Inter-plane coal pillar recovery method and roadway filling equipment
Through the combination of the inter-face coal pillar recovery method and the tunnel filling equipment, the problems of unrecoverable coal pillars and poor tunnel stability are solved, and the recovery of coal pillar resources and high-stability support of the tunnel are achieved.
Patent Information
- Application Number
- CN202410900752.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-01
AI Technical Summary
During the mining process of the coal working face, the coal pillars between the faces cannot be recovered, resulting in a waste of coal resources. Moreover, the existing coal pillar-less mining technology results in poor tunnel stability and difficulty in control.
The coal pillar recovery method between surfaces is used, and the anchor digging machine is used to excavate the coal pillar to be replaced to form a coal pillar empty area, and then the tunnel filling equipment is used to fill it in sections to form a filling wall, and excavation is carried out on both sides of the filling wall to form a stable Transport tunnels and return air tunnels.
It realizes the recycling of coal pillars between faces, avoids waste of resources, and provides large-area support through the filling wall, which improves the stability of the tunnel and can effectively resist the disturbance caused by coal gangue collapse.
Smart Images

Figure CN118728382A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of filling, and in particular to an inter-face coal pillar recovery method and tunnel filling equipment. Background Art
[0002] During the mining process of coal working faces, a large number of section coal pillars need to be left between adjacent coal mining working faces to support the overlying rock strata and protect the normal mining of the working faces on both sides. However, this operation method will lead to the retention of a large number of section coal pillars, which in turn leads to a generally low coal recovery rate, and the remaining coal pillar resources cause a large amount of coal resources to be wasted.
[0003] In order to solve the problem of coal resource loss caused by the section coal pillar, the existing practices include coal pillar-free mining technologies such as "leaving lanes along the goaf" and "digging lanes along the goaf". The use of such coal pillar-free mining technologies has reduced the loss and waste of section coal pillars to a certain extent and improved the recovery rate of coal resources.
[0004] The above-mentioned non-pillar mining technologies require the formation of transport tunnels (climbs) and return air tunnels (climbs) to ensure the smooth progress of construction; the current tunnel formation method is to separate the areas between adjacent mining areas (coal mining areas) by building multiple walls during the mining (coal mining) of the longwall working face, thereby forming the mining area (coal mining area), transport tunnels and return air tunnels (see Figure 1 ) and at the same time provide support to the overlying rock formation;
[0005] However, since this operation method is carried out during coal mining, it is dusty and the working environment is poor. As coal mining progresses, the roof collapses and sinks, which will disturb the surrounding tunnels under the action of mine pressure. And because it is a masonry wall, its stability is difficult to control when used as an adjacent coal mining working face. Summary of the invention
[0006] The invention provides a method for recovering coal pillars between surfaces and tunnel filling equipment, which solves the problems in the prior art that coal pillars between surfaces cannot be recovered and the formed tunnels have poor stability.
[0007] In a first aspect, the present invention provides a method for recovering inter-face coal pillars, comprising:
[0008] S1. Plan two tunnels and the coal pillar to be replaced between the two tunnels between adjacent longwall working faces, and design the widths of the tunnels and the coal pillar to be replaced;
[0009] S2, using a mining and anchoring machine to excavate the coal pillar to be replaced, and using a shuttle car and a belt conveyor to recover coal, thereby forming a coal pillar void area;
[0010] S3, moving the tunnel filling equipment to the innermost end of the coal pillar void area, and the tunnel filling equipment and the innermost end of the coal pillar void area can form a first filling space, and the tunnel filling equipment fills the filling slurry into the first filling space to form a first filling body after solidification;
[0011] S4, moving the tunnel filling device toward the entrance end of the coal pillar void area by one step, at which time the tunnel filling device and the side of the first filling body form a second filling space, and the tunnel filling device fills the filling slurry into the second filling space, and forms a second filling body after solidification;
[0012] S5, repeat S4 until the entire coal pillar void is filled to form a filling wall;
[0013] S6. Use the integrated excavator and anchor machine to excavate along both sides of the filling wall, and use a shuttle car and a belt conveyor to recover coal, thereby forming a transportation tunnel and a return air tunnel.
[0014] According to the inter-face coal pillar recovery method provided by the present invention, S3 comprises:
[0015] S301, moving the tunnel filling equipment to a position 10 m close to the innermost end of the coal pillar void area and fixing it;
[0016] S302, laying a filling slurry delivery pipeline along the main transport lane and the coal pillar void area, and connecting one end of the delivery pipeline to the lane filling equipment, and the other end of the delivery pipeline to the slurry pool;
[0017] S303, preparing a filling slurry, wherein the filling slurry includes 20% of modified magnesium slag-based cementitious material, 10% of fly ash and 70% of coal gangue.
