Pretreatment process for high-degradation-resistant organic matter and high-sulfur leachate through full-membrane system
By adopting PH adjustment, decolorization, flocculation and aeration in the treatment of garbage leachate, the difficult-to-degrade organic matter and sulfide are simultaneously removed, which solves the problem of congestion in the entire membrane system, reduces cleaning costs and improves system stability sex.
Patent Information
- Application Number
- CN202410978393.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art cannot effectively remove the highly difficult degraded organic matter and high sulfide in the garbage leachate at the same time, resulting in frequent congestion of the entire membrane system, high cleaning costs, and the risk of toxicity in the treatment of hydrogen sulfide gas.
The process flow including PH regulation tank, decolorization reaction tank, flocculation reaction tank, pre-aeration reaction tank, and pre-aeration reaction tank are adopted. Through PH regulation, decolorizer addition, PAM flocculation and aeration, the hard-to-degrade organic matter and sulfide are removed. , form precipitates, increase the pH value of the effluent, reduce membrane stains and cleaning costs.
The simultaneous removal of difficult-to-degrade organic matter and sulfide is achieved, which reduces the frequency of congestion in the entire membrane system, reduces the cleaning and operation costs, ensures the continuous and stable water production of the system, and reduces the use of alkaline agents and ferrous ferrous through aeration. pollute.
Smart Images

Figure CN118908443A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of landfill leachate treatment, and specifically relates to a full-membrane system pretreatment process for highly refractory organic matter and high-sulfur leachate. Background Art
[0002] As a wastewater with high concentration of difficult-to-degrade organic matter and complex composition, humus is an important component of organic matter in leachate and also the component with the largest proportion of difficult-to-degrade organic matter. As the landfill time increases, the content of humus increases, especially fulvic acid. In addition, the leachate also contains various aromatic compounds, griseofulvic acid and other difficult-to-biodegrade organic matter. These difficult-to-biodegrade organic matter has a certain negative impact on the operation of leachate treatment equipment, whether it is mainly based on biochemical method or full membrane system, especially full membrane system, which will cause serious organic pollution, and even some colloidal organic matter will carry other inorganic scales to cause double pollution and serious membrane blockage. The flux can be restored after cleaning, but the flux drops rapidly, and continuous normal water production is difficult.
[0003] In most landfills in my country, due to factors such as the actual landfill volume being greater than the designed volume, historical rainwater and sewage diversion problems, and deterioration of leachate water quality, the original leachate treatment system is unable to bear the actual treatment volume demand, and leachate accumulation occurs from time to time. The landfill will activate emergency equipment to quickly treat the stock leachate. Most emergency equipment uses full membrane systems, such as roll membranes, disc-tube reverse osmosis membranes, STRO, etc. When the full membrane system is in operation, acid and scale inhibitors will be added to the raw water end to avoid excessive inorganic pollution. Commonly used acids are sulfuric acid and hydrochloric acid. For projects using sulfuric acid, the introduced sulfate ions are eventually intercepted at the concentrated water end. As the concentrated liquid is recharged to the landfill, the sulfate enters the landfill body and is converted into hydrogen sulfide under anaerobic conditions, and finally returns to the leachate as ionized S2- or free H2S. Hydrogen sulfide is highly reducing and corrosive. Its reducing property is manifested in that when the leachate comes into contact with air, S2- is oxidized by oxygen in the air to produce a milky white precipitate - elemental sulfur. This substance seriously clogs filters and reverse osmosis membranes, resulting in low water production rate of equipment, frequent cleaning, and increased operating and maintenance costs.
[0004] At present, there is no targeted pretreatment method for difficult-to-degrade organic matter in the emergency treatment process, and membranes are usually used for direct interception. The common solution for sulfides is to control the pH, keep it in a free state as much as possible, and remove it in the form of gas by stripping. This method is effective, but there are fatal problems in operation. When the pH is less than 6.1, hydrogen sulfide gas will be produced, which has a distinct and pungent smell of rotten eggs. When it accumulates to a certain concentration, it will be poisonous to operators. Therefore, the stripped gas needs to be centrally disposed of, and the whereabouts of the waste liquid from the deodorization system is a difficult problem. Other methods are also used, such as aerated sedimentation, chemical sedimentation, etc. These methods are simply aimed at the removal of sulfides.
