Submarine cable lifting structure and method for oil platform and tension verification method
During the lifting process of submarine cables on offshore oil drilling platforms, the combined structure of the pulling head, binding components and stop cable components is used to solve the problem of submarine cables being easily damaged under high tension and achieve safe, smooth lifting and lifting of submarine cables. The stability of signal transmission.
Patent Information
- Application Number
- CN202410878715.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-15
AI Technical Summary
During the lifting process of submarine cables on offshore oil drilling platforms, submarine cables are easily damaged. Especially when the axial tension exceeds 15 tons, the lateral pressure of the sling on the submarine cable will be greater than the design threshold, resulting in attenuation of optical fiber transmission performance.
A submarine cable hoisting structure for an oil platform is designed, including a traction head, a binding component and a stop cable component. The traction head is connected to the winch wire. The binding component groups and bundles multiple submarine cables in proportion. The stop cable component is directed along the length of the cable. Set the rope sleeve to evenly conduct the pulling force, reduce the pulling load of the traction head and binding components, and prevent loosening and lateral pressure by protecting the steel belt and manila rope.
It effectively prevents the submarine cable from loosening and being damaged during the pulling process, ensures the structural strength and signal transmission performance of the submarine cable, and ensures the smooth progress and safety of the submarine cable lifting operation.
Smart Images

Figure CN118783307A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of submarine cable lifting devices, and more specifically, to a submarine cable lifting structure and method for an oil platform, and a tension verification method. Background Art
[0002] In order to meet the communication and power supply needs of offshore oil drilling platforms, optical cables or electric cables are usually laid on the seabed. Special devices and methods are required to lift optical cables or electric cables from the seabed to the oil platform.
[0003] In the construction of some optical cable projects, it is necessary to pull multiple double-armored submarine cables from the submarine cable construction ship through the J-tube to the oil platform at the same time. Before the specific construction, calculation and simulation analysis will be performed to obtain the tension that the submarine cable will be subjected to during the construction process, and then the cable will be pulled and lifted with the set force. Usually, after the submarine cable head reaches the platform, it is necessary to continue pulling for about 50 meters. The usual construction method is to use a sling to pull the submarine cable with force, but when the axial tension exceeds the set value, such as when the axial tension exceeds 15 tons, the lateral pressure of the sling on the submarine cable will be greater than the design threshold of 50KN, which will cause an adverse effect on the attenuation of the optical fiber transmission performance of the submarine cable. Summary of the invention
[0004] In view of the problem that the submarine cable is easily damaged during the oil platform submarine cable lifting construction, the first purpose of this application is to propose an oil platform submarine cable lifting structure, which can effectively protect the submarine cable and ensure the smooth progress of the submarine cable lifting construction process; based on the above-mentioned oil platform submarine cable lifting structure, the second purpose of this application is to provide an oil platform submarine cable lifting method, and the third purpose also proposes a tension verification method based on the above-mentioned oil platform submarine cable lifting structure to ensure the reliability and safety of the submarine cable lifting operation. The specific plan is as follows: A submarine cable lifting structure for an oil platform, comprising: A traction head, one end of which is connected to the platform traction equipment via a winch wire, and the other end is used to aggregate the cable heads of multiple submarine cables to be lifted and fixedly connected thereto; The bundling assembly includes a bundling sub-belt for bundling a plurality of submarine cables in a set ratio to form a sub-submarine cable group, and a bundling main belt for bundling a plurality of submarine cable groups to form a main submarine cable group; A stop cable assembly, comprising a plurality of rope loops arranged along the length direction of the cable and wound around the cable, and a steel wire group for connecting each rope loop with the platform traction equipment and / or winch wire; Among them, the spacing between each bundled sub-belt on the sub-submarine cable group and the spacing between each bundled main belt on the main submarine cable group are configured to be 0.8-1.2m; The spacing between multiple sets of rope loops is configured to be 1-2m, and the length of each set of rope loops is configured to be 3.5-4.5m; The length of the submarine cable section where the bundling assembly is located is not less than the length of the submarine cable section where the stop cable assembly is located.
[0005] In the above technical scheme, each section of the submarine cable to be lifted is fixed by a different bundling and fixing structure. The bundling assembly arranged at a section close to the traction head can ensure that the submarine cable will not become loose during the pulling process, thereby ensuring the overall structural strength of the multiple submarine cables. The stop rope assembly can effectively and evenly transmit the pulling force of the traction equipment to a section of the submarine cable farther away from the traction head, thereby reducing the pulling load of the traction head and the bundling assembly and also reducing the lateral pressure of the rope loop on the submarine cable, thereby ensuring that the submarine cable will not be damaged during the pulling and lifting process. The bundling spacing of the submarine cable itself is also reasonably and accurately set, fully considering the bending and stress conditions of the submarine cable itself, thereby ensuring the smooth progress of the submarine cable lifting construction process.