[0018] According to the inter-face coal pillar recovery method provided by the present invention, S6 comprises:
[0019] S601, using the integrated digging and anchoring machine to excavate along one side of the filling wall, and using a shuttle car and a belt conveyor to recover coal, thereby forming a transport tunnel, and connecting the transport tunnel with the main transport tunnel; while excavating, using the integrated digging and anchoring machine to perform bolt support operations on the top of the transport tunnel;
[0020] S602. After the excavation of the transport tunnel is completed, the integrated digging and anchoring machine, the shuttle car and the belt conveyor continue to excavate in a direction perpendicular to the transport tunnel, and then excavate along one side of another adjacent filling body in the direction of the return air tunnel, and finally form a return air tunnel; while excavating, the integrated digging and anchoring machine is used to perform anchor support operations on the top of the return air tunnel.
[0021] According to the inter-face coal pillar recovery method provided by the present invention, the bolt support operation includes:
[0022] Use the integrated drilling and anchoring machine to perform matrix drilling at the top of the tunnel. When drilling, the hole diameter and hole depth are strictly controlled to ensure that the hole wall is smooth;
[0023] The anchor rods are driven into the drilled holes in sequence using the anchor drilling machine. The spacing and row spacing of the anchor rods are set to 1m, and 6 anchor rods are arranged in parallel in each row. When driving, the anchoring agent is first filled into the hole, and then the anchor rod body is installed into the hole, and then the anchor rod tail tray is installed. After the installation is completed, a pull-out test is carried out to ensure the reliability of the anchor rod.
[0024] After the anchor support is completed, anchor cables are arranged at the gaps between the anchors. The designed anchor cable spacing is 2m and the row spacing is 2m. If a broken roof is encountered, a net hanging operation is required.
[0025] In a second aspect, the present invention further provides a tunnel filling device, comprising:
[0026] The frame has three mutually perpendicular dimensions of length, width and height;
[0027] A walking mechanism, arranged on the frame;
[0028] A transverse slide rail is provided on the frame along the width direction of the frame;
[0029] There are at least two slide seats, which are slidably arranged on the transverse slide rails respectively;
[0030] An opposing lead screw having two opposing external threads symmetrically arranged about the center of the lead screw, wherein the two opposing external threads are respectively threadedly connected to the slide seat, so that when the opposing lead screw rotates, the slide seat can synchronously move toward or away from each other;
[0031] A first rotation drive mechanism, connected to the opposing lead screw, for driving the opposing lead screw to rotate in a forward or reverse direction;
[0032] There are at least two first telescopic arms, which are arranged parallel to each other and have one end respectively hinged to the slide seat;
[0033] A baffle assembly, comprising a slide plate and a connecting plate, wherein the slide plates are provided in at least two pieces and are respectively sleeved on both sides of the connecting plate in the width direction, and the slide plates are also detachably connected to the other end of the first telescopic arm;
[0034] An angle adjustment mechanism, connected to the first telescopic arm, for providing a driving force for the first telescopic arm to swing in a plane formed by the height direction and the length direction;
[0035] A swing arm, one end of which is rotatably disposed on the frame and is capable of swinging within a plane formed by the height direction and the length direction;
[0036] a second rotation driving mechanism, connected to the swing arm, and used to provide rotational force for the rotation of the swing arm;
[0037] The arc-shaped pipe has a drilling mechanism fixedly connected to one end and a slurry feeding hose connected to the other end, and the other end of the swing arm is fixedly connected to the arc-shaped pipe near one end of the slurry feeding hose; a grouting port is arranged on the arc-shaped pipe near the drilling mechanism;
[0038] Wherein, when the baffle assembly is parallel to the height direction, the arc tube can pass over the top of the baffle assembly under the action of the rotation of the swing arm.
[0039] The tunnel filling equipment provided by the present invention also includes:
[0040] A first hydraulic telescopic rod, having a plurality of first hydraulic telescopic rods, which are arranged on the frame along the height direction and can extend upward;
[0041] The second hydraulic telescopic rods are provided in plurality and are arranged on the frame along the height direction and can extend downward.
[0042] According to the tunnel filling equipment provided by the present invention, the walking mechanism comprises:
[0043] A vehicle axle, having a first shock absorbing mechanism, is disposed on the vehicle frame;
[0044] There are multiple rollers, which are rotatably arranged on the axle.
[0045] The tunnel filling equipment provided according to the present invention further includes a plurality of second shock absorbing mechanisms, which are respectively arranged at the connection between the first telescopic arm and the slide seat, and are used to provide buffering for the first telescopic arm along the height direction.
