A steel mold for making long sleepers and a production process for long sleepers
By using integrated long molds and partitions for positioning and cutting technical means in the production of sleepers, the problem of inefficient sleepers in traditional methods is solved, and a more efficient production process and cost savings are achieved.
Patent Information
- Application Number
- CN202410999291.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2044-07-24
AI Technical Summary
During the production of sleepers, sleepers are made separately through several molding boxes, which has low working efficiency and complex process. Each molding box needs to place a steel cage and perform maintenance and mold release operations. There is a production efficiency of sleepers. Low defects.
Two sets of clamps and molds arranged parallel to each other are adopted. The mold is arranged in one piece, including multiple forming parts and partitions. The partitions are used for positioning and cutting. Through the integrated long mold setting, multiple placement operations of the steel cage are reduced, and subsequently Cut the concrete blocks and steel bars of the sleepers in the middle to complete the production of multiple sleepers.
It greatly improves the work efficiency of sleeper production, saves costs, simplifies the operation process, and reduces material waste.
Smart Images

Figure CN118906216B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of long rail sleeper production, and in particular to a steel mold for manufacturing long rail sleepers and a production process for long rail sleepers. Background Art
[0002] At present, the structure of concrete sleepers is divided into two categories, one is the integral sleeper and the other is the double-block sleeper. The double-block sleeper is more stable than the integral sleeper and consumes less concrete material, which has better economic benefits and is often used in high-speed lines.
[0003] In the related art, a Chinese patent with a patent publication number of CN111791338A proposes a steel mold for manufacturing steel tube double-block sleepers and a production process for steel tube double-block sleepers, which belongs to the technical field of railway track manufacturing. Its technical points are: the steel mold for manufacturing steel tube double-block sleepers includes two sets of parallel mounting frames and a plurality of forming boxes arranged between the two sets of mounting frames, the plurality of forming boxes are arranged at intervals along the length direction of the mounting frames, and two adjacent forming boxes constitute a group of steel molds for manufacturing steel tube double-block sleepers, and steel tube slots are provided on the opposite sides of the two forming boxes in the steel mold, and positioning columns for pre-installing the sleeves are vertically arranged on the bottom surface of the forming box. Through the above scheme, after pouring concrete into the forming box, the sleeves, steel cage skeletons and sleeves can be buried in the sleeper blocks at the same time as the steel tube double-block sleepers are formed. The overall operation process is simple and fast, and it is easy to industrialize production.
[0004] With respect to the above-mentioned related technologies, the inventors believe that the following defects exist: in the process of producing sleepers, sleepers are made separately through several forming boxes, and the work efficiency is low. Moreover, the whole process is relatively cumbersome and complicated. It is necessary to place a steel cage in each forming box and then perform maintenance and demoulding operations separately, resulting in the defect of low sleeper production efficiency. Summary of the invention
[0005] In order to improve the problem that sleepers are made from several molding boxes separately, the work efficiency is low and the whole process is cumbersome and complicated, the present application provides a steel mold for making long sleepers and a production process for long sleepers.
[0006] The present application provides a steel mold for manufacturing long sleepers using the following technical solution:
[0007] A steel mold for making long sleepers and a production process for long sleepers, comprising two groups of clamps arranged parallel to each other and two groups of molds arranged in the space enclosed by the two groups of clamps, the mold is arranged as an integral whole, the mold and the clamps are both provided with operating holes for operating a steel cage, the mold comprises a plurality of forming parts and a partition, the partition is located between two adjacent forming parts, and the partition is a position for positioning cutting.
[0008] The present application also provides a production process for long sleepers using the following technical solution:
[0009] A production process for long sleepers comprises the following steps:
[0010] S1. Mould preparation: clean the mould in the previous process and spray the release agent on the inner wall of the steel mould to facilitate subsequent demoulding;
[0011] S2. Install embedded parts and steel cage: install embedded parts, and put prestressed steel wire group, stirrups and spiral reinforcement into the mold;
[0012] S3. Pouring concrete: Pouring the prepared concrete into the mold and vibrating it to make the concrete in the mold dense; removing the concrete attached to the outside of the mold;
[0013] S4, steam curing: steam curing the concrete in the mold to obtain a hardened and formed sleeper block;
[0014] S5, release tension and demoulding: after releasing the tension, demould the finished sleeper in the mold and transport it to the next process;
[0015] S6, cutting: positioning and cutting the one-piece formed sleeper block finished product by a wire cutting device to obtain a plurality of sleeper blocks;
[0016] S7, Inspection: Test the strength of the sleeper blocks and put them into storage accordingly;
[0017] The cutting device includes a frame, a wire cutting mechanism, a conveying mechanism and a guide rail mechanism; the wire cutting mechanism includes a cutting assembly, a driving assembly for moving the cutting assembly along the guide rail mechanism and a recycling assembly for recycling waste materials; the recycling assembly includes a recycling box, a screening part for screening steel waste materials and a stirring part for stirring materials in the recycling box; the screening part includes a screening box fixed to the side wall of the recycling box, a screening frame slidingly arranged on any side wall of the recycling box, a reciprocating part for controlling the reciprocating motion of the screening frame, a rotating frame rotatably connected to the screening frame, a rotating motor for controlling the rotation of the rotating frame and an electromagnetic part fixedly connected to the rotating frame, and the corresponding side wall of the recycling box is provided with a screening port for sliding adaptation of the screening frame, and the recycling assembly is also provided with a cleaning part for cleaning the electromagnetic iron parts.