[0006] Furthermore, the number of submarine cables in each sub-submarine cable group does not exceed 2; Multiple submarine cables are alternately grouped along their length, and the distance between each group of submarine cables is configured to be 1m, where: If the number of submarine cables is an even number M, then the number of sub-submarine cable groups is M / 2; If the number of submarine cables is an odd number N, then the number of sub-submarine cable groups is N / 2+1; Each section of submarine cable group is tied with a bundling belt and then with a main bundling belt.
[0007] Through the above technical solution, multiple submarine cables connected to the traction head can be integrated and bundled together. Alternating grouping and bundling can effectively improve the structural strength of the submarine cable in one section of the bundling component and prevent the submarine cables from loosening during the lifting operation. The sub-submarine cable groups formed after grouping are spaced 1m apart, which does not affect the subsequent bending and winding of the submarine cable while maintaining the bundling strength.
[0008] Furthermore, the sub-binding belts and the main binding belts are both configured as binding steel belts, and protective Manila ropes are wound around the binding locations of the binding steel belts and the submarine cables.
[0009] Furthermore, the bundling assembly also includes two protective steel belts arranged on each main submarine cable group, and the spacing between the two protective steel belts is configured to be 0.25-0.35m.
[0010] Through the above technical solution, the bundling effect of the bundling assembly on each submarine cable can be further improved, ensuring that multiple submarine cables near the traction head will not loosen after being subjected to longitudinal tension and lateral stress.
[0011] Furthermore, the number of the rope loops is 4 and they are configured as BTL stoppers, one BTL stopper rope includes six pairs of galvanized steel wire ropes of different lengths and are respectively wound around the submarine cable in a specific manner, and the ends are fixed by steel belts; The steel wire group includes a balancing steel wire respectively connected to four groups of BTL stop cables via rigging, and an auxiliary steel wire connected to the balancing steel wire, wherein one end of the auxiliary steel wire away from the balancing steel wire is fixedly connected to the winch steel wire.
[0012] Through the above technical solution, the tension exerted on the auxiliary steel wire during lifting can be transmitted to the balance steel wire, and finally to each group of BTL stop cables. Each group of rope loops will exert a gripping force on the submarine cable when subjected to tension, thereby achieving safe pulling and lifting of the submarine cable.
[0013] Furthermore, a traction steel wire is provided on the winch steel wire, and the head end of the auxiliary steel wire away from the balance steel wire is connected to the traction steel wire; The overlapped section of the winch steel wire and the auxiliary steel wire is bound by binding ropes, and the spacing between the binding ropes is configured to be 1m.
[0014] Through the above technical solution, it is convenient for the winch to pull the auxiliary steel wire through the traction steel wire, so that the traction force can be evenly distributed on the submarine cable, avoiding deformation of the submarine cable when pulling and lifting, and affecting the communication signal or power transmission performance of the submarine cable.
[0015] A method for lifting a submarine cable on an oil platform, based on the above-mentioned submarine cable lifting structure on the oil platform, comprises the following steps: Adjust and set the initial horizontal distance between the construction ship and the platform, pass the winch wire on the platform through the J-shaped tube and fix it to the guide rope released from the construction ship, and the platform synchronously releases the winch wire through the guide rope until the winch wire of the set length is pulled onto the construction ship; The head end of the auxiliary steel wire is fixedly connected to the winch steel wire, and the winch steel wire is fixedly connected to the traction head, and the traction head is fixedly connected to the submarine cable to be lifted; The traction equipment on the platform recycles the winch wire at a set speed. After the winch wire pulls the submarine cable, the submarine cable is bundled using the bundling assembly. The submarine cable is bundled using the stop cable assembly starting at a distance of 50 meters from the traction head, and the auxiliary wire is connected to the balance wire through the connecting rigging; Detect the distance between the traction head and the seabed. When the traction head approaches the seabed, use an underwater robot to check the relative position of the traction head to the lower pipe opening of the J-type pipe. When the traction head approaches the pipe opening, the platform traction equipment stops recovering the winch wire, and the construction ship continues to bundle and release the submarine cable. The underwater robot is used to detect the length of the submarine cable in contact with the seabed. The platform traction equipment continues to recycle the winch wire and the construction ship simultaneously releases the submarine cable, continuously pulling and lifting the submarine cable. When the head end of the auxiliary steel wire moves out of the upper pipe opening of the J-tube, the end of the auxiliary steel wire is separated from the winch wire, and the winch wire is continuously recovered until the submarine cable of the set length is lifted to the platform.
