Disposal device and method based on tunnel time-lag effluent

By setting cross beams, arch beams, water barriers and grouting pumps in the tunnel time-delayed water outlet section, the separation and grouting treatment of the water discharge holes are achieved, and the problem of poor grouting and water blocking effect in the prior art is solved. , ensuring the stability of the palm surface, reducing the water output and deformation risk.

CN118911730APending Publication Date: 2024-11-08CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411211680.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing tunnel delay water effluent treatment device mainly relies on grouting and blocking water on the inner wall of the tunnel. It has poor results and is difficult to maintain the stability of the palm surface, resulting in an increase in the water effluent and accelerated deformation of the initial branch, which may even cause sudden collapse. .

Method used

A device containing cross beams, arch beams, water barriers and grouting pumps is designed to provide temporary support through cross beams and arch beams. The water barrier separates and blocks the water flow of the drain holes. The grouting pump performs grouting treatment to ensure that The palm face is stable.

Benefits of technology

It effectively prevents deformation caused by the release of water flow in the tunnel sluggish water outlet section, improves the water outlet treatment effect, reduces the water outlet volume, and enhances construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911730A_ABST
    Figure CN118911730A_ABST
Patent Text Reader

Abstract

A handling device and method based on tunnel time-lag water outlet comprises a cross beam (1) installed on a tunnel arch foot, an arched beam (2) arranged on the cross beam (1), a water baffle (3) arranged on the cross beam (1) and a grouting pump (4) arranged on the arched beam (2), through the cross beam (1) and the arched beam (2), temporary supporting of a tunnel time-lag water outlet section is achieved, and through the water baffle (3), the grouting pump (4) is arranged on the arched beam (2). The water flow released by the oblique line drainage hole (10) and the vertical line drainage hole (20) is separated and blocked, grouting treatment is carried out on the oblique line drainage hole (10) and the vertical line drainage hole (20) after the water flow is released through the grouting pump (4), and water treatment is carried out on the time-lag water outlet section of the tunnel while it is guaranteed that the tunnel face is in a stable state. The technical problem that grouting and water plugging are directly carried out on the inner wall of the tunnel is solved, and therefore the treatment effect on time-lag water outlet of the tunnel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a treatment device and method, in particular to a treatment device and method based on time-delay water discharge in a tunnel. Background Art

[0002] When sandy slate and carbonaceous slate are interlayered, a new working condition is likely to occur in which water comes out of the sandy slate layer and the carbonaceous slate layer softens at the same time. Water bodies within three times the tunnel diameter and higher than the bottom of the tunnel are prone to time-delayed water outflow. Time-delayed water outflow refers to the absence of water or local drip-like water outflow during tunnel excavation. As the tunnel face continues to advance, the surrounding rock of the supported section loosens, and the rock cracks open or penetrate, forming a new hydraulic path, causing the groundwater outside the contour line to gradually gather behind the primary support, resulting in an increase in water outflow points on the surface of the supported section. , the water discharge area increases, the water discharge volume increases, and even accompanied by the increase in the deformation rate of the primary support, etc., which may cause the primary support to be damaged, sudden surges and landslides in severe cases. Therefore, a treatment device based on tunnel time-delay water discharge is an important tunnel construction device. Among the existing treatment devices based on tunnel time-delay water discharge, there is no treatment device based on tunnel time-delay water discharge, and grouting and water blocking are directly performed on the inner wall of the tunnel. Due to the inconvenient treatment of grouting and water blocking, the treatment effect of tunnel time-delay water discharge is affected. The present invention has the technical feature of treating the time-delayed water outlet section of the tunnel while ensuring that the tunnel face is in a stable state, and has carried out effective exploration and research on the technical problem of directly grouting and blocking water on the inner wall of the tunnel. The statements here only provide background technology related to the present invention and do not necessarily constitute prior art. The technical solution of the present invention is made based on the technical briefing document provided by the applicant on August 13, 2024, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention

[0003] The object of the present invention is a treatment device based on tunnel time-delay water discharge. The object of the present invention is a treatment method based on time-delayed water discharge from a tunnel.

[0004] In order to overcome the above technical shortcomings, the purpose of the present invention is to provide a treatment device and method based on tunnel time-delay water discharge, thereby improving the treatment effect of tunnel time-delay water discharge.

[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a treatment device based on time-delay water discharge in the tunnel, comprising a crossbeam installed on the tunnel arch foot, an arch beam arranged on the crossbeam, a water retaining plate arranged on the crossbeam, and a grouting pump arranged on the arch beam.

[0006] Due to the design of cross beams, arch beams, water retaining plates and grouting pumps, temporary support is achieved for the time-delay water outlet section of the tunnel through the cross beams and arch beams, the water flows released from the oblique drainage holes and the vertical drainage holes are separated and blocked through the water retaining plates, and grouting treatment is achieved for the oblique drainage holes and the vertical drainage holes after the released water flows are completed through the grouting pumps, thereby achieving water treatment for the time-delay water outlet section of the tunnel while ensuring that the heading face is in a stable state, solving the technical problem of directly grouting and blocking water on the inner wall of the tunnel, thereby improving the treatment effect of time-delay water outlet in the tunnel.

[0007] The present invention is designed to interconnect the cross beam, the arch beam, the water retaining plate and the grouting pump in a manner that water treatment is performed on the time-delay water outlet section of the tunnel while ensuring that the tunnel face is in a stable state.

[0008] The present invention is designed to connect the cross beam and the arch beam with the water retaining plate and the grouting pump in a way of temporarily supporting the time-delay water outlet section of the tunnel.

[0009] The technical effects of the above three technical solutions are: realizing the water flow release operation in the tunnel time-lag water outlet section while preventing deformation, ensuring that the tunnel face is in a stable state.

[0010] The present invention is designed to further include a first accessory device, and the first accessory device is arranged on the arch beam, and the first accessory device is arranged as a water shielding plate.

[0011] The technical effect of the above technical solution is: to realize the integrated installation of other components, and to expand the technical effect of the present invention.

[0012] The present invention is designed that an arch beam and a water retaining plate are respectively arranged on the cross beam, and a grouting pump and a water retaining plate are respectively arranged on the arch beam.

[0013] The technical effect of the above technical solution is that the basic technical solution of the present invention is formed by the cross beam, arch beam, water retaining plate, grouting pump and water retaining plate, which solves the technical problem of the present invention.

[0014] The present invention is designed that the cross beam is arranged to include a beam portion I, a frame portion I, a tightening screw portion, a rod portion I and a rod portion II, and an accommodating hole body is arranged on the upper end face portion of the beam portion I, an accommodating groove body I is arranged outside the lower end face portion of the beam portion I, and a block portion I is arranged at the inner end head of the lower cross portion of the frame portion I, the outer end head of the beam portion I is arranged to be connected to the frame portion I in a through-type manner, and the tightening screw portion is arranged to be connected to the accommodating hole body in a threaded manner, the peripheral side surface portion of the tightening screw portion is arranged to be connected to the inner end face portion of the frame portion I in a contacting manner, and the vertical portion of the frame portion I is arranged It is connected to the inner end of rod part I in a through-type manner, the inner side of the outer end of rod part I is arranged to be connected to the inner end of rod part II through a pin shaft and block part I is arranged to be connected to the accommodating groove body I in a sunken manner, the upper end face portion of beam part I is arranged to be connected to the arch beam in a contact manner and the accommodating hole body is arranged to be connected to the arch beam through bolts, the outer ends of rod part I and rod part II are respectively arranged to be connected to the water retaining plate in a sunken manner and the outer end of frame part I is arranged to be connected to the tunnel arch foot in a contact manner, and the lower end face portion of beam part I is arranged to be connected to the bottom of the tunnel in a contact manner.

[0015] The present invention is designed that the beam portion I is set as a convex strip-shaped body and the frame portion I is set as an H-shaped frame-shaped body, the lower end face portion of the upper transverse portion of the frame portion I is set to be contact-connected with the outer side of the upper end face of the beam portion I and the tightening screw portion is set as a hexagon socket bolt, the rod portion I and the rod portion II are respectively set as rectangular rod-shaped bodies and the accommodating hole bodies are set as threaded hole bodies, the accommodating hole bodies are set to be arranged and distributed at intervals along the upper end face portion of the beam portion I and the accommodating groove body I is set as a dovetail groove body, and the block portion I is set as a dovetail seat body.

[0016] The technical effect of the above two technical solutions is that the tunnel arch foot can be tightly supported.

[0017] The present invention is designed that the arch beam is arranged to include a block part II, a beam part II, a beam part III, a frame part II, a lifting screw part, a rod part III and a rod part IV, and the inner end head of the beam part II and the inner end head of the beam part III are respectively arranged to be connected with the vertical end head of the frame part II, the upper end face portion of the horizontal part of the frame part II is arranged to be contact-connected with the lower end face portion of the block part II, and the horizontal part of the frame part II is arranged to be threadedly connected with the lifting screw part, the inner end head of the lifting screw part is arranged to be sunk-connected with the lower end face portion of the block part II, and the outer corner portion of the rod part III is respectively arranged to be connected with the lower side portion of the inner end face of the beam part II and the beam part The lower side of the inner end face of part III is connected, the inner end head of rod part IV is arranged to be connected to the vertical part of frame part II through a pin shaft and the lower end face part of the lower transverse part of rod part III is arranged to be connected in contact with the cross beam, the lower transverse part of rod part III is arranged to be connected to the cross beam through bolts and the oblique part of rod part III is arranged to be connected to the grouting pump, the outer vertical part of rod part III is arranged to be connected to the water shielding plate through bolts and the outer end head of rod part IV is arranged to be in contact with the bottom of the tunnel, and the outer end face parts of block part II, the outer end face parts of beam part II and the outer end face parts of beam part III are respectively arranged to be connected in contact with the inner wall of the tunnel.

