System control method and device of water heater, water heater and storage medium
By acquiring information about the water usage point and the ambient temperature, calculating the heating time, and controlling the water heater's heating, the problem of gas waste during cold water return is solved, and the hot water utilization rate and circulation preheating efficiency are improved.
Patent Information
- Application Number
- CN202411209619.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-12
AI Technical Summary
When existing water heaters use cold water pipes as return pipes, hot water is supplied to all water points, resulting in wasted gas and an inability to effectively control the hot water circulation.
By obtaining the location information of the water point and the target water temperature, the pipe length and the current ambient temperature are calculated, and the water heater is controlled to heat according to the heating time, avoiding heating the entire circulation pipe.
It enables precise control of hot water delivery to the point of use, avoids gas waste, and improves hot water utilization and circulation preheating efficiency.
Smart Images

Figure CN118935739A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water heaters, and in particular to a system control method and device for a water heater, a water heater and a storage medium. Background Art
[0002] With the widespread use of water heaters, users have higher and higher requirements for water heaters. In order to solve the problem that users need to drain a section of cold water when using water heaters, more and more water heaters have added thermal circulation functions. Specifically, a water pump can be set inside the water heater, and the water pump can be started before the user needs hot water to preheat the water in the pipeline. This solution enables users to use hot water directly without waiting, which effectively improves the user experience. However, after the water heater starts the thermal cycle for preheating, the water in the entire circulation pipeline needs to be heated before stopping the combustion. In this way, not only does it cause gas waste, but if the user uses the cold water pipe as the return pipe, all water points will produce hot water. In this regard, in the related art, a terminal equipped with a temperature probe is set at each hot water water point, and when the temperature of the corresponding water point reaches the set temperature, the water heater is controlled to stop the thermal circulation function. However, it is necessary to connect the temperature probe set at the terminal to the water heater through a wired or wireless signal. If the terminal is not on the circulation pipeline, it is impossible to monitor the temperature of the water point by configuring the terminal. Summary of the invention
[0003] In view of this, the present invention provides a system control method, device, water heater and storage medium to avoid configuring a terminal at each water use point, thereby essentially solving the problem of hot water being supplied to all water use points if the user uses a cold water pipe as a return pipe.
[0004] In a first aspect, the present invention provides a system control method for a water heater, the method comprising:
[0005] Acquire first location information and target water use temperature of a first water use point;
[0006] Based on the first location information, determining the length of a pipeline from the first water use point to the target water heater;
[0007] Calculating a target heating time for the first water use point to reach a target water use temperature based on the pipe length and current operating parameters of the target water heater, the current operating parameters including the current ambient temperature of the environment in which the target water heater is located;
[0008] The target water heater is controlled to perform heating according to the target heating time.
[0009] The system control method for water heaters provided by the embodiment of the present invention obtains the location information of the water use point and the target water use temperature, determines the length of the pipeline from the water use point to the target water heater according to the location information, determines the target heating time based on the pipeline length combined with the current operating parameters such as the current ambient temperature of the target water heater, and controls the target heater to heat according to the target heating time. Therefore, when determining the heating time, the influence of parameters such as the current ambient temperature on the heating time is fully considered, and the hot water heated by the target water heater is effectively controlled to accurately reach the water use point, and the entire circulation pipeline is effectively avoided from being heated.
[0010] In an optional implementation, obtaining first location information of a first water use point includes:
[0011] receiving a position signal sent by a control switch disposed at a first water use point;
[0012] The position information of the first water usage point is determined based on the position signal.
[0013] The system control method of the water heater provided by the embodiment of the present invention determines the position information of the water use point based on the position signal of the control switch of the water use point, thereby effectively ensuring the accuracy of the position information of the water use point.
[0014] In an optional implementation, after determining the length of the pipeline from the first water use point to the target water heater based on the first location information, the method further includes:
[0015] Obtain the historical operating parameters of the target water heater within a set time;
[0016] If the historical operation parameters show that the target water heater completes heating the second water use point within the set time, obtaining the second position information of the second water use point;
[0017] The target heating time for the first water use point to reach the target water use temperature is updated according to the second position information and the first position information.