[0016] Furthermore, the method further comprises: When the traction head is moved out of the J-tube upper pipe opening by about 3 meters, the hand chain hoist suspended on the lifting lug is connected to the traction head and the tension on the winch wire is transferred to the hand chain hoist, and then the winch wire and the traction head are separated; Open the open block, take the winch wire out of the upper and lower diverting pulleys, put the upper 25 meters of the auxiliary wire into the pulley, and connect the winch wire and the auxiliary wire on the platform traction equipment; The platform traction device is rotated to tighten the remaining amount of the auxiliary steel wire, and the tension on the hand chain hoist is transferred to the auxiliary steel wire, and the hand chain hoist and the traction head are separated; The construction vessel continues to release the submarine cable and the platform traction equipment continues to synchronously recover the auxiliary steel wire until the submarine cable section where the stop cable assembly is located is pulled onto the platform.
[0017] A tension verification method based on the above-mentioned oil platform submarine cable lifting structure, based on the above-mentioned oil platform submarine cable lifting structure, comprises the following steps: Verify the tension between the stop cable assembly and the submarine cable: According to the stopper assembly structure as described above, the rope loop and the steel wire group are tied to the submarine cable; Connect both ends of the submarine cable to the input and output of the optoelectronic test equipment; A first tensile machine and a second tensile machine are configured, wherein the first tensile machine is configured to be fixedly connected to the end of the submarine cable, and the second tensile machine is configured to be fixedly connected to the balance steel wire; Reversely drive the first tensile testing machine and the second tensile testing machine, gradually increase the tensile force to the first target tensile force and gradually reduce it to zero after the set time, and detect the relative sliding distance between the rope loop and the submarine cable; Reversely drive the first tensile machine and the second tensile machine, gradually increase the tensile force to the second target tensile force and gradually reduce it to zero after the set time, and detect the fluctuation of the photoelectric signal in the submarine cable; Remove the stopper assembly and the submarine cable, and check whether there is any deformation or damage on the surface of the submarine cable where the force is applied.
[0018] Through the above technical solution, it is possible to verify whether the lifting structure itself will cause damage to the submarine cable during the pulling process.
[0019] Furthermore, the tension verification method also includes: cutting off the traction head and testing the optical performance, insulation resistance and DC resistance of the submarine cable.
[0020] Compared with the prior art, the present invention has the following beneficial effects: (1) Each section of the submarine cable to be lifted is fixed by different bundling and fixing structures. The bundling assembly provided at the section close to the pulling head can ensure that the submarine cable will not become loose during the pulling process, thereby ensuring the overall structural strength of the multiple submarine cables; (2) The stopper assembly can effectively and evenly transmit the pulling force of the traction equipment to the section of the submarine cable that is far away from the traction head, thereby reducing the pulling load of the traction head and the binding assembly and also reducing the lateral pressure of the rope loop on the submarine cable, ensuring that the submarine cable will not be damaged during the pulling and lifting process; (3) The bundling spacing between submarine cables is reasonable and precise, taking full account of the bending and stress conditions of the submarine cables themselves to ensure that the submarine cables themselves will not be damaged during the lifting process. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The overall schematic diagram of the submarine cable lifting structure of the present invention is Figure 1 ; Figure 2 The overall schematic diagram of the submarine cable lifting structure of the present invention is Figure 2 ; Figure 3 This is a schematic diagram of the operation of pulling the submarine cable.
[0022] Figure numerals: 1. submarine cable; 2. traction head; 3. bundling assembly; 4. stop rope assembly; 5. winch wire; 6. tying sub-belt; 7. tying main belt; 8. protective steel belt; 9. rope loop; 10. balance steel wire; 11. auxiliary steel wire; 12. traction steel wire; 13. platform; 14. J-type tube. DETAILED DESCRIPTION
[0023] The present invention will be further described in detail below in conjunction with embodiments and figures, but the embodiments of the present invention are not limited thereto.
