Energy storage container production line
By introducing automatic transportation devices and multiple processing stations into the energy storage container production line, the automated production of energy storage containers is realized, the problems of low efficiency and safety hazards of traditional production methods are solved, and the production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202310508743.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-08
AI Technical Summary
During the production process of existing energy storage containers, the auxiliary transportation and manual assembly of traditional equipment lead to low production efficiency, affecting product quality and posing safety hazards.
An energy storage container production line was designed, using automatic transportation devices and multiple processing stations, including pre-installed stations, lifting equipment, pre-tightening stations, tightening stations, wiring stations, safety testing stations and finished product testing workers The position is to realize automated transportation and assembly through robotic arms and visual identification modules, reducing human participation.
It improves the production efficiency and safety of energy storage containers, reduces manpower operations, and ensures the stability and safety of product quality.
Smart Images

Figure CN118907772A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy storage container production, and in particular to an energy storage container production line. Background Art
[0002] The container energy storage system (CESS) is an integrated energy storage system developed to meet the needs of the mobile energy storage market. It can integrate battery cabinets, battery management systems (BMS), energy storage converters, energy management systems, mobile dynamic environment monitoring systems, etc. The container energy storage system has the characteristics of simplified infrastructure construction costs, short construction period, high degree of modularization, and convenient transportation and installation. It can be applied to power stations such as thermal power generation, wind power, and solar power, or islands, communities, schools, scientific research institutions, factories, and large load centers.
[0003] At present, energy storage containers generally adopt the traditional equipment-assisted transportation and manual assembly production method. In the production process, traditional equipment is mainly used to assist in transportation and manpower is used for assembly and processing. Due to the large size and weight of energy storage containers, manual processing and transportation are inefficient, which affects the overall production efficiency. It is difficult to ensure the quality of the product, and there are certain safety hazards. Summary of the invention
[0004] The present application provides an energy storage container production line to solve the problem of low efficiency of manual processing and transportation in the existing technology, which affects the overall production efficiency, makes it difficult to ensure the quality of the product, and has certain safety hazards.
[0005] To solve the above problems, the present application provides: an energy storage container production line, comprising:
[0006] An automatic transport device, used to carry containers and transport the containers to various processing stations according to a preset route, wherein the containers are used to install the first type of electrical equipment, the second type of electrical equipment, the battery rack and the energy storage module;
[0007] The processing station includes a first pre-installation station and a second pre-installation station in sequence along the preset route, the first pre-installation station is used to install the first type of electrical equipment and the battery rack in the container, and the second pre-installation station is provided with a lifting device, and the lifting equipment is used to lift the second type of electrical equipment into the container.
[0008] In a possible embodiment, the processing station also includes a pre-tightening station located after the second pre-installation station along the preset route, and the pre-tightening station is provided with a first robotic arm, and the first robotic arm is used to place the energy storage module on the battery rack and pick up bolts to preliminarily fix the energy storage module on the battery rack.
[0009] In a possible embodiment, the pre-tightening station also includes a visual recognition module electrically connected to the first robotic arm, the visual recognition module is used to identify the position of the energy storage module and the installation position on the battery rack and generate a first control signal and a second control signal, respectively; the first robotic arm picks up the energy storage module according to the first control signal, places the energy storage module at the installation position according to the second control signal, and then picks up the bolt to preliminarily fix the energy storage module on the battery rack.
[0010] In a possible implementation, the processing station further includes a tightening station located after the pre-tightening station along the preset route, and the tightening station is provided with a second robotic arm, and the second robotic arm is used to tighten the bolts fixing the energy storage module.
[0011] In a possible implementation manner, the pre-tightening station and / or the tightening station further include a robot rail arranged along the preset route, and the first robot arm and / or the second robot arm are respectively slidably arranged on the robot rail; and / or
[0012] The pre-tightening station and / or the tightening station further include a bolt feeding device, respectively, and the bolt feeding device is used to provide the bolts required for the first robotic arm and / or the second robotic arm to fix the energy storage module.
[0013] In a possible embodiment, the pre-tightening station and / or the tightening station also include a first slide rail arranged along the preset route and a door opening and closing device slidably arranged on the first slide rail, and the door opening and closing device is used to open or close the door of the container.
