, and the beam-column casting frame 9 is arranged on the pier-column casting frame 5 and the two are connected to each other. When concrete is poured into the pier-column casting frame 5, since the pier-column casting frame 5 is connected to the beam-column casting frame 9, concrete will also flow into the beam-column casting frame 9, thereby completing the pouring of concrete into the beam-column casting frame 9. The beam-column casting frame 9 is used to connect two adjacent pier-column casting frames 5, and a tie beam is formed after concrete is poured into the beam-column casting frame 9. Furthermore, the steel bar skeleton includes a vertical steel bar group and a third supporting steel bar 7, a plurality of third supporting steel bars 7 are arranged along the length direction of the beam-column casting frame 9, a plurality of vertical steel bar groups are arranged at intervals along the length direction of the beam-column casting frame 9 and the vertical steel bar group is connected to the third supporting steel bars 7; specifically, the vertical steel bar group includes a plurality of fourth supporting steel bars 17 arranged around the third supporting steel bars 7, both ends of the fourth supporting steel bars 17 are connected to the interior of the beam-column casting frame 9 and the fourth supporting steel bars 17 are connected to the third supporting steel bars 7, and the steel bar skeleton can improve the strength of the concrete after solidification that enters the beam-column casting frame 9.

[0047] Furthermore, in this embodiment, the surfaces of the pier casting frame 5 and the beam casting frame 9 are provided with a UHPFRC coating 8. The setting of the UHPFRC coating 8 improves the effect of the pier casting frame 5 and the beam casting frame 9 in resisting water erosion when used in a cross-river bridge, or in resisting wind and sand erosion when used in a desert area. UHPFRC refers to ultra-high performance fiber reinforced concrete, which is a new type of concrete material with excellent performance and characteristics. It is usually used in engineering projects requiring high strength, high durability and high crack resistance. It has very high compressive strength and tensile strength. Due to its high density and optimized microstructure, UHPFRC has excellent durability and can resist long-term stress and environmental erosion. After adding fiber reinforcement materials, UHPFRC has excellent crack resistance and can effectively slow down the expansion and development of cracks.

[0048] like Figure 4 As shown, the working principle of the bridge pier in this embodiment is as follows:

[0049] First, the pile foundation 1 is hoisted into the excavated installation pit. After the hoisting is completed, the pile foundation 1 is buried. After the burial is completed, the limit rod 12 is rotated to make its end part disengage from the clamping hole 11. At this time, the lifting plate 10 is in a movable state; then, concrete is poured into the pier column casting frame 5. When the concrete falls into the upper surface of the lifting plate 10, as more and more concrete is poured, the weight becomes heavier and heavier. The lifting plate 10 moves downward under the gravity of the concrete. The downward movement of the lifting plate 10 drives the first piston rod 3 to retract. Since the first piston rod 3 retracts and squeezes the medium oil in the first hydraulic chamber 14 and the second hydraulic chamber 24, the second piston rod 18 is forced to extend and insert into the soil with the cone block 15;

[0050] During the movement of the cone block 15, the folding cloth 19 and the connecting steel bars 20 will be driven to move synchronously, so that the folding cloth 19 is unfolded, and the connecting steel bars 20 enter the space formed by the folding cloth 19, the cone block 15 and the storage cavity 16; at the same time, the concrete entering the connecting cavity 2 will enter the space formed by the folding cloth 19, the cone block 15 and the storage cavity 16 through the guide cavity 13 and finally solidify in the space, and the connecting steel bars 20 are pre-embedded in the concrete; because the pier casting frame 5 and the beam casting frame 9 are connected, the concrete poured into the pier casting frame 5 will also enter the beam casting frame 9, completing the pouring of the concrete in the beam casting frame 9.

[0051] During the concrete pouring process, as more and more concrete is poured, the squeezing force of the first piston rod 3 on the medium oil becomes greater and greater, and the driving force obtained by the cone block 15 also becomes greater, which can ensure that the second piston rod 18 can be fully extended and the cone block 15 has sufficient driving force to be inserted into the soil.

