Fan tower drum ring piece splicing base and error control method

Through the combination of assembling disc and robotic arms and the error control of Haigull algorithm, the problem of excessive gaps in assembly of fan tower ring sheets is solved, and the precise positioning and error control between tower ring sheets is realized, which improves the assembly quality and structure stability.

CN118911925APending Publication Date: 2024-11-08ANHUI ELECTRIC POWER DESIGN INST CEEC
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410973234.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

During the assembly process of fan tower ring sheets, due to the difficulty in controlling the construction quality of the lifting platform, the settlement between the ring sheets is uneven, resulting in excessive gaps, affecting the assembly quality and structural safety.

Method used

The assembled disc and multiple robotic arms are used to fix and assemble the tower ring sheet, and accurately position it through positioning devices and level monitors. The error control is carried out in combination with the Haigull algorithm and the cylindrical error evaluation model to ensure the inter-ring sheets. The gap is reduced and the assembly accuracy is improved.

Benefits of technology

It effectively improves the assembly quality of the tower ring piece, reduces the gap, and improves the overall assembly accuracy and structural stability of the tower.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911925A_ABST
    Figure CN118911925A_ABST
Patent Text Reader

Abstract

The invention relates to a fan tower drum ring piece splicing base which comprises a horizontally-arranged splicing disc and a plurality of mechanical arms, the splicing disc is downwards provided with a first support capable of stretching out and drawing back up and down, one end of each mechanical arm is installed on the periphery of the disc in the radius direction of the disc, and the two ends of each mechanical arm are downwards provided with a second support capable of stretching out and drawing back up and down. The first support and the second support are both located on the hoisting platform, and each mechanical arm is provided with a positioning device and a levelness monitor. The invention further discloses an error control method of the fan tower drum ring piece splicing base. The tower drum assembling efficiency is improved; the tower drum ring pieces are accurately positioned by using the positioning device and the levelness monitor, so that mounting gaps among the tower drum ring pieces are reduced, and the assembling quality of the tower drum ring pieces is effectively improved; the cylindricity error evaluation model and the seagull algorithm are used for achieving error control over assembly of the ring pieces and all the sections of the tower drum, the tower drum assembly precision can be further improved, the overall quality of the tower drum is improved, and the structural stability of the tower drum is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind turbine tower assembly, in particular to a wind turbine tower ring segment assembly base and an error control method. Background Art

[0002] The assembly of wind turbine tower is the most important part of wind power projects. Due to the large size of wind turbine tower, the tower is often divided into several sections during design, and each section is divided into several pieces for easy transportation. The tower is also assembled by assembling rings into sections, and then assembling them one by one to the foundation of the wind turbine to complete the installation of the entire wind turbine tower.

[0003] At present, the assembly of wind turbine tower ring segments is all located on the lifting platform, which is generally composed of graded crushed stone. Since the assembly area bears a large load, thicker graded crushed stone is generally laid to ensure the stability of the foundation when assembling the ring segments. However, the construction quality of the lifting platform is often difficult to control. When assembling the actual tower ring segments, two adjacent ring segments often settle unevenly, which makes it impossible to align the mounting bolt holes between the ring segments, resulting in large gaps between the tower ring segments, affecting the assembly quality of the ring segments, and then affecting the installation between the tower sections. Not only does it cause the appearance of the wind turbine tower to be poor, that is, the gap is large, but it also affects the force on the wind turbine tower and affects the structural safety. Therefore, a reasonable and effective assembly device is needed to solve this problem. Summary of the invention

[0004] In order to solve the problems of excessive gaps in the existing wind turbine tower splicing process, which leads to deformation of the tower structure, the primary purpose of the present invention is to provide a wind turbine tower ring segment assembly base that can effectively improve the assembly quality of wind turbine tower ring segments and reduce the gaps between wind turbine tower ring segments and between tower sections.

[0005] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a wind turbine tower ring segment assembly base, comprising a horizontally placed assembly disc and a plurality of mechanical arms for carrying the wind turbine tower ring segments, a first bracket capable of being extended and retracted up and down is arranged downwardly on the assembly disc, one end of the mechanical arm is installed around the disc along the radius direction of the disc, and second brackets capable of being extended and retracted up and down are arranged downwardly on both ends of the mechanical arm, the first bracket and the second bracket are both located on a lifting platform, and a positioning device and a levelness monitor are installed on each mechanical arm.

