Pi-shaped steel-concrete composite beam hoisting method

Through the hoisting mechanism of the clamshell steel-mixed composite beam, the combination of hanging blocks, hanging ears and rope holes is used to solve the problem of high lifting cost in the existing technology, achieving low-cost and high-reliability lifting effect, reducing the Damage to the bridge deck.

CN118908027APending Publication Date: 2024-11-08ZHEJIANG COMM CONSTR GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411066660.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing lifting method of the tidal steel-concrete composite beam is insufficient due to the large area of ​​the embedded steel plate, which has high cost, and the bolts need to be cut off with exposed bolts, which increases construction costs.

Method used

The lifting mechanism of the neutral steel-concrete combination beam is adopted, including two lifting components distributed along the longitudinal direction. The lifting components include a lifting block, a lifting lug and a rope hole. The sling is connected through the lifting lug and a rope hole to achieve lifting and pass through the lower The cross-support rod and the upper cross-support rod improve the stability and safety of the lifting and reduce the squeezing effect on the bridge deck.

Benefits of technology

It realizes low-cost lifting, reduces the use of steel, improves the reliability of lifting and the protection effect of bridge decks, and reduces the damage to bridge decks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908027A_ABST
    Figure CN118908027A_ABST
Patent Text Reader

Abstract

The invention provides a hoisting method of a Pi-shaped steel-concrete composite beam, which is completed through a hoisting mechanism of the Pi-shaped steel-concrete composite beam, and the hoisting mechanism of the Pi-shaped steel-concrete composite beam comprises two hoisting assemblies which are distributed along the longitudinal direction, the hoisting assembly comprises a hoisting block connected with hoisting equipment, two hoisting lugs distributed in the transverse bridge direction and two rope penetrating holes formed in the bridge deck and distributed in the transverse bridge direction, the hoisting lugs are connected with the bottom plate, the lower ends of the two hoisting ropes are connected with the hoisting lugs, and the upper ends of the two telescopic hoisting ropes are connected with the hoisting block; according to the specific hoisting process, the Pi-shaped steel-concrete composite beam is installed on the to-be-hoisted Pi-shaped steel-concrete composite beam through the hoisting method, then hoisting equipment and the hoisting block are connected together, so that the Pi-shaped steel-concrete composite beam is hoisted to a set position, and then the hoisting cable and the hoisting block are taken down for repeated utilization. The method has the advantage of being low in hoisting cost, and the problem that the hoisting cost is high due to the fact that an existing embedded steel plate is hoisted by installing a lifting lug is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a method for hoisting a vaulted steel-concrete composite beam. Background Art

[0002] During bridge construction, the arched steel-concrete composite beam will be prefabricated, and then the arched steel-concrete composite beam will be hoisted onto the bridge pier. The arched steel-concrete composite beam includes a bridge deck of concrete structure and two steel beams extending in the transverse direction and longitudinal direction of the bridge. The steel beam includes a top plate, a vertical plate and a bottom plate. The top plate, the vertical plate and the bottom plate are connected together in an "I" shape and are located on the lower surface of the bridge deck. The top plate is fixed together with the bridge deck. In order to be able to hoist, the existing method is to embed a steel plate with bolts in the bridge deck, and then install the lifting lugs on the bridge deck through nuts and bolts, and use equipment such as gantry trucks to cooperate with slings to lift the lifting lugs to achieve lifting. This hoisting method has the following shortcomings: in order to ensure strength, the pre-embedded method must have a large steel plate area, which is not enough for bearing capacity, resulting in a large consumption of steel, and the bolts exposed on the bridge deck need to be cut off, which leads to high cost of hoisting. Summary of the invention

[0003] The invention aims to provide a method for hoisting a vaulted steel-concrete composite beam with low hoisting cost, which solves the problem of high hoisting cost in the existing method of hoisting pre-buried steel plates by installing lifting ears.

[0004] In order to achieve the above-mentioned invention object, the present invention adopts the following technology: a method for hoisting a v-shaped steel-concrete composite beam, the v-shaped steel-concrete composite beam includes a bridge deck of a concrete structure and two steel beams distributed along the transverse direction of the bridge and extending in the longitudinal direction of the bridge, the steel beam includes a top plate, a vertical plate and a bottom plate, the top plate, the vertical plate and the bottom plate are connected together in an "I" shape and are located on the lower surface of the bridge deck, the top plate is fixed together with the bridge deck, and is characterized in that it is completed by a v-shaped steel-concrete composite beam hoisting mechanism, the v-shaped steel-concrete composite beam hoisting mechanism includes two hoisting components distributed along the longitudinal direction, the hoisting components include a hoisting block connected to the hoisting equipment, a hoisting block distributed along the transverse direction of the bridge The two lifting ears and two rope passing holes arranged on the bridge deck and distributed along the transverse direction of the bridge, the two lifting ears and the two rope passing holes are located on the same vertical plane, the lifting ears are connected to the bottom plate, the lower ends of the two slings pass through the two rope passing holes one by one and are connected to the two lifting ears one by one, and the upper ends of the two telescopic slings are connected to the lifting blocks; the specific process of lifting is: installing the lifting method of the arched steel-concrete composite beam on the arched steel-concrete composite beam to be lifted, and then connecting the lifting equipment with the lifting block, so as to lift the arched steel-concrete composite beam to the set position, and then removing the slings and the lifting blocks for reuse.

