Warehouse logistics conveying method and device, electronic equipment and storage medium
By introducing the synergy of workflow execution system, warehouse management system and warehouse control system into the warehouse logistics system, the material production plan is generated, picking actions are calculated and materials are automatically transported according to the shortest path rules, which solves the low efficiency of material transportation in the existing technology. solve the problem and achieve efficient and accurate material transportation.
Patent Information
- Application Number
- CN202410787501.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing warehouse logistics transportation system, due to the lack of automated equipment and intelligent management, the material transportation efficiency is low, and operational errors are prone to occur during the production process, affecting efficiency and accuracy.
The material production plan is generated through the workflow execution system and sent to the warehouse management system. Picking tasks are generated according to the material production plan. Picking actions are calculated through the warehouse control system and the execution of the picking equipment is controlled. The target shortest path rule is used to calculate the optimal conveying path. , automatically transport materials to the target production line location.
It improves the efficiency and accuracy of the entire production process, reduces labor costs, avoids human errors, reduces unnecessary material transportation time and data waste, and ensures the timely and accurate arrival of materials.
Smart Images

Figure CN118735398A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of automated control technology, and in particular to a warehouse logistics transportation method, device, electronic equipment and storage medium. Background Art
[0002] In the relevant warehouse logistics and transportation systems, the production and transportation of materials are usually managed and operated manually. Operational errors may occur during the manual production process, resulting in low production efficiency and accuracy. In addition, due to the lack of automated equipment and intelligent management, the transportation of materials usually adopts a fixed path and is not optimized according to actual needs and production line conditions, resulting in low efficiency of material transportation.
[0003] In summary, the technical problems existing in the relevant technologies need to be improved. Summary of the invention
[0004] The embodiments of the present application aim to solve at least one of the technical problems in the related art to a certain extent. To this end, the main purpose of the embodiments of the present application is to propose a warehouse logistics transportation method, device, electronic device and storage medium, which can improve the efficiency and accuracy of the entire production process.
[0005] To achieve the above object, one aspect of an embodiment of the present application provides a warehouse logistics transportation method, the method comprising the following steps:
[0006] Generate a material production plan through a workflow execution system, and send the material production plan to a warehouse management system;
[0007] Generate a material picking task according to the material production plan through the warehouse management system, and send the material picking task to the warehouse control system;
[0008] Calculating material picking actions according to the material picking tasks by the warehouse control system;
[0009] Controlling the picking equipment to perform the material picking action through the warehouse control system to obtain the target picking material;
[0010] The target picked material is transported to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule.
[0011] In some embodiments, generating a material production plan through a workflow execution system and sending the material production plan to a warehouse management system includes:
[0012] Acquiring material production tasks through the workflow execution system;
[0013] Generate the material production plan according to the material production task through the workflow execution system;
[0014] The material production plan is sent to the warehouse management system through the workflow execution system.
[0015] In some embodiments, generating a material picking task according to the material production plan through the warehouse management system and sending the material picking task to the warehouse control system includes:
[0016] Generate the material picking task according to the target material quantity and target material type in the material production plan through the warehouse management system;
[0017] The material picking task is sent to the warehouse control system through the warehouse management system.
[0018] In some embodiments, the calculating the material picking action according to the material picking task by the warehouse control system includes:
[0019] Sending a material outbound request to the warehouse management system according to the material picking task by the warehouse control system, so that the warehouse management system sends a material outbound task to the warehouse control system according to the material outbound request;
[0020] The material picking action is calculated by the warehouse control system according to the material outbound task.
[0021] In some embodiments, the step of controlling the picking device to perform the material picking action by the warehouse control system to obtain the target picking material includes:
[0022] Obtaining the starting and ending point information corresponding to the target picking location through the warehouse control system;
[0023] The warehouse control system calculates the target shortest picking path corresponding to the target picking location according to the starting and ending point information corresponding to the target picking location and the target shortest path rule;
[0024] The warehouse control system controls the picking device to perform the material picking action according to the target shortest picking path to obtain the target picking material.
[0025] In some embodiments, the step of transporting the target picked material to the target production line location according to the target shortest production line path by the warehouse control system includes:
[0026] Acquire the starting and ending point information corresponding to the target production line position through the warehouse control system;
[0027] Calculating the target shortest production line path corresponding to the target production line position by the warehouse control system according to the start and end point information corresponding to the target production line position and the target shortest path rule;
[0028] The warehouse control system dispatches the electronic control system to transport the target picked material to the target production line position according to the target shortest production line path.
[0029] In some embodiments, the method further comprises:
[0030] When the warehouse control system dispatches the electric control system to transport the target picked materials to the target production line position according to the target shortest production line path, if an abnormality occurs in the electric control system, the electric control system will transport the target picked materials to the target abnormal position.