[0018] The present invention designs that the block part II is set as a seat-shaped body with an arc-shaped surface at the upper end face part and a U-shaped groove body at the lower end face part, the beam part II and the beam part III are respectively set as C-shaped strip-shaped bodies, the frame part II is set as an L-shaped rod-shaped body with a threaded hole body in the horizontal part, the jacking screw part is set as an internal hexagonal bolt, the rod part III is set as an N-shaped rod-shaped body with through hole bodies in the outer vertical part and the lower horizontal part respectively, and the rod part IV is set as a straight rod-shaped body. The inner end of the jacking screw part is set to be connected with the U-shaped groove body of the block part II, and the jacking screw part is set to be connected with the threaded hole body of the frame part II.

[0019] The technical effects of the above two technical solutions are as follows: realizing the tight support for the tunnel vault.

[0020] The present invention designs that a receiving groove body II is arranged in the middle part of the inner end face of the plate part I of the water baffle, and the receiving groove body II is set to be connected with the cross beam in a receiving manner. The side faces of adjacent plate parts I are set to be connected in an overlapping manner, and the lower end face of the plate part I is set to be connected in a contact manner with the tunnel bottom.

[0021] The present invention designs that the plate part I is set as a sheet-shaped body with an extension platform at the lower end face part, and the receiving groove body II is set as a U-shaped groove body.

[0022] The technical effects of the above two technical solutions are as follows: realizing the blocking of water flow before the initial support in the time-delay water outlet section of the tunnel.

[0023] The present invention designs that the grouting pump is set to include a piston rod part, a cylinder shell I, a cylinder shell II, a valve part I, a valve part II, a high-pressure pipe I and a high-pressure pipe II. One end of the piston rod part is set to be slidably connected with the cylinder shell I, the other end of the piston rod part is set to be slidably connected with the cylinder shell II, the inner end part of the side face of the cylinder shell I is set to be connected in a communicating manner with the inner port part of the high-pressure pipe I, the outer end part of the side face of the cylinder shell I is set to be connected in a communicating manner with the inner port part of the high-pressure pipe II, and the outer end part of the side face of the cylinder shell I is respectively set to be connected in a communicating manner with the inner port parts of the valve part I and the valve part II through an infusion pipe. The inner parts of the peripheral side faces of the cylinder shell I and the inner parts of the peripheral side faces of the cylinder shell II are respectively set to be connected with the arch beam, and the infusion pipe located at the outer port part of the valve part I is set to be connected in a communicating manner with the grouting liquid storage tank. The infusion pipe located at the outer port part of the valve part II is set to be connected in a communicating manner with the grouting pipe in the grouting hole on the tunnel inner wall, and the outer port parts of the high-pressure pipe I and the high-pressure pipe II are respectively set to be connected in a communicating manner with the high-pressure liquid device. The control port parts of the valve part I and the valve part II are respectively set to be connected with the PLC controller.

[0024] The present invention is designed that the piston rod portion is configured as an I-shaped rod-shaped body and the cylinder shell I and the cylinder shell II are respectively configured as box-shaped bodies with convex blind holes, the valve portion I and the valve portion II are respectively configured as electric control valves and the inner end port portion of the valve portion I and the inner end port portion of the valve portion II are respectively configured to correspond to the outer end surface portion of one of the end heads of the piston rod portion, the high-pressure pipe I and the high-pressure pipe II are respectively configured as high-pressure rubber hoses and the inner end port portion of the high-pressure pipe I is configured to correspond to the inner end surface portion of the other end head portion of the piston rod portion, and the inner end port portion of the high-pressure pipe II is configured to correspond to the outer end surface portion of the other end head portion of the piston rod portion.

[0025] The technical effect of the above two technical solutions is that grouting is achieved in the oblique drainage holes and the vertical drainage holes.

[0026] The present invention is designed that the water shielding plate is configured to include a cloth piece portion, a plate portion II, a plate portion III and a rod portion VII, and threaded holes are respectively provided on the outer end face portions of the plate portion II and the outer end face portions of the plate portion III, the edge body of the cloth piece portion is configured to be bonded to the inner end face portion of the plate portion II and the middle portion of the cloth piece portion is configured to be bonded to the inner end face portion of the plate portion III, the inner end head of the rod portion VII is configured to be connected to the threaded hole body located on the plate portion III through bolts and the outer end head of the rod portion VII is configured to be connected to the cross beam through bolts, and the threaded hole body located on the plate portion II is configured to be connected to the arch beam through bolts.

[0027] The present invention is designed that the cloth piece portion is set as a rubber sheet and the plate portion II is set as a rectangular sheet body, the plate portion III is set as a convex sheet body and the rod portion VII is set as a Z-shaped strip body with a through hole at the end, and the plate portion III is arranged and distributed at intervals along the middle part of the cloth piece portion.

[0028] The technical effect of the above two technical solutions is that the released water flow is shielded.

[0029] The present invention designs that the cross beams, arch beams, water retaining plates and grouting pumps are arranged according to the distribution of flood control, and the cross beams, arch beams, water retaining plates, grouting pumps and water shielding plates are arranged according to the distribution of water flow diversion.

[0030] The present invention is designed that a cross beam, an arch beam, a water retaining plate and two grouting pumps are arranged to form a group of flood control components, multiple groups of flood control components are arranged in the tunnel, the plate part II, the cylinder shell I and the cylinder shell II are respectively arranged to be connected with the rod part III, the rod part VII and the rod part III are respectively arranged to be connected with the beam part I, and the accommodating tank body II is respectively arranged to be connected with the rod part I and the rod part II.

[0031] The present invention is designed to include a grouting liquid mixer and the grouting liquid mixer is configured to include a box shell, a pipe part I, a pipe part II, a pipe part III, a plate shell part I, a strip part I, a plate shell part II and a strip part II, the box shell is respectively configured to be accommodated and connected with the plate shell part I, the strip part I, the plate shell part II and the strip part II, and one end of the strip part I is configured to be connected with the inner end of the plate shell part I, one end of the strip part II is configured to be connected with the inner end of the plate shell part II, and the other end of the strip part I and the other end of the strip part II are respectively configured to be embedded with the rear inner wall of the box shell. The transverse portion of pipe portion I and the transverse portion of pipe portion II are respectively arranged to be connected in a through-type manner with the rear wall of the box shell, and the vertical portion port of pipe portion I is arranged to be distributed corresponding to the concave end portion of plate shell portion I, the vertical portion port of pipe portion II is arranged to be distributed corresponding to the concave end portion of plate shell portion II, and the inner end head of pipe portion III is arranged to be connected in a through-type manner with the front wall of the box shell, the transverse portion port of pipe portion I and the transverse portion port of pipe portion II are respectively arranged to be connected to the outer port of valve portion II through an infusion pipe, and the outer end head of pipe portion III is arranged to be connected in a communicating manner with a grouting pipe in a grouting hole located on the inner wall of the tunnel.

[0032] The present invention is designed that the box shell is configured as a trapezoidal box-shaped body and the tube portion I and the tube portion II are respectively configured as L-shaped cylindrical bodies, the tube portion III is configured as a straight cylindrical body, the plate shell portion I and the plate shell portion II are respectively configured as parts of the spherical shell and the inner end portion of the plate shell portion I is configured to be distributed in an intersecting manner with the inner end portion of the plate shell portion II, the strip portion I is configured as a spring strip and the strip portion II is configured as a Y-shaped spring strip, and the fork portion of the strip portion II is configured to be connected in a sleeve-type manner with the vertical portion of the tube portion I.

[0033] The technical effect of the above two technical solutions is that the grouting liquid is fully mixed.

[0034] The present invention designs a treatment method based on tunnel time-lag water discharge, and the steps are: temporary support of the tunnel time-lag water discharge section is achieved by a cross beam and an arch beam, water retaining plates are used to separate and block the water flows released from the oblique drainage holes and the vertical drainage holes, and a grouting pump is used to perform grouting treatment on the oblique drainage holes and the vertical drainage holes whose released water flows have been completed, thereby achieving water treatment of the tunnel time-lag water discharge section while ensuring that the heading face is in a stable state.

[0035] The technical effect of the above technical scheme is: highlighting the technical characteristics of water treatment for the tunnel time-delay water discharge section while ensuring that the heading face is in a stable state, and introducing the application of the technical field of treatment methods based on tunnel time-delay water discharge.

