Cleaning device for sediment at bottom of hard rock tube push bench

By designing a sediment cleaning device at the bottom of the hard rock pipe jacking machine and using spraying and extraction technology to clean the sediment at the bottom of the pipe jacking machine, the problem of increased friction caused by sediment deposition during pipe jacking construction was solved, ensuring the normal progress and safety of the construction.

CN118774868AInactive Publication Date: 2024-10-15河南省水务规划设计研究有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410909233.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In pipe jacking construction, especially in long-distance hard rock pipe jacking construction, due to the difference in outer diameter design between the pipe jacking machine and subsequent pipe sections, the gravel material cannot be completely taken away by the mud, and part of the gravel settles between the pipe and the rock. Between the walls, friction is increased, which affects construction safety and efficiency.

Method used

Design a sediment cleaning device at the bottom of the hard rock pipe jacking machine, including a prefabricated pipe, a slurry inlet pipe and a slurry outlet pipe, equipped with a movable sealing unit and a spraying unit. It uses spraying and extraction to clean the mud and mud in the over-excavated gap. sediment, reduce sediment deposition and reduce friction.

Benefits of technology

Effectively clean the sediment at the bottom of the pipe jacking machine, reduce the impact of sediment on construction, ensure the normal progress of pipe jacking construction, reduce the probability of sediment deposition, and improve construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774868A_ABST
    Figure CN118774868A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipe jacking engineering, in particular to a hard rock pipe jacking machine bottom sediment cleaning device which comprises a prefabricated pipe, a slurry inlet pipe and a slurry outlet pipe, a plurality of slurry inlets and a plurality of slurry outlets are formed in the prefabricated pipe, the slurry inlet pipe and the slurry outlet pipe are located on the inner side of the prefabricated pipe, the slurry inlet pipe communicates with the slurry inlets, and the slurry outlet pipe communicates with the slurry outlets. The slurry inlet pipe feeds slurry into the overexcavation gap through the slurry inlet, the slurry outlet pipe communicates with the slurry outlet, the slurry outlet pipe extracts slurry in the overexcavation gap through the slurry outlet, and a slag storage groove is formed in the bottom of the prefabricated pipe and extends in the axial direction of the prefabricated pipe; a movable sealing unit is arranged at a slurry inlet in the bottom of the prefabricated pipe; a first guniting unit is arranged on the sealing unit, a second guniting unit is arranged at the slag storage tank, and the first guniting unit and the second guniting unit are located between the sealing unit and a slurry outlet in the bottom of the prefabricated pipe. The pipe jacking machine has the beneficial effects that sediment at the bottom of the pipe jacking machine can be comprehensively cleaned, so that normal pipe jacking construction is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipe jacking engineering, and in particular to a bottom sediment cleaning device for a hard rock pipe jacking machine. Background Art

[0002] In the process of pipe jacking construction, especially in long-distance hard rock pipe jacking construction, effectively reducing frictional resistance is the primary task and the key to the smooth implementation of the project. In muddy rock pipe jacking construction, the excavated slag material is crushed twice in the crushing chamber and then circulated to the mud-water separator outside the cave through the mud.

[0003] However, the pipe jacking machine and the subsequent pipe segments are designed with an outer diameter difference to form an over-excavation gap around the pipe. Due to the existence of the over-excavation gap and the stirring of the cutter disc, the slag material cannot be completely carried away by the mud. A part of the slag material will flow through the over-excavation gap to the surrounding of the pipe wall and then settle between the pipe and the rock wall. The sediment is first deposited at the bottom of the pipe. As the sediment increases, the range occupied by the sediment gradually expands. The sediment will lift the pipeline and make its upper part contact the rock wall, causing a sharp increase in the frictional resistance of the pipe jacking construction, which brings great risks and difficulties to long-distance pipe jacking construction and may even lead to pipe jacking failure. Therefore, improvement is needed. Summary of the invention

[0004] In order to solve the above problems, an embodiment of the present application provides a sediment cleaning device at the bottom of a hard rock pipe jacking machine, which can clean the sediment at the bottom of the pipe jacking machine more comprehensively to ensure the normal progress of the pipe jacking construction.