[0031] To achieve the above objectives, another aspect of the embodiment of the present application provides a warehouse logistics conveying device, the device comprising the following modules:
[0032] A production plan generation module is used to generate a material production plan through a workflow execution system and send the material production plan to a warehouse management system;
[0033] A picking task generating module, used to generate a material picking task according to the material production plan through the warehouse management system, and send the material picking task to the warehouse control system;
[0034] A picking action calculation module, used for calculating the material picking action according to the material picking task through the warehouse control system;
[0035] A target material acquisition module, used to control the picking equipment to perform the material picking action through the warehouse control system to obtain the target picking material;
[0036] A target material conveying module is used to convey the target picked material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule.
[0037] To achieve the above-mentioned purpose, another aspect of an embodiment of the present application provides an electronic device, the electronic device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the above-mentioned method when executing the computer program.
[0038] To achieve the above objective, another aspect of an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described above is implemented.
[0039] The embodiments of the present application include at least the following beneficial effects: the present application provides a warehouse logistics transportation method, device, electronic device and storage medium, the scheme generates a material production plan through a workflow execution system, and sends the material production plan to a warehouse management system; generates a material picking task according to the material production plan through the warehouse management system, and sends the material picking task to the warehouse control system; calculates the material picking action according to the material picking task through the warehouse control system; controls the picking device to perform the material picking action through the warehouse control system to obtain the target picking material; transports the target picking material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule. The embodiments of the present application can realize the automated production of materials through the synergy between the workflow execution system, the warehouse management system and the warehouse control system, thereby improving the efficiency and accuracy of the entire production process, and reducing labor costs. At the same time, automated production can avoid human errors, thereby improving production quality; in addition, the target shortest production line path is calculated based on the target shortest path rule, so that the warehouse control system transports the target picking material to the target production line position according to the target shortest production line path, thereby improving the efficiency of material transportation and reducing unnecessary material transportation time and data waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a flowchart of the steps of a warehouse logistics transportation method provided by an embodiment of the present application;
[0041] Figure 2 It is a flow chart of a warehouse logistics transportation method provided in an embodiment of the present application;
[0042] Figure 3 It is a structural schematic diagram of a warehouse logistics conveying device provided in an embodiment of the present application;
[0043] Figure 4 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is further described in detail below in conjunction with the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the embodiments of the present application. They are only examples of devices and methods consistent with some aspects of the embodiments of the present application as detailed in the attached claims.
[0045] It is understood that the terms "first", "second", etc. used in this application can be used to describe various concepts in this article, but unless otherwise specified, these concepts are not limited by these terms. These terms are only used to distinguish one concept from another concept. For example, without departing from the scope of the embodiment of the present application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the words "if" and "if" as used herein can be interpreted as "at the time of" or "when" or "in response to determination".
[0046] The terms "at least one", "multiple", "each", "any", etc. used in this application, at least one includes one, two or more, multiple includes two or more, each refers to each of the corresponding multiple, and any refers to any one of the multiple.
[0047] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.
[0048] In the relevant warehouse logistics and transportation systems, the production and transportation of materials are usually managed and operated manually. Operational errors may occur during the manual production process, resulting in low production efficiency and accuracy. In addition, due to the lack of automated equipment and intelligent management, the transportation of materials usually adopts a fixed path and is not optimized according to actual needs and production line conditions, resulting in low efficiency of material transportation. In summary, the technical problems existing in the relevant technologies need to be improved.
[0049] In view of this, a warehouse logistics transportation method, device, electronic device and storage medium are provided in the embodiment of the present application. The scheme generates a material production plan through a workflow execution system, and sends the material production plan to a warehouse management system; generates a material picking task according to the material production plan through the warehouse management system, and sends the material picking task to the warehouse control system; calculates the material picking action according to the material picking task through the warehouse control system; controls the picking device to perform the material picking action through the warehouse control system to obtain the target picking material; and transports the target picking material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule. The embodiment of the present application can realize the automated production of materials through the synergy between the workflow execution system, the warehouse management system and the warehouse control system, thereby improving the efficiency and accuracy of the entire production process, and can reduce labor costs. At the same time, automated production can avoid human errors, thereby improving production quality; in addition, the target shortest production line path is calculated based on the target shortest path rule, so that the warehouse control system transports the target picking material to the target production line position according to the target shortest production line path, thereby improving the efficiency of material transportation and reducing unnecessary material transportation time and data waste.
[0050] The warehouse logistics delivery method provided in the embodiment of the present application relates to the field of automation control technology. The warehouse logistics delivery method provided in the embodiment of the present application can be applied to a terminal, can also be applied to a server, and can also be software running in a terminal or a server. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, and a car terminal, etc., but is not limited to this; the server side can be configured as an independent physical server, or it can be configured as a server cluster or a distributed system composed of multiple physical servers, and can also be configured to provide cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN (Content De l ivery Network, content distribution network) and cloud servers for basic cloud computing services such as big data and artificial intelligence platforms. The server can also be a node server in a blockchain network; the software can be an application that implements the warehouse logistics delivery method, etc., but is not limited to the above forms.
