Safe construction method for negative coal pillar fork

Through the methods of spray sealing and structural adjustment, the problem of difficult crushing and supporting the top plate of the negative coal column fork is solved, and the stability of cross-section sealing and support is achieved, ensuring construction safety and efficiency.

CN118933894APending Publication Date: 2024-11-12XINWEN MINING BUREAU HUAFENG COAL MINE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411236573.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The negative coal column fork is susceptible to roof breakage, water, fire and harmful gases, and the support construction is difficult, which affects safety and efficiency.

Method used

The sprayed sealing section is adopted, and the shed support structure is adjusted to insert beams and lifting shells. Combined with temporary and permanent support, the π-shaped steel front probe beams and U-shaped steel brackets are used to lay metal mesh and fix threaded anchors to ensure support. Stable and prevent air leakage and gangue from being sealed through roof protection measures.

Benefits of technology

Effectively sealing the cross-section improves construction efficiency, ensures the safety and stability of bracket transportation and coal gangue transportation, and reduces the risk of impact ground pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933894A_ABST
    Figure CN118933894A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal mining, in particular to a safety construction method for a negative coal pillar fork. Comprising the following steps: step 1, sealing the section of a fork of a'negative coal pillar 'in a guniting manner; 2, sequentially marking the mounting contour of a shed support and the mounting contour of a belt conveyor on a large sample drawing of a negative coal pillar fork, and determining the mounting position of a lifting shed according to the mounting contour of an insertion beam; thirdly, a temporary support is constructed; and 4, constructing a permanent support. A shed supporting mode is adopted, an effective operation space is supported by using the lifting shed and the inserting beams under the condition that the top plate is broken, and the purposes of bracket transportation and coal gangue transportation are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mining, and in particular to a safe construction method for a "negative coal pillar" fork. Background Art

[0002] Rock burst, also known as rock burst, refers to the dynamic phenomenon of sudden and violent destruction of rock mass around shafts, tunnels or working faces due to the instantaneous release of elastic deformation energy, often accompanied by coal and rock ejection, loud noises and air waves. Rock burst is very destructive and is one of the major disasters in coal mines. The occurrence of rock burst is closely related to the dynamic instability of coal rock impact. The hard texture of the roof and the instability of the coal seam can lead to the dynamic instability of coal rock impact. Among them, the dynamic instability of coal rock impact caused by the hard texture of the roof is the most destructive. The rock properties and thickness of the roof determine the hardness of the roof texture. Thick sandstone and thick conglomerate are common hard roofs. In order to reduce the risk of impact ground pressure induced by hard roof, negative coal pillars are usually arranged to balance and disperse the ground pressure during tunnel excavation. The goaf-side chute is arranged below the goaf of the previous working face to put the excavation tunnel in the optimal stress state. The upper horizontal tunnel is in the ground stress relief area, which reduces the stress of the surrounding rock of the goaf-side chute, achieves "earthquake without disaster", and maintains the stability of the surface and tunnel.

[0003] The tunnel intersection is the location where underground tunnels intersect or penetrate. It is the throat of mine ventilation, transportation, pedestrians and pipeline laying, etc., and is of great significance to ensuring the safe production and efficient operation of the mine. The tunnel intersection needs to meet the needs of multiple uses such as working face matching, transportation support and coal machinery, and gangue discharge. It has the characteristics of large span and long service life. It is easily deformed by the ground pressure of the tunnel, and the reinforcement and support construction is difficult. The existing technology usually sets the tunnel intersection in the area where the negative coal pillar is arranged to resist the impact ground pressure, but the area where the negative coal pillar is arranged has the problem of roof crushing, which is vulnerable to water, fire and harmful gases. Summary of the invention

[0004] Aiming at the problem of broken roof at the fork of "negative coal pillar", which is vulnerable to the harm of water, fire and harmful gas and has great difficulty in support, the present invention provides a safe construction method for the fork of "negative coal pillar", which adopts the way of scaffolding support, utilizes scaffolding and beam insertion to support an effective working space under the condition of broken roof, and meets the purpose of support transportation and coal gangue transportation.

