Full-automatic pipeline machining all-in-one machine and machining method thereof
Through the fully automatic pipeline processing machine, the pipeline processing is automatically completed based on the data on electronic drawings through the fully automatic pipeline processing machine, using control devices and multiple processing mechanisms, the problems of waste of resources and low production efficiency caused by manual operations in the existing technology are solved, and high efficiency is achieved pipe processing.
Patent Information
- Application Number
- CN202410969648.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
The processing process of existing pipeline processing equipment relies on manual operations, resulting in waste of resources and low production efficiency, which cannot meet the rapid development of industries for high-quality pipelines.
A fully automatic pipeline processing integrated machine is designed, including control devices, pipeline feeding machines, feeding mechanisms, processing equipment and unloading mechanisms. The processing action control instructions are generated through the processing process data on electronic drawings, and the pipeline cutting is automatically completed. , opening holes, pressing grooves and wire sleeves and other processing operations.
The automation of pipeline processing has been realized, which greatly saves labor and time, improves production efficiency, and solves the problem of time-consuming and labor-intensive traditional processing methods.
Smart Images

Figure CN118905640A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mechanical processing, and in particular to a fully automatic pipeline processing integrated machine and a processing method thereof. Background Art
[0002] Pipeline is usually a device connected by pipes, pipe connectors, valves and other related components to transport gas, liquid or fluid with solid particles. With the sustained and rapid development of my country's economic construction, pipelines are widely used as the main transportation device in various related industrial fields such as petroleum, nuclear power and fire protection.
[0003] In the actual production process, the development level of pipeline processing technology directly affects the overall quality of the pipeline. However, the processing process of pipeline processing equipment in the prior art is usually: manually move the pipeline after measuring the on-site drawings, and measure the pipeline length, hole position and other information according to the drawings, mark the measured information on the pipeline one by one, and then move the pipeline to the designated location in turn, and process and manufacture it according to the process through equipment such as threading machines, hole openers and groove presses. This processing process wastes both manpower and time. With the continuous improvement of relevant industrial structures and production processes, the existing pipeline processing equipment and processing processes can no longer meet the needs of actual pipeline processing. Summary of the invention
[0004] The present invention provides a fully automatic integrated pipeline processing machine and a processing method thereof, so as to realize fully automatic integrated processing of pipelines.
[0005] The present invention provides a fully automatic pipeline processing integrated machine, which comprises a control device and a pipeline loading machine, a feeding mechanism, a processing device and a discharging mechanism connected to the control device;
[0006] The control device is used to control the actions of the pipe feeder, the feeding mechanism, the processing equipment and the unloading mechanism according to the control sequence, and is also used to generate a processing action control instruction according to the received pipe processing process data, and control the processing equipment to process the pipe to be processed according to the processing action control instruction;
[0007] The pipe loader is arranged on one side of the feeding mechanism, and a first unloading push plate mechanism is arranged on the pipe loader, and the first unloading push plate mechanism is used to push the pipe to be processed onto the feeding mechanism;
[0008] The processing equipment is arranged at the end of the feeding mechanism, and the processing equipment is arranged on the equipment platform; the feeding mechanism is used to transport the pipe to be processed to the processing equipment, and the processing equipment is used to process the pipe to be processed according to the processing action control instruction;
[0009] A discharge mechanism is provided at the end of the equipment platform, and a second discharge push plate mechanism is provided on the discharge mechanism. The second discharge push plate mechanism is used to push the processed pipe to the stockpiling area.
[0010] According to a fully automatic integrated pipeline processing machine provided by the present invention, the pipeline processing process data is obtained by marking on an electronic drawing based on pipeline engineering design requirements and installation site design requirements, and the pipeline processing process data includes one or more of cutting processing data, hole opening processing data, grooving processing data and threading processing data.
[0011] According to a fully automatic integrated pipe processing machine provided by the present invention, the processing equipment includes a transmission operating slide block and one or more of a cutting mechanism, a hole opening mechanism, a groove pressing mechanism and a threading mechanism;
[0012] The transmission operating slider is used to hold the pipeline and rotate the pipeline, the cutting mechanism is used to cut the pipeline, the hole opening mechanism is used to open the pipeline, the groove pressing mechanism is used to groove the pipeline, and the threading mechanism is used to thread the pipeline.
[0013] Furthermore, the transmission operating slider includes a sleeve, a fixed rod, a chuck, a first hydraulic component and an operating component, wherein the sleeve is arranged on the fixed rod, the end of the sleeve is inserted into the chuck, the first hydraulic component is connected to the control device and the chuck, and the control device drives the hydraulic mechanical claw on the chuck to move through the first hydraulic component to hold the pipeline; the operating component is connected to the control device, and the control device is used to drive the chuck to rotate through the operating component to drive the pipeline to rotate.
[0014] Furthermore, the cutting structure includes a fixed support rod, a blade mounting plate, a second hydraulic component and a first control component; the blade mounting plate is arranged on the fixed support rod; a blade is arranged on one side surface of the blade mounting plate, and the second hydraulic component and the first control component are arranged on the other side surface of the blade mounting plate; the second hydraulic component is used to push the blade to move in the direction of the pipe to be cut, and the first control component is used to control the rotation of the blade to cut the pipe.
[0015] Furthermore, the hole opening mechanism includes a fixed chassis, a cutter head, a third hydraulic component and a second control component; a circular hole is opened at the center of the fixed chassis, a pipe tube is arranged in the circular hole, the cutter head is arranged along the circumference of the circular hole, and is connected to the third hydraulic component, the third hydraulic component is used to push the cutter head to move toward the pipe tube along the radial direction of the pipe tube, and the second control component is used to control the cutter head and the third hydraulic component to rotate around the circumference of the circular hole to open holes at different circumferential positions of the pipe.