[0018] Optionally, the stirring part includes a stirring cloth arranged in the recovery box, a traction group for pulling the stirring cloth, and a beating group for beating the stirring cloth. When the electromagnetic component rotates to the bottom end, it becomes a separation position of the stirring cloth, and the beating group beats the stirring cloth on both sides of the electromagnetic component.
[0019] Optionally, the beating group includes a beating frame slidably arranged on the recycling box, a beating rod slidably arranged on the beating frame, and two beating blocks fixedly connected to both ends of the beating rod respectively, the beating block is provided with a beating groove, the stirring cloth is located in the beating groove, the movement direction of the beating frame is perpendicular to the movement direction of the beating rod, and the two beating grooves abut against the same side of the stirring cloth.
[0020] Optionally, the cleaning part includes two slide rails, a slide rod that slides between the two slide rails, a cleaning ring fixed on the slide rod, and a cleaning rod. The two slide rails are fixed on the rotating frame and are respectively connected to positive and negative power supplies. The slide rod is used for the two slide rails to conduct electricity. The cleaning rod is elastically arranged at the end of the rotating frame. The cleaning rod extends out of the rotating frame in an initial state.
[0021] Optionally, the transmission mechanism includes a plurality of transmission rollers rotatably arranged on the frame, an adjustment component for realizing synchronous rotation of the transmission rollers, and a detection component for determining whether the transmission rollers and the sleeper blocks are tightly fitted together. The adjustment component includes a plurality of adjustment gears, an adjustment chain, and an adjustment motor. The plurality of adjustment gears are coaxially fixed to the plurality of transmission rollers, respectively. The plurality of adjustment gears are meshed with the adjustment chain. The adjustment motor is fixed to the frame and is used to control the rotation of the adjustment gears located at the end.
[0022] Optionally, the detection component includes a traction rope, two traction rollers, two traction motors, a tension sensor, an identification part for controlling whether overhaul is required, and a cleaning part for cleaning the traction rollers. The traction rope corresponds to each of the transmission rollers, one end of the traction rope is fixedly connected to the peripheral wall of the traction roller, the other end of the traction rope is connected to the identification part, the other traction motor also controls the operation of the identification part, and the traction rope is arranged in two sections and connected through the tension sensor.
[0023] Optionally, the cleaning part includes a cleaning cloth, one end of the cleaning cloth is fixedly connected to one end of the traction rope, and the other end of the cleaning cloth is fixedly connected to the peripheral wall of another traction roller.
[0024] Optionally, the identification part includes an identification rod, an identification slot arranged on the transmission frame, a proximity switch, a display light, a light source, a color sensor and a color filter, the identification rod is placed on the upper surface of the cleaning cloth, and one end of the identification rod slides in the identification slot, the proximity switch is installed at the top of the identification slot, the display light is electrically connected to the proximity switch, the light source is installed on the frame, the proximity switch is also electrically connected to the display light, the color sensor is installed on the frame and can only identify the true color of the light source, the color of the light after the light source passes through the color filter is different from the true color of the light source, and the color filter slides on the frame.
[0025] Optionally, the recycling box is lifted and provided with a brush, an electromagnet electrically connected to the proximity switch is installed on the top of the identification slot, the identification rod is provided with a plurality of through holes, and identification columns are slidably provided in the plurality of through holes of the identification rod, and one end of the identification rod extending out of the identification slot is connected to a pressure member for pressurizing the identification rod.
[0026] In summary, the present application includes at least one of the following beneficial technical effects:
[0027] 1. The cross section of the partition in this embodiment can be set to a triangle or a trapezoid, and of course it can also be set to other shapes. Its main purpose is to locate the cutting position so as to facilitate accurate positioning in the subsequent cutting process. Compared with the transmission mold, each sleeper is a separate space enclosed, and the steel bar binding and prestressing treatment of each sleeper need to be operated separately, which has the defect of wasting materials and reducing work efficiency. The one-piece long mold setting in this application first saves the operation of placing the steel cage multiple times, saves costs, and can also cut the sleeper concrete blocks and steel bars in the subsequent production, so as to complete the production of multiple sleepers, greatly improving work efficiency;
[0028] 2. It is necessary to screen the metal particles in the waste in the recycling box. At this time, the screening frame is extended from the screening box to the recycling box. When the rotating motor controls the screening frame to rotate to the lowest point, the electromagnetic component is located in the waste in the recycling box. When the electromagnetic component is energized, it adsorbs the steel bar metal particles in the waste, and then the concrete waste and metal waste in the waste can be screened; when the two winding motors start to wind the stirring cloth, the two ends of the stirring cloth begin to move upward gradually, and the stirring cloth is divided into two parts by the electromagnetic component, and the stirring cloths on both sides of the electromagnetic component gradually approach the electromagnetic component, and the stirring cloth covers the waste toward the electromagnetic component, which is convenient for the electromagnetic component to adsorb the metal waste in the waste. In order to further improve the adsorption effect of metal waste, the beating frame is controlled to move toward the stirring cloth, and the beating groove on the beating block moves to wrap the side wall of the stirring cloth. At this time, the beating rod is controlled to start reciprocating motion. For example, when the beating rod moves toward the left, the stirring cloths on both sides of the electromagnetic component are turned over to the left, and the waste also falls to the left. This process has the effect of stirring the waste. The greater the amplitude of the side turn, the better the stirring effect. At the same time, when the beating rod moves toward the right, the stirring cloth also turns over to the right, which also has the effect of turning the waste to the right. After multiple reciprocating movements, the material is stirred and the electromagnetic component is also convenient for fully adsorbing the metal waste.