[0014] In a possible embodiment, the door opening and closing device includes a base, a first rotating arm, a second rotating arm, a first driving device and a second driving device. The base is slidably arranged on the first slide rail, and both ends of the first rotating arm are respectively rotatably connected to the base and one end of the second rotating arm, and the other end of the second rotating arm is detachably connected to the door of the container. The first driving device is respectively connected to the base and the first rotating arm to drive the first rotating arm to rotate, and the second driving device is respectively connected to the first rotating arm and the second rotating arm to drive the second rotating arm to rotate.
[0015] In a possible implementation, the second driving device has a fixed end and a driving end capable of sliding along a straight line, the fixed end is rotatably connected to the first rotating arm, and the driving end is rotatably connected to the second rotating arm; or
[0016] The driving end is rotatably connected to the first rotating arm, and the fixed end is rotatably connected to the second rotating arm.
[0017] In a possible embodiment, the processing station also includes a wiring station located after the tightening station along the preset route, and the wiring station is provided with a second slide rail arranged along the preset route and a manual operation platform slidably arranged on the second slide rail, and a material storage tray is provided on the manual operation platform.
[0018] In a possible implementation, the processing station further includes a safety testing station located after the wiring station along the preset route, and the safety testing station is used to test the insulation and voltage withstand performance of the container.
[0019] In a possible implementation, the processing station further includes a finished product performance inspection station located after the safety testing station along the preset route.
[0020] In a possible implementation, the processing station further includes a waterproof test station located before the first pre-installation station and after the safety test station along the preset route, and the waterproof test station is provided with a spray device.
[0021] In a possible implementation, the processing station further includes loading and unloading stations located at the starting point and the end point of the preset route, and the automatic transport device is an automatic navigation transport vehicle, which loads or unloads the container at the loading and unloading stations.
[0022] In a possible embodiment, the energy storage container production line also includes a material warehouse and a material conveyor vehicle. The material warehouse includes a plurality of material pallets for carrying materials. The material pallets are provided with electronic tags. The material conveyor vehicle is provided with an identifier for identifying the electronic tags. The material conveyor vehicle can identify the material pallet through the identifier and transport it between each of the processing stations and the material warehouse according to a preset trajectory.
[0023] The beneficial effects of the present application are as follows: the present application proposes an energy storage container production line. When in use, the automatic transport device can carry the container and automatically transport it to each processing station for processing in sequence according to a preset route. When the container is transported to the first pre-installation station, the first type of electrical equipment and battery racks with relatively small volume and weight can be installed into the container manually. When the container is transported to the second pre-installation station, the second type of electrical equipment with relatively large weight and volume can be hoisted into the container by manually operating the lifting equipment. Therefore, the method of the automatic transport device transporting the container according to the preset route can reduce manpower and improve the transfer efficiency. At the same time, the lifting equipment assists the staff in carrying the second type of electrical equipment, which can reduce manpower and improve the processing efficiency and safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A schematic diagram showing the structure of a loading and unloading station and a waterproof testing station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0026] Figure 2 A schematic structural diagram of a first pre-installation station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0027] Figure 3 A schematic structural diagram of a second pre-installation station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0028] Figure 4 A schematic structural diagram of a hoisting device for a second pre-installation station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0029] Figure 5 A schematic structural diagram of a pre-tightening station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0030] Figure 6 A structural schematic diagram of a tightening station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0031] Figure 7 A schematic structural diagram of a door opening and closing device of an energy storage container production line provided by an embodiment of the present invention is shown;
[0032] Figure 8A schematic structural diagram of a wiring station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0033] Fig. 9 A schematic diagram of the structure of a safety test station of an energy storage container production line provided by an embodiment of the present invention is shown;
[0034] Fig.10 A schematic structural diagram of a finished product performance testing station of an energy storage container production line provided by an embodiment of the present invention is shown.
[0035] Description of main component symbols:
[0036] 100-container; 110-first category electrical equipment; 120-second category electrical equipment; 130-battery rack; 140-energy storage module; 200-automatic transport device; 210-automatic navigation transport vehicle; 300-loading and unloading station; 400-first pre-installation station; 500-second pre-installation station; 510-lifting equipment; 600-pre-tightening station; 610-first mechanical arm; 700-tightening station; 710-second mechanical arm; 720-mechanical arm guide rail; 730-bolt feeding station Position; 740-first slide rail; 750-door opening and closing device; 751-base; 752-first rotating arm; 753-second rotating arm; 754-first driving device; 755-second driving device; 756-fixed end; 757-driving end; 800-wiring station; 810-second slide rail; 820-manual operation platform; 830-storage tray; 900-safety test station; 910-finished product performance test station; 920-waterproof test station; 1000-material warehouse. DETAILED DESCRIPTION
[0037] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.