[0024] For clarity of explanation, see Figure 3 In the implementation of the present application, a certain submarine cable 1 installation project, in which five submarine cables 1 are landed on a certain oil platform 13, is taken as an example. The project requires that five double-armored submarine cables 1 be bundled together, and the traction head 2 of the submarine cable 1 is pulled from the construction ship to the platform 13 through the preset J-shaped tube 14 using a winch pre-installed on the platform 13, and the 50-meter-long submarine cable 1 is continued to be pulled to the platform 13, so as to meet the design requirements of the landing of the five submarine cables 1 on the platform 13. It is assumed that the working deck of the platform 13 has space for arranging the pulling equipment and tools, and the inner diameter of the J-shaped tube 14 meets the need for the submarine cable 1 to pass through.
[0025] The submarine cable 1 described in the implementation manner of the present application, i.e., a submarine optical cable, includes at least an optical fiber communication cable and a power cable.
[0026] A submarine cable lifting structure for an oil platform, combined with Figure 1 and Figure 2 As shown, it includes: a traction head 2, a binding assembly 3 and a stop rope assembly 4 which are arranged in sequence along the length direction of the coastal cable 1.
[0027] One end of the traction head 2 is connected to the traction equipment of the platform 13 via the winch wire 5, and the other end is used to aggregate the cable heads of multiple submarine cables 1 to be lifted and fixedly connected thereto. The traction head 2 includes a shackle and a lock, and a fixing groove for accommodating and fixing the cable head is provided near one end of the submarine cable 1. The traction equipment of the platform 13 is mainly a winch.
[0028] like Figure 1 As shown, the bundling assembly 3 includes a bundling sub-belt 6 for bundling multiple submarine cables 1 according to a set ratio to form a sub-submarine cable group, and a bundling main belt 7 for bundling multiple submarine cable groups to form a main submarine cable group. In the embodiment of the present application, the bundling sub-belt 6 and the bundling main belt 7 are both configured as bundling steel belts. It should be noted that Figure 1 The figure is for illustration only and does not represent the actual position and size of the main strapping belt 7 and the sub-strap 6.
[0029] In order to ensure the bundling effect, the number of submarine cables 1 in each sub-submarine cable group does not exceed 2, and multiple submarine cables 1 are alternately grouped along their length direction, and the spacing distance between each group of submarine cables 1 is configured to be 1m. Taking the 5 submarine cables 1 in the implementation mode of the present application as an example, the 5 submarine cables 1 are first grouped and bundled in the form of 221 and then bundled as a whole. If the number of submarine cables 1 is an even number M (M>5), the number of sub-submarine cable groups is M / 2; if the number of submarine cables 1 is an odd number N (N>5), the number of sub-submarine cable groups is N / 2+1, and the bundling steps are also that each section of the sub-submarine cable group is bundled with a bundling sub-belt 6 and then with a bundling main belt 7. The spacing between the bundling sub-belts 6 on the sub-submarine cable group and the spacing between the bundling main belts 7 on the main submarine cable group are preferably configured to be 0.8-1.2m. The above technical scheme can integrate and bundle together multiple submarine cables 1 connected to the traction head 2. Alternating grouping and bundling can effectively improve the structural strength of the submarine cable 1 in a section of the bundling component 3, and avoid the loosening of each submarine cable 1 during the lifting operation; each sub-submarine cable group formed after grouping is spaced 1m apart, which does not affect the subsequent bending and winding of the submarine cable 1 while maintaining the bundling strength.
[0030] In order to further improve the binding effect between the submarine cables 1, each bundling steel belt is wrapped with a protective 6mm Manila rope at the bundling point of the submarine cable 1, and the bundling component 3 also includes two protective steel belts 8 arranged on each main submarine cable group, and the spacing between the two protective steel belts 8 is configured to be 0.25-0.35m, that is, 5 submarine cables 1 are bundled in a 221 form at every interval of 1m, and two steel belts are added between each meter, and the interval between each steel belt is about 33cm.
[0031] Combination Figure 2As shown, the stopper assembly 4 includes a plurality of sets of loops 9 wound around the submarine cable 1 arranged along the length direction of the submarine cable 1, and a steel wire group for connecting each set of loops 9 with the traction equipment and / or winch wire 5 of the platform 13. The spacing between the plurality of sets of loops 9 is configured to be 1-2m, and the length of each set of loops 9 is configured to be 3.5-4.5m. Preferably, the length of the submarine cable 1 section where the binding assembly 3 is located is not less than the length of the submarine cable 1 section where the stopper assembly 4 is located.
