Construction method for integrally lifting and transversely moving arch rib to ship

Through the construction method of lifting the arch ribs in the gantry crane and moving them horizontally onto the ship, the construction dependence on hydrological conditions and synchronization control problems in the existing technology are solved, the construction safety and efficiency are improved, and the installation time of arch ribs is shortened.

CN118911031AActive Publication Date: 2024-11-08ROAD & BRIDGE INT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411265871.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-08
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

The existing steel structure arch bridge construction methods are highly dependent on hydrological and weather conditions, and the synchronization of arch ribs is not easy to control during the lifting and boarding of ships, resulting in construction delays and safety risks. The ship is inaccurate in alignment in the floating state, resulting in arch ribs. Installation takes a long time.

Method used

The construction method of lifting the arch ribs in the gantry crane and moving the arch ribs across the boat is adopted. By assembling the arch ribs on the shore and setting up temporary beams between the arch ribs, erecting the trest docks and gantry crane tracks, the gantry crane is used to lift the arch ribs as a whole and slide along the track. Go to the ship, gradually relax the hook after fixing to ensure that the arch ribs are stable to transfer weight to the ship.

Benefits of technology

It reduces the dependence of construction on hydrological conditions, improves construction safety and efficiency, avoids the risk of arch rib overturning, and shortens the total construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911031A_ABST
    Figure CN118911031A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method for integrally lifting, transversely moving and boarding arch ribs, which comprises the following steps of: assembling the arch ribs on the shore by adopting a bracket method, and fixedly connecting two temporary cross beams between arch feet of the two arch ribs; two trestle docks are erected in a river from an arch rib assembling site, two arch rib transport ships are driven into the two docks respectively and are subjected to mooring and positioning, four gantry cranes lift arch ribs to transversely move to trestles, and the arch ribs are lowered and fixed to the ships. The method is not limited by hydrological conditions, and the floating window period of the arch rib can be flexibly selected; when the arch rib is fixed with the support on the ship, the gantry crane always lifts the arch rib, so that the overturning danger caused by inconsistent stress at the two ends of the arch rib can be avoided, and the safety is high; the arch rib boarding speed is high, and the total construction time consumption can be shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and relates to an arch rib installation construction of a steel structure arch bridge, and specifically to a construction method in which a gantry crane is used to integrally lift the arch rib and laterally move it onto the ship when double ships are used to float the arch rib. Background Art

[0002] When constructing a steel arch bridge across a river or the sea, if the navigation conditions are met, a construction method is often used in which the arch ribs are assembled in a different location and transported to the bridge site by two ships for installation. For example, patent CN105603861A discloses "an integrally assembled floating lifting arch bridge and its construction method", which sets two trestles in the water, with a barge docked on the inner side of each trestle. At low tide, ballast water is first injected into the barge to lower the height. After the arch ribs are assembled on the shore, they slide onto the trestles. Then, at high tide, the two barges are drained and raised, and the bearings on the ship are connected to the two ends of the arch ribs and the arch ribs are lifted up. The arch ribs are then floated to the bridge site by two ships for installation. This method makes full use of water transportation conditions, but there are the following problems in construction:

[0003] 1. It is highly dependent on hydrological and weather conditions, and needs to wait for the window period of high and low tide levels. If bad weather occurs, the construction period will be delayed;

[0004] 2. During the process of lifting the arch rib to board the ship, it is difficult to control the synchronization of the two ships floating up. If the lifting height deviation of the two ships exceeds a certain range before the arch rib is fixed to the ship, there is a risk of the arch rib capsizing;

[0005] 3. The docking accuracy between the two ends of the arch rib and the supports on the ship is required to be high. However, when the ship is floating, it will inevitably sway due to the influence of wind and waves. The stability and position of the ship are not easy to control, and it is easy to have misalignment problems. Once the docking fails, the ship needs to be re-pressurized with cabin water to lower the height, and then the position of the ship needs to be adjusted to drain and float again to dock with the arch rib, which makes it time-consuming to board the arch rib. Summary of the invention

[0006] The purpose of the present invention is to provide a method for lifting and laterally moving an arch rib onto a ship as a whole to solve the above problems, thereby reducing the construction difficulty when the arch rib is mounted on a ship, speeding up the construction progress and ensuring the construction safety.