[0051] The present application can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronic devices, network PCs (personal computers), minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.
[0052] See also Figure 1 , Figure 1 This is an optional step flow chart of a warehouse logistics transportation method provided in an embodiment of the present application. Figure 1 The method may include but is not limited to steps S101 to S105.
[0053] Step S101, generating a material production plan through a workflow execution system, and sending the material production plan to a warehouse management system;
[0054] In some embodiments, step S101 may include: acquiring material production tasks through a workflow execution system; generating a material production plan according to the material production tasks through the workflow execution system; and sending the material production plan to a warehouse management system through the workflow execution system.
[0055] Among them, the Workflow Execution System (WES) is used to manage and execute the business processes of the warehouse. In the embodiment of the present application, it is mainly used to generate a material production plan. The material production plan can be generated according to the material production task. Specifically, the workflow execution system can generate a material production plan according to business requirements, production tasks or other input data. The material production plan can guide the warehouse on how to prepare and distribute materials to the production line. For a material production task, it can be all the plate batch information that needs to be produced on the day.
[0056] Specifically, the material production plan may include data such as the color and quantity of the plates to be produced, and a production plan may include plates of different colors in different quantities. For example, a production plan may record 39 plates of color A.
[0057] Among them, the material may include a plate. In the embodiment of the present application, the material is described as a plate. In the logistics and production management system, the plate is usually regarded as a material and included in the processes of material management, inventory control, production planning, etc. It can be understood that the plate is only one of the materials, and the material can include multiple materials, which will not be described in detail in the embodiment of the present application.
[0058] The warehouse management system (WMS) is mainly responsible for optimizing storage, picking, packaging, and shipping operations within the warehouse. After receiving the material production plan from the workflow execution system, the warehouse management system will generate specific material picking tasks based on these plan data, and the material picking tasks will then be sent to the warehouse control system so that the warehouse control system can perform specific picking operations.
[0059] Step S101 shown in the embodiment of the present application generates a material production plan through a workflow execution system, which can achieve standardization and normalization of the production process. A clear material production plan is conducive to optimizing resource allocation, reducing waste in production, and thus improving production efficiency. By sending the material production plan to the warehouse management system, the warehouse management system can obtain the production plan information in a timely manner, providing a clear direction for subsequent material picking and transportation.
[0060] Step S102, generating a material picking task according to the material production plan through the warehouse management system, and sending the material picking task to the warehouse control system;
[0061] Among them, the material picking task can refer to the specific operation instructions generated by the warehouse management system according to the production plan. The material picking task describes in detail the type of materials to be picked, the quantity of materials, the location and destination of the materials, etc.
[0062] Among them, the warehouse control system (Warehouse Control System, referred to as WCS) is located in the control center of the warehouse, responsible for supervising and controlling the real-time operation of logistics automation equipment (such as conveyor belts, picking robots, etc.). For example, based on the material picking tasks received from the warehouse management system, the warehouse control system will calculate the specific material picking actions and command the picking equipment (such as robots or automated picking arms) to perform actual material picking. After the picking is completed, the warehouse control system will also be responsible for transporting the materials to the target production line location according to the shortest production line path, ensuring that the materials can reach the required location on the production line efficiently and accurately.
[0063] In some embodiments, step S102 may include: generating a material picking task according to a target material quantity and a target material type in a material production plan through a warehouse management system; and sending the material picking task to a warehouse control system through the warehouse management system.
[0064] Among them, the target material quantity can be the total quantity of specific materials that need to be picked as specified in the material production plan. The target material quantity is determined based on production demand and inventory status to achieve smooth operation of the production line.
[0065] For the target material type, it is the type of material that needs to be picked as specified in the material production plan. Each material has a unique identification in the warehouse, which can be distinguished by barcodes, labels or other methods. The embodiments of the present application are not limited to this.
[0066] For example, suppose that the normal stacks of boards in the raw material warehouse are all stacked with 40 sheets, and the material production plan requires 39 sheets of color A, but the warehouse management system (WMS) does not have a whole stack of 39 sheets of boards, then the warehouse management system will generate a material picking task according to the material production plan. It is understandable that when the raw material warehouse fails to provide the materials required in the material production plan at one time, it is necessary to generate a picking task according to the material production plan, and if the raw material warehouse can provide the materials required in the material production plan at one time, it is not necessary to generate a material picking task.
[0067] Step S102 shown in the embodiment of the present application generates material picking tasks according to the material production plan through the warehouse management system, and sends the material picking tasks to the warehouse control system, which can realize the automatic generation of picking tasks, reduce human errors, thereby optimizing the picking workflow and improving picking efficiency.