[0032] In the implementation mode of the present application, the number of the rope loops 9 is 4 groups and they are configured as BTL stoppers. The BTL stoppers are rigging commonly used in the construction of submarine cables for armored submarine cables. The working principle is that six pairs of galvanized steel wire ropes of different lengths are respectively wound around the submarine cable 1 in a specific manner and fixed at the end with steel belts. Each group of steel wire ropes will generate a gripping force on the submarine cable when subjected to tension, so that the theoretical gripping force of the stoppers on the submarine cable 1 can reach 7 tons. Based on this design principle, for the present application scheme, a combined BTL stopper is used to achieve the purpose of safely pulling the submarine cable 1, that is, two groups of BTL stoppers are bundled at a distance of 50 meters from the end of the submarine cable 1, which are connected to a section of steel wire longer than 50 meters. When the end of the steel wire comes out of the mouth of the J-shaped tube 14, the required 50 meters of submarine cable is pulled onto the deck of the platform 13 at one time by pulling the steel wire through a winch pre-installed on the platform 13.
[0033] In the implementation mode of this application, Figure 2 As shown, the steel wire group includes a balancing steel wire 10 connected to four groups of BTL stop cables via rigging, and an auxiliary steel wire 11 connected to the balancing steel wire 10, and one end of the auxiliary steel wire 11 away from the balancing steel wire 10 is fixedly connected to the winch wire 5. In the above technical solution, the tension applied to the auxiliary steel wire 11 during lifting can be transmitted to the balancing steel wire 10, and finally to each group of BTL stop cables. Each group of rope loops 9 will generate a gripping force on the submarine cable 1 when subjected to tension, thereby achieving safe pulling and lifting of the submarine cable 1.
[0034] Combination Figure 1 As shown, the winch wire 5 is provided with a traction wire 12, and the two are fixedly connected by rigging or directly woven and tied so that the force of the traction wire 12 can be transmitted to the winch wire 5. The head end of the auxiliary wire 11 away from the balance wire 10 is connected to the winch wire 5 through the traction wire 12. The overlapped section of the winch wire 5 and the auxiliary wire 11 is tied with a binding rope, and the spacing between the binding ropes is preferably configured to be 1m. The above technical solution facilitates the winch to pull the auxiliary wire 11 through the traction wire 12, so that the traction force can be evenly distributed on the submarine cable 1, avoiding deformation of the submarine cable 1 when pulling and lifting, and affecting the communication signal or power transmission performance of the submarine cable 1.
[0035] Combination Figure 1 and Figure 2As shown, in the embodiment of the present application, the length of the auxiliary steel wire 11 is configured to be 80m, the length of the four groups of BTL stoppers is 4m respectively, and the four groups of BTL stoppers are divided into two groups along the length direction of the cable 1, the spacing between the 2 BTL stoppers in each group is set to 1m, and the spacing between the two groups of BTL stoppers is 2m. The connection method of the balance steel wire 10 corresponding to each group of BTL stoppers is as follows Figure 2 As shown, the distance between the connection point between the balance wire 10 and the auxiliary wire 11 and the nearest BTL stopper is configured to be 3.5m.
[0036] Through the above technical scheme, each section of the submarine cable 1 to be lifted is fixed by different binding and fixing structures. The binding assembly 3 arranged at a section close to the traction head 2 can ensure that the submarine cable 1 will not become loose during the pulling process, and ensure the overall structural strength of the multiple submarine cables. The stop rope assembly 4 can effectively and evenly transmit the pulling force of the traction equipment to a section of the submarine cable 1 farther away from the traction head 2, thereby reducing the pulling load of the traction head 2 and the binding assembly 3 and also reducing the lateral pressure of the rope loop 9 on the submarine cable 1, ensuring that the submarine cable 1 will not be damaged during the pulling and lifting process; the binding spacing of the submarine cable 1 itself is also reasonably and accurately set, fully considering the bending and stress conditions of the submarine cable 1 itself, to ensure the smooth progress of the lifting construction process of the submarine cable 1.
[0037] Based on the above-mentioned oil platform submarine cable lifting structure, the present application also proposes a method for lifting the submarine cable 1 of an oil platform 13, comprising the following steps: S1, adjust and set the initial horizontal distance between the construction ship and the platform 13, pass the winch wire 5 on the platform 13 through the J-shaped tube 14 and fix it to the guide rope released from the construction ship, and the platform 13 synchronously releases the winch wire 5 through the guide rope until the winch wire 5 of the set length is pulled onto the construction ship. In the above steps, the connection between the winch wire 5 and the guide rope is usually completed by an underwater robot. According to needs, the distance between the construction ship and the platform 13 is flexibly set. Correspondingly, the length of the winch wire 5 pulled onto the construction ship can also be adaptively adjusted, such as being configured to be 25 meters, so as to facilitate the stable bundling operation of the winch wire 5.