[0046] According to the tunnel filling equipment provided by the present invention, the drilling mechanism comprises:
[0047] A third rotation driving mechanism, coaxially fixed to one end of the arc-shaped tube;
[0048] a drill bit, coaxially connected to the third rotary drive mechanism;
[0049] The third rotation driving mechanism is used to drive the drill bit to rotate, and the rotation diameter of the drill bit is greater than the diameter of the arc tube.
[0050] The present invention provides a method for recovering coal pillars between surfaces. The method first uses an integrated excavator and anchor machine to excavate the coal pillars to be replaced, and then uses a shuttle car and a belt conveyor to recover coal, so as to realize the recovery of coal pillars between surfaces and avoid waste of resources; then the tunnel filling equipment is used to carry out segmented and overall filling of the coal pillar voids, so as to realize large-area support of the overlying rock strata in the tunnel, and has obvious supporting effect compared with the masonry walls in the prior art; at the same time, the filling wall is an integral structure, and its width is the width of a tunnel, so compared with the masonry wall, it has obvious stability and can resist the disturbance caused by the collapse of coal gangue; excavation is carried out on both sides of the filling wall, and shuttle cars and belt conveyors are used to recover coal, thereby forming a transport tunnel and a return air tunnel, and the transport tunnel and return air tunnel formed in this way have high stability, because the filling wall has high stability, which can play a role in supporting the overlying rock strata.
[0051] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0053] Figure 1 It is a schematic diagram of the existing planar structure of non-pillar mining construction;
[0054] Figure 2 It is a flow chart of the inter-face coal pillar recovery method provided by the present invention;
[0055] Figure 3 It is a schematic diagram of the planned construction plane structure obtained by using the inter-face coal pillar recovery method provided by the present invention;
[0056] Figure 4 It is a schematic diagram of the plane structure of coal pillar excavation and recovery construction obtained by using the inter-face coal pillar recovery method provided by the present invention;
[0057] Figure 5 It is a schematic diagram of the plan structure of the transport tunnel excavation construction obtained by using the inter-face coal pillar recovery method provided by the present invention;
[0058] Figure 6 It is a schematic diagram of the plan structure of the mining construction obtained by using the coal mining method provided by the present invention;
[0059] Figure 7It is a schematic diagram of the three-dimensional structure of the tunnel filling equipment provided by the present invention in a non-working state;
[0060] Figure 8 It is a right view structural schematic diagram of the tunnel filling equipment provided by the present invention in a non-working state;
[0061] Fig. 9 This is one of the right-side structural schematic diagrams of the tunnel filling equipment provided by the present invention in working state;
[0062] Fig.10 This is the second right view structural schematic diagram of the tunnel filling equipment provided by the present invention in working state;
[0063] Fig.11 This is one of the disassembled diagrams of the second shock absorbing mechanism provided by the present invention;
[0064] Fig.12 This is the second disassembled diagram of the second shock absorbing mechanism provided by the present invention.
[0065] Reference numerals:
[0066] 1. Frame; 2. Traveling mechanism; 201. Axle; 202. First shock absorbing mechanism; 203. Roller; 3. Transverse slide rail; 4. Sliding seat; 401. Shock absorbing chamber; 5. Opposite lead screw; 6. First rotary drive mechanism; 7. First telescopic arm; 701. Articulated seat; 702. Guide rod; 703. Compression spring; 704. Sliding block; 8. Baffle assembly; 9. Angle adjustment mechanism; 10. Swing arm; 11. Second rotary drive mechanism; 12. Arc tube; 13. Drilling mechanism; 1301. Third rotary drive mechanism; 1302. Drill bit ; 14. First hydraulic telescopic rod; 15. Second hydraulic telescopic rod; 16. Slurry inlet hose; 17. Filling pipe; 18. Water inlet pipe; 19A. Longwall working face mining area to be excavated; 19B. Planned longwall working face mining area; 20. Masonry wall; 21. Return air main tunnel; 22. Transport main tunnel; 23A. Excavated transport tunnel; 23B. Planned transport tunnel; 24A. Excavated return air tunnel; 24B. Planned return air tunnel; 25A. Filling wall; 25B. Planned coal pillar; 26. First filling space; 27. Digging and anchoring machine; 28. Shuttle car. DETAILED DESCRIPTION
[0067] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0068] In the description of the embodiments of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the embodiments of the present invention. In addition, the terms "first", "second", etc., are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0069] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.