[0006] The diameter of the assembling disc is 1 meter to 2 meters, the assembling disc is made of steel, and the assembling disc is connected to the mechanical arm by bolts; the arm length of the mechanical arm is 6 meters to 8 meters, and the first bracket includes a first vertical plate and a first steel plate that can be extended and retracted up and down, the upper end of the first vertical plate is installed at the center position of the lower disk surface of the assembling disc, and the lower end of the first vertical plate is installed on the first steel plate, and the plate surface of the first vertical plate is perpendicular to the plate surface of the first steel plate.

[0007] The robotic arm adopts a long I-beam, and a plurality of stiffening ribs are welded at equal intervals on the web of the long I-beam; the second bracket includes a second vertical plate and a second steel plate that can be extended and retracted up and down, the upper end of the second vertical plate is installed on the robotic arm, and the lower end of the second vertical plate is installed on the second steel plate, and the plate surface of the second vertical plate is perpendicular to the plate surface of the second steel plate.

[0008] A positioning device and a levelness monitor are installed on the upper arm surface of the mechanical arm.

[0009] Another object of the present invention is to provide a method for controlling the error of a wind turbine tower ring assembly base, the method comprising the following steps in sequence:

[0010] (1) Sampling is performed based on the positioning device and the levelness monitor to obtain sampling data, the sampling data including the coordinates of the cylindrical sampling point, the angle And radial dimension R ij ;

[0011] (2) Establish an evaluation model based on cylindricity error of the assembled tower ring segments based on the sampling data;

[0012] (3) Solving the evaluation model based on cylindricity error based on the Seagull algorithm to obtain the cylindricity error of the assembled tower ring segment, comparing the obtained cylindricity error of the assembled tower ring segment with the standard cylindricity to determine whether the assembled tower ring segment is qualified;

[0013] (4) If qualified, the error check is performed; if unqualified, the positioning device is readjusted and the process returns to step (1) to resample and perform error control.

[0014] The evaluation model based on cylindricity error specifically refers to: if the number of extracted cylindrical sections is m, the number of sampling points of each section is n; 1≤j≤n, 1≤i≤m;

[0015] Then R ij and As shown below:

[0016]

[0017] Where: x ij ,y ij is the coordinate of the jth sampling point in the i-th section of the cylindricity; is the angle between two adjacent sampling points; R ij is the radial dimension between the jth sampling point in the i-th section and the rotating axis turntable; is the angle between the jth sampling point in each section and the x-axis;

[0018] The minimum area cylindricality error is evaluated, and its essence is to determine the axis parameters of the cylindrical surface; the minimum area cylindricality error fZCE As shown below:

[0019] f ZCE =maxr Zij -minr Zij

[0020] in:

[0021]

[0022] z i =(i-1)×Δz

[0023] In the formula, r Zij The distance from the jth sampling point to the minimum area cylinder axis L MZ The vertical distance, z i is the distance between the i-th section and the xoy plane, Δz is the distance between two adjacent sections; x OZ ,y OZ Indicates the minimum area cylindrical axis L MZ Coordinates on the xoy plane; p Z ,q Z Both represent L MZ Angle parameter of

[0024] Objective function F of the evaluation model based on cylindricity error Z As shown below:

[0025]

[0026] W Z ={x OZ ,y OZ ,p Z ,q Z}.

[0027] The seagull algorithm specifically refers to: setting the seagull population S A and parameters, the parameters include the maximum number of iterations Tmax, the variable dimension dim, the upper limit ub of the variable, the lower limit lb of the variable; the frequency f c , f c Linearly decrease from 2 to 0; spiral parameters u and spiral parameters v; initialize the seagull population S A And parameters, calculate the fitness value of the objective function;

[0028] The target value initial position P0 is as follows:

[0029] P0=rand(S A ,1)×(ub-lb)+lb

[0030] Get the fitness value f of the objective function of the evaluation model based on cylindricity errorit , and sorted by fitness [f it ,index]=sort(f it ), the sort function arranges the array in ascending order to obtain the optimal value of each target individual and the global optimal value pbest of the entire population, and obtains the sorted position according to the sorting parameter index, and iterates the optimization starting from P0;

