Construction method of built-in PVC pipe reinforced reinforced concrete combination column
Through the segmented package design of PVC pipe groups, steel bar positioning cross frames and stirrups, the problem of PVC pipe skew and insufficient load-bearing strength in reinforced concrete composite columns is solved, a construction method of stable fixation and flexible heightening is achieved, and the combination is improved. Column bearing capacity and construction flexibility.
Patent Information
- Application Number
- CN202411104457.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-29
AI Technical Summary
In the construction of existing reinforced concrete composite columns, the built-in PVC pipes are easily skewed, and the steel cages are not installed enough, resulting in insufficient load-bearing strength. When the composite columns are heightened, the PVC pipes cannot be connected, making it difficult to meet the need for enlarged cross-sections.
The segmented package design of PVC pipe groups, steel bar positioning cross frames and stirrups is adopted. Through the combination of multiple PVC pipe groups and steel cages, the fixed position of the PVC pipes is ensured, the diversity and bearing capacity of the steel cages are increased, and the height is increased. Flexible adjustment of cross-section and shape.
It achieves stable fixation of PVC pipes, enhances the load-bearing capacity and construction flexibility of reinforced concrete composite columns, avoids the problem of PVC pipe skew, keeps construction simple during heightening, and adapts to the needs of different sections and shapes.
Smart Images

Figure CN118855165A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction method for a built-in PVC pipe reinforced reinforced concrete composite column, belonging to the technical field of concrete. Background Art
[0002] As a load-bearing column, the bearing capacity of the reinforced concrete composite column determines the performance of various functions on it, such as the design and arrangement of the load on the roof of the building. The existing reinforced concrete composite column construction generally adopts a protective frame, and a steel cage is installed in the protective frame to improve the bearing strength after the concrete is poured. PVC pipes are also built-in as cable channels or drainage holes. The PVC pipes installed during pouring are prone to skew, so that the connection of the PVC pipes cannot be aligned when the composite column is subsequently raised. In addition, only one layer of steel cage is installed. When the cross-section of the composite column is increased, the bearing strength can only be improved by thickening the diameter of the steel bars in the steel cage. In view of the above shortcomings, the present invention proposes a construction method for reinforced concrete composite columns with built-in PVC pipes. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention aims to provide a construction method for a reinforced concrete composite column with an internal PVC pipe to solve the existing problems.
[0004] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical scheme: a construction method of a built-in PVC pipe reinforced reinforced concrete composite column, including a guard frame, a PVC pipe group vertically placed in the middle of the guard frame cavity, and a plurality of steel bars are vertically sleeved on the PVC pipe group at intervals, and a plurality of stirrups are tied between the plurality of steel bars with the same horizontal spacing with the middle of the PVC pipe group as the midpoint.
[0005] The PVC pipe group is formed by sleeve-connecting a plurality of PVC pipes and a plurality of pipe joint groups, and each pipe joint group is threadedly connected with a plurality of steel bar positioning cross frames in a circular array.
[0006] The construction method is as follows: S1: Install each steel bar positioning cross frame on the pipe joint group in advance. There are multiple sets of pipe joint groups after installation, and they are reserved.
[0007] S2: An installed pipe joint group is placed on the upper end of a PVC pipe and then placed in the middle of the protective frame. Then, steel bars are inserted evenly on the steel bar positioning cross frame on the pipe joint group, and a stirrup is tied to connect multiple evenly spaced steel bars to complete the installation of a section of PVC pipe group.
[0008] S3: Put a PVC pipe and an installed pipe joint group on the top surface of the next section of PVC pipe group to lengthen the height of the PVC pipe group. When inserting, the previous steel bars should also be inserted into the holes on the steel bar positioning cross frame. According to the diameter of the stirrups to be installed on the second section of PVC pipe group, reinsert the steel bars and tie the stirrups to complete the installation of the second section of PVC pipe group. The installation of the PVC pipe group needs to be higher than the height of the guard frame, and the length of the steel bars also needs to be higher than the height of the guard frame to facilitate the subsequent heightening of the concrete composite column.
[0009] S4: Pour concrete into the guard frame cavity after the construction of PVC pipe group, steel bar and stirrup. The PVC pipe cavity does not need to be poured together when it has functions such as wiring outlet and drainage outlet. After the pouring is completed, the concrete composite column is obtained, and then the guard frame is folded.
[0010] S5: When the concrete composite column needs to be raised, the PVC pipe group, steel bars, stirrups and guard frame are re-inserted at a section of the PVC pipe that is higher than the top surface of the concrete composite column for assembly, and the original concrete composite column can be raised and cast again, and the cavity of the built-in PVC pipe in the raised concrete composite column is connected.