[0038] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0039] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0040] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0041] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0042] Embodiment 1
[0043] See also Figure 1 , Figure 2 and Figure 3 , this embodiment provides an energy storage container production line, which relates to the field of intelligent production lines. The energy storage container production line includes an automatic transport device 200 and a processing station. The automatic transport device 200 is used to carry a container 100 and transport the container 100 to each processing station according to a preset route. The container 100 is used to install a first type of electrical equipment 110, a second type of electrical equipment 120, a battery rack 130 and an energy storage module 140. The processing station includes a first pre-installation station 400 and a second pre-installation station 500 in sequence along the preset route. The first pre-installation station 400 is used to install the first type of electrical equipment 110 and the battery rack 130 in the container 100. The second pre-installation station 500 is provided with a lifting device 510, and the lifting device 510 is used to lift the second type of electrical equipment 120 into the container 100.
[0044] The energy storage container production line provided by the embodiment of the present application, when in use, the automatic transport device 200 can carry the container 100 and automatically transport it to each processing station for processing in sequence according to the preset route. When the container 100 is transported to the first pre-installation station 400, the first type of electrical equipment 110 and the battery rack 130 with relatively small volume and weight can be installed into the container 100 by manual means. When the container 100 is transported to the second pre-installation station 500, the second type of electrical equipment 120 with relatively large weight and volume can be hoisted into the container 100 by manually controlling the hoisting equipment 510. Therefore, the method of the automatic transport device 200 transporting the container 100 according to the preset route can reduce manpower and improve the transportation efficiency. At the same time, the hoisting equipment 510 assists the staff in carrying the second type of electrical equipment 120 to reduce manpower and improve the processing efficiency and safety.
[0045] The first type of electrical equipment 110 includes but is not limited to electrical cabinets, power conversion systems (PCS), etc. The second type of electrical equipment 120 includes but is not limited to junction boxes and energy management systems (EMS). The energy storage modules 140 include but are not limited to battery clusters.
[0046] In some embodiments, cleaning equipment may be provided in the second pre-installation station 500. The cleaning equipment may use an industrial vacuum cleaner to clean dust and installation harnesses inside the container 100 to ensure that the working area inside the container 100 is in a clean state.
[0047] In some embodiments, Figure 4 As shown, the hoisting device 510 can be installed on the top of the second pre-installation station 500, such as the indoor ceiling, and the hoisting device 510 can be manually controlled by the staff or automatically hoist the second type of electrical equipment 120 into the container 100 according to the preset instructions. Among them, the hoisting device 510 can control the second type of electrical equipment 120 to move in the horizontal direction and the vertical direction.
[0048] Embodiment 2
[0049] This embodiment, based on the first embodiment, proposes a setting method of the pre-tightening station 600 and the tightening station 700. Figure 5 As shown, in the above embodiment, optionally, the processing station also includes a pre-tightening station 600 located after the second pre-installation station 500 along a preset route, and the pre-tightening station 600 is provided with a first robotic arm 610, and the first robotic arm 610 is used to place the energy storage module 140 on the battery rack 130, and pick up bolts to preliminarily fix the energy storage module 140 on the battery rack 130.
[0050] Specifically, the first robotic arm 610 of the pre-tightening station 600 can automatically pick up the energy storage module 140, and place the energy storage module 140 on the battery rack 130 in the container 100, and then pick up bolts to preliminarily fix the energy storage module 140 on the battery rack 130 to prevent the energy storage module 140 from being offset and separated from the battery rack 130 during subsequent transportation.
[0051] In the above embodiment, optionally, the pre-tightening station 600 also includes a visual recognition module electrically connected to the first robotic arm 610, and the visual recognition module is used to identify the position of the energy storage module 140 and the installation position on the battery rack 130 and generate a first control signal and a second control signal respectively. The first robotic arm 610 picks up the energy storage module 140 according to the first control signal, and places the energy storage module 140 in the installation position according to the second control signal, and then picks up bolts to preliminarily fix the energy storage module 140 on the battery rack 130.