[0036] The present invention is designed with the following steps: During tunnel construction, when the following phenomena are found: The face excavation reveals black and dark gray sandy slate intercalated with carbonaceous slate, thin to medium-thick bedded, weakly weathered, with the rock strata bedding, gently inclined to the right, well-developed joint fissures, slightly open, locally filled with quartz, the structural plane combination is general, the overall is relatively fragmented, there is linear water flow at the arch of the face, the water quality is clear, without impurities, the water volume is about 8 m³ / h, the overall carbonaceous slate in the surrounding rock is soft, with low strength, is easily softened under the influence of groundwater, and is relatively prone to extrusion deformation. There is large-area water seepage on the already constructed initial support surface, accompanied by the phenomenon of excessive deformation speed, which is the time-delay water outflow section of the tunnel. Geophysical exploration is carried out on the tunnel excavation part by the seismic wave reflection method and the transient electromagnetic method to determine the water-containing area in the tunnel excavation part. Place Beam Part I on the tunnel bottom of the tunnel excavation part, move the outer end of Frame Part I outward on Beam Part I, move Block Part I outward in the receiving groove I, so that the outer end of Frame Part I acts on the tunnel arch foot, rotate the tightening screw part in the receiving hole body, so that the peripheral side surface of the tightening screw part contacts the inner end surface of Frame Part I. Place the lower end surface of the lower horizontal part of Rod Part III on the upper end surface of Beam Part I, place the outer end of Rod Part IV on the tunnel bottom, make the outer end surfaces of Beam Part II and Beam Part III act on the tunnel inner wall respectively, place the bolt in the through-hole body of the lower horizontal part of Rod Part III, rotate the bolt in the receiving hole body that is located in the through-hole body of the lower horizontal part of Rod Part III, so that the bolt flange body located in the through-hole body of the lower horizontal part of Rod Part III acts on the lower horizontal part of Rod Part III. Place Block Part II on the upper end surface of the horizontal part of Frame Part II, rotate the jacking screw part in the threaded hole body of Frame Part II, place the inner end of the jacking screw part in the C-shaped groove body of Block Part II, jack up Block Part II by the jacking screw part, so that the outer end surface of Block Part II acts on the tunnel inner wall. Rotate Rod Part I outward on the vertical part of Frame Part I, place Plate Part I on the tunnel bottom, place the outer ends of Rod Part I and Rod Part II in the receiving groove II, make Plate Part I overlap with each other. Place Plate Part III on the tunnel bottom, place the bolt in the through-hole body of the outer vertical part of Rod Part III, rotate the bolt in the threaded hole body of Plate Part II, so that the bolt flange body located in the through-hole body of the outer vertical part of Rod Part III acts on the outer vertical part of Rod Part III. Place the bolt in the through-hole body of the inner end of Rod Part VII, rotate the bolt in the threaded hole body of Plate Part III, so that the bolt flange body located in the through-hole body of the inner end of Rod Part VII acts on the inner end of Rod Part VII. Place the bolt in the through-hole body of the outer end of Rod Part VII, place the outer end of Rod Part VII on the upper end surface of Beam Part I, rotate the bolt in the threaded hole body of the receiving hole body, so that the bolt flange body located in the through-hole body of the outer end of Rod Part VII acts on the outer end of Rod Part VII. Make the cloth piece part correspond to the tunnel side wall, 4.8 m - 5. behind the initial support endThe inclined drainage holes are drilled in the hard rock on the upper front side of the 2 m side wall, so that the angle between the inclined drainage holes and the center line of the tunnel is set to 41-44°, and the vertical drainage holes are drilled in the square hard rock behind the primary support, so that the angle between the vertical drainage holes and the center line of the tunnel is set to 89-91°. The water flow in the water-bearing area in the tunnel excavation is released by the inclined drainage holes and the vertical drainage holes. The released water flow is blocked by the cloth part and blocked by the plate part I. When the inclined drainage holes and the vertical drainage holes are aligned with the tunnel excavation part, the water flow in the water-bearing area in the tunnel excavation part is released. After the water flow in the water-bearing area is released, the liquid infusion pipe on the outer port of valve part I is placed in the grouting liquid storage tank, and the liquid infusion pipe on the outer port of valve part II is connected to the grouting pipes in the oblique drainage hole and the vertical drainage hole. The outer ports of high-pressure pipe I and high-pressure pipe II are connected to the high-pressure liquid device. Through the PLC controller, valve part I is in the open state and valve part II is in the closed state. High-pressure liquid is injected into shell I through high-pressure pipe I, and the high-pressure liquid in shell I is returned to the high-pressure liquid device through high-pressure pipe II. The piston rod moves outward in the cylinder shell I and moves inward in the cylinder shell II, and the grouting liquid is injected into the cylinder shell I through the valve part I, so that the valve part I is in a closed state and the valve part II is in an open state, and the high-pressure liquid is injected into the cylinder shell I through the high-pressure pipe II, and the high-pressure liquid in the cylinder shell I is returned to the high-pressure liquid device through the high-pressure pipe I, so that the piston rod moves inward in the cylinder shell I and moves outward in the cylinder shell II, and the grouting liquid in the cylinder shell I is injected into the grouting pipe through the valve part II, and the water-containing area in the tunnel excavation is grouting treated to achieve Treat the tunnel's time-delayed water discharge. After the treatment of the tunnel's time-delayed water discharge is completed, remove the rod part VII from the beam part I, remove the plate part II from the rod part III, separate the receiving tank body II from the rod part I and the rod part II, make the jacking screw part rotate in the opposite direction in the threaded hole of the frame part II, remove the block part II from the upper end surface of the horizontal part of the frame part II, remove the rod part III and the block part II, remove the jacking screw part from the receiving hole, remove the crossbeam, arch beam, water retaining plate, grouting pump and water retaining plate from the tunnel excavation site, and then continue to excavate the tunnel. .

[0037] The technical effect of the above technical solution is to realize early temporary support, water flow release and grouting and plugging operations in the time-lag water outlet section of the tunnel.

[0038] The present invention designs that the raw materials of the grouting liquid are set to contain silicate gum, complexing agent and chloride ion stabilizer.

[0039] The technical effect of the above technical solution is to achieve the superposition of slurry anti-dispersion and micro-expansion performance.

[0040] The present invention is designed, and its steps are: the grouting liquid transported by the pipe part I is sprayed toward the plate shell part I, and the grouting liquid transported by the pipe part II is sprayed toward the plate shell part II, and they are mixed at the intersection between the plate shell part I and the plate shell part II, and a fused grouting liquid is obtained in the box shell, and the fused grouting liquid is transported by the pipe part III to the grouting pipe in the grouting hole located on the inner wall of the tunnel, and the relative position between the plate shell part I and the plate shell part II is changed through the elasticity of the strip part I and the strip part II, so that the intersection between the plate shell part I and the plate shell part II is in a variable state.

[0041] The technical effect of the above technical solution is that homogeneous mixing of the grouting liquid is achieved.

[0042] In the present technical scheme, the cross beam, arch beam, water retaining plate and grouting pump are basic components and are also the necessary technical features of the present invention. The water shielding plate, grouting liquid mixer, oblique drainage hole and vertical drainage hole are functional components and are the features for realizing other technical effects of the present invention. The designs of the technical features of beam part I, frame part I, tightening screw part, rod part I, rod part II, accommodating hole body, accommodating trough body I, block part I, block part II, beam part II, beam part III, frame part II, lifting screw part, rod part III, rod part IV, plate part I, accommodating trough body II, piston rod part, cylinder shell I, cylinder shell II, valve part I, valve part II, high-pressure pipe I, high-pressure pipe II, cloth part, plate part II, plate part III, rod part VII, box shell, pipe part I, pipe part II, pipe part III, plate shell part I, strip part I, plate shell part II and strip part II are technical features that comply with the Patent Law and its implementing rules.

[0043] In this technical solution, the temporary support state of water treatment for the time-delay water outlet section of the tunnel is achieved by the cross beams and arch beams while ensuring that the tunnel face is in a stable state.

[0044] In the present technical scheme, the cross beams, arch beams, water retaining plates and grouting pumps that ensure that the face is in a stable state and that water is treated in the tunnel's time-delay water discharge section are important technical features. In the technical field of treatment devices and methods based on tunnel time-delay water discharge, the present technical scheme has novelty, creativity and practicality. The terms in the present technical scheme can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0046] Figure 1 is a schematic diagram of a treatment device based on tunnel time-delay water discharge according to the present invention, Figure 2 is a schematic diagram of the structure of the beam 1, Figure 3 is a schematic structural diagram of the water retaining plate 3, Figure 4 is a schematic structural diagram of the water shielding plate 5, Figure 5 is a schematic diagram of the structure of the grouting liquid mixer 6, Figure 6 This is the deformation trend diagram of the tunnel’s time-delayed water outlet section. Cross beam-1, arch beam-2, water retaining plate-3, grouting pump-4, water shielding plate-5, grouting liquid mixer-6, oblique drainage hole-10, vertical drainage hole-20, beam part I-11, frame part I-12, jacking screw part-13, rod part I-15, rod part II-16, receiving hole body-14, receiving trough body I-17, block part I-18, block part II-21, beam part II-22, beam part III-23, frame part II-24, lifting screw part-25, rod part III-26, Rod part IV-27, plate part I-31, accommodating trough body II-32, piston rod part-40, cylinder shell I-41, cylinder shell II-42, valve part I-43, valve part II-44, high-pressure pipe I-45, high-pressure pipe II-46, cloth part-51, plate part II-52, plate part III-53, rod part VII-54, box shell-61, tube part I-62, tube part II-63, tube part III-64, plate shell part I-65, strip part I-66, plate shell part II-67, strip part II-68. DETAILED DESCRIPTION

[0047] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.

[0048] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0049] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0050] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.

[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0052] A treatment device based on tunnel time-delay water discharge, Figure 1 This is one of the first embodiments of the present invention, and this embodiment is specifically described in conjunction with the accompanying drawings. It includes a cross beam 1, an arch beam 2, a water retaining plate 3, a grouting pump 4 and a water shielding plate 5, and the arch beam 2 and the water retaining plate 3 are respectively arranged on the cross beam 1, and the grouting pump 4 and the water shielding plate 5 are respectively arranged on the arch beam 2.

[0053] In this embodiment, the cross beam 1 is configured to include a beam portion Ⅰ11, a frame portion Ⅰ12, a tightening screw portion 13, a rod portion Ⅰ15 and a rod portion Ⅱ16, and a receiving hole body 14 is provided on the upper end face portion of the beam portion Ⅰ11, a receiving groove body Ⅰ17 is provided on the outside of the lower end face of the beam portion Ⅰ11, and a block portion Ⅰ18 is provided on the inner end head of the lower cross portion of the frame portion Ⅰ12, the outer end head of the beam portion Ⅰ11 is configured to be connected to the frame portion Ⅰ12 in a through-type connection and the tightening screw portion 13 is configured to be threadedly connected to the receiving hole body 14, the peripheral side surface portion of the tightening screw portion 13 is configured to be contact-connected to the inner end face portion of the frame portion Ⅰ12 and the frame portion Ⅰ1 The vertical portion of the rod portion 2 is arranged to be connected in a through-type manner with the inner end of the rod portion Ⅰ15, the inner side portion of the outer end of the rod portion Ⅰ15 is arranged to be connected to the inner end of the rod portion Ⅱ16 through a pin shaft and the block portion Ⅰ18 is arranged to be connected in a sunken manner with the accommodating groove body Ⅰ17, the upper end face portion of the beam portion Ⅰ11 is arranged to be connected in a contact manner with the arch beam 2 and the accommodating hole body 14 is arranged to be connected to the arch beam 2 through bolts, the outer ends of the rod portion Ⅰ15 and the outer ends of the rod portion Ⅱ16 are respectively arranged to be connected in a sunken manner with the water retaining plate 3 and the outer end of the frame portion Ⅰ12 is arranged to be connected in a contact manner with the tunnel arch foot, and the lower end face portion of the beam portion Ⅰ11 is arranged to be connected in a contact manner with the bottom of the tunnel.

