Non-standard flower-riding frame beam type hanging basket system and construction method thereof
By designing a non-standard beam-type hanging basket system, the roof structure itself load cancels the rear bracket and counterweight block, the resource waste and safety hazards of traditional hanging basket construction methods are solved, and the stability of the hanging basket and roof construction are achieved. The synchronous progress of the company reduces quality risks and construction costs.
Patent Information
- Application Number
- CN202411123267.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-05
AI Technical Summary
The traditional hanging basket construction method relies on a balanced counterweight system, resulting in roof space occupation, resource waste and safety hazards. Improper distribution of counterweight blocks may damage the roof structure and affect construction progress and safety.
Design a non-standard hanging basket system for riding a flower frame beam, using the load of the roof wall and the flower frame beam, canceling the rear bracket and counterweight block, and achieving the stability of the hanging basket through chemical anchor bolts and wire ropes, reducing resource waste and roof space Occupy and arrange roof construction simultaneously to reduce quality risks.
The stability and safety of the hanging basket are achieved, resource waste and construction costs are reduced, roof construction quality risks and construction period impacts are reduced, and construction efficiency and safety are improved.
Smart Images

Figure CN118895859A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a non-standard flower rack beam type hanging basket system and a construction method thereof. Background Art
[0002] With the development of society and the improvement of people's aesthetic needs, the appearance design of large public buildings tends to be more diversified and personalized; in this context, the construction technology and equipment of buildings are also constantly updated to meet the growing requirements of building quality. In the construction process of large public buildings, the construction of the external protective structure is particularly critical, which not only involves the beauty of the building, but also the functionality and safety of the building. In the construction of building exterior walls and curtain walls, the hanging basket, as a commonly used high-altitude working equipment, plays a vital role. It enables workers to work safely and efficiently at high altitudes, greatly improving construction efficiency and safety. However, there are some limitations in the traditional hanging basket construction method, especially in large public buildings, these limitations are particularly evident. Traditional hanging basket construction usually relies on a balanced counterweight system, that is, by installing a certain weight of counterweight blocks on the hanging basket to maintain the balance of the hanging basket. Although this counterweight system guarantees the stability of the hanging basket to a certain extent, it also brings some problems. First, the counterweight needs to be placed on the upper roof of the building, which will take up precious roof space. For large public buildings, the roof equipment foundation is multi-faceted, the structure is complex, and the construction requirements are high. The arrangement of the counterweight seriously affects the construction of processes such as roof waterproofing, thermal insulation, and rigid flooring, and is prone to cause process interface conflicts, which affects the quality of roof construction and the construction period. Secondly, if the weight or distribution of the counterweight is improper, it may also lead to more serious consequences. The roof structure may be damaged due to excessive counterweights, and the balance of the hanging basket may also be destroyed due to improper counterweights. This will not only affect the construction progress, but may also cause serious safety accidents and threaten the life safety of construction workers. In order to solve the above technical problems, the present invention designs a non-standard flower frame beam hanging basket system and a construction method thereof. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a non-standard flower rack beam hanging basket system and its construction method, which fully utilizes the load of the roof parapet and the flower rack beam structure itself, cancels the rear bracket and counterweight, reduces resource waste and the occupation of roof space during the hanging basket construction operation cycle, saves the rental and installation costs of the counterweight and rear bracket, and the secondary construction costs of the roof. The handling and installation procedures of the rear bracket and the counterweight are reduced, the occupation of the roof space is reduced, and the roof construction can be carried out synchronously according to the construction procedure. The quality risks such as leakage and cracking caused by the post-construction of the roof procedure are greatly reduced.
[0004] The present invention achieves the above technical objectives through the following technical means.
[0005] A non-standard flower rack beam-riding hanging basket system comprises a front bracket of the hanging basket, a customized L-shaped plywood, a roof flower rack beam, a roof parapet and a rear embedded plate; a customized L-shaped plywood is installed on the roof flower rack beam through chemical anchor bolts, the customized L-shaped plywood is fixed to the front bracket of the hanging basket through bolts, the front end of the front bracket of the hanging basket is connected to the hanging basket through a steel wire rope, the rear end of the front bracket of the hanging basket is connected to the semicircular ring on the rear embedded plate through a steel wire rope, and the rear embedded plate is anchored to the roof parapet through chemical anchor bolts; the front bracket of the hanging basket comprises a base connected to the customized L-shaped plywood, a vertical plug rod is installed on the base through bolts, a front beam and a middle beam connected to each other are installed in the inner plug rod at the top of the vertical plug rod through bolts, an upper support is also installed on the top of the inner plug rod, and the top of the upper support is connected to the front beam and the middle beam through steel wire ropes.
