Substrate processing apparatus
By designing a cross-type conveying and processing structure in the substrate processing device, the problems of insufficient maintenance space and expanded land are solved, maintenance workability is improved, and the efficiency of the carrier is optimized.
Patent Information
- Application Number
- CN202380028804.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-03-24
- Filing Date
- 2023-03-16
- Publication Date
- 2024-11-05
AI Technical Summary
The existing substrate processing devices have a compact structure and insufficient maintenance space, resulting in poor maintenance workability, and increasing the transport path may lead to an expansion of the footprint.
A substrate processing device is designed, and the conveying part and the processing part extend in a straight line to form an intersecting structure to ensure the formation of maintenance space, and to optimize the conveying path and reduce interference and land occupation through horizontal and vertical posture transformation of the carrier. Improve maintenance workability.
It effectively suppresses the expansion of the floor area, improves the maintenance workability of each part of the substrate processing device, ensures sufficient maintenance space, and reduces the need for carrier cleaning.
Smart Images

Figure CN118901127A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a substrate processing device for processing a plurality of substrates in a processing tank. Background Art
[0002] A substrate processing device is used to perform various processes on substrates such as semiconductor substrates, FPD (Flat Panel Display) substrates of liquid crystal display devices or organic EL (Electro Luminescence) display devices, optical disk substrates, magnetic disk substrates, magneto-optical disk substrates, photomask substrates, ceramic substrates or solar cell substrates.
[0003] As such a substrate processing apparatus, there is a batch type substrate processing apparatus that immerses a plurality of substrates in a processing liquid stored in a processing tank to perform processing such as etching. For example, the batch type substrate processing apparatus described in Patent Document 1 has a substrate processing unit. The substrate processing unit has a structure arranged in such a manner that a first chemical liquid tank, a first rinse liquid tank, a second chemical liquid tank, a second rinse liquid tank, and a drying processing unit are sequentially arranged in a straight line. In addition, in the above-mentioned substrate processing apparatus, a first handover position and a second handover position are set in such a manner that the drying processing unit of the substrate processing unit is further arranged in a straight line.
[0004] The unprocessed substrates transported into the substrate processing device are received by the main transport mechanism at the first handover position and transported to the substrate processing unit. In the substrate processing unit, the unprocessed substrates are transported, for example, to a position above the first chemical liquid tank or the second chemical liquid tank. In addition, the substrates are immersed in the chemical liquid in the tank below for a predetermined time and lifted up. Thereafter, the substrates are transported to a position above the first rinse liquid tank or the second rinse liquid tank. In addition, the substrates are immersed in the rinse liquid in the tank below for a predetermined time and lifted up.
[0005] After the treatment of the chemical solution in the first chemical solution tank or the second chemical solution tank, the plurality of substrates are transported to the drying processing unit. After the drying processing in the drying processing unit, the plurality of substrates are taken out from the second transfer position and unloaded from the substrate processing apparatus.
[0006] Patent Document 1: Japanese Patent Application Publication No. 2011-238945 Summary of the invention
[0007] Problems to be solved by the invention
[0008] In the above-mentioned substrate processing device, a chuck cleaning unit is provided at the first handover position, and a plurality of substrate handover mechanisms are provided in a manner arranged to the side of the first handover position (in a direction orthogonal to the above-mentioned straight line). In addition, two substrate handover mechanisms (intermediary robots) are provided at the second handover position, and a plurality of substrate handover mechanisms are further provided in a manner arranged to the side of the second handover position (in a direction orthogonal to the above-mentioned straight line). In addition, a wafer box holding portion is provided near these plurality of substrate handover mechanisms. The wafer box holding portion is configured to hold a container (FOUP wafer box) capable of holding a plurality of substrates, and is provided with an opener and closer for opening and closing the cover of the container.
[0009] The plurality of structures (chuck cleaning unit, plurality of substrate transfer mechanisms and wafer box holding unit) disposed at the first and second transfer positions and their surroundings in the substrate processing device are disposed adjacent to each other. Therefore, it is difficult to ensure a sufficiently large maintenance space for each structure, so the maintenance workability is low.
[0010] Therefore, for each structure related to the loading and unloading of the substrate, in order to ensure a sufficiently large maintenance space, it is considered to arrange the first handover position and the second handover position in a manner of sandwiching the substrate processing unit. In this case, since the first handover position and the second handover position are far away from each other, it is necessary to set a new transport path connecting the wafer box holding unit and the first handover position, or a new transport path connecting the wafer box holding unit and the second handover position. However, if a new transport path is set in the substrate processing device, the floor space of the substrate processing device may be expanded.
[0011] An object of the present invention is to provide a substrate processing apparatus capable of suppressing an increase in floor space and improving the maintenance workability of each part of the substrate processing apparatus.
[0012] Solutions to Solve Problems
[0013] (1) According to one embodiment of the present invention, a substrate processing device comprises: a substrate loading and unloading section, which is configured to load a plurality of substrates and to unload a plurality of substrates; and a conveying section and a processing section, which are arranged to extend in parallel from the substrate loading and unloading section in a first direction, the conveying section having a first end and a second end sequentially arranged in the first direction, and being configured to convey a carrier from the first end to the second end in the first direction, the carrier accommodating the plurality of substrates loaded into the substrate loading and unloading section, and the processing section having a third end and a fourth end sequentially arranged in the first direction, and having a plurality of processing sections arranged between the third end and the fourth end. The processing tank is provided in a processing tank, and is configured to be able to transport the carrier transported to the second end in the transport section from the fourth end toward the third end in a second direction opposite to the first direction, and immerse the transported carrier in at least one of a plurality of processing liquids stored in the plurality of processing tanks, so as to perform a predetermined process on a plurality of substrates accommodated in the carrier, and transfer the processed plurality of substrates to the substrate carrying-in and carrying-out section, so as to form a maintenance space for the processing section in a manner adjacent to at least a portion of the processing section in a third direction intersecting the first direction and the second direction in a plan view, and the transport section overlaps with at least a portion of the processing section and the maintenance space in a plan view.
[0014] In the substrate processing device, a plurality of unprocessed substrates are carried into a substrate carrying-in and carrying-out section. The plurality of substrates are carried in a first direction from a first end of the carrying section to a second end thereof in a state of being stored in a carrier. The plurality of substrates carried to the second end of the carrying section are carried in a second direction from a fourth end of the processing section to a third end thereof in a state of being stored in a carrier. During the carrying, the carrier storing the plurality of substrates is immersed in at least one of a plurality of processing liquids respectively stored in a plurality of processing tanks between the fourth end and the third end thereof. Thus, a pre-set processing is commonly performed on the plurality of substrates stored in the carrier. The plurality of processed substrates are transferred to the substrate carrying-in and carrying-out section and carried out.
[0015] According to the above structure, since the third end and the fourth end of the processing unit are separated by a plurality of processing tanks, the structure for transferring the substrate to the fourth end of the processing unit and the structure for taking out the substrate from the third end of the processing unit are arranged in an inaccessible manner. Furthermore, a maintenance space is formed in a manner adjacent to at least a part of the processing unit. Therefore, it is easy to ensure a sufficiently large maintenance space for each part of the substrate processing device. Furthermore, according to the above structure, it is not necessary to arrange the conveying unit at a position far away from the processing unit and the maintenance space when viewed from above.
[0016] As a result, it is possible to improve the workability of maintenance of each part of the substrate processing apparatus while suppressing an increase in the floor space.
