Oil-water well plugging method
By classifying and preparing different types of sealing agents according to the depth of the well condition and formation characteristics, combining ultrafine oil well cement and thixotropic gel, the problems of low sealing construction success rate and waste of materials in the existing technology are solved, and the problem of low sealing construction is achieved. It has a wide range of applications and efficient oil and water well sealing effect.
Patent Information
- Application Number
- CN202410653549.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-24
- Publication Date
- 2024-10-01
AI Technical Summary
The existing oil-water well sealing technology lacks special plugging agent products for different geological conditions, resulting in low sealing construction success rate, poor material waste and sealing effect. Different sealing plans need to be formulated under different oil conditions, and there is a lack of uniformity. solution.
Different types of sealing agents are prepared according to the well condition depth, porosity and leakage, such as GR-1, GR-2, GR-3 and GR-5 types, and ultrafine oil well cement and ultra-pulverized coal are used in combination with the formation characteristics. Materials such as ash, thixotropic gels form a sealing system that is suitable for different geological environments.
It improves the success rate of sealing construction, enhances the compressive strength and permeability of the plugging agent, has a wide range of application, and can effectively solve the sealing problems of leakage, high permeability and medium permeability formations, extends the validity period of the plugging agent, and reduces the material. waste.
Smart Images

Figure CN118728309A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of oil and water well plugging, and in particular relates to a method for plugging an oil and water well. Background Art
[0002] Oil and natural gas are buried in oil and gas layers tens to thousands of meters underground. To extract them, it is necessary to build an oil and gas channel between the ground and the underground oil and gas layer. This channel is the well.
[0003] After searching, it was found that the application number is: CN202022418281.6, an oil and water well plugging device, and its content is: The present invention discloses an oil and water well plugging device, the present invention includes a faucet, a material holding barrel and a control assembly, the faucet is sequentially connected to the material holding barrel and the control assembly; the transmission guide wheel includes a lateral guide wheel and a central guide wheel, and a dynamometer is also installed in the cable that suspends the central guide wheel; the control assembly is provided with an injection outer cylinder, a sliding sleeve and a striker sleeve, the body of the sliding sleeve is provided with a sliding sleeve overflow port, the body of the injection outer cylinder is provided with an external overflow port, the sliding sleeve is installed in the injection outer cylinder above the shear pin, the striker sleeve is fixed in the injection outer cylinder below the shear pin, and the striker is installed in the striker sleeve; one end of the material holding barrel suspension cable is connected to the power device, and the other end is connected to the faucet after passing between the lateral guide wheel and the central guide wheel. The present invention uses a material barrel to transmit through a cable, has a fast construction speed, and reduces the labor intensity of operators; not only can ash covering operations be achieved, but also sand filling operations can be achieved, the construction efficiency is greatly improved, and there is no risk of pipe column getting stuck.
[0004] 1) At present, the main plugging agents used for plugging in old oil fields are: pure oil well cement slurry, strong wall plugging agent, composite plugging agent, etc. The types of plugging agents are relatively single, and a series of plugging agent products for plugging layer well conditions have not been formed; the plugging scheme design and plugging agent type selection, construction process control and effect tracking and evaluation are seriously disconnected, which is not conducive to improving the success rate of plugging construction, and easily leads to poor plugging construction effect, short validity period and waste of materials in some oil and water wells;
[0005] In addition, the different oil produced by the oil and water wells and the different regions will result in different essential differences in the way of oil plugging, and the specific plans used to plug the wellhead will also be different. Therefore, further methods are needed to formulate geological plugging plans for the soil conditions of oil fields in different regions.
