Tool equipment for replacing capacitor in extra-high voltage converter station

By designing tooling equipment for components such as slide rails and suspended fixtures in the UHV converter station, the problems of lifting and ground damage during capacitor replacement are solved, and the portability and safety of replacing capacitors are improved.

CN118899773AInactive Publication Date: 2024-11-05MAINTENANCE COMPANY OF STATE GRID XINJIANG ELECTRIC POWER COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411116799.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In ultra-high voltage converter stations, there are problems such as the risk of lifting personnel, ground damage and difficulty in handling labor during capacitor replacement, resulting in inconvenience in operation and safety hazards.

Method used

A tooling equipment including a slide rail, a suspended fixing seat, a cross beam, a second fixed pulley, a traction rope and a skateboard assembly are designed. The suspension fixing seat is firmly installed on the capacitor tower, and the skateboard assembly and a traction rope are used to realize the capacitor's Suspend and slow movement, reduce manpower operation and avoid ground damage.

Benefits of technology

It improves the portability and safety of capacitor replacement, reduces the difficulty of manpower operation, avoids damage to non-hardened ground and surrounding electrical equipment, and simplifies the capacitor replacement and installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899773A_ABST
    Figure CN118899773A_ABST
Patent Text Reader

Abstract

The invention discloses tooling equipment for replacing a capacitor in an extra-high-voltage converter station, and relates to the technical field of high-voltage conversion lifting, and the tooling equipment comprises two slide rails, a suspension fixing seat, a cross beam, a second fixed pulley, a traction rope and a slide plate assembly. The two sliding rails are arranged in parallel and fixed through the cross beam, and the sliding rails are used for limiting the sliding direction of the sliding plate assembly. A plurality of suspension fixing seats are symmetrically and fixedly arranged on the two sliding rails; the sliding plate assembly is arranged on the two sliding rails in a sliding manner and is used for carrying out suspension operation on the capacitor; one end of the traction rope is connected with the sliding plate assembly, and the other end of the traction rope bypasses the surface of the second fixed pulley and is connected with a fixed pull handle; the second fixed pulley is rotationally arranged between the two sliding rails and used for changing the traction direction of the traction rope. By using the method, the capacitor can be conveniently replaced, other surrounding equipment is effectively prevented from being damaged in the replacement process, and meanwhile, the safety of replacing the capacitor is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of high-voltage battery replacement lifting, and in particular to a tooling equipment used for replacing capacitors in an ultra-high voltage converter station. Background Art

[0002] Capacitors in UHV converter stations are mainly used for filtering and reactive power compensation. They can effectively filter out harmonics on the AC side and improve the quality of power. They can also improve the power factor on the DC side and reduce transmission losses. In UHV DC transmission systems, capacitors, as important reactive power compensation devices, are of great significance for maintaining system stability and improving transmission efficiency. In addition, capacitors can also provide necessary reactive power support when a system failure occurs, ensuring the safe and stable operation of the power system.

[0003] Replacing capacitors in UHV converter stations is a highly professional and risky job. Capacitors are mainly used to filter out high-frequency harmonics on the AC side, improve power quality, and perform reactive power compensation on the DC side to improve transmission efficiency. When a capacitor in a capacitor tower fails, it needs to be replaced. The existing method of replacing capacitors is to use a crane to lift the operator to a high altitude. After removing the capacitor leads, multiple people work together to move out the 100-130kg capacitor, and then install the new capacitor back to its original position to restore the leads. In summary, there are the following disadvantages:

[0004] 1. During the entire process of replacing the capacitor, a crane is required to lift personnel and capacitors. However, there are many devices in the area where the capacitor tower of the converter station is located, and there is a risk of damaging other surrounding electrical equipment during the lifting process;

[0005] 2. If the ground is not hardened enough, long-term use of a crane to lift the ground will damage the ground, and once the ground is damaged, the lifting equipment is prone to tipping over;

[0006] 3. The space between the two layers of the capacitor tower is narrow, so the capacitor replacement process is usually completed by manpower. A capacitor element weighs 100-130kg. Even if multiple people work together, each person needs to bear a large lifting weight. In addition, during the handling process, the operator is very likely to get tired. Once a mistake is made, it will cause great harm to the person and equipment.