[0016] Furthermore, the grooving mechanism includes a mounting rod, a pressure wheel mounting plate, a fourth hydraulic component and a knurled shaft, the mounting rod is arranged on both sides of the equipment platform in the width direction, the pressure wheel mounting plate is arranged on the mounting rod, the pressure wheel mounting plate is provided with a fourth hydraulic component, and a pressure wheel is provided at the end of the fourth hydraulic component; a knurled shaft is provided on the pressure wheel mounting plate below the pressure wheel, and the knurled shaft is used to carry the pipeline; the fourth hydraulic component is used to push the pressure wheel to move in the direction of the pipeline carried on the knurled shaft to perform grooving operations on the pipeline.
[0017] Furthermore, the threading mechanism includes a supporting slide rod, a toothed disc assembly and an electric push rod device; the supporting slide rod is arranged on both sides of the equipment platform in the width direction, the toothed disc assembly is arranged on the supporting slide rod, and the electric push rod device is connected to the control device, and the control device drives the toothed disc assembly to move through the electric push rod device to perform threading operations on the pipeline.
[0018] Furthermore, the chainring assembly includes a chainring mounting plate and a chainring, wherein the chainring mounting plate slides on the support slide rod to a preset position along the height direction of the support slide rod and is fixedly connected to the support slide rod; the chainring is arranged on the chainring mounting plate, and a die is arranged on the chainring; the electric push rod is used to push the die to move so as to perform threading operations on the pipe.
[0019] The present invention also provides a processing method of a fully automatic pipeline processing integrated machine, which comprises the following steps:
[0020] Based on the pipeline engineering design requirements and installation site design requirements, pipeline processing technology information data is marked on the electronic drawings, and processing action control instructions are generated based on the pipeline processing technology information data;
[0021] Prepare pipes of corresponding quantity, length and diameter, and control the pipe loader and feeding mechanism to transfer the pipes according to the processing action control instructions. The feeding mechanism is connected with a transmission operating slider that holds the pipes tightly;
[0022] Perform cutting, hole opening, groove pressing or threading operations on the pipe according to the processing action control instructions;
[0023] Among them, the opening mechanism is used to open the pipe, and the specific process is as follows:
[0024] When the hole-drilling mechanism receives a hole-drilling processing instruction, it automatically determines the hole-drilling position based on the hole-drilling processing data in the pipeline processing process information data, and automatically compares other hole-drilling position parameters in the hole-drilling processing data with the transmission operating slider clamping point to see if there is any overlap, thereby detecting whether the transmission operating slider clamping contact point corresponding to the hole-drilling position is located in the area where other hole-drilling points are located;
[0025] When it is detected that the transmission operating slider corresponding to the hole opening position is located in the area where other hole opening points are located, the hydraulic control device corresponding to the transmission operating slider at the point is closed to prevent the transmission operating slider corresponding to the point from advancing and holding the pipeline;
[0026] When it is detected that the transmission operating slider corresponding to the opening position is not located in the area where other opening points are located, the transmission operating slider is allowed to advance and hold the pipe.
[0027] The fully automatic pipeline processing integrated machine and processing method provided by the present invention input the measured pipeline processing process data into the fully automatic pipeline processing integrated machine, and the fully automatic pipeline processing integrated machine completes automatic loading, automatic processing and production according to the pipeline processing process data requirements, and automatic unloading. The entire processing process does not require manual labor and can achieve continuous processing and production. The present invention can greatly save labor and time for pipeline production and processing, and improve production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 It is a schematic diagram of the overall structure of the fully automatic pipeline processing integrated machine provided by the present invention;
[0030] Figure 2 It is a side view of a conveying component in the fully automatic pipeline processing integrated machine provided by the present invention;
[0031] Figure 3 It is a top view of the feeding mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0032] Figure 4It is a top view of the crawler plate and the rolling pulley in the feeding mechanism of the fully automatic pipeline processing integrated machine provided by the present invention;
[0033] Figure 5 It is a schematic diagram of the external structure of the transmission control slider in the fully automatic pipeline processing integrated machine provided by the present invention;
[0034] Figure 6 It is a schematic diagram of the internal structure of the transmission control slider in the fully automatic pipeline processing integrated machine provided by the present invention;
[0035] Figure 7 It is a structural schematic diagram of a sleeve and a chuck in the fully automatic pipeline processing integrated machine provided by the present invention;
[0036] Figure 8 It is a front view of the cutting mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0037] Fig. 9 It is a rear view of the cutting mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0038] Fig.10 It is a side view of the cutting mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0039] Fig.11 It is a structural schematic diagram of a hole-opening mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0040] Fig.12 It is a front view of the grooving mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0041] Fig.13 It is a side view of the grooving mechanism in the fully automatic integrated pipe processing machine provided by the present invention;
[0042] Fig.14 It is a structural schematic diagram of the threading mechanism in the fully automatic pipeline processing integrated machine provided by the present invention;
[0043] Fig.15 The present invention provides a flow chart of a processing method of the fully automatic pipeline processing integrated machine.