[0005] The reality is that most projects have problems with organic matter and sulfide at the same time. The two produce a milky white jelly-like substance, which greatly interferes with the normal and stable operation of the membrane system. The exploration of removing the two substances at the same time can not only overcome the frequent pollution problem of the membrane system, but also simplify the pretreatment process of the whole membrane system, which is the basis of the project of this invention. Summary of the invention
[0006] To achieve the above object, the present invention proposes a full membrane system pretreatment process for highly refractory organic matter and high-sulfur leachate, which is applied to a sewage treatment device, wherein the sewage treatment device sequentially comprises a pH adjustment tank, a decolorization reaction tank, a primary flocculation reaction tank, a primary sedimentation tank, a pre-aeration reaction tank, a secondary flocculation reaction tank and a secondary sedimentation tank; the process comprises the following steps:
[0007] (1) pH value adjustment is performed in a pH adjustment tank, and mixing is performed using a paddle stirrer;
[0008] (2) Add a dedicated decolorizing agent into the decolorizing reaction tank and stir and mix with a paddle stirrer;
[0009] (3) PAM was added into the primary flocculation reaction tank to enhance the flocculation effect, and a frame stirrer was used for stirring and mixing;
[0010] (4) An inclined tube filler or a vertical flow center tube is installed in the primary sedimentation tank to discharge the supernatant after sedimentation;
[0011] (5) An aeration system is set up in the pre-aeration reaction tank, and gravity flows into the secondary flocculation tank;
[0012] (6) PAM is added into the secondary flocculation reaction tank to enhance the flocculation effect, and a frame stirrer is used for stirring and mixing;
[0013] (7) An inclined tube filler or a vertical flow center tube is installed in the secondary sedimentation tank to discharge the supernatant after sedimentation;
[0014] (8) The residual sludge produced in the primary and secondary sedimentation tanks is sent to the sludge treatment system.
[0015] Among them, the pH adjustment range of the pH regulating pool is 4.2-5.0.
[0016] The dosage range of decolorizing agent is 2000-4000mg / L.
[0017] The landfill leachate after the primary flocculation reaction tank flows by gravity into the primary sedimentation tank for mud-water separation treatment, and the supernatant after sedimentation flows by gravity into the pre-aeration reaction tank.
[0018] The aeration intensity of the aeration tank is 1.5-3m 3 / (m 2 .h).
[0019] Within a reasonable pH range, by adding decolorizer, the hard-to-degrade organic matter and sulfide are removed under the action of PAM flocculation enhancement; under the action of pre-aeration and PAM enhanced flocculation, the residual sulfide continues to be removed, and the pH value of the effluent is increased to prepare for the membrane system.
[0020] More optimally, the process comprises the following steps:
[0021] Add a dedicated decolorizer into the decolorization reaction tank to remove the hard-to-degrade organic matter (removal rate 50-70%) and sulfide (removal rate 60-80%) at the same time and convert them into sediment. A paddle-type stirrer is used in the tank for stirring and mixing.
[0022] The sedimentation tank can be in the form of inclined pipe or vertical flow, and can be selected according to the water volume, land space and equipment size.
[0023] In the pre-aeration reaction tank, air is introduced through the aeration system to continue to oxidize and convert the negative divalent sulfur into zero-valent sulfur to form a precipitate, thereby enhancing the removal of sulfides with a removal rate close to 100%. At the same time, some acidic volatile substances can be removed through aeration stripping, raising the pH to a range suitable for the membrane system (5.5-6.5). In addition, other inorganic pollution can be removed at the same time, such as iron pollution induced by Fe2+ ions.
[0024] The leachate from the pre-aeration reaction tank flows by gravity into the secondary flocculation reaction tank, and the flocculation effect is enhanced by adding PAM; a frame mixer is used in the tank for stirring and mixing.
[0025] After the secondary flocculation reaction tank, the landfill leachate flows by gravity into the secondary sedimentation tank for mud-water separation treatment, and the supernatant after sedimentation flows by gravity into the raw water tank of the membrane system. The sedimentation tank can be in the form of inclined pipe or vertical flow, which can be selected according to the water volume, land space and equipment size.
[0026] By utilizing the pretreatment process provided by the present invention, refractory organic matter and sulfide can be removed simultaneously, the fouling and clogging frequency of the full membrane system in leachate treatment can be reduced, the cleaning and operating costs can be reduced, and continuous and stable water production of the system can be ensured.