[0017] (2) Alternatively, the processing unit allows the carrier to move in the second direction and restricts the carrier from moving in the first direction. In this case, the moving direction of the carrier in the processing unit is restricted to the second direction. In this case, when a plurality of carriers are transported in the processing unit, interference caused by one carrier and another carrier moving in opposite directions is suppressed.
[0018] In addition, since the carrier does not reciprocate along the first direction and the second direction in the processing unit, the length of the carrier transport path in the processing unit does not exceed the distance between the third end and the fourth end of the processing unit in a plan view, thereby preventing the carrier transport path from becoming excessively long.
[0019] (3) Alternatively, the maintenance space may be formed adjacent to the plurality of processing tanks, and the conveying unit may be disposed above the maintenance space and the plurality of processing tanks. In this case, since the maintenance space is adjacent to the plurality of processing tanks, the operability of maintaining the plurality of processing tanks is improved. In addition, since the conveying unit is disposed above the maintenance space and the plurality of processing tanks, particles generated in the maintenance space and the plurality of processing tanks are prevented from being attached to the plurality of substrates being conveyed.
[0020] (4) Alternatively, the conveying unit may overlap at least a portion of the maintenance space when viewed from above, and may not overlap the processing unit when viewed from above. In this case, the space above the maintenance space can be effectively utilized. In addition, since the conveying unit is not provided above the processing unit, the degree of freedom in the design of the processing unit in the height direction is not limited by the conveying unit.
[0021] (5) Alternatively, the substrate processing apparatus further comprises a first conveying device, which conveys the carrier from the second end of the conveying section to the fourth end of the processing section, and the substrate loading and unloading section comprises: a substrate inserting section, which is arranged adjacent to the first end of the conveying section and inserts the unprocessed plurality of substrates loaded into the substrate loading and unloading section into the empty carrier; a substrate taking-out section, which is arranged adjacent to the third end of the processing section and is used to take out the processed plurality of substrates stored in the carrier transferred from the processing section from the substrate loading and unloading section; and a second conveying device, which conveys the empty carrier after taking out the plurality of substrates from the substrate taking-out section to the substrate inserting section.
[0022] In this case, in the substrate insertion section, multiple unprocessed substrates are stored in an empty carrier. The carrier storing the multiple substrates is transported to the fourth end of the processing section by the conveying section and the first conveying device. In addition, the carrier is transported from the fourth end to the third end in the processing section. Thereafter, in the substrate removal section, multiple processed substrates are taken out from the carrier storing the processed substrates. The empty carrier is transported to the substrate insertion section by the second conveying device. Thus, the empty carrier transported to the substrate insertion section can be used for processing multiple new substrates. Therefore, there is no need to prepare too many carriers for storing multiple substrates.
[0023] (6) The device may further include a carrier cleaning unit that cleans an empty carrier from which a plurality of substrates processed by the processing unit are taken out. In this case, the cleaned carrier can be used to process a new plurality of substrates.
[0024] Effects of the Invention
[0025] According to the present invention, it is possible to improve the workability of maintenance of each part of a substrate processing apparatus while suppressing an increase in floor space. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic plan view showing a basic structure of a substrate processing apparatus according to one embodiment of the present invention.
[0027] Figure 2 yes Figure 1 Schematic cross-sectional view of a substrate processing apparatus taken along line AA.
[0028] Figure 3 yes Figure 1 A top view of a carrier used in a substrate processing apparatus.
[0029] Figure 4 yes Figure 3 A side view of a carrier.
[0030] Figure 5 yes Figure 4 A cross-sectional view of the carrier at line BB.
[0031] Figure 6 It is used to illustrate Figure 1 A diagram of a transport path for multiple substrates and carriers in a substrate processing apparatus.
[0032] Figure 7 It is used to illustrate Figure 1 A diagram of a transport path for multiple substrates and carriers in a substrate processing apparatus.
[0033] Figure 8 It is used to illustrate Figure 1 A diagram of a transport path for multiple substrates and carriers in a substrate processing apparatus. DETAILED DESCRIPTION
[0034] Hereinafter, a substrate processing device according to an embodiment of the present invention will be described with reference to the accompanying drawings. In the following description, a substrate refers to a substrate for a FPD (Flat Panel Display) such as a liquid crystal display device or an organic EL (Electro Luminescence) display device, a semiconductor substrate, a disc substrate, a magnetic disk substrate, a magneto-optical disk substrate, a photomask substrate, a ceramic substrate, or a solar cell substrate. In addition, the substrate described below has a rectangular shape when viewed from above.
[0035] <1> Structure of substrate processing apparatus
[0036] (1) Definition of overall structure and direction
[0037] Figure 1 It is a schematic plan view showing a basic structure of a substrate processing apparatus according to one embodiment of the present invention. Figure 2 yes Figure 1 Schematic cross-sectional view of the substrate processing device 1 at line AA. Figure 1 and Figure 2 As shown, the substrate processing apparatus 1 mainly includes a substrate loading / unloading block 100 , a relay block 200 , a processing block 300 , and a cleaning block 400 .
[0038] Here, in Figure 1 and Figure 2 In the subsequent designated figures, in order to clarify the positional relationship of the various components of the substrate processing device 1, arrows representing the X direction, Y direction and Z direction that are orthogonal to each other are marked. The X direction and the Y direction are orthogonal to each other in the horizontal plane, and the Z direction is equivalent to the vertical direction. In addition, in each direction, the direction pointed by the arrow is set as the + direction, and the direction opposite to the + direction is set as the - direction. In the following description, when simply referred to as the X direction, the X direction includes the +X direction and the -X direction. In addition, when simply referred to as the Y direction, the Y direction includes the +Y direction and the -Y direction. In addition, when simply referred to as the Z direction, the Z direction includes the +Z direction and the -Z direction.
[0039] (2) Substrate loading and unloading block 100
[0040] The substrate loading and unloading block 100 includes a plurality of wafer box racks 110, wafer box transfer devices 111, 112, shutters 120, 130, substrate transfer robots 140, 150, two wafer box loading units 190 and a control unit 160 ( Figure 2). In addition, the substrate loading and unloading block 100 has an end face portion 101, a side face portion 102, and another side face portion 103 constituting a portion of the outer wall of the substrate processing apparatus 1. The end face portion 101 is located at one end of the substrate processing apparatus 1 facing the -X direction and is orthogonal to the X direction. The side face portion 102 and the other side face portion 103 extend in parallel from both ends of the end face portion 101 toward the +X direction in a plan view in a manner that they are opposed to each other in the Y direction.
[0041] Two wafer box loading sections 190 are provided so as to protrude from the end surface section 101 in the -X direction. Each wafer box loading section 190 is configured to be able to load a wafer box (FOUP: Front Opening Unified Pod, front-opening wafer transfer box) 8 that stores multiple substrates in multiple stages. In the end surface section 101, a passage opening (not shown) for allowing the wafer box 8 to pass in the X direction is formed in a portion corresponding to each wafer box loading section 190.
[0042] The wafer box 8 has an opening for taking out a substrate from the internal space of the wafer box 8 and for inserting a substrate into the internal space of the wafer box 8. In addition, the wafer box 8 includes a cover for opening and closing the opening. The opening of the wafer box 8 is closed when the wafer box 8 is being transported or on standby, and is opened when taking out and inserting a substrate into the wafer box 8. Figure 1 and Figure 2 In order to clearly distinguish the wafer box 8 from the carrier 9 described later, the wafer box 8 is marked with a hatching line, and the carrier 9 is marked with a dot pattern. Figure 1 In the example, the wafer cassette 8 is placed on one of the two wafer cassette placement sections 190 arranged in the Y direction, and the wafer cassette 8 is not placed on the other wafer cassette placement section 190 .