[0018] The system control method for water heaters provided by the embodiment of the present invention obtains the target information of the second water point when the historical operation parameters show that the target water heater has completed heating the second water point within the set time, and updates the target heating time according to the second position information of the second water point and the first water information of the first water point. Thus, the heating information of the target water heater on multiple water points within the set time is fully utilized, and repeated heating of the shared pipeline part in a short time is effectively avoided, thereby avoiding the energy waste caused thereby, and effectively shortening the heating time and improving the user experience.
[0019] In an optional implementation, updating the target heating time for the first water use point to reach the target water use temperature according to the second location information and the first location information includes:
[0020] If it is determined based on the second position information and the first position information that the second water use point is downstream of the first water use point relative to the target water heater or the second water use point coincides with the first water use point, the target heating time is updated to zero.
[0021] In the water heater system control method provided by the embodiment of the present invention, if it is determined based on the second position information and the first position information that the second water use point of the target water heater is located downstream of the first water use point or the second water use point coincides with the first water use point, the target heating time is updated to zero. Thus, the hot water utilization rate of the target water heater is significantly improved, and the efficiency of the circulation preheating of the target water heater can be effectively improved.
[0022] In an optional implementation, updating the target heating time for the first water use point to reach the target water use temperature according to the second location information and the first location information includes:
[0023] If it is determined based on the second position information and the first position information that the second water use point is located upstream of the first water use point relative to the target water heater, then the volume of water to be heated for heating the water temperature of the first water use point to the target water use temperature is calculated based on the first position information and the second position information;
[0024] Update the target heating time based on the volume of water to be heated and the current operating parameters.
[0025] The system control method for water heaters provided by the embodiment of the present invention, when determining that the second water use point of the target water heater is located upstream of the first water use point, calculates the volume of water to be heated to heat the water temperature of the first water use point to the target water use temperature according to the first position information and the second position information, thereby updating the target heating time according to the volume of water to be heated and the current operating parameters. Thus, the preheating operation that has been completed by the target water heater within the set time is fully utilized, the hot water utilization rate is effectively improved, and the efficiency of the cyclic preheating is significantly improved.
[0026] In an optional embodiment, controlling the target water heater to heat according to the target heating time includes: if the historical operating parameters show that the target water heater has not heated any water use point within the set time, then controlling the target water heater to heat according to the target heating time.
[0027] In a second aspect, the present invention provides a system control device for a water heater, the device comprising:
[0028] An information acquisition module, used to acquire first position information of a first water use point and a target water use temperature;
[0029] A pipeline determination module, used to determine the length of the pipeline from the first water use point to the target water heater based on the first location information;
[0030] A duration determination module, for calculating a target heating duration for the first water use point to reach a target water use temperature based on the length of the pipeline and current operating parameters of the target water heater, the current operating parameters including a current ambient temperature of an environment in which the target water heater is located;
[0031] The control module is used to control the target water heater to heat according to the target heating time.
[0032] In a third aspect, the present invention provides a water heater, including a controller, the controller including:
[0033] The memory and the processor are communicatively connected with each other, the memory stores computer instructions, and the processor executes the system control method for the water heater of the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0034] In an optional embodiment, the water heater further includes: at least one control switch disposed at a water use point, the control switch being communicatively connected to the controller for sending a position signal to the controller.
[0035] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the system control method for a water heater according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 A schematic diagram of a heat cycle principle of a gas water heater is shown;
[0038] Figure 2 A schematic diagram of a heat cycle principle of a gas water heater is shown;
[0039] Figure 3 A schematic flow chart of a system control method for a water heater according to an embodiment of the present invention;
[0040] Figure 4 is a flow chart of another system control method for a water heater according to an embodiment of the present invention;
[0041] Figure 5is a flowchart of a specific application example of a system control method for a water heater according to an embodiment of the present invention;
[0042] Figure 6 is a structural block diagram of a system control device for a water heater according to an embodiment of the present invention;
[0043] Figure 7 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0045] like Figure 1 and Figure 2 Two schematic diagrams of thermal cycle principles of gas water heaters are shown respectively.