[0068] Step S103, calculating the material picking action according to the material picking task through the warehouse control system;
[0069] Among them, the material picking action is a specific action determined by the warehouse control system according to the material picking task. The material picking action is to take out the correct material from the warehouse and send it to the production line.
[0070] In some embodiments, step S103 may include: sending a material outbound request to the warehouse management system according to the material picking task through the warehouse control system, so that the warehouse management system sends a material outbound task to the warehouse control system according to the material outbound request; calculating the material picking action according to the material outbound task through the warehouse control system.
[0071] The material outbound request is a request sent by the warehouse control system to the warehouse management system in order to obtain the required materials. The material outbound request usually contains detailed information such as the identification information, required quantity, storage location, etc. of the materials. When the warehouse control system needs specific materials, the warehouse control system will send an outbound request to the warehouse management system, requesting the management system to assist in completing the outbound work of the materials. In step S103, the material outbound request can be sent to the warehouse management system according to the material picking task, so that the warehouse management system sends the material outbound task to the warehouse control system according to the material outbound request.
[0072] Among them, the material outbound task is the operation instruction generated by the warehouse management system according to the material outbound request. The material outbound task contains all the information required to respond to the request of the warehouse control system, such as the material pickup location, destination, quantity, etc. It should be noted that the picking task and the outbound task need to be distinguished. The picking task is the task given to the picking equipment, while the outbound task is the warehouse control system (WCS) applying to the warehouse management system (WMS) for the outbound of the plate stack according to the picking task. The outbound task is not only for picking, but also when the production line applies for the provision of materials, the outbound task will also be generated.
[0073] For example, assuming that the normal raw material warehouse has stacks of 40 plates, the material production plan requires 39 plates of suit A, but the warehouse management system (WMS) does not have a full stack of 39 plates, the warehouse management system will generate a material picking task according to the material production plan (such as: picking up a plate from a stack of 40 plates, or finding a stack of 30 plates and a stack of 9 plates in the raw material warehouse and picking them together to form a stack), then, the warehouse control system sends a material outbound request to the warehouse management system according to the material picking task, so that the warehouse management system sends a material outbound task to the warehouse control system according to the material outbound request. Assuming that the material outbound task results in a stack of 40 plates, the warehouse control system calculates the picking action according to the material outbound task as picking up a plate from the stack of 40 plates. Assuming that two stacks are obtained according to the material outbound task (one with 30 plates and one with 10 plates), the warehouse control system calculates the picking action based on the material outbound task to pick up 9 plates from the stack of 10 plates and combine them into the plate of 30 plates.
[0074] In step S103 shown in the embodiment of the present application, the warehouse control system calculates the material picking action according to the material picking task, and utilizes the intelligent calculation of the warehouse control system to optimize the picking action and improve the picking efficiency.
[0075] Step S104, controlling the picking equipment to perform the material picking action through the warehouse control system to obtain the target picking material;
[0076] Among them, picking equipment refers to automated equipment used to pick materials in warehouses, such as picking robots, conveyor belts, shuttle vehicles, etc. These devices can perform specific picking actions according to the instructions of the warehouse control system, such as picking, moving, and placing.
[0077] The target picking material is a specific material that needs to be picked. The target picking material can be determined according to the production plan and the material picking task.
[0078] In some embodiments, step S104 may include: obtaining the starting and ending point information corresponding to the target picking position through the warehouse control system; calculating the target shortest picking path corresponding to the target picking position according to the starting and ending point information corresponding to the target picking position and the target shortest path rule through the warehouse control system; controlling the picking equipment through the warehouse control system to perform material picking actions according to the target shortest picking path to obtain the target picking material.
[0079] Among them, the target picking position is the specific storage location of the target picking material in the warehouse. The starting and ending point information corresponding to the target picking position is the starting and ending point information of the material picking task determined by the warehouse control system according to the target picking position. The starting point of the target picking position refers to the position of the picking device before starting the picking task, that is, the place where it needs to depart in order to reach the picking position for picking. The end point refers to the cargo location where the material is located, that is, the location of the material that the picking device needs to reach and perform the picking operation. In this process, the warehouse control system first determines where the picking device departs (starting point), and then calculates the shortest path to the location of the material (end point) for efficient picking.
[0080] For the target shortest path rule, it is a method based on system routing calculation. Specifically, the warehouse site logistics route is one section after another. Assuming that point A is connected to point B, route AB can be formed. Similarly, there are routes AC, CD, DE, BE... For example, the system's routing calculation algorithm calculates all routes from point A to point E based on the existing routes in the warehouse system, thereby calculating the shortest route, and then achieving the fastest delivery of the plate stack to the execution location and avoiding bad routes. Assuming that the route CD equipment fails, route CD will be disabled, then the route CD will be avoided when calculating the shortest route. Traditional logistics systems are fixed routes, and the embodiment of the present application can automatically calculate the shortest path for plate transportation according to the system routing calculation method, which can achieve the timeliness and real-time nature of production feeding, reduce production waiting time caused by long transportation time, and improve production efficiency.