[0006] A construction method of the above-mentioned non-standard flower rack beam type hanging basket system includes the following process: Step 1: Deepen the design of the beam-riding hanging basket; Step 2: Custom embedded plate support installation; Step 3: Install the beam-riding hanging basket after in-depth design; Step 4: Install the heavy hammer and safety rope; Step 5: Fix and inspect the wire rope; Step 6: Self-inspection and acceptance before operation.
[0007] Furthermore, the specific process of step 1 is: cancel the rear support and counterweight in the traditional hanging basket system, and reconsider the load on the hanging basket in the detailed design stage. The load is divided into two categories: permanent load and variable load. The permanent load includes the front support of the hanging basket, the hanging basket (including the hoist and cable), and the wire rope. The variable load includes the operator, construction tools, construction materials and wind load.
[0008] Furthermore, the specific process of step 2 is: install a customized L-shaped plywood on the roof flower rack beam at the installation location of the front bracket of the hanging basket, with a size of 200×250×10mm; install a rear embedded plate on the roof parapet at the rear support point, with a size of 150×150×10mm; both the rear embedded plate and the customized L-shaped plywood are fixed with chemical anchor bolts, with a reinforcement depth of 110mm, and anti-loosening measures are taken; wherein, before the construction of step 2, the force on the chemical anchor bolts is calculated according to the strength grade of the structural concrete, and the shear strength meets the requirements when a single chemical anchor bolt is subjected to force under the most unfavorable working condition, so as to ensure a reliable structure.
[0009] Furthermore, the specific process of step 3 is as follows: Use connecting bolts to fix the base of the front bracket of the hanging basket to the customized L-shaped clamping plate, then insert the vertical plug rod into the base of the front bracket of the hanging basket and adjust its height, and fix it with bolts; then install the front beam and the middle beam into the horizontal inner rod at the top of the vertical plug rod and fix them with bolts, wherein the front beam and the middle beam are connected to each other, and the overhang distance of the front beam and the middle beam is determined according to the on-site conditions to ensure that the length of the middle beam is not shorter than the front beam; then install the upper support on the top of the inner rod; install the suspension device at the front end of the front beam, install the rigging spiral buckle at the end of the middle beam, fix it with bolts, and pull the left, middle and right three rear pull steel wire ropes downward at the tail of the middle beam. The three rear pull steel wire ropes are tensioned with basket bolts to ensure that the hanging crossbeam remains horizontal when the basket body is fully loaded and off the ground. The angle between the three rear pull steel wire ropes is not less than 15°. The rear pull steel wire ropes are fixed to the rear embedded plate below and pre-tightened with basket bolts. At this point, the installation of the front bracket of the hanging basket is completed; Then install the reinforcing steel wire rope, adjust the screw of the spiral buckle to tighten the reinforcing steel wire rope, make the front beam rise 3 to 5 cm, generate prestress, and improve the rigidity of the front beam; then fix the working steel wire rope and safety steel wire rope on the suspension device of the front beam respectively; Install the hoist at both ends of the basket; After the installation is completed, tighten all the connecting bolts evenly; finally, check whether the above components are installed correctly. After confirming that they are correct, tighten the bolts and lower the working wire rope and safety wire rope from the end; Install the safety lock on the safety lock mounting plate and tighten it with bolts.
[0010] Furthermore, the specific process of installing the heavy hammer in step 4 is as follows: For the conical weight, clamp the two halves at the lower end of the wire rope 15 cm from the ground. For the square weight, due to its heavy weight, to prevent the working wire rope from getting entangled with the safety wire rope, place it flat on the ground, ensure that the wire rope is vertically taut, and then fasten it to the wire rope with bolts.
[0011] Furthermore, the specific process of installing the safety rope in step 4 is as follows: Before the hanging basket is installed and used, an independent safety rope is hung from the roof. The safety rope is climbed on the embedded parts at the back of the roof, and the contact surface is protected by a rubber belt. The safety rope is independently fixed to the building and is not entangled with each other. After the top of each safety rope is hung, the safety rope is placed in the middle of the hanging basket, and the self-locking device is directly installed on the safety rope. During construction, the construction workers hang the safety belt on the self-locking device on the safety rope.