[0007] In view of the above problems, the present invention provides a tooling equipment for replacing capacitors in a UHV converter station to solve the above problems. Summary of the invention

[0008] To achieve the above object, the present invention provides the following technical solution: A tooling equipment for replacing capacitors in a UHV converter station, comprising: two slide rails, a suspension fixing seat, a crossbeam, a second fixed pulley, a traction rope, and a slide plate assembly;

[0009] The two slide rails are arranged in parallel and fixed by the crossbeam, and the slide rails are used to limit the sliding direction of the slide plate assembly;

[0010] The suspension fixing seats are provided in plurality and are symmetrically fixed on the two slide rails;

[0011] The slide assembly is slidably arranged on the two slide rails for suspending the capacitor; one end of the traction rope is connected to the slide assembly, and the other end is connected to a fixed handle by passing through the surface of the second fixed pulley, and the traction rope is used to adjust the sliding state of the slide assembly on the slide rails;

[0012] The second fixed pulley is rotatably arranged between the two slide rails to change the traction direction of the traction rope.

[0013] Further, preferably, the skateboard assembly comprises: a fixed plate, four first fixed pulleys, and a slide seat;

[0014] The four first fixed pulleys are respectively fixed at the corners of the fixed plate and are used to suspend and lift the capacitor;

[0015] One ends of the four slide seats are symmetrically fixed on the fixed plate, and the other ends are slidably arranged on the slide rail; a fixed boss is also arranged on the central axis of the fixed plate, and the fixed boss is connected to the traction rope.

[0016] Further, preferably, a fixing sliding hole is provided on the suspension fixing seat, and the fixing sliding hole is used to fix the device to the rigid structure of the capacitor tower.

[0017] Further, preferably, a lifting rope is provided on the first fixed pulley, and the lifting rope is used to suspend and lift the capacitor.

[0018] Further, preferably, a motor is also provided on the first fixed pulley, and the motor is used to drive the first fixed pulley.

[0019] Further, preferably, the motor model is a conical rotor motor.

[0020] Compared with the prior art, the present invention provides a tooling device for replacing capacitors in a UHV converter station, which has the following beneficial effects:

[0021] 1. The portability of replacing capacitors is improved, and the replacement process does not affect the use of other electrical equipment around; the capacitor tooling equipment is firmly installed on the rigid structure of the capacitor tower to avoid damage to the non-hardened ground and reduce the difficulty of operation for operators. The use of tooling equipment reduces the excessive use of manpower in the past;

[0022] 2. The capacitor tooling equipment is firmly installed on the rigid structure of the capacitor tower through a suspension fixing seat, thereby avoiding damage to the non-hardened ground and improving the safety of capacitor replacement and installation;

[0023] 3. When replacing and installing a new capacitor, the capacitor can be lifted by the slide assembly, and then the traction rope is pulled by the second fixed pulley to make the slide assembly move slowly along the slide rail, so that the lifted capacitor can be slowly moved out of the narrow space, making it easier for the operator to replace and install. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is an overall schematic diagram of a tooling equipment used for replacing capacitors in a UHV converter station;

[0025] Figure 2 This is a schematic diagram of a top-down plan structure of a tooling equipment used for replacing capacitors in a UHV converter station;

[0026] Figure 3 It is a schematic diagram of the side plan structure of a tooling equipment used for replacing capacitors in a UHV converter station;

[0027] Figure 4 This is a schematic diagram of the main plan structure of a tooling equipment used for replacing capacitors in a UHV converter station;

[0028] Figure 5 This is a schematic diagram of the installation operation of a tooling equipment used to replace capacitors in a UHV converter station.

[0029] In the figure: 100, fixed plate; 101, first fixed pulley; 102, slide seat; 201, slide rail; 202, suspension fixed seat; 203, crossbeam; 204, second fixed pulley; 205, traction rope. DETAILED DESCRIPTION

[0030] Reference Figure 1 to Figure 5 , the present invention provides a technical solution: a tooling equipment for replacing capacitors in a UHV converter station, comprising: two slide rails 201, a suspension fixing seat 202, a crossbeam 203, a second fixed pulley 204, a traction rope 205, and a slide plate assembly;

[0031] The two slide rails 201 are arranged in parallel and fixed by the crossbeam 203. The slide rails 201 are used to limit the sliding direction of the slide assembly.

[0032] The suspension fixing seats 202 are provided in plurality and are symmetrically fixed on the two slide rails 201;

[0033] The slide assembly is slidably arranged on the two slide rails 201, and is used for suspending the capacitor; one end of the traction rope 205 is connected to the slide assembly, and the other end is connected to a fixed handle on the surface of the second fixed pulley 204, and the traction rope 205 is used to adjust the sliding state of the slide assembly on the slide rails 201;

[0034] The second fixed pulley 204 is rotatably disposed between the two slide rails 201 to change the traction direction of the traction rope 205 .

[0035] When using the capacitor tooling equipment, firstly, the equipment is installed as a whole on the rigid structure of the capacitor tower through the suspension fixing seat 202.