[0005] The present invention provides a safe construction method for a "negative coal pillar" fork, comprising the following steps: Step 1: Use shotcrete to seal the cross section of the "negative coal pillar" fork; Step 2: Mark the installation contours of the shed support and the belt conveyor on the large-scale drawing of the "negative coal pillar" fork in sequence, adjust the installation contour of the shed support affected by the installation contour of the belt conveyor to the installation contour of the beam insertion, and determine the installation position of the shed according to the installation contour of the beam insertion. The shed support includes temporary support and permanent support. The shed support is first opened in the direction of the eye cutting, and then opened in the direction opposite to the eye cutting direction; Step 3: Construct temporary support, lay metal mesh on the top and both sides of the tunnel, use spiral springs to connect the metal meshes hole by hole, fix the π-shaped steel front exploration beam on the metal mesh, the spacing between two adjacent π-shaped steel front exploration beams is 800-1200mm, and the end face distance between the end of the π-shaped steel front exploration beam and the head end of the π-shaped steel front exploration beam is no more than 0.3m; Step 4: Construct permanent support, use U-shaped shed to strengthen support, the leg pit of U-shaped shed is not less than 200mm deep and planted to the hard bottom, the U-shaped shed adopts three-section U-shaped steel bracket, the torque of three-section U-shaped steel bracket after support does not exceed 50mm, the lap length of three-section U-shaped steel bracket is 400-600mm, the shed distance of three-section U-shaped steel bracket is 700-900mm, preferably 800mm, the shed distance is the middle to middle distance of two adjacent three-section U-shaped steel brackets, the back plate spacing of U-shaped steel bracket is 300-500mm, preferably 400mm, the back plate spacing is the middle to middle distance of two adjacent back plates, the back plate is fixed on the metal mesh, the back plate is linearly distributed alternately front and back along the axis direction of the laneway, and threaded anchor rods are set at 800*800mm spacing at the split side, and the preload force of the threaded anchor rods is not less than 400N·m; When all the three-section U-shaped steel supports are installed, the inserted beams are hoisted onto the lifting scaffolding. The overlapping parts of the inserted beams and the lifting scaffolding are fixed with special cable clips, and the other parts between the inserted beams and the lifting scaffolding are filled with wooden boards. The preferred specifications of the wooden boards are square timber or wooden wedges with a size of 400×200×200mm.

[0006] Furthermore, in step 1, the width of the section is 3-4m, preferably 3.4m, and the height is 3-4m, preferably 3.2m. To ensure that there is no air leakage to the goaf, the present invention uses full-section spraying to seal the section of the "negative coal pillar" fork, and locally uses fireproof materials to plug leaks.

[0007] Furthermore, the metal mesh is a diamond mesh woven from 8# iron wire.

[0008] Further, in step 3, the number of π-shaped steel front exploration beams is 3-4. When the cross section of the "negative coal pillar" fork is a normal cross section, 3 π-shaped steel front exploration beams are used. When the cross section of the "negative coal pillar" fork is a larger cross section, 4 π-shaped steel front exploration beams are used. The length of the π-shaped steel front exploration beam is 3.2-3.5m, preferably 3.2m. The normal cross section refers to a cross section with a width of 4m and a height of 3.2m.

[0009] Furthermore, in step 3, each π-shaped steel front exploration beam is used in conjunction with two hook-type lifting rings, and the two hook-type lifting rings are moved forward alternately during the construction process. The metal mesh can be penetrated with a back plate.

[0010] Furthermore, in step three, the π-shaped steel front exploration beam is fixed to the metal mesh using anti-skid chains or 8# iron wire.