[0012] The present invention has the following beneficial effects: The present invention makes full use of the load of the roof parapet and the flower rack beam structure itself, cancels the design of the rear bracket and counterweight of the traditional riding beam hanging basket, and the anti-overturning moment generated by the hanging basket body and the operators is provided by the building structure, thereby reducing the waste of resources and the occupation of the roof space during the hanging basket construction operation cycle, saving the rental and installation costs of the counterweight and the rear bracket, and the secondary construction costs of the roof, and the roof construction can be carried out synchronously according to the construction process, which greatly reduces the quality risks such as leakage and cracking caused by the post-construction of the roof process. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the non-standard flower rack beam type hanging basket system of the present invention.
[0014] Figure 2 This is a schematic diagram of the back-tensioned steel wire rope of the present invention.
[0015] Figure 3 This is a cross-sectional view of the post-embedded plate node of the present invention.
[0016] Figure 4 This is a large-scale drawing of the rear embedded plate described in the present invention.
[0017] Figure 5 A cross-sectional view of a customized L-shaped clamping plate at the front bracket of the hanging basket described in the present invention.
[0018] Figure 6 This is a large-scale drawing of the customized L-shaped plywood described in the present invention.
[0019] In the figure: 1. Front bracket of hanging basket; 101. Front beam; 102. Middle beam; 103. Inner rod; 104. Upper support; 2. Customized L-shaped plywood; 3. Roof flower rack beam; 4. Hanging basket body; 5. Steel wire rope; 6. Roof parapet; 7. Rear embedded plate; 8. Chemical anchor bolt; 9. Connecting bolt; 10. Safety rope. DETAILED DESCRIPTION
[0020] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.
[0021] A non-standard flower rack beam-type hanging basket system comprises a hanging basket front bracket 1, a customized L-shaped clamp plate 2, a roof flower rack beam 3, a hanging basket body 4, a steel wire rope 5, a roof parapet 6, and a rear embedded plate 7.
[0022] like Figure 1 , 5 As shown, the front bracket 1 of the hanging basket is arranged on the top of the roof flower rack beam 3. Specifically, the lower part of the front bracket 1 of the hanging basket is connected to the customized L-shaped clamp plate 2 on the top of the roof flower rack beam 3 through the M16 connecting bolts 9.
[0023] like Figure 1 , 5As shown in 6, the customized L-shaped clamp plate 2 is made of Q235 steel, with a size of 400×300×10mm. The upper part is connected to the front bracket 1 of the hanging basket through M16 connecting bolts 9, and the lower part is fixed to the roof flower rack beam 3 structure through two M12×160mm chemical anchor bolts 8, with an anchoring depth of 110mm.
[0024] The roof pergola beam 3 is the upper structure of the roof, originally designed for fixing the aluminum curtain wall, with a structural size of 300×600mm and a concrete strength grade of C35.
[0025] The basket body 4 is the main body of the basket, which includes a lifting device, a heavy hammer, and a safety lock. It is responsible for carrying personnel and operating tools and is the main load in the basket system.
[0026] The wire rope 5 is a force transmission component connecting various components in the hanging basket system, including the back-pull wire rope, working wire rope, and safety wire rope; the number of wires in each wire rope 5 is not less than 4, and the diameter of the wire rope 5 is 9.1mm. It must not be damaged, deformed, twisted, or stained with oil. The fastening of the ends of the wire rope 5 should be carried out in accordance with the standard "GB5976-2006 Method for Using Wire Rope Clamps". The rear end of the front bracket 1 of the hanging basket is connected to the rear embedded plate 7 on the bottom roof parapet 6 through the three back-pull wire ropes on the left, middle, and right; the front end of the front bracket 1 of the hanging basket is connected to the corresponding structure and part on the basket body 4 of the hanging basket through the working wire rope and the safety wire rope.
[0027] The roof parapet 6 is a roof structure with a structural size of 300×900mm and a concrete strength grade of C35.
[0028] like Figure 1 , 2 As shown in , 3 and 4 , the rear embedded plate 7 has a specification of 150×150×10mm and is anchored to the roof parapet 6 by four M12×160mm chemical anchor bolts 8 to form a rear tension force node. A semicircular ring is also welded on the rear embedded plate 7 , and the semicircular ring is connected to the steel wire rope 5 by an M16 connecting bolt 9 .