[0046] refer to Figure 1 and Figure 2 The gas water heaters applicable to the two heat cycle principles can be regarded as gas water heater zero cold water system. Specifically, the gas water heater zero cold water system can include a water heater 101, a tap water inlet pipe / cold water pipe 103, a wireless switch 102, and a return pipe 104 ( Figure 2 A special return pipe 104 is configured as a hot water return pipe) and a hot water pipe 105. Among them, the tap water inlet pipe / cold water pipe 103, the return pipe 104 and the hot water pipe 105 are used to connect the water inlet and outlet ends of the water heater 101 to form a loop, and the wireless switch 102 is used to start the water heater 101 and turn on the preheating function of the water heater 101.
[0047] In an optional embodiment of the present invention, during the thermal cycle of the gas water heater, a wireless switch 102 is configured for each water use point 100. When the wireless switch 102 of any water use point 100 is turned on, the water heater 101 is triggered to turn on, and the heating pipeline is preheated through the return pipe 104 and the hot water pipe 105. Figure 1 In the heat circulation method shown, water return is achieved through the tap water pipe / cold water pipe 103. Figure 2 In the heat circulation method shown, a special return water pipe 104 is configured to realize water return.
[0048] The system control method for the water heater provided in the embodiment of the present invention can first configure the wireless switch 102 at the water point 100. When the user needs to use hot water, first press the wireless switch 102, and the water heater 101 will obtain relevant data according to the position of the water point 100 corresponding to the wireless switch 102. For example, the length of the pipeline from the water point 100 to the water heater, the inlet and outlet water temperature, the ambient temperature, the circulation flow, etc., calculate the time T1 required for the water temperature of the water point 100 to reach the target temperature, and when the water heater 101 is started and the running time reaches T1, the water heater 101 is controlled to stop running. As a result, the water heater 101 of the gas water heater accurately circulates heat to the target water point without heating the entire circulation pipeline. Further, whether the gas water heater used by the user is equipped with a special return pipe 104, and whether the water point 100 is located on the circulation pipeline, the system control method for the water heater provided in the embodiment of the present invention can be applied.
[0049] In order to explain the system control method of the water heater provided in this embodiment in more detail, the following can be based on the above Figure 1 or Figure 2 The heat cycle principle of the gas water heater shown is used to illustrate the system control method of the water heater provided in this embodiment.
[0050] It should be noted that the above Figure 1 or Figure 2 The heat cycle principle of the gas water heater shown is only used to exemplify the system control method of the water heater provided in the embodiment of the present invention, and is not used to limit the implementation process of the system control method of the water heater provided in the embodiment of the present invention.
[0051] According to an embodiment of the present invention, a system control method for a water heater is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0052] In this embodiment, a system control method for a water heater is provided, which can be used for the above-mentioned gas water heater, etc. Figure 3 is a flow chart of a system control method for a water heater according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0053] Step S301, obtaining first location information and target water use temperature of a first water use point.
[0054] In this embodiment of the present invention, the same water heater can be configured with multiple water points to provide hot water for multiple water points. Figure 1 or Figure 2 In the manner shown, a wireless switch is configured for each water point. If the user presses the wireless switch corresponding to the first water point at the first water point, the control end of the gas water heater can obtain the first position information and the target water temperature of the first water point. Here, the first water point can be any water point among multiple water points. The control end of the water heater can communicate with the wireless switch to obtain the first position information and the target water temperature of the first water point. Specifically, a general communication interaction method can be used, and the present invention does not limit this.
[0055] Step S302: Determine the length of the pipeline from the first water use point to the target water heater based on the first location information.