[0043] A plurality of wafer cassette racks 110 are arranged at a predetermined distance from the end surface 101 in the +X direction, and are spaced apart from each other. In this example, sixteen wafer cassette racks 110 are arranged in four rows and four columns in a plane parallel to the Z direction and the Y direction, and are fixed by a fixing member not shown. Each wafer cassette rack 110 is configured to be able to carry a wafer cassette 8. Figure 1 In the example, three of the four cassette racks 110 located at the uppermost stage are respectively loaded with cassettes 8, and the remaining cassette rack 110 is not loaded with cassettes 8. The number of cassettes 8 and the arrangement of cassette racks 110 can be appropriately changed according to the device design specifications.
[0044] The two shutters 120 and 130 are arranged at a predetermined distance in the +X direction from the plurality of wafer box racks 110 and are spaced apart from each other. In this example, the two shutters 120 and 130 are arranged in the Y direction and fixed by a fixing member not shown. One shutter 120 is located near one side surface 102, and the other shutter 130 is located near the other side surface 103. Each shutter 120 and 130 is configured to be able to place a wafer box 8 and to be able to open and close the lid of the placed wafer box 8. Figure 1 In the example, the wafer cassette 8 is placed on one shutter 120 , but the wafer cassette 8 is not placed on the other shutter 130 .
[0045] The substrate transfer robot 140 is arranged adjacent to the shutter 120 in the +X direction. The substrate transfer robot 140 is configured to be rotatable around an axis in the Z direction and movable (able to be raised and lowered) in the Z direction. The substrate transfer robot 140 is provided with a hand for transferring one or more substrates. The hand is supported by a multi-jointed arm and can move forward and backward in the horizontal direction. The substrate transfer robot 140 is used to take out a substrate from the wafer box 8 containing an unprocessed substrate while the wafer box 8 containing the unprocessed substrate is placed on the shutter 120, and insert the taken-out substrate into a carrier 9 described later and arranged in the relay block 200.
[0046] The substrate delivery robot 150 is disposed adjacent to the shutter 130 in the +X direction. The substrate delivery robot 150 has the same structure as the substrate delivery robot 140. The substrate delivery robot 150 is used to take out a substrate from a carrier 9 (described later) arranged in the relay block 200 while an empty wafer box 8 is placed on the shutter 130, and insert the taken-out substrate into the wafer box 8 on the shutter 130.
[0047] The wafer box conveying device 111 is located between the end surface portion 101 in the X direction and the plurality of wafer box racks 110. The wafer box conveying device 111 has a holding portion (not shown) configured to hold the wafer box 8, and is configured to be able to move the holding portion in the Y direction and in the Z direction. Thus, the wafer box conveying device 111 conveys the wafer box 8 between any one of the two wafer box loading portions 190 and any one of the plurality of wafer box racks 110.
[0048] The wafer box transfer device 112 is located between the plurality of wafer box racks 110 and the two shutters 120 and 130 in the X direction. The wafer box transfer device 112 has the same structure as the wafer box transfer device 111. The wafer box transfer device 112 transfers the wafer box 8 between any one of the plurality of wafer box racks 110 and any one of the two shutters 120 and 130.
[0049] Control unit 160 ( Figure 2) is composed of a computer including a CPU (Central Processing Unit), a ROM (Read Only Memory) and a RAM (Random Access Memory), and controls the operation of each component in the substrate processing device 1.
[0050] (3) Relay block 200
[0051] The relay block 200 mainly includes two carrier support parts 210 and 220, a first standby part 230, a second standby part 240 and a standby conveying device 250. The carrier support part 210 is arranged adjacent to the substrate transfer robot 140 of the substrate loading and unloading block 100 in the +X direction. In addition, the carrier support part 210 is configured to support a carrier 9 that can store multiple substrates in multiple stages. The details of the carrier 9 will be described later. Furthermore, the carrier support part 210 is configured to support the carrier 9 and change the posture of the supported carrier 9. The details of the structure of the carrier support part 210 for changing the posture of the carrier 9 will be described later. In addition, in Figure 1 In the example, the carrier 9 is supported on the carrier support portion 210 .
[0052] The carrier support part 220 is disposed adjacent to the substrate transfer robot 150 of the substrate transfer block 100 in the +X direction. In addition, the carrier support part 220 has the same structure as the carrier support part 210. Figure 1 In the example, the carrier 9 is not supported on the carrier supporting portion 220 .
[0053] The first standby section 230 is disposed adjacent to the carrier support section 210 in the +X direction. In addition, the first standby section 230 is configured to support the carrier 9. Furthermore, the first standby section 230 is configured to transfer the carrier 9 supported by the first standby section 230 to the carrier support section 210 and receive the carrier 9 supported by the carrier support section 210 from the carrier support section 210.
[0054] The second standby section 240 is provided adjacent to the carrier support section 220 in the +X direction. In addition, the second standby section 240 is configured to support the carrier 9. Furthermore, the second standby section 240 is configured to transfer the carrier 9 supported by the second standby section 240 to the carrier support section 220 and receive the carrier 9 supported by the carrier support section 220 from the carrier support section 220.
[0055] The standby conveying device 250 is provided between the first standby section 230 and the second standby section 240. The standby conveying device 250 is configured to be able to hold the carrier 9 and to be able to move in the Y direction between the first standby section 230 and the second standby section 240. The standby conveying device 250 conveys the carrier 9 supported by the second standby section 240 to the first standby section 230, for example.
[0056] (4) Processing block 300
[0057] The processing block 300 includes a first conveying unit 310, a second conveying unit 320, and a processing unit 330. The first conveying unit 310 and the processing unit 330 are arranged in sequence in the +Y direction and extend in parallel from the relay block 200 in the +X direction. The second conveying unit 320 is formed in a manner extending in the Y direction, connecting the end of the first conveying unit 310 facing the +X direction and the end of the processing unit 330 facing the +X direction.
[0058] In the following description, one of the two ends of the first conveying unit 310 extending in the X direction, which faces the -X direction, is appropriately referred to as the first end TA1, and the other end facing the +X direction is appropriately referred to as the second end TA2. In addition, one of the two ends of the processing unit 330 extending in the X direction, which faces the -X direction, is appropriately referred to as the third end TA3, and the other end facing the +X direction is appropriately referred to as the fourth end TA4.
[0059] The first conveying unit 310 includes a main conveying device 311 and two auxiliary conveying devices 312A and 312B. The main conveying device 311 includes a movable stage 311a and a guide rail 311b. The guide rail 311b is provided to extend from the first end TA1 to the second end TA2 of the first conveying unit 310. The movable stage 311a is configured to be movable in the X direction on the guide rail 311b and to be able to carry the carrier 9. The main conveying device 311 also includes a driving mechanism (not shown) for moving the movable stage 311a along the X direction on the guide rail 311b. Thus, the main conveying device 311 places the carrier 9 on the movable stage 311a near the first end TA1 of the relay block 200, and then conveys the placed carrier 9 in the +X direction to the second end TA2 near the second conveying unit 320.
