Method for starting and stopping main helium fan of high-temperature gas cooled reactor
Through systematic insulation measurement, power transmission and inspection confirmation steps, the rationality of the start-up and shutdown process of the high-temperature gas-cooled reactor main helium fan is solved, and the safety and reliability of the start-up and shutdown process is improved.
Patent Information
- Application Number
- CN202411015336.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-12
AI Technical Summary
There is a risk of equipment damage during the start-up and shutdown of the high-temperature gas-cooled relay main helium fan, mainly due to equipment failures caused by unreasonable power transmission sequence, inappropriate cooling water flow and pressure, and unreasonable setting of start-up and shutdown steps. .
Provide a method for starting and stopping the main helium fan of high-temperature air-cooled relay, including insulation measurement, power supply, cooling water input, inspection and confirmation, frequency converter startup and main helium fan speed increase, etc., reduce the rotation speed of the electromagnetic bearing and close the inlet when shut down. Bezel, ensuring the rationality and safety of each step.
Avoid starting failure through strict inspection and confirmation processes, reduce the risk of equipment damage, ensure that the main helium fan safely removes the electromagnetic bearings when it is shut down, avoid equipment damage, and improve the reliability and safety of the start-stop process.
Smart Images

Figure CN118934698A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high temperature gas-cooled reactors, and in particular to a method for starting and stopping a main helium blower of a high temperature gas-cooled reactor. Background Art
[0002] The main helium blower of the HTGR is used to drive a sufficient flow of coolant to circulate the helium in the primary circuit of the HTGR, transferring the heat generated by the core to the secondary circuit side of the evaporator. It is a key equipment in the primary circuit, similar to the main pump of a pressurized water reactor nuclear power plant.
[0003] The main helium blowers of the high temperature gas-cooled reactor include electromagnetic bearing main helium blowers and dry gas seal main helium blowers. Among them, the supporting equipment of the electromagnetic bearing main helium blower includes frequency converters, transformers, electromagnetic bearings, protection system circuit breakers, equipment cooling water, blower baffles, etc. Due to the complex equipment design and numerous interface systems of the electromagnetic bearing main helium blower, its startup process requires joint control of multiple systems. If the start-stop process design is unreasonable, it may cause serious problems such as equipment damage.
[0004] Specifically, the startup of the electromagnetic bearing main helium blower may have the following problems:
[0005] 1. If the power transmission sequence is unreasonable, it is very easy to cause equipment damage;
[0006] 2. If the cooling water that provides support for the main helium blower of the electromagnetic bearing does not meet the requirements in terms of flow and pressure, the main helium blower will not start, or even the equipment will be damaged;
[0007] 3. The start-up process of the electromagnetic bearing main helium blower involves the power supply process before starting, electromagnetic bearing suspension, inverter start-up, etc. Due to the various control interlocks and start-stop conditions in the design, if the start-up sequence or steps are not set reasonably, it may cause some equipment to fail to start;
[0008] 4. When the main helium blower with electromagnetic bearing is shut down, it uses electromagnetic bearings to support the rotor of the main helium blower, which is quite different from ordinary bearings. If the electromagnetic bearings of the main helium blower are operated incorrectly, the main helium blower equipment may be damaged. Summary of the invention
[0009] Therefore, the technical problem to be solved by the present invention is to provide a method for starting and stopping a main helium blower of a high temperature gas-cooled reactor to ensure the safe operation of the main helium blower of the electromagnetic bearing.
[0010] In order to solve the above technical problems, the present invention provides a method for starting and stopping a main helium blower of a high temperature gas-cooled reactor, which comprises the following steps during startup:
[0011] S1. Conduct insulation measurement and power transmission;
[0012] S2, cooling water;
[0013] S3. Check and confirm;
[0014] S4, start the inverter;
[0015] S5, main helium blower speed increase;
[0016] When shutting down, the following steps are included:
[0017] S6, reduce the speed of the main helium blower motor to 400 rpm;
[0018] S7, shut down the main helium blower motor inverter;
[0019] S8, wait until the main helium blower motor speed drops below 60rpm, and release the electromagnetic bearing;
[0020] S9. Check that the main helium blower inlet damper is passively closed. If it is not closed, close it manually.