[0011] Furthermore, in step four, the length of the overlapping part of the three-section U-shaped steel bracket is not less than 500 mm, and the overlapping part is fastened with two U-shaped steel cables. The spacing between the U-shaped steel cables on two adjacent U-shaped steel brackets is 350-450 mm, preferably 400 mm. The spacing between the U-shaped steel cables is the distance from the middle to the middle of two adjacent U-shaped steel cables in front and behind. The tightening torque of the nut of the U-shaped steel cable is not less than 260 N m, and the height of the U-shaped steel cables at the same position on each U-shaped steel bracket is the same.

[0012] Furthermore, in step 4, the length of the back plate is 1300 mm, the width is 60 mm, the thickness is 20 mm, and the back plate is an iron back plate.

[0013] Furthermore, in step 4, the back panel is fixed to the metal mesh using 10# iron wire.

[0014] Furthermore, it also includes step five: roof protection, first reinforce the head support, and then use the "wedge impact" method to control the gangue in advance. The pneumatic drill bit is driven in from the top of the first head-lifting shed. The angle between the pneumatic drill bit and the roof is 10°-15°, the distance between two adjacent pneumatic drill bits is not more than 300mm, the length of the pneumatic drill bit is not less than 1.6m, and the number of pneumatic drill bits driven in is determined according to the size of the leaking roof area. If there is an empty top and empty side part, it should be connected with a concrete backing plate or filled with non-combustible materials.

[0015] The beneficial effects of the present invention are: The present invention provides a safe construction method for a "negative coal pillar" fork, which first uses spraying to close the cross-section of the "negative coal pillar" fork to prevent air leakage from the cross-section to the goaf; then the scaffolding support affected by the installation of the belt conveyor is adjusted to a beam insertion and scaffolding lifting structure; by regulating the construction methods and construction parameters of temporary support and permanent support, the construction efficiency is improved, and the scaffolding lifting and beam insertion are used to support an effective working space under broken roof conditions, and the purposes of support transportation and coal gangue transportation are met. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0017] Figure 1 This is the diagram of the lifting scaffold and beam support at the fork of the "negative coal pillar" in Example 2.

[0018] Figure 2 It is a cross-sectional view of the three-section U-shaped steel bracket in Example 2.

[0019] Figure 3 This is a cross-sectional view of the permanent support in Example 2.

[0020] In the figure, 1-inserted beam, 2-U-shaped shed, 3-chamber, 4-lifting shed, 5-U-shaped steel cable. DETAILED DESCRIPTION

[0021] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0022] Example 1 A safe construction method for a "negative coal pillar" fork comprises the following steps: Step 1: Use full-section spraying to seal the cross section of the "negative coal pillar" fork, and use fireproof materials to plug leaks in the section. In this embodiment, the cross section of the "negative coal pillar" fork is a normal cross section with a width of 3.4m and a height of 3.2m.

[0023] Step 2: According to the radius of curvature required for support transportation, the tunnel door is turned eastward (i.e., in the direction of eye cutting) to make a large-scale drawing of the "negative coal pillar" fork, and the scale of the large-scale drawing is 1:100. On the large-scale drawing of the "negative coal pillar" fork, the installation contour of the shed support and the installation contour of the belt conveyor are marked in sequence, and the installation contour of the shed support affected by the installation contour of the belt conveyor is adjusted to the installation contour of the beam insertion, and the installation position of the shed is determined according to the installation contour of the beam insertion. The shed support includes temporary support and permanent support. The shed support is first opened to the east and then to the west.

[0024] Step 3: Construct temporary support. Lay a diamond net made of 8# iron wire on the top and both sides of the tunnel. The diamond nets are connected by 1.0m long spiral springs, and the diamond nets are penetrated with back plates. Use anti-skid chains or 8# iron wires to fix three 3.2m long π-shaped steel front exploration beams on the diamond net. Each π-shaped steel front exploration beam is used in conjunction with two hook-type lifting rings made of φ22 round steel. The two hook-type lifting rings are moved forward alternately during the construction process. The spacing between two adjacent π-shaped steel front exploration beams is 800-1200mm, and the end face distance between the end of the π-shaped steel front exploration beam and the head end of the π-shaped steel front exploration beam is no more than 0.3m. After each regular cycle of blasting, under the cover of permanent support, use long-handled tools to remove the dangerous rock and gangue at the head, and then immediately move the π-shaped steel front exploration beam to the head, and find the direction of the lifting shed according to the row spacing.

