Offshore rope tensioning device and offshore rope tensioning method

By designing the marine rope tensioning device, pre-tensioning of multiple ropes using pulley set system and dynamometer, the problems of low efficiency and high cost in the existing technology are solved, and stable pre-tensioning and efficient rope tensioning are achieved. .

CN118953578APending Publication Date: 2024-11-15SHANGHAI WISON OFFSHORE & MARINE CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411185760.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The prior art is difficult to effectively pretension multiple offshore ropes, and the traditional methods are inefficient and costly, and cannot meet the needs of offshore wind power and other needs.

Method used

Design a marine rope tensioning device, including a work boat, winch, pulley set and float, and simultaneous pretension of multiple ropes through pulley set system and dynamometer, providing a stable tension load and after the pretension force is achieved Keep it for a certain period of time.

Benefits of technology

Simultaneous pretension of multiple ropes is achieved, stable pretension force is provided, the load required by the winch is reduced, efficiency is improved, the need to use large winches is avoided, and the pretension requirements of fiber ropes is met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118953578A_ABST
    Figure CN118953578A_ABST
Patent Text Reader

Abstract

The invention relates to an offshore rope tensioning device and an offshore rope tensioning method, and the offshore rope tensioning device comprises a working ship, and the left side and the right side of the working ship are provided with a first offshore rope connecting part and a second rope connecting part correspondingly; the winch is fixed on a deck of the working ship; the first pulley block is movably arranged relative to the working ship; the second pulley block is fixed on a deck of the working ship; the working rope is wound on the first pulley block and the second pulley block to form a pulley block system, and one end of the working rope is connected with the traction end of the winch. According to the offshore rope tensioning device, large and stable tensioning loads can be generated, the pre-tensioning requirement of the fiber rope is met, multiple ropes can be tensioned at the same time, and efficiency is improved. According to the scheme, larger pretension force can be provided for the to-be-tensioned offshore rope.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of ship and ocean engineering, and in particular to an offshore rope tensioning device and an offshore rope tensioning method. Background Art

[0002] Offshore floating bodies, such as oil and gas platforms, offshore floating wind power platforms, etc., require permanent mooring systems for anchoring and positioning. The permanent mooring system is usually in the form of a catenary, and the main materials are anchor chains and wire ropes. In recent years, due to the reduction of mooring system costs and the reduction of sea area requirements, the semi-tensioned mooring system using fiber cables, such as nylon cables and polyester cables as the main materials of mooring ropes has received more and more attention from the industry.

[0003] Fiber cables as mooring system materials have the advantages of light weight, high strength and good elasticity. But they also have their disadvantages. One of the problems is that when fiber cables are continuously subjected to relatively large average loads, the pore structure between the fibers will change, resulting in permanent elongation. Even if the load is removed, the fiber cables will not shorten to their original length. However, if they are subjected to loads greater than the historical maximum average load in future service, the fiber cables will undergo permanent elongation again. If a mooring system using fiber cables as the main material is subjected to a strong storm, the environmental load on the mooring cables exceeds the historical maximum load, the mooring cables will elongate, thereby reducing the rigidity of the entire mooring system, and the displacement of the floating body may exceed the design limit. For floating wind power, excessive displacement of the floating body will cause damage to the dynamic submarine cable.

[0004] In order to avoid permanent elongation of the fiber cable during service, the mooring cable can be pre-tensioned before being hung on the buoy, and the pre-tensioned load can be equivalent to the average load it will bear during a storm.

[0005] One way is to pre-tension the rope before leaving the factory to eliminate the structural elongation of the rope, but this load is generally small, only in the order of tens of tons. It is difficult to meet the needs of marine engineering. For offshore wind power, the required pre-tension load is usually hundreds of tons. And after the pre-tensioning is completed, the mooring rope needs to be connected to the floating body as soon as possible so that it has a certain pre-tension to maintain its structural elongation.