[0029] 3. When the electromagnetic component has finished adsorbing the metal waste, the rotating frame rotates the electromagnetic component to the horizontal initial position and pulls the screening frame into the screening box. At this time, the electromagnetic component is powered off. At this time, most of the metal waste falls into the screening box. However, in order to ensure that all the metal waste on the electromagnetic component is thoroughly cleaned, when the two slide rails are energized, the slide bar is affected by the Ampere force and moves on the slide rail toward the direction of the cleaning rod, thereby driving the cleaning ring to move. The moving cleaning ring can scrape off the metal particles remaining on the outer wall of the electromagnetic component. When the cleaning ring squeezes the cleaning rod, the cleaning rod first processes the metal waste adhered to the end of the cleaning ring, and at the same time, the spring on the cleaning rod is squeezed and deformed. When the slide rail is powered off, the cleaning rod can also push in the opposite direction. During the process, the metal waste adhered to the cleaning ring can also be vibrated off, thereby ensuring that the electromagnetic component is cleaned. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the present application;
[0031] Figure 2 It is a schematic diagram of the overall structure of the second embodiment of the present application;
[0032] Figure 3 It is a partial structural diagram of Embodiment 2 of the present application;
[0033] Figure 4 is a schematic diagram of a recycling component in Example 2 of the present application;
[0034] Figure 5 yes Figure 4 The enlarged view of point A in the middle;
[0035] Figure 6 is a schematic diagram of a knocking component, a cleaning unit, and a detection component in Embodiment 2 of the present application;
[0036] Figure 7 This is an enlarged view of point B in 6;
[0037] Figure 8 This is an enlarged view of point C in Figure 6.
[0038] Reference numerals 1, clamping plate; 2, mold; 3, forming part; 4, partition; 5, cutting assembly; 6, driving motor; 7, driving gear; 8, driving rack; 9, recovery box; 10, screening box; 11, screening frame; 12, reciprocating member; 13, rotating frame; 14, rotating motor; 15, electromagnetic member; 16, screening port; 17, stirring cloth; 18, winding roller; 19, beating frame; 20, beating rod; 21, beating block; 22, beating groove; 23, slide rail; 24 , slide bar; 25, cleaning ring; 26, cleaning rod; 27, spring; 28, elastic hole; 29, transmission roller; 30, adjusting gear; 31, traction rope; 32, traction roller; 33, traction motor; 34, tension sensor; 35, cleaning cloth; 36, identification column; 37, identification rod; 38, identification slot; 39, proximity switch; 40, display light; 41, light source; 42, color sensor; 43, color filter; 44, brush; 45, electromagnet; 46, through hole. DETAILED DESCRIPTION
[0039] The following is combined with Figure 1-8 This application is described in further detail. Embodiment 1
[0040] The present application embodiment discloses a steel mold for manufacturing a long sleeper. Figure 1A steel mold for making a long sleeper includes two groups of plywood 1 arranged in parallel with each other and two groups of molds 2 arranged in the space enclosed by the two groups of plywood 1. The mold 2 is arranged as an integral whole. The mold 2 and the plywood 1 are provided with operation holes for operating the steel cage, including prestressing the steel cage, adjusting and binding the stirrups, and tensioning the steel cage. The two ends of the space enclosed by the plywood 1 are respectively provided with mechanisms for prestressing and releasing the prestress. Since the prestressing and releasing the prestress both adopt the existing technology, they will not be repeated in this embodiment. The mold 2 includes a plurality of forming parts 3 and a partition 4. The shape of the forming part 3 is adapted to the shape of the sleeper. The partition 4 is located between two adjacent forming parts. The partition 4 is arranged between the parts 3, and the cross-section of the partition 4 is set to be either triangular or trapezoidal in the present embodiment, and of course it can also be set to other shapes. Its main purpose is to be used for locating the cutting position to facilitate accurate positioning in the subsequent cutting process. Compared with the transmission mold 2, each sleeper is a separate enclosed space, and the steel bar binding and prestressing treatment of each sleeper need to be operated separately, which has the defect of wasting materials and reducing work efficiency. The one-piece long mold 2 in the present application first saves the operations of placing the steel cage multiple times, saves costs, and can also cut the sleeper concrete blocks and steel bars in the subsequent process to complete the production of multiple sleepers, greatly improving work efficiency. Embodiment 2
[0041] The present application embodiment discloses a production process for a long sleeper. Figure 2-Figure 3 , a production process of long sleepers comprises the following steps:
[0042] S1, mold 2 preparation: perform mold cleaning operation on the previous process, and spray release agent on the inner wall of the steel mold to facilitate subsequent demolding; first, clean the one-piece long mold in Example 1, and the role of spraying the release agent is mainly to facilitate demolding. Since the one-piece long mold is used, there is no need to perform multiple mold cleaning operations, which also reduces the work intensity of the staff;
[0043] S2, install embedded parts and steel cage: install embedded parts, and put prestressed steel wire group, stirrups and spiral reinforcement into the mold; install embedded parts in the forming part 3 according to regulations, and place the steel cage, and the steel cage can be put in as a whole and then tie the stirrups;
[0044] S3, pouring concrete: pouring the prepared concrete into the mold 2, and vibrating to make the concrete in the mold 2 dense; removing the concrete attached to the outside of the mold 2;
[0045] S4, steam curing: steam curing the concrete in the mold 2 to obtain a hardened and formed sleeper block;
[0046] S5, release tension and demoulding: after releasing the tension, demould the finished sleeper in mold 2 and transport it to the next process;
[0047] S6, cutting: positioning and cutting the integrally formed sleeper block finished product by a cutting device to obtain a plurality of sleeper blocks;
[0048] S7. Inspection: Test the strength of the sleeper blocks and put them into storage accordingly.