[0005] Preferably, the hoisting assembly further comprises a lower cross support rod supporting along the transverse direction of the bridge, the two ends of the lower cross support rod are connected to the lower end of the steel beam, and the lower cross support rod is aligned with the two lifting ears, so as to avoid bending and deformation of the steel beam due to local stress during hoisting.

[0006] Preferably, both ends of the lower horizontal support rod are connected with connecting pieces by bolts and nuts, the connecting pieces are welded to the steel beam, and the connecting pieces are welded to the upper surface of the bottom plate and the inner surface of the vertical plate. The lower horizontal support rod can be easily removed for reuse, and the lifting lugs and connecting pieces are disposable.

[0007] Preferably, both ends of the lower cross support rod are fixed with a "U"-shaped bracket, the lower end of the steel beam is inserted into the bracket, the lifting lug is fixed together with the bracket, the lifting lug and the lower cross support rod are distributed on both sides of the steel beam, a connecting groove is formed between the lifting lug and the bracket, the part of the bottom plate located outside the vertical plate is inserted into the connecting groove, and the bracket can move along the longitudinal bridge direction equivalent to the steel beam. After the arched steel-concrete composite beam is hoisted into place, the sling and the hoisting block are removed, and then the lower cross support rod is moved along the longitudinal bridge direction, so that the bracket, the lifting lug and the lower cross support rod are all removed; all parts of the arched steel-concrete composite beam hoisting mechanism can be reused, and the accuracy requirements for the relative positions of the rope threading holes and the lifting lugs are low, which improves the convenience during production.

[0008] Preferably, the lower surface of the lower cross support rod is higher than the lower surface of the bracket by more than ten centimeters. When the arched steel-concrete composite beam is not suspended in the air, the arched steel-concrete composite beam hoisting mechanism can also be conveniently removed.

[0009] Preferably, the suspension block includes a horizontal suspension rod and a plurality of blocks arranged on the horizontal suspension rod, a rope threading groove is formed between adjacent blocks, the connection point between the lifting device and the suspension block is located in the middle of the horizontal suspension rod, the blocks are symmetrically distributed on both sides of the connection point between the lifting device and the suspension block, and the two suspension cables are symmetrically distributed on both sides of the connection point between the lifting device and the suspension block. When lifting the steel-concrete composite beams of different bridge widths, the inclination angle of the suspension cable can be reasonable to reduce the squeezing effect on the bridge deck, thereby preventing damage to the bridge deck during lifting.

[0010] Preferably, the lifting lug is welded to the upper surface of the bottom plate and connected to the bottom plate, so that the connection is reliable.

[0011] Preferably, the lifting lug is also welded to the vertical plate, which can further improve the connection reliability.

[0012] Preferably, the vertical plates of the two steel beams are located between the two lifting ears, and the vertical plates of the two steel beams are located between the two rope threading holes, so as to improve the stability during lifting.

[0013] Preferably, the hoisting assembly further comprises an upper cross support rod located above the bridge deck, with forks at both ends of the upper cross support rod, and the two slings are correspondingly passed through the two forks at both ends of the upper cross support rod, and when the sling lifts the arched steel-concrete composite beam, the sling and the forks are in contact with each other. The closing force generated by the sling lifting the arched steel-concrete composite beam acts on the upper cross support rod, so that the bridge deck will not be squeezed. The protective function of the bridge deck is good.

[0014] Beneficial effects: good reliability during hoisting, low hoisting cost, and less damage to the arched steel-concrete composite beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 Schematic diagram of the use state of the hoisting mechanism of the arched steel-concrete composite beam in the first embodiment of the present invention; Figure 2 is a schematic diagram of a second embodiment of the present invention; Figure 3 for Figure 2 A local enlarged schematic diagram of point A.