[0044] Reference numerals:
[0045] 1. Control device;
[0046] 2. Pipe loader; 21. First unloading push plate mechanism;
[0047] 3. Feeding mechanism;
[0048] 31. Conveying assembly; 311. Roller bracket; 312. Bearing; 313. Roller; 314. Roller; 315. Conveying crawler; 316. Crawler block; 317. Rolling pulley;
[0049] 32. Hydraulic lifting rod;
[0050] 33. Feed drive assembly; 331. Feed motor; 332. Transmission hinge;
[0051] 4. Processing equipment;
[0052] 40, platform slide bar; 400, sliding base; 4000, equipment platform;
[0053] 41. Transmission control slider; 411. Sleeve; 412. Fixing rod; 413. Chuck; 4131. Hydraulic mechanical claw; 414. First hydraulic assembly; 4141. Hydraulic pipe; 4142. First hydraulic cylinder; 4143. Hydraulic transmission pipe; 415. Control assembly; 4151. Control motor; 4152. Speed reducer;
[0054] 42, cutting mechanism; 421, fixed support rod; 422, blade mounting plate; 423, second hydraulic assembly; 4231, second hydraulic cylinder; 4232, hydraulic push slide rod; 424, first control assembly; 4241, first motor; 4242, transmission rod; 4243, first bevel gear; 4244, second bevel gear; 4245, third bevel gear; 4246, first spring; 4247, fourth bevel gear; 425, blade; 426, protective cover;
[0055] 43. hole opening mechanism; 431. fixed chassis; 432. cutter head; 433. third hydraulic assembly; 4331. third hydraulic cylinder; 4332. rotating slide bar; 434. second control assembly; 4341. second motor; 4342. slide bar bevel gear; 4343. zero degree bevel gear; 4344. fifth bevel gear; 4345. second spring; 435. pipe tube;
[0056] 44, groove pressing mechanism; 441, mounting rod; 4411, first electromagnetic mechanical locking pin; 442, pressing wheel mounting plate; 443, fourth hydraulic assembly; 4431, fourth hydraulic cylinder; 4432, hydraulic push slide rod; 444, knurled shaft; 445, pressing wheel;
[0057] 45. threading mechanism; 451. supporting slide bar; 4511. second electromagnetic mechanical locking pin; 452. tooth plate assembly; 4521. tooth plate mounting plate; 4522. tooth plate; 4523. die; 4524. water-blocking waste tilting platform; 453. electric push rod; 454. cooling water pipe; 455. sewage waste collection bucket; 456. dial;
[0058] 5. Unloading mechanism;
[0059] 6. LCD screen. DETAILED DESCRIPTION
[0060] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0061] When the fully automatic pipeline processing integrated machine and processing method provided by the present invention are used to process pipelines, after on-site drawing measurement, the measured information is input into the fully automatic pipeline processing integrated machine, and the fully automatic pipeline processing integrated machine completes automatic loading, automatic processing and production according to data requirements, and automatic unloading. The entire processing process does not require manual labor and can achieve continuous processing and production. The present invention can greatly save labor and time for pipeline production and processing, and improve production efficiency.
[0062] Combine the following Figure 1 to Figure 15 The invention describes a fully automatic pipeline processing integrated machine and a processing method thereof.
[0063] like Figure 1 As shown, the fully automatic integrated pipeline processing machine provided by the present invention includes a control device 1 and a pipeline loader 2, a feeding mechanism 3, a processing device 4 and a discharge mechanism 5 connected to the control device 1.
[0064] Among them, the control device 1 is used to control the actions of the pipe loader 2, the feeding mechanism 3, the processing equipment 4 and the unloading mechanism 5 according to the control timing, and is also used to generate processing action control instructions according to the received pipe processing process data, and control the processing equipment 4 to process the pipe to be processed according to the processing action control instructions.
[0065] The pipe loader 2 is arranged at one side of the feeding mechanism 3 , and a first unloading pushing plate mechanism 21 is arranged on the pipe loader 2 . The first unloading pushing plate mechanism 21 is used to push the pipe to be processed onto the feeding mechanism 3 .
[0066] The end of the feeding mechanism 3 is provided with a processing device 4, which is arranged on the device platform 4000. The feeding mechanism 3 is used to transport the pipe to be processed to the processing device 4, and the processing device 4 is used to process the pipe to be processed according to the processing action control instruction.
[0067] A discharge mechanism 5 is provided at the end of the equipment platform, and a second discharge push plate mechanism 51 is provided on the discharge mechanism 5. The second discharge push plate mechanism 51 is used to push the processed pipe to the stockpiling area.
[0068] In this embodiment, the pipeline processing technology data is obtained by marking on the electronic drawing based on the pipeline engineering design requirements and the installation site design requirements.
[0069] Specifically, the pipeline processing data includes one or more of cutting processing data, hole opening processing data, groove pressing processing data and threading processing data.
[0070] In the above embodiment, if Figure 1 As shown, the processing equipment 4 includes a transmission operating slider 41 and one or more of a cutting mechanism 42 , a hole opening mechanism 43 , a groove pressing mechanism 44 and a threading mechanism 45 .
[0071] The transmission operating slider 41 is used to hold the pipe and rotate it to facilitate subsequent processing. The cutting mechanism 42 is used to cut the pipe, the hole punching mechanism 43 is used to punch holes in the pipe, the groove pressing mechanism 44 is used to groove the pipe, and the threading mechanism 45 is used to thread the pipe.
[0072] In the above embodiment, the control device 1 includes a hydraulic control device and an electric control device. The fully automatic pipeline processing integrated machine provided by the present invention also includes a liquid crystal screen 6, which is connected to the control device 1. Through the liquid crystal screen 6, pipeline processing process data can be input, specifically, the specification, size, threading process, hole opening position and hole opening aperture of the pipeline.
[0073] In a specific embodiment, Figure 2 to Figure 4 As shown, the feeding mechanism 3 includes a conveying assembly 31, a hydraulic lifting rod 32 and a feeding drive assembly 33, wherein the conveying assembly 31 is arranged on the hydraulic lifting rod 32, and the hydraulic lifting rod 32 is used to support the conveying assembly 31 to ensure that the center of the pipe conveyed by the conveying assembly 31 is at the same height as the center of the sleeve in the transmission operating slider 41. The hydraulic lifting rod 32 is connected to a hydraulic control device, and the hydraulic control device can conveniently process pipes of different diameters by controlling and adjusting the height of the hydraulic lifting rod 32. The feeding drive assembly 33 is used to drive the conveying assembly 31 so that the conveying assembly 31 conveys the pipe.