[0006] Therefore, it is necessary to design and operate a method for plugging oil and water wells. Summary of the invention
[0007] The present invention provides a method for plugging an oil and water well, comprising the following steps:
[0008] S1: Classify the formations according to the depth, porosity and leakage of the target layer under different well conditions:
[0009] S2: Use different plugging agents according to different reservoir permeabilities;
[0010] S3: Prepare a plugging agent codenamed GR-1 based on the materials for formation plugging:
[0011] S4: Prepare a plugging agent code-named GR-2 based on the material;
[0012] S5: Used to make the component substances corresponding to GR-3 according to the specific materials synthesized;
[0013] S6: Mixing a combination of profile control and water plugging agents code-named GR-5;
[0014] S7: synthesizing again using the synthesized blending composition according to the different geographical locations of specific oil and water wells;
[0015] S8: Add auxiliary materials according to the adaptability of different plugging agents.
[0016] S1 specifically includes: (1) leakage-deficient formations, (2) high-permeability formations, and (3) medium-permeability formations:
[0017] The leakage-deficient strata (1) are specifically manifested as areas where the plugging layer is deficient, low-pressure, and has serious leakage. The difficulty of operation is to establish different channels for pumping and circulating liquids according to the wellhead soil environment to facilitate the suction of liquids, but the environment in which the injected plugging agent can be adapted cannot be applied. The raw materials in the plugging process are too large, and the success rate of the plugging construction is not good at one time. The areas that require multiple filling and plugging operations to succeed are judged as leakage-deficient strata.
[0018] As oilfield development enters the middle and late stages, the number of oil and water wells that need to adjust the injection and production layers and the number of casing leaks increases year by year; with long-term water injection development, the remaining oil in the high permeability layer has dropped significantly. In the process of shifting to the utilization and exploitation of medium and low permeability layers and thin layers, some high permeability layers need to be plugged;
[0019] The plugging agent code-named GR-1 can be used for oil sealing processing in this geological section to solve the problem of plugging the oil and water wells drilled in the lost and deficient strata;
[0020] The high permeability formation (2): This type of plugging layer has excellent permeability, and its characteristic properties are: absorption can be ≥300L / min or more, and the clean water injection pump pressure is ≤6MPa. The technology used is mainly based on shallow reservoirs such as composite processing of materials and combined with a large-pore strong water absorption layer formed by long-term water injection. This type of formation has developed pores, and a large amount of plugging agents can be added to achieve liquid injection and guidance. The one-time success rate of plugging construction is less than 60%;
[0021] The plugging agent code-named GR-2 can be used for oil sealing processing in this geological section to maintain the shape of the specific oil and water well extraction channel to avoid the natural collapse of the oil port in this section and cause the oil port to be blocked;
[0022] The medium permeability formation (3): This type of formation has medium permeability, usually with an absorption capacity of 150-300L / min, and a clean water injection pump pressure of ≤12MPa. Specifically, it is mainly used in medium-deep formations within 1500-2500m. The requirements can be met by using general plugging agents, but the water loss and thickening time of the plugging agent need to be adjusted according to the formation conditions;
[0023] Different oil well GR-3 and GR-4 plugging agents can be used according to different geological areas to ensure the stability of the plugging port;
[0024] As a preferred solution of the present invention: S2 is specifically: can be divided into codes: GR-1, GR-2, GR-3 and GR-4.
[0025] As a preferred embodiment of the present invention: S3 is specifically: the GR-1: (1) is composed of tricalcium silicate, tricalcium aluminate, tetracalcium aluminoferrate, and a synthetic chemical additive reactant, and is processed into ultrafine oil well cement with a specification of 600-1000 mesh;
[0026] (2) The particle size of oil well cement should be less than 5 μm. The prepared oil well cement can be used in wellheads with narrow gaps of 0.25 mm, with a ratio of 94.6%. It is suitable for leaky and depleted formations with a plugging layer absorption of ≤150 L / min and an injection pump pressure of ≥15 MPa; the bearing strength after plugging is 20 MPa.
[0027] As a preferred solution of the present invention: the GR-2 is formulated as follows: a certain amount of ultrafine cement, a certain amount of ultra-oil well cement, a certain amount of ultra-fly ash and a coagulant are combined and prepared;
[0028] The corresponding range is: suitable for the treatment and plugging of medium and high permeability formations with clean water absorption of the plugging layer of 150-300L / min.