[0038] S2, the head end of the auxiliary steel wire 11 is fixedly connected to the winch steel wire 5, and the winch steel wire 5 is fixedly connected to the traction head 2, and the traction head 2 is fixedly connected to the submarine cable 1 to be lifted; S3, the traction equipment on the platform 13 retracts the winch wire 5 at a set speed, and after the winch wire 5 pulls the submarine cable 1, the submarine cable 1 is bundled using the bundling assembly 3, and the submarine cable 1 is bundled using the stopper assembly 4 starting at a position 250 meters away from the traction head, and the auxiliary steel wire 11 is connected to the balance steel wire 10 through a connecting rigging; S4, detect the distance between the traction head 2 and the seabed. When the traction head 2 approaches the seabed, use an underwater robot to check the relative position of the traction head 2 to the lower pipe opening of the J-shaped pipe 14. When it is confirmed that the traction head 2 is close to the pipe opening, the traction equipment of the platform 13 stops recovering the winch wire 5, and the construction ship continues to bundle and release the submarine cable 1; S5, using an underwater robot to detect the length of the submarine cable 1 in contact with the seabed, the traction equipment of the platform 13 continues to recover the winch wire 5 and the construction ship simultaneously releases the submarine cable 1, and continuously pulls and lifts the submarine cable 1; S6, when the head end of the auxiliary steel wire 11 moves out of the upper pipe opening of the J-shaped tube 14, the end of the auxiliary steel wire 11 is separated from the winch wire 5; S7, when the traction head 2 moves out of the upper pipe mouth of the J-tube 14 by about 3 meters, the hand chain hoist suspended on the lifting ear is connected to the traction head 2 and the tension on the winch wire 5 is transferred to the hand chain hoist, and then the winch wire 5 and the traction head 2 are separated; the opening pulley is opened, the winch wire 5 is taken out from the upper and lower steering pulleys, the upper end 25 meters of the auxiliary steel wire 11 is put into the pulley, and the winch wire 5 and the auxiliary steel wire 11 are connected on the platform 13 traction equipment; the platform 13 traction equipment is rotated to tighten the excess of the auxiliary steel wire 11, and the tension on the hand chain hoist is transferred to the auxiliary steel wire 11, and the hand chain hoist and the traction head 2 are separated; the construction ship continues to release the submarine cable 1 and the platform 13 traction equipment continues to synchronously recover the auxiliary steel wire 11 until the section of the submarine cable 1 where the stop cable assembly 4 is located is pulled onto the platform 13.
[0039] In practice, the above solution can ensure that the 50-meter submarine cable 1 can be safely lifted onto the platform 13 under an expected pulling force of 15 tons.
[0040] Based on the aforementioned oil platform submarine cable lifting structure, especially the structure of the stop cable assembly 4, the present application also proposes a tension verification method based on the aforementioned oil platform submarine cable lifting structure, comprising the following steps: Verifying the tension between the stopper assembly 4 and the submarine cable 1 specifically includes: According to the structure of the stopper assembly 4 as described above, the rope loop 9 and the steel wire group are tied to the submarine cable 1; Connect both ends of the submarine cable 1 to the input and output ends of the optoelectronic test equipment, for example, one end is connected to the optical fiber signal input equipment, and the other end is connected to the optical fiber signal output equipment, and can also be connected to the power output and detection equipment.
[0041] The first tensile machine and the second tensile machine are configured so that their force application direction is along the length direction of the cable 1 . The first tensile machine is configured to be fixedly connected to the end of the cable 1 , and the second tensile machine is configured to be fixedly connected to the balance wire 10 .
[0042] The first and second tensile testing machines are driven in reverse, the tensile force is gradually increased to the first target tensile force, such as 10 tons, and then gradually reduced to zero after a set time, to detect the relative sliding distance between the rope loop 9 and the submarine cable 1. The above detection can be achieved by an image acquisition and recognition device, or by marking on the submarine cable 1 and the rope loop 9.
[0043] The first tensile machine and the second tensile machine are driven in reverse, the tensile force is gradually increased to the second target tensile force, such as 15 tons, and then gradually decreased to zero after a set time, to detect the fluctuation of the photoelectric signal in the submarine cable 1. The above detection results can be achieved by configuring the two ends of the submarine cable 1 as photoelectric test equipment.