[0049] Reference Figure 4-Figure 6 The cutting device includes a frame, a wire cutting mechanism, a transmission mechanism and a guide rail mechanism; the wire cutting mechanism includes a cutting assembly 5, a driving assembly for making the cutting assembly 5 move along the guide rail mechanism and a recycling assembly for recycling waste materials; the cutting assembly 5 adopts a wire cutting method such as diamond steel wire cutting in the prior art, the guide rail mechanism includes two guide rails driven and arranged on both sides of the transmission mechanism, the driving assembly includes a driving gear 7 rotatably connected to the shell of the cutting assembly 5, a driving rack 8 fixedly connected to the guide rail and a driving motor 6 for controlling the driving gear 7 to rotate, the driving motor 6 is fixed on the shell of the cutting assembly 5, the driving gear 7 is meshed and connected with the driving rack 8, because there is dust generated by the cutting work in this embodiment, a retractable plastic shell is provided on the outside of the driving rack 8 and the guide rail, one end of the plastic shell is fixedly connected to the shell of the cutting assembly 5, and the other end is fixedly connected to the frame, when the driving motor 6 controls the driving gear 7 to rotate, under the transmission action of the driving rack 8, the driving gear 7 and the driving rack 8 are in relative position, and the driving gear 7 drives the shell of the cutting assembly 5 to move together, thereby realizing the movement effect of the cutting assembly 5 along the guide rail.
[0050] Reference Figure 4-Figure 6The recycling assembly includes a recycling box 9, a screening part for screening steel waste, and a stirring part for stirring the material in the recycling box 9; the recycling box 9 is also fixedly connected to the shell of the cutting assembly 5. In this embodiment, the recycling box 9 is located below the conveying mechanism, that is, the recycling box 9 is located below the sleeper, and the recycling box 9 moves with the cutting assembly 5, so that the waste generated during the cutting process can be collected. The screening part includes a screening box 10 fixed to the side wall of the recycling box 9, a screening frame 11 slidingly arranged on any side wall of the recycling box 9, a reciprocating member 12 for controlling the reciprocating motion of the screening frame 11, a rotating frame 13 rotatably connected to the screening frame 11, a rotating motor 14 for controlling the rotation of the rotating frame 13, and an electromagnetic member 15 fixedly connected to the rotating frame 13. The corresponding side wall of the recycling box 9 is provided with a screening port 16 for sliding adaptation of the screening frame 11, and the top of the screening frame 11 is adapted to the screening port 16. That is, when the screening frame 11 is located in the screening box 10, the screening frame 11 blocks the screening port 16, and the screening port 16 is set above the waste in the recycling box 9. The reciprocating member 12 can be selected from an electric push rod or a cylinder. When it is necessary to screen the metal particles in the waste in the recycling box 9, the screening frame 11 is extended from the screening box 10 into the recycling box 9. Since the rotating frame 13 is set in a concave shape in this embodiment and the electromagnetic member 15 is fixed at the opening of the rotating frame 13, and one side of the rotating frame 13 is fixedly connected to the output end of the rotating motor 14, when the rotating motor 14 controls the screening frame 11 to rotate to the lowest point, the electromagnetic member 15 is located in the waste in the recycling box 9. The electromagnetic member 15 can be selected from an electromagnet in this embodiment. When the electromagnet is energized, it adsorbs the steel bar metal particles of the waste, and then the concrete waste and metal waste in the waste can be screened.
[0051] Reference Figure 4-Figure 6 The stirring part includes a stirring cloth 17 arranged in the recycling box 9, a traction group for pulling the stirring cloth and a beating group for beating the stirring cloth 17. The stirring cloth 17 is located in the recycling box 9 and fits with the inner wall of the recycling box 9 in the initial state, and the electromagnetic member 15 is located above the stirring cloth 17. The traction group includes two winding motors and two winding rollers 18. The winding roller 18 is rotatably arranged outside the recycling box 9. The winding motor is fixed outside the side wall of the recycling box 9 and is located above the opening of the recycling box 9. The winding motor controls the rotation of the winding roller 18. The two winding rollers 18 rotate at the same frequency. When the electromagnetic member 15 rotates to the lowest end, it becomes the separation position of the stirring cloth, that is, the stirring cloth uses the vertical plane where the electromagnetic member 15 is located as the separation plane, and the two ends of the stirring cloth are respectively located on both sides of the electromagnetic member 15. The movement direction of the stirring cloth is perpendicular to the movement direction of the screening frame 11.
[0052] Reference Figure 6-Figure 7The beating group includes a beating frame 19 slidably arranged on the recycling box 9, a beating rod 20 slidably arranged on the beating frame 19, and two beating blocks 21 fixedly connected to the two ends of the beating rod 20 respectively. The movement of the beating frame 19 and the movement of the beating rod 20 can be controlled by the electric push rod, and the movement direction of the beating frame 19 is perpendicular to the movement direction of the beating rod 20, that is, the movement direction of the beating frame 19 is consistent with the movement direction of the screening frame 11, and the movement direction of the beating rod 20 is set along the movement direction of the stirring cloth 17. A beating groove 22 is set on the beating block 21, and the beating groove 22 is opened at one end facing the stirring cloth 17. The stirring cloth 17 is located in the beating groove 22, and the two beating grooves 22 are in contact with the same side of the stirring cloth; when the two winding motors start to wind the stirring cloth 17, the two ends of the stirring cloth 17 begin to gradually move upward, and the stirring cloth 17 is divided into two parts by the electromagnetic member 15, and is located at the electric The stirring cloths 17 on both sides of the magnetic part 15 gradually approach the electromagnetic part 15, and the stirring cloth covers the waste material toward the electromagnetic part 15, so as to facilitate the electromagnetic part 15 to adsorb the metal waste in the waste material. In order to further improve the adsorption effect of the metal waste, the beating frame 19 is controlled to move toward the stirring cloth 17, and the beating groove 22 on the beating block 21 moves to wrap the side wall of the stirring cloth 17. At this time, the beating rod 20 is controlled to start reciprocating motion. For example, when the beating rod 20 moves toward the left, the stirring cloths 17 on both sides of the electromagnetic part 15 are turned over to the left, and the waste material also falls over to the left. This process has the effect of stirring the waste material. The greater the amplitude of the side turn, the better the stirring effect. At the same time, when the beating rod 20 moves toward the right, the stirring cloth 17 also turns over to the right, which also has the effect of flipping the waste material to the right. After reciprocating many times, the material is stirred and it is also convenient for the electromagnetic part 15 to fully adsorb the metal waste.