[0006] Another solution for pre-tensioning ropes at sea is to use the bollard towing force of large tugboats. However, there are few large tugboats and they are expensive. In addition, the towing force of large tugboats at sea is very unstable due to the influence of wind and waves. Due to the limited towing force, they can only be pulled one by one. The efficiency is low and the construction period is long. Summary of the invention

[0007] Based on this, it is necessary to propose an offshore rope tensioning device that can tension multiple ropes at the same time and provide a stable tensioning load. A offshore rope tensioning method is also proposed.

[0008] According to one aspect of the present application, an offshore rope tensioning device includes: a work boat, wherein a first offshore rope connecting part and a second rope connecting part are respectively provided on the left and right sides of the work boat; a winch fixed to the deck of the work boat; a first pulley block movably arranged relative to the work boat; a second pulley block fixed to the deck of the work boat; a working rope wound around the first pulley block and the second pulley block to form a pulley block system, and one end of the working rope is connected to the traction end of the winch.

[0009] In some embodiments, the work vessel is a barge or a tugboat.

[0010] In some embodiments, the offshore rope tensioning device further comprises a float, and the first pulley block is mounted on the float.

[0011] In some embodiments, a force gauge is connected to the float, and the force gauge is used to connect the rope to be tensioned.

[0012] In some embodiments, the arrangement direction of the first pulley block, the second pulley block and the winch is parallel to the length direction of the workboat.

[0013] In some embodiments, the first pulley block is placed on the deck of the workboat.

[0014] According to another aspect of the present application, a method for tensioning an offshore rope is applied to the offshore rope tensioning device, the method comprising: connecting one end of three offshore ropes to be tensioned to the first pulley block, the first offshore rope connecting portion, and the second rope connecting portion, respectively, and connecting the other ends to three positioning anchors, respectively, the three positioning anchors are distributed in a triangular shape, and a dynamometer is provided between at least one rope and the offshore rope tensioning device; turning on the winch to tighten the working rope so that the tension borne by the three offshore ropes reaches the required pre-tension.

[0015] In some embodiments, one end of the three offshore ropes to be tensioned are respectively connected to the first pulley group, the first offshore rope connecting part, and the second rope connecting part, and the other ends are respectively connected to three positioning anchors, the three positioning anchors are distributed in a triangle, and a force gauge is provided between at least one rope and the offshore rope tensioning device, including: completing the connection of the three offshore ropes when the three offshore ropes are in a relaxed state.

[0016] In some embodiments, the method further comprises: maintaining the tension on the three offshore ropes for a predetermined time after the tension reaches the required pre-tension.

[0017] In some embodiments, the anchor is part of a mooring system of an offshore buoy.

[0018] The offshore rope tensioning device of the present application can pre-tension multiple ropes at the same time; and pre-tensioning three ropes at the same time can form a balanced force system, thereby providing a stable pre-tension. In addition, the present application sets a first pulley group and a second pulley group, which can reduce the tension required by the winch when the same pre-tension is achieved. When the winch power is the same, the solution of the present application can provide a greater pre-tension to the offshore rope to be tensioned. The solution of the present application can avoid the use of a large winch, that is, provide a larger tensioning load. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic top view of a marine rope tensioning device according to an embodiment of the present application.

[0020] Figure 2 It is a schematic side view of a marine rope tensioning device according to an embodiment of the present application.

[0021] Figure 3 This is a schematic diagram of starting to tension three marine ropes using a marine rope tensioning device according to an embodiment of the present application.

[0022] Figure 4 This is a schematic diagram of using the offshore rope tensioning device according to an embodiment of the present application to make three offshore ropes form a balanced force system.

[0023] Figure 5 This is a schematic top view of a marine rope tensioning device according to another embodiment of the present application.

[0024] Figure 6 It is a schematic side view of a marine rope tensioning device according to another embodiment of the present application.

[0025] Figure 7 This is a schematic diagram of starting to tension three marine ropes using a marine rope tensioning device according to another embodiment of the present application.

[0026] Figure 8 This is a schematic diagram of using the offshore rope tensioning device according to another embodiment of the present application to make three offshore ropes form a balanced force system.