[0044] Verify the surface damage of submarine cable 1, including: After the tension test is completed, the stopper assembly 4 and the submarine cable 1 are released to detect whether there is any deformation or damage on the surface of the stressed part of the submarine cable 1. The detection method includes using an image acquisition and recognition device, such as a smart phone with a built-in setting applet, to take pictures and compare the surface of the submarine cable 1, especially the place where the rope loop 9 contacts the submarine cable 1, to check whether there are any cracks on the surface of the submarine cable 1.
[0045] In addition to the above tests, the tension verification method described in the embodiment of the present application also includes: cutting off the traction head 2, testing the optical performance, insulation resistance and DC resistance of the submarine cable 1. The above tests can be achieved through the optoelectronic testing equipment configured at both ends of the submarine cable 1.
[0046] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A submarine cable lifting structure for an oil platform, characterized in that: The cable comprises: A traction head (2), one end of which is configured to be connected to the traction equipment of the platform (13) via a winch wire (5), and the other end of which is used to aggregate the cable heads of multiple submarine cables (1) to be lifted and fixedly connected thereto; A bundling assembly (3) comprising a bundling sub-belt (6) for bundling a plurality of submarine cables (1) in a set ratio to form a sub-submarine cable (1) group, and a bundling main belt (7) for bundling a plurality of submarine cable (1) groups to form a main submarine cable (1) group; A stop cable assembly (4) comprises a plurality of rope loops (9) arranged along the length direction of the cable (1) and wound around the cable (1), and a steel wire group for connecting each rope loop (9) with a traction device of a platform (13) and / or a winch wire (5); The spacing between the bundled sub-belts (6) on the sub-submarine cable (1) group and the spacing between the bundled main belts (7) on the main submarine cable (1) group are configured to be 0.8-1.2m; The spacing between the multiple groups of rope loops (9) is configured to be 1-2 m, and the length of each group of rope loops (9) is configured to be 3.5-4.5 m.
2. The oil platform submarine cable lifting structure according to claim 1, characterized in that: The number of submarine cables (1) in each sub-submarine cable (1) group does not exceed 2; A plurality of submarine cables (1) are alternately grouped along their length direction, and the interval between each group of submarine cables (1) is configured to be 1 m, wherein: If the number of submarine cables (1) is an even number M, then the number of sub-submarine cable (1) groups is M / 2; If the number of submarine cables (1) is an odd number N, then the number of sub-submarine cable (1) groups is N / 2+1; Each section of the submarine cable (1) is bundled with a bundling sub-belt (6) and then with a bundling main belt (7).
3. The oil platform submarine cable lifting structure according to claim 1, characterized in that: The sub-binding belt (6) and the main binding belt (7) are both configured as binding steel belts, and protective Manila ropes are wound around the binding locations of each binding steel belt and the submarine cable (1).
4. The oil platform submarine cable lifting structure according to claim 1, characterized in that: The bundling assembly (3) further comprises two protective steel belts (8) arranged on each group of main submarine cables (1), and the spacing between the two protective steel belts (8) is configured to be 0.25-0.35m.
5. The oil platform submarine cable lifting structure according to claim 1, characterized in that: The rope loops (9) are in four groups and are configured as BTL stoppers. A BTL stopper includes six pairs of galvanized steel wire ropes of different lengths and are respectively wound around the submarine cable (1) in a specific manner, and the ends are fixed by steel belts. The steel wire group comprises a balancing steel wire (10) respectively connected to four groups of BTL stop cables via rigging, and an auxiliary steel wire (11) connected to the balancing steel wire (10), wherein one end of the auxiliary steel wire (11) away from the balancing steel wire (10) is fixedly connected to the winch steel wire (5).
6. The oil platform submarine cable lifting structure according to claim 5, characterized in that: The winch steel wire (5) is provided with a traction steel wire (12), and the head end of the auxiliary steel wire (11) away from the balance steel wire (10) is connected to the traction steel wire (12); The overlapped section of the winch steel wire (5) and the auxiliary steel wire (11) is bound by binding ropes, and the spacing between the binding ropes is 1m.