[0070] In the embodiments of the present invention, unless otherwise clearly specified and limited, the first feature being "above" or "below" the second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0071] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiment of the present invention. In this specification, the schematic representations of the above terms are not directed to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0072] First, the existing technology is introduced:
[0073] like Figure 1As shown, an excavated transport tunnel 23A and an excavated return air tunnel 24A are provided between the adjacent longwall working faces to be excavated; a masonry wall 20 is provided between the excavated transport tunnel 23A and the excavated return air tunnel 24A;
[0074] The masonry wall 20 is constructed during coal mining, so there is a lot of dust and a poor working environment during construction. As coal mining progresses, the roof collapses and sinks, and the surrounding tunnels are disturbed by the mine pressure, resulting in poor tunnel stability. Moreover, since it is a masonry wall, its stability is difficult to control when used as an adjacent coal mining working face, and the cost of supporting the masonry wall 20 in the later stage is high.
[0075] To solve this problem, the following technical solution is proposed.
[0076] Combine the following Figures 1 to 12 The embodiments shown describe the technical solution of the present invention:
[0077] The embodiment of the present invention provides a method for recovering coal pillars between surfaces, such as Figures 2 to 6 As shown, including:
[0078] S1. Plan two tunnels and the coal pillar to be replaced between the two tunnels between adjacent longwall working faces, and design the widths of the tunnels and the coal pillar to be replaced;
[0079] like Figure 3 As shown, the construction structure and dimensions are planned as a whole, wherein the width of the longwall working face mining area 19B is planned to be 150m-300m; the widths of the planned transport tunnel 23B, the planned return air tunnel 24B, and the planned coal pillar 25B are 5m respectively.
[0080] S2, using the integrated digging and anchoring machine 27 to dig the coal pillar to be replaced, and using the shuttle car 28 and the belt conveyor to recover the coal, thereby forming a coal pillar void area;
[0081] like Figure 4 As shown, it illustrates the use of the integrated digging and anchoring machine 27 and the shuttle car 28 to excavate and recover the planned coal pillar 25B, and form a coal pillar empty area connected to the transport tunnel 22;
[0082] In this way, the coal pillars between surfaces can be recovered and the waste of coal resources can be avoided.
[0083] S3, moving the tunnel filling equipment to the innermost end of the coal pillar void area, and the tunnel filling equipment and the innermost end of the coal pillar void area can form a first filling space 26, and the tunnel filling equipment fills the filling slurry into the first filling space 26, and forms a first filling body after solidification;
[0084] S4, moving the tunnel filling device toward the entrance end of the coal pillar void area by one step, at which time the tunnel filling device and the side of the first filling body form a second filling space, and the tunnel filling device fills the filling slurry into the second filling space, and forms a second filling body after solidification;
[0085] S5, repeat S4 until the entire coal pillar void is filled to form a filling wall 25A;
[0086] like Figure 5 As shown, after the tunnel filling equipment has filled the tunnel, a filling wall 25A has been formed.
[0087] S6. Use the integrated digging and anchoring machine 27 to dig along both sides of the filling wall 25A, and use the shuttle car 28 and the belt conveyor to recover the coal, thereby forming a transportation tunnel and a return air tunnel.
[0088] As shown Figure 5 As shown, the transport tunnel is excavated using the integrated digging and anchoring machine 27, thereby forming an excavated transport tunnel 23A.
[0089] The embodiment of the present invention provides a method for recovering coal pillars between surfaces. The method first uses the excavation and anchoring machine 27 to excavate the coal pillars to be replaced, and then uses the shuttle car 28 and the belt conveyor to recover the coal, so as to realize the recovery and utilization of the coal pillars between surfaces and avoid waste of resources. Then, the tunnel filling equipment is used to carry out segmented and overall filling of the coal pillar voids, so as to realize large-area support of the overlying rock strata of the tunnel, and has obvious supporting effect compared with the masonry wall 20 in the prior art. At the same time, the filling wall 25A is an integral structure, and its width is the width of a tunnel. Therefore, compared with the wall built with bricks, it has obvious stability and can resist the disturbance caused by the collapse of coal gangue. Excavation is carried out on both sides of the filling wall 25A, and the shuttle car 28 and the belt conveyor are used to recover the coal, thereby forming a transport tunnel and a return air tunnel. The transport tunnel and the return air tunnel formed in this way have high stability. Because the filling wall 25A has high stability, it will not be affected by the filling wall 25A.