[0027] Description of reference numerals:

[0028] 100. offshore rope tensioning device; 110. work boat; 111. deck; 112. first rope connection portion; 113. second rope connection portion; 120. winch; 130. first pulley block; 131. first pulley; 132. first shaft; 133. mounting base; 140. second pulley block; 141. second pulley; 142. second shaft; 150. working rope; 160. float; 171. first offshore rope; 172. second offshore rope; 173. third offshore rope; 181. first positioning anchor; 182. second positioning anchor; 183. third positioning anchor. DETAILED DESCRIPTION

[0029] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0030] In the description of the present application, it should be understood that if the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. appear, the orientation or position relationship indicated by these terms is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0031] In addition, if the terms "first" or "second" appear, these terms are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, if the term "plurality" appears, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0032] In this application, unless otherwise clearly specified and limited, if the terms "installed", "connected", "connected", "fixed" and the like appear, these terms should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.

[0033] In the present application, unless otherwise clearly specified and limited, if there is a description that a first feature is "above" or "below" a second feature, etc., or similar descriptions appear, it may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0034] It should be noted that if an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. If an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. If any, the terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used in this application are for illustrative purposes only and do not represent the only implementation method.

[0035] As described in the background technology, the method of pre-tensioning ropes in the prior art is not suitable for pre-tensioning multiple offshore ropes. To address this problem, the present application proposes an offshore rope tensioning device that can tension multiple ropes at the same time and provide a stable tensioning load. It can also reduce the load required for pre-tensioning.

[0036] refer to Figure 1 and Figure 2, an offshore rope tensioning device 100 of an embodiment of the present application includes a workboat 110, a winch 120, a first pulley block 130, a second pulley block 140, and a working rope 150. The left and right sides of the workboat 110 are respectively provided with a first rope connecting portion 112 and a second rope connecting portion 113. The winch 120 is fixed to the deck 111 of the workboat 110. The first pulley block 130 is movably arranged relative to the workboat 110. The second pulley block 140 is fixed to the deck 111 of the workboat 110. The working rope 150 is wound around the first pulley block 130 and the second pulley block 140 to form a pulley block system, and one end of the working rope 150 is connected to the traction end of the winch 120.

[0037] In the present application, offshore ropes refer to mooring cables used in offshore platforms such as fiber cables that need to be pre-tensioned in advance.

[0038] The work boat 110 is used to set the winch 120. The work boat 110 can be a barge or a tugboat. The first rope connection part 112 and the second rope connection part 113 are respectively used to fix the sea rope. The first rope connection part 112 and the second rope connection part 113 are, for example, plates with through holes.

[0039] The winch 120 is fixed on the deck 111 of the work boat 110. The winch 120 is used to reel in the work rope 150. When the work boat 110 is a barge, the winch 120 is a winch 120 installed on the barge. When the work boat 110 is a tugboat, the winch 120 can be a winch 120 that comes with the tugboat.

[0040] Optionally, in the length direction of the work boat 110, the winch 120 is close to the bow of the work boat 110, and the second pulley block 140 is close to the stern of the work boat 110. In this way, the length direction dimension of the work boat 110 can be fully utilized, thereby expanding the operating range.

[0041] The first pulley block 130 includes at least one first pulley 131 coaxially arranged. Specifically, each first pulley 131 shares a first shaft 132. The second pulley block 140 includes at least one second pulley 141 coaxially arranged. Specifically, each second pulley 141 shares a second shaft 142.

[0042] like Figure 1 As shown, the working rope 150 is reciprocated between the first pulley 131 and the second pulley 141, and one end is connected to the traction end of the winch 120. The other end of the working rope 150 is fixed to the first pulley 131. The first pulley block 130 is movably arranged relative to the work boat 110, and the second pulley block 140 is fixed to the deck 111 of the work boat 110. In the pulley block system, the first pulley 131 is a fixed pulley, and the second pulley 141 is a movable pulley.