[0081] For the target shortest picking path, it is the shortest path from the starting point to the end point corresponding to the target picking position calculated by the warehouse control system according to the target shortest path rule, that is, the best picking route. The target shortest picking path is the route that the picking equipment should follow when performing material picking actions, so that the materials can be taken out from the storage location and delivered to the production line in the most efficient way.
[0082] Step S104 shown in the embodiment of the present application controls the picking equipment to perform material picking actions through the warehouse control system, obtains the target picking materials, realizes automatic control of the picking equipment, reduces the error rate of manual operation, and improves the picking speed to maintain real-time supply to the production line.
[0083] After the picking is completed, the remaining materials will be automatically returned to the warehouse, so as to achieve precise material preparation. Specifically, the warehouse control system issues a picking task to the picking device. Assuming that the picking task issued is to pick 5 plates, and the warehouse management system actually receives 20 plates, when the picking device completes the picking task of 5 plates, it will feedback information to the warehouse control system, and the warehouse control system will trigger the remaining 15 plates to be automatically returned to the warehouse. For example, after the picking is completed, the remaining plates are still on the picking device. If there are other picking tasks in the warehouse control system, and the color of the remaining plates is different from the target color to be picked next, then the remaining plates need to be sent back to the original material warehouse to free up the picking station to perform the next picking task.
[0084] Step S105, transporting the target picked material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule.
[0085] The target shortest production line path is the shortest path for transporting the target picking material from the warehouse to the production line calculated by the warehouse control system according to the target shortest path rule. The target production line location is the specific location of the target picking material on the production line. The warehouse control system will determine the production line location where the target picking material needs to be delivered based on the production plan and material requirements.
[0086] For the target shortest path rule, it is a method based on system routing calculation. Specifically, the warehouse on-site logistics route is one section after another. Assuming that point A is connected to point B, route AB can be formed. Similarly, there are routes AC, CD, DE, BE... For example, the system's routing calculation algorithm calculates all routes from point A to point E based on the existing routes in the warehouse system, thereby calculating the shortest route, and then achieving the fastest delivery of the plate stack to the execution location, and avoiding the faulty route. Assuming that the route CD equipment fails, route CD will be disabled, then the route CD will be avoided when calculating the shortest route. Traditional logistics systems are fixed routes, and the embodiment of the present application can automatically calculate the shortest path for plate transportation according to the system routing calculation method, which can achieve the timeliness and real-time nature of production feeding, reduce production waiting time caused by long transportation time, and improve production efficiency.
[0087] Among them, the system for calculating the shortest path is the warehouse control system (WCS), and the warehouse management system (WMS) provides the warehouse control system with starting point information and end point information.
[0088] It should be noted that in the embodiment of the present application, all transportation tasks of the entire warehouse system need to undergo routing calculation to determine the route taken and the tasks performed, which may include but are not limited to: material picking in and out of the warehouse, material outbound transportation required by the production line, and finished product return to the warehouse. These transportation tasks must undergo routing calculation to determine the route, and then transport according to the calculated route.
[0089] In some embodiments, step S105 may include: obtaining the starting and ending point information corresponding to the target production line position through the warehouse control system; calculating the target shortest production line path corresponding to the target production line position according to the starting and ending point information corresponding to the target production line position and the target shortest path rule through the warehouse control system; and dispatching the electronic control system through the warehouse control system to transport the target picked materials to the target production line position according to the target shortest production line path.
[0090] Among them, the starting and ending information corresponding to the target production line position is the starting and ending information of the material transportation task determined by the warehouse control system according to the target production line position. The starting point corresponding to the target production line position refers to the storage position of the target picking material in the warehouse, and the end point is the production line position where the target picking material needs to be delivered. For the production line transportation task, the warehouse control system needs to determine the shortest path from the current position of the material (starting point) to the specified position (end point) on the production line in order to deliver the material quickly and accurately.
[0091] As for the electric control system, it is an electronic control system used to control the operation of the automated equipment (picking equipment) inside the warehouse. The electric control system can control the picking equipment, conveyor belts and other equipment to perform specific operations according to the instructions of the warehouse control system. Specifically, the warehouse control system (WCS) applies for materials from the warehouse management system (WMS) according to the picking task, and the warehouse management system sends the outbound task to the warehouse control system. The warehouse control system dispatches the electric control system to transport the plate stack. The electric control system is the control system for the action of the picking equipment.
[0092] In some specific embodiments, step S105 may also include: when the warehouse control system dispatches the electric control system to transport the target picked materials to the target production line position according to the target shortest production line path, if an abnormality occurs in the electric control system, the electric control system will transport the target picked materials to the target abnormal position.