[0054] Through the crossbeam 1, a supporting connection point for the arch beam 2 and the water retaining plate 3 is formed, the beam part Ⅰ11 and the receiving hole body 14 realize the connection with the arch beam 2, the rod part Ⅰ15 and the rod part Ⅱ16 realize the connection with the water retaining plate 3, the frame part Ⅰ12 realizes the support processing of the tunnel arch foot, and the tightening screw part 13, the receiving groove body Ⅰ17 and the block part Ⅰ18 realize the movable connection processing of the frame part Ⅰ12 on the beam part Ⅰ11. The technical purpose is to be used as a supporting carrier for the arch beam 2 and the water retaining plate 3.

[0055] In this embodiment, the beam portion Ⅰ11 is configured as a convex strip-shaped body and the frame portion Ⅰ12 is configured as an H-shaped frame-shaped body, the lower end face portion of the upper transverse portion of the frame portion Ⅰ12 is configured to be contact-connected with the outer side of the upper end face portion of the beam portion Ⅰ11 and the tightening screw portion 13 is configured as a hexagon socket bolt, the rod portion Ⅰ15 and the rod portion Ⅱ16 are respectively configured as rectangular rod-shaped bodies and the accommodating hole body 14 is configured as a threaded hole body, the accommodating hole body 14 is configured to be arranged and distributed at intervals along the upper end face portion of the beam portion Ⅰ11 and the accommodating groove body Ⅰ17 is configured as a dovetail groove-shaped body, and the block portion Ⅰ18 is configured as a dovetail seat-shaped body.

[0056] Its technical purpose is to achieve tight support for the tunnel arch foot.

[0057] In this embodiment, the arch beam 2 is arranged to include a block part II 21, a beam part II 22, a beam part III 23, a frame part II 24, a jacking screw part 25, a rod part III 26 and a rod part IV 27. The inner ends of the beam part II 22 and the beam part III 23 are respectively arranged to be connected to the vertical part end of the frame part II 24. The upper end face of the horizontal part of the frame part II 24 is arranged to be in contact connection with the lower end face of the block part II 21, and the horizontal part of the frame part II 24 is arranged to be in threaded connection with the jacking screw part 25. The inner end of the jacking screw part 25 is arranged to be in sunken connection with the lower end face of the block part II 21, and the outer corner parts of the rod part III 26 are respectively arranged to be connected to the lower side parts of the inner end faces of the beam part II 22 and the beam part III 23. The inner end of the rod part IV 27 is arranged to be connected to the vertical part of the frame part II 24 through a pin shaft, and the lower end face of the lower horizontal part of the rod part III 26 is arranged to be in contact connection with the cross beam 1. The lower horizontal part of the rod part III 26 is arranged to be connected to the cross beam 1 through a bolt, and the inclined part of the rod part III 26 is arranged to be connected to the grouting pump 4. The outer vertical part of the rod part III 26 is arranged to be connected to the water shielding plate 5 through a bolt, and the outer end of the rod part IV 27 is arranged to be in contact with the tunnel bottom. The outer end faces of the block part II 21, the beam part II 22 and the beam part III 23 are respectively arranged to be in contact connection with the tunnel inner wall.

[0058] Through the arch beam 2, support connection points for the cross beam 1, the grouting pump 4 and the water shielding plate 5 are formed. Through the rod part III 26, the connection with the cross beam 1 is realized, the connection with the grouting pump 4 is realized, and the connection with the water shielding plate 5 is realized. Through the block part II 21, the beam part II 22 and the beam part III 23, the support treatment for the tunnel inner wall is realized. Through the frame part II 24 and the jacking screw part 25, the jacking support treatment for the block part II 21 is realized. Through the rod part IV 27, the support treatment for the frame part II 24 is realized. Its technical purpose is to be used as a support carrier for the grouting pump 4 and the water shielding plate 5.

[0059] In this embodiment, the block part II 21 is arranged as a seat body with an arc-shaped face on the upper end face and a U-shaped groove body on the lower end face. The beam part II 22 and the beam part III 23 are respectively arranged as C-shaped strip bodies. The frame part II 24 is arranged as an L-shaped rod body with a threaded hole body on the horizontal part, and the jacking screw part 25 is arranged as an inner hexagon bolt. The rod part III 26 is arranged as an N-shaped rod body with through hole bodies on the outer vertical part and the lower horizontal part respectively, and the rod part IV 27 is arranged as a straight rod body. The inner end of the jacking screw part 25 is arranged to be connected to the U-shaped groove body of the block part II 21, and the jacking screw part 25 is arranged to be connected to the threaded hole body of the frame part II 24.

[0060] Its technical purpose is to realize the support for the tunnel vault.

[0061] In this embodiment, a receiving groove body II32 is arranged in the middle part of the inner end surface of the plate part I31 of the water retaining plate 3, and the receiving groove body II32 is arranged to be connected in an accommodating manner with the cross beam 1, the side parts of adjacent plate parts I31 are arranged to be connected in an overlapping manner, and the lower end surface part of the plate part I31 is arranged to be connected in a contact manner with the bottom of the tunnel.

[0062] A supporting connection point for the cross beam 1 is formed by the water retaining plate 3, and the connection with the cross beam 1 is realized by the plate portion Ⅰ31 and the receiving trough body Ⅱ32. The technical purpose is to be used as a component for constructing a water retaining wall behind the initial support of the inclined shaft.

[0063] In this embodiment, the plate portion I31 is configured as a sheet-like body having an extension platform at the lower end surface portion, and the accommodating groove body II32 is configured as a U-shaped groove-like body.

[0064] The technical purpose is to achieve water-retaining treatment of the plate body.

[0065] In the present embodiment, the grouting pump 4 is configured to include a piston rod portion 40, a cylinder shell Ⅰ41, a cylinder shell Ⅱ42, a valve portion Ⅰ43, a valve portion Ⅱ44, a high-pressure pipe Ⅰ45 and a high-pressure pipe Ⅱ46, and one of the end portions of the piston rod portion 40 is configured to be slidably connected to the cylinder shell Ⅰ41, the other end portion of the piston rod portion 40 is configured to be slidably connected to the cylinder shell Ⅱ42, and the inner end portion of the side of the cylinder shell Ⅰ41 is configured to be connected to the inner port portion of the high-pressure pipe Ⅰ45, the outer end portion of the side of the cylinder shell Ⅰ41 is configured to be connected to the inner port portion of the high-pressure pipe Ⅱ46, and the outer end portions of the side of the cylinder shell Ⅰ41 are respectively configured to be connected to the valve portion Ⅰ43 through the infusion pipe. The inner port portion and the inner port portion of the valve portion II 44 are communicatively connected, the inner peripheral side surfaces of the cylinder shell I 41 and the inner peripheral side surfaces of the cylinder shell II 42 are respectively arranged to be connected to the arch beam 2, and the infusion pipe on the outer port portion of the valve portion I 43 is arranged to be communicatively connected to the grouting liquid storage tank, the infusion pipe on the outer port portion of the valve portion II 44 is arranged to be communicatively connected to the grouting pipe in the grouting hole located on the inner wall of the tunnel, and the outer port portions of the high-pressure pipe I 45 and the outer port portions of the high-pressure pipe II 46 are respectively arranged to be communicatively connected to the high-pressure liquid device, and the control port portion of the valve portion I 43 and the control port portion of the valve portion II 44 are respectively arranged to be connected to the PLC controller.

[0066] A supporting connection point for the arch beam 2 is formed by the grouting pump 4, and the connection with the arch beam 2 is realized by the cylinder shell I 41 and the cylinder shell II 42. The pressure cavity processing of the cylinder shell II 42 is realized by the piston rod part 40, the high-pressure pipe I 45 and the high-pressure pipe II 46. The grouting liquid in the cylinder shell II 42 is transported and processed by the valve part I 43 and the valve part II 44. The technical purpose is to be used as a component for grouting the tunnel.

[0067] In this embodiment, the piston rod portion 40 is configured as an I-shaped rod-shaped body and the cylinder shell I 41 and the cylinder shell II 42 are respectively configured as box-shaped bodies with convex blind holes, the valve portion I 43 and the valve portion II 44 are respectively configured as electric control valves and the inner end port portion of the valve portion I 43 and the inner end port portion of the valve portion II 44 are respectively configured to correspond to the outer end surface portion of one of the end heads of the piston rod portion 40, the high-pressure pipe I 45 and the high-pressure pipe II 46 are respectively configured as high-pressure rubber hoses and the inner end port portion of the high-pressure pipe I 45 is configured to correspond to the inner end surface portion of the other end head portion of the piston rod portion 40, and the inner end port portion of the high-pressure pipe II 46 is configured to correspond to the outer end surface portion of the other end head portion of the piston rod portion 40.

[0068] The technical purpose is to realize the power transmission of grouting liquid.

[0069] In this embodiment, the water shielding plate 5 is configured to include a cloth portion 51, a plate portion II 52, a plate portion III 53 and a rod portion VII 54, and threaded holes are respectively provided on the outer end face portions of the plate portion II 52 and the outer end face portions of the plate portion III 53, the edge body of the cloth portion 51 is configured to be bonded to the inner end face portion of the plate portion II 52 and the middle portion of the cloth portion 51 is configured to be bonded to the inner end face portion of the plate portion III 53, the inner end head of the rod portion VII 54 is configured to be connected to the threaded hole body located on the plate portion III 53 by bolts and the outer end head of the rod portion VII 54 is configured to be connected to the cross beam 1 by bolts, and the threaded hole body located on the plate portion II 52 is configured to be connected to the arch beam 2 by bolts.