[0090] According to the inter-face coal pillar recovery method provided by an embodiment of the present invention, S3 includes:
[0091] S301, move the tunnel filling equipment to 10m near the innermost end of the coal pillar void area and fix it;
[0092] Taking 10m as a step distance can take into account both filling efficiency and filling quality;
[0093] S302, laying out a filling slurry delivery pipeline along the main transport tunnel 22 and the coal pillar void area, connecting one end of the delivery pipeline to the tunnel filling equipment, and connecting the other end of the delivery pipeline to the slurry pool;
[0094] S303, preparing a filling slurry, wherein the filling slurry includes 20% of modified magnesium slag-based cementitious material, 10% of fly ash and 70% of coal gangue.
[0095] By setting the composition of the filling slurry to 20% of modified magnesium slag-based cementitious material, 10% of fly ash and 70% of coal gangue, the coal gangue solid waste can be better utilized to achieve the purpose of energy saving and environmental protection.
[0096] According to the inter-face coal pillar recovery method provided by an embodiment of the present invention, S6 includes:
[0097] S601, using the integrated digging and anchoring machine 27 to excavate along one side of the filling wall 25A, and using the shuttle car 28 and the belt conveyor to recover coal, thereby forming a transport tunnel, and connecting the transport tunnel with the main transport tunnel 22; while excavating, using the integrated digging and anchoring machine 27 to perform bolt support operations on the top of the transport tunnel;
[0098] S602. After the excavation of the transport tunnel is completed, the anchor-digging machine 27, shuttle car 28 and belt conveyor continue to excavate in a direction perpendicular to the transport tunnel, and then excavate along one side of another adjacent filling body toward the return air tunnel 21, and finally form a return air tunnel; while excavating, the anchor-digging machine 27 is used to perform anchor support operations on the top of the return air tunnel.
[0099] According to the inter-face coal pillar recovery method provided by an embodiment of the present invention, the bolt support operation includes:
[0100] Matrix drilling is performed on the top of the tunnel using the anchor-digger 27. The hole diameter and depth are strictly controlled during drilling to ensure smooth hole walls.
[0101] The anchor rods are driven into the drilled holes in sequence by using the anchor-digger 27, and the spacing and row spacing of the anchor rods are both set to 1m, with 6 anchor rods arranged in parallel in each row; when driving, the anchoring agent is first filled into the hole, and then the anchor rod body is installed into the hole, and then the anchor rod tail tray is installed; after the installation is completed, a pull-out test is carried out to ensure the reliability of the anchor rod;
[0102] After the anchor support is completed, anchor cables are arranged at the gaps between the anchors. The designed anchor cable spacing is 2m and the row spacing is 2m. If a broken roof is encountered, a net hanging operation is required.
[0103] The embodiment of the present invention further provides a coal mining method, including the inter-face coal pillar recovery method as described above, and further comprising:
[0104] S7, the area between adjacent filling walls 25A, except the area of the return air lane and the transportation lane, the rest is the longwall working face mining area;
[0105] By utilizing the collaborative operation of coal mining machines, hydraulic supports and scraper conveyors, large-section mining is carried out from the innermost end of the tunnel toward the main transport tunnel 22, and the coal is transported to the main inclined shaft through the main transport tunnel 22.
[0106] The embodiment of the present invention also provides a tunnel filling device, such as Figures 7 to 9 As shown, it includes: a frame 1, a traveling mechanism 2, a transverse slide rail 3, a slide seat 4, an opposing lead screw 5, a first rotation drive mechanism 6, a first telescopic arm 7, a baffle assembly 8, an angle adjustment mechanism 9, a swing arm 10, a second rotation drive mechanism 11 and an arc tube 12, wherein the frame 1 has three directions of length, width and height that are perpendicular to each other; the traveling mechanism 2 is arranged on the frame 1; the transverse slide rail 3 is arranged on the frame 1 along the width direction of the frame 1; the slide seat 4 has at least two, which are respectively slidably arranged on the transverse slide rail 3; the opposing lead screw 5 has two reverse external threads symmetrically arranged about the center of the lead screw, and the two reverse external threads are respectively threadedly connected to the slide seat 4, so that when the opposing lead screw 5 rotates, the slide seat 4 can move synchronously toward or away from each other; the first rotation drive mechanism 6 is connected to the opposing lead screw 5, for driving the opposing lead screw 5 to rotate forward or reversely; the first telescopic arm 7 has at least two, They are arranged parallel to each other, and one end is hinged to the slide seat 4 respectively; the baffle assembly 8 includes a slide plate and a connecting plate, the slide plate has at least two, and is respectively sleeved on both sides of the connecting plate along the width direction, and the slide plate is also detachably connected to the other end of the first telescopic arm 7; the angle adjustment mechanism 9 is connected to the first telescopic arm 7, and is used to provide a driving force for the first telescopic arm 7 to swing in the plane formed by the height direction and the length direction; one end of the swing arm 10 is rotatably arranged on the frame 1, and can swing in the plane formed by the height direction and the length direction; the second rotation drive mechanism 11 is connected to the swing arm 10, and is used to provide a rotational force for the rotation of the swing arm 10; one end of the arc tube 12 is fixedly connected to the drilling mechanism 13, and the other end is connected to the slurry feeding hose 16, and the other end of the swing arm 10 is fixedly connected to the arc tube 12 near one end of the slurry feeding hose 16; a grouting port is provided on the arc tube 12 near the drilling mechanism 13;
[0107] When the baffle assembly 8 is parallel to the height direction, the arc tube 12 can pass over the top of the baffle assembly 8 under the action of the rotation of the swing arm 10 .
