A water resources scheduling method based on data processing

By calculating the pipeline parameters accumulation degree and blocking precipitation index and adjusting the water supply pressure, the problem of blockage in the water supply pipeline network affecting water resource scheduling is solved, and the scheduling accuracy and user experience are improved.

CN118759832BActive Publication Date: 2024-11-05GREEN TECHNOLOGY (DALIAN) CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411246313.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-05
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The blockage of water supply pipelines affects the accuracy and reliability of water resource scheduling, and it is difficult to effectively solve the problem of existing technology.

Method used

By obtaining pipeline attribute data and historical water supply data, calculating pipeline parameter deposits and blocking precipitation index, determining the pipeline network blocking index, and adjusting the water supply pressure according to the index for closed-loop control.

Benefits of technology

It improves the control accuracy of the water resource scheduling process and improves the user's water use experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118759832B_ABST
    Figure CN118759832B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of electronic digital data processing, and in particular to a water resource scheduling method based on data processing, the method comprising: obtaining pipeline attribute data and historical water supply data of a water supply network in a to-be-scheduled area; calculating the pipeline parameter product of each branch pipe in the water supply network according to the pipeline attribute data; calculating the blocking sedimentation index of each branch pipe in the water supply network according to the historical water supply data and pipeline attribute data; calculating the network blocking index of the water supply network in the to-be-scheduled area according to the pipeline parameter product and blocking sedimentation index of each branch pipe; determining the proportional gain coefficient in the current water resource scheduling cycle according to the network blocking index; and performing closed-loop control on the water supply pressure of the water supply network in the to-be-scheduled area according to the proportional gain coefficient. Since the influence of the water supply network blocking on the water resource scheduling process is comprehensively considered, the control accuracy of the water resource scheduling process is improved, and the user water experience effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electronic digital data processing, and in particular to a water resources scheduling method based on data processing. Background Art

[0002] In order to meet the water demand in different regions and improve the utilization rate of water resources, it is necessary to reasonably dispatch water resources. Water resource dispatch usually adjusts and arranges the utilization and allocation of water resources through reasonable planning and control according to the supply and demand status of water resources and management objectives, so as to improve the utilization efficiency of water resources.

[0003] In the related technology, when water plants dispatch and allocate water resources in different regions, they only differentiate the water supply status of water supply networks in different regions according to factors such as the terrain characteristics and water supply distance of different regions, in order to achieve reasonable dispatch of water resources. However, for water supply networks with poor water supply status, rust or scale may form inside the pipes due to long-term use, causing the pipes to be blocked, resulting in the water supply pressure failing to reach the expected target, thereby affecting the accuracy and reliability of the water resource dispatch link. Summary of the invention

[0004] In order to solve the technical problem that water supply network blockage affects the accuracy of water resource scheduling, the purpose of the present invention is to provide a water resource scheduling method based on data processing. The technical solution adopted is as follows:

[0005] A water resources scheduling method based on data processing, the method comprising:

[0006] Obtain pipeline attribute data and historical water supply data of the water supply network in the area to be dispatched;

[0007] According to the pipeline attribute data, the pipeline parameter product of each branch pipe in the water supply network is calculated;

[0008] Calculate the blocking sedimentation index of each branch pipe in the water supply network according to the historical water supply data and the pipeline attribute data;

[0009] Calculate the pipe network obstruction index of the water supply pipe network in the area to be dispatched according to the pipe parameter product of each branch pipe and the obstruction sedimentation index;

[0010] Determining a proportional gain coefficient within a current water resource scheduling cycle according to the pipe network blocking index;

[0011] The water supply pressure of the water supply network in the area to be scheduled is controlled in a closed loop according to the proportional gain coefficient.

[0012] According to the water resource scheduling method based on data processing provided by the present invention, the pipeline attribute data includes: the number of sub-pipelines in each branch pipe in the water supply network, the inner diameter of the sub-pipeline, the number of bends in the sub-pipeline, and the use time of the sub-pipeline;

[0013] The method of calculating the pipeline parameter product of each branch pipe in the water supply network according to the pipeline attribute data includes:

[0014] Subtract the inner diameter of a sub-pipeline of any sub-pipeline in each branch pipe from the inner diameter of the sub-pipeline of the previous sub-pipeline to obtain the inner diameter difference of the first adjacent pipes;

[0015] Inputting the difference in inner diameter of the first adjacent pipe of each sub-pipe into a preset curve function to obtain a difference function value;

[0016] Multiplying the difference function value of each sub-pipeline by the sub-pipeline usage time to obtain an intermediate product value;

[0017] According to the number of sub-pipes in each branch pipe, the intermediate product values ​​of all sub-pipes in each branch pipe are summed up to obtain the pipeline parameter product of each branch pipe in the water supply network.

[0018] According to the water resource scheduling method based on data processing provided by the present invention, the blocking sedimentation index of each branch pipe in the water supply network is calculated based on the historical water supply data and the pipeline attribute data, including:

[0019] Calculate the historical sedimentation accumulation of each sub-pipeline in each branch pipe according to the historical water supply data and the pipeline attribute data;

[0020] Subtract the historical sedimentation accumulation of the previous sub-pipeline from the historical sedimentation accumulation of the current sub-pipeline to obtain the difference in accumulation of adjacent pipelines;

[0021] According to the inner diameter of the sub-pipe in the pipeline attribute data, the inner diameter of the sub-pipe of the previous sub-pipe is subtracted from the inner diameter of the sub-pipe of the current sub-pipe to obtain the inner diameter difference of the second adjacent pipeline;

[0022] The blocking sedimentation index of each branch pipe in the water supply network is calculated based on the historical sedimentation accumulation of each sub-pipe in each branch pipe, the difference in the accumulation of adjacent pipes and the difference in the inner diameters of the second adjacent pipes.