[0021] Optionally, in step S1, before performing insulation measurement, the main circuit breaker needs to be disconnected to ensure disconnection from the upstream 6 kV power supply, including:
[0022] Determine the cable segment measurement points, take the transformer as the disconnection point, and divide the cable into two sections: the high-voltage side and the low-voltage side of the transformer for insulation measurement; the insulation measurement range of the transformer high-voltage side is from the main circuit breaker to the high-voltage side of the transformer, and the insulation measurement range of the low-voltage side is from the low-voltage side of the transformer to the main helium blower motor; when measuring the high-voltage side of the transformer, the circuit breaker on the high-voltage side of the transformer needs to be closed to ensure the connection of the line.
[0023] Optionally, in step S1, the power transmission process includes:
[0024] S11, supplies control power to the main helium blower motor inverter;
[0025] S12, supplying power to the transformer;
[0026] S13, supplying power to the electromagnetic bearing;
[0027] S14. Supply power to the entrance baffle and all equipment. After the equipment is powered on, check that all equipment has no abnormal alarms.
[0028] Optionally, the step S2 includes:
[0029] S21, open the electric valve and put it into automatic state;
[0030] S22, open the regulating valve, and adjust the cooling water flow of the main helium blower motor to meet the requirements by controlling the regulating valve.
[0031] Optionally, the cooling water flow of the main helium blower motor is adjusted by controlling the regulating valve to meet the requirement of less than 60 t / h.
[0032] Optionally, the step S3 includes:
[0033] S30, confirm that the helium flow rate and the inlet and outlet temperatures of the main helium blower are normal;
[0034] S31, confirm that the inverter and bearing speed of the main helium blower motor are 0;
[0035] S32, confirm that the voltage, current and power indication of the main helium blower motor are 0;
[0036] S33. Confirm that the pressure difference between the upper and lower compartments of the middle partition of the main helium blower is less than 0.6MPa;
[0037] S34, confirm that the inlet and outlet pressure difference of the main helium blower is 0 kPa;
[0038] S35. Confirm that the axial and radial temperatures of the electromagnetic bearing do not exceed 120°C;
[0039] S36. Confirm that the base vibration and bearing vibration of the main helium blower motor are less than 1.8 mm / s;
[0040] S37, confirm that the electric valves are in remote and open state and are put into automatic operation;
[0041] S38. Confirm that the main helium blower inlet baffle is in the passive position;
[0042] S39. Confirm that the cooling water parameters are normal.
[0043] Optionally, the cooling water parameters include: pressure, flow rate and temperature.
[0044] Optionally, the step S4 includes:
[0045] S41. Close the isolation valve at the inlet of the pressure gauge to isolate the pressure gauge used to measure the primary circuit pressure of the high-temperature gas-cooled reactor.
[0046] Optionally, the step S4 further includes:
[0047] S42, switching the main helium blower motor to manual mode;
[0048] S43, manually set the initial value of the inverter speed to 400rpm;
[0049] S44, start the main helium blower motor inverter and monitor the speed until it reaches 400rpm.
[0050] Optionally, the step S5 includes:
[0051] S51, after the main helium blower motor is started, the speed gradient is controlled within 100rpm, so that the main helium blower inlet damper is slowly opened;
[0052] S52: After the main helium blower inlet damper is opened, during the speed increase process, the speed increase is controlled not to exceed 200 rpm each time.
[0053] The technical solution of the present invention has the following advantages:
[0054] The method for starting and stopping the main helium blower of a high-temperature gas-cooled reactor provided by the present invention first performs an inspection and confirmation during startup to ensure that the inverter is started only after the startup conditions are met, thereby avoiding the problem of startup failure caused by failure to start. During shutdown, the electromagnetic bearing is released after the speed of the main helium blower motor drops below 60rpm, thereby avoiding the problem of damage to the main helium blower equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0056] Figure 1 It is a schematic diagram of a specific implementation of a main helium blower system for a high temperature gas-cooled reactor provided in an embodiment of the present invention.