[0043] In the present application, the offshore rope tensioning device 100 also includes a float 160, and the first pulley block 130 is installed on the float 160. The float 160 can float on the sea surface. By installing the first pulley block 130 on the float 160, the first pulley block 130 is movably arranged relative to the workboat 110. Optionally, the first pulley block 130 and the float 160 are detachably connected, such as the first pulley block 130 itself has a mounting base 133, and the mounting base 133 and the float 160 are detachably connected. Optionally, each first pulley 131 of the first pulley block 130 is directly mounted on the float 160, or it can be said that the float 160 is a part of the first pulley block 130, and the float 160 is equivalent to the mounting base 133 of the first pulley 130.

[0044] By providing the float 160 , the first pulley block 130 can float on the sea surface and can be away from the workboat 10 , thereby increasing the operating radius of the offshore rope tensioning device 100 and reducing the requirement for the length of the deck 111 of the workboat 110 .

[0045] Optionally, a dynamometer (not shown) is connected to the float 160, and the dynamometer is used to connect the rope to be tensioned. The dynamometer can measure the tension that the rope to be tensioned bears when it is pre-tensioned.

[0046] In some embodiments, the arrangement direction of the first pulley block 130, the second pulley block 140, and the winch 120 is parallel to the length direction of the work boat 110. In this way, when the rope is pre-tensioned, the length direction of the work boat 110 can be fully utilized to expand the operating radius.

[0047] The offshore rope tensioning device 100 of the present application can tension multiple offshore ropes at the same time and provide a stable tensioning load, while the load required by the winch 120 is relatively small. The advantages of the offshore rope tensioning device 100 of the present application are described in detail below in conjunction with the offshore rope tensioning method of the present application.

[0048] refer to Figure 3 and Figure 4 The offshore rope tensioning method of the present application is applied to the above-mentioned offshore rope tensioning device 100, and the offshore rope tensioning method includes:

[0049] S100, one end of the three offshore ropes to be tensioned is respectively connected to the first pulley block 130, the first rope connecting part 112, and the second rope connecting part 113, and the other end is respectively connected to three positioning anchors, the three positioning anchors are distributed in a triangle, and a dynamometer is provided between at least one rope and the offshore rope tensioning device 100.

[0050] In this embodiment, the offshore rope is connected to the first pulley block 130 , and the offshore rope may be connected to the mounting base 133 of the first pulley block 130 , or indirectly connected to the first pulley block 130 by being connected to the float 160 .

[0051] like Figure 3 As shown, the first pulley block 130 floats together with the float 160 in front of the bow of the workboat 110. Three positioning anchors are distributed in a triangular shape in front of the bow and on both sides of the workboat 110. The three sea ropes to be tensioned are respectively defined as the first sea rope 171, the second sea rope 172 and the third sea rope 173. The three positioning anchors corresponding to the three sea ropes are respectively defined as the first positioning anchor 181, the second positioning anchor 182 and the third positioning anchor 183.

[0052] Among them, a first sea rope 171 is arranged between the first rope connection part 112 and the corresponding first positioning anchor 181, a second sea rope 172 is arranged between the second sea rope 172 connection part and the corresponding second positioning anchor 182, and a third sea rope 173 is arranged between the third positioning anchor 183 in front of the bow of the workboat 110 and the float 160. In this way, the sea rope tensioning device 100 of the present application is connected to each of the three positioning anchors through a sea rope to be tensioned.

[0053] Further, a dynamometer is provided at one end of the third sea rope 173 in front of the bow of the work boat 110, and the dynamometer is specifically arranged between the third sea rope 173 and the float 160. Of course, the dynamometer can also be arranged between the third sea rope 173 and the third positioning anchor 183. In addition, the dynamometer can also be arranged between the second sea rope 172 or the third sea rope 173 and the work boat 110, or between the second sea rope 172 and the second positioning anchor 182, or between the third sea rope 173 and the third positioning anchor 183. Of course, dynamometers can also be arranged between the three sea ropes and the work boat 110, respectively.