[0052] Specifically, the visual recognition module can identify the position of the energy storage module 140 and the installation position on the battery rack 130 for installing the energy storage module 140, and generate a first control signal and a second control signal respectively. The first mechanical arm 610 can accurately pick up the energy storage module 140 according to the first control signal, and place the energy storage module 140 at the installation position according to the second control signal, and finally pick up the bolts to preliminarily fix the energy storage module 140 on the battery rack 130. The setting mode of the visual recognition module in conjunction with the first mechanical arm 610 can enable the first mechanical arm 610 to accurately locate and pick up the energy storage module 140, and accurately install the energy storage module 140 to the corresponding installation position on the battery rack 130, which can improve the installation efficiency of the energy storage module 140 and the automation level of the pre-tightening station 600, and reduce labor costs.
[0053] Among them, the visual recognition module can use a visual positioning recognition system (CCD) to locate the positioning holes, positioning plates, positioning pins and other structures on the energy storage module 140 or the battery rack 130.
[0054] like Figure 6 As shown, in the above embodiment, optionally, the processing station also includes a tightening station 700 located after the pre-tightening station 600 along a preset route, and the tightening station 700 is provided with a second robotic arm 710, which is used to tighten the bolts fixing the energy storage module 140.
[0055] Specifically, the second mechanical arm 710 in the tightening station 700 can tighten the bolts on the battery rack 130 for fixing the energy storage module 140. The bolts are fixed in two steps, namely, pre-tightening and tightening, so as to achieve the best tightening effect of the bolts.
[0056] The second mechanical arm 710 can use a double tightening gun to apply force to the bolt and nut at the same time to improve the reliability of tightening. Sensors can be used to identify and sense the position, angle, torque, tightening angle, etc. of the bolts, so that the second mechanical arm 710 can automatically put the screws in place and automatically tighten them in place, thereby improving the speed, efficiency and consistency of tightening and reducing human errors.
[0057] like Figure 5 and Figure 6 As shown, in the above embodiments, optionally, the pre-tightening station 600 and / or the tightening station 700 also include a robotic arm guide rail 720 arranged along a preset route, and the first robotic arm 610 and / or the second robotic arm 710 are respectively slidably arranged on the robotic arm guide rail 720.
[0058] Specifically, the first robotic arm 610 and / or the second robotic arm 710 are slidably disposed on the robotic arm rail 720. Since the robotic arm rail 720 can be nearly parallel to the preset line and the length direction of the container 100, this arrangement enables the first robotic arm 610 and the second robotic arm 710 to move and operate within the pre-tightening station 600 and the tightening station 700, respectively, thereby increasing the working range of the first robotic arm 610 and the second robotic arm 710, so that the container 100 does not need to be displaced to adapt to the station range of the first robotic arm 610 and the second robotic arm 710, and the number of times the container 100 moves within the pre-tightening station 600 and the tightening station 700 can be reduced, thereby improving production efficiency.
[0059] like Figure 5 and Figure 6 As shown, in the above embodiment, optionally, the pre-tightening station 600 and / or the tightening station 700 also include a bolt feeding device 730, which is used to provide the bolts required for the first robotic arm 610 and / or the second robotic arm 710 to fix the energy storage module 140.
[0060] Specifically, a bolt feeding device 730 may be provided in the pre-tightening station 600 and / or the tightening station 700, and the first robot arm 610 and the second robot arm 710 may automatically pick up the bolts provided by the bolt feeding device 730, thereby realizing automated assembly. In the production process, the use of automated assembly and the bolt feeding device 730 may greatly speed up assembly, improve production efficiency, and reduce material loss and labor costs.
[0061] like Figure 7 As shown, in the above embodiments, optionally, the pre-tightening station 600 and / or the tightening station 700 also include a first slide rail 740 arranged along a preset route and a door opening and closing device 750 slidably arranged on the first slide rail 740, and the door opening and closing device 750 is used to open or close the door of the container 100.
[0062] Specifically, when the container 100 is transported to the pre-tightening station 600 and / or the tightening station 700, the door opening and closing device 750 can automatically slide along the first slide rail 740 so that the door opening and closing device 750 can correspond to the position of the door of the container 100. After the door opening and closing device 750 automatically opens the door, the first mechanical arm 610 and the second mechanical arm 710 can fix the energy storage module 140 to the battery rack 130 inside the container 100 through the opened door. When the first mechanical arm 610 and the second mechanical arm 710 complete the corresponding work tasks, the door opening and closing device 750 can automatically close the door.