[0029] A construction method of a non-standard flower rack beam hanging basket system includes the following processes: Step 1: Design deepening of the riding beam hanging basket: The beam-riding hanging basket is installed in a new non-standard hanging basket bracket, which cancels the rear bracket and counterweight of the existing beam-riding hanging basket. Therefore, the load on the beam-riding hanging basket needs to be reconsidered in the detailed design stage; the load is divided into two categories: permanent load and variable load. The permanent load includes the hanging basket suspension mechanism (i.e. the front bracket 1 of the hanging basket), the hanging basket (including the hoist and the cable), and the wire rope 5. The variable load includes: operators, construction tools, construction materials and wind load.
[0030] Step 2: Custom embedded plate support installation: The size of the customized L-shaped plywood 2 installed on the roof flower rack beam 3 at the installation point of the front bracket 1 of the hanging basket is 200×250×10mm; the size of the rear embedded plate 7 installed on the roof parapet 6 at the rear support point is 150×150×10mm. The rear embedded plate 7 and the customized L-shaped plywood 2 are both fixed with M12×160mm chemical anchor bolts 8. The embedded reinforcement depth is 110mm and anti-loosening measures are taken. Before the construction of this process, the force on the chemical anchor bolt 8 must be calculated according to the strength grade of the structural concrete. The shear strength under the most unfavorable working condition when a single chemical anchor bolt 8 is under force must meet the requirements to ensure the reliability of the structure.
[0031] Step 3: Install the designed riding beam hanging basket: Use the connecting bolts 9 to fix the base of the front bracket 1 of the hanging basket to the customized L-shaped clamp 2, then insert the vertical plug rod into the base of the front bracket 1 of the hanging basket and adjust its height according to the height of the finished surface, and fix it with bolts; then install the front beam 101 and the middle beam 102 into the horizontal inner plug rod 103 at the top of the vertical plug rod and fix them with bolts, wherein the front beam 101 and the middle beam 102 are connected to each other, and the overhang distance of the front beam 101 and the middle beam 102 is determined according to the on-site conditions, so that the length of the middle beam 102 is not shorter than the front beam 101; then the upper support 104 Installed on the top of the inner rod 103; install the suspension device on the front end of the front beam 101, install the rigging spiral buckle on the end of the middle beam 102, and fix it with bolts. Pull the left, middle and right three rear-pull wire ropes downward at the tail of the middle beam 102. The three rear-pull wire ropes are properly tensioned with basket bolts to ensure that the suspension beam can remain horizontal when the basket body 4 is fully loaded and off the ground. The angle between the three rear-pull wire ropes should be no less than 15°. The rear-pull wire ropes are fixed on the rear embedded plate 7 below and properly pre-tightened with basket bolts. At this point, the front bracket 1 of the hanging basket is installed; Then install the reinforcing steel wire rope, adjust the screw of the spiral buckle to tighten the reinforcing steel wire rope, make the front beam 101 slightly tilted up by 3 to 5 cm, generate prestress, and improve the rigidity of the front beam 101; then fix the working steel wire rope and the safety steel wire rope on the suspension device of the front beam 101 respectively, and install the upper limit block at the appropriate position of the safety steel wire rope; Install the hoist at both ends of the basket body 4, and make sure that the safety lock bracket faces the outside of the platform during installation; After the installation is completed, tighten all the connecting bolts evenly; finally, check whether the above components are installed correctly. After confirming that they are correct, tighten the bolts and lower the working wire rope and safety wire rope from the end. During this process, pay attention to the winding of the wire rope; Install the safety lock on the safety lock mounting plate and tighten it with bolts (the safety lock roller faces the inside of the platform).
[0032] Step 4: Installation of heavy hammer and safety rope 10: The weight is fixed at the lower end of the wire rope 5 to tighten and stabilize the wire rope of the hanging basket, to prevent the suspension platform from swaying and to prevent the wire rope 5 from being pulled up during lifting, thus affecting the normal operation of the suspension platform. During installation, clamp the two halves at the lower end of the wire rope 5 15 cm above the ground (conical weight). The square weight has a large deadweight, so it needs to be placed flat on the ground to prevent the working wire rope from getting entangled with the safety wire rope. However, the wire rope 5 needs to be vertically tightened, and then fastened to the wire rope 5 with bolts; Before the hanging basket is installed and used, an independent safety rope 10 must be hung from the roof. The safety rope 10 is climbed and hung on the embedded parts at the back of the roof, and the contact surface is protected with a rubber belt. The safety rope 10 is independently fixed to the building and must not be entangled and fixed with each other. After the top of each safety rope 10 is hung, the safety rope 10 is placed in the middle of the hanging basket, and the self-locking device is directly installed on the safety rope 10. During construction, construction workers must hang the safety belt on the self-locking device on the safety rope 10.