[0025] Step 4: Construct permanent support and use U-shaped shed to strengthen support. The leg socket of the U-shaped shed is 200mm deep and planted on the hard bottom. When encountering a soft bottom, the legs of the U-shaped shed need to wear wooden shoes with a specification of 250×200×50mm. The U-shaped shed uses a three-section U-shaped steel bracket. The overlap length of the three-section U-shaped steel bracket is 500mm. The overlap part is fastened with two U-shaped steel cables. When fastening, ensure that the screws are fully capped and must not be loose. The spacing between the U-shaped steel cables on two adjacent U-shaped steel brackets is 400mm, and the spacing between the U-shaped steel cables is the distance from the middle to the middle of the two adjacent U-shaped steel cables in front and behind. The tightening torque of the nut of the U-shaped steel cable is 260N·m. The height of the U-shaped steel cables at the same position on each U-shaped steel bracket is the same and kept in a straight line.

[0026] After the three-section U-shaped steel bracket is supported, it should be straight, with no twisting and tilting on both sides, and the torque should not exceed 50mm. The shelf distance of the three-section U-shaped steel bracket is 800mm, which is the distance between the middle of the two adjacent three-section U-shaped steel brackets. The back plate spacing of the three-section U-shaped steel bracket is 400mm, which is the distance between the middle of the two adjacent back plates. Use 10# iron wire to fix the back plate on the diamond net. The back plate is linearly distributed alternately front and back along the axis of the laneway, and is evenly arranged and must not be loose. The back plate is an iron back plate with a length of 1300mm, a width of 60mm, and a thickness of 20mm. Threaded anchor rods are set at a spacing of 800*800mm at the split side, and the preload force of the threaded anchor rod is 400N·m.

[0027] When all the three-section U-shaped steel supports are installed, the inserted beams are hoisted onto the U-shaped shed. The overlapping parts of the inserted beams and the U-shaped shed are fixed with special cable clips. Then the top of the lifting shed is hoisted and fixed under the inserted beams. Special cable clips are used in conjunction with special tools for pre-tightening. Finally, the legs of the lifting shed are installed, and the two lifting sheds are chained and fixed to give them load-bearing capacity.

[0028] Step 5: Roof protection, first reinforce the head-on support, and then use the "wedge impact" method to control the loess in advance. The specific method is as follows: Before head-on blasting, drive a pneumatic drill from the top of the first head-on lifting shed to control the loess on the roof. The pneumatic drill is driven from the top of the first head-on lifting shed. The angle between the pneumatic drill and the roof is 10-15°, the spacing between two adjacent pneumatic drills is 300mm, the length of the pneumatic drill is 1.6m, and the number of pneumatic drills driven is determined according to the size of the leaking roof area. If there is an empty top and empty side, it must be connected with a concrete backing plate or filled with non-combustible materials. The construction adopts a small cycle operation, the cycle operation advance is 0.7 meters, and the depth of each drilling is 0.8m.

[0029] Example 2 A safe construction method for a "negative coal pillar" fork comprises the following steps: Step 1: Use full-section spraying to seal the cross section of the "negative coal pillar" fork, and use fireproof materials to plug leaks in the section. In this embodiment, the cross section of the "negative coal pillar" fork is a larger cross section, with a width of 4.8m and a height of 3.6m.

[0030] Step 2: According to the radius of curvature required for support transportation, turn the tunnel door to the east (i.e. the direction of eye cutting) to make a large-scale drawing of the "negative coal pillar" fork. The scale of the large-scale drawing is 1:100. On the large-scale drawing of the "negative coal pillar" fork, mark the installation outline of the shed support and the installation outline of the belt conveyor in sequence, such as Figure 1 As shown, the installation contour of the shed support affected by the installation contour of the belt conveyor is adjusted to the installation contour of the inserted beam 1, and the installation position of the lifting shed 4 is determined according to the installation contour of the inserted beam 1. The shed support includes temporary support and permanent support. The shed support is first opened to the east for construction and then opened to the west for construction.