[0029] As a preferred embodiment of the present invention: the main components of the GR-3 are: oil well cement, silica powder, sodium moving soil, solid concrete plugging material and chemical plugging material are mixed and prepared to form a synthetic composition;
[0030] The scope of application is: suitable for high permeability layers with clean water absorption of the plugging layer >300L / min, injection pump pressure ≤6MPa, and geological environments with pressure above 8MPa after plugging.
[0031] As a preferred solution of the present invention: S6 is specifically: the raw materials used for material preparation are: composed of alkaline expanded particles, oil well cement, FH composite additives and water. Through hydration reaction, specific hydrated minerals are generated, which can solve the void area inside the soil. According to the hydration reaction, hydrated minerals with a certain strength are generated, which play a role in repairing the loose skeleton of the formation and blocking the inertial flow channels in the formation. For the oil well water discharge, the characteristics of the plugging agent are: hydrophilicity, hydration reaction in the formation to form solids, isolate the edge and bottom water, and achieve the purpose of water blocking in actual application. The plugging agent material will react chemically when encountering acidic substances, and can be used in the environment of removing the plugging agent from the formation, which is suitable for the purpose of filtering it out after the plugging is completed in the later stage.
[0032] As a preferred solution of the present invention: S7 is specifically: the raw materials for preparing the GR-5 profile control and water plugging agent are inorganic cementing particles, high alumina sand, quartz sand and activator mixed and compounded in a certain proportion;
[0033] It is suitable for plugging and consolidating sand in large physical deficits and serious leakage layers, and for leakage, high water content and sand production.
[0034] As a preferred solution of the present invention: S8 is specifically: thixotropic gel plugging agent: in order to solve the problem that the wellhead soil with loose shallow strata and large leakage volume cannot be mixed, a thixotropic gel plugging agent is used to increase the sealing performance of the plugging around the wellhead:
[0035] The specific values of the absorption amount to be used are: the absorption amount is greater than 300L / min, the injection pump pressure is less than 10MPa, the system quickly undergoes thixotropy and loses water, the viscosity increases, the fluidity deteriorates, retention occurs, and the plugging agent system agglomerates into agglomerates.
[0036] A method for plugging an oil and water well provided by the present invention:
[0037] 1) The GR-1 plugging material used can significantly accelerate its hydration speed, reduce water absorption, increase the compressive strength and flexural strength by nearly 1 times, and increase the stone's impermeability by 14 times compared with ordinary plugging materials;
[0038] 2) The particle size distribution range of GR-2 is relatively large, and the proportion of fine particles in the cement paste is increased, so that the ability of the plugging agent to penetrate fine cracks is enhanced. In addition, particles of different particle sizes can play a bridging role in high permeability layers, making the plugging agent have certain anti-leakage performance;
[0039] 3) The GR-3 plugging agent used has a strong wall-building property. When the slurry encounters a large-pore stratum skeleton during the flow process, it can quickly form a bridge at the inlet and on the surface of the skeleton to form a network structure; the consolidable granular substances of different particle sizes in the slurry then fill the gaps in the network structure. With the continuous increase of time and pressure difference, the wall-building layer begins to lose water and continues to thicken until it becomes a stone-like solid with considerable strength and toughness;
[0040] 4) With the advantages of good pumpability, plugging without killing, strong hydrophilicity, high strength, and wide application range, the isolation and deceleration gel plugging system is a new plugging system developed specifically for low-pressure, high-permeability, loose and high-water-content formations where plugging agents cannot plug, the strength is insufficient (low pressure bearing), and the damage is serious. The system can automatically stop the flow when entering the leakage layer, playing the role of "network building and bridge building", forming a "gel segment plug" that can isolate the internal fluid of the formation from the wellbore fluid, and the tail is followed by common plugging agents for sealing, ensuring that the plugging agent can stay in the near-well area and ensure the success of the plugging operation at one time;