[0057] Description of reference numerals:
[0058] 1. Main helium blower motor; 2. Electromagnetic bearing; 3. Cooling water pipeline; 4. Power supply line; 5. Air duct; 6. Electric valve; 7. Regulating valve; 8. Inlet baffle; 9. Pressure gauge; 10. Isolation valve; 11. Transformer; 12. First circuit breaker group; 13. Second circuit breaker group; 14. Main circuit breaker. DETAILED DESCRIPTION
[0059] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0061] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0062] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0063] like Figure 1 As shown, a specific implementation of the main helium blower system of the high-temperature gas-cooled reactor provided in this embodiment includes: a main helium blower motor 1, an electromagnetic bearing 2, a cooling water pipeline 3, a power supply line 4 and an air duct 5. Among them, the main helium blower motor 1 is used to drive the main helium blower to rotate, forming a high-temperature reactor primary loop helium circulation flow to carry out the core heat. The electromagnetic bearing 2 is used to support the main helium blower rotor when the main helium blower is running. The cooling water pipeline 3 is provided with an electric valve 6 and a regulating valve 7. The electric valve 6 is used to isolate the cooling water of the main helium blower motor 1, and the regulating valve 7 is used to adjust the flow of cooling water. The air duct 5 is provided with an inlet baffle 8, which can be electrically driven or passively actuated (similar to a swing check valve). When the main helium blower is running, the inlet baffle 8 is in a passive open state. A pressure gauge 9 is provided upstream of the inlet baffle 8. The pressure gauge 9 is connected to the air duct 5 through an isolation valve 10 and is used to detect the pressure in the air duct 5. With such an arrangement, when the pressure in the air duct 5 is unstable, the pressure gauge 9 can be protected by closing the isolation valve 10.
[0064] like Figure 1As shown, the inlet baffle 8 and the electromagnetic bearing 2 are connected to the power supply through a circuit breaker, and the main helium blower motor 1 is connected to the power supply through a transformer 11, a circuit breaker group and a main circuit breaker 14. The transformer 11 has a transformer 11 circuit breaker, and the side of the transformer 11 close to the power supply is the high-voltage side, and the side away from the power supply and close to the blower is the low-voltage side. The circuit breaker group includes a first circuit breaker group 12 and a second circuit breaker group 13. The first circuit breaker group 12 and the second circuit breaker group 13 respectively have two parallel circuit breakers, namely the first circuit breaker and the second circuit breaker. Connecting any one circuit breaker can connect the circuit breakers in this group. The main circuit breaker 14 is used to control the overall on and off of the circuit.
[0065] The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment includes the following steps when starting:
[0066] S1. Conduct insulation measurement and power transmission;
[0067] S2, cooling water;
[0068] S3. Check and confirm;
[0069] S4, start the inverter;
[0070] S5, main helium blower speed increase;
[0071] When shutting down, the following steps are included:
[0072] S6, reducing the speed of the main helium blower motor 1 to 400 rpm;
[0073] S7, shut down the inverter of main helium blower motor 1;
[0074] S8. When the speed of the main helium blower motor 1 drops below 60 rpm, release the electromagnetic bearing 2, otherwise the main helium blower and the electromagnetic bearing 2 will be irreversibly damaged.
[0075] S9. Check whether the main helium blower inlet damper 8 is passively closed. If it is not closed, close it manually.
[0076] The method for starting and stopping the main helium blower of a high-temperature gas-cooled reactor provided in this embodiment first performs an inspection and confirmation during startup to ensure that the inverter is started only after the startup conditions are met, thereby avoiding the problem of startup failure caused by failure to start. During shutdown, the electromagnetic bearing 2 is released after the speed of the main helium blower motor 1 drops below 60rpm, thereby avoiding the problem of damage to the main helium blower equipment.
[0077] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, in the step S1, before performing insulation measurement, the main circuit breaker 14 needs to be disconnected to ensure disconnection from the upstream 6kV power supply, and the method includes the following steps:
[0078] Determine the cable segment measurement point, take transformer 11 as the disconnection point, and divide it into two sections, the high-voltage side and the low-voltage side of transformer 11, for insulation measurement; wherein, the insulation measurement range of the high-voltage side of transformer 11 is from the main circuit breaker outlet to the high-voltage side of transformer 11, and the insulation measurement range of the low-voltage side is from the low-voltage side of transformer 11 to the main helium blower motor 1; when measuring the high-voltage side of the transformer 11, the sub-circuit breaker on the high-voltage side of the transformer 11 needs to be closed to ensure the line connectivity, that is, the first circuit breaker or the second circuit breaker in the circuit breaker group.