7. A method for lifting a submarine cable on an oil platform, characterized in that: The oil platform submarine cable lifting structure according to any one of claims 1 to 6 comprises the following steps: The initial horizontal distance between the construction vessel and the platform (13) is adjusted and set, the winch wire (5) on the platform (13) is passed through the J-shaped tube (14) and fixedly connected to the guide rope released from the construction vessel, and the platform (13) is pulled by the guide rope and the winch wire (5) is released synchronously until the winch wire (5) of the set length is pulled onto the construction vessel; The head end of the auxiliary steel wire (11) is fixedly connected to the winch steel wire (5), and the winch steel wire (5) is fixedly connected to the traction head (2), and the traction head (2) is fixedly connected to the submarine cable to be lifted (1); The traction equipment on the platform (13) retracts the winch wire (5) at a set speed, and after the winch wire (5) pulls the submarine cable (1), the submarine cable (1) is bundled using the bundling assembly (3), and the submarine cable (1) is bundled using the stop cable assembly (4) starting at a position 50 meters away from the traction head (2), and the auxiliary wire (11) is connected to the balance wire (10) through a connecting rigging; Detect the distance between the traction head (2) and the seabed. When the traction head (2) approaches the seabed, use an underwater robot to check the relative position of the traction head (2) to the lower pipe opening of the J-shaped pipe (14). When it is confirmed that the traction head (2) is close to the pipe opening, the traction equipment of the platform (13) stops recovering the winch wire (5), and the construction ship continues to bundle the submarine cable (1) and release the submarine cable (1); An underwater robot is used to detect the length of the submarine cable (1) in contact with the seabed, the traction equipment of the platform (13) continues to recover the winch wire (5) and the construction ship simultaneously releases the submarine cable (1), and continuously pulls and lifts the submarine cable (1); After the head end of the auxiliary steel wire (11) moves out of the upper pipe opening of the J-shaped tube (14), the end of the auxiliary steel wire (11) is separated from the winch wire (5), and the winch wire (5) is continuously recovered until the submarine cable (1) of a set length is lifted to the platform (13).
8. The method for lifting a submarine cable on an oil platform according to claim 7, characterized in that: The method further comprises: When the traction head (2) is moved out of the upper pipe opening of the J-shaped pipe (14) by a length of about 3 meters, a hand chain hoist suspended on the lifting lug is connected to the traction head (2) and the tension on the winch wire (5) is transferred to the hand chain hoist, and then the winch wire (5) and the traction head (2) are separated; Open the open pulley, take the winch wire (5) out of the upper and lower diverting pulleys, put the upper 25 meters of the auxiliary wire (11) into the pulley, and connect the winch wire (5) and the auxiliary wire (11) on the traction device of the platform (13); The traction device of the rotating platform (13) tightens the surplus of the auxiliary steel wire (11), and the tension on the hand chain hoist is transferred to the auxiliary steel wire (11), and the hand chain hoist and the traction head (2) are separated; The construction vessel continuously releases the submarine cable (1) and the traction equipment of the platform (13) continuously and synchronously recovers the auxiliary steel wire (11) until the section of the submarine cable (1) where the stop cable assembly (4) is located is pulled onto the platform (13).
9. A tension verification method based on the above-mentioned oil platform submarine cable lifting structure, characterized in that: The oil platform submarine cable lifting structure according to any one of claims 1 to 6 comprises the following steps: Verify the tension between the stop cable assembly (4) and the submarine cable (1): According to the stopper assembly (4) structure as claimed in claim 5, the rope loop (9) and the steel wire group are tied to the submarine cable (1); Connecting two ends of the submarine cable (1) to the input end and the output end of the optoelectronic testing equipment; A first tensile testing machine and a second tensile testing machine are configured, wherein the first tensile testing machine is configured to be fixedly connected to an end of the submarine cable (1), and the second tensile testing machine is configured to be fixedly connected to a balance steel wire (10); Reversely drive the first tensile testing machine and the second tensile testing machine to gradually increase the tensile force to a first target tensile force and then gradually reduce the tensile force to zero after a set period of time, and detect the relative sliding distance between the rope loop (9) and the submarine cable (1); Reversely drive the first tensile machine and the second tensile machine to gradually increase the tensile force to a second target tensile force and then gradually reduce the tensile force to zero after a set period of time, and detect the fluctuation of the photoelectric signal in the submarine cable (1); The stopper assembly (4) and the submarine cable (1) are released to detect whether there is any deformation or damage on the surface of the stressed part of the submarine cable (1).
10. The tensile force verification method according to claim 9, characterized in that: Also includes: The pulling head (2) is cut off, and the optical performance, insulation resistance and DC resistance of the submarine cable (1) are tested.
Citation Information
Cited By
Construction system and construction method for seabed earthquake monitoring system
CN120797635A
Construction system and method for a submarine seismic monitoring system
CN120797635B