[0063] The first slide rail 740 may be disposed on the top of the pre-tightening station 600 and / or the tightening station 700, such as an indoor ceiling.
[0064] like Figure 7 As shown, in the above embodiment, optionally, the door opening and closing device 750 includes a base 751, a first rotating arm 752, a second rotating arm 753, a first driving device 754 and a second driving device 755, the base 751 is slidably arranged on the first slide rail 740, the two ends of the first rotating arm 752 are respectively rotatably connected to the base 751 and one end of the second rotating arm 753, the other end of the second rotating arm 753 is detachably connected to the door of the container 100, the first driving device 754 is respectively connected to the base 751 and the first rotating arm 752 to drive the first rotating arm 752 to rotate, and the second driving device 755 is respectively connected to the first rotating arm 752 and the second rotating arm 753 to drive the second rotating arm 753 to rotate.
[0065] Specifically, after the container 100 is transported to the pre-tightening station 600 and / or the tightening station 700, when the door opening and closing device 750 is in use, the base 751 can move along the first slide rail 740 until the rotation connection portion between the base 751 and the first rotating arm 752 is close to the position of the rotating axis of the door, and then the first driving device 754 drives the first rotating arm 752 to rotate toward the door, and at the same time the second driving device 755 is extended to drive the second rotating arm 753 to rotate toward or away from the door, so that the second rotating arm 753 can be detachably connected to the handle of the door and other structures, and then the first driving device 754 drives the first rotating arm 752 to rotate in the direction away from the door to open the door. Among them, when the door of the container 100 is a double door, the door opening and closing device 750 can be correspondingly set to two, and the two door opening and closing devices 750 are symmetrically arranged.
[0066] like Figure 7As shown, in the above embodiment, optionally, the second driving device 755 has a fixed end 756 and a driving end 757 that can slide along a straight line, the fixed end 756 is rotationally connected to the first rotating arm 752, and the driving end 757 is rotationally connected to the second rotating arm 753; or the driving end 757 is rotationally connected to the first rotating arm 752, and the fixed end 756 is rotationally connected to the second rotating arm 753.
[0067] Specifically, the second driving device 755 includes a fixed end 756 and a driving end 757 that can slide along a straight line. The fixed end 756 and the driving end 757 can be telescopically moved to drive the second rotating arm 753 to move toward or away from the door.
[0068] Embodiment 3
[0069] Based on the second embodiment, this embodiment proposes a setting method of wiring station 800, safety test station 900, finished product performance test station 910 and waterproof test station 920. Figure 8 As shown, in the above embodiment, optionally, the processing station also includes a wiring station 800 located after the tightening station 700 along a preset route, and the wiring station 800 is provided with a second slide rail 810 arranged along the preset route and a manual operation platform 820 slidably arranged on the second slide rail 810, and a material storage tray 830 is provided on the manual operation platform 820.
[0070] Specifically, after the container 100 is transported to the wiring station 800, the production personnel can operate the manual operation platform 820 to slide along the second slide rail 810 to a preset position, and then operate the production personnel to connect the positive and negative electrodes and high-voltage wire harnesses of the energy storage module 140, electrical equipment, etc. in the container 100 on the manual operation platform 820. The manual operation platform 820 is provided with a material storage tray 830 for storing materials required for wiring, which can facilitate the production personnel to quickly pick up materials to improve production and processing efficiency.
[0071] like Fig. 9 As shown, in the above embodiment, optionally, the processing station also includes a safety test station 900 located after the wiring station 800 along a preset route, and the safety test station 900 is used to test the insulation withstand voltage performance of the container 100.
[0072] Specifically, after the container 100 is transported to the safety testing station 900, the container 100 can be set up on an insulating bracket, and the energy storage module 140 can be subjected to insulation test and voltage resistance test to ensure the insulation of the energy storage module 140, the first type electrical equipment 110 and the second type electrical equipment 120.
[0073] Among them, the step of manually installing the nameplate is also completed at the safety testing station 900.
[0074] like Fig.10 As shown, in the above embodiment, optionally, the processing station also includes a finished product performance inspection station 910 located after the safety testing station 900 along a preset route.