[0053] Reference Figure 4-Figure 5The recycling component is also provided with a cleaning part for cleaning the electromagnet 45, the cleaning part includes two slide rails 23, a slide rod 24 that is sleeved and slides between the two slide rails 23, a cleaning ring 25 fixed on the slide rod 24, and a cleaning rod 26. The two slide rails 23 are fixed on the rotating frame 13 and are respectively connected to the positive and negative power supplies. The slide rod 24 is used to connect the two slide rails 23 and make the two slide rails 23 conductive. The cleaning rod 26 is elastically arranged at the end of the rotating frame 13. The cleaning rod 26 extends out of the rotating frame 13 in the initial state. The end of the rotating frame 13 is provided with an elastic hole 28, and the cleaning rod 26 slides In the elastic hole 28, one end of the elastic hole 28 is fixedly connected with a spring 27, and the other end of the spring 27 is fixedly connected to the inner wall of the end of the elastic hole 28, so as to realize the elastic effect of the cleaning rod 26; when the electromagnetic part 15 completes the adsorption of the metal waste, the rotating frame 13 rotates the electromagnetic part 15 to the horizontal initial position, and pulls the screening frame 11 into the screening box 10. At this time, the electromagnetic part 15 is powered off, and most of the metal waste falls into the screening box 10. However, in order to ensure that all the metal waste on the electromagnetic part 15 is thoroughly cleaned, the two slide rails 23 are powered on at this time, and the two slide rails 23 and the slide rod 24 are and an external DC power supply form a closed loop. According to the flow direction of the current and Ampere's law, the direction of the magnetic flux lines of the two slide rails 23 and the slide rod 24 close to the energized power supply side can be obtained. Then, by the left-hand rule, it can be obtained that the direction of the Ampere force on the slide rod 24 is parallel to the slide rail 23 and points to the cleaning rod 26. That is, when the slide rail 23 is energized, the slide rod 24 is acted upon by the Ampere force and moves on the slide rail 23 toward the cleaning rod 26, thereby driving the cleaning ring 25 to move. The moving cleaning ring 25 can scrape off the metal particles remaining on the outer wall of the electromagnetic component 15. When the cleaning ring 25 squeezes the cleaning rod 26, First, the cleaning rod 26 processes the metal waste adhered to the end of the cleaning ring 25, and at the same time, the spring 27 on the cleaning rod 26 is squeezed and deformed. When the slide rail 23 is powered off, the cleaning rod 26 can also push in the opposite direction and vibrate the metal waste adhered to the cleaning ring 25. When the cleaning ring 25 needs to move in the opposite direction, it only needs to change the direction of the current on each slide rail 23, that is, to switch the positive and negative poles. For example, the positive and negative poles are set at the other end of the slide rail 23 in the opposite way to the previous setting, so as to realize the reciprocating motion of the cleaning ring 25, thereby ensuring that the electromagnetic component 15 is cleaned.
[0054] Reference Figure 6-Figure 8The transmission mechanism includes a plurality of transmission rollers 29 rotatably arranged on the frame, an adjustment component for realizing synchronous rotation of the transmission rollers 29, and a detection component for whether the transmission rollers 29 and the sleeper blocks are closely fitted. The adjustment component includes a plurality of adjustment gears 30, an adjustment chain, and an adjustment motor. The plurality of adjustment gears 30 are coaxially fixed to the plurality of transmission rollers 29, respectively, and the plurality of adjustment gears 30 are meshedly connected with the adjustment chain. The adjustment motor is fixed on the frame and is used to control the rotation of the adjustment gears 30 located at the end. When the sleeper block is prevented from being on the transmission roller 29, the position of the cutting component 5 or the position of the sleeper can be adjusted at this time, thereby facilitating the cutting of the integrally formed long sleeper. Since the transmission of the sleeper is through the sleeper and the outer periphery of the transmission roller 29 The friction force between the walls is realized, and then it is necessary to ensure that the transmission roller 29 is tightly fitted with the sleeper block. The detection component includes a traction rope 31, two traction rollers 32, two traction motors 33, a tension sensor 34, an identification part for controlling whether an overhaul is needed, and a cleaning part for cleaning the traction roller 32. In this embodiment, each transmission roller needs to correspond to the traction rope 31, and the two traction rollers 32 are located below the transmission roller 29 and are respectively located on both sides of the transmission roller 29. One end of the traction rope 31 is fixedly connected to the peripheral wall of the traction roller 32, and the other end of the traction rope 31 is connected to the identification part. Another traction motor 33 also controls the operation of the identification part. The traction rope 31 is set to two sections and is connected through a tension sensor 34. The two traction rollers 32 are both located below the transmission roller 29.