[0005] In order to achieve the above-mentioned purpose, the embodiment of the present application specifically adopts the following technical scheme: a bottom sediment cleaning device of a hard rock pipe jacking machine, comprising a prefabricated pipe, a slurry inlet pipe and a slurry outlet pipe, the prefabricated pipe is provided with a plurality of slurry inlets and a plurality of slurry outlets, the slurry inlet pipe and the slurry outlet pipe are located on the inner side of the prefabricated pipe, the slurry inlet pipe is connected to the slurry inlet, the slurry inlet pipe feeds slurry into the over-excavation gap through the slurry inlet, the slurry outlet pipe is connected to the slurry outlet, the slurry outlet pipe extracts the slurry in the over-excavation gap through the slurry outlet, and a slag storage tank is provided at the bottom of the prefabricated pipe, and the slag storage tank extends along the axial direction of the prefabricated pipe;

[0006] A movable sealing unit is provided at the slurry inlet at the bottom of the prefabricated pipe, and the sealing unit can slide against the inner wall of the over-excavation gap or slide away from the over-excavation gap;

[0007] A first shotcrete unit is provided on the sealing unit, a second shotcrete unit is provided at the slag storage tank, and the first shotcrete unit and the second shotcrete unit are located between the sealing unit and the slurry outlet at the bottom of the prefabricated pipe;

[0008] When the sealing unit contacts the inner wall of the over-excavation gap, the first grouting unit and the second grouting unit will spray slurry into the over-excavation gap, and the mud and sediment in the over-excavation gap will be discharged into the slurry outlet pipe through the slurry outlet.

[0009] Optionally, the sealing unit includes a first fixed shell installed in the prefabricated pipe, in which a slag stopper is slidably embedded. The slag stopper slides through a slurry inlet at the bottom of the prefabricated pipe, and the slag stopper can sink into the slurry inlet or contact the inner wall of the over-excavation gap.

[0010] Optionally, the first fixed shell is connected to the slurry inlet pipe through the first connecting pipe. When the slurry inlet pipe feeds slurry into the first fixed shell through the first connecting pipe, the slurry in the first fixed shell will push the slag retaining plate to contact the inner wall of the over-excavation gap.

[0011] Optionally, the slag blocking plate is connected to the first fixed shell via a first spring, and when the first spring is in a natural state, the slag blocking plate will sink into the slurry inlet.

[0012] Optionally, the first grouting unit includes a slurry guiding channel, a first connecting channel and a first grouting port, the slurry guiding channel is arranged between the inner wall of the first fixed shell and the outer wall of the first fixed shell, both end openings of the slurry guiding channel are arranged on the inner wall of the first fixed shell, the first connecting channel and the first grouting port are interconnected and both are arranged inside the slag blocking plate, and the openings at one end of the first connecting channel and the first grouting port that are opposite to each other are both arranged on the side wall of the slag blocking plate;

[0013] When the slag blocking plate sinks into the slurry inlet, the side wall of the slag blocking plate will close the openings at both ends of the slurry guiding channel, the inner wall of the first fixed shell will close the opening at one end of the first connecting channel, and the mouth wall of the slurry inlet will close the opening at one end of the first spraying port;

[0014] When the slag retaining plate contacts the inner wall of the over-excavation gap, the first connecting pipe will be connected to the slurry guiding channel through the first fixed shell, the slurry guiding channel will be connected to the first grouting port through the first connecting channel, the first grouting port will be connected to the over-excavation gap and toward the slurry outlet at the bottom of the prefabricated pipe.

[0015] Optionally, the second grouting unit includes a second fixed shell and a plurality of fixed columns, the second fixed shell is installed in the prefabricated pipe, and the second fixed shell is connected to the first connecting pipe through a second connecting pipe; the fixed column is installed on the second fixed shell, and a second connecting channel and a second grouting port that are interconnected are provided inside the fixed column, an end opening of the second connecting channel away from the second grouting port is connected to the second fixed shell through a slurry guide pipe, and an end opening of the second spraying port away from the second connecting channel is used for spraying grout into the slag storage tank.