[0093] Among them, the target abnormal position refers to the specific location where the target picking material is transported when an abnormality occurs in the electronic control system. It can usually be set to a safe area away from the production line to prevent material damage or production line shutdown.
[0094] In step S105 shown in the embodiment of the present application, the target picking material is transported to the target production line position according to the target shortest production line path through the warehouse control system, and the shortest path is calculated using the target shortest path rule, thereby optimizing the material transportation route, reducing transportation time and cost, and improving production efficiency. In addition, when an abnormality occurs in the electronic control system, the material can be quickly transferred to the abnormal position, avoiding stagnation of the production line and maintaining the continuity and stability of production.
[0095] In the steps S101 to S105 shown in the embodiment of the present application, a material production plan is generated by the workflow execution system, and the material production plan is sent to the warehouse management system; a material picking task is generated according to the material production plan by the warehouse management system, and the material picking task is sent to the warehouse control system; the material picking action is calculated according to the material picking task by the warehouse control system; the picking device is controlled by the warehouse control system to perform the material picking action to obtain the target picking material; the target picking material is transported to the target production line position according to the target shortest production line path by the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule. The embodiment of the present application can realize the automated production of materials through the synergy between the workflow execution system, the warehouse management system and the warehouse control system, thereby improving the efficiency and accuracy of the entire production process, and reducing labor costs. At the same time, automated production can avoid human errors, thereby improving production quality; in addition, the target shortest production line path is calculated based on the target shortest path rule, so that the warehouse control system transports the target picking material to the target production line position according to the target shortest production line path, thereby improving the efficiency of material transportation and reducing unnecessary material transportation time and data waste.
[0096] Moreover, after the picking is completed, the remaining materials will be automatically returned to the warehouse, so as to achieve precise material preparation. In addition, when the electronic control system controlling the plate stack conveying is abnormal, the materials can be quickly transferred to the abnormal position, avoiding the stagnation of the production line and maintaining the continuity and stability of production.
[0097] In order to explain the principle of the technical solution of the present invention in detail, the overall process of the present invention is described below in combination with some specific embodiments. It is easy to understand that the following is an explanation of the technical principle of the present invention and cannot be regarded as a limitation of the present invention.
[0098] The traditional logistics system uses a single route for transportation from the warehouse entrance to the vertical warehouse and from the vertical warehouse to the warehouse exit. When materials are needed for production, they need to be transported to the production line by other manual transportation equipment after they come out of the vertical warehouse and arrive at the warehouse exit. The remaining materials are then transported back to the warehouse entrance and re-stored. The warehouse logistics transportation method provided in the embodiment of the present application improves the single route into a real-time calculated route, avoiding the continuous transportation of plate stacks to problematic routes, causing unnecessary congestion, improving the transportation line, and reducing transportation risks.
[0099] See also Figure 2 , Figure 2 is a flow chart of a warehouse logistics transportation method provided in an embodiment of the present application; Figure 2As shown, the overall implementation process of the warehouse logistics transportation method in the embodiment of the present application can be: first, the user starts the production management system, the system enters the initialization state, and is ready to start executing various tasks. The user logs in, the system verifies the user's identity, and enters the system main interface after successful login. Then, the workflow execution system generates a material production plan according to the material production task, and synchronizes the material production plan to the warehouse management system through the workflow execution system. Then, before the production task starts, the required materials, including raw materials, tools, etc., are prepared in advance according to the production plan. The warehouse management system generates a material picking task according to the material production plan, and sends the material picking task to the warehouse control system. Then, the warehouse control system sends a material outbound request to the warehouse management system according to the material picking task, that is, applies to issue the material, so that the warehouse management system sends the material outbound task to the warehouse control system according to the material outbound request. When the warehouse management system responds to the material outbound request and provides the plate stack material to the picking position, the warehouse control system calculates the material picking action according to the material outbound task, and the warehouse control system controls the picking device to perform the material picking action ( Figure 2 The warehouse control system uses the gantry picking module in the vertical warehouse to obtain the target picking material. After the picking is completed, the remaining materials will be automatically returned to the warehouse, thereby realizing precise material preparation. Specifically, the warehouse control system issues a picking task to the picking device. Assume that the picking task issued is to pick 5 plates, and the actual incoming materials of the warehouse management system are 20 plates. After the picking device completes the picking task of 5 plates, it will feedback information to the warehouse control system. The warehouse control system triggers the remaining 15 plates to be automatically returned to the warehouse. If the number of plates required for production on the production line is consistent with the number of plates provided by the vertical warehouse, there will be no remaining materials returned to the warehouse on the production line, thereby improving production efficiency. Finally, the warehouse control system transports the target picking material to the target production line position according to the target shortest production line path. During the production process, when the production line needs materials, the vertical warehouse will deliver the corresponding amount of materials according to actual demand without the need for additional transportation equipment for transportation. This not only improves production efficiency, but also reduces material waste and risks during transportation. By calculating routes in real time, preparing materials in advance to generate picking tasks, and automating material picking and returning to the warehouse, the embodiments of the present application can calculate and monitor the logistics path of the plate stack in real time, manage material flow more efficiently, improve production efficiency, and achieve precise loading.
