Building bridge garbage recycling equipment and treatment method thereof
By establishing a construction waste model and adjusting the extension length of the processing block or the blocking angle of the fixed block, the problems of low efficiency and entanglement of steel bars in existing equipment when processing concrete stones are solved, and more efficient construction waste crushing and equipment are achieved. Extended lifespan.
Patent Information
- Application Number
- CN202410885936.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When existing construction and bridge waste recycling equipment processes concrete stones through rotating crushing blades, the efficiency is low, the life of the crushing blades is short, and the steel bars are entangled and damage the equipment.
By establishing a construction waste model, using cameras to collect data, preprocessing and training the model, and adjusting the extension length of the processing block or the blocking angle of the fixed block, more effective stone crushing can be achieved and the entanglement of steel bars can be avoided.
It improves the crushing efficiency of construction waste, extends the service life of the equipment, and avoids damage to the equipment by steel bars.
Smart Images

Figure CN118768032A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction bridge waste recycling equipment, and more specifically, to a construction bridge waste recycling equipment and a processing method thereof. Background Art
[0002] With the development of social economy, my country has continuously deepened urban construction, because my country's modern urban construction is mainly based on concrete buildings, and concrete buildings have certain service life limits due to aging problems. The service life of concrete buildings in my country is mostly designed to be about 70 years. These old buildings are in urgent need of demolition and reconstruction. At the same time, because my country has experienced many earthquake disasters in recent years, some old concrete buildings whose service life has not yet expired also need to be demolished and rebuilt due to the unsuitability of earthquake-resistant structural design. At the same time, because of the large-scale use of concrete buildings, a large amount of river sand and stone have been mined, which has also caused serious damage to the natural environment. After the demolition of concrete buildings, a large amount of construction waste will be generated. With the renovation of old cities, the demolition of urban villages, and the reconstruction of roads, there will be more and more construction waste, among which the amount of concrete and masonry construction waste is the largest. Most of the construction waste is transported to the suburbs or villages by construction units without any treatment, and is piled up or landfilled in the open air, consuming a large amount of construction funds such as land acquisition fees and garbage removal fees. In the process of studying the building environment and energy utilization, if there is not much construction waste to be recycled, these construction wastes are extremely difficult to degrade, and the land filled with construction wastes can only be abandoned for a long time, which causes huge pollution to the environment. Therefore, those skilled in the art provide a construction site waste recycling device to solve the problems raised in the above background technology.
[0003] The document with the prior art publication number CN206631688U provides a garbage recycling device for construction sites. The device is provided with a processing box, a crushing chamber is provided inside the processing box, a crushing motor is provided on the upper side of the crushing chamber, feeding ports are provided on the left and right sides of the crushing motor, a crushing shaft is provided on the lower side of the crushing motor, a crushing blade is provided on the outer side of the crushing shaft, a plurality of screening holes are provided on the chamber wall of the crushing chamber, a storage box is provided on the outer side of the crushing chamber, a discharge port is provided on the outer side of the lower end of the storage box, support legs are provided on the left and right ends of the lower side of the processing box, a rotating shaft is provided on the lower side of the crushing chamber, a rotating motor is provided on the right side of the rotating shaft, the rotating shaft and the rotating motor are connected by a belt, a base is provided on the lower side of the support legs, the rotating shaft and the rotating motor, and a vibration-damping pad is provided inside the base.
[0004] Although the above-mentioned prior art solution can achieve the relevant beneficial effects through the structure of the prior art, it still has the following defects: the device processes and recycles construction waste through rotating crushing blades, and most of the construction waste is concrete stones, which are more difficult to process through the crushing blades. At the same time, all the concrete stones are on the blades, and the life of the crushing blades is short. At the same time, there are steel bars in the construction waste that will entangle the crushing blades and damage the equipment.
[0005] Regarding the above-mentioned related technologies, the inventor believes that in the process of processing construction waste, it is necessary to crush the construction waste through processing blocks, and at the same time, generate impact force between the construction waste to improve the processing effect, extend the service life of the equipment, and control the crushing effect through different angles. At the same time, it is necessary to avoid the situation where steel bars are entangled in the construction waste.