[0027] The sulfide removal is more thorough, and chemical precipitation comes first and aeration comes later, which minimizes the aeration residence time, simplifies the process flow, and minimizes the equipment footprint.
[0028] By utilizing the characteristic of increased pH after aeration, the dosage of alkaline agents is reduced.
[0029] Through aeration, the problem of ferrous iron pollution that is ignored by most landfills is solved, and the possibility of inorganic pollution of the membrane is further reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 The figure is a schematic flow chart of a pretreatment process for high-sulfur landfill leachate according to the present invention.
[0031] In the figure: T01-PH adjustment tank; T02-decolorization reaction tank; T03-primary flocculation reaction tank; T04-primary sedimentation tank; T05-pre-aeration reaction tank; T06-secondary flocculation reaction tank; T07-secondary sedimentation tank.
[0032] S1, S2-paddle mixer; S3, S10-frame mixer; S4-hydrochloric acid dosing system; S5-exclusive decolorizing agent dosing system; S6-PAM(-) dosing system; S7, S11-center tube; S8, S12-water outlet rectifier; S9-pre-aeration system; S13-sludge pump. DETAILED DESCRIPTION
[0033] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the embodiments of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0034] The present invention provides a pretreatment process for highly refractory organic matter and high-sulfur leachate in a full membrane system, such as Figure 1 shown.
[0035] Step 1: The leachate raw water enters the T01. PH regulating tank, hydrochloric acid is added through the S4. hydrochloric acid dosing system, and the wastewater is stirred and mixed using the S1. paddle mixer to adjust the PH to 4.2-5.0, and the acid dosage is about 1%-2%.
[0036] Step 2: The effluent from T01.PH adjustment tank flows to T02.decolorization reaction tank through the water hole, and 2000-4000mg / L of exclusive decolorizer is added through S5.exclusive decolorizer dosing system (the specific dosage is adjusted according to the small test experiment), and the wastewater is stirred and mixed by S2.paddle mixer, and the reaction residence time is controlled at 40-60min. The exclusive decolorizer reacts with organic matter and sulfide to precipitate precipitate.
[0037] Step 3: The effluent from the T02. decolorization reaction tank flows through the water hole to the T03. primary flocculation reaction tank. 3-5 mg / LPAM(-) is added through the S6. PAM(-) dosing system. The wastewater is stirred and mixed using the S3. frame mixer. The reaction residence time is controlled at 30-40 minutes. Under the action of PAM(-), the precipitated flocs become larger and the sedimentation properties can be optimized.
[0038] Step 4: The effluent from the T03. primary flocculation reaction tank flows by gravity through the pipeline to the T04. primary sedimentation tank. The S7. central tube is used to achieve uniform water distribution and mud-water separation, and the surface load is controlled at about 0.8m3 / (m2·h). The S8. effluent rectification device is used to achieve stable effluent and prevent mud from running. The organic matter removal rate in the supernatant is 50-70%, and the sulfide removal rate is 60-80%.
[0039] Step 5: The effluent from the T04. primary sedimentation tank flows through the water hole to the T05. pre-aeration reaction tank. The retention time is set to 30-40 minutes. The pre-aeration system is used to blow air into the tank. The aeration form is not limited to perforated pipes or disc aeration. The aeration intensity is 1.5-3m 3 / (m 2 .h). Under the action of oxygen molecules in the air, the remaining sulfide is further oxidized to sulfur, and divalent iron can also be oxidized. Through the large amount of air stripping, the acid gas is removed and the pH of the outlet water gradually rises.
[0040] Step 6: The effluent from T05. pre-aeration reaction tank flows into T06. secondary flocculation reaction tank through the water hole. The residence time is set to 30-40min. 3-5mg / LPAM(-) is added through S6. PAM(-) dosing system. The wastewater is stirred and mixed by S10. frame mixer to increase the particle size of precipitated flocs and improve its sedimentation performance.
[0041] Step 7: The effluent from T06. Secondary flocculation reaction tank flows to T07. Secondary sedimentation tank through the pipeline. The S11. Central tube is used to achieve uniform water distribution and mud-water separation, and the surface load is controlled to 0.8m3 / (m 2.h), the S12. outlet water rectifying device is used to achieve stable water outlet and prevent mud from running. The sulfide removal rate in the supernatant is close to 100%. This avoids the problem of sulfide precipitation and clogging the membrane column in the filter and membrane column.