[0016] Optionally, a penetration groove is provided at the bottom of the prefabricated pipe, the penetration groove is located above the slag storage tank and is connected to the slag storage tank, a sealing plate is slidably embedded in the penetration groove, a plurality of sliding grooves for the fixed column to slide through the sealing plate are provided on the sealing plate, and the sealing plate is connected to a slide plate through a connecting rod, the slide plate is slidably embedded in the second fixed shell, and the slide plate is connected to the second fixed shell through a second spring;

[0017] When the second spring is in a natural state, the sealing plate will seal the connection between the penetration groove and the slag storage groove, the groove wall of the chute will seal the second grouting port, and the sliding plate will block the interior of the second fixed shell, so that the second connecting pipe cannot be connected to the slurry guide pipe through the interior of the second fixed shell;

[0018] When the second connecting pipe feeds slurry into the second fixed shell, the slurry in the second fixed shell will push the slide plate to move, the second connecting pipe will be connected to the slurry guide pipe through the inside of the second fixed shell, the slide plate will drive the sealing plate to move through the connecting rod, and the second grouting port will be separated from the slide groove and face the slurry outlet at the bottom of the prefabricated pipe.

[0019] The beneficial effects of the embodiments of the present application are:

[0020] 1. When it is necessary to clean the sediment at the bottom of the pipe jacking machine, the solenoid valve will be opened, the slurry inlet pipe will feed slurry into the first connecting pipe and the second connecting pipe, the mud in the first fixed shell will push the slag baffle plate to contact the inner wall of the over-excavation gap, and the mud will pass through the slurry guide channel and the first connecting channel in sequence and spray to the slurry outlet at the bottom of the prefabricated pipe through the first grouting port. At the same time, the mud in the second fixed shell will push the slide plate to move, and the slide plate will drive the sealing plate to move through the connecting rod. The mud in the second fixed shell will pass through the slurry guide pipe and the second connecting channel in sequence and spray to the slurry outlet at the bottom of the prefabricated pipe through the second grouting port. The slurry outlet pipe will extract the mud and sediment in the over-excavation gap through the slurry outlet to reduce the influence of the sediment on the pipe jacking construction.

[0021] 2. The slag storage tank can accommodate part of the sediment at the bottom of the prefabricated pipe, so that the remaining sediment is not easy to deposit and squeeze into shape in a short time, so that this part of the sediment is convenient for being taken away by the mud, which greatly reduces the probability of sediment deposition and ensures the normal progress of the pipe jacking construction;

[0022] 3. The sealing unit can slide against the inner wall of the over-excavation gap, so that the sealing unit can block the mud sprayed by the first shotcrete unit and the second shotcrete unit. Therefore, this part of the mud can only move to the slurry outlet at the bottom of the prefabricated pipe to facilitate the cleaning of the sediment at the bottom of the pipe jacking machine. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the prefabricated pipe in the embodiment of the present application;

[0024] Figure 2 is a schematic cross-sectional structural diagram of a prefabricated pipe and an over-excavation gap in an embodiment of the present application;

[0025] Figure 3 is a schematic structural diagram of a sealing unit and a first spraying unit in an embodiment of the present application;

[0026] Figure 4 is a schematic cross-sectional structural diagram of the second spraying unit and the sealing plate in the embodiment of the present application;

[0027] Figure 5 It is a structural schematic diagram of the second spraying unit and the sealing plate in the embodiment of the present application;

[0028] Figure 6 It is a schematic diagram of the cross-sectional structure of the second spraying unit in the embodiment of the present application.