[0041] 5) Isolation and deceleration gel plugging system is suitable for low-pressure, high-permeability loose and high-water-content formations. After the gel segment plug is established, conventional plugging agents are followed up to seal the thixotropic gelling plugging agent, which is suitable for the problem that the wellhead soil cannot be mixed in the loose shallow formation and the large leakage (absorption is greater than 300L / min, and the injection pump pressure is less than 10MPa). The resin plugging agent is suitable for formations with high pressure test requirements and has a significant effect on high-pressure and low-permeability formations. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 This is one of the synthetic diagrams of raw material ratios for different plugging of the GR-I oil field in Example 1 of the present invention;
[0043] Figure 2 This is a composite diagram of construction project materials for the GR-I oil field in Example 1 of the present invention;
[0044] Figure 3 This is a batching diagram for oil field construction effect in Example 1 of the present invention;
[0045] Figure 4 This is a synthetic diagram of the GR-II ratio of Example 2 of the present invention;
[0046] Figure 5 This is a composite picture of the construction effect of Example 2GR-II of the present invention;
[0047] Figure 6 This is a raw material formula diagram for the synthesis of GR-III in Example 3 of the present invention;
[0048] Figure 7 This is a graph showing the comprehensive actual effect of oil production of GR-III in Example 3 of the present invention;
[0049] Figure 8 The composition diagram of the synthetic formula of Example 3GR-III of the present invention;
[0050] Fig. 9 This is a material diagram of Example 3GR-III after solidification of the present invention;
[0051] Fig.10 This is a composition diagram of the components of Example 4GR-4 of the present invention;
[0052] Fig.11 It is a schematic diagram of the structure of the comprehensive oil production curve of Port 2-54-2 of Example 4 of the present invention;
[0053] Fig.12 This is a graph showing the actual oil recovery rate of the oil field of GR-4 in Example 4 of the present invention;
[0054] Fig.13 This is a composition diagram of the GR-4 medium in Example 4 of the present invention;
[0055] Fig.14 This is a diagram of the GR-4 gel plugging material according to Example 4 of the present invention;
[0056] Fig.15 This is a diagram showing the amount of GR-4 gel plugging resin added in Example 4 of the present invention;
[0057] Fig.16 This is a component curve diagram of the actual application of Example 4GR-4 of the present invention.
[0058] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work. DETAILED DESCRIPTION
[0059] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0060] Embodiment 1:
[0061] Please refer to the instruction manual Figure 1-Figure 3 A method for plugging an oil and water well is shown, S1: Classifying the formations according to the depth, porosity and leakage of the target layer under different well conditions:
[0062] It is divided into: (1) leakage-deficient formations, (2) high-permeability formations, and (3) medium-permeability formations:
[0063] The leakage-deficient strata (1) described above are specifically characterized as areas where the plugging layer is deficient, low-pressure, and has severe leakage. The difficulty of the operation can be established based on the specific wellhead soil environment. For the circulation channel of the extracted oil, it is characterized by suction and injection. The amount of plugging agent injected is large and the success rate of the plugging construction is extremely low. Generally, areas where multiple filling and plugging operations are required to succeed are all leakage-deficient strata.
[0064] As oilfield development enters the middle and late stages, the number of oil and water wells that need to adjust the injection and production layers and the number of casing leaks increases year by year; with long-term water injection development, the remaining oil in the high permeability layer has dropped significantly, and its utilization value has decreased. In the process of shifting to the utilization and production of medium and low permeability layers and thin layers, some high permeability layers need to be plugged;
[0065] The high permeability formation (2): This type of plugging layer has excellent permeability, and its characteristic properties are: absorption can be ≥300L / min or more, and the clean water injection pump pressure is ≤6MPa. The technology used is mainly based on shallow reservoirs such as composite processing of materials and combined with a large-pore strong water absorption layer formed by long-term water injection. This type of formation has developed pores, and a large amount of plugging agents can be added to achieve liquid injection and guidance. The one-time success rate of plugging construction is less than 60%;
[0066] The medium permeability formation (3) mentioned above: This type of formation has medium permeability, usually with an absorption capacity of 150-300L / min, and a clean water injection pump pressure of ≤12MPa. Specifically, it mainly relies on medium-deep formations within 1500-2500m. The requirements can be met by using general plugging agents, but the water loss and thickening time of the plugging agents need to be adjusted according to the formation conditions.