[0060] The auxiliary conveying device 312A and the auxiliary conveying device 312B are respectively provided at the first end TA1 and the second end TA2 of the first conveying section 310 in the X direction. When the carrier 9 storing an unprocessed substrate is supported by the carrier support section 210, the auxiliary conveying device 312A places the carrier 9 on the movable stage 311a of the main conveying device 311 arranged at the first end TA1. In addition, the auxiliary conveying device 312A conveys an empty carrier 9 from the first standby section 230 to the carrier support section 210. On the other hand, when the movable stage 311a carrying the carrier 9 moves to the second end TA2, the auxiliary conveying device 312B transfers the carrier 9 to the conveying device 321 of the second conveying section 320, which will be described later.
[0061] Here, if Figure 2 As shown in FIG. 1 , the first conveyor 310 is disposed at a position away from the installation surface of the substrate processing apparatus 1 in the +Z direction (upward). Thus, the space located in the -Z direction (downward) of the first conveyor 310 can be used as a maintenance space MS1 for maintaining the processing unit 330 described later. Figure 1 As shown in FIG. 1 , the first conveying unit 310 overlaps with the maintenance space MS1 of the processing unit 330 in a plan view. Figure 8 , in the maintenance space MS1 , a worker WP who performs maintenance work on the processing unit 330 below the first conveying unit 310 is shown.
[0062] The second conveying unit 320 includes a conveying device 321. The conveying device 321 is configured to support the carrier 9 and change the posture of the supported carrier 9. The details of the structure of the conveying device 321 for changing the posture of the carrier 9 will be described later. Furthermore, the conveying device 321 is configured to be movable in the Y direction. Thus, the second conveying unit 320 can receive the carrier 9 from the auxiliary conveying device 312B near the second end TA2 of the first conveying unit 310. In addition, the second conveying unit 320 can change the posture of the carrier 9 received from the auxiliary conveying device 312B and move the carrier 9 to a position near the fourth end TA4 of the processing unit 330.
[0063] The processing unit 330 includes a plurality of (five in this example) liquid processing units 331, a drying unit 332, and a plurality of (three in this example) main transport devices 333A, 333B, and 333C. The plurality of liquid processing units 331 and the drying unit 332 are arranged in the X direction such that the drying unit 332 is located at the third end TA3.
[0064] The plurality of main transport devices 333A, 333B, and 333C are arranged in a straight line extending in the +X direction from the third end TA3 toward the fourth end TA4. Each of the main transport devices 333A, 333B, and 333C is configured to hold the carrier 9 and to transport the held carrier 9 between the plurality of liquid processing units 331 and the drying unit 332. The main transport device 333C located farthest from the relay block 200 receives the carrier 9 when the carrier 9 is transported to the vicinity of the processing unit 330 by the second transport unit 320. In addition, the main transport device 333C transports the received carrier 9 to any one of the plurality of liquid processing units 331.
[0065] Each of the plurality of liquid treatment units 331 includes one or more treatment tanks 331a and an elevator 331b. Each of the liquid treatment units 331 in this example includes two treatment tanks 331a. Each treatment tank 331a is configured to be able to insert and remove the carrier 9 from a position above the treatment tank 331a. In addition, in the treatment tank 331a, a treatment liquid (chemical liquid or rinse liquid) for cleaning the plurality of substrates accommodated in the carrier 9 is stored.
[0066] The lifter 331b of each liquid processing unit 331 is configured to hold the carrier 9. In addition, the lifter 331b is configured to receive the carrier 9 from any one of the plurality of main transport devices 333A, 333B, and 333C, and to transfer the carrier 9 to any one of the plurality of main transport devices 333A, 333B, and 333C. Furthermore, the lifter 331b is configured to immerse the carrier 9 in the processing liquid and to lift the carrier 9 from the processing liquid for each of the two processing tanks 331a of the liquid processing unit 331. Thus, the carrier 9 containing the unprocessed substrate is transferred to the processing unit 330, and the plurality of substrates contained in the carrier 9 are immersed in one or more processing liquids for a predetermined time, and the plurality of substrates are subjected to a common process.
[0067] The drying unit 332 performs a drying process on the carrier 9 transported by the main transport device 333A located closest to the relay block 200. The drying process dries the plurality of substrates stored in the carrier 9. The carrier 9 after the drying process is transferred to the second standby unit 240 of the relay block 200 by the main transport device 333A located closest to the relay block 200.
[0068] Here, in the plurality of processing tanks 331 a of the plurality of liquid processing units 331 , a plurality of processing liquids corresponding to a plurality of processes to be performed on the substrate are stored so as to be arranged in the −X direction in the order of the processes to be performed on the substrate. Figure 2The control unit 160 allows the main transport devices 333A, 333B, and 333C to move in the -X direction while holding the carrier 9, and restricts the main transport devices 333A, 333B, and 333C from moving in the +X direction while holding the carrier 9. In this case, when a plurality of carriers 9 are transported by the plurality of main transport devices 333A, 333B, and 333C, the occurrence of interference caused by one carrier 9 and another carrier 9 moving in opposite directions is suppressed. In addition, since the carrier 9 does not reciprocate in the X direction in the processing unit 330, the length of the transport path of the carrier 9 in the processing unit 330 does not exceed the length of the processing unit 330 in the X direction.
[0069] like Figure 1 As shown by the middle dotted line, in the processing block 300 and the vicinity thereof, in addition to the maintenance space MS1, a maintenance space MS2 is further formed on the +Y direction side of the processing unit 330. In this way, two maintenance spaces MS1 and MS2 are formed in a manner of separating the processing unit 330 in the Y direction, thereby ensuring a sufficiently large maintenance space for the processing unit 330.
[0070] (5) Cleaning block 400
[0071] The cleaning block 400 includes a cleaning and conveying device 410 and a carrier cleaning unit 420. The carrier cleaning unit 420 is provided to extend in the X direction at a position lateral to the substrate loading and unloading block 100 and the relay block 200 (in the +Y direction). In addition, the carrier cleaning unit 420 includes a plurality of carrier cleaning tanks 421, a carrier drying section 422, and a plurality of carrier standby sections 423 arranged in an array in the X direction.
[0072] The plurality of carrier cleaning tanks 421, the carrier drying section 422, and the plurality of carrier standby sections 423 are each configured so that the carrier 9 can be inserted and removed from a position above the tank, the drying section, or the standby section. In addition, each of the plurality of carrier cleaning tanks 421 stores a treatment liquid (chemical solution or rinse liquid) for washing the carrier 9. The carrier drying section 422 performs a drying process on the inserted carrier 9.
[0073] The cleaning and transporting device 410 is configured to transport the empty carrier 9 between the second standby section 240, the plurality of carrier cleaning tanks 421, the carrier drying section 422, and the plurality of carrier standby sections 423 of the relay block 200. In the cleaning block 400, the empty carrier 9 is transported between the plurality of carrier cleaning tanks 421 and immersed in the processing liquid stored in any of the carrier cleaning tanks 421. Thus, the empty carrier 9 used for processing a plurality of substrates in the processing block 300 is cleaned.
[0074] The cleaned carrier 9 is transferred to the carrier drying section 422 for drying. The dried carrier 9 is transferred to the carrier standby section 423 and held. Thereafter, the carrier is taken out from the carrier standby section 423 by the cleaning and transfer device 410 according to the receiving sequence of the plurality of substrates in the relay block 200 and transferred to the second standby section 240 of the relay block 200.
[0075] <2> Structure of carrier 9 and posture of carrier 9
[0076] Figure 3 yes Figure 1 A top view of a carrier 9 used in the substrate processing apparatus 1, Figure 4 yes Figure 3 A side view of the carrier 9, Figure 5 yes Figure 4 A cross-sectional view of the carrier 9 at line BB. Figure 3 to Figure 5 As shown, the carrier 9 includes four frame members 10a, 10b, 10c, 10d.