[0011] A further improvement is that each of the pipe joint groups includes a pipe joint body, and a plurality of connecting screw seats are arranged in a circular array around the circumference of the pipe joint body, and a screw hole is opened in the middle of each connecting screw seat. Each of the pipe joint groups is an integrated structure and is made of PVC.
[0012] A further improvement is that each of the steel bar positioning cross frames includes a cross frame body, and a stud compatible with the screw mouth is arranged on one side of the cross frame body, and a plurality of positioning sleeves are equidistantly opened on the top surface of the cross frame body. Each of the steel bar positioning cross frames is an integrated structure and is made of iron.
[0013] A further improvement is that the protective frame is divided into two types: a square frame or a circular frame.
[0014] A further improvement is that the stirrups are divided into two types: square rings or circular rings.
[0015] A further improvement is that when the guard frame adopts a square frame, the stirrups adopt multiple groups of square rings with different diameters.
[0016] A further improvement is that when the guard frame adopts a square frame, the stirrups are mixed with multiple groups of square rings and circular rings of different diameters.
[0017] A further improvement is that when the guard frame adopts a circular frame, the stirrups adopt multiple groups of circular rings with different diameters.
[0018] A further improvement is that when a circular frame is used as the guard frame, the stirrups are made by mixing and binding multiple groups of circular rings and square rings of different diameters.
[0019] The beneficial effects of the present invention are: The present invention provides a reinforced concrete composite column with built-in PVC pipes. The PVC pipe group, steel bars and stirrups formed by the PVC pipe, pipe joint group and steel bar positioning cross frame are designed to be segmented and set in the middle of the frame cavity, so that the PVC pipe is set and raised by multiple sections, and the corresponding steel bar cage formed by the vertical insertion of the steel bars is diversified, and a plurality of steel bar cages set together can be formed. When the cross section of the concrete composite column needs to be increased, the bearing capacity of the reinforced concrete composite column is increased by combining a plurality of steel bar cages with different shapes and diameters. The construction of the steel bar cage in the concrete composite column by the present invention makes the distribution of the steel bars more uniform. When the composite column needs to be raised, the cross section and shape of the composite column can be changed at any time according to actual needs. Similarly, the shape and number of the steel bar cage can be changed arbitrarily, and the construction difficulty will not be increased. In addition, the built-in PVC pipe is always fixed at the initial position during the pouring construction, so as to solve the problem that the prior art easily causes skewness during pouring, and facilitates the sleeve connection when the subsequent PVC pipe is lengthened. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the structure of a reinforced concrete composite column with built-in PVC pipe reinforcement according to the present invention; Figure 2 This is a schematic diagram of the structure of the PVC pipe group of the present invention; Figure 3 This is a schematic diagram of the top surface structure of the PVC pipe assembly of the present invention; Figure 4 This is a schematic diagram of the pipe joint group and the steel bar positioning cross frame structure of the present invention; Figure 5 It is a schematic diagram of the construction effect of the circular guard frame and circular stirrups of the present invention; Figure 6 This is a schematic diagram of the construction effect of the mixed use of circular guard frame, circular stirrups and square stirrups of the present invention; Figure 7 It is a schematic diagram of the construction effect of the square guard frame and square stirrups of the present invention; Figure 8 It is a schematic diagram of the construction effect of the mixed use of square stirrups, square stirrups and round stirrups of the present invention. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0022] See also Figure 1-Figure 8The present invention provides a construction method for a built-in PVC pipe reinforced reinforced concrete composite column, comprising a guard frame 1, a PVC pipe group 2 vertically placed in the middle of the cavity of the guard frame 1, and a plurality of steel bars 3 are vertically sleeved on the PVC pipe group 2 at intervals, and a plurality of stirrups 4 are tied between the plurality of steel bars 3 with the same spacing in the horizontal direction with the middle of the PVC pipe group 2 as the midpoint.
[0023] The PVC pipe group 2 is composed of a plurality of PVC pipes 21 and a plurality of pipe joint groups 22, and each pipe joint group 22 is threadedly connected with a plurality of steel bar positioning cross frames 23 in a circular array.
[0024] A further improvement is that each of the pipe joint groups 22 includes a pipe joint body 221, and a plurality of connecting screw seats 222 are arranged in a circular array around the pipe joint body 221, and a screw hole 223 is opened in the middle of each connecting screw seat 222. Each of the pipe joint groups 22 is an integrated structure and is made of PVC.
