A civil engineering pile foundation fixed structure

By using a combination of fixed control bracket, anti-capsulse barrier and push drive components in civil engineering pile foundations, the upper pulling force is detected and dealt with, and the stability of the pile foundation is solved under the buoyancy or freezing effect, and the pile foundation is realized Improved stability and safety.

CN118704462BActive Publication Date: 2024-11-08JILIN COMM POLYTECHNIC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411203280.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-08
Estimated Expiration
2044-08-30

AI Technical Summary

Technical Problem

When civil engineering pile foundations face the impact of natural disasters such as weak foundation, abundant groundwater and earthquakes, their stability and safety are threatened, especially the buoyancy or freezing effect caused by uplifting forces affects the stability of the pile foundation.

Method used

A civil engineering pile foundation fixed structure including fixed control bracket, anti-capsulation barrier, tensioned steel rope and pushing drive component was designed. The position status and water level changes of the pile basic body were detected by pulling up the detection component, and pushing was started. The pressure drive assembly increases the tension force of the steel rope to ensure the stability of the pile foundation.

Benefits of technology

It effectively avoids overturn caused by pulling force on the pile gene, improves the stability and safety of the pile foundation, simplifies the construction process, and provides convenience for subsequent operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118704462B_ABST
    Figure CN118704462B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of civil engineering pile foundations, and specifically to a civil engineering pile foundation fixing structure, comprising a fixed control bracket, and also comprising: an anti-overturning baffle frame, wherein the anti-overturning baffle frame is fixedly connected to the fixed control bracket, and a pile basic body is detachably installed in the anti-overturning baffle frame, and the pile basic body is connected to a ground anchor point through a plurality of tensioning steel ropes; and a fixed control mechanism, wherein the fixed control mechanism is respectively connected to the fixed control bracket and the anti-overturning baffle frame, and is respectively connected to the pile basic body and the tensioning steel rope, wherein the fixed control mechanism comprises a pull-out detection component and a push-drive component; the civil engineering pile foundation fixing structure of the present invention can avoid the problem that the pile basic body is affected by the pull-out force, thereby causing poor stability of the pile basic body, and is conducive to ensuring the stability of the pile basic body in subsequent operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering pile foundations, in particular to a civil engineering pile foundation fixing structure. Background Art

[0002] The pile foundation fixed structure of civil engineering is a vital component in civil engineering construction. As a commonly used deep foundation form in civil engineering, the stability and safety of the pile foundation are directly related to the quality and life of the entire project. The pile foundation consists of a pile and a pile cap connected to the top of the pile. Its working principle is to embed the pile body into the ground, use the friction between the pile and the soil and the bearing capacity of the pile end to transfer the load, thereby dispersing the load of the building into the underground soil layer to ensure the stability and safety of the building. However, in actual engineering, pile foundations often face challenges from various complex geological conditions and environmental factors, such as weak foundations, abundant groundwater, and the impact of natural disasters such as earthquakes, which will have an adverse effect on the stability and safety of the pile foundation.

[0003] The existing civil engineering pile foundation fixing structure is subjected to various external forces during use. Among them, when the upper structure of the pile foundation is subjected to upward pulling force, for example, for some areas with abundant groundwater, the change of groundwater level causes buoyancy or freezing effect, which will affect the stability of the pile foundation. It is necessary to resist this upward pulling force to maintain stability, otherwise it will be detrimental to subsequent operations. Therefore, in view of the above situation, it is urgent to develop a civil engineering pile foundation fixing structure to overcome the shortcomings in current practical applications. Summary of the invention

[0004] The object of the present invention is to provide a civil engineering pile foundation fixing structure to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A civil engineering pile foundation fixing structure includes a fixing control bracket and further includes:

[0007] An anti-overturning baffle frame, wherein the anti-overturning baffle frame is fixedly connected to the fixed control bracket, and a pile basic body is detachably installed in the anti-overturning baffle frame, and the pile basic body is connected to a ground anchor point through a plurality of tensioned steel ropes;

[0008] and a fixed control mechanism, the fixed control mechanism is respectively connected to the fixed control bracket and the anti-overturning baffle, and is respectively connected to the pile basic body and the tensioning steel rope, wherein the fixed control mechanism includes a pull-up detection component and a push drive component;

[0009] The pushing drive assembly is respectively connected to the fixed control bracket and the anti-overturning baffle, and is connected to the tensioning steel rope. The pulling-up detection assembly is connected to the pushing drive assembly and is detachably connected to the pile basic body, and the pulling-up detection assembly is also electrically connected to the pushing drive assembly.