[0029] Figure numerals: 1. prefabricated pipe; 11. slurry inlet; 12. slurry outlet; 13. slag storage tank; 14. penetration groove; 2. slurry inlet pipe; 3. slurry outlet pipe; 4. sealing unit; 41. first fixed shell; 42. slag baffle plate; 43. first connecting pipe; 44. solenoid valve; 45. first spring; 5. first spraying unit; 51. slurry guide channel; 52. first connecting channel; 53. first spraying port; 6. second spraying unit; 61. second fixed shell; 62. fixed column; 63. support rod; 64. second connecting pipe; 65. fixed rod; 66. second connecting channel; 67. second spraying port; 68. slurry guide pipe; 7. sealing plate; 71. slide groove; 72. connecting rod; 73. slide plate; 74. second spring; 8. over-excavation gap. DETAILED DESCRIPTION

[0030] The preferred embodiments of the present application are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present application and are not intended to limit the protection scope of the present application.

[0031] See also Figure 1-6 The present application embodiment discloses a bottom sediment cleaning device for a hard rock pipe jacking machine. Figure 1 and Figure 2 As shown, a bottom sediment cleaning device of a hard rock pipe jacking machine includes a prefabricated pipe 1, a slurry inlet pipe 2 and a slurry outlet pipe 3. The prefabricated pipe 1 is provided with a plurality of slurry inlets 11 and a plurality of slurry outlets 12. The slurry inlet pipe 2 and the slurry outlet pipe 3 are located on the inner side of the prefabricated pipe 1. The slurry inlet pipe 2 is connected to the slurry inlet 11, and the slurry outlet pipe 3 is connected to the slurry outlet 12.

[0032] During the pipe jacking construction process, the slurry inlet pipe 2 feeds slurry into the over-excavation gap 8 through the slurry inlet port 11, and the slurry in the over-excavation gap 8 will provide a certain lubrication effect for the outer wall of the prefabricated pipe 1 to reduce the resistance encountered by the prefabricated pipe 1 during the forward movement; at the same time, the mud in the over-excavation gap 8 will push a part of the sediment into the slurry outlet port 12, and the slurry outlet pipe 3 will extract the mud and sediment in the over-excavation gap 8 through the slurry outlet port 12 to reduce the influence of the sediment on the pipe jacking construction.

[0033] A slag storage tank 13 is provided at the bottom of the prefabricated pipe 1, and the slag storage tank 13 extends along the axial direction of the prefabricated pipe 1, so that the slag storage tank 13 can accommodate part of the sediment located at the bottom of the prefabricated pipe 1, so that the residual sediment is not easy to be deposited and extruded in a short time, thereby facilitating this part of the sediment to be taken away by the mud, greatly reducing the probability of sediment deposition and ensuring the normal progress of the jacking construction.

[0034] like Figure 1 and Figure 2 As shown, a movable sealing unit 4 is provided at the slurry inlet 11 at the bottom of the prefabricated pipe 1, a first shotcrete unit 5 is provided on the sealing unit 4, a second shotcrete unit 6 is provided at the slag storage tank 13, and the first shotcrete unit 5 and the second shotcrete unit 6 are located between the sealing unit 4 and the slurry outlet 12 at the bottom of the prefabricated pipe 1.

[0035] During the construction process of the pipe jacking, the first grouting unit 5 and the second grouting unit 6 can spray slurry to the bottom of the over-excavation gap 8. The slurry will pressurize the sediment at the bottom of the prefabricated pipe 1 and the sediment in the slag storage tank 13 so that the mud can push this part of the sediment into the slurry outlet 12, thereby facilitating the cleaning of the sediment at the bottom of the pipe jacking machine.

[0036] In addition, the sealing unit 4 can slide against the inner wall of the over-excavation gap 8, so that the sealing unit 4 can block the mud sprayed by the first spraying unit 5 and the second spraying unit 6, so this part of the mud can only move toward the slurry outlet 12 at the bottom of the prefabricated pipe 1 to facilitate the cleaning of the sediment at the bottom of the pipe jacking machine.

[0037] It is worth noting that, when there is no need to clean the sediment at the bottom of the pipe jacking machine, the sealing unit 4 can be slid away from the over-excavation gap 8, so that the sealing unit 4 will not affect the advancement of the pipe jacking machine.