[0023] According to the water resource scheduling method based on data processing provided by the present invention, the historical water supply data includes: historical water supply flow rate and historical water quality parameters;

[0024] The historical sedimentation accumulation of each sub-pipeline in each branch pipe is calculated based on the historical water supply data and the pipeline attribute data, including:

[0025] Calculate the water supply sedimentation index in each statistical period based on the historical water quality parameters in each statistical period;

[0026] The number of bends of the sub-pipeline of each sub-pipeline in each branch pipe is divided by the inner diameter of the sub-pipeline to obtain the sedimentation influence parameter of each sub-pipeline;

[0027] Calculate the average water supply flow rate in each statistical period based on the historical water supply flow rate;

[0028] The historical accumulation of sedimentation of each sub-pipeline is calculated based on the water supply sedimentation index, the mean water supply flow rate, the sedimentation influencing parameter of each sub-pipeline and the use time of the sub-pipeline in each statistical period.

[0029] According to the water resource scheduling method based on data processing provided by the present invention, the historical water quality parameters include: historical water quality pH value and historical water quality hardness;

[0030] The water supply sedimentation index in each statistical period is calculated based on the historical water quality parameters in each statistical period, including:

[0031] The historical water hardness in each statistical period is divided by the historical water pH value to obtain the water supply sedimentation index in each statistical period.

[0032] According to the water resource scheduling method based on data processing provided by the present invention, the historical precipitation accumulation degree of each sub-pipeline is calculated based on the water supply precipitation index, the water supply flow rate mean, the precipitation influencing parameter of each sub-pipeline and the use time of the sub-pipeline in each statistical period, including:

[0033] The water supply sedimentation index in each statistical period is divided by the mean value of the water supply flow rate to obtain the water supply intermediate parameter of each statistical period;

[0034] The water supply intermediate parameters of each sub-pipeline in each statistical period within the sub-pipeline usage time are summed to obtain a summed value of the water supply parameters of each sub-pipeline;

[0035] The sum of the water supply parameters of each sub-pipeline is multiplied by the sedimentation influencing parameter to obtain the historical sedimentation accumulation of each sub-pipeline.

[0036] According to the water resource scheduling method based on data processing provided by the present invention, the blocking sedimentation index of each branch pipe in the water supply network is calculated based on the historical sedimentation accumulation of each sub-pipe in each branch pipe, the difference in the accumulation of adjacent pipes, and the difference in the inner diameters of the second adjacent pipes, including:

[0037] Taking the quotient of the difference in the accumulated diameters of the adjacent pipes of each sub-pipeline and the difference in the inner diameters of the second adjacent pipes, a quotient of the difference is obtained;

[0038] Multiplying the difference quotient of each sub-pipeline by the historical sedimentation accumulation degree to obtain a blocking index of each sub-pipeline;

[0039] The blocking index of all sub-pipes in each branch pipe is summed to obtain the blocking sedimentation index of each branch pipe in the water supply network.

[0040] According to the water resource scheduling method based on data processing provided by the present invention, the pipe network blocking index of the water supply pipe network in the area to be scheduled is calculated according to the pipe parameter product of each branch pipe and the blocking sedimentation index, including:

[0041] Multiply the pipeline parameter product of each branch pipe by the blocking precipitation index to obtain the branch pipe blocking value of each branch pipe;

[0042] Sum the branch pipe blockage values ​​of each branch pipe in the water supply network in the area to be scheduled to obtain a summed blockage value;

[0043] The summed blockage value is input into a tanh function to obtain a network blockage index of the water supply network in the area to be scheduled.

[0044] According to the water resource scheduling method based on data processing provided by the present invention, the proportional gain coefficient in the current water resource scheduling cycle is determined according to the pipe network blocking index, including:

[0045] Adding the pipe network obstruction index to 1 to obtain a coefficient correction value;

[0046] The coefficient correction value is multiplied by a preset proportional gain initial value to obtain a proportional gain coefficient in the current water resource scheduling cycle.

[0047] According to the water resource scheduling method based on data processing provided by the present invention, the closed-loop control of the water supply pressure of the water supply network in the area to be scheduled according to the proportional gain coefficient includes:

[0048] Input the proportional gain coefficient and the preset integral gain initial value and differential gain initial value into the PID controller to obtain a water pressure control signal output by the PID controller;

[0049] The water supply pressure of the water supply network in the area to be scheduled is closed-loop controlled according to the water pressure control signal.

[0050] The present invention has the following beneficial effects:

[0051] By obtaining the pipeline attribute data and historical water supply data of the water supply network in the area to be scheduled, the pipeline parameter integral of each branch pipe in the water supply network is calculated according to the pipeline attribute data, and the blocking sedimentation index of each branch pipe in the water supply network is calculated according to the historical water supply data and pipeline attribute data, and then the network blocking index of the water supply network in the area to be scheduled is calculated according to the pipeline parameter integral and blocking sedimentation index of each branch pipe, and then the proportional gain coefficient in the current water resource scheduling cycle is determined according to the network blocking index, and finally the water supply pressure of the water supply network in the area to be scheduled is closed-loop controlled according to the proportional gain coefficient. Since the water supply pressure can be closed-loop controlled according to the network blocking index of the water supply network in the area to be scheduled, the influence of the water supply network blocking on the water resource scheduling process is comprehensively considered, thereby improving the control accuracy of the water resource scheduling process and improving the user water experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0053] Figure 1 A schematic flow chart of a water resource scheduling method based on data processing provided by an embodiment of the present invention;

[0054] Figure 2 It is a schematic diagram of the statistical data of water flow velocity in the water supply network in different time periods;