[0074] Specifically, the conveying assembly 31 includes a roller bracket 311, a roller 313 is connected to the roller bracket 311 through a bearing 312, a roller 314 is arranged on the roller 313, and a conveying crawler 315 is arranged on the roller 314. The conveying crawler 315 is used to convey the pipe. In addition, a crawler plate 316 is arranged on the conveying crawler 315 along the width direction of the conveying crawler 315, and a rolling pulley 317 is arranged on the crawler plate 316. The rolling pulley 317 is used to assist the pipe on the conveying crawler 315 to rotate.
[0075] The feed drive assembly 33 includes a feed motor 331 and a transmission hinge 332, wherein the feed motor 331 is connected to an electric control device and the transmission hinge 332, the electric control device is used to control the action of the feed motor 331, and the feed motor 331 drives the roller 313 to move through the transmission hinge 332, thereby enabling the conveying track 315 to convey the pipeline.
[0076] In a specific embodiment, Figure 5 As shown, the transmission operating slider 41 is slidably arranged on the platform slider 40, and the platform slider 40 is arranged on the sliding base 400. The transmission operating slider 41 is connected to the electric control device, and the electric control device can control the transmission operating slider 41 to slide on the platform slider 40 and move along the pipeline transmission direction.
[0077] Among them, Figure 6 As shown, the transmission operating slider 41 includes a sleeve 411, a fixed rod 412, a chuck 413, a first hydraulic assembly 414 and an operating assembly 415, wherein the sleeve 411 is arranged on the fixed rod 412, the end of the sleeve 411 is inserted into the chuck 413, the first hydraulic assembly 414 is connected with the hydraulic control device and the chuck 413, and the hydraulic control device drives the hydraulic mechanical claw 4131 on the chuck 413 to move through the first hydraulic assembly 414 to hold the pipeline. The operating assembly 415 is connected with the electric control device, and the electric control device is used to drive the chuck 413 to rotate through the operating assembly 415 to drive the pipeline to rotate.
[0078] Specifically, in order to hold the pipe more firmly, a front chuck 413 may be provided at one end of the sleeve 411 , and a rear chuck 413 may be provided at the other end of the sleeve 411 .
[0079] like Figure 6 and Figure 7As shown, the first hydraulic assembly 414 includes a hydraulic pipe 4141, a first hydraulic cylinder 4142 and a hydraulic transmission pipe 4143. The hydraulic pipe 4141 is connected to the hydraulic control device, the hydraulic pipe 4141 is connected to the first hydraulic cylinder 4142, and the first hydraulic cylinder 4142 is connected to the hydraulic mechanical claw 4131 on the chuck 413 through the hydraulic transmission pipe 4143. When the hydraulic control device is started, the hydraulic oil enters the hydraulic cavity of the first hydraulic cylinder 4142 through the hydraulic pipe 4141, and controls the hydraulic mechanical claw 4131 on the chuck 413 to move through the hydraulic transmission pipe 4143, and the hydraulic mechanical claw 4131 holds the pipeline tightly through the sleeve 411.
[0080] The manipulation assembly 415 includes a manipulation motor 4151 and a reducer 4152, wherein the manipulation motor 4151 is connected to the electric control device and the reducer 4152. When the pipeline needs to rotate, the electric control device controls the manipulation motor 4151 to move, and the manipulation motor 4151 drives the chuck 413 to rotate through the reducer 4152 to realize the rotation of the pipeline.
[0081] In a specific embodiment, Figure 8 and Fig. 9 As shown, the cutting mechanism 42 includes a fixed support rod 421, a blade mounting plate 422, a second hydraulic assembly 423 and a first control assembly 424. The fixed support rod 421 is provided with a blade mounting plate 422, and the blade mounting plate 422 can slide on the fixed support rod 421 along the height direction of the fixed support rod 421. A blade 425 is provided on one side of the blade mounting plate 422, and a second hydraulic assembly 423 and a first control assembly 424 are provided on the other side of the blade mounting plate 422. The second hydraulic assembly 423 is used to push the blade 425 to move in the direction of the pipe to be cut, and the first control assembly 424 is used to control the rotation of the blade 425 to cut the pipe.
[0082] Among them, Fig. 9 As shown, the second hydraulic assembly 423 includes a second hydraulic cylinder 4231 and a hydraulic push slide bar 4432, the second hydraulic cylinder 4231 is connected to the hydraulic push slide bar 4432, and the hydraulic push slide bar 4432 is connected to the blade 425 through the connecting rod 4233. The second hydraulic cylinder 4231 pushes the blade 425 to move toward the pipe to be cut through the hydraulic push slide bar 4432.
[0083] like Fig. 9 and Fig.10As shown, the first control assembly 424 includes a first motor 4241 and a transmission rod 4242. The output shaft of the first motor 4241 is connected to a first bevel gear 4243, one end of the transmission rod 4242 is provided with a second bevel gear 4244, a third bevel gear 4245 is slidably provided on the transmission rod 4242, a first spring 4246 is connected between the bottom of the third bevel gear 4245 and the other end of the transmission rod 4242, and a fourth bevel gear 4247 is provided at one end of the connecting rod 4233 connected to the blade 425. The first bevel gear 4243 is meshed with the second bevel gear 4244, and the first spring 4246 is used to pull the third bevel gear 4245 so that the third bevel gear 4245 is meshed with the fourth bevel gear 4247. The first motor 4241 drives the blade 425 to rotate through the first bevel gear 4243 , the second bevel gear 4244 , the transmission rod 4242 , the third bevel gear 4245 and the fourth bevel gear 4247 , so that the blade 425 can cut the pipe.
[0084] In addition, if Figure 8 As shown, in order to prevent debris or sparks from flying during the cutting process, a protective cover 426 is also provided on the blade 425.