[0031] Perform a global search: The cylindrical error target value will move in the direction of the optimal position. During the migration, the target value must meet the conditions of avoiding collision, the optimal position direction, and being close to the optimal position:

[0032]

[0033] D s =|C s +M s

[0034] Where: C s represents the collision avoidance coefficient; X represents the target value of the current iteration process; A represents the collision random variable; t represents the current iteration number; M s Indicates the optimal position direction coefficient; D s Indicates the new position where the target value meets the conditions; B indicates the directional balance coefficient; rd indicates a random number from 1 to the variable dimension;

[0035] Use the following formula to perform local optimal search and obtain the optimization target value X after this iteration: new :

[0036] X new =x×y×z×D s +pbest

[0037]

[0038] Where: θ represents a random number in [0, 2π]; x, y, z are the coordinate coefficients of the target value; r represents the radial size of each spiral;

[0039] Determine whether the target value of individual cylindricity error exceeds the boundary: determine the position of the target value that meets the conditions, and calculate the fitness value of the cylindricity error that meets the conditions; update the target position and fitness value, determine whether the end conditions are met, and the iteration ends.

[0040] It can be seen from the above technical scheme that the beneficial effects of the present invention are: first, the basic fixation and assembly of the wind turbine tower ring segments are completed by assembling discs and multiple mechanical arms, thereby improving the tower assembly efficiency; second, the tower ring segments are accurately positioned by using a positioning device and a levelness monitor, thereby reducing the installation gap between the tower ring segments and effectively improving the tower ring segment assembly quality; third, the cylindrical error evaluation model and the Seagull algorithm are used to achieve error control of the tower ring segments and the assembly between each section, which can further improve the tower assembly accuracy, thereby improving the overall quality of the tower and ensuring its structural stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a structural schematic diagram of the present invention;

[0042] Figure 2 for Figure 1 AA direction schematic diagram;

[0043] Figure 3 for Figure 1 BB direction schematic diagram. DETAILED DESCRIPTION

[0044] like Figure 1 , Figure 2 , Figure 3 As shown, a wind turbine tower ring segment assembly base includes a horizontally placed assembly disc 1 and a plurality of mechanical arms 2 for carrying wind turbine tower ring segments. A first bracket capable of being extended and retracted upward and downward is arranged downwardly on the assembly disc 1. One end of the mechanical arm 2 is installed around the disc along the radius direction of the disc. Second brackets capable of being extended and retracted upward and downward are arranged downwardly on both ends of the mechanical arm 2. Both the first bracket and the second bracket are located on a hoisting platform. A positioning device 3 and a levelness monitor 4 are installed on each mechanical arm 2. The first bracket and the second bracket can be adjusted up and down to adjust the horizontal flatness of the mechanical arm 2. The number of mechanical arms 2 is determined according to the geological conditions on site. The bottom of a single wind turbine tower ring segment can be increased according to the geological conditions. During assembly, the number of mechanical arms 2 under each tower ring segment shall not be less than 2. The robot arm 2 is adjusted to a horizontal position through the second bracket, and then the wind turbine tower ring segment is hoisted to the specified position to complete the assembly between the wind turbine tower ring segments, effectively controlling the assembly quality of the tower ring segments, and then the error of the tower section is controlled through the evaluation model based on the cylindricity error, and then the assembly between the tower sections can also be effectively controlled, thereby controlling the assembly quality of the entire wind turbine tower.

[0045] like Figure 1 , Figure 2 , Figure 3As shown, the diameter of the assembly disk 1 is 1 to 2 meters, the assembly disk 1 is made of steel, and the assembly disk 1 is connected to the mechanical arm 2 by bolts; the arm length of the mechanical arm 2 is 6 to 8 meters, and the first bracket includes a first vertical plate 8 and a first steel plate 9 that can be extended and retracted up and down, the upper end of the first vertical plate 8 is installed at the center of the lower disk surface of the assembly disk 1, and the lower end of the first vertical plate 8 is installed on the first steel plate 9, and the plate surface of the first vertical plate 8 is perpendicular to the plate surface of the first steel plate 9. The first steel plate 9 can increase the contact area between the first bracket and the foundation and reduce the settlement of the first bracket.