[0006] In view of this, we propose a recycling device for construction bridge waste. Summary of the invention
[0007] 1. Technical issues to be solved
[0008] The purpose of the present application is to provide a method for processing construction and bridge waste recycling equipment, which solves the technical problem that the device in the above-mentioned background technology processes and recycles construction waste by rotating crushing blades, and most of the construction waste is concrete stones, which are more difficult to process by crushing blades. At the same time, all the concrete stones are on the blades, and the life of the crushing blades is short. At the same time, there are steel bars in the construction waste that will entangle the crushing blades and damage the equipment, thereby achieving a technical effect.
[0009] 2. Technical solution
[0010] The technical solution of the present application provides a recycling device for construction bridge waste, comprising:
[0011] Collect construction waste data, such as the angle and size of bridge waste falling from the bridge waste recycling bin into the hopper;
[0012] Preprocessing of construction waste data: preprocessing of construction waste data by normalization and smoothing;
[0013] Establish and train a construction waste model using construction waste data;
[0014] Evaluation and optimization of the construction waste model: the model is evaluated using a validation set and optimized based on the evaluation results to improve the performance of the model.
[0015] Construction waste model deployment application, deploying the trained construction waste model into the actual environment;
[0016] The execution module controls the extension length of the processing block or the blocking angle of the fixed block according to the prediction results to achieve a better stone crushing effect.
[0017] By adopting the above technical scheme and setting up a construction waste model, the extension length of the processing block or the blocking angle of the fixed block can be adjusted according to the size of the building stones or the angle of their fall, thereby increasing the crushing effect. At the same time, construction waste can be crushed by mutual impact, thereby improving the processing effect and extending the service life of the equipment. At the same time, this setting avoids the situation where steel bars in the construction waste will entangle the crushing blades and damage the equipment.
[0018] As an optional solution of the technical solution of this application document, the construction waste data is collected by using a camera embedded in the inner wall of the bridge garbage recycling box, and multiple cameras can be set;
[0019] It also includes the crushing effect of different extension lengths of the processing blocks or the blocking angles of the fixed blocks during the knocking process, and marks the degree of the effect.
[0020] As an optional solution of the technical solution of this application document, the construction waste data preprocessing scales the construction waste data to a relatively small range, usually between 0 and 1 or -1 and 1, and converts the construction waste data into a distribution with a mean of 0 and a standard deviation of 1. Standardization makes the data distribution more stable, which helps to speed up the training of the model;
[0021] Smoothing the construction waste data is performed to reduce noise or unnecessary fluctuations in the construction waste data, and to handle missing values in the construction waste data, including by filling the mean, median, or using interpolation methods.
[0022] As an optional solution of the technical solution of the present application document, the construction waste model is established and trained, and a recurrent neural network architecture is selected to learn the relationship between the stone falling angle and the protruding length of the processing block or the blocking angle of the fixed block. The input of the construction waste model is the stone falling angle, and the output is the protruding length of the processing block or the blocking angle of the fixed block. During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn the appropriate control strategy.
[0023] As an optional solution of the technical solution of this application document, the construction waste model evaluation optimization, when adjusting according to the results, adjusts the hyperparameters of the construction waste model through grid search and other technologies to find the best parameter combination, avoids overfitting of the construction waste model to the training data, and controls the complexity of the model by adding regularization terms, using a simpler model structure, and stopping training early;
[0024] Regularly monitor the performance of the model on the validation set, observe the model's learning curve, and changes in training and validation errors, and adjust the training strategy in a timely manner.
[0025] As an optional solution of the technical solution of this application document, the execution module includes
[0026] Bridge recycling bins;
[0027] A hopper, which is arranged on one side of the bridge garbage collection box;
[0028] A crushing shaft, which is rotated by a first motor and is disposed inside the bridge garbage recycling box;
[0029] A processing plate is arranged inside the bridge garbage recycling box and is driven to swing by adjusting the angle, and is located on one side of the crushing processing axis.