[0056] In one embodiment of the present invention, a mapping relationship between the location information of multiple water use points and the length of the pipeline from the water use point to the target water heater can be pre-stored at the control end of the water heater. After determining the location information of a certain water use point, the length of the pipeline from the water use point to the target water heater can be determined according to the mapping relationship. In this way, the length of the pipeline from the first water use point to the target water heater is determined based on the first location information.
[0057] Step S303, based on the pipeline length and the current operating parameters of the target water heater, the target heating time for the first water use point to reach the target water temperature is calculated, and the current operating parameters include the current ambient temperature of the environment in which the target water heater is located.
[0058] In this embodiment of the present invention, the heat loss per unit length of the hot water pipeline can first be determined according to the following empirical formula (1):
[0059]
[0060] Among them, Q 损 It indicates the heat loss per unit length of the hot water pipe when the hot water from the target water heater flows through the hot water pipe;
[0061] T 热 Indicates the target water temperature at the water point;
[0062] T 环境 Indicates the ambient temperature of the water heater;
[0063] D 0 Indicates the outer diameter of the hot water pipe for which heat loss needs to be calculated;
[0064] D 1 Indicates the inner diameter of the hot water pipe for which heat loss needs to be calculated;
[0065] λ represents the thermal conductivity of the hot water pipe, which is a common constant in this field and can be determined according to the material of the hot water pipe, etc.;
[0066] K is represented by the compensation coefficient, which can be determined according to the insulation conditions of the user's hot water pipe, and its value range can be 1-1.3.
[0067] Secondly, based on the basic principle of heat exchange, the heat loss per unit length of the hot water pipeline can be determined according to the following formula (2):
[0068] Q 损 =CmΔt=CρV a Δt (2)
[0069] Among them, Q 损 It indicates the heat loss per unit length of the hot water pipe when the hot water from the target water heater flows through the hot water pipe;
[0070] C represents the specific heat capacity of water;
[0071] ρ represents the water density value;
[0072] V a Indicates the heat loss Q per unit length of hot water pipe offset under temperature difference Δt 损 The volume of hot water required;
[0073] Δt represents the temperature difference between the inlet and outlet water of the target water heater.
[0074] Again, according to formula (2), the following formula (3) can be determined:
[0075]
[0076] Among them, V a Indicates the heat loss Q per unit length of hot water pipe offset under temperature difference Δt 损 The volume of hot water required;
[0077] C represents the specific heat capacity of water;
[0078] ρ represents the water density value;
[0079] Δt represents the temperature difference between the inlet and outlet water of the target water heater.
[0080] Furthermore, the time T required for the target water heater to deliver hot water to the first water point can be determined according to the following formula (4): 1 :
[0081]
[0082] Among them, T 1 Indicates the time required for the target water heater to deliver hot water to the first water use point;
[0083] V 1 Indicates the volume of hot water in the pipeline between the target water heater and the first water use point;
[0084] Q 泵 Indicates the booster pump flow rate of the target water heater;
[0085] V a Indicates the water storage Q from the outlet of the target water heater to the first water use point under the temperature difference Δt 损 Required volume.
[0086] Furthermore, by substituting formulas (1) and (3) into formula (4), we can obtain the following formula (5):
[0087]
[0088] Among them, T 1 Indicates the time required for the target water heater to deliver hot water to the first water use point;
[0089] V 1 Indicates the volume of hot water in the pipeline between the target water heater and the first water use point;
[0090] Q 泵 Indicates the booster pump flow rate of the target water heater;
[0091] V a Indicates the heat loss Q per unit length of hot water pipe offset under temperature difference Δt 损 The volume of hot water required;
[0092] C represents the specific heat capacity of water;
[0093] ρ represents the water density value;
[0094] Δt represents the temperature difference between the inlet and outlet water of the target water heater;
[0095] Q 损 It indicates the heat loss per unit length of the hot water pipe when the hot water from the target water heater flows through the hot water pipe;
[0096] T 热 Indicates the water heater setting temperature;
[0097] T 环境 Indicates the ambient temperature of the gas water heater;
[0098] D 0 Indicates the outer diameter of the hot water pipe for which heat loss needs to be calculated;
[0099] D 1 Indicates the inner diameter of the hot water pipe for which heat loss needs to be calculated;
[0100] λ represents the thermal conductivity of the hot water pipe, which is a common constant in the art and can be determined according to the material of the hot water pipe, etc.