[0038] like Figure 2 and Figure 3 As shown, the sealing unit 4 includes a first fixed shell 41 installed on the inner wall of the prefabricated pipe 1, and a slag blocking plate 42 is slidably embedded in the first fixed shell 41, and the slag blocking plate 42 is slidably penetrated through the slurry inlet 11 at the bottom of the prefabricated pipe 1. The slag blocking plate 42 can be sunk into the slurry inlet 11, so that the sealing unit 4 will not affect the advancement of the pipe jacking machine; the slag blocking plate 42 can also abut against the inner wall of the over-excavation gap 8, so that the mud sprayed by the first grouting unit 5 and the second grouting unit 6 can only push the sediment at the bottom of the pipe jacking machine into the slurry outlet 12 at the bottom of the prefabricated pipe 1, so as to clean the sediment at the bottom of the pipe jacking machine.

[0039] The first fixed shell 41 is connected to the slurry inlet pipe 2 through the first connecting pipe 43, and a solenoid valve 44 is installed on the first connecting pipe 43. When it is necessary to clean the sediment at the bottom of the pipe jacking machine, the worker will remotely open the solenoid valve 44, and the slurry inlet pipe 2 will flow into the first fixed shell 41 through the first connecting pipe 43. The mud in the first fixed shell 41 will push the slag blocking plate 42 to contact the inner wall of the over-excavation gap 8, so as to clean the sediment at the bottom of the pipe jacking machine.

[0040] One end of the slag retaining plate 42 extending into the first fixed shell 41 is connected to the first fixed shell 41 through the first spring 45. When no slurry enters the first fixed shell 41, the first spring 45 will be in a natural state, and the slag retaining plate 42 will sink into the slurry inlet 11, so that the sealing unit 4 will not affect the advancement of the prefabricated pipe 1.

[0041] The first grouting unit 5 includes a slurry guiding channel 51, a first connecting channel 52 and a first grouting port 53. The slurry guiding channel 51 is arranged in a "U" shape and is arranged between the inner wall of the first fixed shell 41 and the outer wall of the first fixed shell 41. The openings at both ends of the slurry guiding channel 51 are arranged on the inner wall of the first fixed shell 41; the first connecting channel 52 and the first grouting port 53 are interconnected and are both arranged inside the slag retaining plate 42. The first connecting channel 52 is arranged in an "L" shape, and the openings at the ends of the first connecting channel 52 and the first grouting port 53 that are opposite to each other are both arranged on the side wall of the slag retaining plate 42.

[0042] During the forward movement of the prefabricated pipe 1, the slag blocking plate 42 will sink into the slurry inlet 11, the side walls of the slag blocking plate 42 will close the openings at both ends of the slurry guide channel 51, the inner wall of the first fixed shell 41 will close the opening at one end of the first connecting channel 52, and the mouth wall of the slurry inlet 11 will close the opening at one end of the first grouting port 53, so that the mud and sediment in the over-excavation gap 8 cannot enter the first grouting port 53, so as to avoid the first grouting port 53 being blocked.

[0043] When it is necessary to clean the sediment at the bottom of the pipe jacking machine, the solenoid valve 44 will be opened, and the slurry inlet pipe 2 will feed slurry into the first fixed shell 41 through the first connecting pipe 43, and the mud in the first fixed shell 41 will push the slag baffle 42 to hit the inner wall of the over-excavation gap 8. At this time, the first connecting pipe 43 will be connected to the slurry guide channel 51 through the inside of the first fixed shell 41, and the slurry guide channel 51 will be connected to the first grouting port 53 through the first connecting channel 52. The first grouting port 53 will be connected to the over-excavation gap 8 and face the slurry outlet 12 at the bottom of the prefabricated pipe 1. The mud in the first fixed shell 41 will pass through the slurry guide channel 51 and the first connecting channel 52 in turn and be sprayed to the slurry outlet 12 at the bottom of the prefabricated pipe 1 through the first grouting port 53, so that this part of the mud can push and clean the sediment at the bottom of the pipe jacking machine.