[0010] As a further solution of the present invention: the push drive assembly includes:

[0011] A pushing driving member, wherein the pushing driving member is fixedly connected to the fixed control bracket;

[0012] A push-pull column, which is inserted into the fixed control bracket and slidably connected to the fixed control bracket, and is also fixedly connected to the output end of the push drive member;

[0013] and a telescopic movable unit, wherein the telescopic movable unit is respectively connected to the fixed control bracket and the anti-overturning baffle frame, and is connected to the push-pull column.

[0014] As a further solution of the present invention: the telescopic moving unit comprises:

[0015] An adjusting slide rail, wherein the number of the adjusting slide rails is multiple, and the multiple adjusting slide rails are all located between the fixed control bracket and the anti-overturning baffle frame, and are all fixedly connected to the fixed control bracket and the anti-overturning baffle frame;

[0016] A control sliding body, wherein the number of the control sliding bodies is two, and the two control sliding bodies are both slidably mounted on the adjustment slide rail and are located on both sides of the pile basic body, and the control sliding bodies are also fixedly connected to the push-pull column;

[0017] and a rope winding portion, wherein the rope winding portion is located on the control sliding body, wherein a plurality of the tensioning steel ropes pass through the rope winding portion.

[0018] As a further solution of the present invention: it also includes: arc-shaped slots, the number of which is equal to the number of the tensioning steel ropes, and a plurality of the arc-shaped slots are evenly arranged on the control sliding body and are detachably connected to the tensioning steel ropes.

[0019] As a further solution of the present invention: the pull-up detection assembly comprises:

[0020] A movable notch, the movable notch is provided on the control sliding body, and a telescopic card rod is slidably installed in the movable notch;

[0021] An upper pull detection roller, the upper pull detection roller is rotatably connected to the telescopic clamping rod and is rollingly connected to the side surface of the pile basic body, and the upper pull detection roller is also electrically connected to the pushing driving member;

[0022] And a return spring, the two ends of which are fixedly connected to the movable notch and the telescopic clamping rod respectively.

[0023] As a further solution of the present invention: the pull-up detection assembly further includes:

[0024] Rotating connecting rods, the number of the rotating connecting rods is two, the two rotating connecting rods are both rotatably mounted on the anti-overturning baffle frame, and the two rotating connecting rods are arranged in parallel;

[0025] Driving rods, the number of the driving rods is four, and the four driving rods are respectively mounted on the two control sliding bodies;

[0026] Active rod one and active rod two, the number of active rod one and active rod two are both two, wherein two ends of the two active rods one are respectively rotatably connected with two rotating connecting rods and two driving rods, and two active rods two are respectively rotatably connected with two rotating connecting rods and two driving rods;

[0027] And a position limiting and blocking unit, wherein the position limiting and blocking unit is respectively connected to the anti-overturning blocking frame and the rotating connecting rod.

[0028] As a further solution of the present invention: the position limiting blocking unit includes:

[0029] Positioning telescopic slots, the number of the positioning telescopic slots is four, and the four positioning telescopic slots are all opened on the anti-overturning baffle frame;

[0030] U-shaped lifting frames, the number of the U-shaped lifting frames is two, two tilting limit plates are fixedly mounted on each of the U-shaped lifting frames, and the two tilting limit plates on the same U-shaped lifting frame have opposite tilting directions, wherein the tilting limit plates are also slidably connected to the rotating connecting rod;

[0031] and a detection support rod, wherein the detection support rod is fixedly connected to the U-shaped lifting frame, and a buoyancy body is fixedly installed on the detection support rod, wherein the detection support rod is also electrically connected to the pushing driving member.

[0032] As a further solution of the present invention: it also includes: a supporting connecting rod, the supporting connecting rod is detachably connected to the anti-overturning baffle, and a protective sleeve is fixedly installed at the bottom end of the supporting connecting rod, and the protective sleeve is sleeved on the pile basic body;

[0033] an annular plate, the annular plate is sleeved on the protective sleeve and fixedly connected to the protective sleeve via a plurality of buffer springs;

[0034] And a protection component, wherein the protection component is connected to the protection sleeve and the annular plate respectively.