[0055] Figure 3 It is a schematic diagram of the water distribution of each branch pipe on a certain main pipe in the water supply network;

[0056] Figure 4 A schematic diagram of the structure of a water resource scheduling device based on data processing provided by an embodiment of the present invention;

[0057] Figure 5 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0058] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the specific implementation method, structure, features and effects of a water resource scheduling method based on data processing proposed by the present invention in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0059] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0060] This embodiment relates to the field of electronic digital data processing, and can be specifically applied to the scenario of achieving reasonable scheduling of water resources by regulating the water supply pressure of the water supply network. At present, the water source for urban water supply is generally surface water, including rivers, lakes and reservoirs. The water plant takes water from the water source, and pressurizes it through the water intake pump station to the water plant for treatment. The water treated by the water plant is pressurized and sent to the municipal water supply network in the city through the water delivery pump station in the plant. Each water use point (area) takes water from the municipal water supply network according to the scheduling rules. Water resource scheduling is mainly divided into several key steps, such as water resource statistics, demand forecasting, water allocation plan formulation, scheduling execution and monitoring, water quality assurance and monitoring, system maintenance and optimization. Among them, scheduling execution mainly controls the water supply process by adjusting the operating status of the pump station. This embodiment mainly analyzes this process and optimizes the water resource scheduling process.

[0061] When the water plant supplies water to the water supply network, some old water pipes may be blocked by rust or dissolved substances. This blockage will have many effects on the water supply pressure of the water supply system, such as reduced water pressure, insufficient water supply, damage to the pipeline structure, etc., especially during peak water use periods, the water supply may not meet the water demand. Therefore, in the process of water resource scheduling, it is necessary to analyze the rust blockage of the water supply network, and optimize the water supply process based on the analysis results to improve the accuracy of water resource scheduling.

[0062] The following is combined with Figures 1 to 5 The detailed scheme of a water resource scheduling method based on data processing provided by the present invention is specifically described.

[0063] See also Figure 1 , which shows a method flow chart of a water resources scheduling method based on data processing provided by an embodiment of the present invention, such as Figure 1 As shown, the water resources scheduling method based on data processing provided by the embodiment of the present invention specifically includes the following steps:

[0064] Step 110: Obtain pipeline attribute data and historical water supply data of the water supply network in the area to be scheduled.

[0065] It is understandable that the pipe attribute data of the water supply network is mainly used to characterize the performance of the pipes themselves in the water supply network, and may specifically include data related to the performance of the pipes themselves, such as the inner diameter of the pipe, the number of pipe bends, the service life, and the maximum pressure parameters of the pipe.

[0066] In this embodiment, the historical water supply data is mainly used to characterize some key parameters in the water supply process of the water supply network in the previous period of time, which may specifically include historical water supply flow rate, historical water quality pH value, historical water quality hardness and other related data.

[0067] The historical water supply flow rate can be collected by the flow rate sensor arranged in the water supply network. Specifically, the flow rate sensor can be used to monitor the water flow rate at the main pipe inlet, each branch pipe inlet and outlet in the water supply network in the previous period of time, and then the historical water supply flow rate can be obtained. Figure 2 The water flow velocity data of the water supply network collected at different key moments during the five days from February 27, 2017 to March 3, 2017 are shown as an example. The water flow velocity of each day is then averaged to obtain the historical water supply flow velocity of each day.

[0068] In practical applications, historical water quality pH value and historical water quality hardness can be extracted from the test data obtained from the tap water supply testing link and the water use point testing link.

[0069] Step 120: Calculate the pipeline parameter product of each branch pipe in the water supply network based on the pipeline attribute data.

[0070] It is understandable that, with the passage of time, the inner wall of a pipe that has been in use for a long time will gradually accumulate deposits due to rust or scale, and these deposits may fall off and block the pipe. In this embodiment, the pipe parameter integration degree can characterize the probability of deposits appearing inside the pipes of each branch pipe. The higher the pipe parameter integration degree, the greater the probability of deposits appearing inside the pipe.

[0071] Step 130: Calculate the blockage sedimentation index of each branch pipe in the water supply network based on the historical water supply data and pipeline attribute data.

[0072] It can be understood that the blocking sedimentation index can represent the probability of pipeline blockage caused by the accumulation of sediment inside the pipeline, which leads to obstruction of water flow in the pipeline. The higher the blocking sedimentation index, the higher the probability that the pipeline of the branch pipe is blocked due to sediment accumulation.

[0073] Step 140: Calculate the pipe network blockage index of the water supply pipe network in the area to be dispatched according to the pipe parameter product and the blockage sedimentation index of each branch pipe.

[0074] In this embodiment, the pipe network blockage index can represent the probability that the entire water supply network is blocked by sediments. The higher the pipeline parameter accumulation degree and blockage sedimentation index of each branch pipe, the higher the pipe network blockage index of the water supply network and the higher the probability that the water supply network is blocked.

[0075] Step 150: Determine the proportional gain coefficient in the current water resource scheduling cycle according to the pipe network blocking index.

[0076] In this embodiment, a PID (Proportional Integral Derivative) control process is introduced in the water supply pressure control link. The PID control process mainly uses the proportional gain coefficient, the integral gain coefficient and the differential gain coefficient to achieve closed-loop control of the controlled quantity. In this embodiment, the proportional gain coefficient is mainly corrected by the pipe network blockage index, thereby providing accurate input data for the subsequent closed-loop control of the water supply pressure.

[0077] Step 160: Perform closed-loop control on the water supply pressure of the water supply network in the dispatching area according to the proportional gain coefficient.