[0079] like Figure 1 As shown, in this embodiment, the power cable circuit of the main helium blower includes five 6KV switches (circuit breakers), a transformer 11, and a frequency converter, which is quite different from the insulation measurement of ordinary blowers. This embodiment changes the requirements for circuit breaker opening and closing through a reasonable insulation measurement method, and realizes the one-time completion of 6KV cable insulation measurement.
[0080] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, in step S1, the power transmission process includes:
[0081] S11, supplies control power to the inverter of main helium blower motor 1;
[0082] S12, supplying power to transformer 11;
[0083] S13, supplying power to the electromagnetic bearing 2;
[0084] S14, power is supplied to the inlet baffle 8, and power is supplied to all devices. After power is supplied to the devices, all devices are checked for abnormal alarms. This embodiment provides a more reasonable power supply sequence, thereby avoiding the problem of equipment damage during the power supply process.
[0085] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, the step S2 includes:
[0086] S21, open the electric valve 6 and put it into automatic state;
[0087] S22, opening the regulating valve 7, and adjusting the cooling water flow of the main helium blower motor 1 to meet the requirement by controlling the regulating valve 7.
[0088] Specifically, in the method for starting and stopping the main helium blower of the high temperature gas-cooled reactor provided in this embodiment, the cooling water flow rate of the main helium blower motor 1 is adjusted by controlling the regulating valve 7 to meet the requirement of less than 60 t / h. Through this setting, the flow rate and pressure of the cooling water meet the requirements, avoiding the problem that the main helium blower cannot be started or even the equipment is damaged.
[0089] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, the step S3 includes:
[0090] S30, confirm that the helium flow rate and the inlet and outlet temperatures of the main helium blower are normal;
[0091] S31, confirm that the inverter and bearing speed of the main helium blower motor 1 are 0;
[0092] S32, confirming that the voltage, current and power indication of the main helium blower motor 1 are 0;
[0093] S33. Confirm that the pressure difference between the upper and lower compartments of the middle partition of the main helium blower is less than 0.6MPa;
[0094] S34, confirm that the inlet and outlet pressure difference of the main helium blower is 0 kPa;
[0095] S35, confirm that the axial and radial temperatures of the electromagnetic bearing 2 do not exceed 120°C;
[0096] S36, confirming that the base vibration and bearing vibration of the main helium blower motor 1 are less than 1.8 mm / s;
[0097] S37, confirm that the electric valves 6 are in remote and open state and are put into automatic operation;
[0098] S38, confirming that the main helium blower inlet baffle 8 is in the passive position;
[0099] S39. Confirm that the cooling water parameters are normal; specifically, the cooling water parameters include: pressure, flow rate and temperature.
[0100] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, the step S4 includes:
[0101] S41, close the isolation valve 10 at the inlet of the pressure gauge 9, and isolate the pressure gauge 9 used to measure the primary circuit pressure of the high temperature gas-cooled reactor. Through this setting, by closing the isolation valve 10 before starting the main helium blower, the inlet pressure fluctuation caused by the start of the main helium blower can be prevented. The inlet pressure fluctuation may cause a high negative change rate of helium pressure (reactor protection signal) and cause the reactor to shut down.
[0102] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, the step S4 further includes:
[0103] S42, switching the main helium blower motor 1 to manual mode;
[0104] S43, manually set the initial value of the inverter speed to 400rpm. The starting speed of 400rpm can prevent a large disturbance to the primary circuit pressure and prevent the starting current from being too large;
[0105] S44, start the inverter of the main helium blower motor 1 and monitor the speed until it reaches 400rpm.
[0106] In the method for starting and stopping the main helium blower of a high temperature gas-cooled reactor provided in this embodiment, the step S5 includes:
[0107] S51, after the main helium blower motor 1 is started, the speed gradient is increased and controlled within 100rpm, so that the main helium blower inlet damper 8 is slowly opened. By reasonably controlling the speed, the influence of the large speed change on the primary circuit pressure of the stack can be prevented, so that the system runs stably;
[0108] S52. After the damper 8 at the inlet of the main helium blower is opened, during the speed increase process, the speed increase is controlled not to exceed 200 rpm each time, and the speed increase of the frequency converter does not exceed 200 rpm each time, which can effectively reduce the problem of an increase in the negative change rate of the pressure gauge 9 at the inlet of the main helium blower during the speed increase process.