[0030] The present application also discloses a method for using the aforementioned construction bridge waste recycling device, comprising the following steps:
[0031] S1. First, collect data such as the angle and size of the bridge construction waste falling from the bridge waste recycling box to the inside of the hopper, and use a camera embedded in the inner wall of the bridge waste recycling box to collect data. Multiple cameras can be set. The crushing effect is also obtained by the extension length of different processing blocks or the blocking angle of the fixed block during the knocking process, and the degree of the effect is marked;
[0032] S2. At this point, the construction waste data is normalized and smoothed to scale the construction waste data to a relatively small range, usually between 0 and 1 or -1 and 1, and the construction waste data is converted to a distribution with a mean of 0 and a standard deviation of 1. Standardization makes the data distribution more stable and helps to speed up the training of the model; the construction waste data is smoothed to reduce noise or unnecessary fluctuations in the construction waste data, and missing values in the construction waste data are processed, including by filling the mean, median or using interpolation methods;
[0033] S3. At this time, a construction waste model is established using the construction waste data and trained using the construction waste data. A recurrent neural network architecture is selected to learn the relationship between the stone falling angle and the extension length of the processing block or the blocking angle of the fixed block. The input of the construction waste model is the stone falling angle, and the output is the extension length of the processing block or the blocking angle of the fixed block. During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn a suitable control strategy.
[0034] S4. At this time, the model is evaluated using the validation set and optimized based on the evaluation results to improve the performance of the model. When making adjustments based on the results, the hyperparameters of the construction waste model are adjusted through grid search and other techniques to find the best parameter combination to avoid overfitting of the construction waste model to the training data. The complexity of the model is controlled by adding regularization terms, using a simpler model structure, and stopping training early. The performance of the model on the validation set is regularly monitored, and the learning curve of the model, as well as the changes in the training and validation errors, are observed to adjust the training strategy in a timely manner.
[0035] S5. At this point, the trained construction waste model is deployed in the actual environment;
[0036] S6. At this time, the extension length of the processing block or the blocking angle of the fixed block is controlled according to the prediction result to achieve a better stone crushing effect.
[0037] 3. Beneficial effects
[0038] One or more technical solutions provided in the technical solution of this application have at least the following technical effects or advantages:
[0039] 1. Through the setting of the construction waste model, the application can adjust the extension length of the processing block or the blocking angle of the fixed block according to the size of the building stones or the falling angle, thereby increasing the crushing effect. At the same time, the construction waste can be crushed by mutual impact, thereby improving the processing effect and extending the service life of the equipment. At the same time, this setting avoids the situation where steel bars in the construction waste will entangle the crushing blades and damage the equipment.
[0040] 2. The square setting of the crushing processing axis in this application can increase the edges and corners and improve the processing effect. At the same time, the telescopic setting of the processing block thereon can increase the processing and impact effect of construction waste.
[0041] 3. The present application can adjust the processing plate to different angles through the setting of angle adjustment drive, thereby changing the size of the gap, or making impacts at different angles and changing the trajectory of its movement by changing the angle, thereby improving the processing effect.
[0042] 4. This application uses the setting of fixed blocks to allow the impact to be carried out in the form of lines and edges, thereby concentrating the force on one point and improving the effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A system schematic diagram of a construction bridge waste recycling device disclosed in a preferred embodiment of the present application;
[0044] Figure 2This is a schematic diagram of the overall structure of a construction bridge waste recycling device disclosed in a preferred embodiment of the present application;
[0045] Figure 3 This is a cross-sectional view of the overall structure of a construction bridge waste recycling device disclosed in a preferred embodiment of the present application;
[0046] Figure 4 A cross-sectional view of the internal structure of a crushing shaft of a construction bridge waste recycling device disclosed in a preferred embodiment of the present application;
[0047] Figure 5 This is a disassembled diagram of the angle adjustment drive structure of a construction bridge waste recycling device disclosed in a preferred embodiment of the present application;
[0048] Explanation of the numbers in the figure: 1. Bridge garbage recycling box; 2. Feed hopper; 3. Crushing and processing shaft; 31. Processing block; 32. Adjustment slot; 33. Moving rack; 34. Driving gear; 35. Bevel gear B; 36. Driving slot; 37. Bevel gear A; 38. Second motor; 4. Processing plate; 41. Mechanical cavity; 42. Driving rod; 43. Connecting rod; 44. Limiting track; 45. Telescopic rod; 46. Connecting block; 401. Fixed block. DETAILED DESCRIPTION
[0049] The present application is further described in detail below in conjunction with the accompanying drawings.
[0050] Reference Figure 1 The present application embodiment provides a recycling device for construction bridge waste, comprising:
[0051] Collect construction waste data, such as the angle and size of the bridge waste falling from the bridge waste recycling box 1 into the hopper 2;
[0052] Preprocessing of construction waste data: preprocessing of construction waste data by normalization and smoothing;
[0053] Establish and train a construction waste model using construction waste data;
[0054] Evaluation and optimization of the construction waste model: the model is evaluated using a validation set and optimized based on the evaluation results to improve the performance of the model.