[0035] As a further solution of the present invention: the protection component includes:

[0036] A limiting slot, wherein the number of the limiting slots is multiple, the multiple limiting slots are evenly arranged on the annular plate, and a telescopic protective plate is inserted in each of the limiting slots, and the telescopic protective plate is slidably connected to the limiting slot;

[0037] An annular placement groove, which is opened on the side wall of the annular plate and is connected with the plurality of limiting slots;

[0038] an annular tension spring, the annular tension spring is located in the annular placement groove and passes through the plurality of telescopic protective plates;

[0039] And detection sensors, the number of the detection sensors is equal to the number of the telescopic protective plates, and the multiple detection sensors are fixedly mounted on the protective sleeve and are respectively arranged opposite to the multiple telescopic protective plates.

[0040] As a further solution of the present invention: it also includes: a through hole, the number of the through holes is multiple, the multiple through holes are all opened on the annular plate and are connected to the annular placement groove;

[0041] And a detection connecting rope, one end of which passes through the through hole and is fixedly connected to the annular tension spring, and the other end of which is fixedly connected to the tensioning steel rope.

[0042] Compared with the prior art, the present invention has the following beneficial effects:

[0043] During the construction process, the anti-overturning baffle is installed on the pile basic body at the specified position (since the present invention is mainly to overcome the problem of unstable pile foundation caused by factors such as uplift force generated by the pile basic body during use, and the buoyancy change caused by water level change is a more common factor, the pile basic body in the water position can be reinforced and protected, especially the position with deeper water level. Other positions can only use conventional pile foundation fixing structure as needed, which will not be elaborated here), and the fixed control bracket is fixedly connected to other components to form a fence support for the pile basic body to prevent the pile basic body from overturning. In addition, during the process of reinforcing the pile basic body with the anti-overturning baffle, the uplift detection component contacts the side wall of the pile basic body and extends into the accumulated water at the position where the pile basic body is located to detect the longitudinal direction of the pile basic body. The upward position state and the change of water level, under the joint detection effect of the two, can start the pushing drive component to increase the reinforcement effect on the pile basic body accordingly. For example, when the water level at the location where the pile basic body is located increases, it may cause buoyancy or freezing effect. At this time, if the pull-out detection component detects the upward pull-out trend of the pile basic body and the change of the buoyancy it is subjected to, it will control the push-out drive component to start, thereby increasing the tension of the tightening steel rope to ensure the stability of the pile basic body. At the same time, the tightening steel rope can also play a role in reinforcing the pile basic body to prevent the pile basic body from overturning. The operation is simple, and can avoid the problem of the pile basic body being affected by the upward pull force, resulting in poor stability of the pile basic body. It is beneficial to ensure the stability of the pile basic body in subsequent operations and provides convenience for the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a schematic diagram of the three-dimensional structure of the distribution of the tensioned steel ropes in an embodiment of the present invention.

[0045] Figure 2 It is a schematic diagram of the three-dimensional structure of the buoyancy body distribution in an embodiment of the present invention.

[0046] Figure 3 Schematic diagram of the top view of the fixed control bracket in the embodiment of the present invention.

[0047] Figure 4 It is a schematic diagram of the three-dimensional structure of the control sliding body in an embodiment of the present invention.

[0048] Figure 5 It is a schematic diagram of the three-dimensional structure of the anti-overturning baffle frame in an embodiment of the present invention.

[0049] Figure 6 It is a schematic diagram of the three-dimensional structure of the pull-up detection roller in an embodiment of the present invention.

[0050] Figure 7 Schematic diagram of the three-dimensional structure of the arc-shaped slot in an embodiment of the present invention.

[0051] Figure 8 It is a schematic diagram of the auxiliary structure of the protective sleeve in an embodiment of the present invention.

[0052] Fig. 9 Schematic diagram of the cross-sectional structure of the annular plate in the embodiment of the present invention.

[0053] In the figure: 1-fixed control bracket, 2-push drive member, 3-anti-overturning baffle, 4-pile basic body, 5-tensioning steel rope, 6-adjusting slide rail, 7-positioning telescopic slot, 8-U-shaped lifting frame, 9-detection support rod, 10-buoyancy body, 11-rotating connecting rod, 12-active rod one, 13-active rod two, 14-driving rod, 15-control sliding body, 16-active slot, 17-telescopic clamping rod, 18-pull-up detection roller, 19-push-pull column, 20-inclined limit plate, 21-rope winding part, 22-arc-shaped clamping groove, 23-reset spring, 24-support connecting rod, 25-protective sleeve, 26-detection sensor, 27-telescopic protective plate, 28-buffer spring, 29-through hole, 30-annular plate, 31-limiting slot, 32-detection connecting rope, 33-annular placement groove, 34-annular tension spring. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0056] See also Figure 1-Figure 9 , a civil engineering pile foundation fixing structure provided by an embodiment of the present invention includes a fixed control bracket 1, and also includes:

[0057] An anti-overturning baffle 3, wherein the anti-overturning baffle 3 is fixedly connected to the fixed control bracket 1, and a pile basic body 4 is detachably installed in the anti-overturning baffle 3, and the pile basic body 4 is connected to a ground anchor point through a plurality of tensioned steel ropes 5;

[0058] and a fixed control mechanism, the fixed control mechanism is respectively connected to the fixed control bracket 1 and the anti-overturning baffle 3, and is respectively connected to the pile basic body 4 and the tensioning steel rope 5, wherein the fixed control mechanism includes a pull-up detection component and a push drive component;

[0059] The pushing drive assembly is respectively connected to the fixed control bracket 1 and the anti-overturning baffle 3, and is connected to the tensioning steel rope 5. The pulling-up detection assembly is connected to the pushing drive assembly and is detachably connected to the pile basic body 4, and the pulling-up detection assembly is also electrically connected to the pushing drive assembly.

[0060] During the construction process, the anti-overturning retaining frame 3 is installed on the pile basic body 4 at the specified position (since the present invention is mainly to overcome the problem of unstable pile foundation caused by factors such as uplift force generated by the pile basic body 4 during use, and the buoyancy change caused by water level change is a more common factor, therefore, the pile basic body 4 in the water position can be reinforced and protected, especially the position with deeper water level, and other positions can only use conventional pile foundation fixing structure as needed, which will not be elaborated here), and the fixed control bracket 1 is fixedly connected to other components to form a surrounding support for the pile basic body 4 to prevent the pile basic body 4 from overturning. In addition, during the process of reinforcing the pile basic body 4 by the anti-overturning retaining frame 3, the uplift detection component contacts the side wall of the pile basic body 4 and will extend into the accumulated water at the position where the pile basic body 4 is located to detect the pile basic body 4 in the longitudinal direction. The position state in direction and the change of water level, under the joint detection action of the two, can start the pushing drive component to increase the reinforcement effect on the pile basic body 4 accordingly. For example, when the water level at the position where the pile basic body 4 is located increases, it may cause buoyancy or freezing effect. At this time, if the pulling-up detection component detects the pulling-up trend of the pile basic body 4 and the change of the buoyancy it is subjected to, it will control the pushing drive component to start, thereby increasing the tension of the tensioning steel rope 5 to ensure the stability of the pile basic body 4. At the same time, the tensioning steel rope 5 can also play a role in reinforcing the pile basic body 4 to prevent the pile basic body 4 from overturning. The operation is simple, and can avoid the problem that the pile basic body 4 is affected by the pulling force, thereby causing the pile basic body 4 to have poor stability. It is beneficial to ensure the stability of the pile basic body 4 in subsequent operations and provides convenience for the staff.

[0061] In one embodiment of the present invention, see Figure 1-Figure 9 , the push drive assembly comprises:

[0062] A pushing driving member 2, wherein the pushing driving member 2 is fixedly connected to the fixed control bracket 1;

[0063] A push-pull column 19, wherein the push-pull column 19 is inserted into the fixed control bracket 1 and is slidably connected to the fixed control bracket 1, and the push-pull column 19 is also fixedly connected to the output end of the push driving member 2;

[0064] And a telescopic moving unit, which is respectively connected to the fixed control bracket 1 and the anti-overturning bracket 3, and is connected to the push-pull column 19.

[0065] The telescopic moving unit comprises:

[0066] An adjusting slide rail 6, wherein the number of the adjusting slide rails 6 is multiple, and the multiple adjusting slide rails 6 are all located between the fixed control bracket 1 and the anti-overturning baffle 3, and are all fixedly connected to the fixed control bracket 1 and the anti-overturning baffle 3;

[0067] A control sliding body 15, wherein the number of the control sliding bodies 15 is two, and the two control sliding bodies 15 are both slidably mounted on the adjustment slide rail 6 and are located on both sides of the pile basic body 4, and the control sliding bodies 15 are also fixedly connected to the push-pull column 19;

[0068] and a rope winding portion 21 , wherein the rope winding portion 21 is located on the control sliding body 15 , wherein a plurality of the tensioning steel ropes 5 pass through the rope winding portion 21 .