[0044] like Figures 4 to 6As shown, the second spraying unit 6 includes a second fixed shell 61 and a plurality of fixed columns 62. The second fixed shell 61 is installed on the inner wall of the prefabricated pipe 1 through a plurality of support rods 63, and the second fixed shell 61 is connected to the first connecting pipe 43 through a second connecting pipe 64; the fixed column 62 is installed on the outer wall of the second fixed shell 61 through a fixed rod 65, and a second connecting channel 66 and a second spraying port 67 that are interconnected are provided inside the fixed column 62. The second connecting channel 66 has an opening at one end away from the second spraying port 67 and is connected to the second fixed shell 61 through a slurry guide pipe 68.

[0045] A penetration groove 14 is provided at the bottom of the prefabricated pipe 1, and the penetration groove 14 is located above the slag storage tank 13 and is connected to the slag storage tank 13. A sealing plate 7 is slidably embedded in the penetration groove 14, and a plurality of sliding grooves 71 are provided on the sealing plate 7 for the fixed column 62 to slide through, and the sealing plate 7 is connected to a slide plate 73 through a connecting rod 72. The slide plate 73 is slidably embedded in the second fixed shell 61, and the slide plate 73 is connected to the second fixed shell 61 through a second spring 74.

[0046] During the forward movement of the prefabricated pipe 1, the second spring 74 will be in a natural state, and the sealing plate 7 will close the connection between the penetration groove 14 and the slag storage tank 13, so that the mud and sediment in the over-excavation gap 8 are not easy to enter the penetration groove 14; and the groove wall of the slide groove 71 will be closed at the second grouting port 67, so that the second grouting port 67 is not easy to be blocked; the slide plate 73 will isolate the interior of the second fixed shell 61, so that the second connecting pipe 64 cannot be connected to the slurry guide pipe 68 through the interior of the second fixed shell 61.

[0047] When it is necessary to clean the sediment at the bottom of the pipe jacking machine, the solenoid valve 44 will be opened, and the slurry inlet pipe 2 will feed slurry into the second fixed shell 61 through the first connecting pipe 43 and the second connecting pipe 64, and the mud in the second fixed shell 61 will push the slide plate 73 to move, so that the second connecting pipe 64 is connected to the slurry guide pipe 68 through the inside of the second fixed shell 61; at the same time, the slide plate 73 will drive the sealing plate 7 to move through the connecting rod 72, and the second grouting port 67 will be separated from the slide groove 71 and face the slurry outlet 12 at the bottom of the prefabricated pipe 1; at this time, the mud in the second fixed shell 61 will pass through the slurry guide pipe 68 and the second connecting channel 66 in turn and be sprayed to the slurry outlet 12 at the bottom of the prefabricated pipe 1 through the second grouting port 67, so that this part of the mud can push and clean the sediment in the slag storage tank 13.

[0048] The working principle of the present application is as follows: when it is necessary to clean the sediment at the bottom of the pipe jacking machine, the solenoid valve 44 will be opened, and the slurry inlet pipe 2 will feed slurry into the first fixed shell 41 through the first connecting pipe 43, and the mud in the first fixed shell 41 will push the slag baffle 42 to hit the inner wall of the over-excavation gap 8. At this time, the first connecting pipe 43 will be connected to the slurry guide channel 51 through the inside of the first fixed shell 41, and the slurry guide channel 51 will be connected to the first grouting port 53 through the first connecting channel 52. The first grouting port 53 will be connected to the over-excavation gap 8 and face the slurry outlet 12 at the bottom of the prefabricated pipe 1. The mud in the first fixed shell 41 will pass through the slurry guide channel 51 and the first connecting channel 52 in sequence and be sprayed to the slurry outlet 12 at the bottom of the prefabricated pipe 1 through the first grouting port 53, so that this part of the mud will push and clean the sediment at the bottom of the pipe jacking machine.