[0055] Construction waste model deployment application, deploying the trained construction waste model into the actual environment;
[0056] The execution module controls the extension length of the processing block 31 or the blocking angle of the fixed block 401 according to the prediction result to achieve a better stone crushing effect.
[0057] By setting the construction waste model, the extension length of the processing block 31 or the blocking angle of the fixed block 401 can be adjusted according to the size of the construction stone or the angle of fall, thereby increasing the crushing effect. At the same time, the construction waste can be crushed by mutual impact, thereby improving the processing effect and extending the service life of the equipment. At the same time, this setting avoids the situation where steel bars in the construction waste will entangle the crushing blades and damage the equipment.
[0058] Reference Figure 1 and Figure 2 , the embodiment of the present application provides a recycling device for construction bridge waste, which collects construction waste data by using a camera embedded in the inner wall of a bridge waste recycling box 1, and multiple cameras can be set;
[0059] It also includes the crushing effect obtained by different extension lengths of the processing blocks 31 or blocking angles of the fixing blocks 401 during the knocking process, and marking the degree of the effect.
[0060] Preprocessing of construction waste data: scaling the construction waste data to a relatively small range, usually between 0 and 1 or -1 and 1, converting the construction waste data into a distribution with a mean of 0 and a standard deviation of 1. Standardization makes the data distribution more stable and helps speed up the training of the model;
[0061] Smoothing the construction waste data is performed to reduce noise or unnecessary fluctuations in the construction waste data, and to handle missing values in the construction waste data, including by filling the mean, median, or using interpolation methods.
[0062] A construction waste model is established and trained, and a recurrent neural network (RNN) architecture is selected to learn the relationship between the stone falling angle and the extension length of the processing block 31 or the blocking angle of the fixed block 401. The input of the construction waste model is the stone falling angle, and the output is the extension length of the processing block 31 or the blocking angle of the fixed block 401. During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn the appropriate control strategy.
[0063] Evaluation and optimization of the construction waste model. When making adjustments based on the results, the hyperparameters of the construction waste model are adjusted through grid search and other techniques to find the best parameter combination to avoid overfitting of the construction waste model to the training data. The complexity of the model is controlled by adding regularization terms such as L1 and L2 regularization, using a simpler model structure, and stopping training early.
[0064] Regularly monitor the performance of the model on the validation set, observe the model's learning curve, and changes in training and validation errors, and adjust the training strategy in a timely manner.
[0065] Execution modules include
[0066] Bridge waste recycling bin 1;
[0067] A feed hopper 2, which is arranged on one side of the bridge garbage recycling box 1;
[0068] A crushing shaft 3, which is rotated by a first motor and is disposed inside the bridge garbage recycling box 1;
[0069] The processing plate 4 is set inside the bridge garbage recycling box 1 and is driven to swing by adjusting the angle, and is located on one side of the crushing processing shaft 3.
[0070] Reference Figure 3 and Figure 4 The present application embodiment provides a recycling device for construction bridge waste, comprising:
[0071] Bridge waste recycling bin 1;
[0072] A feed hopper 2, which is arranged on one side of the bridge garbage recycling box 1;
[0073] A crushing shaft 3, which is rotated by a first motor and is disposed inside the bridge garbage recycling box 1;
[0074] The processing plate 4 is set inside the bridge garbage recycling box 1 and is driven to swing by adjusting the angle, and is located on one side of the crushing processing shaft 3.
[0075] An adjustment groove 32 is provided on the outer wall of the crushing processing shaft 3, a processing block 31 is slidably arranged inside the adjustment groove 32, a moving rack 33 is fixedly arranged on the outer wall of the processing block 31, a driving gear 34 is meshedly connected to the outer wall of the moving rack 33, and the driving gear 34 and the moving rack 33 are symmetrically arranged in two groups;
[0076] A driving groove 36 is opened in the middle of the crushing processing shaft 3, and a second motor 38 is arranged inside the driving groove 36. A bevel gear A37 is coaxially fixedly arranged on the output shaft of the second motor 38. The outer wall of the bevel gear A37 is meshed with a bevel gear B35, and the bevel gear B35 is coaxially fixedly connected with the driving gear 34 axis.