[0036] When replacing and installing a new capacitor, the capacitor to be replaced is suspended and fixed by the slide assembly, and then the capacitor is lifted to a suitable installation height by the slide assembly. After reaching the installation height, the power is cut off, so that the slide assembly is powered off and self-locked, thereby preventing the capacitor from falling. After the slide assembly is self-locked, the operator stands at the bottom of the capacitor tower, slowly pulls the traction rope 205 and, under the action of the second fixed pulley 204, makes the slide assembly slide on the slide rail 201, so that the suspended capacitor is moved and pulled out along the slide rail 201. When the capacitor element is moved out between the two narrow layers of the capacitor tower, the operator can quickly carry and replace it.

[0037] As a preferred embodiment, the slide assembly includes: a fixed plate 100, four first fixed pulleys 101, and a slide seat 102;

[0038] The four first fixed pulleys 101 are respectively fixed at the corners of the fixed plate 100 to suspend and lift the capacitor;

[0039] One end of the four slide seats 102 is symmetrically fixed on the fixed plate 100 , and the other end is slidably arranged on the slide rail 201 ; a fixed boss is also arranged on the central axis of the fixed plate 100 , and the fixed boss is connected to the traction rope 205 .

[0040] As a preferred embodiment, a lifting rope is provided on the first fixed pulley 101, and the lifting rope is used to suspend and lift the capacitor.

[0041] As a preferred embodiment, a motor is further provided on the first fixed pulley 101 , and the motor is used to drive the first fixed pulley 101 .

[0042] As a preferred embodiment, the motor model is a conical rotor motor.

[0043] It should be noted that when the capacitor is suspended, the capacitor is first fixed by a lifting rope, and after the fixation is completed, the motor is controlled to start, thereby completing the suspension and lifting operation of the capacitor.

[0044] When the capacitor reaches the lifting height, the motor power is disconnected to improve safety. At the same time, the conical rotor motor completes self-locking, thereby avoiding the risk of the suspended capacitor falling.

[0045] As a preferred embodiment, the suspension fixing seat 202 is provided with a fixing sliding hole, and the fixing sliding hole is used to fix the device to the rigid structure of the capacitor tower.

[0046] During specific implementation, when replacing and installing a new capacitor, the capacitor to be replaced is fixed by suspending the lifting rope, and the motor is started to lift the replacement capacitor to the installation height. After reaching the installation height, the motor power is cut off to prevent the capacitor from falling; then, the operator stands at the bottom of the capacitor tower, slowly pulls the traction rope 205 and under the action of the second fixed pulley 204, the capacitor is moved and pulled out along the slide rail 201, so that the operator can quickly transport and replace it.

[0047] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A tooling equipment for replacing capacitors in a UHV converter station, characterized by: include: Two slide rails (201), a suspension fixing seat (202), a crossbeam (203), a second fixed pulley (204), a traction rope (205), and a slide plate assembly; The two slide rails (201) are arranged in parallel and fixed by the crossbeam (203), and the slide rails (201) are used to limit the sliding direction of the slide plate assembly; The suspension fixing seats (202) are provided in plurality and are symmetrically fixed on the two slide rails (201); The slide plate assembly is slidably arranged on the two slide rails (201) and is used for suspending the capacitor; one end of the traction rope (205) is connected to the slide plate assembly, and the other end is passed around the second fixed pulley (204) and is connected to a fixed handle on the surface; the traction rope (205) is used to adjust the sliding state of the slide plate assembly on the slide rails (201); The second fixed pulley (204) is rotatably disposed between the two slide rails (201) and is used to change the traction direction of the traction rope (205).

2. The tooling equipment for replacing capacitors in a UHV converter station according to claim 1, characterized in that: The slide plate assembly comprises: a fixed plate (100), four first fixed pulleys (101), and a slide seat (102); The four first fixed pulleys (101) are respectively fixed at the corners of the fixed plate (100) and are used to suspend and lift the capacitor; One end of the four slide seats (102) is symmetrically fixed on the fixed plate (100), and the other end is slidably arranged on the slide rail (201); a fixed boss is also arranged on the central axis of the fixed plate (100), and the fixed boss is connected to the traction rope (205).

3. The tooling equipment for replacing capacitors in a UHV converter station according to claim 1 is characterized in that: The suspension fixing seat (202) is provided with a fixing sliding hole, and the fixing sliding hole is used to fix the device to the rigid structure of the capacitor tower.

4. The tooling equipment for replacing capacitors in a UHV converter station according to claim 2 is characterized in that: A hoisting rope is arranged on the first fixed pulley (101), and the hoisting rope is used to suspend and lift the capacitor.

5. The tooling equipment for replacing capacitors in a UHV converter station according to claim 2 is characterized in that: A motor is also provided on the first fixed pulley (101), and the motor is used to drive the first fixed pulley (101).

6. The tooling equipment for replacing capacitors in a UHV converter station according to claim 5, characterized in that: The motor model is a conical rotor motor.