[0078] In practical applications, the proportional gain coefficient corrected according to the pipe network blockage index is input into the PID controller, and the water pump operation can be controlled by the water pressure control signal output by the PID controller, thereby realizing closed-loop control of the water supply pressure of the water supply network in the dispatching area.

[0079] In one embodiment, the pipeline attribute data specifically includes: the number of sub-pipelines in each branch pipe in the water supply network, the inner diameter of the sub-pipeline, the number of bends in the sub-pipeline, and the use time of the sub-pipeline.

[0080] In this embodiment, the number of sub-pipes in each branch pipe in the water supply network, the inner diameter of the sub-pipe, the number of sub-pipe bends and the usage time of the sub-pipes can be determined according to the configuration of the branch pipes in the water supply network and the parameters of the sub-pipes themselves.

[0081] In practical applications, before analyzing the blockage of each branch pipe in the water supply network, it is necessary to evaluate the pipeline status of each branch pipe in the water supply network according to the water distribution conditions of the main pipes and branches in the water supply network. Figure 3 The water distribution of each branch pipe on the main pipe from section A to B in the water supply network is shown as an example. Among them, q1, q2, ..., q6 represent the flow direction of each branch pipe, q1', q2', ..., q7' represent the flow along the main pipe, and Q1 and Q2 represent the node flow on the main pipe.

[0082] Furthermore, according to the pipeline attribute data, the pipeline parameter product of each branch pipe in the water supply network is calculated, including:

[0083] In the first step, the inner diameter of a sub-pipeline of any sub-pipeline in each branch pipe is subtracted from the inner diameter of a sub-pipeline of the previous sub-pipeline to obtain the inner diameter difference of the first adjacent pipes.

[0084] It is understandable that when evaluating the impact of the pipeline status of the branch pipe on the pipeline blockage, the sub-pipes with different inner diameters in the branch pipe correspond to different water flow velocities. Especially for the sub-pipes with larger inner diameters, the water flow velocity in the current sub-pipe is lower than the water flow velocity in the previous sub-pipe, which means that the probability of sediment appearing inside the current sub-pipe is higher.

[0085] Therefore, this embodiment introduces the influencing parameter of the inner diameter of the sub-pipeline in the calculation link of the pipeline parameter product. By calculating the difference in the inner diameters of two adjacent sub-pipelines, the difference in the inner diameters of the first adjacent pipes is obtained. It can be understood that the difference in the inner diameters of the first adjacent pipes can characterize the difference in the inner diameters of the two adjacent sub-pipelines. The larger the difference in the inner diameters of the first adjacent pipes, the more obvious the difference in the inner diameters of the two adjacent sub-pipelines.

[0086] In the second step, the difference in inner diameters of the first adjacent pipes of each sub-pipeline is input into a preset curve function to obtain a difference function value.

[0087] In this embodiment, the preset curve function may be a sigmoid function. The sigmoid function can be used to avoid interference of negative numbers on the final calculation result, thereby improving the calculation accuracy of the pipeline parameter product.

[0088] The third step is to multiply the difference function value of each sub-pipeline by the sub-pipeline usage time to obtain the intermediate product value.

[0089] In practical applications, before using the sub-pipeline usage time for calculation, the usage time of different sub-pipelines can be normalized by using the range normalization method to ensure the accuracy of subsequent calculation links.

[0090] The fourth step is to sum the intermediate product values ​​of all the sub-pipes in each branch pipe according to the number of sub-pipes in each branch pipe, and obtain the pipeline parameter product of each branch pipe in the water supply network.

[0091] In this embodiment, the calculation formula of the pipeline parameter product is as follows:

[0092] (1)

[0093] Among them, h represents the pipe parameter product of a branch pipe, m represents the number of sub-pipes of the branch pipe, Indicates the sub-pipeline usage time of the i-th sub-pipeline, represents the inner diameter difference of the first adjacent pipe of the i-th sub-pipeline, and sig represents the sigmoid function.

[0094] According to the above formula (1), the sub-pipeline usage time of the i-th sub-pipeline is The difference between the inner diameter of the first adjacent pipe of the i-th sub-pipeline The larger the value is, the greater the probability of sediment appearing in the current branch pipe. Therefore, after combining the above two values, the intermediate product value is It represents the accumulation parameter of a sub-pipeline in the current branch. Finally, after adding the accumulation parameters of all sub-pipelines, the pipeline parameter accumulation degree h of the current branch is obtained.

[0095] In one embodiment, the blocking sedimentation index of each branch pipe in the water supply network is calculated based on the historical water supply data and the pipe attribute data, specifically including:

[0096] The first step is to calculate the historical sedimentation accumulation of each sub-pipeline in each branch pipe based on the historical water supply data and pipeline attribute data.

[0097] It is understandable that in the process of evaluating the degree of internal blockage in the pipeline, in addition to the pipeline parameter integration obtained through the pipeline use link and the use of the pipeline's own properties to analyze the sediment accumulation during operation, the historical operating status of the pipeline can be combined to more accurately analyze the degree of internal blockage in the pipeline.

[0098] Therefore, this embodiment introduces historical water supply data, and combines the historical water supply data and pipeline attribute data to calculate the historical sedimentation accumulation of each sub-pipe in each branch pipe. The historical sedimentation accumulation can characterize the accumulation of sediment in a sub-pipe during the service life of the sub-pipe.

[0099] In a specific implementation, the historical water supply data includes: historical water supply flow rate and historical water quality parameters, and the pipeline attribute data also includes: the number of sub-pipelines in each branch pipe in the water supply network, the inner diameter of the sub-pipeline, the number of sub-pipeline bends, and the length of time the sub-pipeline is in use.