[0033] Step 5: Fix and check the wire rope 5: The tightening of the end of the wire rope 5 should be carried out in accordance with the standard "GB5976-2006 Methods for Using Wire Rope Clamps"; The rope clamp seat is buckled on the working section of the steel wire rope 5, and the U-bolt is buckled on the tail end of the steel wire rope 5. The rope clamps shall not be arranged alternately on the steel wire rope 5; When tightening the rope clamps, the reasonable force of each rope clamp must be considered. The rope clamp closest to the ring should not be tightened first. The rope clamp closest to the ring should be as close to the ring as possible, but it must still be tightened correctly and the outer wire of the wire rope 5 must not be damaged. The number of steel wires in the working wire rope and the safety wire rope shall not be less than 4, and the diameter of the wire rope 5 shall be 9.1mm. It shall not be damaged, deformed or twisted, and shall not be stained with oil. It is prohibited to use them together. The inspection and scrapping judgment of wear, wire breakage and corrosion shall be carried out in accordance with the relevant provisions of "Methods for Using Wire Rope Clamps GB / T 5976-2006".
[0034] Step 6: Self-inspection and acceptance before operation: After the whole hanging basket is installed and debugged, the installation unit shall refer to Appendix B of "Technical Specifications for Installation, Disassembly and Use of Height-Altitude Working Hanging Basket JB / T 11699-2013" and the relevant requirements of the instruction manual to conduct self-inspection of the installation quality, and shall explain the safe use to the user unit.
[0035] After the installation unit passes the self-inspection, the construction unit, general contractor and supervision unit or a qualified inspection unit shall organize relevant personnel to conduct acceptance inspection. The inspection content and requirements are shown in Appendix B of "Technical Specifications for Installation, Disassembly and Use of High-altitude Working Baskets JB / T 11699-2013". After the inspection is passed and Form B.1 is filled in, it can be put into use only after being signed by relevant personnel.
[0036] Suspension baskets that have not been accepted or have failed acceptance should not be put into use.
[0037] Installation self-inspection forms, test reports and acceptance records shall be included in the equipment files.
[0038] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.
Claims
1. A non-standard flower rack beam hanging basket system, characterized in that: The invention comprises a front bracket (1) of a hanging basket, a customized L-shaped clamp (2), a roof flower rack beam (3), a roof parapet (6), and a rear embedded plate (7); the customized L-shaped clamp (2) is installed on the roof flower rack beam (3) through a chemical anchor bolt (8); the customized L-shaped clamp (2) is fixed to the front bracket (1) of the hanging basket through bolts; the front end of the front bracket (1) of the hanging basket is connected to the hanging basket through a steel wire rope (5); the rear end of the front bracket (1) of the hanging basket is connected to a semicircular ring on the rear embedded plate (7) through a steel wire rope (5); the rear embedded plate (7) ) is anchored to the roof parapet (6) by chemical anchor bolts (8); the front bracket (1) of the hanging basket includes a base connected to the customized L-shaped clamp (2), a vertical plug rod is installed on the base by bolts, and a front beam (101) and a middle beam (102) which are sleeved together are installed in an inner plug rod (103) at the top of the vertical plug rod by bolts, and an upper support (104) is also installed on the top of the inner plug rod (103), and the top of the upper support (104) is connected to the front beam (101) and the middle beam (102) by a steel wire rope (5).
2. A construction method for the non-standard flower rack beam hanging basket system according to claim 1, characterized in that: The process includes the following: Step 1: Deepen the design of the beam-riding hanging basket; Step 2: Custom embedded plate support installation; Step 3: Install the beam-riding hanging basket after in-depth design; Step 4: Install the heavy hammer and safety rope (10); Step 5: Fix and inspect the wire rope (5); Step 6: Self-inspection and acceptance before operation.