[0069] It also includes: arc-shaped slots 22 , the number of which is equal to the number of the tensioning steel ropes 5 , and a plurality of the arc-shaped slots 22 are evenly arranged on the control sliding body 15 and are detachably connected to the tensioning steel ropes 5 .

[0070] When a water level change is detected or the pile basic body 4 is subject to an upward pulling trend, the push-pull drive member 2 will start and push the push-pull column 19 to slide on the fixed control bracket 1, and the push-pull column 19 will push the control sliding body 15 to slide on the adjusting slide rail 6. In the process of controlling the movement of the sliding body 15, on the one hand, a part of the structure of the upward pulling detection component will be pressed tightly against the surface of the pile basic body 4, and on the other hand, the tensioning steel rope 5 located in the arc-shaped slot 22 will gradually be in a tensioned state, and the tension will gradually increase. Since multiple tensioning steel ropes 5 are respectively located on both sides of the pile basic body 4, the tensioning steel ropes 5 will not only tighten the pile basic body 4, but also overcome the upward pulling force on the pile basic body 4, thereby ensuring the stability of the pile basic body 4 and ensuring the smooth progress of subsequent operations.

[0071] In one embodiment of the present invention, see Figure 1-Figure 9 , the pull-up detection component comprises:

[0072] A movable notch 16, wherein the movable notch 16 is provided on the control sliding body 15, and a telescopic card rod 17 is slidably installed in the movable notch 16;

[0073] An upper pull detection roller 18, the upper pull detection roller 18 is rotatably connected to the telescopic clamping rod 17, and is rollingly connected to the side of the pile basic body 4, and the upper pull detection roller 18 is also electrically connected to the push driving member 2;

[0074] And a return spring 23, two ends of which are fixedly connected to the movable notch 16 and the telescopic clamping rod 17 respectively.

[0075] See also Figure 1-Figure 9 , the pull-up detection component also includes:

[0076] A rotating connecting rod 11, wherein the number of the rotating connecting rods 11 is two, and both of the two rotating connecting rods 11 are rotatably mounted on the anti-overturning baffle 3, and the two rotating connecting rods 11 are arranged in parallel;

[0077] A driving rod 14, wherein the number of the driving rods 14 is four, and the four driving rods 14 are respectively mounted on the two control sliding bodies 15;

[0078] The movable rod 1 12 and the movable rod 2 13, the number of the movable rod 1 12 and the movable rod 2 13 are both two, wherein the two ends of the two movable rods 12 are respectively rotatably connected to the two rotating connecting rods 11 and the two driving rods 14, and the two movable rods 2 13 are respectively rotatably connected to the two rotating connecting rods 11 and the two driving rods 14;

[0079] And a position limiting and blocking unit, wherein the position limiting and blocking unit is connected to the anti-overturning blocking frame 3 and the rotating connecting rod 11 respectively.

[0080] The position limiting and blocking unit comprises:

[0081] Positioning telescopic slots 7, the number of the positioning telescopic slots 7 is four, and the four positioning telescopic slots 7 are all opened on the anti-overturning baffle 3;

[0082] A U-shaped lifting frame 8, wherein the number of the U-shaped lifting frames 8 is two, and two tilting limit plates 20 are fixedly mounted on each of the U-shaped lifting frames 8, and the tilting directions of the two tilting limit plates 20 on the same U-shaped lifting frame 8 are opposite, wherein the tilting limit plates 20 are also slidably connected to the rotating connecting rod 11;

[0083] And a detection support rod 9, wherein the detection support rod 9 is fixedly connected to the U-shaped lifting frame 8, and a buoyancy body 10 is also fixedly installed on the detection support rod 9, wherein the detection support rod 9 is also electrically connected to the pushing driving member 2.