[0031] Step 3: Construct temporary support. Lay a diamond net made of 8# iron wire on the top and both sides of the tunnel. The diamond nets are connected by 1.0m long spiral springs, and the diamond nets are penetrated with back plates. Four 3.2m long π-shaped steel front exploration beams are fixed to the diamond net with anti-skid chains or 8# iron wires. Each π-shaped steel front exploration beam is used in conjunction with two hook-type lifting rings made of φ22 round steel. The two hook-type lifting rings are moved forward alternately during the construction process. The spacing between two adjacent π-shaped steel front exploration beams is 800-1200mm, and the end face distance between the end of the π-shaped steel front exploration beam and the head end of the π-shaped steel front exploration beam is no more than 0.3m. After each regular cycle of blasting, under the cover of permanent support, use long-handled tools to remove the dangerous rock and gangue at the head, and then immediately move the π-shaped steel front exploration beam to the head, and find the direction of the lifting shed according to the row spacing.

[0032] Step 4: Build permanent support, use U-shaped shed to strengthen support, the leg socket of U-shaped shed is 200mm deep and planted on hard bottom. When encountering soft bottom, the legs of U-shaped shed need to wear wooden shoes with specifications of 250×200×50mm. Figure 2 As shown, the U-shaped shed 2 uses a three-section U-shaped steel bracket, and the overlap length of the three-section U-shaped steel bracket is 600mm. The overlapped part is fastened with two U-shaped steel cables 5. When fastening, ensure that the screws are fully capped and not loose. The spacing between the U-shaped steel cables 5 on two adjacent U-shaped steel brackets is 400mm, and the spacing between the U-shaped steel cables 5 is the distance from the middle to the middle of the two adjacent U-shaped steel cables 5. The tightening torque of the nut of the U-shaped steel cable 5 is 260N·m. The height of the U-shaped steel cables 5 at the same position on each U-shaped steel bracket is the same and kept in a straight line.

[0033] After the three-section U-shaped steel bracket is supported, it should be straight, with no twisting and tilting on the two sides, and the torque should not exceed 50mm. The shelf distance of the three-section U-shaped steel bracket is 800mm, which is the distance from the middle to the middle of the two three-section U-shaped steel brackets adjacent to each other. The back plate spacing of the three-section U-shaped steel bracket is 400mm, which is the distance from the middle to the middle of the two back plates adjacent to each other. Use 10# iron wire to fix the back plate on the diamond net. The back plate is linearly distributed alternately front and back along the axis of the laneway, and is evenly arranged and must not be loose. The back plate is an iron back plate with a length of 1300mm, a width of 60mm, and a thickness of 20mm. Threaded anchor rods are set at a spacing of 800*800mm at the split side, and the preload force of the threaded anchor rods is 400N·m.

[0034] like Figure 3 As shown, after all the three-section U-shaped steel supports are installed, the inserted beam 1 is hoisted onto the U-shaped shed 2, and the overlapping parts of the inserted beam 1 and the U-shaped shed 2 are fixed with special cable clips. Then the top of the lifting shed 4 is hoisted and fixed under the inserted beam 1, and pre-tightened with special cable clips and special tools; finally, the legs of the lifting shed are installed, and the two lifting sheds 4 are chained and fixed to give them load-bearing capacity.

[0035] Step 5: Roof protection, first reinforce the head-on support, and then use the "wedge impact" method to control the loess in advance. The specific method is as follows: Before head-on blasting, drive a pneumatic drill from the top of the first head-on lifting shed to control the loess on the roof. The pneumatic drill is driven from the top of the first head-on lifting shed. The angle between the pneumatic drill and the roof is 10-15°, the spacing between two adjacent pneumatic drills is 300mm, the length of the pneumatic drill is 1.6m, and the number of pneumatic drills driven is determined according to the size of the leaking roof area. If there is an empty top and empty side, it must be connected with a concrete backing plate or filled with non-combustible materials. The construction adopts a small cycle operation, the cycle operation advance is 0.7 meters, and the depth of each drilling is 0.8m.