[0025] A further improvement is that each of the steel bar positioning cross frames 23 includes a cross frame body 231, and a stud 232 compatible with the screw mouth 223 is provided on one side of the cross frame body 231, and a plurality of positioning sleeves 233 are equidistantly provided on the top surface of the cross frame body 231. Each of the steel bar positioning cross frames 23 is an integrated structure and is made of iron.
[0026] The protective frame 1 is divided into two types: a square frame or a circular frame.
[0027] The stirrups 4 are divided into two types: square rings or circular rings.
[0028] When the guard frame 1 is a square frame, the stirrups 4 are made of multiple groups of square rings with different diameters (see Appendix Figure 5 ).
[0029] When the frame 1 is a square frame, the stirrups 4 are made of multiple groups of square rings and circular rings with different diameters. Figure 6 ).
[0030] When the guard frame 1 is a circular frame, the stirrups 4 are made of multiple groups of circular rings with different diameters (see Appendix Figure 7 ).
[0031] When the protective frame 1 is a circular frame, the stirrups 4 are made of multiple groups of circular rings and square rings with different diameters. Figure 8 ).
[0032] The construction method is as follows: S1: Install each steel bar positioning cross frame 23 on the pipe joint group 22 in advance. There are multiple groups of pipe joint groups 22 after installation, and they are reserved.
[0033] S2: An installed pipe joint group 22 is sleeved on the upper end of a PVC pipe 21 and then placed together in the middle of the protective frame 1. Then, steel bars 3 are equidistantly inserted into the steel bar positioning cross frame 23 on the pipe joint group 22, and a stirrup 4 is tied to connect multiple equidistant steel bars 3, completing the installation of a section of PVC pipe group 2.
[0034] By using S2, the steel bars 3 can be used as the outer support legs of the PVC pipe 21, so that the PVC pipe 21 can be stably erected, and the stirrups 4 connect the steel bars 3 together, thus forming a circle of steel cage.
[0035] S3: Put a PVC pipe 21 and an installed pipe joint group 22 on the top surface of the upper PVC pipe group 2 to lengthen the height of the PVC pipe group 2. When inserting, the previous steel bars 3 should also be inserted into the holes on the steel bar positioning cross frame 23. According to the diameter of the stirrups 4 to be installed on the second PVC pipe group 2, the steel bars 3 are reinserted and the stirrups 4 are tied to complete the installation of the second PVC pipe group 2. The installation of the PVC pipe group 2 needs to be higher than the height of the guard frame 1, and the length of the steel bars 3 also needs to be higher than the height of the guard frame 1, so as to facilitate the subsequent heightening of the concrete composite column.
[0036] By reinserting steel bars 3 with different transverse spacings into the steel bar positioning cross frame 23 through S3 and tying stirrups 4, a steel bar cage with a different diameter, the same shape or a different shape from that of S2 can be formed again. There are many shapes of steel bar cages, which can be selected according to actual needs. It should be noted that when a circular steel bar cage is formed, the number of steel bars is large, while when a square steel bar cage is formed, the number of steel bars is small. In addition, due to the transverse connection of the steel bar positioning cross frame 23, multiple circles of steel bar cages with different diameters and different or same shapes can be connected together, thereby improving the overall strength of the steel bar cage.
[0037] S4: After the PVC pipe group 2, steel bar 3, and stirrup 4 are constructed, concrete is poured into the cavity of the guard frame 1. The cavity of the PVC pipe 21 does not need to be poured together when it serves as a wiring outlet, a drainage outlet, etc. After the pouring is completed, a concrete composite column is obtained, and then the guard frame 1 is folded.
[0038] S5: When the concrete composite column needs to be raised, the PVC pipe group 2, the steel bar 3, the stirrups 4 and the guard frame 1 are re-inserted at a section of the PVC pipe 21 higher than the top surface of the concrete composite column for assembly, so that the original concrete composite column can be raised and cast again, and the cavity of the built-in PVC pipe 21 of the raised concrete composite column is connected.
[0039] In actual construction, the heightened composite columns may not have the same specifications and shapes as the concrete composite columns of the lower layer. For example, the lower layer may be a square column, while the heightened upper layer may have a reduced cross-section or be constructed as a round column. The construction difficulty will not increase. Only a reduced length of steel bar positioning cross frame 23 is required, and other operations are the same as above.