[0055] The cleaning part includes a cleaning cloth 35, one end of the cleaning cloth 35 is fixedly connected to one end of the traction rope 31, and the other end of the cleaning cloth 35 is fixedly connected to the peripheral wall of another traction roller 32. In this embodiment, only one of the cleaning cloth 35 and the traction rope 31 is located on the transmission roller 29. When it is necessary to detect whether the sleeper block is completely fitted with the transmission roller 29, the traction rope 31 needs to be pulled onto the transmission roller 29. When the cleaning cloth 35 is needed to clean the transmission roller 29, the cleaning cloth 35 is pulled onto the transmission roller 29; the marking part includes a marking rod 37, a marking slot 38 arranged on the transmission frame, a proximity switch 39, a display light 40, a light source 41, a color sensor 42 and a color filter 4 3. The identification rod 37 is placed on the upper surface of the cleaning cloth 35, and one end of the identification rod 37 slides in the identification groove 38. The end of the identification rod 37 is fixedly connected with a slider, and the identification groove 38 is used for sliding adaptation of the slider, that is, to ensure that the identification rod 37 does not rotate, the identification rod 37 can only move along the length direction of the identification groove 38; the proximity switch 39 is installed at the top of the identification groove 38, the display light 40 is electrically connected to the proximity switch 39, the light source 41 is installed on the frame, the proximity switch 39 and the display light 40 are also electrically connected, the color sensor 42 is installed on the frame and can only identify the true color light of the light source 41, and the color of the light from the light source 41 after passing through the color filter 43 is different from the true color of the light source 41.
[0056] Reference Figure 6-Figure 8 First, in this embodiment, three adjacent transmission rollers 29 need to be set as a group for detection, that is, before the sleeper is suspended or moved to the transmission roller 29 by other means, the traction rope 31 needs to be pulled to the top of the transmission roller, and at the same time, it is necessary to ensure that the identification rod 37 is located at the lowest end of the identification groove 38. At this time, the traction roller 32 connected to the cleaning cloth 35 is kept stationary, and the other traction roller 32 is controlled to rotate and the traction rope 31 is pulled. If the transmission roller 29 fits tightly with the sleeper block, the tension sensor 34 is pulled to generate tension. The tension sensor 34 can be controlled by the PLC controller to be connected to a buzzer, and then the buzzer makes a sound, which can indicate that the corresponding transmission roller 29 is in a normal position; however, the other two transmission rollers 29 in the same group are still needed for detection. If only one of the transmission rollers 29 is not in close contact with the sleeper block, the traction rope 31 is pulled at this time, and the tension sensor 34 is not subjected to tension, and as the identification rod 3 is continued to be pulled 7 is pulled to move upward in the identification slot 38 until the identification rod 37 moves to the top of the identification slot 38, at which time the identification rod 37 triggers the proximity switch 39, and in this embodiment, it is set that as long as any one of the three identification rods 37 triggers the proximity switch 39, the light source 41 is triggered and turned on, and the color sensor 42 and the light source 41 are respectively located at both ends, and the three color filters 43 are located in the middle. For example, the three color filters 43 are red, green and blue filters 43, respectively. At this time, as long as any one of the identification rods 37 is triggered, the corresponding color filter 43 can be popped out, and the color of the light source 41 received by the color sensor 42 is not the true color of the light source 41. The color sensor 42 can be connected to the drive motor 6 through the PLC control, that is, the drive motor 6 starts to stop working and can only be turned on after the position adjustment of the transmission roller 29 is completed. In this embodiment, due to the large number of transmission rollers, only three transmission rollers 29 in any group need to be detected.
[0057] Reference Figure 6-Figure 8, the recycling box 9 is provided with a brush 44 for lifting, an electromagnet 45 electrically connected to the proximity switch 39 is installed on the top of the identification groove 38, and the electromagnet 45 and the proximity switch 39 are also controlled and connected by a PLC controller, and the identification rod 37 is provided with a plurality of through holes 46, and the identification rod 37 is slidably provided with identification posts 36 in the plurality of through holes 46, and one end of the identification rod 37 extending out of the identification groove 38 is connected with a pressurizing member for pressurizing the identification rod 37, and the brush 44 moves along the vertical direction of the recycling box 9, and the lifting of the brush 44 can be achieved by an electric push rod, and the electromagnet 45 is used to adsorb the identification rod 37 or the slider, and the pressurizing member uses a pressurizing pump, and the inside of the identification rod 37 is pressurized by the pressurizing pump. The position 38 is a sliding fit. As the pressure in the identification rod 37 gradually increases, the marking column in the identification rod 37 is pushed out and stabilized, and the identification column 36 is aligned with the cleaning cloth 35. When the recycling box 9 moves to the bottom of the corresponding cleaning cloth 35, the brush 44 rises to abut against the bottom surface of the cleaning cloth 35, and the identification column 36 abuts against the upper surface of the cleaning cloth 35. At this time, the cleaning cloth 35 is controlled to reciprocate. During this process, the tension sensor 34 does not exceed the set tension value. Under the friction of the identification column 36 and the brush 44, the cleaning effect of the cleaning cloth 35 is achieved; when there is no air pressure in the identification rod 37, the identification column 36 is located in the identification rod 37, and is located in the identification rod 37 due to the pulling action of the cleaning cloth 35.