[0084] During the inspection of the pile basic body 4, as the water level increases, the buoyancy body 10 will gradually be immersed in the water. As the length of the buoyancy body 10 entering the water is different, the buoyancy effect generated by the buoyancy body 10 is also different. At this time, under the action of buoyancy, the buoyancy body 10 will push the inspection support rod 9 and the U-shaped lifting frame 8 to move upward, and make the two inclined limit plates 20 squeeze on both sides of the rotating connecting rod 11 respectively, wherein the U-shaped lifting frame 8 can be slidably connected with the fixed control bracket 1 or the anti-overturning baffle 3, and adopts the existing sliding matching form to ensure that the U-shaped lifting frame 8 moves upward smoothly, and can only move in the longitudinal direction. No more details are given here. The rotating connecting rod 1 is adjusted by the inclined limit plate 20. 1 can prevent the rotating connecting rod 11 from rotating, and can ensure the stable pulling force of the tightening steel rope 5 on the pile basic body 4. Since one side of the inclined limiting plate 20 is in the form of an inclined surface, when the inclined limiting plate 20 cannot continue to move upward, as the length of the buoyancy body 10 immersed in the water increases, the buoyancy effect on the buoyancy body 10 will also increase, and the sensor on the detection support rod 9 will detect the buoyancy size of the buoyancy body 10. When the detected value is greater than the set value, the pushing driving member 2 will start working to push the control sliding body 15 to move in the direction of the pile basic body 4. At this time, the tightening steel rope 5 will be further tightened. In addition, the rotating connecting rod 11 will also rotate counterclockwise (such as Figure 3As shown), and rotates a very small angle, at this time, the buoyancy body 10 will push the inclined limit plate 20 to continue to move upward, so that the detection value of the detection support rod 9 will also be less than the set value, so that the overall equipment can stay in a suitable position according to the height of the water level, so that the tensioning steel rope 5 can provide a suitable pulling force on the pile basic body 4, thereby ensuring the stability of the pile basic body 4 during use (the higher the water level, the greater the degree of tensioning of the tensioning steel rope 5, until the maximum tensioning degree is reached. At this time, if the water level continues to rise, the pressing force of the inclined limit plate 20 on the rotating connecting rod 11 will also be greater, thereby forming a good limiting effect on the rotating connecting rod 11 to ensure the tensioning effect of the tensioning steel rope 5 on the pile basic body 4). The above is the action of slowly tightening the tensioning steel rope 5 as the water level gradually increases. However, if the water level has not reached a very high level, but the stability of the pile basic body 4 is threatened, at this time, because the upward pull detection roller 18 is under the thrust of the control sliding body 15 and in the reset spring Under the elastic action of the spring 23, it is always pressed against the surface of the pile basic body 4. Among them, a pressure sensor and a rotation detection sensor 26 are arranged on the U-shaped lifting frame 8, which are used to detect the slight rotation and vibration of the pulling detection roller 18. As the water level is higher (the stronger the pulling effect of the accumulated water on the pile basic body 4 is), the closer the position of the control sliding body 15 is to the pile basic body 4, the greater the pressure of the pulling detection roller 18 on the surface of the pile basic body 4, and the higher the detection accuracy. When the pile basic body 4 shows a tendency to pull up (such as slight movement or vibration), it means that although the water level has not reached a very high level, it has affected the stability of the pile basic body 4. At this time, the pulling detection roller 18 will control the push drive 2 to start, and make the tensioning degree of the tensioning steel rope 5 immediately reach the maximum, so as to ensure the stability of the pile basic body 4 during use. Through the above two control methods for the tensioning degree of the tensioning steel rope 5, the stability of the pile basic body 4 can be fully guaranteed and the safety of the equipment during use can be improved.

[0085] In one embodiment of the present invention, see Figure 1-Figure 9 , further comprising: a supporting link 24, the supporting link 24 being detachably connected to the anti-overturning baffle 3, and a protective sleeve 25 being fixedly mounted on the bottom end of the supporting link 24, the protective sleeve 25 being sleeved on the pile basic body 4;

[0086] an annular plate 30, the annular plate 30 is sleeved on the protective sleeve 25 and fixedly connected to the protective sleeve 25 via a plurality of buffer springs 28;

[0087] And a protection component, wherein the protection component is connected to the protection sleeve 25 and the annular plate 30 respectively.

[0088] The protection component comprises:

[0089] A plurality of limit slots 31 are provided, and the plurality of limit slots 31 are evenly arranged on the annular plate 30, and a telescopic protective plate 27 is inserted into each of the limit slots 31, and the telescopic protective plate 27 is slidably connected to the limit slots 31;

[0090] An annular placement groove 33, which is formed on the side wall of the annular plate 30 and communicates with the plurality of limiting slots 31;

[0091] an annular tension spring 34, the annular tension spring 34 is located in the annular placement groove 33 and passes through the plurality of telescopic protective plates 27;

[0092] And detection sensors 26 , the number of the detection sensors 26 is equal to the number of the telescopic protective plates 27 , and the plurality of detection sensors 26 are fixedly mounted on the protective sleeve 25 and are respectively arranged opposite to the plurality of telescopic protective plates 27 .