[0101] Step S304, controlling the target water heater to perform heating according to the target heating time.
[0102] Specifically, the actual heating time of the target water heater may be timed, and when the actual heating time reaches the target heating time, the target heater may be controlled to stop heating.
[0103] In this embodiment, a system control method for a water heater is provided, which can be used for the above-mentioned gas water heater, etc. Figure 4 is a flow chart of a system control method for a water heater according to an embodiment of the present invention. Figure 4 As shown, the process includes the following steps:
[0104] Step S401, obtaining first location information and target water use temperature of a first water use point.
[0105] In some optional implementations, obtaining the first location information of the first water use point in step S401 may include:
[0106] Step S4011, receiving a position signal sent by a control switch arranged at the first water use point.
[0107] Specifically, the control switch can be Figure 1 and Figure 2 The wireless switch 102 in the water heater can communicate with the controller 101 of the water heater. The location signal that the wireless switch 102 can send to the controller 101 can be the actual coordinate location information of the corresponding water point. The location signal can also be the identification information of the wireless switch that has a certain mapping relationship with the water point. Or the identification information of the water point can be sent. Whether it is the identification information of the water point, the identification information of the wireless switch, etc., the identification rules can be pre-set, and the wireless switch identification or the water point identification can be assigned to each water point.
[0108] Step S4012: determining the location information of the first water use point based on the location signal.
[0109] For other detailed operations of step S401, see Figure 3 Step S301 of the illustrated embodiment will not be described in detail here.
[0110] Step S402: determining the length of a pipeline from the first water use point to the target water heater based on the first location information.
[0111] Step S403, calculating the target heating time for the first water use point to reach the target water use temperature based on the pipeline length and the current operating parameters of the target water heater, the current operating parameters including the current ambient temperature of the environment in which the target water heater is located.
[0112] For details, please see Figure 3Step S302 of the illustrated embodiment will not be described in detail here.
[0113] Step S404, controlling the target water heater to perform heating according to the target heating time.
[0114] For details, please see Figure 3 Step S304 of the illustrated embodiment will not be described in detail here.
[0115] Step S405, obtaining historical operating parameters of the target water heater within a set time.
[0116] In an optional embodiment of the present invention, the historical operating parameters mainly include that the target water heater completes the heating of other water use points other than the first water use point within the set time, and if the target water heater completes the heating of other water use points other than the first water use point within the set time, the historical parameter information also includes the location information of other water use points.
[0117] Step S406: If the historical operation parameters show that the target water heater completes heating the second water use point within the set time, the second position information of the second water use point is obtained.
[0118] Similar to the location information of the first water use point, here, the second location information of the second water use point can also be obtained based on the control switch of the second water use point.
[0119] The fundamental purpose of obtaining the position information of the second water use point is to determine the relative position relationship between the second water use point and the first water use point.
[0120] Step S407: updating the target heating time for the first water use point to reach the target water use temperature according to the second location information and the first location information.
[0121] In an optional embodiment, if based on the second position information and the first position information, it is determined that the second water use point of the target water heater is downstream of the first water use point or the second water use point coincides with the first water use point, the target heating time is updated to zero.
[0122] In an optional embodiment, the first water use point is recorded as A, and the second water use point is recorded as B. Take into full consideration the situation that the water use time points of the first water use point A and the second water use point B are very close, and the hot water heated by the target water heater has not been cooled down after flowing through the hot water pipeline. If the second water use point B is located downstream of the first water use point A, a complete heat cycle has been completed in the previous water use process, and the temperature of the hot water stored in the pipeline is relatively high. In order to avoid the reduction of heating efficiency and waste of heat energy caused by repeated heating. When the target water use temperature of the first water use point is obtained, the hot water in the heating pipeline in the previous heat cycle process can be fully utilized, and preheating is no longer repeated. The set time can be 5 minutes or other suitable time. Update the target heating time to zero, that is, the water heater is no longer preheated.