[0077] The output shaft of the second motor 38 rotates to drive the driving gear 34, and the driving gear 34 is meshed with the moving rack 33, thereby driving the processing block 31 to move and retract, thereby cooperating with the rotation of the crushing processing shaft 3 for processing. The square setting of the crushing processing shaft 3 can increase the edges and corners and improve the processing effect. At the same time, the telescopic setting of the processing block 31 thereon can increase the processing and impact effects of construction waste.
[0078] Reference Figure 5, the embodiment of the present application provides a recycling device for construction bridge waste, the angle adjustment drive includes a driving rod 42, the outer end of the driving rod 42 is connected and fixed to the outer wall of the processing plate 4 through a fixed shaft;
[0079] One end of the driving rod 42 is rotatably disposed inside the mechanical cavity 41 opened inside the bridge garbage recycling box 1 through an axis;
[0080] A connecting rod 43 is rotatably provided at the other end of the driving rod 42, and a limit track 44 is slidably provided outside the connecting rod 43, and the limit track 44 is fixedly provided inside the mechanical cavity 41;
[0081] A telescopic rod 45 is rotatably provided at the middle of the driving rod 42 , a connecting block 46 is rotatably provided at the outer end of the telescopic rod 45 , and the connecting block 46 is rotatably provided on the inner wall of the mechanical cavity 41 .
[0082] The extension and retraction of the telescopic rod 45 drives the swing angle of the driving rod 42, and one side of the driving rod 42 is rotated and set inside the bridge garbage recycling box 1, thereby driving the connecting rod 43 to move, and one side of the connecting rod 43 is slidably set inside the limiting track 44, thereby driving the angle of the processing plate 4 to change. Through the setting of the angle adjustment drive, the processing plate 4 can be adjusted at different angles, thereby changing the size of the gap, or by changing the angle, it can impact at different angles and change its movement trajectory, thereby improving the processing effect.
[0083] Reference Figure 3 , the embodiment of the present application provides a recycling device for construction bridge waste, the outer wall of the processing plate 4 is fixedly provided with a plurality of fixed blocks 401, and the outer wall of the fixed block 401 is provided with an inclined structure;
[0084] There are multiple fixing blocks 401 , which are distributed in an arc-shaped structure.
[0085] By setting the fixed block 401, the collision is performed in the form of lines and edges, so that the force is concentrated on one point, thereby improving the effect.
[0086] The embodiment of the present application provides a recycling device for construction bridge waste, comprising the following steps:
[0087] S1. First, collect data such as the angle and size of the bridge construction waste falling from the bridge waste recycling box 1 to the inside of the hopper 2, and use a camera embedded in the inner wall of the bridge waste recycling box 1 to collect data. Multiple cameras can be set. The crushing effect is obtained by the extension length of different processing blocks 31 or the blocking angle of the fixed block 401 during the knocking process, and the degree of the effect is marked;
[0088] S2. At this point, the construction waste data is normalized and smoothed to scale the construction waste data to a relatively small range, usually between 0 and 1 or -1 and 1, and the construction waste data is converted to a distribution with a mean of 0 and a standard deviation of 1. Standardization makes the data distribution more stable and helps to speed up the training of the model; the construction waste data is smoothed to reduce noise or unnecessary fluctuations in the construction waste data, and missing values in the construction waste data are processed, including by filling the mean, median or using interpolation methods;
[0089] S3. At this time, a construction waste model is established using the construction waste data and trained using the construction waste data. A recurrent neural network (RNN) architecture is selected to learn the relationship between the stone falling angle and the extension length of the processing block 31 or the blocking angle of the fixed block 401. The input of the construction waste model is the stone falling angle, and the output is the extension length of the processing block 31 or the blocking angle of the fixed block 401. During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn a suitable control strategy.
[0090] S4. At this time, the model is evaluated using the validation set and optimized based on the evaluation results to improve the performance of the model. When making adjustments based on the results, the hyperparameters of the construction waste model are adjusted through grid search and other techniques to find the best parameter combination to avoid overfitting of the construction waste model to the training data. The complexity of the model is controlled by adding regularization terms such as L1 and L2 regularization, using a simpler model structure, and stopping training early. The performance of the model on the validation set is monitored regularly, and the learning curve of the model, as well as the changes in the training and validation errors, are observed to adjust the training strategy in a timely manner.