[0100] Furthermore, based on the historical water supply data and pipeline attribute data, the historical sedimentation accumulation of each sub-pipeline in each branch pipe is calculated, including:

[0101] On the one hand, the water supply sedimentation index in each statistical period is calculated based on the historical water quality parameters in each statistical period.

[0102] Specifically, historical water quality parameters include: historical water pH and historical water hardness;

[0103] In this embodiment, the water supply sedimentation index in each statistical period is calculated based on the historical water quality parameters in each statistical period, specifically including:

[0104] The historical water hardness and the historical water pH value in each statistical period are divided to obtain the water supply sedimentation index in each statistical period. The specific calculation formula is as follows:

[0105] (2)

[0106] In the formula, It represents the water supply precipitation index within a certain statistical period. Indicates the historical water hardness in the current statistical period. Indicates the historical water quality PH value in the current statistical period.

[0107] In practical applications, a statistical cycle can be one day. The historical water hardness can represent the concentration of sediments in the water body. The larger the value, the greater the probability of sediments forming in the pipes. In addition, acidic water (i.e., low pH value) will accelerate the corrosion of iron pipes and increase the probability of corrosion in water supply pipes. In summary, through After correcting the logical relationship between the two parameters, It can represent the water supply sedimentation index within a certain statistical period.

[0108] On the other hand, the number of sub-pipeline bends of each sub-pipeline in each branch pipe is divided by the inner diameter of the sub-pipeline to obtain the sedimentation influence parameter of each sub-pipeline.

[0109] It is understandable that the smaller the inner diameter of the pipe, the greater the impact of its internal sediment on the water flow in the pipe. At the same time, the bending area of ​​the pipe may form a buffer zone for the flow of water. The existence of the buffer zone may cause the water flow speed in the pipe to weaken, increasing the probability of sediment appearing in the pipe. Therefore, by calculating the ratio of the number of sub-pipeline bends to the inner diameter of the sub-pipeline of each sub-pipeline, and using it as a pipeline sedimentation influencing parameter to participate in the calculation of the historical sedimentation accumulation, the accuracy of the calculation results can be further improved.

[0110] On the other hand, based on the historical water supply flow rate, the average water supply flow rate in each statistical period is calculated.

[0111] Finally, the historical accumulation of sedimentation in each sub-pipeline is calculated based on the water supply sedimentation index, the average water supply flow rate, the sedimentation influencing parameters of each sub-pipeline, and the use time of the sub-pipeline in each statistical period.

[0112] In a specific implementation, the historical sedimentation accumulation of each sub-pipeline is calculated based on the water supply sedimentation index, the average water supply flow rate, the sedimentation influencing parameters of each sub-pipeline and the sub-pipeline usage time in each statistical period, including:

[0113] Firstly, the water supply sedimentation index in each statistical period is divided by the mean water supply flow rate to obtain the intermediate parameters of water supply in each statistical period.

[0114] Then, the water supply intermediate parameters of each sub-pipeline in each statistical period within the sub-pipeline usage time are summed to obtain the sum value of the water supply parameters of each sub-pipeline.

[0115] Finally, the sum of the water supply parameters of each sub-pipeline is multiplied by the sedimentation influence parameter to obtain the historical sedimentation accumulation of each sub-pipeline.

[0116] In this embodiment, the calculation formula for the historical deposit accumulation is as follows:

[0117] (3)

[0118] In the formula, It represents the historical accumulation of sedimentation of a sub-pipeline, t represents the working days of the sub-pipeline, that is, the usage time of the sub-pipeline, and z represents the sedimentation influencing parameter of the current sub-pipeline. represents the water supply precipitation index of the jth statistical period, Represents the mean water supply flow rate in the jth statistical period.

[0119] In this embodiment, the intermediate water supply parameters of each statistical period during the operation of the sub-pipeline are accumulated. The higher the sum of the water supply parameters, the more obvious the cumulative contribution to the precipitation of the current sub-pipeline. In addition, for the influence of pipeline precipitation caused by water supply, in addition to water quality factors, the mean water supply flow rate is also one of the factors affecting pipeline precipitation. Sediments are easily accumulated in areas with slow flow or stagnation, forming rust blocks.

[0120] Accordingly, this embodiment uses the water supply intermediate parameter Adjust the calculation logic, and combine the water supply intermediate parameters with the sedimentation influence parameter z of the sub-pipeline after accumulation. Indicates the historical accumulation of sedimentation in a sub-pipeline.

[0121] The second step is to subtract the historical sedimentation accumulation of the previous sub-pipeline from the historical sedimentation accumulation of the current sub-pipeline to obtain the difference in accumulation between adjacent pipelines.

[0122] In practical applications, when analyzing the blockage sedimentation index inside the current branch pipe through the historical accumulation of sedimentation in each sub-pipeline in the branch pipe, it is also necessary to analyze the connection characteristics of the pipeline distribution. For example, water flow may wash away some sediments, and the sedimentation blockage inside the sub-pipeline will also be affected by other sub-pipelines connected to it.

[0123] It can be understood that the historical sedimentation accumulation of the current sub-pipeline is affected by the previous sub-pipeline. When the historical sedimentation accumulation of the previous sub-pipeline is large, the historical sedimentation accumulation in the current sub-pipeline may also increase accordingly. That is, the greater the difference in the accumulation of adjacent pipelines, the higher the sediment deposition amount in the current sub-pipeline may be.

[0124] Therefore, this embodiment subtracts the historical sedimentation accumulation degrees of two adjacent sub-pipelines, and the obtained adjacent pipeline accumulation degree difference can characterize the difference in historical sedimentation accumulation degrees of the two adjacent sub-pipelines, thereby introducing the influencing factors of other sub-pipelines connected to the current sub-pipeline into the calculation link of the blocking sedimentation index, thereby improving the calculation accuracy of the calculation link.