[0123] In an optional embodiment, the above step S407 may include:
[0124] Step a1: If based on the second position information and the first position information, it is determined that the second water use point is upstream of the first water use point relative to the target water heater, then the volume of water to be heated to heat the water temperature of the first water use point to the target water use temperature is calculated based on the first position information and the second position information.
[0125] Specifically, if the second water point is located upstream of the first water point, the heating pipeline between the first water point and the second water point is not overheated. If the second water point is located downstream of the first water point, the hot water outlet of the gas water heater to the second water point passes through the first water point, so that the heating pipeline from the hot water outlet of the gas water heater to the first water point is overheated within the set time before receiving the preheating request. Therefore, the upstream and downstream relationship between the second water point and the first water point in the heating pipeline of the water heater has a greater impact on how to control the heating operation of the water heater in response to the preheating request, so here we can first determine the upstream and downstream relationship between the second water point and the first water point in the heating pipeline of the water heater based on the historical operation information. The upstream and downstream relationship between multiple water points can be pre-configured in the controller of the water heater.
[0126] The system control method for a water heater provided in an embodiment of the present invention fully considers the cyclic preheating process of the water heater, obtains the upstream and downstream relationship between the second water use point and the first water use point in the heating pipeline of the water heater, and provides effective reference information for controlling the heating operation of the water heater in response to a preheating request.
[0127] In an optional embodiment, the first water point is marked as A and the second water point is marked as B. If the second water point B is located upstream of the first water point A, the volume of water to be heated is the difference V between the hot water volume from the hot water outlet of the water heater to the first water point and the second water point. BAHere, the hot water volume VA required from the hot water outlet of the water heater to the first water point and the hot water volume VB required from the hot water outlet of the water heater to the second water point can be determined respectively, so as to determine the hot water volume difference V from the hot water outlet of the water heater to the first water point and the second water point BA =VB-VA.
[0128] The system control method for a water heater provided in an embodiment of the present invention, when determining that the second water use point in the heating pipeline of the water heater is located upstream of the first water use point, determines that the heating pipeline needs to be preheated. At this time, the difference in the required hot water volume between the second water use point and the first water use point is obtained in time, and the utilization rate of the hot water in the heating pipeline that has been preheated within the set time is fully utilized to avoid the waste of heat source caused by repeated heating.
[0129] Step a2, updating the target heating time according to the volume of water to be heated and the current operating parameters.
[0130] In an optional embodiment, based on the hot water volume difference V from the hot water outlet of the water heater to the first water use point and the second water use point obtained in step a1, BA , combined with the above formula (5), the following formula can be obtained to determine the time T for the hot water of the water heater to flow from the second water point B to the first water point A: BA Formula (6):
[0131]
[0132] Among them, T BA Indicates the target heating time for the first water point to reach the target water temperature when the target water heater overheats the second water point within the set time and the second water point is located upstream of the first water point;
[0133] V BA Indicates the volume of water to be heated to heat the water temperature of the first water use point to the target water use temperature;
[0134] Q 泵 Indicates the booster pump flow rate of the target water heater;
[0135] V a Indicates the heat loss Q per unit length of hot water pipe offset under temperature difference Δt 损 The volume of hot water required;
[0136] C represents the specific heat capacity of water;
[0137] ρ represents the water density value;
[0138] Δt represents the temperature difference between the inlet and outlet water of the target water heater;
[0139] Q 损It indicates the heat loss per unit length of the hot water pipe when the hot water from the target water heater flows through the hot water pipe;
[0140] T 热 Indicates the water heater setting temperature;
[0141] T 环境 Indicates the ambient temperature of the gas water heater;
[0142] D 0 Indicates the outer diameter of the hot water pipe for which heat loss needs to be calculated;
[0143] D 1 Indicates the inner diameter of the hot water pipe for which heat loss needs to be calculated;
[0144] λ represents the thermal conductivity of the hot water pipe, which is a common constant in the art and can be determined according to the material of the hot water pipe, etc.