[0054] It can be understood that the structural strength of the buoy 160, the working boat 110, the first pulley block 130, the second pulley block 140, and the working rope 150 should be able to withstand sufficient tensioning force so as to complete the tensioning of the offshore rope.

[0055] S200, start the winch 120 to tighten the working rope 150 so that the tension borne by the three sea ropes reaches the required pre-tension.

[0056] The winch 120 is turned on and the working rope 150 is gradually tightened. The bearing force of the three sea ropes gradually increases and they gradually stretch. The distance between the float 160 and the winch 120 is getting closer and closer. Finally, the three sea ropes form a balanced force system. At this time, the working boat 110 is at the geometric center of the three positioning anchors, and the tension of the three sea ropes is almost equal. The reading of the above dynamometer can be considered as the tension borne by any rope.

[0057] It can be seen from the above process that, by using the offshore rope tensioning device 100 of the present application, multiple ropes can be pre-tensioned at the same time; and pre-tensioning three ropes at the same time can form a balanced force system, thereby providing a stable pre-tensioning force.

[0058] In addition, the present application sets a first pulley block 130 and a second pulley block 140, which can reduce the tension required by the winch 120 when the same pre-tension is achieved. Specifically, assuming that the required pre-tension is G, the tension of the winch 120 is F, F=G / n, and n is the number of ropes wound on the pulley block. On the other hand, when the power of the winch 120 is the same, compared with the prior art, the solution of the present application can provide a greater pre-tension to the marine rope to be tensioned. In this way, the solution of the present application can avoid the use of a large winch 120, that is, provide a larger tensioning load.

[0059] In summary, the offshore rope tensioning device 100 and the offshore rope tensioning method of the present application can generate a large and stable tensioning load, meet the fiber rope pre-tensioning requirements, and can tension multiple ropes at the same time to improve efficiency.

[0060] Optionally, step S100, one end of the three sea ropes to be tensioned are respectively connected to the first pulley group 130, the first rope connecting part 112, and the second sea rope 172 connecting part, and the other ends are respectively connected to three positioning anchors, the three positioning anchors are distributed in a triangle, and a force gauge is provided between at least one rope and the sea rope tensioning device 100, including: completing the connection of the three sea ropes when the three sea ropes are in a relaxed state.

[0061] Specifically, before connecting the first sea rope 171, the second sea rope 172, and the third sea rope 173, the working rope 150 between the two pulley blocks is made longer, so that the first sea rope 171, the second sea rope 172, and the third sea rope 173 can be connected in a relaxed state, which is convenient for the connection operation. The winch 120 is turned on to gradually tighten the working rope 150. The three sea ropes are gradually tightened from a relaxed state and then stretched.

[0062] Optionally, the method further comprises: maintaining the tension on the three offshore ropes for a predetermined time after the tension reaches the required pre-tension.

[0063] The tension on the three offshore ropes reaches the required pre-tension and then is maintained for a period of time. The specific time can be determined based on the empirical time of the historical maximum load of the offshore ropes in the sea area, so that the working conditions during pre-tensioning are closer to the actual working conditions, thereby achieving a better pre-tensioning effect.

[0064] Optionally, the positioning anchor is part of the mooring positioning system of the offshore floating body. In this way, the present application can pre-tension the offshore rope directly at sea, and after pre-tensioning, it can be connected to the offshore floating body in time without further transportation. The offshore floating body is, for example, a floating wind turbine or a liquefied gas production ship.

[0065] refer to Figure 5 and Figure 6 In another embodiment of the offshore rope tensioning device 100 of the present application, the first pulley block 130 is placed on the deck 111 of the workboat 110, so that the first pulley block 130 can move relative to the workboat 110.

[0066] Optionally, a roller is provided at the bottom of the mounting base 133 of the first pulley block 130 , so that the first pulley block 130 as a whole can move smoothly relative to the work boat 110 .