[0067] S2: Use different plugging agents according to different reservoir permeabilities;
[0068] It can be divided into codes: GR-1, GR-2, GR-3 and GR-4;
[0069] S3: Prepare a plugging agent codenamed GR-1 based on the materials for use as formation plugging:
[0070] The GR-1: (1) is composed of tricalcium silicate, tricalcium aluminate, tetracalcium aluminoferrate, and a synthetic chemical additive reactant and is processed into ultrafine oil well cement with a specification of 600-1000 mesh;
[0071] (2) The particle size of oil well cement should be less than 5 μm, and the achieved specification is that the percentage of particles passing through a narrow gap of 0.25 mm is 94.6%.
[0072] It is suitable for leaky and deficient formations with plugging layer absorption of ≤150L / min and squeeze pump pressure of ≥15MPa; the bearing pressure after plugging can reach 20MPa.
[0073] Embodiment 2:
[0074] Please refer to the instruction manual Figure 4-Figure 5 A method for plugging an oil and water well is shown, S4: the components of GR-2 are prepared as follows:
[0075] The GR-2: (2) is formulated as follows: a certain amount of ultrafine cement, a certain amount of ultra-oil well cement, a certain amount of ultra-fly ash and chemical additives;
[0076] The corresponding range is: suitable for the treatment and plugging of medium and high permeability formations with clean water absorption of the plugging layer of 150-300L / min.
[0077] Well Guan 2-29 is a production well in the Guan 29 block of Wangguantun Oilfield in Kongdian Structure, Huanghua Depression. The well was repaired and prepared for pump inspection. Due to the slurry before construction, it was suspected that the casing was leaking. The double seal leak detection result showed that the casing was leaking at 1893.98-1895.13m, and it was decided to plug the casing leak. The absorption volume was measured at 200L / min, 14Mpa. After consulting the test data, there was a water layer near the leak point. According to the on-site absorption volume results, 20 cubic meters of GR-2 plugging agent were used for plugging operations. The maximum construction pressure was 17Mpa, and the test pressure was 8Mpa.
[0078] Embodiment 3:
[0079] Please refer to the instruction manual Figure 6-Figure 9 A method for plugging an oil and water well is shown, S5: using the synthesized specific materials to prepare the components of GR-3. The synthesized components of GR-3 are:
[0080] The main components of the GR-3 are: oil well cement, silica powder, sodium moving soil, solid plugging material and chemical plugging material are mixed and prepared to form a synthetic composition;
[0081] The scope of application is: suitable for high permeability layers with clear water absorption of plugging layer>300L / min, injection pump pressure ≤6MPa, and pressure after plugging reaching more than 8MPa;
[0082] Among them, Gang 52-20K in the plan is located in Gangxi prospective fault block. Currently, it produces Guanyi 1-1 (1646.1-1656.0m), with a normal liquid volume of 14.32 cubic meters, a daily oil production of 0.67 tons, and a water content of 95.3%. In order to increase the production of this well, it is required to plug Guanyi 1-1 (1646.1-1656.0m) and open Guanyi 1-2 (1668.0-1671.0m). After the plugging, the pressure of the new layer is measured, and single production (1668.0-1671.0m) is carried out. The absorption volume of this well was seriously lost before plugging. 15 cubic meters of GR-3 plugging agent were used for plugging operations. The maximum construction pressure was 15MPA, and the test pressure of 8MPA was qualified. It is currently in normal production.
[0083] S6: Mix the combined materials of the profile control and water plugging agent code-named GR-5:
[0084] The raw materials used for material preparation are: alkaline expansion particles, oil well cement, FH composite additives and water. Through hydration reaction, specific hydrated minerals are generated. The effect achieved is that, according to the hydration reaction, hydrated minerals of a certain strength are generated, which play a role in repairing the loose skeleton of the formation and blocking the inertial flow channels in the formation. For the water produced by the oil well, GR-4 has hydrophilic ability and will chase the water. It will react with water in the formation to form solids, isolate the edge and bottom water, and play a role in water blocking. The plugging agent material is very easy to react with acid, which can remove the blockage of the formation by the plugging agent.