[0016] In the figure: a bridge deck 1 of a concrete structure, a steel beam 2, a top plate 3, a vertical plate 4, a bottom plate 5, a hanging block 6, a hanging ear 7, a rope threading hole 8, a sling 9, a horizontal hanging rod 10, a block 11, a rope threading groove 12, a lifting device 13, a connection point 14 between the lifting device and the hanging block, a lower horizontal support rod 15, a connecting piece 16, a bracket 17, a rolling ball 18, a portion of the bottom plate located outside the vertical plate 19, a lower surface of the lower horizontal support rod 20, a lower surface of the bracket 21, an upper horizontal support rod 22, and a fork 23. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] Example 1, see Figure 1A method for hoisting a v-shaped steel-concrete composite beam, wherein the v-shaped steel-concrete composite beam comprises a bridge deck 1 of a concrete structure and two steel beams 2 extending in the longitudinal direction and distributed in the transverse direction of the bridge, wherein the steel beam comprises a top plate 3, a vertical plate 4 and a bottom plate 5, wherein the top plate, the vertical plate and the bottom plate are connected together in an "I" shape and are located on the lower surface of the bridge deck. The top plate is fixed together with the bridge deck. This is accomplished by a v-shaped steel-concrete composite beam hoisting structure. The v-shaped steel-concrete composite beam hoisting mechanism comprises two hoisting assemblies distributed in the longitudinal direction. The hoisting assembly comprises a hoisting block 6 connected to the hoisting equipment, two lifting ears 7 distributed in the transverse direction of the bridge, and two rope threading holes 8 arranged on the bridge deck and distributed in the transverse direction of the bridge, wherein the two lifting ears and the two rope threading holes are located on the same vertical plane. The lifting ears are connected to the bottom plate, specifically: the lifting ears are welded to the upper surface of the bottom plate and connected to the bottom plate, and the lifting ears are also welded to the vertical plate.

[0019] The lower ends of the two slings 9 are connected to the two lifting ears one by one after passing through the two rope holes. The upper ends of the two telescopic slings are connected to the said lifting block. The lifting block includes a horizontal suspension rod 10 and a plurality of blocks 11 arranged on the horizontal suspension rod, and a rope threading groove 12 is formed between adjacent blocks. The connection point 14 of the lifting device 13 and the lifting block is located in the middle of the horizontal suspension rod. The blocks are symmetrically distributed on both sides of the connection point of the lifting device and the suspension block, and the two slings are symmetrically distributed on both sides of the connection point of the lifting device and the lifting block. The lifting assembly also includes a lower horizontal support rod 15 supported along the transverse bridge direction, and the two ends of the lower horizontal support rod are connected to the lower end of the steel beam, and the lower horizontal support rod is aligned with the two lifting ears. Both ends of the lower horizontal support rod are connected with a connecting piece 16 through bolts and nuts, and the connecting piece is welded to the steel beam, and the connecting piece is welded to the upper surface of the bottom plate and the inner surface of the vertical plate. The vertical plates of the two steel beams are located between the two lifting ears, and the vertical plates of the two steel beams are located between the two rope passing holes.

[0020] The specific process of hoisting is: install the hoisting method of the vaulted steel-concrete composite beam on the vaulted steel-concrete composite beam to be hoisted, then connect the hoisting equipment with the hoisting block, so as to hoist the vaulted steel-concrete composite beam to the set position, and then remove the sling and hoisting block for reuse. The rope hole can be used as the interface of the bridge deck drainage pipe in the later stage.

[0021] Embodiment 2 is different from Embodiment 1 in that: See also Figure 2 and Figure 3, both ends of the lower horizontal support rod are fixedly connected with a "U"-shaped bracket 17, and the lower end of the steel beam, i.e., the bottom plate, is inserted into the bracket. The lifting lug is fixed together with the bracket, specifically welded together. The place where the lifting lug passes through the ball 18 is on the vertical plate. The lifting lug and the lower horizontal support rod are distributed on both sides of the steel beam, and a connecting groove is formed between the lifting lug and the bracket. The part 19 of the bottom plate located on the outside of the vertical plate is inserted into the connecting groove, and the bracket can move along the longitudinal bridge direction equivalent to the steel beam. After the U-shaped steel-concrete composite beam is hoisted into place, remove the sling and the lifting block, and then move the lower horizontal support rod along the longitudinal bridge direction, so as to remove the bracket, the lifting lug and the lower horizontal support rod. The lower surface 20 of the lower horizontal support rod is higher than the lower surface 21 of the bracket by more than ten centimeters. The hoisting assembly also includes an upper cross support rod 22 located above the bridge deck, with forks 23 at both ends of the upper cross support rod. Two slings are correspondingly passed through the two forks at both ends of the upper cross support rod. When the sling lifts the arched steel-concrete composite beam, the sling and the fork are in contact with each other.