[0145] In some optional implementations, if the historical operating parameters show that the target water heater has not heated any water usage point within the set time, the target water heater is controlled to heat according to the target heating time.
[0146] In this embodiment, a specific application example of a system control method for a water heater is provided, which can be used for the above-mentioned gas water heater, etc. Figure 5 is a flowchart of a specific application example of the system control method for a water heater according to an embodiment of the present invention. Figure 5 As shown, the process of a specific application example of the system control method for a water heater according to an embodiment of the present invention includes the following steps:
[0147] Step S501: The user presses a wireless switch at a target water use point.
[0148] The target water use point can be Figure 1 Or any water point in the schematic diagram shown in 2.
[0149] Step S502, determine whether the time from the last cycle is ≤ 5 minutes. If yes, execute step S504. If no, execute step S503.
[0150] The last cycle time is the time point when the target water heater last preheated before the user pressed the wireless switch at the target water point. Here, it should be noted that the last cycle time can be the time between the time when the user pressed the wireless switch at the target water point and the time when the target water heater completed the last preheating.
[0151] The heating operation completed by the water heater within the set time before receiving the signal from the user pressing the wireless switch at the target water use point.
[0152] Step S503, start the circulation function of the water heater, determine the position of the wireless switch that sends the signal, and call the data such as the pipe length, water heater setting temperature, water inlet temperature, ambient temperature, etc., and determine through calculation that the circulation time required for preheating the target water point is T1.
[0153] Step S504, determine whether the target water point is located upstream of the water point used in the previous heat cycle of the water heater. If yes, the operation is terminated directly without starting the circulation function of the water heater. If yes, execute step S505.
[0154] Step S505, start the circulation function of the water heater, determine the position of the wireless switch that sends the signal, and call the data such as the pipe length, the water heater setting temperature, the water inlet temperature, the ambient temperature, and the difference in the hot water volume of the target water point and the water point in the previous heat cycle process, and determine the circulation time required for preheating the target water point by calculation as T BA .
[0155] Step S506: when it is determined that the continuous heating time of the water heater reaches the cycle working time T1 or T BA When the water heater stops burning and heating.
[0156] In this embodiment, a system control device for a water heater is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0157] This embodiment provides a system control device for a water heater, such as Figure 6 As shown, including:
[0158] Information acquisition module 601, used to acquire the location information of the first water use point and the target water use temperature;
[0159] A pipeline determination module 602 is used to determine the length of the pipeline from the first water use point to the target water heater based on the first location information;
[0160] The duration determination module 603 is used to calculate the target heating duration for the first water use point to reach the target water use temperature based on the pipeline length and the current operating parameters of the target water heater, the current operating parameters including the current ambient temperature of the environment where the target water heater is located;
[0161] The control module 604 is used to control the target water heater to perform heating according to the target heating time.
[0162] In an optional implementation, the information acquisition module 601 includes:
[0163] A receiving submodule, used for receiving a position signal sent by a control switch arranged at the first water use point;
[0164] The determination submodule is used to determine the location information of the first water use point based on the location signal.
[0165] In an optional embodiment, the device further comprises:
[0166] A historical parameter module, for obtaining historical operating parameters of the target water heater within a set time after determining the length of the pipeline from the first water use point to the target water heater based on the first location information;
[0167] A relative position module, used for obtaining second position information of the second water use point if the historical operation parameters show that the target water heater has completed heating the second water use point within a set time;
[0168] The duration updating module is used to update the target heating duration for the first water use point to reach the target water use temperature according to the second position information and the first position information.
[0169] In an optional implementation, the duration updating module includes:
[0170] The first updating submodule is used to update the target heating time to zero if it is determined based on the second position information and the first position information that the second water use point of the target water heater is downstream of the first water use point or the second water use point coincides with the first water use point.