[0108] In this embodiment, by setting the transverse slide rail 3, the opposing lead screw 5 and the slide seat 4, it can be realized that when the opposing lead screw 5 rotates, the slide seat 4 can move synchronously in opposite directions or reversely, thereby realizing the synchronous movement of the first telescopic arm 7, so that the baffle assembly 8 can be changed from a retracted state to an extended state, so that the baffle assembly 8 can be completely fitted with the two side arms of the tunnel to ensure the sealing and integrity of the grouting space; by hingedly connecting the first telescopic arm 7 with the slide seat 4 and arranging an angle adjustment mechanism 9 on the first telescopic arm 7, the rotation of the first telescopic arm 7 can be realized, thereby adjusting the angle of the baffle assembly 8. Adjustment is performed because the height of the lane is limited and the height of the baffle assembly 8 should be set to be consistent with the height of the lane. Therefore, when the equipment enters the lane, the baffle assembly 8 should be in an inclined state. When the equipment reaches the target position, the rotation angle of the first telescopic arm 7 is adjusted to make the baffle assembly 8 gradually perpendicular to the ground, and then respectively press against the top plate and the floor of the lane in the height direction. Then, the width of the baffle assembly 8 is adjusted by rotating the opposing lead screw 5, and finally both sides of the baffle assembly 8 are pressed against the side walls of the lane, so that the sealing of the filling space can be achieved;
[0109] By arranging the swing arm 10, the second rotary drive mechanism 11, the arc tube 12 and the drilling mechanism 13, it is possible to inject slurry into the filling space without destroying the integrity and completeness of the filling space, thereby realizing integrated grouting and exhaust, and also making the injected filling body fully contact with the top of the tunnel. This is different from the method of opening an opening for injection on the baffle in the traditional process. The traditional injection method cannot completely achieve "full injection" of the slurry, because the grouting through the opening on the baffle can only be injected to the opening height, and further injection will cause overflow; opening an arc-shaped injection channel at the top of the tunnel can solve this problem well; after the injection is completed, the slurry overflowing into the arc-shaped channel can also be used to seal the arc-shaped channel.
[0110] According to the tunnel filling equipment provided by the embodiment of the present invention, Figure 6 and Figure 7 As shown, it also includes: a first hydraulic telescopic rod 14 and a second hydraulic telescopic rod 15, wherein the first hydraulic telescopic rod 14 has multiple, is arranged on the frame 1 along the height direction, and can extend upward; the second hydraulic telescopic rod 15 has multiple, is arranged on the frame 1 along the height direction, and can extend downward.
[0111] With such an arrangement, when the baffle assemblies 8 are adjusted and pressed against the inner wall of the tunnel, the first hydraulic telescopic rod 14 and the second hydraulic telescopic rod 15 press against the top and bottom surfaces of the tunnel in the height direction, thereby fixing the entire equipment so that it does not move during grouting.
[0112] The embodiment of the present invention also provides a tunnel filling device, such as Figures 7 to 9 As shown, the traveling mechanism 2 includes: an axle 201 and rollers 203 , wherein the axle 201 has a first damping mechanism 202 disposed on the frame 1 ; and there are a plurality of rollers 203 rotatably disposed on the axle 201 .
[0113] By arranging the first shock absorbing mechanism 202 on the axle 201, it can be achieved that after the second hydraulic telescopic rod 15 is first extended and put into place, the first hydraulic telescopic rod 14 also needs to have a certain pressure on the tunnel roof. At this time, the first shock absorbing mechanism 202 can have a certain buffering and protective effect on the equipment as a whole, so as not to deform the axle 201.
[0114] The embodiment of the present invention also provides a tunnel filling device, such as Figure 11 to Figure 12 As shown, it also includes a plurality of second shock absorbing mechanisms, which are respectively arranged at the connection between the first telescopic arm 7 and the slide seat 4, and are used to provide buffering for the first telescopic arm 7 along the height direction.