[0085] In a specific embodiment, Fig.11 As shown, the hole-opening mechanism 43 includes a fixed chassis 431, a cutter head 432, a third hydraulic assembly 433 and a second control assembly 434. A circular hole is opened at the center of the fixed chassis 431, a pipe tube 435 is arranged in the circular hole, and the pipe to be opened passes through the pipe tube 435. The cutter head 432 is arranged along the circumference of the circular hole and connected to the third hydraulic assembly 433. The third hydraulic assembly 433 is used to push the cutter head 432 to move along the radial direction of the pipe tube 435 toward the pipe to be opened in the pipe tube 435. The second control assembly 434 is used to control the cutter head 432 and the third hydraulic assembly 433 to rotate around the circumference of the circular hole to open holes at different positions of the circumference of the pipe.
[0086] Among them, the third hydraulic component 433 includes a third hydraulic cylinder 4331 and a rotating slide rod 4332. The third hydraulic cylinder 4331 is connected to one end of the rotating slide rod 4332, and the other end of the rotating slide rod 4332 is connected to the cutter head 432. The third hydraulic cylinder 4331 pushes the cutter head 432 toward the direction of the pipe to be opened through the rotating slide rod 4332 to perform the opening operation on the pipe.
[0087] The second control assembly 434 includes a second motor 4341, a sliding rod bevel gear 4342 and a zero-degree bevel gear 4343. The output shaft of the second motor 4341 is connected to the fifth bevel gear 4344, the sliding rod bevel gear 4342 is slidably arranged on the rotating sliding rod 4332, and a second spring 4345 is arranged between the bottom of the sliding rod bevel gear 4342 and one end of the rotating sliding rod 4332 connected to the cutter head 432. The fifth bevel gear 4344 is meshed with the zero-degree bevel gear 4343, and the second spring 4345 is used to pull the sliding rod bevel gear 4342 so that the sliding rod bevel gear 4342 is meshed with the zero-degree bevel gear 4343. The second motor 4341 drives the zero-degree bevel gear 4343 to rotate through the fifth bevel gear 4344, and the zero-degree bevel gear 4343 drives the cutter head 432 and the third hydraulic assembly 433 to rotate through the sliding rod bevel gear 4342, so that the cutter head 432 can open holes at different positions around the pipeline.
[0088] In this embodiment, a plurality of cutter heads 432 may be provided, and the plurality of cutter heads 432 are evenly arranged along the circumference of the circular hole. Specifically, six cutter heads 432 may be provided, and each cutter head 432 is connected to a set of third hydraulic components 433 .
[0089] In a specific embodiment, Fig.12 and Fig.13 As shown, the groove pressing mechanism 44 includes a mounting rod 441, a pressure roller mounting plate 442, a fourth hydraulic assembly 443 and a knurled shaft 444. The mounting rod 441 is arranged on both sides of the equipment platform in the width direction, the pressure roller mounting plate 442 is arranged on the mounting rod 441, the pressure roller mounting plate 442 is arranged with a fourth hydraulic assembly 443, and a pressure roller 445 is arranged at the end of the fourth hydraulic assembly 443. A knurled shaft 444 is arranged on the pressure roller mounting plate 442 below the pressure roller 445. The pipeline can be sleeved on the knurled shaft 444, and the knurled shaft 444 is used to carry the pipeline. The fourth hydraulic assembly 443 is used to push the pressure roller 445 to move in the direction of the pipeline carried on the knurled shaft 444, so as to perform a groove pressing operation on the pipeline. Under the pressure of the pressure roller 445, the pipeline and the knurled shaft 444 can rotate relative to the pressure roller mounting plate 442.
[0090] Specifically, the fourth hydraulic assembly 443 includes a fourth hydraulic cylinder 4431 and a hydraulic push slide 4432 , wherein the fourth hydraulic cylinder 4431 is connected to the hydraulic push slide 4432 , and a pressure wheel 445 is provided at the opposite end of the hydraulic push slide 4432 connected to the fourth hydraulic cylinder 4431 .
[0091] After the pressure wheel mounting plate 442 slides on the mounting rod 441 to a preset position, it can be fixed to the mounting rod 441 through the first electromagnetic mechanical locking pin 4411 .
[0092] In addition, a grooving mechanism 44 capable of grooving pipes of different diameters may be provided on the mounting rod 441 .
[0093] In a specific embodiment, Fig.14 As shown, the threading mechanism 45 includes a support slide 451, a toothed disc assembly 452 and an electric push rod 453. The support slide 451 is arranged on both sides of the equipment platform in the width direction, the toothed disc assembly 452 is arranged on the support slide 451, and the electric push rod 453 is connected to the electric control device, which drives the toothed disc assembly 452 to operate through the electric push rod 453 to perform threading operations on the pipeline.
[0094] It should be noted that two chainring assemblies 452 can be set on the support slide bar 451 along the height direction of the support slide bar 451, and the pipe to be processed can pass between the two chainring assemblies 452 to facilitate the chainring assembly 452 to thread the pipe.
[0095] Specifically, the tooth plate assembly 452 includes a tooth plate mounting plate 4521 and a tooth plate 4522, wherein the tooth plate mounting plate 4521 can slide on the support slide bar 451 along the height direction of the support slide bar 451, and after the tooth plate mounting plate 4521 slides to a preset position on the support slide bar 451, it can be fixed to the support slide bar 451 through a second electromagnetic mechanical locking pin 4511. The tooth plate 4522 is arranged on the tooth plate mounting plate 4521, and a die 4523 is arranged on the tooth plate 4522. The electric push rod device 453 is used to push the die 4523 to move, so that the die 4523 moves to the preset opening position on the pipeline, so as to perform threading operation on the pipeline.
[0096] In addition, the threading mechanism 45 also includes a cooling water pipe 454 and a sewage waste collection bucket 455, wherein the cooling water sprayed from the cooling water pipe 454 is used to reduce the temperature of the die 4523 during the threading process. A water-retaining waste tilting platform 4524 is provided on the toothed plate mounting plate 4521 below the toothed plate 4522, and a sewage waste collection bucket 455 is provided below the water-retaining waste tilting platform 4524. The water-retaining waste tilting platform 4524 is used to divert the waste water and waste generated during the threading operation to the sewage waste collection bucket 455.