[0042] Step 9: T07. The effluent from the secondary sedimentation tank goes to the membrane system. The effluent COD removal rate is greater than 50%, the sulfide removal rate is greater than 95%, and the pH value is 5.5-6.5, which prepares the pH conditions for entering the membrane system and saves the amount of alkali.
[0043] Step 10: The sludge from the primary sedimentation tank T04 and the secondary sedimentation tank T07 is pumped into the sludge treatment system through the sludge pump S13.
[0044] The present invention effectively solves the problem of serious fouling and blockage of the whole membrane system when the landfill leachate has high refractory organic matter and high sulfur properties, ensures the stable operation of the subsequent membrane system, and reduces the cleaning and operation costs. The process flow is simple, and the process is adapted according to the removal capacity of pollutants, saving equipment floor space and equipment investment.
[0045] Example
[0046] (1) Project name: A landfill leachate treatment project in Anhui.
[0047] (2) Project Overview: Designed water volume is 660 tons / day, COD content of landfill leachate is 2000-2300 mg / L, sulfide is 240-260 mg / L; pH value is 7-8. Three sets of integrated equipment are provided, each set of equipment is 12m long, 2.4m wide, 3m high, and has an installed power of 35kw.
[0048] (3) Operation effect: effluent COD content ≤ 1000 mg / L, sulfide ≤ 5 mg / L, pH value 5.5-6.5. In this example, the construction cost of the civil engineering part is 50,000 yuan, the equipment investment cost is 750,000 yuan, and the operating cost is 12 yuan / ton of water.
Claims
1. A pre-membrane pretreatment process for highly refractory organic matter and high-sulfur leachate, applied to a sewage treatment device, wherein the sewage treatment device sequentially comprises a pH adjustment tank, a decolorization reaction tank, a primary flocculation reaction tank, a primary sedimentation tank, a pre-aeration reaction tank, a secondary flocculation reaction tank and a secondary sedimentation tank, characterized in that: The process comprises the following steps: (1) pH value adjustment is performed in a pH adjustment tank, and mixing is performed using a paddle stirrer; (2) Add a dedicated decolorizing agent into the decolorizing reaction tank and stir and mix with a paddle stirrer; (3) PAM was added into the primary flocculation reaction tank to enhance the flocculation effect, and a frame stirrer was used for stirring and mixing; (4) An inclined tube filler or a vertical flow center tube is installed in the primary sedimentation tank to discharge the supernatant after sedimentation; (5) An aeration system is set up in the pre-aeration reaction tank, and gravity flows into the secondary flocculation tank; (6) PAM is added into the secondary flocculation reaction tank to enhance the flocculation effect, and a frame stirrer is used for stirring and mixing; (7) An inclined tube filler or a vertical flow center tube is installed in the secondary sedimentation tank to discharge the supernatant after sedimentation; (8) The residual sludge produced in the primary and secondary sedimentation tanks is sent to the sludge treatment system.
2. The process according to claim 1, characterized in that: The pH adjustment range of the pH regulating pool is 4.2-5.
0.
3. The process according to claim 1, characterized in that: The dosage range of decolorizing agent is 2000-4000mg / L.
4. The process according to claim 1, characterized in that: The landfill leachate after the primary flocculation reaction tank flows by gravity into the primary sedimentation tank for mud-water separation treatment, and the supernatant after sedimentation flows by gravity into the pre-aeration reaction tank.
5. The process according to claim 1, characterized in that: The aeration intensity of the aeration tank is 1.5-3m 3 / (m 2 .h).
6. The process according to claim 1, characterized in that: Within a reasonable pH range, by adding decolorizer, the hard-to-degrade organic matter and sulfide are removed under the action of PAM flocculation enhancement; under the action of pre-aeration and PAM enhanced flocculation, the residual sulfide continues to be removed, and the pH value of the effluent is increased to prepare for the membrane system.
Citation Information
Patent Citations
Treatment process of barium residue leachate
CN115925186A
Combined process for full-quantitative treatment of landfill leachate
CN115974300A
A landfill leachate purification system
CN218811002U