[0091] S5. At this point, the trained construction waste model is deployed in the actual environment;
[0092] S6. At this time, the extension length of the processing block 31 or the blocking angle of the fixed block 401 is controlled according to the prediction result to achieve a better stone crushing effect.
[0093] When the recycling equipment for the construction bridge waste is needed, first, the data such as the angle and size of the bridge construction waste falling from the bridge waste recycling box 1 to the inside of the hopper 2 are collected, and the data are collected using a camera embedded in the inner wall of the bridge waste recycling box 1. Multiple cameras can be set, and the crushing effect is obtained by the extension length of different processing blocks 31 or the blocking angle of the fixed block 401 during the knocking process, and the degree of the effect is marked. The construction waste data is pre-processed by normalization and smoothing, and the construction waste data is scaled to a relatively small range, usually between 0 and 1 or -1 to 1, and the construction waste data is converted into a distribution with a mean of 0 and a standard deviation of 1.Standardization makes data distribution more stable, which helps to speed up the training of the model; the construction waste data is smoothed to reduce noise or unnecessary fluctuations in the construction waste data, and missing values in the construction waste data are processed, including by filling the mean, median or using interpolation methods, using the construction waste data to establish a construction waste model and train it through the construction waste data, selecting the recurrent neural network RNN architecture to learn the relationship between the stone falling angle and the extension length of the processing block 31 or the blocking angle of the fixed block 401. The input of the construction waste model is the stone falling angle, and the output is the processing block 31 of the extension length or the blocking angle of the fixed block 401. During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn the appropriate control strategy, use the validation set to evaluate the model, and optimize it according to the evaluation results to improve the performance of the model. When adjusting according to the results, the hyperparameters of the construction waste model are adjusted through grid search and other technologies to find the best parameter combination to avoid overfitting the training data of the construction waste model. The complexity of the model is controlled by adding regularization terms such as L1 and L2 regularization, using a simpler model structure and stopping training early; regular monitoring The performance of the model on the validation set is observed, and the learning curve of the model, as well as the changes in training and validation errors, the training strategy is adjusted in time, the trained construction waste model is deployed in the actual environment, and the extension length of the processing block 31 or the blocking angle of the fixed block 401 is controlled according to the prediction results to achieve a better stone crushing effect, so that the driving gear 34 is driven to rotate by the rotation of the output shaft of the second motor 38, and the driving gear 34 is meshed and connected with the moving rack 33, thereby driving the processing block 31 to move and retract, so as to cooperate with the rotation of the crushing processing shaft 3 for processing. The square setting of the crushing processing shaft 3 can increase the angularity. , improving the processing effect, and at the same time, the telescopic setting of the processing block 31 thereon can increase the processing and impact effect of construction waste. At the same time, the telescopic rod 45 drives the swing angle of the driving rod 42, and one side of the driving rod 42 is rotated and set inside the bridge garbage recycling box 1, thereby driving the connecting rod 43 to move, and one side of the connecting rod 43 is slidably set inside the limiting track 44, thereby driving the angle of the processing plate 4 to change. Through the setting of the angle adjustment drive, the processing plate 4 can be adjusted at different angles, thereby changing the size of the gap, or by changing the angle, it can impact at different angles and change its movement trajectory, thereby improving the processing effect.
Claims
1. A recycling device for construction bridge waste, characterized by: Include: Collecting construction waste data, such as the angle and size of the bridge waste falling from the bridge waste recycling box (1) into the hopper (2); Preprocessing of construction waste data: preprocessing of construction waste data by normalization and smoothing; Establish and train a construction waste model using construction waste data; Evaluation and optimization of the construction waste model: use the validation set to evaluate the model and optimize it based on the evaluation results to improve the performance of the model; Construction waste model deployment application, deploying the trained construction waste model into the actual environment; The execution module controls the extension length of the processing block (31) or the blocking angle of the fixed block (401) according to the prediction result to achieve a better stone crushing effect.
2. The recycling equipment for construction bridge waste according to claim 1 is characterized in that: The construction waste data is collected by using a camera embedded in the inner wall of the bridge waste recycling box (1), and multiple cameras can be provided; It also includes the crushing effect obtained by different extension lengths of the processing blocks (31) or blocking angles of the fixed blocks (401) during the knocking process, and marking the degree of the effect.