[0097] In this embodiment, a dial 456 is further provided on the outer side of the tooth plate 4522, and the dial 456 is used to display the processing feed amount of the die 4523, the movement amount of the die 4523, the rotation angle of the die 4523, etc.
[0098] In other embodiments, Fig.15 As shown, the present invention also provides a processing method of a fully automatic pipeline processing integrated machine, which comprises the following steps:
[0099] S100, based on the pipeline engineering design requirements and the installation site design requirements, marking the pipeline processing technology information data on the electronic drawing, and generating a processing action control instruction based on the pipeline processing technology information data;
[0100] The pipeline processing technology information data can reflect the pipeline structure. Specifically, the pipeline processing technology information data includes one or more of cutting processing data, hole punching processing data, groove pressing processing data and threading processing data.
[0101] S200, prepare pipes of corresponding quantity, length and caliber, and control the pipe loader 2 and the feeding mechanism 3 to execute the transmission of the pipes according to the processing action control instruction. The feeding mechanism 3 is connected with a transmission operating slider 41; wherein the transmission operating slider 41 is used to hold the pipe and hold the pipe to rotate.
[0102] S300, performing cutting, hole opening, groove pressing or threading operations on the pipeline according to the processing action control instructions;
[0103] The opening mechanism 43 is used to open a hole in the pipeline, and the specific process is as follows:
[0104] When the hole-drilling mechanism 43 receives the hole-drilling processing instruction, it automatically determines the hole-drilling position based on the hole-drilling processing data in the pipeline processing process information data, and automatically compares other hole-drilling position parameters in the hole-drilling processing data with the clamping point of the transmission operating slider 41 to see if there is any overlap, thereby detecting whether the clamping contact point of the transmission operating slider 41 corresponding to the hole-drilling position is located in the area where other hole-drilling points are located;
[0105] When it is detected that the transmission operating slider 41 corresponding to the hole opening position is located in the area where other hole opening positions are located, the hydraulic control device corresponding to the transmission operating slider 41 at the point is closed to prevent the transmission operating slider 41 corresponding to the point from advancing and holding the pipe tightly;
[0106] When it is detected that the gripping contact point of the transmission operating slider 41 corresponding to the hole opening position is not located in the area where other hole opening points are located, the transmission operating slider 41 is allowed to advance and grip the pipe.
[0107] In the above step S300, the clamping action tolerance opening size data corresponding to the transmission operating slider 41 and the feeding mechanism 3 are added to the pipeline processing process information data. When it is detected that the clamping contact point of the transmission operating slider 41 corresponding to the opening position is not located in the area where other opening points are located, but the distance between the two is less than the clamping action tolerance opening size data, the hydraulic control device corresponding to the transmission operating slider 41 at this point is still closed to prevent the transmission operating slider 41 corresponding to this point from advancing and clamping the pipeline.
[0108] When it is detected that the clamping contact point of the transmission operating slider 41 corresponding to the opening position is not located in the area where other opening points are located, but the distance between the two is smaller than the opening size data of the clamping action tolerance, the hydraulic control device corresponding to the transmission operating slider 41 at this point is still closed to prevent the transmission operating slider 41 corresponding to this point from advancing and only allow other transmission operating sliders 41 to clamp the pipe.
[0109] When the fully automatic pipeline processing integrated machine provided by the present invention is used to process the pipeline, the processing method includes threading both ends of the pipeline, grooving both ends of the pipeline, grooving one end of the pipeline and threading the other end of the pipeline, threading one end of the pipeline, grooving one end of the pipeline, only cutting the pipeline and only opening a hole in the pipeline.
[0110] The following specifically describes the process of threading the two ends of a pipe using the fully automatic pipe processing integrated machine provided by the present invention. The process is as follows:
[0111] S1. Obtain pipeline processing data;
[0112] Specifically, the specification, size, threading process, hole position and hole diameter of the required pipe are obtained through the LCD screen. If there is no data on the hole position and hole diameter, it means that the pipe section does not need to be drilled.
[0113] S2, preparatory work before processing, including loading, moving the transmission operating slider 41 and fixing the toothed disc assembly 452 in the threading mechanism 45;
[0114] Specifically, the control device 1 controls the pipe loader 2 to start loading, and the pipe loader 2 pushes the pipe to the feeding mechanism 3; the electric control device controls the transmission operating slider 41 to slide along the platform slide bar to the end where the feeding mechanism 3 is connected to the equipment platform; at the same time, the toothed disc assembly 452 in the threading mechanism 45 is moved down or up along the supporting slide bar 451 to the equipment platform, and the toothed disc assembly 452 is fixed to the support slide bar 451 with an electromagnetic mechanical locking pin.
[0115] S3, perform a hole opening operation on one end of the pipeline in the advancing direction;
[0116] Specifically, if it is necessary to make a hole at the entrance of the pipeline (i.e., the distance between the hole opening position and the entrance of the pipeline is less than the length of the platform slide bar), after the feeding mechanism 3 transfers the pipeline to the pipeline hole opening position, the hydraulic control device drives the hydraulic mechanical claw 4131 on the chuck 413 to hold the pipeline tightly through the first hydraulic component 414; at the same time, the control device 1 controls the hole opening mechanism 43 to perform the hole opening operation. If it is not necessary to make a hole in the pipeline, this step is directly skipped. It should be noted that the pipeline entrance here is one end of the pipeline propulsion direction.
[0117] S4. Perform threading operation on one end of the pipeline in the advancing direction, including:
[0118] S41, the electric control device controls the feeding mechanism 3 to transfer the pipe to the threading mechanism 45 close to the unloading mechanism 5, and the control device 1 controls the transmission operating slider 41 to move to hold the pipe tightly.