[0058] The implementation principle of the production process of a long rail sleeper in the embodiment of the present application is as follows: when it is necessary to screen the metal particles in the waste in the recycling box 9, the screening frame 11 is extended from the screening box 10 into the recycling box 9, and when the rotating motor 14 controls the screening frame 11 to rotate to the lowest point, the electromagnetic component 15 is located in the waste in the recycling box 9, and when the electromagnetic component 15 is energized, it adsorbs the steel bar metal particles in the waste, and then can screen the concrete waste and metal waste in the waste; when the two winding motors start to wind the stirring cloth 17, the two ends of the stirring cloth 17 begin to gradually move upward, and the stirring cloth 17 is divided into two parts by the electromagnetic component 15, and the stirring cloths 17 located on both sides of the electromagnetic component 15 gradually approach the electromagnetic component 15, and the stirring cloth covers the waste toward the electromagnetic component 15, which is convenient for The electromagnetic component 15 adsorbs the metal waste in the waste. In order to further improve the adsorption effect of the metal waste, the knocking frame 19 is controlled to move toward the stirring cloth 17, and the knocking groove 22 on the knocking block 21 moves to wrap the side wall of the stirring cloth 17. At this time, the knocking rod 20 is controlled to start reciprocating motion. For example, when the knocking rod 20 moves toward the left, the stirring cloths 17 on both sides of the electromagnetic component 15 are turned over to the left, and the waste also falls to the left. This process has the effect of stirring the waste. The greater the amplitude of the side turn, the better the stirring effect. At the same time, when the knocking rod 20 moves toward the right, the stirring cloth 17 also turns over to the right, which also has the effect of flipping the waste to the right. After multiple reciprocating movements, the material is stirred and the electromagnetic component 15 is also convenient for fully adsorbing the metal waste.
[0059] When the electromagnetic component 15 has completed the adsorption of the metal waste, the rotating frame 13 rotates the electromagnetic component 15 to the horizontal initial position and pulls the screening frame 11 into the screening box 10. At this time, the electromagnetic component 15 is powered off. At this time, most of the metal waste falls into the screening box 10. However, in order to ensure that all the metal waste on the electromagnetic component 15 is thoroughly cleaned, when the two slide rails 23 are energized, the slide bar 24 is affected by the Ampere force and moves on the slide rail 23 toward the direction of the cleaning rod 26, thereby driving the cleaning ring 25 to move. The moving cleaning ring 25 can scrape off the metal particles remaining on the outer wall of the electromagnetic component 15. When the cleaning ring 25 squeezes the cleaning rod 26, the cleaning rod 26 first processes the metal waste adhered to the end of the cleaning ring 25, and the spring 27 on the cleaning rod 26 is squeezed and deformed. When the slide rail 23 is powered off, the cleaning rod 26 can also push in the opposite direction. During the process, the metal waste adhered to the cleaning ring 25 can also be vibrated off, thereby ensuring that the electromagnetic component 15 is cleaned.
[0060] Before the sleeper is suspended or moved to the transmission roller 29 by other means, the traction rope 31 needs to be pulled to the top of the transmission roller, and at the same time, it is necessary to ensure that the identification rod 37 is located at the lowest end of the identification groove 38. At this time, the traction roller 32 connected to the cleaning cloth 35 is kept stationary, and the other traction roller 32 is controlled to rotate and the traction rope 31 is pulled. If the transmission roller 29 fits tightly with the sleeper block, the tension sensor 34 is pulled to generate tension, and the buzzer sounds, which can indicate that the corresponding transmission roller 29 is in the normal position; if as long as one of the transmission rollers 29 is not in close contact with the sleeper block, the traction sensor 34 is pulled at this time. The guide rope 31 and the tension sensor 34 are not subjected to tension, but as the marking rod 37 continues to be pulled, it is pulled to move upward in the marking slot 38 until the marking rod 37 moves to the top of the marking slot 38. The marking rod 37 triggers the proximity switch 39, and the corresponding color filter 43 can pop out. At this time, the color of the light source 41 received by the color sensor 42 is not the true color of the light source 41. The color sensor 42 triggers the drive motor 6 to stop working and can not be turned on until the position adjustment of the transmission roller 29 is completed. In this embodiment, due to the large number of transmission rollers, only three transmission rollers 29 in any group need to be detected.
[0061] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A production process for long rail sleepers, wherein the steel mold for making the long rail sleepers comprises two groups of clamping plates (1) arranged in parallel with each other and two groups of molds (2) arranged in the space enclosed by the two groups of clamping plates (1), wherein the mold (2) is arranged as an integral body, and the mold (2) and the clamping plates (1) are both provided with operation holes for operating a steel cage, and the mold (2) comprises a plurality of forming parts (3) and a partition (4), wherein the partition (4) is located between two adjacent forming parts (3), and the partition (4) is a position for positioning cutting; and the characteristics are as follows: The steps include: S1, mold (2) preparation: clean the mold in the previous process and spray a release agent on the inner wall of the steel mold to facilitate subsequent demoulding; S2. Install embedded parts and steel cage: install embedded parts, and put prestressed steel wire group, stirrups and spiral reinforcement into the mold; S3, pouring concrete: pouring the prepared concrete into the mold (2), and vibrating the mold (2) to make the concrete in the mold (2) dense; removing the concrete attached to the outside of the mold (2); S4, steam curing: steam curing the concrete in the mold (2) to obtain a hardened and formed sleeper block; S5, releasing tension and demoulding: after releasing tension, demoulding the finished sleeper in the mold (2) and conveying it to the next process; S6, cutting: positioning and cutting the one-piece formed sleeper block finished product by a wire cutting device to obtain a plurality of sleeper blocks; S7, Inspection: Test the strength of the sleeper blocks and put them into storage accordingly; The wire cutting device comprises a frame, a wire cutting mechanism, a conveying mechanism and a guide rail mechanism; the wire cutting mechanism comprises a cutting assembly (5), a driving assembly for causing the cutting assembly (5) to move along the guide rail mechanism and a recycling assembly for recycling waste materials; the recycling assembly comprises a recycling box (9), a screening part for screening steel waste materials and a stirring part for stirring materials in the recycling box (9); the screening part comprises a screening box (10) fixed to the side wall of the recycling box (9), a slidable part arranged on the recycling box (9) a screening frame (11) on any side wall, a reciprocating member (12) for controlling the reciprocating motion of the screening frame (11), a rotating frame (13) rotatably connected to the screening frame (11), a rotating motor (14) for controlling the rotation of the rotating frame (13), and an electromagnetic member (15) fixedly connected to the rotating frame (13), the corresponding side wall of the recovery box (9) is provided with a screening port (16) for slidingly adapting the screening frame (11), and the recovery component is also provided with a cleaning portion for cleaning the electromagnetic member (15).