[0115] A shock-absorbing chamber 401 is provided on the front wall surface of the slide seat 4, and two mutually parallel guide rods 702 are fixedly arranged in the shock-absorbing chamber 401 in the height direction. A slider 704 is slidably mounted on the guide rod 702, and the slider 704 is fixedly connected to the hinge seat 701 of the first telescopic arm 7. A plurality of compression springs 703 are arranged between the slider 704 and the wall of the shock-absorbing chamber 401, and the compression springs 703 are all mounted on the guide rod 702.
[0116] Therefore, by setting up the second shock absorbing mechanism, it can be achieved that when the first hydraulic telescopic rod 14 presses the equipment as a whole, the state of the first telescopic arm 7 can be kept unchanged, thereby ensuring that the first telescopic arm 7 does not deform, and ensuring the integrity of the connection with the baffle assembly 8 and the stability of the baffle assembly 8 itself.
[0117] The embodiment of the present invention also provides a tunnel filling device, such as Fig. 9 As shown, the drilling mechanism 13 includes: a third rotation drive mechanism 1301 and a drill bit 1302, wherein the third rotation drive mechanism 1301 is coaxially fixed to one end of the arc tube 12; the drill bit 1302 is coaxially connected to the third rotation drive mechanism 1301; the three rotation drive mechanisms are used to drive the drill bit 1302 to rotate, and the rotation diameter of the drill bit 1302 is larger than the diameter of the arc tube 12.
[0118] In this way, the arc tube 12 can smoothly pass through the rock layer at the top of the tunnel, and by setting the rotation diameter of the drill bit 1302 to be larger than the diameter of the arc tube 12, the arc tube 12 can be effectively protected from wear by the rock wall. At the same time, the diameter of the arc channel can be larger than the diameter of the arc tube 12, leaving room for ventilation and exhaust of the arc channel, that is, the injection channel (arc channel) and the exhaust channel are integrated, and there is no need to drill an exhaust hole separately. When the filling chamber is filled, the second rotary drive mechanism 11 is started to withdraw the arc tube 12. While withdrawing, injection can continue to seal the arc channel.
[0119] Of course, the slurry inlet hose 16 is connected to the filling pipe 17, and the filling pipe 17 branch is connected to the water inlet pipe 18. Whenever the pouring is completed, the solenoid valve of the water inlet pipe 18 needs to be opened to allow water to spray out from the spray port of the arc tube 12 to clean the environment inside the pipe and avoid the slurry remaining in the pipe from solidifying and causing pipe blockage.
[0120] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for recovering inter-face coal pillars, characterized in that: include: S1. Plan two tunnels and the coal pillar to be replaced between the two tunnels between adjacent longwall working faces, and design the widths of the tunnels and the coal pillar to be replaced; S2, using a mining and anchoring machine to excavate the coal pillar to be replaced, and using a shuttle car and a belt conveyor to recover coal, thereby forming a coal pillar void area; S3, moving the tunnel filling equipment to the innermost end of the coal pillar void area, and the tunnel filling equipment and the innermost end of the coal pillar void area can form a first filling space, and the tunnel filling equipment fills the filling slurry into the first filling space to form a first filling body after solidification; S4, moving the tunnel filling device toward the entrance end of the coal pillar void area by one step, at which time the tunnel filling device and the side of the first filling body form a second filling space, and the tunnel filling device fills the filling slurry into the second filling space, and forms a second filling body after solidification; S5, repeat S4 until the entire coal pillar void is filled to form a filling wall; S6. Use the integrated excavator and anchor machine to excavate along both sides of the filling wall, and use a shuttle car and a belt conveyor to recover coal, thereby forming a transportation tunnel and a return air tunnel.
2. The method for recovering inter-face coal pillars according to claim 1, characterized in that: The S3 includes: S301, moving the tunnel filling equipment to a position 10 m close to the innermost end of the coal pillar void area and fixing it; S302, laying a filling slurry delivery pipeline along the main transport lane and the coal pillar void area, and connecting one end of the delivery pipeline to the lane filling equipment, and the other end of the delivery pipeline to the slurry pool; S303, preparing a filling slurry, wherein the filling slurry includes 20% of modified magnesium slag-based cementitious material, 10% of fly ash and 70% of coal gangue.
3. The method for recovering inter-face coal pillars according to claim 1, characterized in that: The S6 includes: S601, using the integrated digging and anchoring machine to excavate along one side of the filling wall, and using a shuttle car and a belt conveyor to recover coal, thereby forming a transport tunnel, and connecting the transport tunnel with the main transport tunnel; while excavating, using the integrated digging and anchoring machine to perform bolt support operations on the top of the transport tunnel; S602. After the excavation of the transport tunnel is completed, the integrated digging and anchoring machine, the shuttle car and the belt conveyor continue to excavate in a direction perpendicular to the transport tunnel, and then excavate along one side of another adjacent filling body in the direction of the return air tunnel, and finally form a return air tunnel; while excavating, the integrated digging and anchoring machine is used to perform anchor support operations on the top of the return air tunnel.