[0070] By means of the water shielding plate 5, a supporting connection point for the cross beam 1 and the arch beam 2 is formed, the rod part Ⅶ 54 realizes the connection with the cross beam 1, the plate part II 52 realizes the connection with the arch beam 2, the cloth part 51 realizes the shielding of the water flow sprayed from the drainage hole, and the plate part III 53 realizes the supporting of the cloth part 51. The technical purpose is to be used as a component for shielding the water flow sprayed from the drainage hole.

[0071] In this embodiment, the cloth sheet portion 51 is configured as a rubber sheet and the plate portion II52 is configured as a rectangular sheet body, the plate portion III53 is configured as a convex sheet body and the rod portion VII54 is configured as a Z-shaped strip body with a through hole at the end, and the plate portion III53 is configured to be arranged and distributed at intervals along the middle portion of the cloth sheet portion 51.

[0072] The technical purpose is to achieve the rubber sheet blocking the water flow sprayed from the water leakage hole.

[0073] In this embodiment, the cross beam 1 and the arch beam 2 and the water retaining plate 3 and the grouting pump 4 are arranged according to the distribution of flood control, and the cross beam 1, the arch beam 2, the water retaining plate 3 and the grouting pump 4 and the water shielding plate 5 are arranged according to the distribution of water flow diversion, a cross beam 1, an arch beam 2, a water retaining plate 3 and two grouting pumps 4 are arranged to form a group of flood control components, and multiple groups of flood control components are arranged in the tunnel, the plate part II52, the cylinder shell I41 and the cylinder shell II42 are respectively arranged to be connected to the rod part III26, the rod part VII54 and the rod part III26 are respectively arranged to be connected to the beam part I11, and the accommodating tank body II32 is respectively arranged to be connected to the rod part I15 and the rod part II16.

[0074] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.

[0075] A method for handling tunnel time-delay water discharge, one of the first embodiments of the present invention, comprises the following steps: when the following phenomenon is found during tunnel construction: the excavation of the face reveals black and dark gray sandy slate intercalated with carbonaceous slate, thin to medium-thick layers, weak weathering, the rock layers are in line with the layers, gently inclined to the right, the joints and fissures are developed, slightly open, partially filled with quartz, the structural surface is generally combined, and the whole is relatively broken, the arch of the face discharges water in a linear flow, the water quality is clear, and there are no impurities, the water volume is about 8m³ / h, the surrounding rock as a whole is soft and has low strength, and is easily softened by groundwater and is more prone to compression deformation, and a large area of ​​water seepage occurs on the initial support face that has been constructed, accompanied by deformation overspeed phenomenon, which is the tunnel time-delay water discharge section, and the tunnel excavation site is geophysically explored by seismic wave reflection method and transient electromagnetic method to determine the water-bearing area in the tunnel excavation site, Place the beam part Ⅰ11 on the tunnel bottom at the tunnel excavation site, move the frame part Ⅰ12 outward at the outer end of the beam part Ⅰ11, move the block part Ⅰ18 outward in the receiving groove body Ⅰ17, make the outer end of the frame part Ⅰ12 act on the tunnel arch foot, rotate the tightening screw part 13 in the receiving hole body 14, make the peripheral side face of the tightening screw part 13 contact with the inner end face of the frame part Ⅰ12, place the lower end face of the lower horizontal part of the rod part Ⅲ26 on the upper end face of the beam part Ⅰ11, place the outer end of the rod part Ⅳ27 on the tunnel bottom, make the outer end face of the beam part Ⅱ22 and the outer end face of the beam part Ⅲ23 act on the tunnel inner wall respectively, place the bolt in the through-hole body of the lower horizontal part of the rod part Ⅲ26, make the bolt in the through-hole body of the lower horizontal part of the rod part Ⅲ26 rotate in the receiving hole body 14, make the bolt flange body in the through-hole body of the lower horizontal part of the rod part Ⅲ26 act on the lower horizontal part of the rod part Ⅲ26, place the block part Ⅱ21 on the upper end face of the horizontal part of the frame part Ⅱ24, rotate the jacking screw part 25 in the threaded hole body of the frame part Ⅱ24, make the inner end of the jacking screw part 25 placed in the U-shaped groove body of the block part Ⅱ21, jack up the block part Ⅱ21 by the jacking screw part 25, make the outer end face of the block part Ⅱ21 act on the tunnel inner wall, rotate the rod part Ⅰ15 outward on the vertical part of the frame part Ⅰ12, place the plate part Ⅰ31 on the tunnel bottom, place the outer end of the rod part Ⅰ15 and the outer end of the rod part Ⅱ16 in the receiving groove body Ⅱ32, and make the plate part Ⅰ31 overlap each other. Place the plate part Ⅲ53 on the tunnel bottom, place the bolt in the through-hole body of the outer vertical part of the rod part Ⅲ26, make the bolt rotate in the threaded hole body of the plate part Ⅱ52, make the bolt flange body in the through-hole body of the outer vertical part of the rod part Ⅲ26 act on the outer vertical part of the rod part Ⅲ26, place the bolt in the through-hole body of the inner end of the rod part Ⅶ54, make the bolt rotate in the threaded hole body of the plate part Ⅲ53, make the bolt flange body in the through-hole body of the inner end of the rod part Ⅶ54 act on the inner end of the rod part Ⅶ54, place the bolt in the through-hole body of the outer end of the rod part Ⅶ54, place the outer end of the rod part Ⅶ54 on the upper end face of the beam part Ⅰ11, make the bolt rotate in the threaded hole body of the receiving hole body 14, make the bolt flange body in the through-hole body of the outer end of the rod part Ⅶ54 act on the outer end of the rod part Ⅶ54, and make the cloth piece part 51 correspond to the tunnel side wall. Drill the inclined drainage hole 10 in the hard rock at the upper front side of the side wall 4.8 m - 5.2 m behind the primary support end, set the angle between the inclined drainage hole 10 and the center line of the tunnel to 41 - 44°, drill the vertical drainage hole 20 in the hard rock behind the primary support, set the angle between the vertical drainage hole 20 and the center line of the tunnel to 89 - 91°, release the water flow in the water-containing area at the tunnel excavation site by the inclined drainage hole 10 and the vertical drainage hole 20, and the released water flow is blocked by the cloth piece part 51 and blocked by the plate part Ⅰ31. After the water flow in the water-bearing area of ​​the diagonal drainage hole 10 and the vertical drainage hole 20 is released to the excavation site of the tunnel, the liquid infusion pipe on the outer port of the valve part Ⅰ43 is placed in the grouting liquid storage tank, the liquid infusion pipe on the outer port of the valve part Ⅱ44 is connected to the grouting pipes in the diagonal drainage hole 10 and the vertical drainage hole 20, the outer port of the high-pressure pipe Ⅰ45 and the outer port of the high-pressure pipe Ⅱ46 are connected to the high-pressure liquid device, and the valve part Ⅰ43 is opened and the valve part Ⅱ44 is closed through the PLC controller, and the high-pressure liquid is injected into the cylinder shell Ⅰ41 through the high-pressure pipe Ⅰ45, and the high-pressure liquid in the cylinder shell Ⅰ41 is returned to the high-pressure liquid device through the high-pressure pipe Ⅱ46, so that the piston rod part 40 moves outward in the cylinder shell Ⅰ41 and the piston rod part 40 moves inward in the cylinder shell Ⅱ42, and the grouting liquid is injected into the cylinder shell Ⅰ41 through the valve part Ⅰ43. The valve part I 43 is in a closed state and the valve part II 44 is in an open state, and high-pressure liquid is injected into the cylinder shell I 41 through the high-pressure pipe II 46, and the high-pressure liquid in the cylinder shell I 41 is returned to the high-pressure liquid device through the high-pressure pipe I 45, so that the piston rod part 40 moves inward in the cylinder shell I 41 and the piston rod part 40 moves outward in the cylinder shell II 42, and the grouting liquid in the cylinder shell I 41 is injected into the grouting pipe through the valve part II 44, and the water-containing area in the tunnel excavation part is grouted to achieve the treatment of the time-delay water discharge of the tunnel. After the treatment of the time-delayed water discharge in the tunnel is completed, the rod part VII 54 is removed from the beam part I 11, the plate part II 52 is removed from the rod part III 26, the receiving tank body II 32 is separated from the rod parts I 15 and II 16, the lifting screw part 25 is rotated in the opposite direction in the threaded hole body of the frame part II 24, the block part II 21 is removed from the upper end surface of the horizontal part of the frame part II 24, the rod part III 26 and the block part II 21 are disassembled, the tightening screw part 13 is removed from the receiving hole body 14, the cross beam 1, the arch beam 2, the water retaining plate 3, the grouting pump 4 and the water shielding plate 5 are moved out of the tunnel excavation part, and then the tunnel is continued to be excavated.

[0076] In this embodiment, the grouting liquid raw materials are configured to include silicate gum, a complexing agent and a chloride ion stabilizer.

[0077] By adding temporary cross braces and radial grouting reinforcement, the deformation of the tunnel's time-delay water outlet section has stabilized and converged, and the water output has been significantly reduced. It is determined that the effect has been achieved and the tunnel face can be excavated. By taking measures such as water discharge and pressure reduction and radial grouting, the initial water output has been significantly reduced, the deformation has converged, and there is no abnormality in the monitoring and measurement data. The tunnel's time-delay water outlet section has been safely constructed. Figure 6 This is a deformation change trend diagram of the time-lag water outlet section of the tunnel.