[0100] Moreover, when an abnormality occurs in the electronic control system corresponding to the action of the picking equipment, the material can be quickly transferred to the abnormal position. For example, suppose that data information is lost, data is disordered, etc. occurs during the control of the electronic control system during the conveying of the plate stack. When the data of the electronic control system is lost and the destination is lost, the electronic control system directly transports the material to the abnormal exit, thus avoiding stagnation of the production line and maintaining the continuity and stability of production.
[0101] In summary, by continuously improving data rules and intelligent systems, managers can more quickly discover production problems in the system, make timely adjustments and avoid risks, and avoid dealing with problems after they occur; this improves the low production efficiency caused by internal personnel's active inspections, manual material preparation, and manual picking before the use of intelligent systems. The embodiments of this application reduce the workload of workshop personnel on the one hand, and improve the production efficiency of the production line on the other.
[0102] It should be pointed out that this embodiment only provides a brief schematic illustration of the general process of the warehouse logistics transportation method. The detailed description of each step can refer to the relevant content in the aforementioned embodiment and will not be repeated here. It can be understood that the present invention is not limited to this.
[0103] The embodiment of the present application provides a warehouse logistics transportation method, device, electronic device and storage medium. The scheme generates a material production plan through a workflow execution system and sends the material production plan to a warehouse management system; generates a material picking task according to the material production plan through the warehouse management system, and sends the material picking task to the warehouse control system; calculates the material picking action according to the material picking task through the warehouse control system; controls the picking device to perform the material picking action through the warehouse control system to obtain the target picking material; and transports the target picking material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule. The embodiment of the present application can realize the automated production of materials through the synergy between the workflow execution system, the warehouse management system and the warehouse control system, thereby improving the efficiency and accuracy of the entire production process, and can reduce labor costs. At the same time, automated production can avoid human errors, thereby improving production quality; in addition, the target shortest production line path is calculated based on the target shortest path rule, so that the warehouse control system transports the target picking material to the target production line position according to the target shortest production line path, thereby improving the efficiency of material transportation and reducing unnecessary material transportation time and data waste.
[0104] Moreover, after the picking is completed, the remaining materials will be automatically returned to the warehouse, so as to achieve precise material preparation. In addition, when the electronic control system controlling the plate stack conveying is abnormal, the materials can be quickly transferred to the abnormal position, avoiding the stagnation of the production line and maintaining the continuity and stability of production.
[0105] See also Figure 3 The embodiment of the present application further provides a warehouse logistics conveying device 300, which can implement the above-mentioned warehouse logistics conveying method. The device 300 includes the following modules:
[0106] The production plan generation module 301 is used to generate a material production plan through a workflow execution system and send the material production plan to a warehouse management system;
[0107] A picking task generating module 302 is used to generate a material picking task according to the material production plan through the warehouse management system, and send the material picking task to the warehouse control system;
[0108] A picking action calculation module 303, used to calculate the material picking action according to the material picking task through the warehouse control system;
[0109] A target material acquisition module 304 is used to control the picking device to perform the material picking action through the warehouse control system to obtain the target picking material;
[0110] The target material conveying module 305 is used to convey the target picked material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule.
[0111] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0112] The embodiment of the present application also provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above warehouse logistics transportation method when executing the computer program. The electronic device can be any intelligent terminal including a tablet computer, a car computer, etc.
[0113] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0114] See also Figure 4 , Figure 4 The hardware structure of an electronic device of another embodiment is illustrated, and the electronic device includes:
[0115] The processor 401 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application.
[0116] The memory 402 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 402 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 402, and the processor 401 calls and executes the warehouse logistics transportation method of the embodiment of this application;
[0117] Input / output interface 403, used to implement information input and output;
[0118] Communication interface 404, used to realize communication interaction between the device and other devices, which can be realized through wired mode (such as USB, network cable, etc.) or wireless mode (such as mobile network, WI FI, Bluetooth, etc.);
[0119] Bus 405 , which transmits information between various components of the device (e.g., processor 401 , memory 402 , input / output interface 403 , and communication interface 404 );
[0120] The processor 401 , the memory 402 , the input / output interface 403 and the communication interface 404 are connected to each other in communication within the device via the bus 405 .
[0121] An embodiment of the present application also provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the above-mentioned warehouse logistics transportation method is implemented.