[0040] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0041] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A construction method for reinforced concrete composite columns with built-in PVC pipes. Features: It comprises a protective frame (1), a PVC pipe group (2) vertically placed in the middle of the cavity of the protective frame (1), a plurality of steel bars (3) are vertically sleeved on the PVC pipe group (2) at intervals, and a plurality of stirrups (4) are tied between the plurality of steel bars (3) at the same intervals in the horizontal direction with the middle of the PVC pipe group (2) as the midpoint; The PVC pipe group (2) is composed of a plurality of PVC pipes (21) and a plurality of pipe joint groups (22) connected in a sleeve manner, and each pipe joint group (22) is threadedly connected to a plurality of steel bar positioning cross frames (23) in a circular array; The construction method is as follows: S1: Installing each steel bar positioning cross frame (23) on the pipe joint group (22) in advance, and having multiple sets of pipe joint groups (22) after installation, and keeping them in reserve; S2: A mounted pipe joint assembly (22) is sleeved on the upper end of a PVC pipe (21) and then placed together in the middle of the protective frame (1), and then steel bars (3) are inserted evenly on the steel bar positioning cross frame (23) on the pipe joint assembly (22), and a stirrup (4) is tied to connect the multiple evenly spaced steel bars (3), thereby completing the installation of a section of the PVC pipe assembly (2); S3: A PVC pipe (21) and an installed pipe joint group (22) are placed on the top surface of the upper PVC pipe group (2) to lengthen the height of the PVC pipe group (2). When the PVC pipe group (2) is inserted, the previous steel bars (3) are also inserted into the holes on the steel bar positioning cross frame (23) accordingly. The steel bars (3) are re-inserted according to the diameter of the stirrups (4) to be installed on the second PVC pipe group (2), and the stirrups (4) are tied to complete the installation of the second PVC pipe group (2). The installation of the PVC pipe group (2) needs to be higher than the height of the guard frame (1), and the length of the steel bars (3) also needs to be higher than the height of the guard frame (1), so as to facilitate the subsequent heightening of the concrete composite column. S4: After the PVC pipe group (2), the steel bars (3) and the stirrups (4) are constructed, concrete is poured into the cavity of the guard frame (1). The cavity of the PVC pipe (21) does not need to be poured together when it serves as a wiring hole, a drainage hole, etc. After the pouring is completed, a concrete composite column is obtained, and then the guard frame (1) is folded; S5: When the concrete composite column is to be raised, the PVC pipe assembly (2), the steel bars (3), the stirrups (4) and the guard frame (1) are re-inserted at a section of the PVC pipe (21) higher than the top surface of the concrete composite column for assembly, so that the original concrete composite column can be re-raised and cast, and the cavity of the built-in PVC pipe (21) of the raised concrete composite column is connected.
2. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 1, Features: Each of the pipe joint groups (22) comprises a pipe joint body (221), and a plurality of connection screw seats (222) are arranged in a circular array around the circumference of the pipe joint body (221), and a screw opening (223) is provided in the middle of each connection screw seat (222). Each of the pipe joint groups (22) is an integrated structure and is made of PVC material.
3. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 2, Features: Each of the steel bar positioning cross frames (23) comprises a cross frame body (231), and a stud (232) adapted to the screw hole (223) is arranged on one side of the cross frame body (231), and a plurality of positioning sleeves (233) are equidistantly provided on the top surface of the cross frame body (231). Each of the steel bar positioning cross frames (23) is an integrated structure and is made of iron.
4. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 3, Features: The protective frame (1) is divided into two types: a square frame or a circular frame.
5. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 4, Features: The stirrups (4) are divided into two types: square rings or circular rings.
6. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 5, Features: When the guard frame (1) is a square frame, the stirrups (4) are a plurality of groups of square rings with different diameters.
7. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 6, Features: When the guard frame (1) is a square frame, the stirrups (4) are a combination of multiple groups of square rings and circular rings with different diameters.
8. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 7, Features: When the guard frame (1) is a circular frame, the stirrups (4) are a plurality of groups of circular rings with different diameters.
9. The construction method of the reinforced concrete composite column with built-in PVC pipe according to claim 8, Features: When the protective frame (1) is a circular frame, the stirrups (4) are formed by mixing and binding a plurality of groups of circular rings and square rings of different diameters.
Citation Information
Patent Citations
PVC (polyvinyl chloride) pipe constrained and round spiral stirrup hooped reinforced concrete combined column
CN103206043A
Reinforced concrete combination column structure and simultaneous pouring construction method
CN106884502A
Composite structure of concrete filled steel tube composite column and reinforced concrete beam
CN115217269A
Assembly type combination column structure with core column provided with reinforcement cage
CN220267019U
Fabricated reinforced concrete bridge pier and construction method therefor
WO2020211175A1