[0093] It also includes: a through hole 29, the number of the through holes 29 is multiple, and the multiple through holes 29 are all opened on the annular plate 30 and communicated with the annular placement groove 33;

[0094] And a detection connecting rope 32, one end of the detection connecting rope 32 passes through the through hole 29 and is fixedly connected to the annular tension spring 34, and the other end of the detection connecting rope 32 is fixedly connected to the tensioning steel rope 5.

[0095] When the water level at the location where the pile basic body 4 is located is high, the environment of the part of the pile basic body 4 in the water is more complicated, the force is also more complicated, and it is not convenient for the staff to check. The above factors will also affect the stability of the pile basic body 4 during use. Therefore, according to the needs of the use position, the support link 24 can be fixedly installed below the anti-overturning baffle 3 by bolt connection, and the protective sleeve 25 is located in the water and sleeved on the pile basic body 4 to protect the part of the pile basic body 4 in the water. When a foreign object moves in the direction of the pile basic body 4, it will first contact with a certain extension The telescopic protective plate 27 contacts the retractable protective plate 27, wherein the outer side of the telescopic protective plate 27 is in the form of an arc-shaped plate. When the telescopic protective plate 27 is subjected to a thrust, the telescopic protective plate 27 will move in the limit slot 31 toward the pile basic body 4. At this time, the telescopic protective plate 27 will pull the annular tension spring 34 to extend (wherein the annular tension spring 34 can also be in the form of an elastic band). In the process of gradual extension and elongation, the annular tension spring 34 will not only play a buffering role, but also pull the tensioning steel rope 5 through the detection connecting rope 32, so that the tensioning steel rope 5 further tightens the pile basic body 4, so as to ensure that the pile is in a stable state. When the basic body 4 is about to be impacted, the stability of the pile basic body 4 is improved. In addition, the buffer spring 28 corresponding to the impacted part of the annular plate 30 may also shrink to further buffer the impact. If the impact of foreign matter is offset by the elastic action of the buffer spring 28 and the annular tension spring 34, the pile basic body 4 can be protected (in addition, when the annular tension spring 34 is stretched, the multiple detection connecting ropes 32 are all subjected to tension, so that the multiple tensioning steel ropes 5 can also be simultaneously tightened on the pile basic body 4, so that the multiple tensioning steel ropes 5 can be subjected to approximately Even, and can fully guarantee the stability of the pile basic body 4 when hit), if the impact is large, the telescopic protective plate 27 moves toward the direction of the pile basic body 4 and contacts with the detection sensor 26. Since the number of the detection sensors 26 and the telescopic protective plate 27 are both multiple and relatively arranged, the number and position of the detection sensors 26 can be used to start the work, so as to intuitively understand the impact position and impact force of the pile basic body 4 in the underwater part, thereby facilitating the staff to respond in time and adopt corresponding measures to ensure the stability of the pile basic body 4 to avoid overturning or damage.