3. The construction method according to claim 2, characterized in that: The specific process of step 1 is as follows: the rear support and counterweight in the traditional hanging basket system are cancelled, and the loads on the hanging basket are reconsidered in the detailed design stage. The loads are divided into two categories: permanent loads and variable loads. The permanent loads include the front support of the hanging basket, the hanging basket (including the hoist and the cable), and the wire rope (5). The variable loads include the operators, construction tools, construction materials, and wind loads.
4. The construction method according to claim 2, characterized in that: The specific process of step 2 is as follows: a customized L-shaped clamp (2) with a size of 200×250×10 mm is installed on the roof flower rack beam (3) at the installation location of the front bracket (1) of the hanging basket; a rear embedded plate (7) with a size of 150×150×10 mm is installed on the roof parapet (6) at the rear support point; the rear embedded plate (7) and the customized L-shaped clamp (2) are both fixed with chemical anchor bolts (8) with a reinforcement depth of 110 mm, and anti-loosening measures are taken; wherein, before the construction of step 2, the stress of the chemical anchor bolts (8) is calculated according to the strength grade of the structural concrete, and the shear strength meets the requirements when a single chemical anchor bolt (8) is subjected to stress under the most unfavorable working condition, so as to ensure the reliability of the structure.
5. The construction method according to claim 2, characterized in that: The specific process of step 3 is as follows: The base of the front support (1) of the hanging basket is fixed to the customized L-shaped clamp (2) by using connecting bolts (9), and then the vertical insertion rod is inserted into the base of the front support (1) of the hanging basket and its height is adjusted and fixed with bolts; then the front beam (101) and the middle beam (102) are installed into the transverse inner rod (103) at the top of the vertical insertion rod and fixed with bolts, wherein the front beam (101) and the middle beam (102) are mutually sleeved, and the overhang distance of the front beam (101) and the middle beam (102) is determined according to the on-site conditions to ensure that the length of the middle beam (102) is not shorter than the front beam (101); then the upper support The column (104) is installed on the top of the inner rod (103); the suspension device is installed on the front end of the front beam (101), the rigging spiral buckle is installed on the end of the middle beam (102), and fixed with bolts, and the left, middle and right three pull-back steel wire ropes are pulled downward at the tail of the middle beam (102), and the three pull-back steel wire ropes are tensioned with basket bolts to ensure that the suspension beam remains horizontal when the basket body (4) is fully loaded and off the ground, and the angle between the three pull-back steel wire ropes is not less than 15°, and the pull-back steel wire ropes are fixed on the rear embedded plate (7) below and pre-tightened with basket bolts, and the front bracket (1) of the hanging basket is now installed; Then, the reinforcing steel wire rope is installed, and the screw of the turnbuckle is adjusted to tighten the reinforcing steel wire rope, so that the front beam (101) is tilted upward, a prestress is generated, and the rigidity of the front beam (101) is increased; and then the working steel wire rope and the safety steel wire rope are respectively fixed to the suspension device of the front beam (101); Install the hoist at both ends of the basket body (4); after installation, tighten all the connecting bolts evenly; finally, check whether the above components are installed correctly. After confirmation, tighten the bolts and lower the working wire rope and safety wire rope from the end; install the safety lock on the safety lock mounting plate and tighten it with bolts.
6. The construction method according to claim 2, characterized in that: The specific process of installing the heavy hammer in step 4 is as follows: For the conical weight, clamp the two halves between the lower end of the wire rope (5) 15 cm from the ground. For the square weight, which has a larger deadweight, place it flat on the ground to prevent the working wire rope from getting entangled with the safety wire rope, and ensure that the wire rope (5) is vertically taut, and then fasten it to the wire rope (5) with bolts.
7. The construction method according to claim 2, characterized in that: The specific process of installing the safety rope (10) in step 4 is as follows: Before the hanging basket is installed and used, an independent safety rope (10) is hung from the roof. The safety rope (10) is hung on the rear embedded part of the roof, and the contact surface is protected by a rubber belt. The safety rope (10) is independently fixed to the building and is not entangled and fixed with each other. After the top of each safety rope (10) is hung, the safety rope (10) is placed in the middle of the hanging basket. The self-locking device is directly installed on the safety rope (10). During construction, the construction personnel hang the safety belt on the self-locking device on the safety rope (10).
Citation Information
Patent Citations
Clamp type parapet riding beam hanging basket device and parapet hanging basket system
CN111321883A
Counterweight-free hanging basket suspension system and installation method
CN112761348A
Wall-straddling type hanging basket
CN220058778U
Onstruction
KR2020000009476U