4. The method for recovering inter-face coal pillars according to claim 3, characterized in that: The anchor support operation includes: Use the integrated miner and anchor machine to perform matrix drilling at the top of the tunnel. Strictly control the hole diameter and depth during drilling to ensure smooth hole walls. The anchor rods are driven into the drilled holes in sequence using the anchor drilling machine. The spacing and row spacing of the anchor rods are set to 1m, and 6 anchor rods are arranged in parallel in each row. When driving, the anchoring agent is first filled into the hole, and then the anchor rod body is installed into the hole, and then the anchor rod tail tray is installed. After the installation is completed, a pull-out test is carried out to ensure the reliability of the anchor rod. After the anchor support is completed, anchor cables are arranged at the gaps between the anchors. The designed anchor cable spacing is 2m and the row spacing is 2m. If a broken roof is encountered, a net hanging operation is required.
5. A tunnel filling device, characterized in that: include: The frame has three mutually perpendicular dimensions of length, width and height; A walking mechanism, arranged on the frame; A transverse slide rail is provided on the frame along the width direction of the frame; There are at least two slide seats, which are slidably disposed on the transverse slide rails respectively; An opposing lead screw having two opposing external threads symmetrically arranged about the center of the lead screw, wherein the two opposing external threads are respectively threadedly connected to the slide seat, so that when the opposing lead screw rotates, the slide seat can synchronously move toward or away from each other; A first rotation drive mechanism, connected to the opposing lead screw, for driving the opposing lead screw to rotate in a forward or reverse direction; There are at least two first telescopic arms, which are arranged parallel to each other and have one end respectively hinged to the slide seat; A baffle assembly, comprising a slide plate and a connecting plate, wherein the slide plates are provided in at least two pieces and are respectively sleeved on both sides of the connecting plate in the width direction, and the slide plates are also detachably connected to the other end of the first telescopic arm; An angle adjustment mechanism, connected to the first telescopic arm, for providing a driving force for the first telescopic arm to swing in a plane formed by the height direction and the length direction; A swing arm, one end of which is rotatably disposed on the frame and is capable of swinging within a plane formed by the height direction and the length direction; a second rotation driving mechanism, connected to the swing arm, and used to provide rotational force for the rotation of the swing arm; The arc-shaped pipe has a drilling mechanism fixedly connected to one end and a slurry feeding hose connected to the other end, and the other end of the swing arm is fixedly connected to the arc-shaped pipe near one end of the slurry feeding hose; a grouting port is arranged on the arc-shaped pipe near the drilling mechanism; Wherein, when the baffle assembly is parallel to the height direction, the arc tube can pass over the top of the baffle assembly under the action of the rotation of the swing arm.
6. The tunnel filling device according to claim 5, characterized in that: Also includes: A first hydraulic telescopic rod, having a plurality of first hydraulic telescopic rods, which are arranged on the frame along the height direction and can extend upward; The second hydraulic telescopic rods are provided in plurality and are arranged on the frame along the height direction and can extend downward.
7. The tunnel filling device according to claim 6, characterized in that: The walking mechanism comprises: A vehicle axle, having a first shock absorbing mechanism, is disposed on the vehicle frame; There are multiple rollers, which are rotatably arranged on the axle.
8. The tunnel filling device according to claim 7, characterized in that: It also includes a plurality of second shock absorbing mechanisms, which are respectively arranged at the connection between the first telescopic arm and the slide seat, and are used to provide buffering for the first telescopic arm along the height direction.
9. The tunnel filling device according to claim 5, characterized in that: The drilling mechanism comprises: A third rotation driving mechanism, coaxially fixed to one end of the arc-shaped tube; a drill bit, coaxially connected to the third rotary drive mechanism; The third rotation driving mechanism is used to drive the drill bit to rotate, and the rotation diameter of the drill bit is greater than the diameter of the arc tube.
Citation Information
Patent Citations
Strip filling integral backstopping coal mining method
CN101372891A
Multi-angle material distribution filling device
CN102003208A
Mechanical pouring equipment and method for roof-cutting gob-side entry retaining filling body
CN115628105A
Large-section tunneling, filling and entry retaining integrated method and system
CN117365474A
Coal mine mining filling tunneling device and method
CN117468933A