[0085] Embodiment 4:
[0086] Please refer to the instruction manual Figure 10-Figure 16 A method for plugging an oil and water well is shown, S7: according to the different geographical locations of the specific oil and water wells, the synthetic blending composition is used again to synthesize:
[0087] GR-5 profile control and water plugging agent is made by mixing inorganic cementing particles, high alumina sand, quartz sand and activator in a certain proportion;
[0088] The material is suitable for stable performance, no pollution to the environment, strong adaptability, high temperature resistance, controllable permeability and bonding strength, and can meet the requirements of measures under different well conditions. It is mainly suitable for plugging and consolidating sand in large solid deficits and serious leakage layers, and can effectively prevent leakage, high water content and sand production.
[0089] According to: Gang 2-54-2 is an example. The well is located in the fifth block of the second area of Gangdong Oilfield. The production well section is 1659.3-1763.4, and the production is 8mm. The daily liquid production is 41.1 cubic meters and the daily oil production is 1.07 tons. The production process was stopped, and the sand buried oil layer was found during the repair. The sand was flushed with 40m3 of clean water + 60m3 of liquid temporary plugging agent in positive circulation. The well section is 1684.33-1735.3m, the pump pressure is 2Mpa, the displacement is 20m3 / h, and the leakage is 30m3. It suddenly does not return when flushing to 1735.3m. Finally, 60m3 of anti-swelling sand-carrying fluid + 5.2T of sulphoaluminate plugging agent for oil production were used for positive extrusion plugging. Finally, 40m3 of clean water was used for positive circulation sand flushing. The well section is 1611.54-1816.67m, the pump pressure is 2Mpa, the displacement is 20m3 / h, and 2.48m3 of sand is returned. After the well implemented intralayer plugging, the daily oil production increased from 1.07 tons to 3.37 tons, and the water content dropped from 97.4% to 91.2%, with a daily increase of 2.3 tons.
[0090] S8: Auxiliary additive ingredients:
[0091] Thixotropic gel plugging agent: A thixotropic plugging agent is a thin fluid under the action of shear force. After the shear force disappears, it thickens quickly to form a gel structure with a certain supporting effect. This process is reversible. It is mainly used to solve the problem that the wellhead soil with loose shallow strata and large leakage cannot be mixed (absorption capacity is greater than 300L / min, injection pump pressure is less than 10MPa). The system has a strong thixotropic sensitivity when entering the leakage layer. The system quickly undergoes thixotropy and loses water, the viscosity increases, the fluidity deteriorates, and the retention occurs. The plugging agent system agglomerates into agglomerates to avoid large-scale loss of slurry and inability to form plugs, improve the pressure-bearing capacity after plugging, and ensure the effectiveness of plugging.
[0092] Well 8-15-2 is a production well located in the Zao 21 block of Zilaitun Oilfield. It was repaired and pumped. After the repair in August 2020, the 116mm well was drilled to 1885m, and the packer was lowered to 1534.1m. The casing was tested at 20MPa and passed. The sand surface is currently 1663m, and the absorption is measured at 8MPa, 200L / min; 10MPa does not rise, 260L / min; after consultation with the oil production plant, it was decided to use a thixotropic gel system 8m 3 The plugging operation was carried out. The highest squeeze pump pressure during the construction process was 16Mpa. After drilling, the pressure test was 8Mpa and passed. It is currently in normal production.
[0093] It is also necessary to prepare suitable materials, resin plugging agents, which are mainly composed of resin gel materials, Gangrui series plugging agents and composite additives. Resin gelling materials are polymers with a three-dimensional network structure formed by polymerization reactions. They have high strength, high elasticity, anti-shrinkage, improved interface bonding and other functions. They are an ideal annular space isolation material. Resin has no solid phase and can easily pass through the micropores of dense sandstone without solid particle bridging and blockage. It has been well applied in well repair to solve annular pressure and other aspects.