[0077] The frame members 10a and 10b are each formed of a substantially square plate-shaped member and have an outer shape larger than the substrate to be processed. Four openings 13 are formed in the central portion of each of the frame members 10a and 10b. The frame members 10c and 10d are each formed of a substantially rectangular plate-shaped member. The length of the long side of the frame members 10c and 10d is substantially equal to the length of one side of the frame members 10a and 10b.
[0078] The frame members 10a and 10b are arranged to be spaced apart in a state of being opposed to each other. The frame member 10c is provided in a manner of connecting one side of the frame member 10a with one side of the frame member 10b. The frame member 10d is provided in a manner of connecting the other side of the frame member 10a with the other side of the frame member 10b. In this state, the frame members 10c and 10d are also arranged to be opposed to each other. Thus, the carrier 9 has a square tube shape.
[0079] The rectangular opening formed at one end of the square tube-shaped carrier 9 functions as a substrate entrance 12 for inserting a substrate into the carrier 9 and for taking a substrate out of the carrier 9. At the other end of the carrier 9, a plurality of (six in this example) support pieces 11 are provided in a manner that connects the frame members 10a and 10b and is dispersedly arranged between the frame members 10c and 10d.
[0080] Each support piece 11 is composed of a long plate member and is arranged parallel to the frame members 10c and 10d. In addition, each support piece 11 is provided with a plurality of grooves (not shown) at a predetermined reference pitch into which a portion of the outer edges of the plurality of substrates accommodated in the carrier 9 can be inserted. The number of grooves formed in each support piece 11 is equal to the number of substrates to be accommodated in the carrier 9.
[0081] A plurality of protrusions pr are formed on two mutually opposing surfaces of the frame members 10c and 10d. The plurality of protrusions pr are formed to extend along the long side direction of the frame members 10c and 10d and are arranged in the short side direction at the above-mentioned reference pitch. Thus, a groove into which the outer edge of the substrate can be inserted is formed between each two adjacent protrusions pr.
[0082] As mentioned above, in Figure 1 In the substrate processing apparatus 1, the posture of the carrier 9 is appropriately changed. Here, with respect to the carrier 9 having the above-mentioned structure, the posture in which the plurality of support pieces 11 are located at the lower end and the frame members 10a and 10b are maintained in parallel with the vertical direction is referred to as a vertical posture. On the other hand, the posture in which the frame members 10a and 10b are maintained in a manner orthogonal to the vertical direction is referred to as a horizontal posture.
[0083] When inserting a plurality of substrates into an empty carrier 9, the plurality of substrates are inserted into the interior of the carrier 9 from the substrate inlet and outlet 12 of the carrier 9 in a horizontal position. At this time, the two side portions (parts of two sides facing each other) of the outer edge of each substrate are inserted between any two of the plurality of protrusions pr of the frame member 10c and between any two of the plurality of protrusions pr of the frame member 10d. Thus, when the carrier 9 storing a plurality of substrates is in a horizontal position, each substrate is maintained in a state where the two side portions of the substrate are supported by the plurality of protrusions pr. On the other hand, when the carrier 9 storing a plurality of substrates is in a vertical position, each substrate is maintained in a state where the plurality of portions of the lower end of the substrate are embedded in the plurality of grooves of the plurality of support sheets 11.
[0084] As described above, when the carrier 9 is in a horizontal position, both side portions of each of the plurality of substrates stored are supported as a whole by the plurality of protrusions pr. On the other hand, when the carrier 9 is in a vertical position, each of the plurality of substrates stored partially supports a plurality of portions of the lower end portion of the substrate using the plurality of support pieces 11. Therefore, when the carrier 9 is in a horizontal position, the load applied to the outer edge of each stored substrate (the load caused by the self-weight of each substrate) is reduced compared to the case where the carrier 9 is in a vertical position.
[0085] The carrier 9 of the present embodiment is formed such that the vertical dimension (height) of the carrier 9 in the horizontal posture is smaller than the vertical dimension (height) of the carrier 9 in the vertical posture.
[0086] <3> Conveying path of multiple substrates and carriers 9 in substrate processing apparatus
[0087] Figure 6 to Figure 8 It is used to illustrate Figure 1 FIG. 1 is a diagram showing a transport path of a plurality of substrates and a carrier 9 in a substrate processing apparatus 1 . Figure 6 In, with Figure 1 A schematic top view of the substrate processing apparatus 1 is also shown. Figure 7 Shown in one direction Figure 1 Schematic appearance stereogram of the substrate processing device 1. Figure 8 Shown in another direction Figure 1 A schematic perspective view of the appearance of the substrate processing device 1. Figure 7 and Figure 8 in, omit Figure 1 FIG. 4 is a diagram of a cleaning block 400. Figure 6 to Figure 8 In addition Figure 8 In addition to the maintenance space MS1, Figure 1 Illustration of maintenance spaces MS1 and MS2.
[0088] It is assumed that a plurality of unprocessed substrates W stored in one wafer cassette 8 are subjected to a series of processes. In this case, one wafer cassette 8 is loaded into the substrate loading and unloading block 100, and Figure 6 As shown, the substrate 9 is placed on the shutter 120 and the cover is opened. In addition, the empty carrier 9 is supported in a horizontal position on the carrier support portion 210 of the relay block 200. At this time, the substrate inlet 12 ( Figure 5 ) is oriented in the -X direction in a manner opposite to the wafer box 8. In this state, the substrate transfer robot 140 takes out a plurality of unprocessed substrates W from a wafer box 8 and inserts them into the carrier 9. Figure 6 to Figure 8 The transport path of the plurality of substrates W at this time is indicated by a thick dotted arrow a1.
[0089] Thereafter, the empty wafer cassette 8 closes its lid, is held by the wafer cassette transfer device 112, and is placed on any one of the plurality of wafer cassette racks 110. On the other hand, the carrier 9 storing a plurality of substrates W is received by the carrier support 210, and is placed on the movable stage 311a of the main transfer device 311 by the auxiliary transfer device 312A of the first transfer unit 310. Figure 6 to Figure 8 The thick solid arrow a2 in FIG. 1 indicates the conveyance path of the carrier 9 at this time.
[0090] Next, the carrier 9 placed on the movable stage 311a is transported in a horizontal position in the +X direction from a position near the relay block 200 (first end TA1) to a position near the second transport unit 320 (second end TA2). Figure 8 The pop-up box BA3 displays the status of the carrier 9 transported by the main transport device 311 of the first transport unit 310.
[0091] Thereafter, the carrier 9 that has reached the vicinity of the second conveying unit 320 is transferred to the conveying device 321 of the second conveying unit 320 by the auxiliary conveying device 312B of the first conveying unit 310. Therefore, the posture of the carrier 9 transferred to the conveying device 321 is changed from a horizontal posture to a vertical posture by the conveying device 321. Figure 7 The pop-up box BA2 schematically shows the state of the posture change of the carrier 9 in the conveying device 321.
[0092] like Figure 7 As shown in the pop-up box BA2, the conveying device 321 includes a movable pedestal 322 and a carrier holder 323. The movable pedestal 322 is configured to be movable in the Y direction within the second conveying unit 320. The carrier holder 323 is composed of a first holding portion 323a and a second holding portion 323b. The first holding portion 323a has a rectangular flat plate shape that can hold the lower end of the carrier 9 when it is in a horizontal position. In addition, the second holding portion 323b has a rectangular flat plate shape that can hold the lower end of the carrier 9 when it is in a vertical position.