[0036] Although the present invention has been described in detail with reference to the accompanying drawings and in combination with the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person of ordinary skill in the art may easily think of changes or substitutions within the technical scope disclosed by the present invention, and these shall be within the scope of protection of the present invention.

Claims

1. A safe construction method for "negative coal pillar" fork, It is characterized in that The steps include: Step 1: Use shotcrete to seal the cross section of the "negative coal pillar" fork; Step 2: Mark the installation contours of the shed support and the belt conveyor on the large-scale drawing of the "negative coal pillar" fork in sequence, adjust the installation contour of the shed support affected by the installation contour of the belt conveyor to the installation contour of the beam insertion, and determine the installation position of the shed according to the installation contour of the beam insertion. The shed support includes temporary support and permanent support. The shed support is first opened in the direction of the eye cutting, and then opened in the direction opposite to the eye cutting direction; Step 3: Construct temporary support, lay metal mesh on the top and both sides of the tunnel, use spiral springs to connect the metal meshes hole by hole, fix the π-shaped steel front exploration beam on the metal mesh, the spacing between two adjacent π-shaped steel front exploration beams is 800-1200mm, and the end face distance between the end of the π-shaped steel front exploration beam and the head end of the π-shaped steel front exploration beam is no more than 0.3m; Step 4: Build permanent support, use U-shaped shed to strengthen support, the leg pit of U-shaped shed is not less than 200mm deep and planted to the hard bottom, the U-shaped shed adopts three-section U-shaped steel bracket, the torque of three-section U-shaped steel bracket after support is not more than 50mm, the lap length of three-section U-shaped steel bracket is 400-600mm, the shelf distance of three-section U-shaped steel bracket is 700-900mm, the back plate spacing of U-shaped steel bracket is 300-500mm, the back plate is fixed on the metal net, the back plate is linearly distributed alternately front and back along the axis of the laneway, and the threaded anchor rods are set at the split side according to the spacing of 800*800mm, and the preload force of the threaded anchor rods is not less than 400N·m; When all three-section U-shaped steel supports are installed, the inserted beams are hoisted onto the lifting scaffolding. The overlapping parts of the inserted beams and the lifting scaffolding are fixed with special cable clips, and the other parts between the inserted beams and the lifting scaffolding are filled with wooden boards.

2. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step one, the width of the section is 3-4m and the height is 3-4m.

3. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that The metal mesh is a diamond-shaped mesh woven with iron wire.

4. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step three, the number of π-shaped steel front exploration beams is 3-4, and the length of the π-shaped steel front exploration beam is 3-3.5m.

5. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step three, each π-shaped steel front exploration beam is used in conjunction with two hook-type lifting rings, and the two hook-type lifting rings are moved forward alternately during the construction process.

6. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step three, use anti-skid chains or 8# iron wire to fix the π-shaped steel front exploration beam on the metal mesh.

7. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step 4, the length of the overlapping part of the three-section U-shaped steel bracket is not less than 500 mm, and the overlapping part is fastened with two U-shaped steel cables. The spacing between the U-shaped steel cables on two adjacent U-shaped steel brackets is 350-450 mm, and the tightening torque of the nut of the U-shaped steel cable is not less than 260 N·m. The height of the U-shaped steel cables at the same position on each U-shaped steel bracket is the same.

8. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step 4, the length of the backboard is 1300 mm, the width is 60 mm, the thickness is 20 mm, and the backboard is an iron backboard.

9. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that In step 4, use 10# wire to fix the back panel to the metal mesh.

10. A safe construction method for a "negative coal pillar" fork as claimed in claim 1, It is characterized in that It also includes step five: roof protection, first reinforce the head support, and then use the "wedge impact" method to control the gangue in advance.