[0075] Specifically, after the container 100 completes the insulation and withstand voltage performance test, the container 100 is transported to the finished product performance test station 910 for electrical performance test, overall total voltage, and overall state of charge (SOC) state test. The insulation and withstand voltage performance test step can improve the safety of the finished product performance test process. Among them, the finished product performance test station 910 can use production line test equipment such as a booster integrated machine and use a DC / DC solution for testing.
[0076] like Figure 1 As shown, in the above embodiment, optionally, the processing station also includes a waterproof test station 920 located before the first pre-installation station 400 and after the safety test station 900 along a preset route, and the waterproof test station 920 is provided with a spray device.
[0077] Specifically, the container 100 is in an empty state before entering the first pre-installation station 400. At this time, the container 100 in an empty state can be subjected to a rain test at the waterproof test station 920. The spray equipment simulates rainfall, and can simulate the spraying effect on the container 100 from all directions to examine the waterproof performance of the container 100, thereby preventing containers 100 with unqualified waterproof performance from flowing into subsequent processing stations. After passing the safety test station 900, the container 100 is in a full state. At this time, the container 100 in a full state needs to be tested for waterproof performance again to observe the sealing of the container 100 for long-term outdoor operation, so as to prevent products with unqualified waterproof performance from flowing into the market.
[0078] Embodiment 4
[0079] This embodiment further defines the technical solution based on the first to third embodiments. Figure 1 As shown, optionally, the processing station also includes a loading and unloading station 300 located at the starting point and the end point of the preset route, and the automatic transport device 200 is an automatic navigation transport vehicle 210, and the automatic navigation transport vehicle 210 loads or unloads the container 100 at the loading and unloading station 300.
[0080] Specifically, the empty container 100 can be transported from the warehouse to the loading and unloading station 300 and loaded on the automatic navigation transport vehicle 210. The automatic navigation transport vehicle 210 can automatically transport the container 100 to each processing station along a preset route. After passing through each processing station, the container 100 is in a full box state. At this time, the container 100 in a full box state is unloaded from the automatic navigation transport vehicle 210 at the loading and unloading station 300 and transported to the warehouse. The loading and unloading steps are both performed at the loading and unloading station 300, so that the automatic navigation transport vehicle 210 after unloading can be quickly put into the loading step. Among them, the automatic navigation transport vehicle 210 can be a heavy-duty automatic guided vehicle (AGV).
[0081] In some embodiments, the energy storage container production line also includes an air shower door, through which the container 100 can pass before being transported to the loading and unloading station 300 by the automatic transport device 200. The air shower door uses strong air flow to remove pollutants such as dust, viruses, and bacteria on the surface of the container 100 and the automatic transport device 200, thereby achieving the purpose of purifying the air and ensuring product safety.
[0082] like Figure 3 , Figure 5 , Figure 8 and Fig. 9 As shown, in the above embodiment, optionally, the energy storage container production line also includes a material warehouse 1000 and a material conveyor vehicle. The material warehouse 1000 includes a plurality of material pallets for carrying materials. The material pallets are provided with electronic tags. The material conveyor vehicle is provided with an identifier for identifying the electronic tags. The material conveyor vehicle can identify the material pallet through the identifier and transport it between each processing station and the material warehouse 1000 according to a preset trajectory.
[0083] Specifically, a plurality of material pallets for carrying materials are placed in the material warehouse 1000, and each material pallet is provided with an electronic tag corresponding to the name and type of the material. The identifier provided on the material transport vehicle can identify the electronic tag, so as to transport the corresponding material pallet and the material to each processing station according to the preset track, so as to realize the transportation of materials online. At the same time, unqualified materials at the processing station can also be transported back to the material warehouse 1000 by the material transport vehicle, so as to realize the transportation of materials offline. Among them, during the transportation of materials online, the materials can pass through the manual transfer station, and the materials online can be manually confirmed in the manual transfer station and the materials online can be untied in the material system to ensure that there are no errors in the materials online. Among them, the identifier can be an RFID reader / writer.
[0084] In some embodiments, an intelligent opening and closing door may be provided between different processing stations, and the intelligent opening and closing door may sense the container 100 and automatically open and close the door.
[0085] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0086] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. An energy storage container production line, characterized in that: include: An automatic transport device, used to carry containers and transport the containers to various processing stations according to a preset route, wherein the containers are used to install the first type of electrical equipment, the second type of electrical equipment, the battery rack and the energy storage module; The processing station includes a first pre-installation station and a second pre-installation station in sequence along the preset route, the first pre-installation station is used to install the first type of electrical equipment and the battery rack in the container, and the second pre-installation station is provided with a lifting device, and the lifting equipment is used to lift the second type of electrical equipment into the container.