[0093] The first holding portion 323a and the second holding portion 323b are connected in such a manner that one side of the first holding portion 323a and one side of the second holding portion 323b are in contact with each other and the two holding portions are orthogonal to each other. The movable pedestal 322 holds a part of the carrier holder 323 in such a manner that the first holding portion 323a and the second holding portion 323b are parallel to the Y direction and the carrier holder 323 can rotate around an axis extending in the Y direction.
[0094] The conveying device 321 further includes a driving unit (not shown) capable of adjusting the rotation angle of the carrier holder 323 on the movable pedestal 322. Thus, when the carrier 9 in a horizontal posture is received from the first conveying unit 310, the carrier holder 323 adjusts the rotation angle in such a manner that the first holding portion 323a becomes horizontal and the second holding portion 323b becomes vertical. Thereafter, if the carrier 9 in a horizontal posture is received on the carrier holder 323, the carrier holder 323 adjusts the rotation angle in such a manner that the first holding portion 323a becomes vertical and the second holding portion 323b becomes horizontal. Thus, the posture of the carrier 9 is changed from a horizontal posture to a vertical posture.
[0095] The conveying device 321 further includes a driving unit (not shown) for moving the movable pedestal 322 in the Y direction in the second conveying unit 320. Thus, the carrier 9 maintained in a vertical posture is conveyed in the vertical posture in the +Y direction from a position near the first conveying unit 310 to a position near the processing unit 330.
[0096] Thereafter, the main transport device 333C of the processing unit 330 receives the carrier 9 that has arrived at a position near the processing unit 330 from the transport device 321. The carrier 9 received by the main transport device 333C is transported to any one of the one or more liquid processing units 331 by the main transport device 333C and other main transport devices 333B and 333A, and is immersed in various processing liquids for a predetermined period of time while maintaining a vertical posture. Thus, the plurality of substrates W accommodated in the carrier 9 are processed according to the processing liquids in which they are immersed. Figure 8 The pop-up box BA4 displays the status of the carrier 9 transported by the main transport devices 333A, 333B, and 333C of the processing unit 330.
[0097] like Figure 8 As shown in the pop-up box BA4, each main transport device 333A, 333B, and 333C includes a movable support column 333a and a pair of chuck members 333b. The movable support column 333a can move in the X direction and can move in the Z direction (can be raised and lowered) and is arranged on the side (+Y direction side) of the plurality of liquid processing units 331. A pair of chuck members 333b are arranged in a manner extending from the upper end of the movable support column 333a to the top of the liquid processing unit 331. The pair of chuck members 333b is configured to clamp and maintain the carrier 9 in a vertical posture. Furthermore, each main transport device 333A, 333B, and 333C has a driving unit (not shown) that can switch to use a pair of chuck members 333b to hold the carrier 9 and release the carrier 9 from the pair of chuck members 333b. Thus, the carrier 9 is transferred between the plurality of main transport devices 333A, 333B, and 333C and the plurality of liquid processing units 331.
[0098] Thereafter, the carrier 9 storing the plurality of substrates W processed by the processing liquid is further transported to the drying unit 332 close to the relay block 200. Thus, the carrier 9 and the plurality of substrates W in the carrier 9 are dried by the drying unit 332. As described above, Figure 6 to Figure 8 The thick solid arrow a3 in FIG. 3 represents a series of transport paths of the carrier 9 in the processing block 300 .
[0099] The carrier 9 storing the processed plurality of substrates W is transferred from the drying unit 332 to the carrier support 220 of the relay block 200 by the main transfer device 333A, and is supported by the carrier support 220 . Figure 6 to Figure 8 The thick dotted arrow a4 in FIG. 1 indicates the conveyance path of the carrier 9 at this time.
[0100] Therefore, the posture of the carrier 9 transferred to the carrier support portion 220 is changed from the vertical posture to the horizontal posture by the carrier support portion 220. Figure 7The pop-up box BA1 schematically shows the state of the posture change of the carrier 9 in the carrier support part 220.
[0101] like Figure 7 As shown in the pop-up box BA1 of , the carrier support part 220 includes a fixed base 211 and a carrier holder 212 fixed in the relay block 200. The carrier holder 212 is composed of a first holder 212a and a second holder 212b. The first holder 212a has a rectangular flat plate shape that can hold the lower end of the carrier 9 in a horizontal posture. In addition, the second holder 212b has a rectangular flat plate shape that can hold the lower end of the carrier 9 in a vertical posture.
[0102] The first holding portion 212a and the second holding portion 212b are connected in a manner that one side of the first holding portion 212a and one side of the second holding portion 212b are in contact with each other and the two holding portions are orthogonal to each other. The fixed base 211 holds a portion of the carrier holder 212 in a manner that the first holding portion 212a and the second holding portion 212b are parallel to the Y direction and the carrier holder 212 can rotate around an axis extending in the Y direction.
[0103] The carrier support portion 220 also has a driving portion (not shown) capable of adjusting the rotation angle of the carrier holder 212 on the fixed base 211. Thus, when receiving the carrier 9 in a vertical posture from the drying unit 332, the carrier holder 212 adjusts the rotation angle in such a way that the second holding portion 212b becomes horizontal and the first holding portion 212a becomes vertical. Thereafter, after receiving the carrier 9 in a vertical posture on the carrier holder 212, the carrier holder 212 adjusts the rotation angle in such a way that the second holding portion 212b becomes vertical and the first holding portion 212a becomes horizontal. Thus, the posture of the carrier 9 is changed from the vertical posture to the horizontal posture. At this time, the substrate inlet and outlet 12 ( Figure 5 ) towards the -X direction.
[0104] When the carrier 9 storing a plurality of substrates W is supported in a horizontal posture on the carrier support portion 220, an empty wafer box 8 is placed on the shutter 130 of the substrate loading / unloading block 100. In addition, the cover of the wafer box 8 is opened. In this state, the substrate transfer robot 150 takes out a plurality of processed substrates W from the carrier 9 and inserts them into the wafer box 8 on the shutter 130. Figure 6 to Figure 8 The arrow a5 indicated by the thick dotted line in FIG. 1 indicates the transport path of the plurality of substrates W at this time.
[0105] Thereafter, the wafer box 8 containing the processed substrates W is closed, held by the wafer box transfer device 112, and placed on any one of the plurality of wafer box racks 110. In addition, the wafer box 8 is transferred to the wafer box loading unit 190 by the wafer box transfer device 111, and is unloaded from the substrate processing apparatus 1. On the other hand, the empty carrier 9 in the carrier support 220 is changed from the horizontal position to the vertical position by the carrier support 220. The empty carrier 9 in the carrier support 220 that has returned to the vertical position is transferred by the main transfer device 333A and received by the second standby unit 240.
[0106] In this embodiment, the empty carrier 9 received from the carrier supporting part 220 by the second standby part 240 is maintained in a vertical position and is transported to the carrier cleaning unit 420 by the cleaning and transporting device 410 of the cleaning block 400 . Figure 6 The arrow c1 indicated by the thicker dashed line in FIG. 1 indicates the transport path of the carrier 9 at this time.
[0107] In the carrier cleaning unit 420, the carrier 9 is further transported between the plurality of carrier cleaning tanks 421, the carrier drying section 422, and the plurality of carrier standby sections 423 by the cleaning and transporting device 410. Thus, the used carrier 9 is cleaned and dried. In addition, the cleaned and dried carrier 9 is stored in any one of the plurality of carrier standby sections 423. In the plurality of carrier cleaning tanks 421, the carrier drying section 422, and the plurality of carrier standby sections 423, the vertical posture of the carrier 9 is maintained.