[0096] It should be noted that in the present invention, unless otherwise clearly specified and limited, the terms "slide", "rotate", "fix", "have" and the like should be understood in a broad sense, for example, it can be a welding connection, a bolt connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0097] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A civil engineering pile foundation fixed structure, comprising a fixed control bracket, It is characterized in that Also includes: An anti-overturning baffle frame, wherein the anti-overturning baffle frame is fixedly connected to the fixed control bracket, and a pile basic body is detachably installed in the anti-overturning baffle frame, and the pile basic body is connected to a ground anchor point through a plurality of tensioned steel ropes; and a fixed control mechanism, the fixed control mechanism is respectively connected to the fixed control bracket and the anti-overturning baffle, and is respectively connected to the pile basic body and the tensioning steel rope, wherein the fixed control mechanism includes a pull-up detection component and a push drive component; The pushing drive assembly is respectively connected to the fixed control bracket and the anti-overturning baffle, and is connected to the tensioning steel rope; the pulling detection assembly is connected to the pushing drive assembly and is detachably connected to the pile basic body, and the pulling detection assembly is also electrically connected to the pushing drive assembly; The pushing drive assembly comprises: a pushing drive member, the pushing drive member is fixedly connected to the fixed control bracket; A push-pull column, which is inserted into the fixed control bracket and slidably connected to the fixed control bracket, and is also fixedly connected to the output end of the push drive member; and a telescopic movable unit, wherein the telescopic movable unit is respectively connected to the fixed control bracket and the anti-overturning bracket, and is connected to the push-pull column; The telescopic moving unit comprises: an adjusting slide rail, the number of the adjusting slide rails is multiple, the multiple adjusting slide rails are all located between the fixed control bracket and the anti-overturning bracket, and are all fixedly connected to the fixed control bracket and the anti-overturning bracket; A control sliding body, wherein the number of the control sliding bodies is two, and the two control sliding bodies are both slidably mounted on the adjustment slide rail and are located on both sides of the pile basic body, and the control sliding bodies are also fixedly connected to the push-pull column; and a rope winding portion, the rope winding portion being located on the control sliding body, wherein a plurality of the tensioning steel ropes pass through the rope winding portion; It also includes: arc-shaped card slots, the number of which is equal to the number of the tensioning steel ropes, and a plurality of the arc-shaped card slots are evenly arranged on the control sliding body and are detachably connected to the tensioning steel ropes; The pull-up detection assembly comprises: a movable notch, the movable notch is provided on the control sliding body, and a telescopic card rod is slidably installed in the movable notch; An upper pull detection roller, the upper pull detection roller is rotatably connected to the telescopic clamping rod and is rollingly connected to the side surface of the pile basic body, and the upper pull detection roller is also electrically connected to the pushing driving member; and a return spring, the two ends of which are fixedly connected to the movable notch and the telescopic clamping rod respectively; The pull-up detection assembly further includes: a rotating connecting rod, the number of the rotating connecting rods is two, the two rotating connecting rods are both rotatably mounted on the anti-overturning baffle frame, and the two rotating connecting rods are arranged in parallel; Driving rods, the number of the driving rods is four, and the four driving rods are respectively mounted on the two control sliding bodies; Active rod one and active rod two, the number of active rod one and active rod two are both two, wherein two ends of the two active rods one are respectively rotatably connected with two rotating connecting rods and two driving rods, and two active rods two are respectively rotatably connected with two rotating connecting rods and two driving rods; and a position limiting and blocking unit, wherein the position limiting and blocking unit is respectively connected to the anti-overturning blocking frame and the rotating connecting rod; The position limiting and blocking unit comprises: a positioning telescopic slot, the number of the positioning telescopic slots is four, and the four positioning telescopic slots are all opened on the anti-overturning blocking frame; U-shaped lifting frames, the number of the U-shaped lifting frames is two, two tilting limit plates are fixedly mounted on each of the U-shaped lifting frames, and the two tilting limit plates on the same U-shaped lifting frame have opposite tilting directions, wherein the tilting limit plates are also slidably connected to the rotating connecting rod; and a detection support rod, wherein the detection support rod is fixedly connected to the U-shaped lifting frame, and a buoyancy body is fixedly installed on the detection support rod, wherein the detection support rod is also electrically connected to the pushing driving member.

2. The civil engineering pile foundation fixing structure according to claim 1, It is characterized in that It also includes: a supporting connecting rod, the supporting connecting rod is detachably connected to the anti-overturning blocking frame, and a protective sleeve is fixedly installed on the bottom end of the supporting connecting rod, and the protective sleeve is sleeved on the pile basic body; an annular plate, the annular plate is sleeved on the protective sleeve and fixedly connected to the protective sleeve via a plurality of buffer springs; And a protection component, wherein the protection component is connected to the protection sleeve and the annular plate respectively.

3. The civil engineering pile foundation fixing structure according to claim 2, It is characterized in that The protection component comprises: A limiting slot, wherein the number of the limiting slots is multiple, the multiple limiting slots are evenly arranged on the annular plate, and a telescopic protective plate is inserted in each of the limiting slots, and the telescopic protective plate is slidably connected to the limiting slot; An annular placement groove, which is opened on the side wall of the annular plate and is connected with the plurality of limiting slots; an annular tension spring, the annular tension spring is located in the annular placement groove and passes through the plurality of telescopic protective plates; And detection sensors, the number of the detection sensors is equal to the number of the telescopic protective plates, and the multiple detection sensors are fixedly mounted on the protective sleeve and are respectively arranged opposite to the multiple telescopic protective plates.

4. The civil engineering pile foundation fixing structure according to claim 3, It is characterized in that Also includes: A through hole, wherein the number of the through holes is multiple, and the multiple through holes are all opened on the annular plate and are connected to the annular placement groove; And a detection connecting rope, one end of which passes through the through hole and is fixedly connected to the annular tension spring, and the other end of which is fixedly connected to the tensioning steel rope.