[0078] A treatment device based on tunnel time-delay water discharge, Figure 5This is the second embodiment of the first embodiment of the present invention. This embodiment is specifically described in conjunction with the accompanying drawings. It includes a grouting liquid mixer 6 and the grouting liquid mixer 6 is configured to include a box shell 61, a pipe part I 62, a pipe part II 63, a pipe part III 64, a plate shell part I 65, a strip part I 66, a plate shell part II 67 and a strip part II 68. The box shell 61 is respectively configured to be accommodated with the plate shell part I 65, the strip part I 66, the plate shell part II 67 and the strip part II 68, and one of the ends of the strip part I 66 is configured to be connected to the inner end of the plate shell part I 65, one of the ends of the strip part II 68 is configured to be connected to the inner end of the plate shell part II 67, and the other end of the strip part I 66 and the other end of the strip part II 68 are connected to the inner end of the plate shell part II 67. They are respectively arranged to be embedded in the rear inner wall of the box shell 61, the transverse part of the pipe part I62 and the transverse part of the pipe part II63 are respectively arranged to be through-connected with the rear wall of the box shell 61, and the vertical port of the pipe part I62 is arranged to be distributed corresponding to the concave end surface part of the plate shell part I65, the vertical port of the pipe part II63 is arranged to be distributed corresponding to the concave end surface part of the plate shell part II67, and the inner end head of the pipe part III64 is arranged to be through-connected with the front wall of the box shell 61, the transverse port of the pipe part I62 and the transverse port of the pipe part II63 are respectively arranged to be connected with the outer port part of the valve part II44 through an infusion pipe, and the outer end head of the pipe part III64 is arranged to be connected in a communicating manner with the grouting pipe in the grouting hole located on the inner wall of the tunnel.

[0079] A supporting connection point for the grouting pump 4 is formed through the grouting liquid mixer 6, and the connection with the grouting pump 4 is realized by the pipe part I 62 and the pipe part II 63. The connection with the grouting pipe in the grouting hole on the inner wall of the tunnel is realized by the pipe part III 64. The grouting liquid is mixed by the box shell 61, the plate shell part I 65, the strip part I 66, the plate shell part II 67 and the strip part II 68. The technical purpose is to serve as a component for mixing the grouting liquid transported by the grouting pump 4.

[0080] In this embodiment, the box shell 61 is configured as a trapezoidal box-shaped body and the tube portion I62 and the tube portion II63 are respectively configured as L-shaped cylindrical bodies, the tube portion III64 is configured as a straight cylindrical body, the plate shell portion I65 and the plate shell portion II67 are respectively configured as parts of the spherical shell and the inner end portion of the plate shell portion I65 is configured to be intersectingly distributed with the inner end portion of the plate shell portion II67, the strip portion I66 is configured as a spring strip and the strip portion II68 is configured as a Y-shaped spring strip, and the fork portion of the strip portion II68 is configured to be connected to the vertical portion of the tube portion I62 in a sleeve-type manner.

[0081] The technical purpose is to achieve mixing of the grouting liquid delivered by the two grouting pumps 4 located on the arch beam 2.

[0082] A method for treating time-delayed water discharge in a tunnel, the second embodiment of the first embodiment of the present invention, comprises the following steps: the grouting liquid transported by pipe part I 62 is sprayed toward plate shell part I 65, the grouting liquid transported by pipe part II 63 is sprayed toward plate shell part II 67, the grouting liquid is mixed at the intersection between plate shell part I 65 and plate shell part II 67, a fused grouting liquid is obtained in box shell 61, the fused grouting liquid is transported by pipe part III 64 to the grouting pipe in the grouting hole on the inner wall of the tunnel, the relative position between plate shell part I 65 and plate shell part II 67 is changed through the elasticity of strip part I 66 and strip part II 68, so that the intersection between plate shell part I 65 and plate shell part II 67 is in a variable state.

[0083] When verifying the present invention, the inventors abandoned the existing technical features of directly grouting and blocking water on the inner wall of the tunnel, and first proposed a technical feature of treating water in the time-delay water outlet section of the tunnel while ensuring that the heading face is in a stable state, and obtained the first unexpected technical effect: it is realized that when the time-delay water outlet section of the tunnel is under the reinforced support state, the water flow is released to prevent the deformation of the tunnel, and the construction accuracy of the time-delay water outlet section of the tunnel is improved. The second unexpected technical effect is obtained: it is realized that the released water body is blocked and shielded, and the construction environment of the time-delay water outlet section of the tunnel is guaranteed, and the construction effect of the time-delay water outlet section of the tunnel is improved. The third unexpected technical effect is achieved: it is realized based on the support of the tunnel arch foot to improve the tunnel time delay The temporary support effect of the tunnel time-lag water outlet section is achieved, and the fourth unexpected technical effect is obtained: the plate treatment of the released water flow is realized, so that the released water flow is diverted on the side of the tunnel time-lag water outlet section, and the bottom of the tunnel time-lag water outlet section is protected, ensuring the temporary support stability performance of the tunnel time-lag water outlet section, and the fifth unexpected technical effect is obtained: the transportation of the grouting liquid by a large-diameter cylinder is realized, and the efficiency of grouting is improved, and the sixth unexpected technical effect is obtained: the homogeneous mixing of the grouting liquid with silicate gum, chelating agent and chloride ion stabilizer is realized, and the grouting effect is improved, and the seventh unexpected technical effect is obtained: the crossbeam 1 and the arch beam 2 are used as the support body, which facilitates the use of the water retaining plate 3, the grouting pump 4 and the water shielding plate 5.

[0084] In the second embodiment of the present invention, the cross beam 1, the arch beam 2, the water retaining plate 3 and the grouting pump 4 are interconnected in such a way as to treat the water in the time-delayed water outlet section of the tunnel while ensuring that the tunnel face is in a stable state.

[0085] In this embodiment, the cross beam 1 and the arch beam 2 are connected to the water retaining plate 3 and the grouting pump 4 in a manner of temporarily supporting the time-delayed water outlet section of the tunnel.

[0086] In this embodiment, a first accessory device is also included and is arranged on the arch beam 2 , and the first accessory device is arranged as a water shielding plate 5 .

[0087] The second embodiment of the present invention is based on the first embodiment. The second embodiment of the present invention comprises the following steps: the cross beam 1 and the arch beam 2 are used to temporarily support the time-lag water outlet section of the tunnel; the water retaining plate 3 is used to separate and block the water flow released by the oblique drainage hole 10 and the vertical drainage hole 20; the grouting pump 4 is used to grout the oblique drainage hole 10 and the vertical drainage hole 20 after the released water flow has been completed, thereby achieving water treatment of the time-lag water outlet section of the tunnel while ensuring that the heading face is in a stable state.

[0088] The second embodiment of the present invention is based on the first embodiment.

[0089] The present invention has the following characteristics: 1. Due to the design of the cross beam 1, the arch beam 2, the water retaining plate 3 and the grouting pump 4, the cross beam 1 and the arch beam 2 are used to temporarily support the time-delay water outlet section of the tunnel, the water retaining plate 3 is used to separate and block the water flows released by the oblique drainage holes 10 and the vertical drainage holes 20, and the grouting pump 4 is used to grout the oblique drainage holes 10 and the vertical drainage holes 20 after the released water flows have been completed, so that the water treatment of the time-delay water outlet section of the tunnel is achieved while ensuring that the heading face is in a stable state, and the technical problem of directly grouting and blocking water on the inner wall of the tunnel is solved, thereby improving the treatment effect of the time-delay water outlet of the tunnel.

[0090] 2. Due to the design of the water shielding plate 5, the water flow released by the oblique drainage hole 10 and the vertical drainage hole 20 is shielded.

[0091] 3. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.

[0092] 4. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.

[0093] There are other technical features connected with the crossbeam 1, arch beam 2, water retaining plate 3 and grouting pump 4 to ensure that the face is in a stable state and to carry out water treatment for the time-lag water outlet section of the tunnel, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0094] The above embodiment is only one implementation form of the treatment device and method based on tunnel time-delay water discharge provided by the present invention. Other variations of the scheme provided by the present invention, adding or reducing components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the protection scope of the present invention.

Claims

1. A treatment device based on tunnel time-delay water discharge, characterized by: The invention comprises a crossbeam (1) installed on a tunnel arch foot, an arch beam (2) arranged on the crossbeam (1), a water retaining plate (3) arranged on the crossbeam (1), and a grouting pump (4) arranged on the arch beam (2).

2. The treatment device based on tunnel time-delay water discharge according to claim 1 is characterized by: The cross beam (1), the arch beam (2), the water retaining plate (3) and the grouting pump (4) are connected to each other in a manner that water treatment is performed on the time-delayed water outlet section of the tunnel while ensuring that the tunnel face is in a stable state.

3. The treatment device based on tunnel time-delay water discharge according to claim 2 is characterized in that: The cross beam (1) and the arch beam (2) are connected with the water retaining plate (3) and the grouting pump (4) in a manner of temporarily supporting the time-delayed water outlet section of the tunnel.

4. The treatment device based on tunnel time-delay water discharge according to claim 1 is characterized by: It also includes a first accessory device and the first accessory device is arranged on the arch beam (2), and the first accessory device is arranged as a water shielding plate (5).

5. The device for treating water based on tunnel time-delay discharge according to claim 1 is characterized in that: An arch beam (2) and a water retaining plate (3) are respectively arranged on the cross beam (1), and a grouting pump (4) and a water retaining plate (5) are respectively arranged on the arch beam (2).