[0108] Suppose that a series of processes are performed on a plurality of unprocessed substrates W newly stored in other wafer cassettes 8. In this case, the cleaned carrier 9 stored in the carrier standby section 423 of the cleaning block 400 is transferred from the carrier cleaning unit 420 to the second standby section 240 by the cleaning transfer device 410 as a new carrier 9. Figure 6 The arrow c2 with a thicker dot-dash line in the figure indicates the conveyance path of the new carrier 9 at this time.
[0109] The new carrier 9 transferred to the second standby section 240 is conveyed to the first standby section 230 by the standby conveying device 250 while maintaining the vertical posture, and is supported by the first standby section 230 . Figure 6 The arrow b1 with a thick double-dashed line in the figure indicates the conveying path of the new carrier 9 at this time. The first standby section 230 transfers the new carrier 9 supported by the first standby section 230 to the carrier support section 210. Therefore, the posture of the new carrier 9 transferred to the carrier support section 210 is changed from a vertical posture to a horizontal posture by the carrier support section 210. As described above, the two carrier support sections 210 and 220 in the relay block 200 have the same structure. Therefore, in the carrier support section 210, as shown in FIG. Figure 7As shown in the pop-up box BA1 of , the posture of the new carrier 9 is changed. Thereafter, a plurality of unprocessed substrates W newly stored in other wafer cassettes 8 are inserted into the new carrier 9 in the horizontal posture.
[0110] A new carrier 9 storing a plurality of unprocessed substrates W is arranged along the Figure 6 to Figure 8 The substrates W are transported along the transport paths indicated by the series of arrows a2, a3, and a4 shown in the figure. Thus, a series of processes are performed on the plurality of substrates W accommodated in the new carrier 9.
[0111] <4> Effect
[0112] (1) In the above-mentioned substrate processing apparatus 1, the third end TA3 and the fourth end TA4 of the processing section 330 are separated by a gap through the plurality of processing tanks 331a of the plurality of liquid processing units 331. Thus, the structure for carrying the carrier 9 into the fourth end TA4 of the processing section 330 and the structure for carrying the carrier 9 out of the third end TA3 of the processing section 330 are not arranged close to each other. Furthermore, a maintenance space MS1 is formed adjacent to the processing section 330 in which the plurality of processing tanks 331a are arranged. Therefore, a sufficiently large maintenance space is ensured for each part of the substrate processing apparatus 1. Furthermore, according to the above-mentioned structure, the first conveying section 310 for conveying the carrier 9 to the fourth end TA4 of the processing section 330 is not arranged at a position away from the processing section 330 and the maintenance spaces MS1 and MS2 when viewed from above.
[0113] As a result, it is possible to improve the workability of maintenance of each part of the substrate processing apparatus 1 while suppressing an increase in the floor space.
[0114] (2) In addition, in the above-mentioned substrate processing apparatus 1, if Figure 8 As shown, the first conveying unit 310 is located at a position spaced apart from the processing unit 330 in the -Y direction and above the maintenance space MS1. Furthermore, the first conveying unit 310 is located above the plurality of processing tanks 331a of the processing unit 330. Generally speaking, a clean downward airflow (downflow) is formed in a clean room where the substrate processing apparatus 1 is installed. Thus, particles generated in the maintenance space MS1 and the plurality of processing tanks 331a are prevented from being attached to the plurality of substrates W in the carrier 9 conveyed in the first conveying unit 310.
[0115] (3) In addition, in the substrate processing apparatus 1, the first conveyor 310 overlaps with the maintenance space MS1 in a plan view, and does not overlap with the processing unit 330 in a plan view. Thus, the space above the maintenance space MS1 can be effectively utilized. In addition, since the first conveyor 310 is not provided above the processing unit 330, the degree of freedom in designing the processing unit 330 in the height direction is not limited by the first conveyor 310.
[0116] (4) In the above-mentioned substrate processing apparatus 1, the carrier 9 used for processing a plurality of substrates W is cleaned by the carrier cleaning unit 420. The carrier 9 cleaned by the carrier cleaning unit 420 is used for processing a plurality of new substrates W. Therefore, it is not necessary to prepare an excess number of carriers 9 for processing a plurality of substrates W.
[0117] (5) The vertical dimension of the first conveying unit 310 is determined according to the vertical dimension (height) of the carrier 9 to be conveyed. In the carrier 9 used in the above-mentioned substrate processing apparatus 1, the vertical dimension (height) of the carrier 9 when in a horizontal position is smaller than the vertical dimension (height) of the carrier 9 when in a vertical position. In addition, in the first conveying unit 310, the carrier 9 is conveyed in a horizontal position. Therefore, the vertical dimension of the first conveying unit 310 can be reduced compared to when the carrier 9 is conveyed in a vertical position. Thus, even when there is a limitation on the vertical dimension of the substrate processing apparatus 1, the vertical dimension of the first conveying unit 310 is reduced, so that a maintenance space MS1 of sufficient height is formed below the first conveying unit 310.
[0118] <5> Other Implementations
[0119] (1) In the substrate processing apparatus 1 of the above embodiment, the first conveyor 310 is disposed above the maintenance space MS1, but the present invention is not limited thereto. The first conveyor 310 may be disposed below the maintenance space MS1 instead of above the maintenance space MS1. For example, a part of the components of the substrate processing apparatus 1 and the maintenance space MS1 may be disposed above a predetermined installation surface, and other components including the first conveyor 310 may be disposed below the installation surface.
[0120] Alternatively, the first conveying unit 310 may be provided so that at least a portion overlaps with the processing unit 330 in a plan view. That is, the first conveying unit 310 may be provided so that at least a portion is located above or below the processing unit 330.
[0121] (2) In the substrate processing apparatus 1 of the above embodiment, the frame members 10a and 10b of the carrier 9 in the vertical posture are maintained parallel to the vertical direction, but the frame members 10a and 10b of the carrier 9 in the vertical posture may be maintained substantially parallel to the vertical direction. That is, the carrier 9 in the vertical posture only needs to be able to keep the plurality of substrates W stored therein parallel or substantially parallel to the vertical direction.
[0122] In addition, in the substrate processing apparatus 1 of the above-mentioned embodiment, the frame members 10a and 10b of the carrier 9 in the horizontal posture are maintained to be orthogonal to the vertical direction, but the frame members 10a and 10b of the carrier 9 in the horizontal posture may be maintained to be approximately orthogonal to the vertical direction. That is, the carrier 9 in the horizontal posture only needs to be able to keep the plurality of substrates W stored therein parallel or approximately parallel to the horizontal direction.
[0123] (3) In the substrate processing apparatus 1 of the above embodiment, the maintenance space MS1 is formed adjacent to all of the plurality of processing tanks 331a of the processing unit 330 in the Y direction, but the present invention is not limited thereto. The maintenance space MS1 may be formed adjacent to a portion of the plurality of processing tanks 331a of the processing unit 330 in the Y direction.
[0124] (4) In the substrate processing apparatus 1 of the above embodiment, the cleaning block 400 for cleaning the used carrier 9 for processing a plurality of substrates W is provided, but the present invention is not limited thereto. The cleaning block 400 may not be provided in the substrate processing apparatus 1. In this case, the used carrier 9 from which a plurality of substrates W have been taken out may be transported to the carrier support portion 210 without being cleaned in the carrier support portion 220 of the relay block 200. Alternatively, the used carrier 9 may be taken out to the outside of the substrate processing apparatus 1 without being cleaned and discarded.