[0094] It is also necessary to prepare suitable materials, resin plugging agents, which are mainly composed of resin gel materials, Gangrui series plugging agents and composite additives. Resin gelling materials are polymers with a three-dimensional network structure formed by polymerization reaction. They have high strength, high elasticity, anti-shrinkage, improved interface bonding and other functions. They are an ideal annulus isolation material. Resin has no solid phase and can easily pass through the micropores of dense sandstone without solid particle bridging and blockage. It has been well applied in well repair and solving annulus pressure.
[0095] GR-1(Silica plugging agent for oil production)
[0096] Suitable for plugging operations in low-porosity and low-permeability formations, with a pressure strength greater than 20MPa
[0097] GR-2 (Silica plugging agent for oil production)
[0098] Suitable for plugging operations in medium permeability formations, with a pressure strength greater than 12MPa
[0099] GR-3 (Silica plugging agent for oil production)
[0100] Suitable for plugging operations in high permeability formations, with a pressure strength greater than 8MPa
[0101] GR-4 (carbonate plugging agent for oil production)
[0102] It is suitable for plugging and sealing operations in formations with serious leakage and loss and casing leaking wells. The pressure bearing strength is greater than 6MPa, and the pressure bearing increases by more than 5MPa for every meter.
[0103] GR-5 (Sulphoaluminate plugging agent for oil production)
[0104] It is suitable for plugging leaks and consolidating sand in strata with serious leakage and loss, and its pressure strength is greater than 5.6Mpa
[0105] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for plugging an oil and water well, characterized in that: The steps include: S1: Classify the formations according to the depth, porosity and leakage of the target layer under different well conditions: S2: Use different plugging agents according to different reservoir permeabilities; S3: Prepare a plugging agent codenamed GR-1 based on the materials for formation plugging: S4: Prepare a plugging agent code-named GR-2 based on the material; S5: Used to make the component substances corresponding to GR-3 according to the specific materials synthesized; S6: Mixing a combination of profile control and water plugging agents code-named GR-5; S7: synthesizing again using the synthesized blending composition according to the different geographical locations of specific oil and water wells; S8: Add auxiliary materials according to the adaptability of different plugging agents. S1 specifically includes: (1) leakage-deficient formations, (2) high-permeability formations, and (3) medium-permeability formations: The leakage-deficient strata (1) are specifically manifested as areas where the plugging layer is deficient, low-pressure, and has serious leakage. The difficulty of operation is to establish different channels for pumping and circulating liquids according to the wellhead soil environment to facilitate the suction of liquids, but the environment in which the injected plugging agent can be adapted cannot be applied. The raw materials in the plugging process are too large, and the success rate of the plugging construction is not good at one time. The areas that require multiple filling and plugging operations to succeed are judged as leakage-deficient strata. As oilfield development enters the middle and late stages, the number of oil and water wells that need to adjust the injection and production layers and have casing leaks increases year by year; After long-term water injection development, the remaining oil volume in high permeability layers has dropped significantly. When turning to the utilization and exploitation of medium-low permeability layers and thin layers, some high permeability layers need to be plugged; The plugging agent code-named GR-1 can be used for oil sealing processing in this geological section to solve the problem of plugging the oil and water wells drilled in the lost and deficient strata; The high permeability formation (2): This type of plugging layer has excellent permeability, and its characteristic properties are: absorption can be ≥300L / min or more, and the clean water injection pump pressure is ≤6MPa. The technology used is mainly based on shallow reservoirs such as composite processing of materials and combined with a large-pore strong water absorption layer formed by long-term water injection. This type of formation has developed pores, and a large amount of plugging agents can be added to achieve liquid injection and guidance. The one-time success rate of plugging construction is less than 60%; The plugging agent code-named GR-2 can be used for oil sealing processing in this geological section to maintain the shape of the specific oil and water well extraction channel to avoid the natural collapse of the oil port in this section and cause the oil port to be blocked; The medium permeability formation (3): This type of formation has medium permeability, usually with an absorption capacity of 150-300L / min, and a clean water injection pump pressure of ≤12MPa. Specifically, it is mainly used in medium-deep formations within 1500-2500m. The requirements can be met by using general plugging agents, but the water loss and thickening time of the plugging agent need to be adjusted according to the formation conditions; Different GR-3 and GR-4 plugging agents can be used for different oil wells according to different geological areas to ensure the stability of the plugging port.