[0046] like Figure 1 , Figure 2 , Figure 3 As shown, the mechanical arm 2 is made of long I-beams, and a plurality of stiffening ribs 12 are welded at equal intervals on the web of the long I-beams; the second bracket includes a second vertical plate 10 and a second steel plate 11 that can be extended and retracted up and down, the upper end of the second vertical plate 10 is mounted on the mechanical arm 2, and the lower end of the second vertical plate 10 is mounted on the second steel plate 11, and the plate surface of the second vertical plate 10 is perpendicular to the plate surface of the second steel plate 11. A positioning device 3 and a level monitor 4 are installed on the upper arm surface of the mechanical arm 2, the positioning device 3 is used for hoisting and positioning the tower ring segment on the mechanical arm 2, and the level monitor 4 is used for leveling the second bracket of the mechanical arm 2. The second steel plate 11 can increase the contact area between the second bracket and the foundation and reduce the settlement of the second bracket.

[0047] The method comprises the following steps in order:

[0048] (1) Sampling is performed based on the positioning device 3 and the levelness monitor 4 to obtain sampling data, wherein the sampling data includes the coordinates of the cylindrical sampling point, the angle And radial dimension R ij ;

[0049] (2) Establishing an evaluation model based on cylindricity error of the assembled tower ring segments based on the sampling data, and performing error control through the evaluation model based on cylindricity error;

[0050] (3) Solving the evaluation model based on cylindricity error based on the Seagull algorithm to obtain the cylindricity error of the assembled tower ring segment, comparing the obtained cylindricity error of the assembled tower ring segment with the standard cylindricity to determine whether the assembled tower ring segment is qualified;

[0051] (4) If qualified, the error check is performed; if unqualified, the positioning device 3 is readjusted and the process returns to step (1) to resample and perform error control.

[0052] The evaluation model based on cylindricity error specifically refers to: if the number of extracted cylindrical sections is m, the number of sampling points of each section is n; 1≤j≤n, 1≤i≤m;

[0053] Then Rij and As shown below:

[0054]

[0055] Where: x ij ,y ij is the coordinate of the jth sampling point in the i-th section of the cylindricity; is the angle between two adjacent sampling points; R ij is the radial dimension between the jth sampling point in the i-th section and the rotating axis turntable; is the angle between the jth sampling point in each section and the x-axis;

[0056] The minimum area cylindricality error is evaluated, and its essence is to determine the axis parameters of the cylindrical surface; the minimum area cylindricality error f ZCE As shown below:

[0057] f ZCE =maxr Zij -minr Zij

[0058] in:

[0059]

[0060] z i =(i-1)×Δz

[0061] In the formula, r Zij The distance from the jth sampling point to the minimum area cylinder axis L MZ The vertical distance, z i is the distance between the i-th section and the xoy plane, Δz is the distance between two adjacent sections; x OZ ,y OZ Indicates the minimum area cylindrical axis L MZ Coordinates on the xoy plane; p Z ,q Z Both represent L MZ Angle parameter of

[0062] Objective function F of the evaluation model based on cylindricity error Z As shown below:

[0063]

[0064] W Z ={x OZ ,y OZ ,p Z ,q Z}.

[0065] The seagull algorithm specifically refers to: setting the seagull population S A and parameters, the parameters include the maximum number of iterations Tmax, the variable dimension dim, the upper limit ub of the variable, the lower limit lb of the variable; the frequency f c , f c Linearly decrease from 2 to 0; spiral parameters u and spiral parameters v; initialize the seagull population S A And parameters, calculate the fitness value of the objective function;

[0066] The target value initial position P0 is as follows:

[0067] P0=rand(S A ,1)×(ub-lb)+lb

[0068] Get the fitness value f of the objective function of the evaluation model based on cylindricity error it , and sorted by fitness [f it ,index]=sort(f it ), the sort function arranges the array in ascending order to obtain the optimal value of each target individual and the global optimal value pbest of the entire population, and obtains the sorted position according to the sorting parameter index, and iterates the optimization starting from P0;

[0069] Perform a global search: The cylindrical error target value will move in the direction of the optimal position. During the migration, the target value must meet the conditions of avoiding collision, the optimal position direction, and being close to the optimal position:

[0070]

[0071] D s =|C s +M s

[0072] Where: C s represents the collision avoidance coefficient; X represents the target value of the current iteration process; A represents the collision random variable; t represents the current iteration number; M s Indicates the optimal position direction coefficient; D s Indicates the new position where the target value meets the conditions; B indicates the directional balance coefficient; rd indicates a random number from 1 to the variable dimension;

[0073] Use the following formula to perform local optimal search and obtain the optimization target value X after this iteration: new :

[0074] X new =x×y×z×D s +pbest

[0075]

[0076] Where: θ represents a random number in [0, 2π]; x, y, z are the coordinate coefficients of the target value; r represents the radial size of each spiral;

[0077] Determine whether the target value of individual cylindricity error exceeds the boundary: determine the position of the target value that meets the conditions, and calculate the fitness value of the cylindricity error that meets the conditions; update the target position and fitness value, determine whether the end conditions are met, and the iteration ends.

[0078] The specific installation process of the wind turbine tower ring assembly base is as follows:

[0079] First, install the assembly disc 1 in the lifting area;

[0080] Second, mechanical arms 2 are installed around the assembled disc 1 according to the number of wind turbine ring segments. The number of mechanical arms 2 under each tower ring segment shall not be less than 2, and the number of mechanical arms 2 can be increased according to geological conditions; Figure 1 As shown, there are three tower ring segments in total, including a first tower ring segment 5, a second tower ring segment 6 and a third tower ring segment 7;

[0081] Third, adjusting the second bracket according to the levelness monitor 4 on the robot arm 2 so that the robot arm 2 is in a horizontal state;

[0082] Fourth, a positioning device 3 is installed at the top of the mechanical arm 2, and the displacement of the positioning device 3 is determined according to the size of the tower ring segment;

[0083] Fifth, hoist the wind turbine tower ring segments to the designated positions on the mechanical arm 2 to complete the installation between the wind turbine tower ring segments.

[0084] In summary, the present invention completes the basic fixation and assembly of the wind turbine tower ring segments through the assembly disk 1 and multiple mechanical arms 2, thereby improving the tower assembly efficiency; uses the positioning device 3 and the levelness monitor 4 to accurately position the tower ring segments, reduces the installation gap between the tower ring segments, and effectively improves the tower ring segment assembly quality; uses the cylindrical error evaluation model and the Seagull algorithm to achieve error control of the tower ring segments and the assembly between each section, which can further improve the tower assembly accuracy, thereby improving the overall quality of the tower and ensuring its structural stability.

Claims

1. A wind turbine tower ring assembly base, characterized by: It includes a horizontally placed assembly disc and multiple mechanical arms for carrying wind turbine tower ring segments. A first bracket that can be extended and retracted up and down is set downwards on the assembly disc. One end of the mechanical arm is installed around the disc along the radius of the disc. Second brackets that can be extended and retracted up and down are set downwards on both ends of the mechanical arm. The first bracket and the second bracket are both located on the lifting platform. A positioning device and a levelness monitor are installed on each mechanical arm.

2. The wind turbine tower ring assembly base according to claim 1, characterized in that: The diameter of the assembled disc is 1 meter to 2 meters, the assembled disc is made of steel, and the assembled disc is connected to the robotic arm with bolts; the arm length of the robotic arm is 6 meters to 8 meters, and the first bracket includes a first vertical plate and a first steel plate that can be extended and retracted up and down, the upper end of the first vertical plate is installed at the center position of the lower disk surface of the assembled disc, and the lower end of the first vertical plate is installed on the first steel plate, and the plate surface of the first vertical plate is perpendicular to the plate surface of the first steel plate.

3. The wind turbine tower ring assembly base according to claim 1, characterized in that: The robotic arm uses a long I-beam, and a plurality of stiffening ribs are welded at equal intervals on the web of the long I-beam; the second bracket includes a second vertical plate and a second steel plate that can be extended and retracted up and down, the upper end of the second vertical plate is installed on the robotic arm, and the lower end of the second vertical plate is installed on the second steel plate, and the plate surface of the second vertical plate is perpendicular to the plate surface of the second steel plate.

4. The wind turbine tower ring assembly base according to claim 1, characterized in that: A positioning device and a levelness monitor are installed on the upper arm surface of the mechanical arm.