[0049] At the same time, the slurry inlet pipe 2 will also feed slurry into the second fixed shell 61 through the first connecting pipe 43 and the second connecting pipe 64, and the mud in the second fixed shell 61 will push the slide plate 73 to move, so that the second connecting pipe 64 is connected to the slurry guide pipe 68 through the inside of the second fixed shell 61; at the same time, the slide plate 73 will drive the sealing plate 7 to move through the connecting rod 72, and the second grouting port 67 will be separated from the slide groove 71 and face the slurry outlet 12 at the bottom of the prefabricated pipe 1; at this time, the slurry in the second fixed shell 61 will pass through the slurry guide pipe 68 and the second connecting channel 66 in turn and be sprayed to the slurry outlet 12 at the bottom of the prefabricated pipe 1 through the second grouting port 67, so that this part of the slurry can push and clean the sediment in the slag storage tank 13.

[0050] Finally, the slurry outlet pipe 3 will extract the slurry and sediment in the over-excavation gap 8 through the slurry outlet 12 to reduce the influence of the sediment on the jacking construction.

[0051] In summary, the present application can more comprehensively clean the sediment at the bottom of the pipe jacking machine to ensure the normal progress of the pipe jacking construction.

[0052] It should be noted that in the description of this application, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0053] In addition, it should be noted that in the description of this application, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0054] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion, such that a process, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, article, or apparatus / device.

[0055] So far, the technical solutions of the present application have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present application is obviously not limited to these specific embodiments. Without departing from the principles of the present application, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present application.

Claims

1. A bottom sediment cleaning device for a hard rock pipe jacking machine, comprising a prefabricated pipe (1), a slurry inlet pipe (2) and a slurry outlet pipe (3), wherein the prefabricated pipe (1) is provided with a plurality of slurry inlets (11) and a plurality of slurry outlets (12), the slurry inlet pipe (2) and the slurry outlet pipe (3) are located on the inner side of the prefabricated pipe (1), the slurry inlet pipe (2) is connected to the slurry inlet (11), the slurry inlet pipe (2) feeds slurry into an over-excavation gap (8) through the slurry inlet (11), the slurry outlet pipe (3) is connected to the slurry outlet (12), the slurry outlet pipe (3) extracts slurry in the over-excavation gap (8) through the slurry outlet (12), and the characteristic is that: A slag storage tank (13) is provided at the bottom of the prefabricated pipe (1), and the slag storage tank (13) extends along the axial direction of the prefabricated pipe (1); A movable sealing unit (4) is provided at the slurry inlet (11) at the bottom of the prefabricated pipe (1), and the sealing unit (4) can slide against the inner wall of the over-excavation gap (8) or slide away from the over-excavation gap (8); A first grouting unit (5) is provided on the sealing unit (4), a second grouting unit (6) is provided at the slag storage tank (13), and the first grouting unit (5) and the second grouting unit (6) are located between the sealing unit (4) and the slurry outlet (12) at the bottom of the prefabricated pipe (1); When the sealing unit (4) contacts the inner wall of the over-excavation gap (8), the first grouting unit (5) and the second grouting unit (6) will spray slurry into the over-excavation gap (8), and the mud and sediment in the over-excavation gap (8) will be discharged into the slurry outlet pipe (3) through the slurry outlet (12).

2. A bottom sediment cleaning device for a hard rock pipe jacking machine according to claim 1, characterized in that: The sealing unit (4) comprises a first fixed shell (41) installed in the prefabricated pipe (1), a slag retaining plate (42) is slidably embedded in the first fixed shell (41), the slag retaining plate (42) is slidably penetrated through the slurry inlet (11) at the bottom of the prefabricated pipe (1), and the slag retaining plate (42) can sink into the slurry inlet (11) or abut against the inner wall of the over-excavation gap (8).

3. A bottom sediment cleaning device for a hard rock pipe jacking machine according to claim 2, characterized in that: The first fixed shell (41) is connected to the slurry inlet pipe (2) through the first connecting pipe (43). When the slurry inlet pipe (2) enters the first fixed shell (41) through the first connecting pipe (43), the slurry in the first fixed shell (41) pushes the slag retaining plate (42) to contact the inner wall of the over-excavation gap (8).