[0067] Optionally, the mounting base 133 of the first pulley block 130 is relatively slidably matched with the deck 111 of the work boat 110. For example, the ground of the mounting base 133 of the first pulley block 130 is set to be relatively smooth, and the mounting base 133 of the first pulley block 130 is directly placed on the deck 111 of the work boat 110. For example, the mounting base 133 of the first pulley block 130 is guided and matched with the deck 111 of the work boat 110, one of which is provided with a guide rail, and the other of which is provided with a guide groove.

[0068] refer to Figure 7 and Figure 8 When the offshore rope tensioning method of the present application is applied to the offshore rope tensioning device 100 of another embodiment, the implementation steps are basically the same as those of the previous embodiment, except that: since the float 160 is not provided, the first offshore rope 171 can be directly connected to the mounting base 133 of the first pulley block 130. It can be understood that at this time, when the dynamometer is provided between the first offshore rope 171 and the upper rope tensioning device, the dynamometer can be specifically provided between the first offshore rope 171 and the first pulley block 130.

[0069] In addition, after the winch 120 is turned on, the first pulley block 130 does not float on the sea surface, but moves on the deck 111 of the workboat 110. The bearing force of the three sea ropes gradually increases, and they gradually stretch. The first pulley block 130 is getting closer and closer to the winch 120. Finally, the three sea ropes form a balanced force system. At this time, the workboat 110 is at the geometric center of the three positioning anchors, and the tension of the three sea ropes is almost equal.

[0070] Finally, it should be noted that the various technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the various technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0071] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. A marine rope tensioning device, characterized in that: include: A working boat, wherein a first sea rope connecting portion and a second sea rope connecting portion are respectively provided on the left and right sides of the working boat; A winch, fixed to the deck of the workboat; a first pulley block, movably disposed relative to the workboat; A second pulley block is fixed to the deck of the work boat; A working rope is wound around the first pulley block and the second pulley block to form a pulley block system, and one end of the working rope is connected to the traction end of the winch.

2. The offshore rope tensioning device according to claim 1, characterized in that: The working vessel is a barge or a tugboat.

3. The offshore rope tensioning device according to claim 1, characterized in that: The offshore rope tensioning device further comprises a float, and the first pulley block is mounted on the float.

4. The offshore rope tensioning device according to claim 3, characterized in that: The float is connected with a dynamometer, and the dynamometer is used to connect the rope to be tensioned.

5. The offshore rope tensioning device according to claim 1, characterized in that: The arrangement direction of the first pulley block, the second pulley block and the winch is parallel to the length direction of the workboat.

6. The offshore rope tensioning device according to claim 1, characterized in that: The first pulley block is placed on the deck of the work boat.

7. A method for tensioning a rope at sea, characterized in that: Applied to the offshore rope tensioning device according to claim 1, the method comprises: One end of the three sea ropes to be tensioned is respectively connected to the first pulley block, the first sea rope connection part, and the second rope connection part, and the other end is respectively connected to three positioning anchors, the three positioning anchors are distributed in a triangle, and a dynamometer is provided between at least one rope and the sea rope tensioning device; Turn on the winch to tighten the working rope so that the tension on the three sea ropes reaches the required pre-tension.

8. The method according to claim 7, characterized in that One end of the three sea ropes to be tensioned is respectively connected to the first pulley block, the first sea rope connecting part, and the second rope connecting part, and the other end is respectively connected to three positioning anchors, the three positioning anchors are distributed in a triangle, and a dynamometer is provided between at least one rope and the sea rope tensioning device, including: completing the connection of the three sea ropes when the three sea ropes are in a relaxed state.

9. The method according to claim 7, characterized in that: The method further comprises: After the tension on the three sea ropes reaches the required pre-tension, it is maintained for a predetermined time.

10. The method according to claim 7, characterized in that The positioning anchor is a part of the mooring positioning system of the offshore floating body.

Citation Information

Cited By

  • Anchor chain pre-tensioning system and construction method

    CN121590695A

  • Anchoring chain pre-tensioning system and construction method

    CN121590695B