[0007] The technical solution of the present invention is as follows:

[0008] A construction method for lifting and lateral movement of an arch rib as a whole onto a ship, characterized by comprising the following steps:

[0009] (1) Assemble the arch ribs on the shore using the bracket method, install the cross brace between the two arch ribs, and fix two temporary cross beams between the arch feet of the two arch ribs;

[0010] (2) two trestle docks are built from the arch rib assembly site to the river, each trestle dock includes two parallel trestles, and a distance between the two trestles is set to accommodate an arch rib transport ship, forming a trestle dock;

[0011] Lay gantry crane tracks at the arch rib assembly site and on the top of the trestle;

[0012] (3) Two arch rib transport ships enter the two docks respectively and are moored to position, and the arch rib supports are installed on the ships;

[0013] (4) Four gantry cranes are installed between the two arch ribs, with two gantry cranes installed at each end of the arch rib. The two gantry cranes at each end are connected to the temporary beams between the two arch ribs through hooks;

[0014] (5) Four gantry cranes are started simultaneously to lift the arch rib as a whole, slide it along the gantry crane track to the pier, align the legs at both ends of the arch rib with the arch rib supports on the ship, and then slowly lower the arch rib, support the legs at both ends of the arch rib on the arch rib supports and connect and fix them;

[0015] (6) The gantry crane gradually loosens the hook until the weight of the arch rib is completely transferred to the ship; after confirming that the arch rib is stable, the gantry crane hook is completely released, the gantry crane is dismantled, and the two arch rib transport ships sail out of the dock and float the arch ribs to the bridge for installation.

[0016] Compared with the prior art, the present invention has the following advantages:

[0017] 1. The hydrological conditions have little impact on the arch rib boarding construction. The height of the arch rib lifted by the gantry crane can be adjusted arbitrarily without being restricted by high and low tide levels. The arch rib floating window period selection is more flexible;

[0018] 2. The present invention uses a gantry crane to lower the arch rib onto the ship, which is completely different from the prior art that uses the ship to lift the arch rib. When the gantry crane lowers the arch rib, before the arch rib is fixed to the support on the ship, the gantry crane is always in a lifting state for the arch rib, which can completely avoid the risk of overturning caused by inconsistent force at both ends of the arch rib, and the construction safety is high;

[0019] 3. In the process of lowering the arch rib, when the arch rib is docked with the support on the ship, if there is a deviation in the position of the ship, the gantry crane can immediately lift the arch rib, readjust the position of the ship and then lower the arch rib again. Compared with the prior art of adjusting the height of the ship by filling and draining water inside the ship, the total construction time can be greatly shortened. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a construction flow chart of the present invention;

[0021] Figure 2 It is a schematic diagram of the plan structure of the arch rib shore assembly and the trestle dock;

[0022] Figure 3 It is a schematic diagram of the plan structure of two barges entering the trestle dock and the gantry crane lifting the arch rib;

[0023] Figure 4 It is a side view structural diagram of the gantry crane lifting arch rib;

[0024] Figure 5 This is a schematic diagram of the front view of the arch rib of the gantry crane;

[0025] Figure 6 It is a schematic diagram of the plan structure of the gantry crane placing the arch rib on the ship;

[0026] Figure 7 It is a front view structural diagram of the gantry crane placing arch ribs on the ship. DETAILED DESCRIPTION

[0027] Figure 1 It is the construction flow chart of the present invention, and the specific construction method is as follows:

[0028] (1) Figure 2 As shown, an arch rib assembly site is set up on the shore, and the arch rib 1 is assembled by a bracket method, and a cross brace 2 between two arch ribs is installed at the same time; after the arch rib assembly is completed, two temporary cross beams 3 are fixedly connected between the arch feet of the two arch ribs;

[0029] The temporary crossbeam 3 may adopt a truss structure, and both ends of the truss are respectively welded to the arch ribs;

[0030] (2) two trestle docks are built from the arch rib assembly site to the river, each trestle dock includes two parallel trestle bridges 4, and a distance between the two trestle bridges 4 is set to accommodate an arch rib transport ship, forming a trestle dock 5;

[0031] Lay gantry crane tracks 6 at the arch rib assembly site and on the top surface of the trestle;

[0032] (3) Figure 3 , Figure 4 , Figure 5 As shown, two arch rib transport ships 7 are driven into two docks respectively and tied to position, and arch rib supports 8 are installed on the two ships respectively;

[0033] (4) Four gantry cranes 9 are installed between the two arch ribs, with two gantry cranes installed at each end of the arch rib. The two gantry cranes 9 at each end are connected to the temporary crossbeam 3 between the two arch ribs through hooks;

[0034] (5) Figure 6 , Figure 7As shown, four gantry cranes 9 are started simultaneously to lift the arch rib 1 as a whole, slide it along the gantry crane track to the trestle, accurately adjust the position of the barge by mooring, align the legs at both ends of the arch rib 1 with the arch rib support 8 on the barge 7, and then slowly lower the arch rib, support the legs at both ends of the arch rib on the arch rib support 8, and connect and fix them by welding or screwing;

[0035] During the process of connecting and fixing the arch rib to the support on the ship, the gantry crane always keeps lifting the arch rib to prevent the arch rib from capsizing due to shaking caused by wind and waves or height inconsistency between the two ships;

[0036] (6) The gantry crane gradually loosens its hook until the weight of the arch rib 1 is completely transferred to the barge 7. After confirming that the arch rib is stable, the gantry crane hook is completely released, the gantry crane is dismantled, and the two barges 7 are driven out of the dock to float the arch rib 1 to the bridge position for installation.

Claims

1. A construction method for lifting and transversely moving an arch rib as a whole onto a ship, characterized in that: The following steps are involved: (1) Assemble the arch ribs on the shore using the bracket method, install the cross brace between the two arch ribs, and fix two temporary cross beams between the arch feet of the two arch ribs; (2) two trestle docks are built from the arch rib assembly site to the river, each trestle dock includes two parallel trestles, and a distance between the two trestles is set to accommodate an arch rib transport ship, forming a trestle dock; Lay gantry crane tracks at the arch rib assembly site and on the top of the trestle; (3) Two arch rib transport ships enter the two docks respectively and are moored to position, and the arch rib supports are installed on the ships; (4) Four gantry cranes are installed between the two arch ribs, with two gantry cranes installed at each end of the arch rib. The two gantry cranes at each end are connected to the temporary beams between the two arch ribs through hooks; (5) Four gantry cranes are started simultaneously to lift the arch rib as a whole, slide it along the gantry crane track to the pier, align the legs at both ends of the arch rib with the arch rib supports on the ship, and then slowly lower the arch rib, support the legs at both ends of the arch rib on the arch rib supports and connect and fix them; (6) The gantry crane gradually loosens the hook until the weight of the arch rib is completely transferred to the ship; after confirming that the arch rib is stable, the gantry crane hook is completely released, the gantry crane is dismantled, and the two arch rib transport ships sail out of the dock and float the arch ribs to the bridge for installation.

Citation Information

Patent Citations

  • Integrated assembling floating transportation lifting arch bridge and construction method thereof

    CN105603861A

  • Steelwork pipe arch bridge float-dragging construction method

    CN101117793A

  • Steel structural bridge installation method by utilizing air bag carrying

    CN107761568A

  • Bridge building steel structure transporting method

    CN109823970A

  • Maritime vertical rail type cargo handling system

    JP1996164889A