6. The device for treating water based on time-delay discharge in a tunnel according to claim 5 is characterized in that: The cross beam (1) is configured to include a beam portion I (11), a frame portion I (12), a tightening screw portion (13), a rod portion I (15) and a rod portion II (16), and an upper end surface portion of the beam portion I (11) is provided with a receiving hole body (14), an outer portion of a lower end surface portion of the beam portion I (11) is provided with a receiving groove body I (17), and an inner end portion of a lower cross portion of the frame portion I (12) is provided with a block portion I (18), the outer end portion of the beam portion I (11) is configured to be connected to the frame portion I (12) in a through-type manner, and the tightening screw portion (13) is configured to be connected to the receiving hole body (14) in a threaded manner, the peripheral side surface portion of the tightening screw portion (13) is configured to be connected to the inner end surface portion of the frame portion I (12) in a contact manner, and the frame portion I (1 The vertical part of the rod part 2) is arranged to be connected to the inner end of the rod part I (15) in a through-type connection, the inner side of the outer end of the rod part I (15) is arranged to be connected to the inner end of the rod part II (16) through a pin shaft, and the block part I (18) is arranged to be connected to the receiving groove body I (17) in a sunken type, the upper end face of the beam part I (11) is arranged to be connected to the arch beam (2) in a contact type, and the receiving hole body (14) is arranged to be connected to the arch beam (2) through a bolt, the outer end of the rod part I (15) and the outer end of the rod part II (16) are respectively arranged to be connected to the water retaining plate (3) in a sunken type, and the outer end of the frame part I (12) is arranged to be connected to the tunnel arch foot in a contact type, and the lower end face of the beam part I (11) is arranged to be connected to the bottom of the tunnel in a contact type, Or, the beam part I (11) is configured as a convex strip-shaped body and the frame part I (12) is configured as an H-shaped frame-shaped body, the lower end face portion of the upper transverse part of the frame part I (12) is configured to be contact-connected with the outer side of the upper end face portion of the beam part I (11) and the tightening screw part (13) is configured as a hexagon socket bolt, the rod part I (15) and the rod part II (16) are respectively configured as rectangular rod-shaped bodies and the receiving hole body (14) is configured as a threaded hole body, the receiving hole bodies (14) are configured to be arranged and distributed at intervals along the upper end face portion of the beam part I (11) and the receiving groove body I (17) is configured as a dovetail groove body, and the block part I (18) is configured as a dovetail seat body, Or, the arch beam (2) is arranged to include a block part II (21), a beam part II (22), a beam part III (23), a frame part II (24), a jacking screw part (25), a rod part III (26) and a rod part IV (27), and the inner ends of the beam part II (22) and the beam part III (23) are respectively arranged to be connected to the vertical end of the frame part II (24). The upper end face of the horizontal part of the frame part II (24) is arranged to be in contact connection with the lower end face of the block part II (21), and the horizontal part of the frame part II (24) is arranged to be in threaded connection with the jacking screw part (25). The inner end of the jacking screw part (25) is arranged to be in sunken connection with the lower end face of the block part II (21), and the outer corners of the rod part III (26) are respectively arranged to be connected to the lower side part of the inner end face of the beam part II (22) and the lower side part of the inner end face of the beam part III (23). The inner end of the rod part IV (27) is arranged to be connected to the vertical part of the frame part II (24) through a pin shaft, and the lower end face of the lower horizontal part of the rod part III (26) is arranged to be in contact connection with the cross beam (1). The lower horizontal part of the rod part III (26) is arranged to be connected to the cross beam (1) through a bolt, and the inclined part of the rod part III (26) is arranged to be connected to the grouting pump (4). The outer vertical part of the rod part III (26) is arranged to be connected to the water shielding plate (5) through a bolt, and the outer end of the rod part IV (27) is arranged to be in contact with the tunnel bottom. The outer end faces of the block part II (21), the beam part II (22) and the beam part III (23) are respectively arranged to be in contact connection with the tunnel inner wall. Or, the block part II (21) is arranged to be a seat body with an arc surface on the upper end face and a U-shaped groove on the lower end face, and the beam part II (22) and the beam part III (23) are respectively arranged to be C-shaped strip bodies. The frame part II (24) is arranged to be an L-shaped rod body with a threaded hole in the horizontal part, and the jacking screw part (25) is arranged to be an inner hexagon bolt. The rod part III (26) is arranged to be an N-shaped rod body with through holes in the outer vertical part and the lower horizontal part respectively, and the rod part IV (27) is arranged to be a straight rod body. The inner end of the jacking screw part (25) is arranged to be connected to the U-shaped groove of the block part II (21), and the jacking screw part (25) is arranged to be connected to the threaded hole of the frame part II (24). Or, a receiving groove II (32) is arranged in the middle of the inner end face of the plate part I (31) of the water shielding plate (3), and the receiving groove II (32) is arranged to be in receiving connection with the cross beam (1). The side faces of adjacent plate parts I (31) are arranged to be in overlapping connection with each other, and the lower end face of the plate part I (31) is arranged to be in contact connection with the tunnel bottom. Or, the plate part I (31) is arranged to be a sheet body with an extended platform on the lower end face, and the receiving groove II (32) is arranged to be a U-shaped groove body. Alternatively, the grouting pump (4) is configured to include a piston rod portion (40), a cylinder shell I (41), a cylinder shell II (42), a valve portion I (43), a valve portion II (44), a high-pressure pipe I (45) and a high-pressure pipe II (46), and one end portion of the piston rod portion (40) is configured to be slidably connected to the cylinder shell I (41), the other end portion of the piston rod portion (40) is configured to be slidably connected to the cylinder shell II (42), and the inner end portion of the side surface of the cylinder shell I (41) is configured to be connected in a communication manner to the inner port portion of the high-pressure pipe I (45), the outer end portion of the side surface of the cylinder shell I (41) is configured to be connected in a communication manner to the inner port portion of the high-pressure pipe II (46), and the outer end portions of the side surface of the cylinder shell I (41) are respectively configured to be connected to the valve portion through a liquid infusion pipe. The inner port of the valve part I (43) is connected to the inner port of the valve part II (44), the inner side of the peripheral side of the shell I (41) and the inner side of the peripheral side of the shell II (42) are respectively arranged to be connected to the arch beam (2), and the liquid delivery pipe located on the outer port of the valve part I (43) is arranged to be connected to the grouting liquid storage tank, the liquid delivery pipe located on the outer port of the valve part II (44) is arranged to be connected to the grouting pipe in the grouting hole located on the inner wall of the tunnel, and the outer port of the high-pressure pipe I (45) and the outer port of the high-pressure pipe II (46) are respectively arranged to be connected to the high-pressure liquid device, and the control port of the valve part I (43) and the control port of the valve part II (44) are respectively arranged to be connected to the PLC controller, Or, the piston rod portion (40) is configured as an I-shaped rod-shaped body and the cylinder shell I (41) and the cylinder shell II (42) are respectively configured as box-shaped bodies having a convex blind hole, the valve portion I (43) and the valve portion II (44) are respectively configured as electric control valves and the inner end port portion of the valve portion I (43) and the inner end port portion of the valve portion II (44) are respectively configured to correspond to the outer end face portion of one of the end heads of the piston rod portion (40), the high-pressure pipe I (45) and the high-pressure pipe II (46) are respectively configured as high-pressure rubber hoses and the inner end port portion of the high-pressure pipe I (45) is configured to correspond to the inner end face portion of the other end head portion of the piston rod portion (40), and the inner end port portion of the high-pressure pipe II (46) is configured to correspond to the outer end face portion of the other end head portion of the piston rod portion (40), Alternatively, the water shielding plate (5) is configured to include a cloth sheet portion (51), a plate portion II (52), a plate portion III (53) and a rod portion VII (54), and threaded holes are respectively provided on the outer end face portion of the plate portion II (52) and the outer end face portion of the plate portion III (53), the edge of the cloth sheet portion (51) is configured to be bonded to the inner end face portion of the plate portion II (52), and the middle portion of the cloth sheet portion (51) is configured to be bonded to the inner end face portion of the plate portion III (53), the inner end of the rod portion VII (54) is configured to be connected to the threaded hole body located on the plate portion III (53) by bolts, and the outer end of the rod portion VII (54) is configured to be connected to the cross beam (1) by bolts, and the threaded hole body located on the plate portion II (52) is configured to be connected to the arch beam (2) by bolts, Alternatively, the cloth sheet portion (51) is configured as a rubber sheet and the plate portion II (52) is configured as a rectangular sheet, the plate portion III (53) is configured as a convex sheet and the rod portion VII (54) is configured as a Z-shaped strip having a through hole at an end, and the plate portion III (53) is configured to be arranged and distributed at intervals along the middle portion of the cloth sheet portion (51).

7. The treatment device based on tunnel time-delay water discharge according to any one of claims 1 to 6, characterized in that: The cross beam (1), the arch beam (2), the water retaining plate (3), and the grouting pump (4) are arranged according to the distribution of flood control, and the cross beam (1), the arch beam (2), the water retaining plate (3), the grouting pump (4), and the water shielding plate (5) are arranged according to the distribution of water flow diversion. Alternatively, a cross beam (1), an arch beam (2), a water retaining plate (3) and two grouting pumps (4) are arranged to form a group of flood control components, and multiple groups of flood control components are arranged in the tunnel, the plate part II (52), the cylinder shell I (41) and the cylinder shell II (42) are respectively arranged to be connected to the rod part III (26), the rod part VII (54) and the rod part III (26) are respectively arranged to be connected to the beam part I (11), and the accommodating tank body II (32) is respectively arranged to be connected to the rod part I (15) and the rod part II (16).