[0171] In an optional implementation, the duration updating module includes:
[0172] a volume submodule, for calculating the volume of water to be heated to heat the water temperature of the first water use point to the target water use temperature according to the first position information and the second position information, if it is determined based on the second position information and the first position information that the second water use point relative to the target water heater is located upstream of the first water use point;
[0173] The second updating submodule is used to update the target heating time according to the volume of water to be heated and the current operating parameters.
[0174] In an optional embodiment, the control module 604 includes: a reference control submodule for controlling the target water heater to heat according to a target heating time if the historical operating parameters show that the target water heater has not heated any water point within a set time.
[0175] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0176] The system control device of the water heater in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0177] The embodiment of the present invention also provides a computer device having the above Figure 7 System controls for water heater shown.
[0178] See also Figure 7 , Figure 7 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 7 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 7 A processor 10 is taken as an example.
[0179] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0180] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0181] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0182] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0183] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0184] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0185] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0186] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A system control method for a water heater, characterized in that: The method comprises: Acquire first location information and target water use temperature of a first water use point; Based on the first location information, determining a pipe length from the first water use point to a target water heater; Calculating a target heating time for the first water use point to reach the target water use temperature based on the pipe length and current operating parameters of the target water heater, wherein the current operating parameters include a current ambient temperature of an environment in which the target water heater is located; The target water heater is controlled to perform heating according to the target heating time.
2. The method according to claim 1, characterized in that: The obtaining of first location information of a first water use point includes: receiving a position signal sent by a control switch disposed at the first water use point; First location information of the first water use point is determined based on the location signal.
3. The method according to claim 1, characterized in that After determining the length of the pipeline from the first water use point to the target water heater based on the first location information, the method further includes: Obtaining historical operating parameters of the target water heater within a set time; If the historical operation parameter shows that the target water heater completes heating the second water use point within the set time, obtaining second position information of the second water use point; The target heating time for the first water use point to reach the target water use temperature is updated according to the second position information and the first position information.
4. The method according to claim 3, characterized in that The updating, according to the second location information and the first location information, of the target heating time for the first water use point to reach the target water use temperature comprises: If it is determined based on the second position information and the first position information that the second water use point is downstream of the first water use point relative to the target water heater or the second water use point coincides with the first water use point, the target heating time is updated to zero.
5. The method according to claim 3, characterized in that: The updating, according to the second location information and the first location information, of the target heating time for the first water use point to reach the target water use temperature comprises: If it is determined based on the second position information and the first position information that the second water use point is located upstream of the first water use point relative to the target water heater, then the volume of water to be heated for heating the water temperature of the first water use point to the target water use temperature is calculated based on the first position information and the second position information; The target heating time is updated according to the volume of water to be heated and the current operating parameters.
6. The method according to claim 3, characterized in that The controlling the target water heater to heat according to the target heating time includes: if the historical operation parameters show that the target water heater has not heated any water use point within the set time, controlling the target water heater to heat according to the target heating time.
7. A system control device for a water heater, characterized in that: The device comprises: An information acquisition module, used to acquire first position information of a first water use point and a target water use temperature; a pipeline determination module, configured to determine a pipeline length from the first water use point to a target water heater based on the first location information; a duration determination module, configured to calculate a target heating duration for the first water use point to reach the target water use temperature based on the length of the pipeline and current operating parameters of the target water heater, wherein the current operating parameters include a current ambient temperature of an environment in which the target water heater is located; A control module is used to control the target water heater to perform heating according to the target heating time.
8. A water heater, characterized in that: A controller is included, the controller comprising: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the system control method of the water heater according to any one of claims 1 to 6 by executing the computer instructions.
9. The water heater according to claim 8, characterized in that: The water heater further comprises: at least one control switch arranged at a water use point, wherein the control switch is communicatively connected with the controller and is used for sending a position signal to the controller.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the system control method for a water heater according to any one of claims 1 to 6.