2. The production process of a long sleeper according to claim 1, characterized in that: The stirring portion comprises a stirring cloth (17) arranged in the recovery box (9), a traction group for pulling the stirring cloth (17) and a beating group for beating the stirring cloth (17); when the electromagnetic member (15) rotates to the bottom end, it becomes a separation position of the stirring cloth (17), and the beating group beats the stirring cloth (17) on both sides of the electromagnetic member (15).
3. The production process of a long sleeper according to claim 2, characterized in that: The knocking group comprises a knocking frame (19) slidably arranged on the recovery box (9), a knocking rod (20) slidably arranged on the knocking frame (19), and two knocking blocks (21) respectively fixedly connected to the two ends of the knocking rod (20), the knocking block (21) is provided with a knocking groove (22), the stirring cloth (17) is located in the knocking groove (22), the moving direction of the knocking frame (19) is perpendicular to the moving direction of the knocking rod (20), and the two knocking grooves (22) are in contact with the same side of the stirring cloth (17).
4. The production process of a long sleeper according to claim 3 is characterized in that: The cleaning part comprises two slide rails (23), a slide rod (24) sleeved and slidably disposed between the two slide rails (23), a cleaning ring (25) fixed on the slide rod (24), and a cleaning rod (26); the two slide rails (23) are fixed on the rotating frame (13) and are respectively connected to a positive and negative power supply; the slide rod (24) is used for the two slide rails (23) to conduct electricity; the cleaning rod (26) is elastically arranged at the end of the rotating frame (13); the cleaning rod (26) extends out of the rotating frame (13) in an initial state.
5. The production process of a long sleeper according to claim 4, characterized in that: The transmission mechanism comprises a plurality of transmission rollers (29) rotatably arranged on the frame, an adjustment component for realizing synchronous rotation of the transmission rollers (29), and a detection component for detecting whether the transmission rollers (29) and the sleeper blocks are tightly fitted, the adjustment component comprises a plurality of adjustment gears (30), an adjustment chain and an adjustment motor, the plurality of adjustment gears (30) are respectively coaxially fixed to the plurality of transmission rollers (29), the plurality of adjustment gears (30) are all meshedly connected with the adjustment chain, and the adjustment motor is fixed on the frame and is used to control the rotation of the adjustment gears (30) located at the end.
6. The production process of a long sleeper according to claim 5, characterized in that: The detection component comprises a traction rope (31), two traction rollers (32), two traction motors (33), a tension sensor (34), an identification part for controlling whether overhaul is required, and a cleaning part for cleaning the traction roller (32). The traction rope (31) corresponds to each of the transmission rollers (29). One end of the traction rope (31) is fixedly connected to the peripheral wall of the traction roller (32), and the other end of the traction rope (31) is connected to the identification part. The other traction motor (33) also controls the operation of the identification part. The traction rope (31) is arranged in two sections and is connected via the tension sensor (34).
7. The production process of a long sleeper according to claim 6, characterized in that: The cleaning part comprises a cleaning cloth (35), one end of the cleaning cloth (35) is fixedly connected to one end of the traction rope (31), and the other end of the cleaning cloth (35) is fixedly connected to the peripheral wall of another traction roller (32).
8. The production process of a long sleeper according to claim 7, characterized in that: The identification part comprises an identification rod (37), an identification slot (38) arranged on the frame, a proximity switch (39), a display light (40), a light source (41), a color sensor (42) and a color filter (43); the identification rod (37) is placed on the upper surface of the cleaning cloth (35), and one end of the identification rod (37) slides in the identification slot (38); the proximity switch (39) is installed at the top of the identification slot (38); the display light (40) is electrically connected to the proximity switch (39); the light source (41) is installed on the frame; the color sensor (42) is installed on the frame and can only identify the original color light of the light source (41); the color of the light from the light source (41) after passing through the color filter (43) is different from the original color of the light source (41); and the color filter (43) slides on the frame.
9. The production process of a long sleeper according to claim 8, characterized in that: The recycling box (9) is provided with a brush (44) for lifting, an electromagnet (45) electrically connected to the proximity switch (39) is installed on the top of the identification slot (38), the identification rod (37) is provided with a plurality of through holes (46), and identification columns (36) are slidably provided in the plurality of through holes (46) of the identification rod (37), and one end of the identification rod (37) extending out of the identification slot (38) is connected to a pressure member for pressurizing the identification rod (37).
Citation Information
Patent Citations
Steel tube double-block type sleeper fabricating steel mold and steel tube double-block type sleeper production process
CN111791338A
Method of manufacturing concrete sleeper blocks
US4495127A