8. The treatment device based on tunnel time-delay water discharge according to claim 7 is characterized by: The invention comprises a grouting liquid mixer (6) and the grouting liquid mixer (6) is configured to include a box shell (61), a pipe part I (62), a pipe part II (63), a pipe part III (64), a plate shell part I (65), a strip part I (66), a plate shell part II (67) and a strip part II (68), wherein the box shell (61) is respectively configured to be accommodatedly connected with the plate shell part I (65), the strip part I (66), the plate shell part II (67) and the strip part II (68), and one end of the strip part I (66) is configured to be connected to the inner end of the plate shell part I (65), one end of the strip part II (68) is configured to be connected to the inner end of the plate shell part II (67), and the other end of the strip part I (66) and the other end of the strip part II (68) are respectively configured to be connected to the inner end of the plate shell part II (67). The rear inner wall of the box shell (61) is embeddedly connected, the transverse part of the pipe part I (62) and the transverse part of the pipe part II (63) are respectively arranged to be connected to the rear wall of the box shell (61) in a through-type manner, and the vertical port of the pipe part I (62) is arranged to be distributed corresponding to the concave end surface of the plate shell part I (65), the vertical port of the pipe part II (63) is arranged to be distributed corresponding to the concave end surface of the plate shell part II (67), and the inner end of the pipe part III (64) is arranged to be connected to the front wall of the box shell (61), the transverse port of the pipe part I (62) and the transverse port of the pipe part II (63) are respectively arranged to be connected to the outer port of the valve part II (44) through a liquid infusion pipe, and the outer end of the pipe part III (64) is arranged to be connected to the grouting pipe in the grouting hole located on the inner wall of the tunnel. Alternatively, the box shell (61) is configured as a trapezoidal box-shaped body and the tube portion I (62) and the tube portion II (63) are respectively configured as L-shaped cylindrical bodies, the tube portion III (64) is configured as a straight cylindrical body, the plate shell portion I (65) and the plate shell portion II (67) are respectively configured as parts of the spherical shell and the inner end portion of the plate shell portion I (65) is configured to be intersectingly distributed with the inner end portion of the plate shell portion II (67), the strip portion I (66) is configured as a spring strip and the strip portion II (68) is configured as a Y-shaped spring strip, and the fork portion of the strip portion II (68) is configured to be connected to the vertical portion of the tube portion I (62) in a sleeve-type manner.

9. A method for treating water discharge based on time-delay in tunnel, characterized in that the steps are: The cross beam (1) and the arch beam (2) are used to temporarily support the tunnel's time-delayed water outlet section, the water retaining plate (3) is used to separate and block the water flow released from the oblique water discharge hole (10) and the vertical water discharge hole (20), and the grouting pump (4) is used to perform grouting treatment on the oblique water discharge hole (10) and the vertical water discharge hole (20) after the released water flow has been completed, thereby ensuring that the tunnel face is in a stable state and performing water treatment on the tunnel's time-delayed water outlet section.

10. The method for treating water discharge based on tunnel time lag according to claim 7 is characterized in that: the steps are: During tunnel construction, when the following phenomena are found: The excavation of the heading face reveals black and dark gray sandy slate intercalated with carbonaceous slate, in thin to medium-thick layers, weakly weathered, with the rock strata bedding along the layer, gently inclined to the right, well-developed joint fissures, slightly open, locally filled with quartz, the structural plane combination is general, the whole is relatively broken, there is linear water outflow at the arch of the heading face, the water quality is clear, without impurities, the water volume is about 8 m³ / h, the overall carbonaceous slate in the surrounding rock is soft, with low strength, easily softened by groundwater, and prone to squeezing deformation. There is large-area water seepage on the initially constructed support surface, accompanied by the phenomenon of excessive deformation speed, which is the time-delay water outflow section of the tunnel. Geophysical exploration is carried out on the tunnel excavation area by the seismic wave reflection method and the transient electromagnetic method to determine the water-bearing area in the tunnel excavation area. Place the beam part Ⅰ(11) on the tunnel bottom of the tunnel excavation area, move the frame part Ⅰ(12) outward at the outer end of the beam part Ⅰ(11), move the block part Ⅰ(18) outward in the receiving groove Ⅰ(17), make the outer end of the frame part Ⅰ(12) act on the tunnel arch foot, rotate the tightening screw part (13) in the receiving hole body (14), make the peripheral side surface of the tightening screw part (13) contact with the inner end surface of the frame part Ⅰ(12), place the lower end surface of the lower horizontal part of the rod part Ⅲ(26) on the upper end surface of the beam part Ⅰ(11), place the outer end of the rod part Ⅳ(27) on the tunnel bottom, make the outer end surfaces of the beam part Ⅱ(22) and the beam part Ⅲ(23) act on the tunnel inner wall respectively, place the bolt in the through-hole body of the lower horizontal part of the rod part Ⅲ(26), make the bolt in the through-hole body of the lower horizontal part of the rod part Ⅲ(26) rotate in the receiving hole body (14), make the bolt flange body in the through-hole body of the lower horizontal part of the rod part Ⅲ(26) act on the lower horizontal part of the rod part Ⅲ(26), place the block part Ⅱ(21) on the upper end surface of the horizontal part of the frame part Ⅱ(24), rotate the jacking screw part (25) in the threaded hole body of the frame part Ⅱ(24), make the inner end of the jacking screw part (25) placed in the C-shaped groove body of the block part Ⅱ(21), jack up the block part Ⅱ(21) by the jacking screw part (25), make the outer end surface of the block part Ⅱ(21) act on the tunnel inner wall, rotate the rod part Ⅰ(15) outward on the vertical part of the frame part Ⅰ(12), place the plate part Ⅰ(31) on the tunnel bottom, place the outer ends of the rod part Ⅰ(15) and the rod part Ⅱ(16) in the receiving groove Ⅱ(32), make the plate part Ⅰ(31) overlap each other, place the plate part Ⅲ(53) on the tunnel bottom, place the bolt in the through-hole body of the outer vertical part of the rod part Ⅲ(26), make the bolt rotate in the threaded hole body of the plate part Ⅱ(52), make the bolt flange body in the through-hole body of the outer vertical part of the rod part Ⅲ(26) act on the outer vertical part of the rod part Ⅲ(26), place the bolt in the through-hole body of the inner end of the rod part Ⅶ(54), make the bolt rotate in the threaded hole body of the plate part Ⅲ(53), make the bolt flange body in the through-hole body of the inner end of the rod part Ⅶ(54) act on the inner end of the rod part Ⅶ(54).Put the bolt into the through hole of the outer end of the rod part VII (54), put the outer end of the rod part VII (54) on the upper end face of the beam part I (11), and rotate the bolt in the threaded hole of the receiving hole (14), so that the bolt flange in the through hole of the outer end of the rod part VII (54) acts on the outer end of the rod part VII (54), so that the cloth part (51) corresponds to the tunnel side wall, and at 4.8m-5.2m behind the primary support end An oblique drainage hole (10) is drilled in the hard rock on the upper front side of the side wall of m, so that the angle between the oblique drainage hole (10) and the center line of the tunnel is set to 41-44°, and a vertical drainage hole (20) is drilled in the square hard rock behind the primary support, so that the angle between the vertical drainage hole (20) and the center line of the tunnel is set to 89-91°. The oblique drainage hole (10) and the vertical drainage hole (20) are used to release the water flow in the water-bearing area in the tunnel excavation area. The released water flow is blocked by the cloth part (51) and blocked by the plate part I (31). When the oblique drainage hole (10) and the vertical drainage hole (20) are completed, the water flow in the water-bearing area in the tunnel excavation area is released. 0) After releasing the water flow in the water-bearing area in the excavation part of the tunnel, the liquid infusion pipe located at the outer port of the valve part I (43) is placed in the grouting liquid storage tank, the liquid infusion pipe located at the outer port of the valve part II (44) is connected to the grouting pipes located in the oblique drainage hole (10) and the vertical drainage hole (20), the outer port of the high-pressure pipe I (45) and the outer port of the high-pressure pipe II (46) are connected to the high-pressure liquid device, and the valve part I (43) is opened and the valve part II (44) is closed through the PLC controller, and the high-pressure liquid is injected into the shell I (41) through the high-pressure pipe I (45). The high-pressure pipe II (46) returns the high-pressure liquid in the shell I (41) to the high-pressure liquid device, so that the piston rod portion (40) moves outward in the shell I (41) and the piston rod portion (40) moves inward in the shell II (42), and the grouting liquid is injected into the shell I (41) through the valve portion I (43), so that the valve portion I (43) is in a closed state and the valve portion II (44) is in an open state, and the high-pressure liquid is injected into the shell I (41) through the high-pressure pipe II (46), and the high-pressure liquid in the shell I (41) is returned to the high-pressure liquid device through the high-pressure pipe I (45), so that the piston rod portion (40) moves inward in the shell I (41). The piston rod (40) moves inward in the cylinder shell II (42), and the grouting liquid in the cylinder shell I (41) is injected into the grouting pipe through the valve part II (44), and the water-containing area in the tunnel excavation is grouted to achieve the treatment of the tunnel's time-delayed water discharge. After the treatment of the tunnel's time-delayed water discharge is completed, the rod part VII (54) is removed from the beam part I (11), the plate part II (52) is removed from the rod part III (26), the accommodating tank body II (32) is separated from the rod part I (15) and the rod part II (16), and the jacking screw part (25) is rotated in the opposite direction in the threaded hole body of the frame part II (24).The block part II (21) is removed from the upper end surface of the horizontal part of the frame part II (24), the rod part III (26) and the block part II (21) are disassembled, the top screw part (13) is removed from the receiving hole body (14), the cross beam (1), the arch beam (2), the water retaining plate (3), the grouting pump (4) and the water retaining plate (5) are moved out of the tunnel excavation part, and the tunnel is continued to be excavated. Or, the grouting liquid raw material is set to include silicate gum, complexing agent and chloride ion stabilizer, Or, the steps are: The grouting liquid transported by pipe part I (62) is sprayed toward plate shell part I (65), and the grouting liquid transported by pipe part II (63) is sprayed toward plate shell part II (67). The grouting liquid is mixed at the intersection between plate shell part I (65) and plate shell part II (67), and a fused grouting liquid is obtained in the box shell (61). The fused grouting liquid is transported by pipe part III (64) to the grouting pipe in the grouting hole located on the inner wall of the tunnel. The relative position between plate shell part I (65) and plate shell part II (67) is changed through the elasticity of strip part I (66) and strip part II (68), so that the intersection between plate shell part I (65) and plate shell part II (67) is in a variable state.