[0109] Obviously, the above embodiments are merely examples for clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the scope of protection of the present invention.
Claims
1. A method for starting and stopping the main helium blower of a high temperature gas-cooled reactor, characterized in that: When starting up, the following steps are involved: S1. Conduct insulation measurement and power transmission; S2, cooling water; S3. Check and confirm; S4, start the inverter; S5, main helium blower speed up; When shutting down, the following steps are included: S6, reducing the speed of the main helium blower motor (1) to 400 rpm; S7, shut down the frequency converter of the main helium blower motor (1); S8, wait until the speed of the main helium blower motor (1) drops below 60 rpm, and release the electromagnetic bearing (2); S9. Check whether the main helium blower inlet damper (8) is passively closed. If it is not closed, close it manually.
2. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 1, characterized in that: In the step S1, before performing insulation measurement, the main circuit breaker (14) needs to be disconnected to ensure disconnection from the upstream 6 kV power supply, including: The cable segment measurement points are determined, and the transformer (11) is used as the disconnection point to perform insulation measurement on the high-voltage side and the low-voltage side of the transformer (11); wherein the insulation measurement range of the high-voltage side of the transformer (11) is from the main circuit breaker outlet to the high-voltage side of the transformer (11), and the insulation measurement range of the low-voltage side is from the low-voltage side of the transformer (11) to the main helium blower motor (1); when measuring the high-voltage side of the transformer (11), the circuit breaker on the high-voltage side of the transformer (11) needs to be closed to ensure line connectivity.
3. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 1, characterized in that: In the step S1, the power transmission process includes: S11, supplies control power to the frequency converter of the main helium blower motor (1); S12, supplying power to the transformer (11); S13, supplying power to the electromagnetic bearing (2); S14, supply power to the inlet baffle (8), and then supply power to all devices. After the power supply is completed, check that all devices have no abnormal alarms.
4. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 1, characterized in that: The step S2 includes: S21, open the electric valve (6) and put it into automatic state; S22, opening the regulating valve (7), and adjusting the cooling water flow of the main helium blower motor (1) to meet the requirement by controlling the regulating valve (7).
5. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 4, characterized in that: The cooling water flow rate of the main helium blower motor (1) is adjusted by controlling the regulating valve (7) to meet the requirement of less than 60 t / h.
6. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 1, characterized in that: The S3 step includes: S30, confirm that the helium flow rate and the inlet and outlet temperatures of the main helium blower are normal; S31, confirm that the inverter and bearing speed of the main helium blower motor (1) are 0; S32, confirming that the voltage, current and power indication of the main helium blower motor (1) are 0; S33. Confirm that the pressure difference between the upper and lower compartments of the middle partition of the main helium blower is less than 0.6MPa; S34, confirm that the inlet and outlet pressure difference of the main helium blower is 0 kPa; S35, confirm that the axial and radial temperatures of the electromagnetic bearing (2) do not exceed 120°C; S36, confirming that the base vibration and bearing vibration of the main helium blower motor (1) are less than 1.8 mm / s; S37, confirming that the electric valves (6) are in remote and open state and are in automatic mode; S38, confirming that the main helium blower inlet baffle (8) is in the passive position; S39. Confirm that the cooling water parameters are normal.
7. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 6, characterized in that: The cooling water parameters include: pressure, flow rate and temperature.
8. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 1, characterized in that: The step S4 includes: S41. Close the isolation valve (10) at the inlet of the pressure gauge (9) to isolate the pressure gauge (9) used to measure the primary circuit pressure of the high temperature gas-cooled reactor.
9. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to claim 8, characterized in that: The step S4 further includes: S42, switching the main helium blower motor (1) to a manual state; S43, manually set the initial value of the inverter speed to 400rpm; S44, start the inverter of the main helium blower motor (1) and monitor the speed until it reaches 400 rpm.
10. The method for starting and stopping the main helium blower of a high temperature gas-cooled reactor according to any one of claims 1 to 9, characterized in that: The step S5 includes: S51, after the main helium blower motor (1) is started, the speed gradient is increased and controlled within 100 rpm, so that the main helium blower inlet damper (8) is slowly opened; S52, after the main helium blower inlet damper (8) is opened, during the speed increase process, the speed increase is controlled to not exceed 200 rpm each time.