2. The energy storage container production line according to claim 1, characterized in that: The processing station also includes a pre-tightening station located after the second pre-installation station along the preset route. The pre-tightening station is provided with a first robotic arm, which is used to place the energy storage module on the battery rack and pick up bolts to preliminarily fix the energy storage module on the battery rack.
3. The energy storage container production line according to claim 2 is characterized in that: The pre-tightening station also includes a visual recognition module electrically connected to the first robotic arm, the visual recognition module is used to identify the position of the energy storage module and the installation position on the battery rack and generate a first control signal and a second control signal, respectively. The first robotic arm picks up the energy storage module according to the first control signal, and places the energy storage module at the installation position according to the second control signal, and then picks up the bolt to preliminarily fix the energy storage module on the battery rack.
4. The energy storage container production line according to claim 2, characterized in that: The processing station also includes a tightening station located after the pre-tightening station along the preset route. The tightening station is provided with a second robotic arm, and the second robotic arm is used to tighten the bolts fixing the energy storage module.
5. The energy storage container production line according to claim 4, characterized in that: The pre-tightening station and / or the tightening station further include a robot guide rail arranged along the preset route, and the first robot arm and / or the second robot arm are respectively slidably arranged on the robot guide rail; and / or The pre-tightening station and / or the tightening station further include a bolt feeding device, respectively, and the bolt feeding device is used to provide the bolts required for the first robotic arm and / or the second robotic arm to fix the energy storage module.
6. The energy storage container production line according to claim 4, characterized in that: The pre-tightening station and / or the tightening station also include a first slide rail arranged along the preset route and a door opening and closing device slidably arranged on the first slide rail, and the door opening and closing device is used to open or close the door of the container.
7. The energy storage container production line according to claim 6, characterized in that: The door opening and closing device includes a base, a first rotating arm, a second rotating arm, a first driving device and a second driving device. The base is slidably arranged on the first slide rail, two ends of the first rotating arm are respectively rotatably connected to the base and one end of the second rotating arm, and the other end of the second rotating arm is detachably connected to the door of the container. The first driving device is respectively connected to the base and the first rotating arm to drive the first rotating arm to rotate, and the second driving device is respectively connected to the first rotating arm and the second rotating arm to drive the second rotating arm to rotate.
8. The energy storage container production line according to claim 7, characterized in that: The second driving device has a fixed end and a driving end capable of sliding along a straight line, the fixed end is rotatably connected to the first rotating arm, and the driving end is rotatably connected to the second rotating arm; or The driving end is rotatably connected to the first rotating arm, and the fixed end is rotatably connected to the second rotating arm.
9. The energy storage container production line according to claim 4, characterized in that: The processing station also includes a wiring station located after the tightening station along the preset route, and the wiring station is provided with a second slide rail arranged along the preset route and a manual operation platform slidably arranged on the second slide rail, and a material storage tray is provided on the manual operation platform.
10. The energy storage container production line according to claim 9, characterized in that: The processing station also includes a safety testing station located after the wiring station along the preset route, and the safety testing station is used to test the insulation and withstand voltage performance of the container.
11. The energy storage container production line according to claim 10, characterized in that: The processing station also includes a finished product performance detection station located after the safety testing station along the preset route.
12. The energy storage container production line according to claim 11, characterized in that: The processing station also includes a waterproof test station located before the first pre-installation station and after the safety test station along the preset route, and the waterproof test station is provided with a spray device.
13. The energy storage container production line according to any one of claims 1 to 12, characterized in that: The processing station also includes loading and unloading stations located at the starting point and the end point of the preset route. The automatic transport device is an automatic navigation transport vehicle, and the automatic navigation transport vehicle loads or unloads the container at the loading and unloading stations.
14. The energy storage container production line according to any one of claims 1 to 12, characterized in that: The energy storage container production line also includes a material warehouse and a material conveyor vehicle. The material warehouse includes a plurality of material pallets for carrying materials. The material pallets are provided with electronic tags. The material conveyor vehicle is provided with an identifier for identifying the electronic tags. The material conveyor vehicle can identify the material pallets through the identifier and transport them between each of the processing stations and the material warehouse according to a preset trajectory.