4. A bottom sediment cleaning device for a hard rock pipe jacking machine according to claim 3, characterized in that: The slag blocking plate (42) is connected to the first fixed shell (41) via a first spring (45). When the first spring (45) is in a natural state, the slag blocking plate (42) will sink into the pulp inlet (11).

5. A bottom sediment cleaning device for a hard rock pipe jacking machine according to claim 4, characterized in that: The first grouting unit (5) comprises a slurry guiding channel (51), a first connecting channel (52) and a first grouting port (53); the slurry guiding channel (51) is arranged between the inner wall of the first fixed shell (41) and the outer wall of the first fixed shell (41); both ends of the slurry guiding channel (51) are opened on the inner wall of the first fixed shell (41); the first connecting channel (52) and the first grouting port (53) are interconnected and are both arranged inside the slag blocking plate (42); and the openings of the ends of the first connecting channel (52) and the first grouting port (53) that are opposite to each other are both arranged on the side wall of the slag blocking plate (42); When the slag blocking plate (42) sinks into the slurry inlet (11), the side wall of the slag blocking plate (42) will close the openings at both ends of the slurry guiding channel (51), the inner wall of the first fixed shell (41) will close the opening at one end of the first connecting channel (52), and the mouth wall of the slurry inlet (11) will close the opening at one end of the first slurry spraying port (53); When the slag retaining plate (42) contacts the inner wall of the over-excavation gap (8), the first connecting pipe (43) will be connected to the slurry guide channel (51) through the interior of the first fixed shell (41), the slurry guide channel (51) will be connected to the first grouting port (53) through the first connecting channel (52), and the first grouting port (53) will be connected to the over-excavation gap (8) and face the slurry outlet (12) at the bottom of the prefabricated pipe (1).

6. A bottom sediment cleaning device for a hard rock pipe jacking machine according to any one of claims 3 to 5, characterized in that: The second grouting unit (6) comprises a second fixed shell (61) and a plurality of fixed columns (62); the second fixed shell (61) is installed in the prefabricated pipe (1), and the second fixed shell (61) is connected to the first connecting pipe (43) through a second connecting pipe (64); the fixed column (62) is installed on the second fixed shell (61), and a second connecting channel (66) and a second grouting port (67) which are connected to each other are provided inside the fixed column (62); an end of the second connecting channel (66) which is away from the second grouting port (67) is opened and connected to the second fixed shell (61) through a slurry guide pipe (68); and an end of the second grouting port (67) which is away from the second connecting channel (66) is opened and is used for grouting into the slag storage tank (13).

7. A bottom sediment cleaning device for a hard rock pipe jacking machine according to claim 6, characterized in that: The bottom of the prefabricated pipe (1) is provided with a penetration groove (14), the penetration groove (14) is located above the slag storage tank (13) and is connected to the slag storage tank (13), a sealing plate (7) is slidably embedded in the penetration groove (14), the sealing plate (7) is provided with a plurality of sliding grooves (71) for the fixed column (62) to slide through, and the sealing plate (7) is connected to a slide plate (73) through a connecting rod (72), the slide plate (73) is slidably embedded in the second fixed shell (61), and the slide plate (73) is connected to the second fixed shell (61) through a second spring (74); When the second spring (74) is in a natural state, the sealing plate (7) will seal the connection between the penetration groove (14) and the slag storage groove (13), the groove wall of the chute (71) will seal the second grouting port (67), and the slide plate (73) will block the inside of the second fixed shell (61), so that the second connecting pipe (64) cannot be connected to the slurry guide pipe (68) through the inside of the second fixed shell (61); When the second connecting pipe (64) is fed into the second fixed shell (61), the slurry in the second fixed shell (61) will push the slide plate (73) to move, the second connecting pipe (64) will be connected to the slurry guide pipe (68) through the inside of the second fixed shell (61), the slide plate (73) will drive the sealing plate (7) to move through the connecting rod (72), and the second grouting port (67) will be separated from the slide groove (71) and move toward the slurry outlet (12) at the bottom of the prefabricated pipe (1).