[0119] S42, the control device 1 controls the transmission operating slider 41 to drive the pipe to rotate and slowly push it toward the toothed disc assembly 452 in the threading mechanism 45, and the electric control device drives the toothed disc assembly 452 to move through the electric push rod 453 to perform threading operation on the pipe.
[0120] S43, after the threading operation is completed, the control device 1 controls the transmission operating slider 41 to stop rotating, and the threading mechanism 45 close to the unloading mechanism 5 returns to its original position.
[0121] S44, the control device 1 controls the transmission operating slider 41 to drive the pipeline to move toward the unloading mechanism 5, so that one end of the pipeline falls on the conveying crawler 315 of the unloading mechanism 5, and the chuck 413 in the transmission operating slider 41 is released from the action state and returns to the original position.
[0122] S5. Perform hole opening operation on the opposite end of the pipeline advancement direction;
[0123] The electric control device controls the feeding mechanism 3 to convey the pipe to the place where a hole needs to be opened in the pipe, the transmission operating slider 41 moves to hold the pipe tightly, and the hole opening mechanism 43 moves at the same time to perform the hole opening operation; after the hole opening is completed, the chuck 413 in the transmission operating slider 41 is released from the action state and restored to its original position, and the feeding mechanism 3 moves to convey the pipe to the place where a hole needs to be opened in the pipe; if there is no need to open a hole in the pipe, this step is skipped directly.
[0124] S6. Cutting the pipeline;
[0125] Specifically, the electric control device controls the feeding mechanism 3 to transfer the pipe to the place where the pipe needs to be cut (the pipe outlet), the transmission operating slider 41 holds the pipe tightly, and the cutting mechanism 42 is activated to perform the cutting operation.
[0126] S7, threading one end of the pipeline in the advancing direction;
[0127] After the cutting is completed, the transmission operating slider 41 holds the pipe tightly and moves toward the unloading mechanism 5, so that the end of the pipe close to the feed and discharge mechanism reaches the threading mechanism 45 close to the feed and discharge mechanism; at this time, the toothed disc assembly 452 in the threading mechanism 45 moves down or up to the equipment platform, and the transmission operating slider 41 rotates and slowly moves in the direction close to the feed and discharge mechanism, and the threading mechanism 45 close to the feed and discharge mechanism performs the threading operation.
[0128] S8. Unloading the processed pipe, specifically including:
[0129] S81. After the threading operation is completed, the transmission operating slider 41 carries the pipe and moves to the end of the platform slide bar in the direction close to the unloading mechanism 5. The chuck 413 in the transmission operating slider 41 is released from the action state and returns to its original position. At the same time, the unloading mechanism 5 is activated and the conveying crawler 315 rotates.
[0130] S82, after the pipeline reaches the designated position via the conveying crawler 315, the second unloading push plate mechanism on the unloading mechanism 5 is actuated to push the pipeline off the working platform.
[0131] After the pipe cutting is completed in step S6, if the remaining pipe meets the length requirement of the subsequent pipe processing, it will continue to be used; if it does not meet the requirement, it goes to step S8, and the second unloading push plate mechanism on the unloading mechanism 5 pushes the pipe off the work platform.
[0132] When the fully automatic pipeline processing integrated machine provided by the present invention is used to perform grooving operations on both ends of the pipeline, it is only necessary to replace the threading mechanism 45 in steps S2, S4 and S7 with the grooving mechanism 44.
[0133] When the fully automatic pipeline processing integrated machine provided by the present invention is used to perform grooving operation on one end of the pipeline and threading operation on the other end of the pipeline, it is only necessary to replace the threading mechanism 45 in step S4 with the grooving mechanism 44.
[0134] When the fully automatic pipeline processing integrated machine provided by the present invention is used to perform single-end threading operation on the pipeline, all the above steps except step S7 are performed.
[0135] When the fully automatic pipeline processing integrated machine provided by the present invention is used to perform a single-end grooving operation on a pipeline, the step of performing a single-end threading operation on the pipeline is performed, and the threading mechanism 45 is replaced with a grooving mechanism 44 .
[0136] When the fully automatic pipeline processing integrated machine provided by the present invention is used to perform a pipeline cutting operation, steps S1, S2, S6 and S8 are performed.
[0137] When the fully automatic pipeline processing integrated machine provided by the present invention is used to perform a hole-opening operation on a pipeline, steps S1, S2, S3, S5, S6 and S8 are performed.
[0138] By implementing the present invention, it is possible to mark pipeline processing data on electronic drawings based on pipeline engineering design requirements and installation site design requirements, and complete the entire processing flow at one time by driving processing action control instructions. Moreover, it is also possible to avoid the problem of potential engineering defects due to the mutual influence of processing conditions, and completely solve the problems of time-consuming and labor-intensive, high requirements on workers' work experience and work skills, and insufficient processing accuracy in non-intelligent traditional processing methods.
[0139] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0140] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0141] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A fully automatic pipeline processing machine, characterized in that: It includes a control device and a pipeline feeder, a feeding mechanism, a processing device and a discharge mechanism connected to the control device; The control device is used to control the actions of the pipe feeder, the feeding mechanism, the processing equipment and the unloading mechanism according to the control sequence, and is also used to generate a processing action control instruction according to the received pipe processing process data, and control the processing equipment to process the pipe to be processed according to the processing action control instruction; The pipe loader is arranged on one side of the feeding mechanism, and a first unloading push plate mechanism is arranged on the pipe loader, and the first unloading push plate mechanism is used to push the pipe to be processed onto the feeding mechanism; The processing equipment is arranged at the end of the feeding mechanism, and the processing equipment is arranged on the equipment platform; the feeding mechanism is used to transport the pipe to be processed to the processing equipment, and the processing equipment is used to process the pipe to be processed according to the processing action control instruction; A discharge mechanism is provided at the end of the equipment platform, and a second discharge push plate mechanism is provided on the discharge mechanism. The second discharge push plate mechanism is used to push the processed pipe to the stockpiling area.