[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for hoisting a vaulted steel-concrete composite beam, wherein the vaulted steel-concrete composite beam comprises a bridge deck of a concrete structure and two steel beams distributed in the transverse direction of the bridge and extending in the longitudinal direction of the bridge, wherein the steel beam comprises a top plate, a vertical plate and a bottom plate, wherein the top plate, the vertical plate and the bottom plate are connected together in an "I" shape and are located on the lower surface of the bridge deck, wherein the top plate is fixed together with the bridge deck, and wherein the method comprises: The lifting is accomplished by a hoisting mechanism for a v-shaped steel-concrete composite beam, which comprises two hoisting components distributed in the longitudinal direction, the hoisting components comprising a hoisting block connected to the hoisting equipment, two hoisting ears distributed in the transverse direction of the bridge, and two rope threading holes arranged on the bridge deck and distributed in the transverse direction of the bridge, the two hoisting ears and the two rope threading holes being located on the same vertical plane, the hoisting ears being connected to the base plate, the lower ends of the two slings correspondingly passing through the two rope threading holes and connected to the two hoisting ears in a one-to-one manner, and the upper ends of the two telescopic slings being connected to the hoisting blocks; the specific process of hoisting is as follows: the hoisting method for the v-shaped steel-concrete composite beam is installed on the v-shaped steel-concrete composite beam to be lifted, and then the hoisting equipment is connected to the hoisting block, so that the v-shaped steel-concrete composite beam is lifted to the set position, and then the slings and the hoisting blocks are removed for reuse.

2. The method for hoisting a steel-concrete composite beam according to claim 1, characterized in that: The hoisting assembly also includes a lower transverse support rod supported along the transverse bridge direction, the two ends of the lower transverse support rod are connected to the lower end of the steel beam, and the lower transverse support rod is aligned with the two lifting ears.

3. The method for hoisting a steel-concrete composite beam according to claim 2, characterized in that: Both ends of the lower cross support rod are connected with connecting plates through bolts and nuts. The connecting plates are welded together with the steel beams, and the connecting plates are welded together with the upper surface of the bottom plate and the inner surface of the vertical plate.

4. The method for hoisting a vaulted steel-concrete composite beam according to claim 2, characterized in that: Both ends of the lower cross support rod are fixedly connected with a "U"-shaped bracket, the lower end of the steel beam is inserted into the bracket, the lifting ear is fixed together with the bracket, the lifting ear and the lower cross support rod are distributed on both sides of the steel beam, a connecting groove is formed between the lifting ear and the bracket, the part of the bottom plate located on the outside of the vertical plate is inserted into the connecting groove, and the bracket can move along the longitudinal bridge direction equivalent to the steel beam; after the U-shaped steel-concrete composite beam is hoisted into place, the sling and the lifting block are removed, and then the lower cross support rod is moved along the longitudinal bridge direction, so that the bracket, the lifting ear and the lower cross support rod are all removed.

5. The method for hoisting a vaulted steel-concrete composite beam according to claim 4, characterized in that: The lower surface of the lower horizontal support rod is higher than the lower surface of the bracket by more than ten centimeters.

6. A method for hoisting a vaulted steel-concrete composite beam according to claim 1, 2, 3, 4 or 5, characterized in that: The lifting block includes a transverse lifting rod and a plurality of blocks arranged on the transverse lifting rod, and rope threading grooves are formed between adjacent blocks. The connection point between the lifting equipment and the lifting block is located in the middle of the transverse lifting rod, and the blocks are symmetrically distributed on both sides of the connection point between the lifting equipment and the lifting block. The two lifting cables are symmetrically distributed on both sides of the connection point between the lifting equipment and the lifting block.

7. A method for hoisting a vaulted steel-concrete composite beam according to claim 1, 2, 3, 4 or 5, characterized in that: The hanging ear is welded to the upper surface of the bottom plate and connected to the bottom plate.

8. The method for hoisting a vaulted steel-concrete composite beam according to claim 7, characterized in that: The lifting lug is also welded to the vertical plate.

9. A method for hoisting a vaulted steel-concrete composite beam according to claim 1, 2, 3, 4 or 5, characterized in that: The vertical plates of the two steel beams are located between the two lifting ears, and the vertical plates of the two steel beams are located between the two rope threading holes.

10. A method for hoisting a vaulted steel-concrete composite beam according to claim 9, characterized in that: The hoisting assembly also includes an upper cross support rod located above the bridge deck, with forks at both ends of the upper cross support rod, and two slings are correspondingly inserted into the two forks at both ends of the upper cross support rod, and when the sling lifts the arched steel-concrete composite beam, the sling and the fork are in contact with each other. The closing force generated by the sling lifting the arched steel-concrete composite beam acts on the upper cross support rod, so as not to squeeze the bridge deck.