[0122] It can be understood that the contents of the above method embodiments are all applicable to the present storage medium embodiments, the functions specifically implemented by the present storage medium embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0123] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0124] The warehouse logistics transportation method, warehouse logistics transportation device, electronic device and storage medium provided in the embodiment of the present application generate a material production plan through a workflow execution system, and send the material production plan to a warehouse management system; generate a material picking task according to the material production plan through the warehouse management system, and send the material picking task to the warehouse control system; calculate the material picking action according to the material picking task through the warehouse control system; control the picking device to perform the material picking action through the warehouse control system to obtain the target picking material; transport the target picking material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule. The embodiment of the present application can realize the automated production of materials through the synergy between the workflow execution system, the warehouse management system and the warehouse control system, thereby improving the efficiency and accuracy of the entire production process, and reducing labor costs. At the same time, automated production can avoid human errors, thereby improving production quality; in addition, the target shortest production line path is calculated based on the target shortest path rule, so that the warehouse control system transports the target picking material to the target production line position according to the target shortest production line path, thereby improving the efficiency of material transportation and reducing unnecessary material transportation time and data waste.
[0125] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0126] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.
[0127] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0128] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0129] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0130] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0131] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0132] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0133] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0134] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), disk or optical disk and other media that can store programs.
[0135] The preferred embodiments of the present invention are described above with reference to the accompanying drawings, but the scope of the rights of the present invention is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present invention should be within the scope of the rights of the present invention.
Claims
1. A warehouse logistics transportation method, characterized in that: The method comprises the following steps: Generate a material production plan through a workflow execution system, and send the material production plan to a warehouse management system; Generate a material picking task according to the material production plan through the warehouse management system, and send the material picking task to the warehouse control system; Calculating material picking actions according to the material picking tasks by the warehouse control system; Controlling the picking equipment to perform the material picking action through the warehouse control system to obtain the target picking material; The target picked material is transported to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule.
2. The method according to claim 1, characterized in that The method of generating a material production plan through a workflow execution system and sending the material production plan to a warehouse management system includes: Acquiring material production tasks through the workflow execution system; Generate the material production plan according to the material production task through the workflow execution system; The material production plan is sent to the warehouse management system through the workflow execution system.
3. The method according to claim 1, characterized in that The step of generating a material picking task according to the material production plan through the warehouse management system and sending the material picking task to the warehouse control system includes: Generate the material picking task according to the target material quantity and target material type in the material production plan through the warehouse management system; The material picking task is sent to the warehouse control system through the warehouse management system.
4. The method according to claim 1, characterized in that: The calculating the material picking action according to the material picking task by the warehouse control system includes: Sending a material outbound request to the warehouse management system according to the material picking task by the warehouse control system, so that the warehouse management system sends a material outbound task to the warehouse control system according to the material outbound request; The material picking action is calculated by the warehouse control system according to the material outbound task.
5. The method according to claim 1, characterized in that The step of controlling the picking device to perform the material picking action by the warehouse control system to obtain the target picking material includes: Obtaining the starting and ending point information corresponding to the target picking location through the warehouse control system; The warehouse control system calculates the target shortest picking path corresponding to the target picking location according to the starting and ending point information corresponding to the target picking location and the target shortest path rule; The warehouse control system controls the picking device to perform the material picking action according to the target shortest picking path to obtain the target picking material.
6. The method according to claim 1, characterized in that The method of transporting the target picked material to the target production line position according to the target shortest production line path by the warehouse control system includes: Acquire the starting and ending point information corresponding to the target production line position through the warehouse control system; Calculating the target shortest production line path corresponding to the target production line position by the warehouse control system according to the start and end point information corresponding to the target production line position and the target shortest path rule; The warehouse control system dispatches the electronic control system to transport the target picked material to the target production line position according to the target shortest production line path.
7. The method according to claim 6, characterized in that The method further comprises: When the warehouse control system dispatches the electric control system to transport the target picked materials to the target production line position according to the target shortest production line path, if an abnormality occurs in the electric control system, the electric control system will transport the target picked materials to the target abnormal position.
8. A warehouse logistics conveying device, characterized in that: The device comprises the following modules: A production plan generation module is used to generate a material production plan through a workflow execution system and send the material production plan to a warehouse management system; A picking task generating module, used to generate a material picking task according to the material production plan through the warehouse management system, and send the material picking task to the warehouse control system; A picking action calculation module, used for calculating the material picking action according to the material picking task through the warehouse control system; A target material acquisition module, used to control the picking equipment to perform the material picking action through the warehouse control system to obtain the target picking material; A target material conveying module is used to convey the target picked material to the target production line position according to the target shortest production line path through the warehouse control system; wherein the target shortest production line path is calculated according to the target shortest path rule.
9. An electronic device, characterized in that: The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor implements the method according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Flexible scheduling method and system
CN115542857A
Intelligent workshop production management system and method
CN116012188A
Automatic cargo sorting system
CN116280850A
Cargo management method, device and system and electronic equipment
CN116452089A
Planning for manufacturing environments
US20170075333A1
Cited By
Feeding control method for automobile wire harness production line
CN120348618A