2. The fully automatic pipeline processing integrated machine according to claim 1, characterized in that: The pipeline processing data is obtained by marking on the electronic drawing based on the pipeline engineering design requirements and the installation site design requirements, and the pipeline processing data includes one or more of cutting processing data, hole opening processing data, groove pressing processing data and threading processing data.
3. The fully automatic pipeline processing integrated machine according to claim 1, characterized in that: The processing equipment includes a transmission operating slide block and one or more of a cutting mechanism, a hole opening mechanism, a groove pressing mechanism and a threading mechanism; The transmission operating slider is used to hold the pipeline and rotate the pipeline, the cutting mechanism is used to cut the pipeline, the hole opening mechanism is used to open the pipeline, the groove pressing mechanism is used to groove the pipeline, and the threading mechanism is used to thread the pipeline.
4. The fully automatic pipeline processing integrated machine according to claim 3 is characterized in that: The transmission operating slider includes a sleeve, a fixed rod, a chuck, a first hydraulic component and an operating component, wherein the sleeve is arranged on the fixed rod, the end of the sleeve is inserted into the chuck, the first hydraulic component is connected to the control device and the chuck, and the control device drives the hydraulic mechanical claw on the chuck to move through the first hydraulic component to hold the pipeline; the operating component is connected to the control device, and the control device is used to drive the chuck to rotate through the operating component to drive the pipeline to rotate.
5. The fully automatic pipeline processing integrated machine according to claim 3, characterized in that: The cutting structure includes a fixed support rod, a blade mounting plate, a second hydraulic component and a first control component; the blade mounting plate is arranged on the fixed support rod; a blade is arranged on one side surface of the blade mounting plate, and the second hydraulic component and the first control component are arranged on the other side surface of the blade mounting plate; the second hydraulic component is used to push the blade to move in the direction of the pipe to be cut, and the first control component is used to control the rotation of the blade to cut the pipe.
6. The fully automatic pipeline processing integrated machine according to claim 3, characterized in that: The hole-opening mechanism includes a fixed chassis, a cutter head, a third hydraulic component and a second control component; a circular hole is opened at the center of the fixed chassis, a pipe tube is arranged in the circular hole, the cutter head is arranged along the circumference of the circular hole and is connected to the third hydraulic component, the third hydraulic component is used to push the cutter head to move toward the pipe tube along the radial direction of the pipe tube, and the second control component is used to control the cutter head and the third hydraulic component to rotate around the circumference of the circular hole to open holes at different positions around the circumference of the pipe.
7. The fully automatic pipeline processing integrated machine according to claim 3, characterized in that: The grooving mechanism includes a mounting rod, a pressure wheel mounting plate, a fourth hydraulic component and a knurled shaft, the mounting rod is arranged on both sides of the equipment platform in the width direction, the pressure wheel mounting plate is arranged on the mounting rod, the pressure wheel mounting plate is provided with a fourth hydraulic component, and a pressure wheel is provided at the end of the fourth hydraulic component; a knurled shaft is provided on the pressure wheel mounting plate below the pressure wheel, and the knurled shaft is used to carry the pipeline; the fourth hydraulic component is used to push the pressure wheel to move in the direction of the pipeline carried on the knurled shaft to perform grooving operations on the pipeline.
8. The fully automatic pipeline processing integrated machine according to claim 3, characterized in that: The threading mechanism includes a supporting slide rod, a toothed disc assembly and an electric push rod device; the supporting slide rod is arranged on both sides of the equipment platform in the width direction, the toothed disc assembly is arranged on the supporting slide rod, and the electric push rod device is connected to the control device, and the control device drives the toothed disc assembly to move through the electric push rod device to perform threading operations on the pipeline.
9. The fully automatic integrated pipe processing machine according to claim 8, characterized in that: The chainring assembly includes a chainring mounting plate and a chainring, wherein the chainring mounting plate slides on the support slide to a preset position along the height direction of the support slide and is fixedly connected to the support slide; the chainring is arranged on the chainring mounting plate, and a die is arranged on the chainring; the electric push rod is used to push the die to move so as to perform threading operations on the pipe.
10. A processing method based on the fully automatic pipeline processing integrated machine according to any one of claims 1 to 9, characterized in that: The following steps are involved: Based on the pipeline engineering design requirements and installation site design requirements, pipeline processing technology information data is marked on the electronic drawings, and processing action control instructions are generated based on the pipeline processing technology information data; Prepare pipes of corresponding quantity, length and diameter, and control the pipe loader and feeding mechanism to transfer the pipes according to the processing action control instructions. The feeding mechanism is connected with a transmission operating slider that holds the pipes tightly; Perform cutting, hole opening, groove pressing or threading operations on the pipe according to the processing action control instructions; Among them, the opening mechanism is used to open the pipe, and the specific process is as follows: When the hole-drilling mechanism receives a hole-drilling processing instruction, it automatically determines the hole-drilling position based on the hole-drilling processing data in the pipeline processing process information data, and automatically compares other hole-drilling position parameters in the hole-drilling processing data with the transmission operating slider clamping point to see if there is any overlap, thereby detecting whether the transmission operating slider clamping contact point corresponding to the hole-drilling position is located in the area where other hole-drilling points are located; When it is detected that the transmission operating slider corresponding to the hole opening position is located in the area where other hole opening points are located, the hydraulic control device corresponding to the transmission operating slider at the point is closed to prevent the transmission operating slider corresponding to the point from advancing and holding the pipeline; When it is detected that the transmission operating slider corresponding to the opening position is not located in the area where other opening points are located, the transmission operating slider is allowed to advance and hold the pipe.