2. The method for plugging an oil and water well according to claim 1, characterized in that: S2 can be specifically divided into codes: GR-1, GR-2, GR-3 and GR-4.
3. The method for plugging an oil and water well according to claim 1, characterized in that: S3 is specifically: the GR-1: (1) is composed of tricalcium silicate, tricalcium aluminate, tetracalcium aluminoferrate, and a synthetic chemical additive reactant, and is processed into ultrafine oil well cement with a specification of 600-1000 mesh; (2) The particle size of oil well cement should be less than 5 μm. The prepared oil well cement can be used in wellheads with narrow gaps of 0.25 mm, with a ratio of 94.6%. It is suitable for leaky and depleted formations with a plugging layer absorption of ≤150 L / min and an injection pump pressure of ≥15 MPa; the bearing strength after plugging is 20 MPa.
4. The method for plugging an oil and water well according to claim 1, characterized in that: S4 is specifically: the GR-2: the composition formula used is: a certain amount of ultrafine cement, a certain amount of ultra-oil well cement, a certain amount of ultra-fly ash and a coagulant are combined and prepared; The corresponding range is: suitable for the treatment and plugging of medium and high permeability formations with clean water absorption of the plugging layer of 150-300L / min.
5. The method for plugging an oil and water well according to claim 1, characterized in that: S5 is specifically: the main components of the GR-3 are: oil well cement, silica powder, sodium moving soil, solid concrete plugging material and chemical plugging material are mixed and prepared to form a synthetic composition; The scope of application is: suitable for high permeability layers with clean water absorption of the plugging layer >300L / min, injection pump pressure ≤6MPa, and geological environments with pressure above 8MPa after plugging.
6. The method for plugging an oil and water well according to claim 1, characterized in that: S6 is specifically: the raw materials used for material preparation are: alkaline expanded particles, oil well cement, FH composite additives and water. Through hydration reaction, specific hydrated minerals are generated, which can solve the void area inside the soil. According to the hydration reaction, hydrated minerals with a certain strength are generated, which play a role in repairing the loose skeleton of the formation and blocking the inertial flow channel in the formation. For the oil well water, the characteristics of the plugging agent are: hydrophilicity, hydration reaction in the formation to form solids, isolate the edge and bottom water, and achieve the purpose of water blocking in actual application. The plugging agent material will react chemically when encountering acidic substances, and can be used in the environment of removing the plugging agent from the formation, which is suitable for the purpose of filtering it out after the plugging is completed in the later stage.
7. The method for plugging an oil and water well according to claim 1, characterized in that: S7 is specifically: the raw materials for preparing the GR-5 profile control and water plugging agent are inorganic cementing particles, high-alumina sand, quartz sand and activator mixed and compounded in a certain proportion; It is suitable for plugging and consolidating sand in large physical deficits and serious leakage layers, and for leakage, high water content and sand production.
8. The method for plugging an oil and water well according to claim 1, characterized in that: S8 is specifically: thixotropic gel plugging agent: In order to solve the problem that the soil at the wellhead with loose shallow strata and large leakage cannot be mixed, thixotropic gel plugging agent is used to increase the sealing performance of the plugging around the wellhead: The specific values of the absorption amount to be used are: the absorption amount is greater than 300L / min, the injection pump pressure is less than 10MPa, the system quickly undergoes thixotropy and loses water, the viscosity increases, the fluidity deteriorates, retention occurs, and the plugging agent system agglomerates into agglomerates.
Citation Information
Patent Citations
Oil-water well plugging device
CN214007112U
Cited By
Method for blocking cracks of hydrogen storage cap based on mineralization of microorganisms and composite materials
CN119878060A