[0125] In the third step, based on the inner diameter of the sub-pipe in the pipeline attribute data, the inner diameter of the sub-pipe of the previous sub-pipe is subtracted from the inner diameter of the sub-pipe of the current sub-pipe to obtain the inner diameter difference of the second adjacent pipeline.

[0126] It is understandable that, under a constant water pressure, the smaller the inner diameter of the pipe, the higher the water flow rate. Therefore, when analyzing the impact of sediment deposition in other sub-pipelines on the sediment deposition in the current sub-pipeline, it is necessary to analyze in combination with the inner diameter of the pipe. To this end, this embodiment introduces the inner diameter difference of the second adjacent pipe, which can characterize the difference in the inner diameters of two adjacent sub-pipelines. The smaller the inner diameter difference of the second adjacent pipe, the higher the water flow rate in the previous sub-pipeline, and the higher the probability that the sediment in the previous sub-pipeline will rush into the current pipe.

[0127] The fourth step is to calculate the blocking sedimentation index of each branch pipe in the water supply network based on the historical sedimentation accumulation of each sub-pipe in each branch pipe, the difference in the accumulation of adjacent pipes and the difference in the inner diameter of the second adjacent pipes.

[0128] In a specific implementation, the blocking sedimentation index of each branch pipe in the water supply network is calculated based on the historical sedimentation accumulation of each sub-pipe in each branch pipe, the difference in the accumulation of adjacent pipes, and the difference in the inner diameter of the second adjacent pipe, which specifically includes:

[0129] First, the difference in the accumulated diameters of adjacent pipes of each sub-pipeline is divided by the difference in the inner diameters of the second adjacent pipes to obtain a quotient of the differences.

[0130] Then, the difference quotient of each sub-pipeline is multiplied by the historical sedimentation accumulation to obtain the blocking index of each sub-pipeline.

[0131] Finally, the blockage index of all sub-pipes in each branch pipe is summed up to obtain the blockage sedimentation index of each branch pipe in the water supply network.

[0132] In this embodiment, the calculation formula of the blocking sedimentation index of a certain branch pipe is as follows:

[0133] (4)

[0134] In the formula, It represents the blocking sedimentation index of a branch pipe, m represents the number of sub-pipes that make up the current branch pipe, It represents the difference between the historical accumulation of the i-1th sub-pipeline and the historical accumulation of the i-th sub-pipeline, that is, the difference in the accumulation of adjacent pipelines. It represents the difference between the inner diameter of the i-1th sub-pipeline and the inner diameter of the i-th sub-pipeline, that is, the inner diameter difference of the second adjacent pipe. Represents the historical accumulation of the i-th sub-pipeline.

[0135] According to the above formula (4), we can find the quotient by the difference Adjust the current calculation logic relationship, that is, the smaller the difference between the inner diameter of the sub-pipeline of the current sub-pipeline and the inner diameter of the sub-pipeline of the previous sub-pipeline, and the difference in the historical sedimentation accumulation is large, the difference is calculated. The larger the value, the greater the probability that the sediment in the previous sub-pipeline will enter the current sub-pipeline. Then calculate the quotient of the difference The historical accumulation of sedimentation with the current sub-pipeline After multiplication and accumulation of each sub-pipeline, It indicates the blockage sedimentation index inside the current branch pipe. The larger the blockage sedimentation index is, the higher the sedimentation blockage degree is in the current branch pipe.

[0136] In one embodiment, according to the pipeline parameter product and the blocking precipitation index of each branch pipe, the pipe network blocking index of the water supply pipe network in the area to be dispatched is calculated, specifically including:

[0137] The first step is to multiply the pipeline parameter product of each branch pipe by the blocking sedimentation index to obtain the branch blocking value of each branch pipe.

[0138] In the second step, the blockage values ​​of each branch pipe in the water supply network in the area to be dispatched are summed to obtain the summed blockage value.

[0139] The third step is to input the sum of the blockage values ​​into the tanh function to obtain the network blockage index of the water supply network in the area to be dispatched.

[0140] In this embodiment, the calculation formula of the pipe network blockage index of the water supply pipe network is as follows:

[0141] (5)

[0142] In the formula, D represents the pipe network obstruction index of the water supply network, tanh represents the tanh function, which can set the value range of the obstruction sum value between [0,1], n represents the number of branches in the water supply network, represents the product of pipeline parameters of the vth branch, Represents the blocking sedimentation index of the vth branch.

[0143] It can be understood that the higher the pipeline parameter product and blockage sedimentation index of each branch pipe, the greater the blockage level inside the water supply network. The branch blockage values ​​of each branch pipe in the water supply network are summed up, and the obtained summed blockage value is set to the range between [0,1] through the tanh function to obtain the network blockage index of the water supply network.

[0144] It should be noted that due to the dimensional differences between some parameters involved in the calculation in this embodiment, in order to ensure the accuracy and effectiveness of the calculation process, the parameters of different dimensions have been normalized before calculation. For example, the difference in the inner diameters of the first adjacent pipes, the difference in the inner diameters of the second adjacent pipes, and the difference in the cumulative degree of adjacent pipes all refer to the parameters obtained after the difference operation and normalization.

[0145] In one embodiment, the proportional gain coefficient in the current water resource scheduling cycle is determined according to the pipe network blocking index, specifically including:

[0146] First, add the pipe network blockage index to 1 to obtain the coefficient correction value.

[0147] Then, the coefficient correction value is multiplied by the preset initial value of the proportional gain to obtain the proportional gain coefficient in the current water resources scheduling cycle.