[0125] (5) In the substrate processing apparatus 1 of the above embodiment, the carrier support unit 210 and the first standby unit 230 are separately provided in the relay block 200, but the present invention is not limited thereto. If the first standby unit 230 can be provided with a function of changing the posture of the carrier 9, the carrier support unit 210 may not be provided.
[0126] In the substrate processing apparatus 1 of the above embodiment, the carrier support unit 220 and the second standby unit 240 are separately provided in the relay block 200, but the present invention is not limited thereto. If the second standby unit 240 can be provided with a function of changing the posture of the carrier 9, the carrier support unit 220 may not be provided.
[0127] (6) In the second conveying unit 320 of the processing block 300 of the above embodiment, the conveying device 321 has a function of changing the posture of the carrier 9 and a function of conveying the carrier 9, but the present invention is not limited to this. In the second conveying unit 320, instead of the conveying device 321, a component having a function of changing the posture of the carrier 9 and a component having a function of conveying the carrier 9 may be separately provided.
[0128] (7) In the substrate processing apparatus 1 of the above embodiment, the substrate W to be processed has a rectangular shape when viewed from above, but the substrate to be processed may also have a circular shape when viewed from above, or may have a polygonal shape other than a quadrilateral such as a triangle or pentagon when viewed from above.
[0129] (8) The carrier 9 of the above embodiment supports both sides of the rectangular substrate W when the rectangular substrate W is stored in a horizontal posture, but the present invention is not limited to this. The carrier 9 may be configured to support the center of the substrate W in a horizontal posture.
[0130] (9) In the substrate processing apparatus 1 of the above embodiment, a processing liquid for cleaning the substrates W is stored in the plurality of processing tanks 331a of the processing section 330, but the present invention is not limited thereto. A plating liquid for plating the substrates W or a liquid for modifying the surface state of the substrates W may be stored as the processing liquid in at least a portion of the plurality of processing tanks 331a of the processing section 330. Thus, the above embodiment is an example in which the present invention is applied to a cleaning process of a plurality of substrates W, but the present invention is not limited thereto, and the present invention may also be applied to other processes such as plating or surface modification of a plurality of substrates W.
[0131] (10) In the carrier 9 of the above embodiment, four openings 13 are formed in the central portion of each of the frame members 10a and 10b, but the present invention is not limited to this. The central portion of each of the frame members 10a and 10b is not limited to four, and one, two, three, five or other openings 13 may be formed. Alternatively, the opening 13 may not be formed in the central portion of each of the frame members 10a and 10b. Furthermore, the shapes of the frame members 10a and 10b may be appropriately designed and changed.
[0132] (11) In each of the main transport devices 333A, 333B, and 333C of the above-mentioned embodiment, the pair of chuck members 333b holds the carrier 9 by clamping the carrier 9 in the X direction, but the present invention is not limited to this. The pair of chuck members 333b may hold the carrier 9 by clamping the carrier 9 in the Y direction, or may hold the carrier 9 by clamping the carrier 9 in a direction intersecting the X direction and the Y direction in a horizontal plane.
[0133] <6> Correspondence between the constituent elements of the technical solution and the elements of the implementation method
[0134] Hereinafter, examples of correspondence between the constituent elements of the technical solution and the constituent elements of the embodiment will be described, but the present invention is not limited to the following examples. As the constituent elements of the technical solution, various other elements having the structure or function described in the technical solution may also be used.
[0135] In the above-mentioned embodiment, the substrate carry-in / out block 100 and the relay block 200 are examples of a substrate carry-in / out unit, the +X direction is an example of a first direction, the first conveying unit 310 is an example of a conveying unit, the processing unit 330 is an example of a processing unit, the first end TA1 of the first conveying unit 310 is an example of a first end, and the second end TA2 of the first conveying unit 310 is an example of a second end.
[0136] In addition, the third end TA3 of the processing unit 330 is an example of the third end, the fourth end TA4 of the processing unit 330 is an example of the fourth end, the multiple processing tanks 331a of the multiple liquid processing units 331 are an example of the multiple processing tanks, the -X direction is an example of the second direction, the Y direction is an example of the third direction, and the maintenance space MS1 is an example of the maintenance space.
[0137] In addition, the substrate processing device 1 is an example of a substrate processing device, the conveying device 321 is an example of a first conveying device, the component group including the opener and closer 120, the substrate transfer robot 140, the carrier support part 210 and the first standby part 230 is an example of a substrate insertion part, the component group including the opener and closer 130, the substrate transfer robot 150, the carrier support part 220 and the second standby part 240 is an example of a substrate removal part, the standby conveying device 250 is an example of a second conveying device, and the carrier cleaning unit 420 is an example of a carrier cleaning part.
Claims
1. A substrate processing device, characterized in that: have: a substrate loading and unloading section configured to be able to load in a plurality of substrates and to be able to unload the plurality of substrates; and The conveying unit and the processing unit are arranged to extend in parallel from the substrate carrying-in and carrying-out unit in a first direction. The conveying portion has a first end and a second end sequentially arranged in the first direction. The conveying unit is configured to be able to convey a carrier from the first end to the second end in the first direction, the carrier accommodating the plurality of substrates carried into the substrate carrying-in / out unit, The processing section has a third end and a fourth end sequentially arranged in the first direction, and has a plurality of processing tanks disposed between the third end and the fourth end. The processing section is configured to transport the carrier transported to the second end in the transport section in a second direction opposite to the first direction from the fourth end toward the third end, and immerse the transported carrier in at least one of the plurality of processing liquids stored in the plurality of processing tanks, thereby performing a predetermined process on the plurality of substrates accommodated in the carrier, and transferring the processed plurality of substrates to the substrate loading and unloading section. A maintenance space for the processing unit is formed in a manner adjacent to at least a portion of the processing unit in a third direction intersecting the first direction and the second direction in a plan view, The conveying unit overlaps at least a portion of the processing unit and the maintenance space in a plan view.
2. The substrate processing device according to claim 1, characterized in that: The processing unit allows the carrier to move in the second direction and restricts the carrier from moving in the first direction.
3. The substrate processing device according to claim 1 or 2, characterized in that: The maintenance space is formed adjacent to the plurality of processing tanks. The conveying unit is provided above the maintenance space and the plurality of processing tanks.
4. The substrate processing device according to claim 3, characterized in that: The conveying unit overlaps with at least a portion of the maintenance space in a plan view, and does not overlap with the processing unit in a plan view.
5. The substrate processing apparatus according to any one of claims 1 to 4, characterized in that: further comprising a first conveying device that conveys the carrier from the second end of the conveying unit to the fourth end of the processing unit, The substrate loading and unloading unit includes: a substrate inserting portion, which is disposed adjacent to the first end portion of the conveying portion and inserts the plurality of unprocessed substrates carried into the substrate carrying-in / out portion into the empty carrier; a substrate removal section, which is disposed adjacent to the third end of the processing section and is used to carry out the processed plurality of substrates stored in the carrier transferred from the processing section from the substrate carrying-in / out section; as well as The second transport device transports the empty carrier after taking out the plurality of substrates from the substrate taking-out portion to the substrate inserting portion.
6. The substrate processing apparatus according to any one of claims 1 to 5, characterized in that: The method further includes a carrier cleaning unit that cleans an empty carrier from which the plurality of substrates processed by the processing unit are taken out.
Citation Information
Patent Citations
Substrate processing apparatus
JP2011238945A