5. The error control method for the wind turbine tower ring assembly base according to any one of claims 1 to 4, characterized in that: The method comprises the following steps in sequence: (1) Sampling is performed based on the positioning device and the levelness monitor to obtain sampling data, which includes the coordinates of the cylindrical sampling points, the angle and radial dimension R ij ; (2) Establish an evaluation model based on the cylindricity error of the assembled tower ring segments based on the sampling data; (3) Solve the evaluation model based on cylindricity error based on the Seagull algorithm to obtain the cylindricity error of the assembled tower ring segment. Compare the obtained cylindricity error of the assembled tower ring segment with the standard cylindricity to determine whether the assembled tower ring segment is qualified. (4) If qualified, the error check is performed; if unqualified, the positioning device is readjusted and the process returns to step (1) to resample and perform error control.

6. The error control method according to claim 5, characterized in that: The evaluation model based on cylindricity error specifically refers to: if the number of extracted cylindrical sections is m, the number of sampling points of each section is n; 1≤j≤n, 1≤i≤m; Then R ij and As shown in the following formula: Where: x ij 、y ij is the coordinate of the jth sampling point in the i-th section of the cylindricity; is the angle between two adjacent sampling points; R ij is the radial dimension between the jth sampling point in the i-th section and the rotary axis turntable; is the angle between the jth sampling point in each section and the x-axis; The evaluation of the minimum area cylindricity error is actually to determine the axis parameters of the cylindrical surface; the minimum area cylindricity error f ZCE As shown in the following formula: f ZCE =maxr Zij -minr Zij in: z i =(i-1)×Δz Where r Zij The distance from the jth sampling point to the minimum area cylindrical axis L MZ The vertical distance, z i is the distance between the i-th section and the xoy plane, Δz is the distance between two adjacent sections; x OZ ,y OZ Indicates the minimum area cylindrical axis L MZ Coordinates on the xoy plane; p Z ,q Z Both represent L MZ Angle parameter; Objective function F of the evaluation model based on cylindricity error Z As shown in the following formula: W Z ={x OZ ,y OZ ,p Z ,q Z }。 7. The error control method according to claim 5, characterized in that: The seagull algorithm specifically refers to: setting the seagull population S A and parameters, including the maximum number of iterations Tmax, the variable dimension dim, the upper limit ub of the variable, the lower limit lb of the variable; the frequency f c , f c Linearly decrease from 2 to 0; spiral parameters u and spiral parameters v; initialize the seagull population S A And parameters, calculate the fitness value of the objective function; The target value initial position P0 is as follows: P0=rand(S A ,1)×(ub-lb)+lb Obtain the fitness value f of the objective function of the evaluation model based on cylindricity error it , and sorted by fitness [f it ,index]=sort(f it ), the sort function arranges the array in ascending order to obtain the optimal value of each target individual and the global optimal value pbest of the entire population, and obtains the sorted position according to the sorting parameter index, and iterates the optimization starting from P0; Perform a global search: The cylindricity error target value will move toward the optimal position. During the migration, the target value must meet the conditions of avoiding collisions, being in the optimal position direction, and being close to the optimal position: D s =|C s +M s Where: C s represents the collision avoidance coefficient; X represents the target value of the current iteration process; A represents the collision random variable; t represents the current iteration number; M s Indicates the optimal position direction coefficient; D s Indicates the new position where the target value meets the conditions; B represents the directional balance coefficient; rd represents a random number from 1 to the variable dimension; Use the following formula to perform local optimal search and obtain the optimization target value X after this iteration: new : X new =x×y×z×D s +pbest Where: θ represents a random number in [0, 2π]; x, y, z are the coordinate coefficients of the target value; r represents the radial size of each spiral; Determine whether the individual cylindricity error target value exceeds the boundary: determine the position of the target value that meets the conditions, and calculate the adaptation value of the cylindricity error that meets the conditions; Update the target position and fitness value, determine whether the end conditions are met, and the iteration ends.

Citation Information

Cited By

  • Concrete tower drum ring piece positioning and splicing method and system based on visual model

    CN121437623A

  • A concrete tower drum ring piece positioning and splicing method and system based on a visual model

    CN121437623B