[0148] In this embodiment, the calculation formula of the proportional gain coefficient is as follows:

[0149] (6)

[0150] In the formula, represents the proportional gain coefficient in the current water resources scheduling cycle after adjustment, Represents the pipe network blocking index of the water supply network, Indicates the initial value of proportional gain.

[0151] In one embodiment, closed-loop control is performed on the water supply pressure of the water supply network in the dispatching area according to the proportional gain coefficient, specifically including:

[0152] First, the proportional gain coefficient and the preset integral gain initial value and differential gain initial value are input into the PID controller to obtain the water pressure control signal output by the PID controller.

[0153] Then, the water supply pressure of the water supply network in the dispatching area is closed-loop controlled according to the water pressure control signal.

[0154] After obtaining the pipe network blockage index of the water supply network, this embodiment can improve the stability of the water supply system by adjusting the water supply pressure of the water pump, ensure that the water pressure and water supply of each water outlet are more uniform, and thus achieve reasonable scheduling of water resources. In this process, a PID controller is specifically set to perform closed-loop control of the water supply pressure. In practical applications, the initial parameters of the PID controller can be obtained by the Ziegler-Nichols method. The Ziegler-Nichols method is a technology for determining the gain coefficient of the PID controller. This method can be used to calculate the initial value of the proportional gain of the PID controller in the initial state. , initial value of integral gain and the initial value of the differential gain And other initial parameters to ensure the stability and response speed of the control system.

[0155] In this embodiment, the proportional gain coefficient in the current water resource scheduling cycle is obtained After that, , and Input PID controller, which can calculate and output water pressure control signal, thereby adjusting water supply pressure and further optimizing water resource scheduling process.

[0156] In summary, the water resource scheduling method based on data processing provided by the embodiment of the present invention analyzes the degree of blockage of the water supply network through pipeline attribute data and historical water supply data, obtains the network blockage index of the current water supply network, and then uses the water supply network blockage index as the basis for controlling the water supply pressure of the water pump to optimize the water resource scheduling process. Compared with the traditional water resource scheduling scheme, by analyzing the impact of historical water supply data and pipeline attribute data on sediment formation, combined with the analysis of the use time of different pipelines, the accuracy of the sediment blockage analysis process is improved, thereby improving the accuracy of the water resource scheduling process and optimizing the user's water use experience.

[0157] Based on the same general inventive concept, the present invention also protects a water resource scheduling device based on data processing. The water resource scheduling device based on data processing provided by the present invention is described below. The water resource scheduling device based on data processing described below and the water resource scheduling method based on data processing described above can be referenced to each other.

[0158] See also Figure 4 , which shows a structural diagram of a water resource scheduling device based on data processing provided by an embodiment of the present invention, such as Figure 4 As shown, the water resource scheduling device based on data processing provided by the embodiment of the present invention specifically includes:

[0159] The acquisition module 210 is used to acquire the pipeline attribute data and historical water supply data of the water supply network in the area to be scheduled.

[0160] The first calculation module 220 is used to calculate the pipeline parameter product of each branch pipe in the water supply network according to the pipeline attribute data.

[0161] The second calculation module 230 is used to calculate the blocking sedimentation index of each branch pipe in the water supply network according to the historical water supply data and the pipeline attribute data.

[0162] The third calculation module 240 is used to calculate the pipe network blocking index of the water supply pipe network in the area to be scheduled according to the pipe parameter product and blocking sedimentation index of each branch pipe.

[0163] The processing module 250 is used to determine the proportional gain coefficient in the current water resource scheduling cycle according to the pipe network blocking index;

[0164] The control module 260 is used to perform closed-loop control on the water supply pressure of the water supply network in the dispatching area according to the proportional gain coefficient.

[0165] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated again here.

[0166] See also Figure 5 , which shows a structural diagram of an electronic device provided by an embodiment of the present invention, such as Figure 5 As shown, the electronic device may include: a processor 310, a communication interface 320, a memory 330 and a communication bus 340, wherein the processor 310, the communication interface 320 and the memory 330 communicate with each other through the communication bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the water resource scheduling method based on data processing provided in the above embodiments.

[0167] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0168] Regarding the system in the above embodiment, the specific manner in which the electronic device performs the operation has been described in detail in the embodiment of the method, and will not be elaborated again here.

[0169] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the water resource scheduling method based on data processing provided in the above-mentioned embodiments.

[0170] On the other hand, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the water resource scheduling method based on data processing provided in the above-mentioned embodiments.