3. The equipment for recycling construction and bridge waste according to claim 1 is characterized in that: The construction waste data preprocessing is to scale the construction waste data to a relatively small range, usually between 0 and 1 or -1 and 1, and convert the construction waste data into a distribution with a mean of 0 and a standard deviation of 1. Standardization makes the data distribution more stable, which helps to speed up the training of the model; Smoothing the construction waste data is performed to reduce noise or unnecessary fluctuations in the construction waste data, and to handle missing values in the construction waste data, including by filling the mean, median, or using interpolation methods.
4. The equipment for recycling construction and bridge waste according to claim 1 is characterized in that: The construction waste model is established and trained, and a recurrent neural network (RNN) architecture is selected to learn the relationship between the stone falling angle and the extension length of the processing block (31) or the blocking angle of the fixed block (401). The input of the construction waste model is the stone falling angle, and the output is the extension length of the processing block (31) or the blocking angle of the fixed block (401). During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn a suitable control strategy.
5. The equipment for recycling construction and bridge waste according to claim 1 is characterized in that: The construction waste model evaluation optimization, when adjusting according to the results, uses grid search and other techniques to adjust the hyperparameters of the construction waste model to find the best parameter combination, avoid overfitting of the construction waste model to the training data, and control the complexity of the model by adding regularization terms (such as L1 and L2 regularization), using a simpler model structure, and stopping training early; Regularly monitor the performance of the model on the validation set, observe the model's learning curve, and changes in training and validation errors, and adjust the training strategy in a timely manner.
6. The equipment for recycling construction and bridge waste according to claim 1 is characterized in that: The execution module includes Bridge waste recycling bin (1); A feed hopper (2), wherein the feed hopper (2) is arranged on one side of the bridge garbage recycling box (1); A crushing shaft (3), wherein the crushing shaft (3) is rotated by a first motor and is disposed inside the bridge waste recycling box (1); A processing plate (4) is arranged inside the bridge garbage recycling box (1) and is driven to swing by adjusting the angle, and is located on one side of the crushing processing shaft (3).
7. A method for using a construction bridge waste recycling device according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1. First, data such as the angle and size of the bridge construction waste falling from the bridge waste recycling box (1) into the hopper (2) are collected by using a camera embedded in the inner wall of the bridge waste recycling box (1). A plurality of cameras may be provided. The crushing effect is obtained by measuring the extension length of different processing blocks (31) or the blocking angle of the fixed block (401) during the knocking process, and the degree of the effect is marked; S2. At this time, the construction waste data is preprocessed by normalization and smoothing, and the construction waste data is scaled to a relatively small range, usually between 0 and 1 or -1 and 1, and the construction waste data is converted into a distribution with a mean of 0 and a standard deviation of 1. Standardization makes the data distribution more stable, which helps to speed up the training of the model; Smoothing the construction waste data to reduce noise or unnecessary fluctuations in the construction waste data, and handling missing values in the construction waste data, including by filling the mean, median or using interpolation methods; S3. At this time, a construction waste model is established using the construction waste data and trained using the construction waste data. A recurrent neural network (RNN) architecture is selected to learn the relationship between the stone falling angle and the extension length of the processing block (31) or the blocking angle of the fixed block (401). The input of the construction waste model is the stone falling angle, and the output is the extension length of the processing block (31) or the blocking angle of the fixed block (401). During the training process, the construction waste model will try to minimize the difference between the predicted value and the true value, so as to learn a suitable control strategy. S4. At this time, the model is evaluated using the validation set and optimized based on the evaluation results to improve the performance of the model. When making adjustments based on the results, the hyperparameters of the construction waste model are adjusted through grid search and other techniques to find the best parameter combination to avoid overfitting of the construction waste model to the training data. The complexity of the model is controlled by adding regularization terms (such as L1 and L2 regularization), using a simpler model structure, and stopping training early. The performance of the model on the validation set is regularly monitored, and the learning curve of the model, as well as the changes in the training and validation errors, are observed, and the training strategy is adjusted in a timely manner. S5. At this point, the trained construction waste model is deployed in the actual environment; S6. At this time, the extension length of the processing block (31) or the blocking angle of the fixed block (401) is controlled according to the prediction result to achieve a better stone crushing effect.
Citation Information
Cited By
High-precision separation measurement method and device for rotation error of main shaft
CN121804399A