[0052] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A bridge pier capable of resisting impact and erosion, characterized in that: include: A pile foundation (1), wherein the pile foundation (1) is provided with a connecting chamber (2), a first hydraulic chamber (14) and a second hydraulic chamber (24), wherein the connecting chamber (2) is located above the first hydraulic chamber (14), and a plurality of second hydraulic chambers (24) are arranged along the circumference of the pile foundation (1) and are all connected to the lower end of the first hydraulic chamber (14); a first piston rod (3) is provided in the first hydraulic chamber (14), a lifting plate (10) is provided in the connecting chamber (2), and the lifting plate (10) is connected to the first piston rod (3); a second piston rod (18) is provided in the second hydraulic chamber (24), and the second piston rod (18) is connected to a cone block (15); A pier column casting frame (5), the pier column casting frame (5) being arranged on the pile foundation (1) and the interior of which is in communication with the connection cavity (2), and the surface of the pier column casting frame (5) being provided with a UHPFRC coating (8); The first hydraulic chamber (14) and the second hydraulic chamber (24) are filled with medium oil. In an initial state, the first piston rod (3) is in an extended state and the second piston rod (18) is in a retracted state. Concrete is poured into the interior of the pier column pouring frame (5) and the connecting chamber (2). The poured concrete acts on the lifting plate (10) to retract the first piston rod (3), and the second piston rod (18) extends with the cone block (15) and is inserted into the soil. The pile foundation (1) is provided with a storage cavity (16) for accommodating the cone block (15); a folding cloth (19) is provided between the storage cavity (16) and the cone block (15); the storage cavity (16) and the connecting cavity (2) are connected via a guide cavity (13); the folding cloth (19) can be extended and retracted along with the cone block (15); concrete poured in the connecting cavity (2) enters into a space formed by the folding cloth (19), the cone block (15) and the storage cavity (16) via the guide cavity (13).

2. The impact-resistant and erosion-resistant bridge pier according to claim 1, characterized in that: The pile foundation (1) is provided with a receiving chute (22) connected to the receiving chamber (16); the length direction of the receiving chute (22) is parallel to the movement direction of the second piston rod (18); a connecting steel bar (20) is movably provided in the receiving chute (22); one end of the connecting steel bar (20) close to the cone block (15) is fixedly connected to the cone block (15).

3. The impact-resistant and erosion-resistant bridge pier according to claim 2, characterized in that: When the second piston rod (18) is fully extended with the cone block (15), the connecting steel bar (20) and the receiving chute (22) do not separate; a gap is left between the connecting steel bar (20) and the receiving chute (22) to allow concrete to flow through.

4. The impact-resistant and erosion-resistant bridge pier according to any one of claims 1 to 3, characterized in that: It also comprises a limiting rod (12) movably arranged on the pile foundation (1), and a clamping hole (11) is provided on the lifting plate (10); the end of the limiting rod (12) is inserted into the clamping hole (11) to limit the lifting plate (10) in the initial state.

5. The impact-resistant and erosion-resistant bridge pier according to claim 4, characterized in that: The pile foundation (1) is provided with an internal thread ring (4), the limiting rod (12) is provided with an external thread (23), the limiting rod (12) is arranged in the internal thread ring (4) and the two are threadedly connected.

6. The impact-resistant and erosion-resistant bridge pier according to any one of claims 1 to 3, characterized in that: It also includes N first supporting steel bars (6) located inside the pier column casting frame (5), the lower ends of the first supporting steel bars (6) extending into the connecting cavity (2) and fixedly connected to the bottom surface of the connecting cavity (2); the lifting plate (10) is correspondingly provided with N guide holes, and the lifting plate (10) is movably mounted on the first supporting steel bars (6) through the guide holes, wherein N is a natural number greater than or equal to 1.

7. The impact-resistant and erosion-resistant bridge pier according to claim 6, characterized in that: A plurality of transverse steel bar groups are arranged at vertical intervals inside the pier column casting frame (5), and the transverse steel bar groups are connected to the first supporting steel bars (6).

8. The impact-resistant and erosion-resistant bridge pier according to any one of claims 1 to 3, characterized in that: It also comprises a beam-column casting frame (9), wherein a steel bar skeleton is provided inside the beam-column casting frame (9), and the beam-column casting frame (9) is arranged on the pier-column casting frame (5), and the two are interconnected.

9. The impact-resistant and erosion-resistant bridge pier according to claim 8, characterized in that: The surface of the beam-column casting frame (9) is provided with a UHPFRC coating (8).