[0171] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0172] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0173] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0174] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A water resources scheduling method based on data processing, characterized in that: The method comprises: Obtain pipeline attribute data and historical water supply data of the water supply network in the area to be dispatched; According to the pipeline attribute data, the pipeline parameter product of each branch pipe in the water supply network is calculated; Calculate the blocking sedimentation index of each branch pipe in the water supply network according to the historical water supply data and the pipeline attribute data; Calculate the pipe network obstruction index of the water supply pipe network in the area to be dispatched according to the pipe parameter product of each branch pipe and the obstruction sedimentation index; Determining a proportional gain coefficient within a current water resource scheduling cycle according to the pipe network blocking index; Performing closed-loop control on the water supply pressure of the water supply network in the area to be dispatched according to the proportional gain coefficient; The pipeline attribute data includes: the number of sub-pipelines in each branch pipe in the water supply network, the inner diameter of the sub-pipeline, the number of bends in the sub-pipeline, and the use time of the sub-pipeline; The method of calculating the pipeline parameter product of each branch pipe in the water supply network according to the pipeline attribute data includes: Subtract the inner diameter of a sub-pipeline of any sub-pipeline in each branch pipe from the inner diameter of the sub-pipeline of the previous sub-pipeline to obtain the inner diameter difference of the first adjacent pipes; Inputting the difference in inner diameters of the first adjacent pipes of each sub-pipeline into a preset curve function to obtain a difference function value; Multiplying the difference function value of each sub-pipeline by the sub-pipeline usage time to obtain an intermediate product value; According to the number of sub-pipes in each branch pipe, the intermediate product values ​​of all sub-pipes in each branch pipe are summed to obtain the pipeline parameter product of each branch pipe in the water supply network; The blockage sedimentation index of each branch pipe in the water supply network is calculated based on the historical water supply data and the pipeline attribute data, including: Calculate the historical sedimentation accumulation of each sub-pipeline in each branch pipe according to the historical water supply data and the pipeline attribute data; Subtract the historical sedimentation accumulation of the previous sub-pipeline from the historical sedimentation accumulation of the current sub-pipeline to obtain the difference in accumulation of adjacent pipelines; According to the inner diameter of the sub-pipe in the pipeline attribute data, the inner diameter of the sub-pipe of the previous sub-pipe is subtracted from the inner diameter of the sub-pipe of the current sub-pipe to obtain the inner diameter difference of the second adjacent pipeline; Calculate the blocking sedimentation index of each branch pipe in the water supply network according to the historical sedimentation accumulation of each sub-pipe in each branch pipe, the difference of the accumulation of adjacent pipes and the difference of the inner diameters of the second adjacent pipes; The calculation of the pipe network obstruction index of the water supply pipe network in the area to be scheduled according to the pipe parameter product of each branch pipe and the obstruction sedimentation index comprises: Multiply the pipeline parameter product of each branch pipe by the blocking precipitation index to obtain the branch pipe blocking value of each branch pipe; Sum the branch pipe blockage values ​​of each branch pipe in the water supply network in the area to be scheduled to obtain a summed blockage value; The summed blockage value is input into a tanh function to obtain a network blockage index of the water supply network in the area to be scheduled.

2. The water resources scheduling method based on data processing according to claim 1 is characterized in that: The historical water supply data includes: historical water supply flow rate and historical water quality parameters; The historical sedimentation accumulation of each sub-pipeline in each branch pipe is calculated based on the historical water supply data and the pipeline attribute data, including: Calculate the water supply sedimentation index in each statistical period based on the historical water quality parameters in each statistical period; The number of bends of the sub-pipeline of each sub-pipeline in each branch pipe is divided by the inner diameter of the sub-pipeline to obtain the sedimentation influence parameter of each sub-pipeline; Calculate the average water supply flow rate in each statistical period based on the historical water supply flow rate; The historical accumulation of sedimentation of each sub-pipeline is calculated based on the water supply sedimentation index, the mean water supply flow rate, the sedimentation influencing parameter of each sub-pipeline and the use time of the sub-pipeline in each statistical period.

3. The water resources scheduling method based on data processing according to claim 2 is characterized in that: The historical water quality parameters include: historical water quality pH value and historical water quality hardness; The water supply sedimentation index in each statistical period is calculated based on the historical water quality parameters in each statistical period, including: The historical water hardness in each statistical period is divided by the historical water pH value to obtain the water supply sedimentation index in each statistical period.

4. The water resources scheduling method based on data processing according to claim 3 is characterized in that: The historical sedimentation accumulation of each sub-pipeline is calculated based on the water supply sedimentation index, the water supply flow rate mean, the sedimentation influencing parameter of each sub-pipeline and the use time of the sub-pipeline in each statistical period, including: The water supply sedimentation index in each statistical period is divided by the mean value of the water supply flow rate to obtain the water supply intermediate parameter of each statistical period; The water supply intermediate parameters of each sub-pipeline in each statistical period within the sub-pipeline usage time are summed to obtain a summed value of the water supply parameters of each sub-pipeline; The sum of the water supply parameters of each sub-pipeline is multiplied by the sedimentation influencing parameter to obtain the historical sedimentation accumulation of each sub-pipeline.

5. The water resources scheduling method based on data processing according to claim 1 is characterized in that: The blockage sedimentation index of each branch pipe in the water supply network is calculated based on the historical sedimentation accumulation of each sub-pipe in each branch pipe, the difference in the accumulation of adjacent pipes, and the difference in the inner diameters of the second adjacent pipes, including: Taking the quotient of the difference in the accumulated diameters of the adjacent pipes of each sub-pipeline and the difference in the inner diameters of the second adjacent pipes, a quotient of the difference is obtained; Multiplying the difference quotient of each sub-pipeline by the historical sedimentation accumulation degree to obtain a blocking index of each sub-pipeline; The blocking index of all sub-pipes in each branch pipe is summed to obtain the blocking sedimentation index of each branch pipe in the water supply network.

6. The water resources scheduling method based on data processing according to claim 1 is characterized in that: Determining the proportional gain coefficient in the current water resource scheduling cycle according to the pipe network blocking index includes: Adding the pipe network obstruction index to 1 to obtain a coefficient correction value; The coefficient correction value is multiplied by a preset proportional gain initial value to obtain a proportional gain coefficient in the current water resource scheduling cycle.

7. The water resources scheduling method based on data processing according to claim 1 is characterized in that: The closed-loop control of the water supply pressure of the water supply network in the area to be scheduled according to the proportional gain coefficient includes: Input the proportional gain coefficient and the preset integral gain initial value and differential gain initial value into the PID controller to obtain a water pressure control signal output by the PID controller; The water supply pressure of the water supply network in the area to be scheduled is closed-loop controlled according to the water pressure control signal.

Citation Information

Cited By

  • Supply-demand double-end collaborative water resource adaptation management method and system under climate change background

    CN121680094A

  • Water resource adaptation management methods and systems that coordinate supply and demand in the context of climate change

    CN121680094B